THE PLAN

336 west 20th street


03
A new blackened steel stair connects the upper and lower lobbies. Its very tough and industrial-looking, and its set in right up against a section of old foundation, an old foundation wall, so its a really beautiful contrast of the old and the new there, Mr. Denham said. The building is now ADA accessibility compliant, with wheelchair access ramps from the outside and an elevator from the ground floor both to the lower floor and into the theater itself. The main seating area has been expanded from 160 to 199 seats. In order to create more space and to improve the audiences experience, the slope of the seats has been adjusted. The overall seating bank slopes gradually from the back down to the front, Mr. Denham said. You can carefully work it so that people actually look between the heads of the people in the row ahead of them, he added.

A
01

fter two years of ambitious renovations, the Atlantic Theater Companys new season has just kicked off in a redone space. The company, which was founded in 1985 by playwright David Mamet and actor William H. Macy along with 30 of their acting students from New York University, first rented the former parish hall of St. Peters Church on West 20th Street about 20 years ago. With its current lease expiring in 2039, the company signed off on a project that included significant renovations and the creation of a basement floor. Jon Denham, a principal with Denham Wolf who oversaw the project, reviewed the floor plans with The Commercial Observer and explained how the company was able to double the square footage of the theater by building below. They loved the feel of the space, they loved the location, but it was just limited in terms of total space and in terms of basic functions and amenities, he said late last week. So from the get-go they had a very clear list of objectives that included improving the experience for the audience, better access and circulation, better lobbies, convenient restrooms.

05

04

Expanding the stage was another one of the difficult surgeries we did on the building, Mr. Denham said. The stage is just about 30 feet in depth and about 40 feet in width. We increased the depth of the stage, or the depth of the whole stage and house of the theater, by about eight feet by doing a pretty big structural move, he said. The backstage area was originally in a separate building. Now there are two levels backstage. Upstairs, the dressing rooms and bathrooms were refreshed, while the main level was turned into crossover space, a green room for the actors and a bigger office.
3/4" "VIROC" CEMENT BONDED PARTICLE BOARD OVER MTL FRAMING; REF. STRUCT.; INFILL MTL FRAMING W/ SOUND ATTENUATION BATT INSULATION

06

FINISHES KEY
CODE DESCRIPTION FLOOR:

Because the building is landmarked, the architects chose to maintain the original design of the 160-year-old building. Weve added some very subtle signage, all of which is part of our landmark preservation approvals, but in general we did very little to the exterior, Mr. Denham said. The essential changes were made inside. From the front to back, we excavated out to almost double the square footage of the theater, of the whole building.
KEY NOTE SCHEDULE:

02

Before the renovation, there was a lobby, but it was squeezed under the main floor and always packed between acts. Directly below the upstairs lobby, we built another whole lobby which, again, is a little bit more than double, so the new lobby space combined is a little more than double what there once was, Mr. Denham said. In the lobby area, the renovation maintained the old exposed brick and the arched wooden trusses that support the roof.

EX'G PARAPET BEYOND TO REMAIN

NEW SHINGLE ROOF: MAJESTIC SLATE TRADITIONAL TILES BY "ECOSTAR" OVER 6" MIN. RIGID INSULATION ON EX'G ROOF STRUCTURE

CONTROL BOOTH LOFT 203A

CONTROL BOOTH LOFT FIN. FLR. 20'-9"

CARPET OVER NEW CONC SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT. CONTROL BOOTH FIN. FLR. +12'-0" INFILL SPACE BETWEEN STL BEAMS W/ SOUND ATTENUATION BATT INSULATION

LADDER LOFT 202

CONTROL BOOTH 203

AMP ROOM 204

3-PANEL SLIDING CONTROL BOOTH WNDW IN ALUM FRAME

NEW STL CATWALK CARPET OVER NEW CONC SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT. CONTROL BOOTH FIN. FLR. +12'-0" STL SHIP'S LADDER
15R @ 9 1/2" EA. & 14T @ 9" EA.

