Vous êtes sur la page 1sur 43

TRANSFORM STAR SDN BHD

OVERVIEW ON STARADOME THE CAMOUFLAGE PANEL TECHNOLOGY

COMPANY PROFILE
TRANSFORM STAR

Name of Company Date of Incorporation Companys Reg. Number Correspondence Address

Telephone Number Fax Number E-Mail Address Equity Structure Share Holder

Factory area Full time Employee

: Transform Star Sdn. Bhd. : 8hb Febuari 2001 : 538675-V : No. 46, Jalan Bulan U5/5, Subang 2, Seksyen U5, 40150 Shah Alam, Selangor : 603 7859 1905 : 603 7847 5905 : transformstar@yahoo.com : Modal berbayar; RM 250,000.00 : 100% Bumiputera Chairman; Hj Ahmad Hasim, AMW Managing Director; Mohd. Raffie B. M. Mohd. Abdullah Executive Director; Faridah Bt. Ridzuan : 5,820 kps : 20 Orang Executive; 5 Orang (Manager-1, Engineer-2, Architec-2) Non-Executive; 15 Orang.

NATURE OF BUSINESS
TRANSFORM STAR

1. CREATE, DESIGN AND MANUFACTURE OF ISLAMIC ARCHITECTURE BUILDING MATERIALS FOR INTERIOR, EXTERIOR & GARDEN (HARDSCAPE) GLASSFIBER REINFORCED CONCRETE (GRC) GLASSFIBER REINFORCED GYPSUM (GRG) FIBER-GLASS REINFORCED PLASTICS (FRP) GLASSES, WOODEN, STEEL & MARBLE

2. CREATE, DESIGN AND MANUFACTURE OF AESTHETICAL TELOCOMMUNICATION TOWER WITH APPLICATION OF STARADOME MINARET CLOCK TOWER ROOF-TOP CONCEALMENT ADVERTISEMENT TOWER (PILON SIGNAGE) SCULPTURE TOWER LAMP POLE

LIST OF COMPLETED PROJECTS


TRANSFORM STAR
NO. DESCRIPTION CLIENTS DATE OF COMMENCEMENT & COMPLETION OCT 2005 ~ NOV 2005

MINARET 25M AT MASJID AL-MIZAN, KEMPAS, JOHOR BAHRU MANUFACTURE, SUPPLY & INSTALL PRECAST GLASSFIBRE REINFORCED CONCRETE (GRC) DECORATIVE CLADING & FIBREGLASS REINFORCED PLASTIC (FRP)

STEALTH SOLUTION SDN BHD TELCO: MAXIS

MINARET 25M AT SURAU AL-MUJHAJIRIN, SEGAMAT JOHOR MANUFACTURE, SUPPLY & INSTALL DECORATIVE FRP CLADDING

STEALTH SOLUTION SDN BHD TELCO: MAXIS STEALTH SOLUTION SDN BHD TELCO: MAXIS STEALTH SOLUTION SDN BHD TELCO: MAXIS

DEC 2005 ~ JAN 2006

MINARET 25M AT SURAU TAMAN PLENTONG, MASAI JOHOR MANUFACTURE, SUPPLY & INSTALL DECORATIVE FRP CLADDING

AUG 2006 ~ SEP 2006

MINARET 25M AT BANDAR PERMAS JAYA, JOHOR MANUFACTURE, SUPPLY & INSTALL DECORATIVE FRP CLADDING

AUG 2006 ~ SEP 2006

LIST OF COMPLETED PROJECTS


TRANSFORM STAR
NO. DESCRIPTION CLIENTS DATE OF COMMENCEMENT & COMPLETION NOV 2007 ~ JUN 2008

MINARET 30M AT SURAU IBNU SINA, BANDAR PUTERA KULAI, JOHOR MANUFACTURE, SUPPLY & INSTALL GRC DECORATIVE CLADING, GRC DECORATIVE GRILL, PILING WORKS, 6M HEIGHT BRICKS CABIN AND HOT-DIPPED GALVANIZED STEEL STRUCTURE (22.6M)

