ANALISA HARGA SATUAN

1.

:
:
:
:

NO

II.1 , III.1, IV.1, V.1, VI.1, VII.1


Galian Tanah biasa (per 1 M3)
Rp.
42.460,000
3.980,62 m3

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3

II

III

TENAGA
1 Pekerja
2 Mandor
3

OH
OH

0,700
0,020

52.000,00
60.000,00

36.400,00
1.200,00

1 Alat Bantu
2
3

LS

1,000

1.000,00

1.000,00

ALAT

SUB TOTAL

38.600,00
3.860,00
42.460,00
42.460,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

2.

:
:
:
:

II.2, III.2, IV.2, V.2, VI.2, VII.2


Timbrisan Tanah (1-3 m)
Rp.
13.200,000
3.781,17 m3
0,000

NO

URAIAN

BAHAN
1
2

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

3
II

III

TENAGA
1 Pekerja
2 Mandor
3

OH
OH

0,200
0,010

52.000,00
60.000,00

10.400,00
600,00

1 Alat Bantu
2
3

LS

1,000

1.000,00

1.000,00

ALAT

SUB TOTAL

12.000,00
1.200,00
13.200,00
13.200,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

:
:
:
:

NO

II.3, III.3, IV.3, V.3, VI.3, VII.3


Urugan Pasir (per 1 m3)
Rp.
253.352,000
1.095,00 m3

URAIAN

SATUAN

III

JUMLAH
Rp

M3

1,200

177.500,00

213.000,00

1 Pekerja
2 Mandor
3

OH
OH

0,300
0,012

52.000,00
60.000,00

15.600,00
720,00

1 Alat Bantu
2
3

LS

1,000

1.000,00

1.000,00

SUB TOTAL

230.320,00
23.032,00
253.352,00
253.352,00

TENAGA

ALAT

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

4.

HARGA
SATUAN
Rp

BAHAN
1 Pasir Urug
2
3

II

KUANTITAS

:
:

II.4, III.5, IV.5


Pasangan Batu Kosong (per 1 M3)

:
:

NO

Rp.

URAIAN

SATUAN

III

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Batu kali
2
3

II

267.096,500
17,48 m3

M3

1,190

138.500,00

164.815,00

1 Pekerja
2 Mandor
3

OH
OH

1,400
0,070

52.000,00
60.000,00

72.800,00
4.200,00

1 Alat Bantu
2
3

LS

1,000

1.000,00

1.000,00

TENAGA

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

242.815,00
24.281,50
267.096,50
267.096,50

ANALISA HARGA SATUAN

5.

:
:
:
:

NO

URAIAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

M3
Zak
M3

1,190
3,250
0,520

138.500,00
61.000,00
138.500,00

164.815,00
198.250,00
72.020,00

OH
OH
OH
OH

0,950
0,095
2,850
0,140

70.000,00
75.000,00
52.000,00
60.000,00

66.500,00
7.125,00
148.200,00
8.400,00

Unit/Hari
LS

0,165
1,000

75.000,00
1.000,00

12.375,00
1.000,00

TENAGA
1
2
3
4

III

SATUAN

BAHAN
1 Batu kali
2 Semen Pc 50 Kg
3 Pasir pasang

II

II.5, III.4, IV.4, VI.4, VII.4


Pasangan Batu Kali Campuran 1PC : 4PS (per 1 M3)
Rp.
746.553,500
92,06 M3

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1 Molen
2 Alat Bantu
3

SUB TOTAL

678.685,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

67.868,50
746.553,50
746.553,50

ANALISA HARGA SATUAN

6.

:
:
:
:

NO

II.6, VI.5, VII.5


Pasangan Batu Bata (1 Pc : 4 Ps)
Rp.
128.018,000
59,15 M2

URAIAN

SATUAN

JUMLAH
Rp

Buah
Zak
M3

75,000
0,190
0,040

950,00
61.000,00
138.500,00

71.250,00
11.590,00
5.540,00

OH
OH
OH
OH

0,100
0,010
0,350
0,018

70.000,00
75.000,00
52.000,00
60.000,00

7.000,00
750,00
18.200,00
1.050,00

LS

1,000

1.000,00

1.000,00

TENAGA
1
2
3
4

III

HARGA
SATUAN
Rp

BAHAN
1 Batu Bata
2 Semen Pc 50 Kg
3 Pasir pasang

II

KUANTITAS

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1 Alat Bantu
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

116.380,00
11.638,00
128.018,00
128.018,00

ANALISA HARGA SATUAN

7.

