Australian Model Railway Magazine

Columbia Models NOFF to Shunter’s Truck

The kitbash of the NOFF from ore wagon to shunter’s truck is reasonably straightforward. However, it does have a couple of assemblies that need to be built from brass wire, not to mention the removal of a couple of side panels.

Firstly you will need to choose which particular wagon you are going to model, as they all had the openings cut out of the sides in different positions (refer diagram and online photos). Furthermore, if modelling 70029, one side of the opening was not cut out against the vertical bracing, 2mm of the section to be removed needs to be retained towards the centre of the wagon in this case. Again, refer to photos and the drawings and take note of where the removed section is on each

You’re reading a preview, subscribe to read more.

More from Australian Model Railway Magazine

Australian Model Railway Magazine2 min read
Charles Agland 1945 - 2023
Sadly, we record the death of Charlie Agland, in November 2023 Charles ‘Charlie’ Agland was born on 11th of March 1945, and soon developed a strong interest in all things rail, inspired by his father’s work as Head Fitter at Cardiff locomotive worksh
Australian Model Railway Magazine7 min read
Super Series Locomotives: The SRA of NSW 81 class
There is very little that can be described as ubiquitous in the modern New South Wales (NSW) rail scene other than the State Rail Authority (SRA) 81 class. Its rugged design has been matched by its longevity. In the modern diesel era, New South Wales
Australian Model Railway Magazine4 min read
Time Invested
As I approach construction of what will probably be my last large layout, I’ve been putting some thought into the construction methods I would use on the structures. Over time, one of my favourite aspects of the hobby has been scratch building struct

Related Books & Audiobooks