STEALTH SOLUTION SDN BHD TELCO: MAXIS

MINARET 25M AT MASJID TAMAN RIA, SG. PETANI, KEDAH MANUFACTURE, SUPPLY & INSTALL GRC DECORATIVE WALL CLADDING, FRP CLADDING AND CAMOUFLAGE PANEL (STARADOME)

SYRUZ FONESYS S/B TELCO: CELCOM

DEC 2007 ~ JAN 2008

3G - CME ROOM RENOVATION WORKS AT CHANCELARY BUILDING, USM, P. PINANG MANUFACTURE, SUPPLY & INSTALL STEEL WORKS, POWER SUPPLY, EARTHING SYSTEM AND M&E WORKS

CELCOM (MALAYSIA) BERHAD

MAR 2008 ~ MAY 2008

LIST OF COMPLETED PROJECTS


TRANSFORM STAR
NO. DESCRIPTION CLIENTS DATE OF COMMENCEMENT & COMPLETION MAY 2008 ~ JUN 2008

MINARET 25M AT SURAU TAMAN PANDAN MEWAH, AMPANG SELANGOR MANUFACTURE, SUPPLY & INSTALL DECORATIVE FRP CLADDING

STEALTH SOLUTION SDN BHD TELCO: MAXIS STEALTH SOLUTION SDN BHD TELCO: MAXIS STEALTH SOLUTION SDN BHD TELCO: MAXIS

PETRONAS BILLBOARD 30M AT JALAN TUN RAZAK, KUALA LUMPUR MANUFACTURE, SUPPLY & INSTALL 6M HEIGHT CAMOUFLAGE PANEL (STARADOME)

JUL 2008 ~ SEP 2008

10

PETRONAS BILLBOARD 30M AT GRAND HIGHWAY SAGA, KAJANG MANUFACTURE, SUPPLY & INSTALL 6M HEIGHT CAMOUFLAGE PANEL (STARADOME) C/W STEEL FRAME

AUG 2008 ~ MAR 2009

11

PETRONAS BILLBOARD 30M AT SEKSYEN 7, SHAH ALAM, SELANGOR MANUFACTURE, SUPPLY & INSTALL OF 6M HEIGHT CAMOUFLAGE PANEL (STARADOME) C/W STEEL FRAME

STEALTH SOLUTION SDN BHD TELCO: MAXIS

FEB 2009 ~ MAR 2009

LIST OF COMPLETED PROJECTS


TRANSFORM STAR
NO. DESCRIPTION CLIENTS DATE OF COMMENCEMENT & COMPLETION AUG 2009 ~ SEP 2009

12

3G MINOR C&S TAMAN NIRWANA & JALAN SIRAM, P. PINANG CME WORKS FOR CAMOUFLAGE ANTENNA & MICROWAVE DISC

CELCOM (MALAYSIA) BERHAD

13

DRIVE TEST FOR P1 ROOFTOP AT BDR BARU BANGI DESIGN, MANUFACTURE & INSTALL CAMOUFLAGE (STARADOME) ANTENNA AND MICROWAVE

NEXT HORIZON COMMUNICATION SDN BHD TELCO: P1 R&A TELECOM. SDN BHD TELCO: MAXIS

OCT 2009

14

ROOFTOP CONCEALMENT CITI BANK BDR TUN HUSSEIN ONN, CHERAS DESIGN, MANUFACTURE & DELIVERY STARADOME CONCEALMENT FOR MICROWAVE DISC

FEB 2010 ~ MAR 2010

15

ROOFTOP CONCEALMENT CITI BANK KUANTAN, PAHANG DESIGN, MANUFACTURE & DELIVERY STARADOME CONCEALMENT FOR MICROWAVE DISC

R&A TELECOM. SDN BHD TELCO: MAXIS

APR 2010 ~ MAY 2010

LIST OF COMPLETED PROJECTS


TRANSFORM STAR
NO. DESCRIPTION CLIENTS DATE OF COMMENCEMENT & COMPLETION MAY 2010

16

ROOFTOP CONCEALMENT CITI BANK BATU BERENDAM, MELAKA DESIGN, MANUFACTURE & DELIVERY STARADOME CONCEALMENT FOR MICROWAVE DISC