LADDER LOFT 202

ATLANTIC THEATER FRESH AIR SUPPLY DUCT; REF. COMPANY: MECH. LINDA GROSS THEATER PROVIDE SOUND ATTENUATION BATT
INSULATION AT 20TH STREET 336 WEST ALL PARTITIONS NEW YORK, NY 10011 TOP SEATING RISER FIN. FLR. +3'-1 1/2" UPPER LOBBY FIN. Coburn Architecture, P.C.FLR. 0'-0"

EAST LIGHTLOCK 107 BOX OFFICE 106


5R @ 7 1/2" EA. & 4T @ 10 1/2" EA. W/ 1 1/4" NOSING

WEST LIGHTLOCK 105

104 A

SEATING RISER PLATFORM; REF. STRUCT.

TOP SEATING RISER FIN. FLR. +3'-1 1/2" UPPER LOBBY FIN. FLR. 0'-0"

45 MAIN STREET STUDIO 1210 BROOKLYN NY 11201 TEL 718 624 1700 FAX 718 624 3232

5R @ 7 1/2" EA. & 4T @ 10 1/2" EA. W/ 1 1/4" NOSING

EXIT CORRIDOR 104

LOFT STAI B

CONSULTANTS

EXPEDITOR

BASE:
THEATER CONSULTANT

NEW CONC WALL; REF. STRUCT.

CONCESSIONS B01A

PNL-1 WALL SURFACE: DECOUSTICS CUSTOM ACOUSTICAL PANELS FINISHED IN CARNEGIE XOREL FABRIC LOWER LOBBY B01

NEW CONC WALL; REF. STRUCT. UNDERPIN EX'G FOUNDATION WALL AS REQ'D; REF. STRUCT. LOWER LOBBY FIN. FLR. -12'-1"

CONCESSIONS B01A

WALL:

LEED CONSULTANT

UNDERPIN EX'G FOUNDATION WALL AS REQ'D; REF. STRUCT. LOWER LOBBY FIN. FLR. -12'-1"

02

ELEVATOR MACHINE B03

NEW CONC WALL; REF. STRUCT. UNDERPIN EX'G FOUNDATION WALL AS REQ'D; REF. STRUCT.

STRUCTURAL ENGINEER

CEILING:

CONCESSIONS MILLWORK
MEP ENGINEER

NEW CONC. SLAB; REF. STRUCT.

ELEVATOR PIT T.O. SLAB -16'-1", COOR'D W/ ELEV MFR. CARPET OVER NEW CONC SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT.

CARPET OVER NEW CONC SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT.
101 FINISHES 104 FINISHES EXIT CORRIDOR 104 107 FINISHES 108 FINISHES 108 FINISHES 109, 109A FINISHES STAIR E FINISHES 113, 109B FINISHES

SECTION THRU CONTROL BOOTH LOOKING SOUTH


SCALE 3/16" = 1'-0"

6 2
HVAC PLENUM SPACE UNDER SEATING RISER PLATFORM; REF. MECH.
NO. DATE REVISIONS

ATLANTIC THEATER COMPANY: LINDA GROSS THEATE


336 WEST 20TH STREET NEW YORK, NY 10011

7'-8"

36'-0"

30'-0" CLR.

15

22

17

35

30

38

3 TYP. A-603

7'-4"

7 1/4" 7 1/2" 7 3/4"

ENTRY 101

EAST LIGHTLOCK 107 LOFT STAIR B

33

STAIR E

LAV WC

SPECIFIED FLOOR FINISH OVER 1/4" PLYWOOD ON 3/4" MDF ON 3/4" VIROC CEMENT BONDED PARTICLE BOARD W/ HARDWOOD NOSING ON FRAMING, REF. STRUCT. HVAC PLENUM SPACE UNDER SEATING RISER PLATFORM; REF. MECH.

2'-5"

FIXED THEATER SEATING MOUNTED TO SEATING RISER PLATFORM W/ TOGGLE BLOT; COOR'D FINAL ASSEMBLY IN FIELD W/ ARCHITECT AND SEATING INSTALLATION CONTRACTOR, TYP.

HVAC PLENUM SPACE UNDER SEATING RISER PLATFORM; REF. MECH.

