CALCULO DE LA LECHADA

VOLUMENES
DI LINER^2
VI
19.430464
DH^2
V2
52.5625
DH^2-DE LINER^2
V3
27.5625
DI LINER ANT.^2-DE LINER ANT.^2
V4
18.890625
DI LINER ANT.^2-DE LINER ANT.^2
V5
18.890625
DI LINER ANT.^2
V6
43.890625

/1029,4
0.018875524
/1029,4
0.051061298
/1029,4
0.026775306
/1029,4
0.018351103
/1029,4
0.018351103
/1029,4
0.042637094
VT

*LONGITUD
0.809759963
*LONGITUD
0.102122596
*LONGITUD
115.1713012
*LONGITUD
7.340441034
*LONGITUD
1.835110258
*LONGITUD

CALCULO DEL VOLUMEN DESPLAZANTE


DI DP'S^2
/1029,4
*LONGITUD
VD1
18.292729 0.017770283
DI DC'S^2
/1029,4
*LONGITUD
VD2
19.430464 0.018875524
VDT
NSXS=
VT LECHADA/RENDIMIENTO
399.5980912
TOPE DE CADA FLUJO
TOPE DEL FLUJO=TOPE DEL FLUIDO ANT.-(BLS PRE-FLUJO/(CV1-CV2))
CV1=DI LINER^2/1029,4
CV1

0.042637094

CV2=DE DP'S^2/1029,4
CV2

0.024285992

TOPE DEL ESPACIADOR

15331.22079

TOPE PILDORA SALINA

13696.44159

TOPE LAV. QUIMICO 2

12061.66239

TOPE LAV. QUIMICO 1

9064.567185

TIEMPO DE OPERACIN O TIEMPO DE CEMENTACION


TIEMPO DE MEZCLADO=NSXS/CAPACIDAD DEL EQUIPO MEZCLADOR
TIEMPO DE MEZCLADO
23.50577007
TIEMPO DE BOMBEO=VT LECHADA/CAPACIDAD DE LA BOMBA

4.263709442
129.5224445

303.2676444
90.31938045
393.5870248

TIEMPO DE BOMBEO
Q=0,02575(2(LV^2-DV^2)*LC)*0,2642
Q

25.90448891

11.6333865

TIEMPO DE DEZPLASAMIENTO DELCEMENTO=VDT*42/Q*EPM*EFICIENCIA


TIEMPO DE DEZPLASAMIENTO DEL CEMENTO
28.51056819
TIEMPO DE CEMENTADO=T. MEZCLADO+T. BOMBEO+T. DESPLAZAMIENTO
TIEMPO DE CEMENTADO
77.92082717
EN HORAS
EN MINUTOS
1.298680453

EN SEGUNDOS
17.92082718 55.2496308

DP'S

VT=PIE^3
727.2685261

TOPE LAV.QUIMICO 1 9064,56718'


TOPE 11869'
BASE 11895'

TOPE LAV. QUIMICO 2 12061,6624'

TOPE PILDORA SALINA 13696,4416'

TOPE ESPACIADOR 15331,2208'

TOPE LINER 17066'

V6

V6
100

TOPE 17166'
BASE 17192'

V5

V5

V4

V4

DC'S
4829

V3

V3

4301,4 LONG. V3

1.1
42.9
V1

1.6
2'

5''
21895

V2
21897'

1898' TOPE REV. 13^3/8''

16''
2298'

4900'-2'=4898'
6796' TOPE REV. 9^5/8
13^3/8''
7196'
11966' TOPE DE CEMENTO LINER 5''

5100'-2'=5098'

9^5/8''
12294'

16966' TOPE DEL CEMENTO DEL LINER


100
5300'-2=5298'

7^5/8''
17592'

4305'

21851' TOPE CUELLO FLOTADOR


TOPE ZAPATA 21893,4

REGISTRO CALIPER 7^1/4''