:
:
:
:

NO

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Semen Pc 50 Kg
2 Pasir pasang
3

II

II.7, III.6, IV.7, VI.8, VII.10


Plesteran 1 : 3 (Per 1 m2)
Rp.
55.533,500
1.040,67 M2

Zak
M3

0,190
0,020

61.000,00
138.500,00

11.590,00
2.770,00

OH
OH
OH

0,190
0,019
0,380

70.000,00
75.000,00
52.000,00

13.300,00
1.425,00
19.760,00

TENAGA
1 Tukang
2 Kepala Tukang
3 Pekerja

III

4 Mandor

OH

1 Alat Bantu
2
3

LS

0,019

60.000,00

1.140,00

500,00

500,00

ALAT
1,000

SUB TOTAL

50.485,00
5.048,50
55.533,50
55.533,50

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

8.

:
:
:
:

NO

II.9, III.8, IV.8, VI.6, VII.6


Cor Beton 1 Pc : 2 Ps : 3 Kr (per 1 M3)
Rp.
1.063.172,000
140,29 M3

URAIAN

SATUAN

JUMLAH
Rp

M3
Zak
M3

0,950
5,900
0,470

249.500,00
61.000,00
138.500,00

237.025,00
359.900,00
65.095,00

Tukang
Kepala Tukang
Pekerja
Mandor

OH
OH
OH
OH

0,400
0,040
4,500
0,225

70.000,00
75.000,00
52.000,00
60.000,00

28.000,00
3.000,00
234.000,00
13.500,00

1 Molen
2 Vibrator Concrete
3 Alat Bantu

Unit/Hari
Unit/Hari
LS

0,200
0,200
1,000

75.000,00
50.000,00
1.000,00

15.000,00
10.000,00
1.000,00

TENAGA
1
2
3
4

III

HARGA
SATUAN
Rp

BAHAN
1 Kerikil pecah
2 Semen Pc 50 Kg
3 Pasir pasang

II

KUANTITAS

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

966.520,00
96.652,00
1.063.172,00
1.063.172,00

ANALISA HARGA SATUAN

9.

:
:
:
:

NO

URAIAN

BAHAN

II.11, III.10, IV.10, VII.8


Bekisting Termasuk Pembongkaran (Per 1 m2)
Rp.
206.085,000
1.076,08 M2

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

1 Kayu bekisting
2 Paku
3
II

0,040
0,400

2.790.000,00
18.000,00

111.600,00
7.200,00

OH
OH
OH
OH

0,480
0,048
0,570
0,029

70.000,00
75.000,00
52.000,00
60.000,00

33.600,00
3.600,00
29.640,00
1.710,00

Bh
Bh

0,010
0,010

TENAGA
1
2
3
4

III

M3
Kg

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1 Palu
2 Gergaji
3

SUB TOTAL

187.350,00
18.735,00
206.085,00
206.085,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

10.

:
:
:
:

NO

II.10, III.9, IV.9, VII.7


Besi Beton (per 1 Kg)
Rp.
26.989,600
8.431,07 Kg

URAIAN

III

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Besi Beton
2 Kawat Bendrat
3

II

SATUAN

Kg
Kg

1,000
0,018

13.100,00
20.000,00

13.100,00
360,00

1 Tukang
2 Pekerja
3 Mandor
4

OH
OH
OH

0,078
0,078
0,026

70.000,00
52.000,00
60.000,00

5.460,00
4.056,00
1.560,00

1 Gunting Pemotong Baja


2 Kunci Pembengkok Tulangan
3

Bh
Bh

0,020
0,010

TENAGA

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

24.536,00
2.453,60
26.989,60
26.989,60

ANALISA HARGA SATUAN

11.

:
:
:
:

NO

II.8, III.7, IV.6, VI.7, VII.9


Acian ( Per M2)
Rp.
10.758,000
1.014,48 M2

URAIAN

SATUAN

III

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Semen putih
2
3

II

KUANTITAS

Zak

0,040

87.000,00

3.480,00

1 Pekerja
2 Mandor
3

OH
OH

0,100
0,010

52.000,00
60.000,00

5.200,00
600,00

1 Alat Bantu
2
3

LS

500,00

500,00

TENAGA

ALAT
1,000

SUB TOTAL

9.780,00
978,00
10.758,00
10.758,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

12.