2'-1"

22
5R @ 7 1/2" EA. & 4T @ 10 1/2" EA. W/ 1 1/4" NOSING

3'-4"

HC BATH 113
SHOWER UTILITY SINK

T.O. SEATING RISER PLATFORM + 3-1 1/2"

Coburn Architecture, P.C.

ATLANTIC THEATER COMPANY: 45 MAIN STR LINDA GROSS THEA STUDIO 1210

TEL 718 624 336 WEST 20TH STREET FAX 718 624 NEW YORK, NY 10011 EXPEDITOR J CALLAHAN CONSULTING 299 BROADWAY, SUITE 1420, NEW YORK, NY 10007 (T) 212.766.2115x11 (F) 212.766.2787

BROOKLYN N

4'-0" CLR.

A
EQ' 5'-5"

5 3/4" 6" 6 1/4"6 1/2" 6 3/4"

HALL 109B

4'-5" VIF

37

5'-11"

4'-7"

4'-0"

23
12'-3"

20

4'-0"

STAIR A

THEATER 108

C L

8'-0"

UPPER LOBBY 102

32

BOX OFFICE 106

T.O SLAB 0'-0"

EX'G BACKSTAGE 109

OFFICE 111SEATING

34 21
2" COOR'D W/ ELEV. 102 FINISHES

3 C

RISER PLATFORM DETAIL


SCALE 3" = 1'-0"

04
ISSUED TO

MAINTAIN 2-HR FIRE RATING @ STRUCTURAL SLAB TRANSITION

SEATING RISER PLATFORM SECTION


SCALE 1/2" = 1'-0"

5 3/4" 6" 6 1/4"6 1/2" 6 3/4"

STORAGE 109A

7"

5'-3"

28

29

8
MOP SINK

7 1/4" 7 1/2" 7 3/4"

39

05

3 TYP. A-603
SPECIFIED FLOOR FINISH OVER 1/4" PLYWOOD ON 3/4" MDF ON 3/4" VIROC CEMENT BONDED PARTICLE BOARD W/ HARDWOOD NOSING ON FRAMING, REF. STRUCT.

FIXED THEATER SEATING MOUNTED TO SEATING RISER PLATFORM W/ TOGGLE BLOT; COOR'D FINAL ASSEMBLY IN FIELD W/ ARCHITECT AND SEATING INSTALLATION CONTRACTOR, TYP.

HVAC PLENUM SPACE UNDER SEATING RISER PLATFORM; REF. MECH.

7"

112 FINISHES

T.O SLAB 0'-0"

T.O. SEATING RISER PLATFORM + 3-1 1/2"

THEATER CONSULTANT FISHER DACHS ASSOCIATES 22 WEST 19TH ST, NEW YORK, NY 10011 (T) 212.691.3020 (F) 212.633.1644

Coburn Architecture, P.C.

45 MA STUDI BROOK TEL 7 FAX 7

34

HC DRESSING 112

MAINTAIN 2-HR FIRE RATING @ STRUCTURAL SLAB TRANSITION

T.O STAGE FIN. FLR. -1' 1 1/4" T.O. SLAB -2'-3"

T.O STAGE FIN. FLR. -1' 1 1/4" T.O. SLAB -2'-3"

LEED CONSULTANT KINETIX,EXPEDITOR LLC 70 BANK STREET, NEW YORK, NY 10014 J CALLAHAN CONSULTING (T) 212.366.9997 299 BROADWAY, SUITE 1420, NEW YORK, NY 10007 (T) 212.766.2115x11 (F) 212.766.2787 STRUCTURAL ENGINEER GRIGG & DAVIS ENGINEERS THEATER CONSULTANT 21 CROSSWAY,DACHS ASSOCIATES FISHER SCARSDALE, NY 10583 (T) 914.725.5095 19TH 914.725.5095 NY 10011 22 WEST (F) ST, NEW YORK, (T) 212.691.3020 (F) 212.633.1644 MEP ENGINEER ENGINEERING SOLUTIONS, PLLC LEED CONSULTANT 1140 BROADWAY, #204, NEW YORK, NY 10001 KINETIX, LLC (T) 212.840.1030 STREET, NEW YORK, NY 10014 70 BANK (F) 212.684.2886 (T) 212.366.9997 STRUCTURAL ENGINEER GRIGG & DAVIS ENGINEERS 21 CROSSWAY, SCARSDALE, NY 10583 (T) 914.725.5095 (F) 914.725.5095 MEP ENGINEER ENGINEERING SOLUTIONS, PLLC 1140 BROADWAY, #204, NEW YORK, NY 10001 (T) 212.840.1030 (F) 212.684.2886