R&A TELECOM. SDN BHD TELCO: MAXIS

LIST OF CURRENT PROJECTS


TRANSFORM STAR
NO. DESCRIPTION CLIENTS DATE OF COMMENCEMENT & COMPLETION APR 2010 ~ MAY 2010

ROOFTOP CONCEALMENT MENARA MUTIARA BANGSAR, K.L DESIGN, MANUFACTURE & INSTALL CAMOUFLAGE PANEL (STARADOME) FOR ANTENNA AND MICROWAVE

MAXIS BROADBAND SDN BHD

MINARET 30M AT MASJID AL-MUTTAQIN, KULIM, KEDAH DESIGN, MANUFACTURE & INSTALL STEEL STRUCTURE, DECORATIVE FRP PANEL & CAMOUFLAGE PANEL (STARADOME)

STAGE ONE RESOURCES SDN BHD TELCO: P1

OCT 2009 ~ OCT 2010

LAMP POLE 30M FOR STATE OF KEDAH, 7 SITES DESIGN, MANUFACTURE & INSTALL STEEL STRUCTURE, STARADOME CONCEALMENT, FRP DOME & ERATHING SYSTEM

STAGE ONE RESOURCESS SDN BHD

APR 2010 ~ AUG 2010

COMPLETED PROJECT
TRANSFORM STAR

STARADOME

25M MINARET WITH INTERGRATED CABIN SURAU IBNU SINA, BDR BARU PULAI, JOHOR MAXIS

25M MINARET WITH INTERGRATED CABIN MASJID, TAMAN RIA JAYA, SG. PETANI, KEDAH CELCOM

COMPLETED PROJECT
TRANSFORM STAR

STARADOME

24M MINARET WITH INTERGRATED CABIN MASJID, KG. MANJOI, IPOH, PERAK CELCOM

30M PETRONAS PILON SIGNAGE JALAN TUN RAZAK (DEPAN IJN), K.L MAXIS

COMPLETED PROJECT (ROOFTOP)


BEFORE AFTER

TAMAN NIRWANA, BKT MERTAJAM, P. PENANG CELCOM

COMPLETED PROJECT (ROOFTOP)


BEFORE AFTER

JALAN SIRAM, SEBERANG PRAI, P. PENANG CELCOM

COMPLETED PROJECT (ROOFTOP)


BEFORE WIP AFTER INSTALLATION DONE

JALAN SULTAN ISMAIL, KUANTAN PAHANG MAXIS

STARADOME - ROOF TOP CONCEALMENT


TRANSFORM STAR

OTHERS AESTHETIC TELECOMMUNICATION TOWER WITH APPLICATION STARADOME STARADOME

TRANSFORM STAR

LAMP POLE

CLOCK TOWER ADVERTISEMENT TOWER

OTHERS AESTHETIC TELECOMMUNICATION TOWER WITH APPLICATION STARADOME

RADOME

BEFORE

AFTER

OTHERS AESTHETIC TELECOMMUNICATION TOWER WITH APPLICATION STARADOME

CADANGAN REKABENTUK PENUTUP BERTEKNOLOGI STARADOME UNTUK ANTENA & PIRING MIKROGELOMBANG SEDIA ADA DI NO.79, JLN 3/39 TMN MIHARJA, OFF JLN CHERAS, KUALA LUMPUR

CADANGAN REKABENTUK PENUTUP BERTEKNOLOGI STARADOME UNTUK ANTENA & PIRING MIKROGELOMBANG SEDIA ADA DI NO.79, JLN 3/39 TMN MIHARJA, OFF JLN CHERAS, KUALA LUMPUR

CADANGAN REKABENTUK PENUTUP BERTEKNOLOGI STARADOME UNTUK ANTENA & PIRING MIKROGELOMBANG SEDIA ADA DI JALAN SG. BESI KUALA LUMPUR

CADANGAN REKABENTUK PENUTUP BERTEKNOLOGI STARADOME UNTUK ANTENA & PIRING MIKROGELOMBANG SEDIA ADA DI JALAN SG. BESI KUALA LUMPUR

