BOP Package

S.No Particulars Design Status

1 1.1 1.2 1.3 1.4 1.5 2 2.1 2.2 2.3 2.4 2.5 3 3.1 3.2 3.3 3.4 3.5 3.6

Over all palnt earthing TG building Boiler ESP FHS & AHS Others Lighting TG building Boiler ESP FHS & AHS Others Lightning TG Building Boiler ESP FHS & AHS Chimney Others

SEPL SEPL SEPL Viswakirthi SEPL

yes yes yes yes yes

1 2 3 4

SEPL RKE RKE RKE RKE

No do do do do

SEPL SEPL SEPL Viswakirthi SEPL SEPL SEPL SEPL SEPL SEPL

yes yes NA NA yes NA No yes yes Yes

4 Cable trench drawings TG 5 Cable tray drawings for TG 6 PCC with base frame 7 Busduct MCC incoming cables with 8 glands & Lugs Shredder MCC with firefighting 9 system feeders Cables to Belt motors & 90kW motors, Earthing to Shredder 9.1 90kW motor 10 Cooling tower MCC 10.1 Cables to motors 10.2 LPBS for motors 11 Plant ACDB 12 MLDB with transformers

SEPL

yes

SEPL

yes

SEPL SEPL SEPL SEPL SEPL RKE

yes yes yes yes Yes do

Cables for Bus PT, Line PT to Sync. Panel, Breakers to TG Panels, Instrumentation PRDS 13 cables, etc 14 D.G set Bus duct, Cablingetc 15 6x50kvar Capacitor bank

SEPL SEPL SEPL

Yes Yes Yes

After Tender
Compressor shall be of Two Nos. So Incoming cable from PCC shall be 2 Nos and Earthing shall be provided for 2 Motors. Separate earth pits to be provided for Weigh bridge. Generator Neutral earth pit location to be changed.