24
6'-4" CLR

8'-0" CLR ELEVATOR 103

4'-7" WEST LIGHT LOCK 105

6'-1"

31
+7.75" +7.50" +7.25" +7.00" +6.75" +6.50" +6.25" +6.00" +5.75" +0"

33

GREEN ROOM 110

10'-10 1/2"

03

EQ'

22 E 13

5'-11"

C 39

110, 111 FINISHES

DW

5R @ 7 1/2" EA. & 4T @ 10 1/2" EA. W/ 1 1/4" NOSING

SINK

SEATING RISER PLATFORM DETAIL REF


SCALE 3" = 1'-0"

4'-6" VIF

NO.

DATE

SEATING RISER PLATFORM SECTION


SCALE 1/2" = 1'-0"

PROJECT NORTH

PROJECT

1'-0"

22

4'-2 1/2"

10 27
STAIR D STAIR C

STAIR C FINISHES

ATLANTIC THEATER FRESH AIR SUPPLY DUCT; REF. MECH. 3/4" "VIROC" CEMENT BONDED PARTICLE BOARD OVER MTL FRAMING; REF. STRUCT.; INFILL MTL COMPANY: FRAMING W/ SOUND ATTENUATION BATT LINDA GROSS THEATER INSULATION
336 WEST 20TH STREET NEW YORK, NY 10011
SHEET TITLE

NEW EPDM ROOFING OVER 6" MIN. RIGID INSULATION ON MTL. ROOF DECK OVER 3/4" T&G WOOD PLANKS TO REPLICATE EX'G ON STL. BEAMS; REF. STRUCT. NEW SHINGLE ROOF: MAJESTIC SLATE TRADITIONAL TILES BY "ECOSTAR" OVER 6" MIN. RIGID INSULATION ON EX'G ROOF STRUCTURE STRIP & PAINT EX'G EXPOSED WOOD ROOF STRUCTURE EX'G MASONRY PARAPET WALL

NEW MECHANICAL EQUIPMENT ON STL DUNNAGE EX'G CHIMNEY

NEW EPDM ROOFING OVER 6" MIN. RIGID INSULATION ON MTL. ROOF DECK OVER 3/4" T&G WOOD PLANKS TO REPLICATE EX'G ON STL. BEAMS; REF. STRUCT. 3/4" "VIROC" CEMENT BONDED PARTICLE BOARD OVER MTL FRAMING; REF. STRUCT.; INFILL MTL FRAMING W/ SOUND ATTENUATION BATT INSULATION NEW SHINGLE ROOF: MAJESTIC SLATE TRADITIONAL TILES BY "ECOSTAR" OVER 6" MIN. RIGID INSULATION ON EX'G ROOF STRUCTURE STRIP & PAINT EX'G EXPOSED WOOD ROOF STRUCTURE EX'G MASONRY PARAPET WALL

18 TYP. 25

16

14 36

11 22 12
STAIR D FINISHES
201 A

19 33

CONTROL BOOTH LOFT FIN. FLR. +20'-9" NEW STL CATWALK NEW DR IN EX'G ENLARGED OPNG

CONSTRUCTION PLAN: MAIN LEVEL

FRESH AIR SUPPLY DUCT; REF. MECH.

