Doc.No.

:WD/LAB/FM/10

WADI CEMENT WORKS


WORKS TEST CERTIFICATE

DATE : 03.02.2010
Name & Address of the Consignee : VARIOUS PARTIES INCLUDING ACC DUMPS DESPATCH PARTICULARS :QTY. DESPATCHED :

WEEK NO:04 (22.01.10 to 28.01.10)


Results Requirements as per IS:1489 (Part-I)-1991

CHEMICAL COMPOSITION : % Soluble Silica % Alumina % Iron Oxide % Lime % Magnesia % Insoluble Residue % Sulphur Calculated as SO3 % Loss On Ignition % Chloride

1.1 27.0 2.3

-------

Not more than 6.0% [X+4.0(100-X)/100] Max. X is % Pozzolana in PPC Not more than 3.0 %

2.0 0.022

---

Not more than 5.0 %

2 3

FINENESS : Specific Surface (m2/kg) COMPRESSIVE STRENGTH (MPa) : at 3-Days 7-Days (W.No:03) 28-Days (W.No:52) a) SETTING TIME (minutes) : Initial Final SOUNDNESS : Le-Chatelier Expn. (mm) Autoclave Expn. (%) Drying shrinkage (%) (W no-51) a) Normal Consistency (%) b) Temp.during Testing (deg.C) c) % POZZOLANA MATERIAL USED

396 30.0 40.0 57.0 215 315

Not less than 300 Not less than 16 Not less than 22 Not less than 33 Not less than 30 Not more than 600

0.5 0.005 0.004 30.5 27+/-2 28.0

Not more than 10 mm Not more than 0.8 % Not more than 0.15 %

Not less than 15% and not more than 35%

Mgr.Q.A.
Forwarded to : CMD -MUMBAI/PUNE/B'LORE/SEC/COIMBATORE/Solapur Dump/Lab