Académique Documents
Professionnel Documents
Culture Documents
1 1.1 1.2 1.3 1.4 1.5 2 2.1 2.2 2.3 2.4 2.5 3 3.1 3.2 3.3 3.4 3.5 3.6
Over all palnt earthing TG building Boiler ESP FHS & AHS Others Lighting TG building Boiler ESP FHS & AHS Others Lightning TG Building Boiler ESP FHS & AHS Chimney Others
1 2 3 4
No do do do do
SEPL SEPL SEPL Viswakirthi SEPL SEPL SEPL SEPL SEPL SEPL
4 Cable trench drawings TG 5 Cable tray drawings for TG 6 PCC with base frame 7 Busduct MCC incoming cables with 8 glands & Lugs Shredder MCC with firefighting 9 system feeders Cables to Belt motors & 90kW motors, Earthing to Shredder 9.1 90kW motor 10 Cooling tower MCC 10.1 Cables to motors 10.2 LPBS for motors 11 Plant ACDB 12 MLDB with transformers
SEPL
yes
SEPL
yes
Cables for Bus PT, Line PT to Sync. Panel, Breakers to TG Panels, Instrumentation PRDS 13 cables, etc 14 D.G set Bus duct, Cablingetc 15 6x50kvar Capacitor bank
After Tender
Compressor shall be of Two Nos. So Incoming cable from PCC shall be 2 Nos and Earthing shall be provided for 2 Motors. Separate earth pits to be provided for Weigh bridge. Generator Neutral earth pit location to be changed.