REASONS OF ROAD FAILURE

A report of the subject Technical Writing and Communication Skills


Submitted to: Mohammad Irfan Kakar

Lecturer Department Of Civil Engineering

BUITEMS, PAKISTAN.

Submitted By

Shah Zaman..8515 Alamgir Khan8974 Arif Khan Kakar..8597 Muhammad Khan.8769 Kaleemullah.9497

Acknowledgment
First of all we all would like to Thank Mr. Irfan Kakar who has given a best opportunity to us to work on the given interesting topics regarded our profession. And I am thankful of my group member who help me to make a such interesting technical report.

Table contents Abstracts..1 Introduction1 Reason of Road failure..3 Fatigue failure..6 Bleeding14 Depression.22 Failure due to compaction.45 Failures due to camber45

References Abstract
In this report we have explained the reasons of road failures; especially we have failures due to fatigue, bleeding, cambers and improper compaction. If we didnt act upon safety codes then we may face this problem.

Introduction Roads are the basic needs of communications and it is most commonly used in our daily life for the travelling, transport and carriage. Due to its importance we should pay special attention to its each step while making a road. If we do not follow the codes and safety measures given according to specification then we may face many problems about road failures. Generally the road failures occur due to fatigue (alligator) cracking bleeding block cracking depression longitudinal cracking Patching Polished aggregate rutting slippage cracking stripping transverse (thermal) cracking .

Reasons:
1- Fatigue (Alligator) Cracking Description: Series of interconnected cracks caused by fatigue

failure of the HMA surface (or stabilized base) under repeated traffic loading. In thin pavements, cracking initiates at the bottom of the HMA (hot mix asphalt) layer. This is commonly referred to as "bottom-up" or "classical" fatigue cracking. The reasons of fatigue are Decrease in pavement load supporting characteristics Loss of base, sub base or subgrade support (e.g., poor drainage or spring thaw resulting in a less stiff base). Increase in loading (e.g., more or heavier loads than anticipated in design) Inadequate structural design Poor construction (e.g., inadequate compaction)

Bleeding
This can be caused by one or a combination of the following: Excessive asphalt binder in the HMA (either due to mix design or manufacturing) Excessive application of asphalt binder during BST (bituminous surface treatment) application (as in the above figures) Low HMA air voids content.

Block Cracking
Description: Interconnected cracks that divide the pavement up into rectangular pieces. Block cracking normally occurs over a large portion of pavement area but sometimes will occur only in non-traffic areas.

Depression
Description: Localized pavement surface areas with slightly lower elevations than the surrounding pavement. Depressions are very noticeable after a rain when they fill with water. Problem: Roughness, depressions filled with substantial water can cause vehicle hydroplaning Possible Causes: Frost heave or subgrade settlement resulting from inadequate compaction during construction.

Longitudinal Cracking
Description: Cracks parallel to the pavement's centerline or laydown direction. Usually a type of fatigue cracking. Problem: Allows moisture infiltration, roughness, indicates possible onset of alligator cracking and structural failure. Possible Causes: Poor joint construction or location. Joints are generally the least dense areas of a pavement. Therefore, they should be constructed outside of the wheelpath so that they are only infrequently loaded.

Patching
Description: An area of pavement that has been replaced with new material to repair the existing pavement. A patch is considered a defect no matter how well it performs. Problem: Roughness Possible Causes: Previous localized pavement deterioration that has been removed and patched

Slippage
Description: Crescent or half-moon shaped cracks generally having two ends pointed into the direction of traffic. Problem: Allows moisture infiltration, roughness

Possible Causes: Braking or turning wheels cause the pavement surface to slide and deform. The resulting sliding and deformation is caused by a low-strength surface mix or poor bonding between the surface HMA layer and the next underlying layer in the pavement structure.

Transverse (Thermal) Cracking


Description: Cracks perpendicular to the pavement's centerline or laydown direction. Usually a type of thermal cracking. Problem: Allows moisture infiltration, roughness Possible Causes: Several including: Shrinkage of the HMA surface due to low temperatures or asphalt binder hardening Reflective crack caused by cracks beneath the surface HMA layer top-down cracking

Failure due to compaction


Compaction is the process that bring about an increase in a soil density or unit weight a accompanied by decrease in air volume. If we not compact the soil of the road there will be air voids in soil and will case failure

Failure of a road due to camber


The camber is any curve on a surface, and in this case refers to upward curve from the edge. You may sometimes notice that the road isnt exactly flat. The reason for that is because most roads have a camber to them that helps water drain off of them rather than pooling up in the center of the road. If we not provide camber there will be no proper drainage of water and water will go inside of a road and failure will occur

God helps those who help them selves

The End