:
:
:
:

NO

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Pasir pasang
2 Semen
3 Beton Roster

II

Beton Roster (per 1 M2)


Rp.
385.601,150
M2

M3
Zak
Buah

0,009
0,100
28,000

138.500,00
61.000,00
11.200,00

1.246,50
6.100,00
313.600,00

OH
OH
OH
OH

0,120
0,012
0,360
0,018

70.000,00
75.000,00
52.000,00
60.000,00

8.400,00
900,00
18.720,00
1.080,00

TENAGA
1
2
3
4

Tukang
Kepala Tukang
Pekerja
Mandor

III

ALAT
1 Alat bantu
2
3

LS

1,000

500,00

SUB TOTAL

500,00

350.546,50
35.054,65
385.601,15
385.601,15

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

13.

:
:
:
:

NO

II.15
Kosen Pintu per M3
Rp.
6.238.760,000
- M2

URAIAN

SATUAN

JUMLAH
Rp

M3
Kg

1,000
0,200

3.290.000,00
18.000,00

3.290.000,00
3.600,00

OH
OH
OH
OH

25,000
2,500
8,000
0,400

70.000,00
75.000,00
52.000,00
60.000,00

1.750.000,00
187.500,00
416.000,00
24.000,00

LS

1,000

500,00

500,00

TENAGA
1
2
3
4

III

HARGA
SATUAN
Rp

BAHAN
1 Kayu Kelas II
2 Paku
3

II

KUANTITAS

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1 Alat bantu
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

5.671.600,00
567.160,00
6.238.760,00
6.238.760,00

ANALISA HARGA SATUAN

14.

:
:
:
:

NO

URAIAN

BAHAN

II.18
Daun Pintu Panel Kayu Klas II per M2
Rp.
1.067.284,900
M2

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

1 Kayu Kelas II
2
3
II

0,076

3.290.000,00

248.724,00

OH
OH
OH
OH

7,560
0,756
2,457
0,123

70.000,00
75.000,00
52.000,00
60.000,00

529.200,00
56.700,00
127.764,00
7.371,00

LS

1,000

500,00

500,00

TENAGA
1
2
3
4

III

M3

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1 Alat Bantu
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

970.259,00
97.025,90
1.067.284,90
1.067.284,90

ANALISA HARGA SATUAN

15.

:
:
:
:

NO

URAIAN

III

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

Besi L 50.50.5 (rangka pintu panel)


Besi Plat tebal 3 mm
Kunci pintu grendel
Engsel besi
Kawat Las

Rp

M'
M2
Buah
Buah
Dos

11,780
2,760
1,000
3,000
0,500

80.000,00
310.000,00
220.000,00
100.000,00
110.000,00

942.400,00
855.600,00
220.000,00
300.000,00
55.000,00

1 Biaya pembuatan
2

LS

1,000

450.000,00

450.000,00

1 Sewa Mesin Las


2
3

LS

1,000

120.000,00

120.000,00

TENAGA

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

16.

JUMLAH

BAHAN

1
2
3
4
5

II

II.16
Daun Pintu Besi b = 1,2 m ; h = 2,3 m per M2
Rp.
3.237.300,000
5,00 Buah

II.17

2.943.000,00
294.300,00
3.237.300,00
3.237.300,00

:
:
:

NO

URAIAN

III

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN

1
2
3
4
5

II

Daun Pintu Besi b = 0,6 m ; h = 2,3 m per M2


Rp.
2.156.880,000
5,00 Buah

Besi L 50.50.5 (rangka pintu panel)


Besi Plat tebal 3 mm
Kunci pintu grendel
Engsel besi
Kawat Las

M'
M2
Buah
Buah
Dos

7,000
1,380
1,000
3,000
0,300

80.000,00
310.000,00
220.000,00
100.000,00
110.000,00

560.000,00
427.800,00
220.000,00
300.000,00
33.000,00

1 Biaya pembuatan
2

LS

1,000

300.000,00

300.000,00

1 Sewa Mesin Las


2
3

LS

1,000

120.000,00

120.000,00

TENAGA

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

1.960.800,00
196.080,00
2.156.880,00
2.156.880,00

ANALISA HARGA SATUAN

17.

:
:
:
:

NO

II.16, II.17
Kosen Pintu Besi
Rp.
1,00 M'

URAIAN

III

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Besi U 100.50.5 (konsen pintu besi)
2 Besi Beton 12 mm
3 Kawat Las

II

243.402,500

M'
Kg
Dos

1,000
0,250
0,100

155.000,00
13.100,00
110.000,00

155.000,00
3.275,00
11.000,00

1 Tukang las
2 Pekerja

OH
OH

0,333
0,167

70.000,00
52.000,00

23.333,33
8.666,67

1 Sewa Mesin Las


2

LS

0,167

120.000,00

20.000,00

TENAGA

ALAT

3
SUB TOTAL

221.275,00
22.127,50
243.402,50
243.402,50

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

Kosen pintu besi b = 1,2 m ; h = 2,3 m

panjang 6 m

= 6 x

243.402,50 =

1.460.415,00

Kosen pintu besi b = 0,6 m ; h = 2,3 m

panjang 5,4 m

= 5.40 x

243.402,50 =

1.314.373,50

ANALISA HARGA SATUAN


18.