NEW EPDM ROOFING OVER NEW 3/4" CDX PLYWOOD SHEATHING ON EX'G ROOF STRUCTURE; INSULATE COCK-LOFT W/ BATT NEW MECHANICAL INSULATION EQUIPMENT ON STL DUNNAGE EX'G CHIMNEY NEW STL GIRDER TO SUPPORT EX'G MASONRY NEW EPDM ROOFING OVER PARAPET; REF. STRUCT. NEW 3/4" CDX PLYWOOD SHEATHING ON EX'G ROOF STRUCTURE; INSULATE COCK-LOFT W/ BATT INSULATION REFINISH EX'G WOOD FLOORING NEW STL GIRDER TO SUPPORT EX'G MASONRY PARAPET; REF. STRUCT.
1 06.15.10 CONTRACTOR - FOR CONSTRUCTION

203 A
SEAL AND SIGNATURE DATE CONTROL

106 FINISHES

105 FINISHES

EX'G DRESSING ROOM FIN. FLR. +12'-10CONTROL BOOTH LOFT FIN. FLR. 1/2" VIF +20'-9" CONTROL BOOTH FIN. FLR. + 12'-0" NEW STL CATWALK

BOOTH

203 PROJECT NUMBER


DRAWN BY

CARPET 06.15.10 OVER NEW CONC SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT.

EX'G DRESSING ROOM 206

0332 SPACE BETWEEN STL BEAMS W/ INFILL


SOUND ATTENUATION BATT INSULATION

26

MAIN LEVEL: CONSTRUCTION PLAN


SCALE 3/16" = 1'-0"

NEW DR L4 LIGHT FIXTURE IN EX'G INSTALLEDENLARGED OPNG IN COVE

BH,FRESH AIR SUPPLY DUCT; REF. MECH. YI


201 A
REVIEWED BY SHEET NUMBER

TOP SEATING RISER FIN. FLR. +3'-1 1/2" VIF EX'G DRESSING ROOM FIN. FLR. +12'-10 1/2" VIF EX'G BACKSTAGE FIN. FLR. FLR. CONTROL BOOTH FIN. +0'-3" VIF 12'-0" +
20R @ 7 1/4" EA. & 19T @ 10" EA. W/ 1" NOSING

203 A

JSF PROVIDE SOUND ATTENUATION BATT


INSULATION AT ALL PARTITIONS CARPET OVER NEW CONC SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT. INFILL SPACE BETWEEN STL BEAMS W/ SOUND ATTENUATION BATT INSULATION FRESH AIR SUPPLY DUCT; REF. MECH. PROVIDE SOUND ATTENUATION BATT INSULATION AT ALL PARTITIONS

2 A-603

EX'G BRICK SURFACE TO REMAIN EXPOSED @ THEATER (108); CLEAN & REPOINT AS NECESSARY

102 A UPPER LOBBY 102


CAD FILE

CONTROL BOOTH 203

EX'G DRESSING ROOM 206 EX'G BACKSTAGE 109

A-201.00
BOX OFFICE 0332 - CD - A0-A5.VWX 106
PAGE

12 OF 97

UPPER LOBBY FIN. FLR. L4 0'-0" LIGHT FIXTURE INSTALLED IN COVE STAGE FIN. FLR. -1'-11 1/4" TOP SEATING RISER FIN. FLR. +3'-1 EX'G CONC SLAB 1/2" VIF EX'G BACKSTAGE FIN. FLR. 4" CONC TOPPING SLAB TO VIF +0'-3" MATCH EX'G ADJACENT CONC OVER WATERPROOFING OVER UPPER LOBBY FIN. FLR. 4" STRUCTURAL SLAB; REF. 0'-0" STRUCT. STAGE FIN. FLR. -1'-11 1/4" LOWER LOBBY FIN FLR -12'-1" EX'G CONC SLAB 4" CONC TOPPING SLAB TO MATCH EX'G ADJACENT CONC OVER WATERPROOFING OVER NEW CONC. FOUNDATION 4" STRUCTURAL SLAB; REF. WALL @ MECHANICAL STRUCT. VAULT (B00); REF. STRUCT. LOWER LOBBY FIN FLR -12'-1"

Coburn Architecture, P.C.

