Rail Express

Gas guzzlers

THE gas turbine story, in terms of locomotive application, was started by the Swiss Federal Railway in a search for suitable motive power for routes with low traffic density where electrification could not be justified.

A prototype ordered in 1939 proved to be reliable in traffic and thus attracted interest from the Great Western Railway, which resulted in a visit to the manufacturer Brown Boveri by the GWR’s chief mechanical engineer, F W Hawksworth, in 1946.

This was aperiod when improved steam engine design was continuing, with new types of locomotive being produced by all of the ‘Big Four’ companies. But the proposal for a GWR ‘Pacific’ had not been progressed, which resulted in alternative options being considered to provide higher power.

The advantage offered by gas turbine technology was a consistent output of at least 2500hp, which was more than could be offered by diesel power at the time. The LMS, for example, developed two diesel-electric prototypes in partnership with English Electric, Nos. 10000 and 10001, but accepted their individual rating of 1600hp was some way short of the power that could be produced by aCoronation Class ‘Pacific’ steam loco. The idea was the ‘twins’ would operate in multiple if the power output demanded this.

Like the LMS prototypes, the GWR opted for two locomotives but each with sufficient power output to operate independently on trains that needed greater haulage capability than steam traction could provide.

The decision was that the locomotives would be supplied by different manufacturers, one from Brown Boveri and the other from Metropolitan Vickers in Manchester. Both companies were expected to produce equipment that offered an output of 2500hp, and contracts were signed with the GWR in June 1946.

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express4 min read
EWS Business Train pack
00 GAUGE 4mm:1ft Mid-to late 2000s ERA SCOTRAIL modellers may be the ones that benefit the most from the latest train pack from Hornby. Labelled as the ‘EWS Business Train’, it contains one of Hornby’s super detailed Class 67s rather than the form
Rail Express11 min read
Why Batteries Could Be Included
THE issue of traction power for trains, both existing and new-build, is one that is set to dominate discussions for some time. In many cases, electric trains are the preferred choice, however this is not always possible. A lack of coherent electrific
Rail Express8 min read
West Coast Railways Suspends ‘Jacobite’ As CDL Row Rumbles On
WEST Coast Railways suspended its ‘Jacobite’ steam service from March 20 as it still had no exemption to operate Mk.1 coaches without central door locking (CDL). The Office of Rail and Road (ORR) had revoked WCR’s previous exemption to use stock with

Related Books & Audiobooks