:
:
:
:

NO

URAIAN

III

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3
4

II

II.21
Kayu untuk Rangka Atap per M3
Rp.
7.731.405,000
2,14 M3

Kayu Kelas II
Paku
Besi Klem
Mur baut

M3
Kg
Kg
Buah

1,100
1,000
50,300
100,000

3.290.000,00
18.000,00
13.500,00
7.600,00

3.619.000,00
18.000,00
679.050,00
760.000,00

1 Tukang
2 Pekerja
3 Mandor

OH
OH
OH

8,000
24,000
2,400

70.000,00
52.000,00
60.000,00

560.000,00
1.248.000,00
144.000,00

1 Alat Bantu
2
3

LS

1,000

500,00

500,00

TENAGA

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

7.028.550,00
702.855,00
7.731.405,00
7.731.405,00

ANALISA HARGA SATUAN

19.

:
:
:
:

NO

URAIAN

II.23
Penutup Atap Seng Gelombang per M2
Rp.
76.054,000
261,25 M2

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Seng Gelombang BJLS 30
2 Paku Seng
3

Lembar
Kg

0,750
0,130

60.000,00
18.000,00

45.000,00
2.340,00

II

TENAGA
1
2
3
4

III

Tukang
Kepala Tukang
Pekerja
Mandor

OH
OH
OH
OH

0,200
0,020
0,100
0,010

70.000,00
75.000,00
52.000,00
60.000,00

14.000,00
1.500,00
5.200,00
600,00

LS

1,000

500,00

500,00

ALAT
1 Alat Bantu
2
3

SUB TOTAL

69.140,00
6.914,00
76.054,00
76.054,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

20.

:
:
:
:

NO

II.22
Kayu Kelas II untuk Lisplank per M2
Rp.
125.840,000
49,63 M2

URAIAN

SATUAN

Tukang
Kepala Tukang
Pekerja
Mandor

Rp

M3
Kg

0,010
0,200

3.290.000,00
18.000,00

32.900,00
3.600,00

OH
OH
OH
OH

0,800
0,080
0,280
0,014

70.000,00
75.000,00
52.000,00
60.000,00

56.000,00
6.000,00
14.560,00
840,00

LS

1,000

500,00

500,00

ALAT
1 Alat Bantu
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

21.

JUMLAH

TENAGA
1
2
3
4

III

HARGA
SATUAN
Rp

BAHAN
1 Kayu Kelas II
2 Paku
3

II

KUANTITAS

:
:
:
:

V.4
Pemasangan dan Penyambungan Pipa (per 1 M')
Rp.
20.427,000
9.132,00 M'

114.400,00
11.440,00
125.840,00
125.840,00

NO

URAIAN

SATUAN

III

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Lem Pipa PVC
2
3

II

KUANTITAS

Kg

0,042

55.000,00

2.310,00

1 Pekerja
2 Tukang
3 Mandor

OH
OH
OH

0,240
0,024
0,010

52.000,00
70.000,00
60.000,00

12.480,00
1.680,00
600,00

1 Alat Bantu
2 Angkutan Lokal
3

LS
LS

1,000
1,000

500,00
1.000,00

500,00
1.000,00

TENAGA

ALAT

SUB TOTAL

18.570,00
1.857,00
20.427,00
20.427,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

22.

:
:
:
:

NO

V.4
Pengadaan Pipa PVC S-12,5 diameter 4" per M'
Rp.
79.200,000
9.132,00 M'

URAIAN

HARGA
SATUAN
Rp

JUMLAH
Rp

M'

1,000

64.500,00

64.500,00

6.000,00
1.000,00
500,00

6.000,00
1.000,00
500,00

TENAGA
1 Angkutan Surabaya - Bitung
2 Angkutan Bitung - Site
3 Lokal

III

KUANTITAS

BAHAN
1 Pipa PVC S-12,5 diameter 4"
2
3

II

SATUAN

OH
OH
OH

LS
LS
LS

ALAT
1
2
3
SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA

72.000,00
7.200,00
79.200,00

HARGA SATUAN PEKERJAAN

79.200,00

ANALISA HARGA SATUAN


#
:
:
:
:

NO

URAIAN

SATUAN

Pipa GIP diameter 2"


