Vous êtes sur la page 1sur 5

ISSUE NO.

R1

SECTION C4 THE TATA POWER COMPANY LIMITED PART 2 BHIRA 100 MW AUGMENTATION SCHEME VOLUME V INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

SPEC NO.

DATA SHEET - B HYDRO TURBINE INLET SPHERICAL VALVE TCE.5270A-H-112-601 AND ACCESSORIES ENQUIRY /SPECIFICATION NO. SR.NO. 1.0 1.1 1.2 1.3 1.4 1.5 1.5.1 1.5.2 1.5.3 1.5.4 2.0 2.1 2.1.1 2.1.2 2.1.4 2.1.5 2.2 2.2.1 2.2.2 2.2.3 2.3 2.4 2.4.1 2.4.2 ITEM GENERAL Size No. of servocylinders provided Face to face dimension for spherical valve Design temperature Torque Torque required for opening Torque required for closing Lever arm length for counter weight Total weight of counter weight provided DESIGN DATA Pressure Max. Operating pressure Design pressure Maximum differential pressure Pressure drop across valve with maximum flow when valve is open Test pressure Valve body Valve rotor Seal test Operating torque required Flow Max. Flow Min. Flow m /sec m /sec SIGNATURE OF BIDDER DATE
3 3

SHEET 1 OF 4

BIDDER

mm Nos. mm
o

Nm Nm m N

mwc mwc mwc mwc

mwc mwc mwc mwc

NOTE TO BIDDER 1. ITEMS WHICH DEVIATE FROM THE SPECIFICATION SHOULD BE MARKED WITHIN ASTERISK (*) (DETAILS TO BE GIVEN IN SCHEDULE OF DEVIATIONS) 2. THIS DATA SHEET SHALL BE FILLED UP COMPLETELY AND A COPY SHALL BE ENCLOSED WITH EACH COPY OF THE BID.

FILE NAME : DB13911R1.DOC

TCE FORM 294 R1

ISSUE NO. R1

SECTION C4 THE TATA POWER COMPANY LIMITED PART 2 BHIRA 100 MW AUGMENTATION SCHEME VOLUME V INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

SPEC NO.

DATA SHEET - B HYDRO TURBINE INLET SPHERICAL VALVE TCE.5270A-H-112-601 AND ACCESSORIES ENQUIRY /SPECIFICATION NO. SR.NO. 2.4.3 2.5 2.6 2.7 2.7.1 2.7.2 2.7.3 2.7.4 2.7.5 2.7.6 2.8 2.9 2.10 2.11 3.0 3.1 3.2 4.0 4.1 4.2 5.0 5.1 5.2 ITEM Rated flow Length of stroke of service seal Length of stroke of maintenance seal Valve Operating time Maximum valve closing time Minimum valve closing time Maximum valve opening time Minimum valve opening time Opening time of service / maintenance seal Closing time of service / maintenance seal Leakage rate (for max. Head) in valve closed position Weight of valve with accessories Shipping dimension Name and weight of heaviest assembly to be lifted by EOT crane during maintenance. UPSTREAM PIPE ASSEMBLY: Diameter & Length Wall thickness of the pipe DOWNSTRAM PIPE ASSEMBLY Diameter & Length Wall thickness of the pipe DISMANTLING CUM EXPANSION JOINT : Diameter & Length Thickness of flange mm mm SIGNATURE OF BIDDER DATE mm mm mm mm sec sec sec sec sec sec lpm kgs m BIDDER m /sec mm mm
3

SHEET 2 OF 4

NOTE TO BIDDER 1. ITEMS WHICH DEVIATE FROM THE SPECIFICATION SHOULD BE MARKED WITHIN ASTERISK (*) (DETAILS TO BE GIVEN IN SCHEDULE OF DEVIATIONS) 2. THIS DATA SHEET SHALL BE FILLED UP COMPLETELY AND A COPY SHALL BE ENCLOSED WITH EACH COPY OF THE BID.

FILE NAME : DB13911R1.DOC

TCE FORM 294 R1

ISSUE NO. R1

SECTION C4 THE TATA POWER COMPANY LIMITED PART 2 BHIRA 100 MW AUGMENTATION SCHEME VOLUME V INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

SPEC NO.

DATA SHEET - B HYDRO TURBINE INLET SPHERICAL VALVE TCE.5270A-H-112-601 AND ACCESSORIES ENQUIRY /SPECIFICATION NO. SR.NO. 5.3 ITEM Wall thickness of the shell BIDDER mm

SHEET 3 OF 4

6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.8.1 6.8.2 6.8.3 6.8.4 6.8.5 6.9 6.10 6.11 7.0 7.1

MATERIALS OF CONSTRUCTION Valve body Rotor Service & maintenance seals Seal rings Trunnion/shaft Bush/bearing Lever Servocylinder Body Piston Connecting rod Connecting rod sleeve Piston rings Upstream pipe Downstream pipe Dismantling cum expansion joint BY-PASS VALVE Hydraulically operated (a) Make (b) Size

7.2

Manually Operated (a) Make SIGNATURE OF BIDDER DATE TCE FORM 294 R1

NOTE TO BIDDER 1. ITEMS WHICH DEVIATE FROM THE SPECIFICATION SHOULD BE MARKED WITHIN ASTERISK (*) (DETAILS TO BE GIVEN IN SCHEDULE OF DEVIATIONS) 2. THIS DATA SHEET SHALL BE FILLED UP COMPLETELY AND A COPY SHALL BE ENCLOSED WITH EACH COPY OF THE BID.

FILE NAME : DB13911R1.DOC

ISSUE NO. R1

SECTION C4 THE TATA POWER COMPANY LIMITED PART 2 BHIRA 100 MW AUGMENTATION SCHEME VOLUME V INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

SPEC NO.

DATA SHEET - B HYDRO TURBINE INLET SPHERICAL VALVE TCE.5270A-H-112-601 AND ACCESSORIES ENQUIRY /SPECIFICATION NO. SR.NO. (b) 8.0 9.0 10.0 ITEM Size mm mm Yes/No BIDDER

SHEET 4 OF 4

The maximum allowed axial movement of valve body on the base plate Distance of the nearest anchor from the centre line of valve Whether the complete instrumentation & control System included as per specification

NOTE TO BIDDER 1. ITEMS WHICH DEVIATE FROM THE SPECIFICATION SHOULD BE MARKED WITHIN ASTERISK (*) (DETAILS TO BE GIVEN IN SCHEDULE OF DEVIATIONS) 2. THIS DATA SHEET SHALL BE FILLED UP COMPLETELY AND A COPY SHALL BE ENCLOSED WITH EACH COPY OF THE BID.

SIGNATURE OF BIDDER DATE TCE FORM 294 R1

FILE NAME : DB13911R1.DOC

Vous aimerez peut-être aussi