CADANGAN REKABENTUK MENARA 1 MALAYSIA DWI FINGSI DENGAN PENGGUNAAN STARADOME

30M 1 MALAYSIA TOWER + INTEGRATED CABIN + LED SCREEN/ADVERTISEMENT

STARADOME TECHNICAL SPECIFICATION


TRANSFORM STAR

BASIC CHARACTERISTIC
FIBER GLASS BASED MATERIAL WITH SPECIAL ADDITIVE DEVELOPED BY TSSB TO PERMIT THE RADIO FREQUENCY (RF) TO FLOW THROUGH
1. TENSILE STRENGTH 2. WIND LOAD 2. DENSITY 3. WARRANTY 4. RF SIGNAL LOSS HAD UNDERGONE VERY STRINGENT TESTING BY VARIOUS 3RD PARTIES a) BY UTM FOR GSM, 3G & WiMax (900MHz, 1700MHz, 7GHz, 13GHz, 18GHz) b) DRIVE TEST DONE FOR P1 AT SITE C0362, BDR BARU BANGI WITH COLABRATION OF NEXT HORIZON COM SDN BHD 5. MOULDED FLEXIBILITY 6. MATERIAL THICKNESS 7. PRODUCT NAME 370 MPa Min 180 KM/HR 2.0 Kgf/m 15 YEARS 0.1dB to 1.2dB loss

VERY HIGH 4mm STARADOME

STARADOME MAXIS TESTING REPORT


TRANSFORM STAR

STARADOME MAXIS TESTING REPORT


TRANSFORM STAR

STARADOME MAXIS TESTING REPORT


TRANSFORM STAR

STARADOME MAXIS TESTING REPORT


TRANSFORM STAR

STARADOME UTM, TESTING REPORT


TRANSFORM STAR

Testing for GSM & 3G

STARADOME UTM, TESTING REPORT


TRANSFORM STAR

Testing for GSM, 2G & 3G

STARADOME UTM, TESTING REPORT


TRANSFORM STAR

Testing for GSM, 2G & 3G

STARADOME UTM, TESTING REPORT


TRANSFORM STAR

Testing for GSM, 2G & 3G

STARADOME UTM, TESTING REPORT


TRANSFORM STAR

Testing for GSM, 2G & 3G

STARADOME UTM, TESTING REPORT


TRANSFORM STAR

Testing for GSM, 2G & 3G

STARADOME P1, DRIVE TEST REPORT


TRANSFORM STAR

STARADOME P1, DRIVE TEST REPORT


TRANSFORM STAR

STARADOME P1 DRIVE TEST REPORT


TRANSFORM STAR

STARADOME P1 DRIVE TEST REPORT


TRANSFORM STAR

STARADOME SIRIM, TEST REPORT


TRANSFORM STAR

STARADOME TECHNICAL SPEC Vs COMPETITORS


TRANSFORM STAR

PRODUCT NAME / ORIGION BANDWITH 900 MHz 1700 MHz 7 GHz 13 GHz 18 GHz 21 GHz

StealthSkin/ USA dB Loss 0.035 0.028 0.62 1.18 1.22 1.41

Peabody Fiberscreen / UK dB Loss 0.10 0.60 0.80 1.20 1.40 1.60

Concealfab / UK dB Loss 0.00 0.50 1.00 1.30 1.80 2.50

STARADOME / MALAYSIA dB Loss 0.10 0.48 0.80 1.00 1.20 1.20

STARADOME PRICE OUTLOOK Vs COMPETITORS


TRANSFORM STAR

PRODUCT NAME / ORIGION StealthSkin/ USA Peabody Fiberscreen / UK Concealfab / UK ANSCOM (LOCAL TRADER) / USA & CHINA STARADOME / MALAYSIA

VALUE/ M (RM) 1,100.00

1,250.00

1,250.00

1,100.00 & 760.00 550.00

ENDORSEMENT LETTER FROM MINISTRY OF INFORMATION, COMMUNICATION, AND CULTURE MALAYSIA


TRANSFORM STAR

ENDORSEMENT OF OUR AESTHETIC DESIGN BY DBKL


TRANSFORM STAR

Vous aimerez peut-être aussi