Pipa GIP diameter 3"
Stop Kran diameter 3"
Water Mur diameter 2"
Flange besi diameter 6"
Reducer diameter 3" x 2"
Kawat Las
Besi Skrip
Besi Beton 12 mm
Besi plat t = 5 mm

M'
M'
Buah
Buah
Buah
Buah
Dos
Ujung
Kg
M2

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

5,250
0,350
1,000
2,000
1,000
1,000
0,250
0,030
0,050
0,400

94.000,00
140.000,00
1.434.300,00
63.000,00
232.000,00
72.300,00
126.000,00
172.000,00
12.595,00
451.388,89

493.500,00
49.000,00
1.434.300,00
126.000,00
232.000,00
72.300,00
31.500,00
5.160,00
629,75
180.555,56

TENAGA
1 Tukang Las
2 Pekerja
3

III

TDK PAKAI

BAHAN
1
2
3
4
5
6
7
8
9

II

III.8
Pengadaan Triport Dudukan Sprinkler
Rp.
3.318.639,836
Buah

OH
OH

1,000
1,000

70.000,00
52.000,00

70.000,00
52.000,00

Unit/hari
Unit/hari
Unit/hari
Unit/hari

LS
LS
LS
LS

120.000,00
50.000,00
50.000,00
50.000,00

120.000,00
50.000,00
50.000,00
50.000,00

ALAT
1
2
3
4

Sewa Mesin Las


Alat Potong Pipa
Alat Snei Pipa
Mesin Bor Tangan

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

3.016.945,31
301.694,53
3.318.639,84
3.318.639,84

ANALISA HARGA SATUAN

23.

NO

BAHAN

:
:
:
:

V.4
Pengadaan dan Pemasangan Pipa PVC S-12,5 diameter 4" per M'
Rp.
99.627,000
9.132,00 M'

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

1 Pengadaan Pipa PVC S-12,5 diameter 4" per M'


2
3
II

1,000

72.000,00

72.000,00

M'

1,000

18.570,00

18.570,00

TENAGA
1 Pemasangan dan Penyambungan Pipa (per 1 M')
2
3

III

M'

ALAT
1
2
3
SUB TOTAL

90.570,00
9.057,00
99.627,00
99.627,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN
ANALISA HARGA SATUAN

24.

:
:
:
:

NO

URAIAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

Sewa mesin las 1 buah


Kawat las
Solar
Mur baut uk. 24
Baut uk. 24 panjang 20 cm
Semen
Pasir
Kerikil

Hari
Dos
Liter
Buah
Buah
Zak
M3
M3

4,000
1,000
20,000
8,000
8,000
2,000
0,500
0,500

120.000,00
110.000,00
4.500,00
8.000,00
12.500,00
61.000,00
138.500,00
249.500,00

480.000,00
110.000,00
90.000,00
64.000,00
100.000,00
122.000,00
69.250,00
124.750,00

Angkutan dari Gudang P2AT


Penanggung jawab
Mekanik 1 orang
Pembantu mekanik 1 orang
Tenaga Terlatih 1 orang

Buah
OH
OH
OH
OH

1,000
4,000
4,000
4,000
4,000

1.500.000,00
75.000,00
75.000,00
60.000,00
60.000,00

1.500.000,00
300.000,00
300.000,00
240.000,00
240.000,00

Unit/Hari
LS

4,000
1,000

100.000,00
2.500,00

400.000,00
2.500,00

TENAGA
1
2
3
4
5

III

SATUAN

BAHAN
1
2
3
4
5
6
7
8

II

I.4
Pemasangan Pompa dan Mesin Penggerak 1 Unit
Rp.
4.556.750,000
- Unit

ALAT
1 Tacle & Tripot
2 Alat Bantu

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

4.142.500,00
414.250,00
4.556.750,00
4.556.750,00

ANALISA HARGA SATUAN

25.

:
:
:
:

NO

URAIAN

III

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3
4
5

II

I.26, I.27, VII.11


Pengecetan Kayu / Besi per M2
Rp.
73.958,500
593,92 M2

Dumpul / Plamir
Cat Dasar
Cat Warna
Minyak Cat
Amplas

Kg
Kg
Kg
Kg
Lembar

0,040
0,260
0,220
0,570
0,125

12.500,00
22.500,00
45.000,00
15.000,00
3.000,00

500,00
5.850,00
9.900,00
8.550,00
375,00

1 Tukang
2 Mandor

OH
OH

0,398
0,220

70.000,00
60.000,00

27.860,00
13.200,00

1 Alat Bantu
2
3

LS

LS

1.000,00

1.000,00

TENAGA

ALAT

SUB TOTAL

67.235,00
6.723,50
73.958,50
73.958,50

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

26.