2 A-603

THEATER 108

EX'G BRICK SURFACE TO REMAIN EXPOSED @ THEATER (108); CLEAN & REPOINT AS NECESSARY

02
EX'G OFFICE 110 EX'G OFFICE 110

RADIATOR/HVAC SUPPLY COVERS: PTD. PERFORATED REFINISH EX'G WOOD ALUM PANEL W/ PTD. FLOORING WOOD FRAME W/ PTD. WOOD TOP; TYP. BOTH SIDES OF THEATER (108) NEW CARPET OVER EX'G SUBFLOOR; PATCH SUBFLOOR AS REQ'D NEW GWB CEILING @ EX'G MECHANICAL (B12) & RADIATOR/HVAC SUPPLY RECYCLING (B13) PTD. PERFORATED COVERS: ALUM PANEL W/ PTD. WOOD FRAME W/ PTD. WOOD TOP; TYP. BOTH SIDES OF EX'G CONC. SLAB THEATER (108) NEW CARPET OVER EX'G SUBFLOOR; PATCH SUBFLOOR UNDERPIN EX'G AS REQ'D FOUNDATION WALL AS NEW GWB CEILING @ EX'G REQ'D; REF STRUCT. MECHANICAL (B12) & RECYCLING (B13)

PROJECT NORTH

102 A UPPER LOBBY 102


20R @ 7 1/4" EA. & 19T @ 10" EA. W/ 1" NOSING

1" SLOT HVAC DIFFUSER

BOX OFFICE 106

EX'G MECHANICAL EX'G B12 BACKSTAGE 109 B06 A LOCKERS B04 B08 A WORKROOM B09 THEATER 108 OFFICE B10

1 06.15.10 CONTRACTOR - FOR CONSTRUCTION ATLANTIC THEATER COMPANY: LINDA GROSS THEATE PROJECT NORTH

336 WEST 20TH STREET NEW YORK, NY 10011

MECHANICAL VAULT B00

LOWER LOBBY B01

BIKES/STORAGE B11

1" SLOT HVAC DIFFUSER

EX'G MECHANICAL B12 THEATER SEATING B06 ON A SEATING RISER PLATFORM METAL LOCKERS LOCKERS B04 B08 DRINKING FOUNTAINS A NEW CONC. SLAB; REF. STRUCT. SPEC'D STAGE FLOORING SYSTEM OVER NEW CONC. SLAB ON COMPOSITE MTL. DECK ON WORKROOM STL. BEAMS; REF. STRUCT. B09 INFILL SPACE BETWEEN STL. BEAMS W/ SOUND ATTENUATION BATT INSULATION OFFICE BIKES/STORAGE B10 B11

ATLANTIC THEATER BUILDING SECTION COMPANY: LINDA GROSS THEA


336 WEST 20TH STREET NEW YORK, NY 10011

EX'G CONC. SLAB

UNDERPIN EX'G FOUNDATION MECHANICAL WALL ASVAULT REQ'D; B00 REF. STRUCT.

CARPET OVER NEW CONC. SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT.

CONCESSIONS MILLWORK LOWER LOBBY B01

UNDERPIN EX'G FOUNDATION WALL AS REQ'D; REF STRUCT.

06 BUILDING SECTION

NEW CONC. FOUNDATION WALL @ MECHANICAL VAULT (B00); REF. STRUCT.

UNDERPIN EX'G FOUNDATION WALL AS REQ'D; REF. STRUCT.

CARPET OVER NEW CONC. SLAB ON COMPOSITE MTL DECK ON STL BEAMS; REF. STRUCT.

CONCESSIONS MILLWORK

THEATER SEATING ON SEATING RISER PLATFORM

METAL LOCKERS

DRINKING FOUNTAINS

NEW CONC. SLAB; REF. STRUCT.

SPEC'D STAGE FLOORING SYSTEM OVER NEW CONC. SLAB ON COMPOSITE MTL. DECK ON STL. BEAMS; REF. STRUCT.

INFILL SPACE BETWEEN STL. BEAMS W/ SOUND ATTENUATION BATT INSULATION

LONGITUDINAL SECTION LOOKING EAST


SCALE 3/16" = 1'-0"

A-603.
Coburn Architecture, P.C.

0332 - CD - A6.VWX

34|October 2, 2012|The Commercial Observer

01

LONGITUDINAL SECTION LOOKING EAST


SCALE 3/16" = 1'-0"

A-60
Coburn Architecture, P.C.

0332 - CD - A