picky eater
Sep 14, 2020
3 minutes
The higher the moisture content of the feed material, the slower the material moves and this will cause buildup and further slow production.
There are a number of factors needing consideration when setting the primary crusher feeder speed and loading of the feeder.
How much material can the rest of the crushing circuit handle? Could it cause spillage or an overload situation in the rest of the circuit?
Then there’s type and size of the feed material that is being loaded into the feeder hopper. Is the crusher sitting on level ground? Are there a lot of fines? Are
You’re reading a preview, subscribe to read more.
Start your free 30 days