:
:
:
:

NO

URAIAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

Kg
Kg

0,080
0,270

12.500,00
17.500,00

1.000,00
4.725,00

OH
OH
OH
OH

0,200
0,020
0,170
0,010

70.000,00
75.000,00
52.000,00
60.000,00

14.000,00
1.500,00
8.840,00
600,00

TENAGA
1
2
3
4

III

SATUAN

BAHAN
1 Plamir
2 Cat Tembok
3

II

II.25, III.13, VII.12


Pengecatan Beton per M2
Rp.
34.831,500
1.283,90 M2

ALAT

Tukang
Kepala Tukang
Pekerja
Mandor

1 Alat Bantu
2

LS

LS

1.000,00

1.000,00

SUB TOTAL

31.665,00
3.166,50
34.831,50
34.831,50

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

27.

:
:
:
:

NO

V.7
Uji Kebocoran Jaringan Perpipaan
Rp.
753.500,00 /
5,00 Lokasi

URAIAN

SATUAN

HARGA
SATUAN
Rp

JUMLAH
Rp

Liter
Liter
Kg

48,000
5,000
0,000

4.500,00
25.000,00
15.000,00

216.000,00
125.000,00
-

OH
OH

2,000
2,000

70.000,00
52.000,00

140.000,00
104.000,00

Unit/hari

2,000

50.000,00

100.000,00

TENAGA
1 Operator
2 Pekerja
3
4

III

KUANTITAS

BAHAN
1 Solar
2 Olie Mesin
3 Grease (vet)

II

Lokasi

ALAT
1 Water Pressure Gauge
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

685.000,00
68.500,00
753.500,00
753.500,00

ANALISA HARGA SATUAN

28.

:
:
:
:

NO

V.8
Pengetesan Pengaliran Air pada Jaringan Pipa Terpasang
Rp.
1.460.800,00
5,00 Lokasi

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Solar
2 Olie Mesin
3 Grease (vet)

Liter
Liter
Kg

48,000
5,000
1,000

4.500,00
25.000,00
15.000,00

216.000,00
125.000,00
15.000,00

II

TENAGA
1
2
3
4

III

Penanggung Jawab
Mekanik
Operator
Pekerja

OH
OH
OH
OH

3,000
3,000
3,000
6,000

75.000,00
75.000,00
70.000,00
52.000,00

225.000,00
225.000,00
210.000,00
312.000,00

ALAT
1
2
3
SUB TOTAL

1.328.000,00
132.800,00
1.460.800,00
1.460.800,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

29.

:
:
:
:

NO

VI.9
Pengadaan dan Pemasangan Alva Valve 4"
Rp.
648.931,250
M'

URAIAN

SATUAN

III

HARGA
SATUAN
Rp

Rp

Buah

1,000

581.000,00

581.000,00

1 Pekerja
2 Tukang
3

OH
OH

0,125
0,00625

52.000,00
70.000,00

6.500,00
437,50

1 Alat Bantu
2 Angkutan Lokal
3

LS
LS

1.000,00
1.000,00

1.000,00
1.000,00

TENAGA

ALAT
1,000
1,000

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

30.

JUMLAH

BAHAN
1 Alva Valve 4"
2
3

II

KUANTITAS

:
:
:
:

VII.14
Pengadaan Big Gun Sprinkler dan Assesories
Rp.
31.240.000,00
5,00 Unit

589.937,50
58.993,75
648.931,25
648.931,25

NO

URAIAN

SATUAN

JUMLAH
Rp

M'

1,000

28.000.000,00

28.000.000,00

LS
LS

1,000
1,000

300.000,00
100.000,00

300.000,00
100.000,00

TENAGA
1 Angkutan Jakarta - Bitung
2 Angkutan Bitung - Site
3

III

HARGA
SATUAN
Rp

BAHAN
1 Big Gun Sprinkler

II

KUANTITAS

ALAT
1
2
3
SUB TOTAL

28.400.000,00
2.840.000,00
31.240.000,00
31.240.000,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

Cat: 1 M2 = x M3
x=
31.

:
:
:
:

NO

II.12
Bongkaran Beton Roster
Rp.
46.475,000 /

URAIAN

SATUAN

M3

Rp

KUANTITAS

6.971,25 /

HARGA
SATUAN
Rp

JUMLAH
Rp

TENAGA
1 Mandor
2
3 Pekerja
4

III

M2

BAHAN
1
2
3

II

0,150

OH

0,038

60.000,00

OH

0,750

52.000,00

LS

1,000

1.000,00

2.250,00
39.000,00
-

ALAT
1
2 Alat Bantu
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA

1.000,00

42.250,00
4.225,00
46.475,00

HARGA SATUAN PEKERJAAN

46.475,00

ANALISA HARGA SATUAN


x=
32.

:
:
:
:

NO

II.13
Bongkaran Dinding Batu Bata
Rp.
61.600,00 /

URAIAN

M3

SATUAN

Rp

KUANTITAS

9.240,00 /

HARGA
SATUAN
Rp

0,150

M2

JUMLAH
Rp

BAHAN
1
2
3

II

TENAGA
1 Mandor
2
3 Pekerja
4

III

OH

0,050

60.000,00

3.000,00

OH

1,000

52.000,00

52.000,00

LS

1,000

1.000,00

1.000,00

ALAT
1
2 Alat Bantu
3

SUB TOTAL

56.000,00
5.600,00
61.600,00
61.600,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

33.

:
:
:
:

NO

Bongkaran Beton B0 1 : 2 : 3
Rp.
77.660,00 /

URAIAN

SATUAN

M3

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3

II

TENAGA
1 Mandor
2
3 Pekerja

OH

0,120

60.000,00

7.200,00

OH

1,200

52.000,00

62.400,00

4
III

ALAT
1
2 Alat Bantu
3

LS

1,000

1.000,00

1.000,00

SUB TOTAL

70.600,00
7.060,00
77.660,00
77.660,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

34.

:
:
:
:

NO

Perbaikan Kosen Dan Pintu Kayu


Rp.
757.587,600
BH

URAIAN

SATUAN

JUMLAH
Rp

M3

0,076

3.290.000,00

248.724,00
-

OH
OH
OH
OH

1,814
0,181
5,443
0,272

70.000,00
75.000,00
52.000,00
60.000,00

127.008,00
13.608,00
283.046,40
16.329,60

TENAGA
1
2
3
4

III

HARGA
SATUAN
Rp

BAHAN
1 Kayu Kelas II
2
3

II

KUANTITAS

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

688.716,00
68.871,60
757.587,60
757.587,60

ANALISA HARGA SATUAN

35.

NO

:
:
:
:

URAIAN

II.14
Bongkaran Cor Beton
Rp.
M3

84.700,000 /

SATUAN

M3

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3

II

TENAGA
1
2
3
4

III

Tukang
Kepala Tukang
Pekerja
Mandor

OH
OH
OH
OH

1,400
0,070

52.000,00
60.000,00

72.800,00
4.200,00

ALAT
1
2
3

SUB TOTAL

77.000,00
7.700,00
84.700,00
84.700,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

36.

:
:
:
:

NO

VI.11
Pipa Besi + Penutup Untuk Pintu Air 4"
Rp.
138.604,950
BH

URAIAN

HARGA
SATUAN
Rp

JUMLAH
Rp

M
Bh

0,200
1,000

224.000,00
75.000,00

44.800,00
75.000,00
-

OH
OH
OH
OH

0,0750
0,0075
0,0050
0,0022

70.000,00
75.000,00
52.000,00
60.000,00

5.250,00
562,50
260,00
132,00

TENAGA
1
2
3
4

III

KUANTITAS

BAHAN
1 Pipa besi medium A diameter 4"
2 Penutup pintu air dan rantai pengaman
3

II

SATUAN

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

126.004,50
12.600,45
138.604,95
138.604,95

ANALISA HARGA SATUAN


#
37.

NO

:
:
:
:

VI.12
Plat Besi Penutup Outlet-box Termasuk Engsel dan Kunci Gembok
Rp.
636.281,250

URAIAN

SATUAN

JUMLAH
Rp

Bh

1,000

500.000,00

500.000,00

OH
OH
OH
OH

0,125
0,013
1,250
0,063

70.000,00
75.000,00
52.000,00
60.000,00

8.750,00
937,50
65.000,00
3.750,00

TENAGA
1
2
3
4

III

HARGA
SATUAN
Rp

BAHAN
1 Plat Besi Penutup Outlet-box termasuk
Engsel, Kunci Gembok dan Pengecatan

II

KUANTITAS

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1
2
3

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

578.437,50
57.843,75
636.281,25
636.281,25

ANALISA HARGA SATUAN

38.

:
:
:
:

NO

URAIAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

Dos
Ltr

0,200
2,000

110.000,00
4.500,00

22.000,00
9.000,00
-

OH
OH
OH
OH

1,000
0,100
2,000
0,200

70.000,00
75.000,00
52.000,00
60.000,00

70.000,00
7.500,00
104.000,00
12.000,00

TENAGA
1
2
3
4

III

SATUAN

BAHAN
1 Kawat las
2 Solar
3

II

II.29
Pemasangan Instalasi Pipa Dalam Rumah Pompa
Rp.
256.300,000 /
Lokasi
5,00 Lokasi

ALAT

Tukang
Kepala Tukang
Pekerja
Mandor

1 Mesin las
2 Alat bantu
3

Unit/hr
LS

0,063
1,000

120.000,00
1.000,00

SUB TOTAL

7.500,00
1.000,00

233.000,00
23.300,00
256.300,00
256.300,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

39.

:
:
:
:

NO

URAIAN

III

SATUAN

set

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3
4
5
6
7
8

II

VII.13
Pipa Dudukan Sprinkler dan Accessories
Rp.
896.885,000 /
152,00 Set

TENAGA
1
2
3
4

T/L Joint PVC 4"x3"


Pipa PVC S-12,5 3"
Flange PVC 3"
Packing karet 3"
Flange Besi 3"
Mur Baut
Pipa besi Medium A 3"
Dop Besi 3"

Tukang
Kepala Tukang
Pekerja
Mandor

Buah
M
Buah
Buah
Buah
Buah
M
Buah

1,000
0,500
1,000
1,000
1,000
6,000
2,000
1,000

120.000,00
54.000,00
67.000,00
25.000,00
67.000,00
7.600,00
175.000,00
57.000,00

120.000,00
27.000,00
67.000,00
25.000,00
67.000,00
45.600,00
350.000,00
57.000,00

OH
OH
OH
OH

0,500
0,083
0,250
0,025

70.000,00
75.000,00
52.000,00
60.000,00

35.000,00
6.250,00
13.000,00
1.500,00

LS

1,000

1.000,00

1.000,00
-

ALAT
1 Alat bantu
2
3

SUB TOTAL

815.350,00
81.535,00
896.885,00
896.885,00

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN


#
:
:
:
:

Selang Jaringan Triport Dudukan Sprinkler Dan Accessories


Rp.

- /
0,000

NO

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1
2
3
4
5
6
7
8
9
10

Stop Kran 3"


Neple besi diameter 3"
L Joint Besi diameter 3"
Soket Drat PVC 3"
Elbow PVC 90 PVC 3"
Reducer PVC diameter 3"x2"
Soket Drat PVC 2"
Water Mur 2"
Coupling Drat Besi 2"
SELANG JARINGAN DAN COUPLEL 2"
(1 x 20 Meter)
11 Sadel Pipa (Besi)
II

8,000

70.000,00
75.000,00
52.000,00
60.000,00

TENAGA
1
2
3
4

III

1,000
1,000
1,000
1,000
5,000
1,000
1,000
1,000
2,000
3,000

Tukang
Kepala Tukang
Pekerja
Mandor

OH
OH
OH
OH

ALAT
1
2

SUB TOTAL

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN

40.

:
:
:
:

NO

URAIAN

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

M'

1,000

6.000,00

6.000,00
-

OH
OH
OH
OH

0,000
0,000
0,042
0,004

70.000,00
75.000,00
52.000,00
60.000,00

2.166,67
250,00

LS

1,000

500,00

500,00
-

TENAGA
1
2
3
4

III

SATUAN

M'

BAHAN
1 Kawat Duri
2

II

III.11
Pengadaan dan Pemasangan Kawat duri
Rp.
9.808,333 /
1.500,00 M'

Tukang
Kepala Tukang
Pekerja
Mandor

ALAT
1 Alat bantu
2
3

SUB TOTAL

8.916,67
891,67
9.808,33
9.808,33

BIAYA UMUM DAN KEUNTUNGAN


JUMLAH HARGA
HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN


#
41.

:
:
:
:

NO

I.5
Perbaikan Mesin Penggerak dan Sistem Eletrik
Rp.
11.679.250,000
5,00 Unit

URAIAN

III

KUANTITAS

HARGA
SATUAN
Rp

JUMLAH
Rp

BAHAN
1 Mesin Penggerak
2 Sistem Eletrik
3

II

SATUAN

Unit
Unit

0,085
0,600

70.000.000,00
7.500.000,00

5.950.000,00
4.500.000,00

1 Mekanik
2 Penanggung Jawab
3

OH
OH

2,000
0,200

75.000,00
75.000,00

150.000,00
15.000,00

1 Alat bantu
2
3

LS

1,000

2.500,00

2.500,00
-

TENAGA

ALAT

SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN
JUMLAH HARGA
HARGA SATUAN PEKERJAAN

10.617.500,00
1.061.750,00
11.679.250,00
11.679.250,00