CATCHMENT AREA PIT MELAMUK

142 Ha.

Catchment area Melamuk pit = 142 Ha.

CATCHMENT HW & SOUTH

Water flow line Catchment area

CATCHMENT SIDE WALL, LOW WALL & NORTH DUMP

Water flow line Catchment area

PUMP CALCULATI0N
Daily Rainfall Depth Plan Assumed Running : Ground Water is assumed 10 ltr / sec Volume (m3) 1 Sump 1 28,200 RL 20 15.00 mm / day 20.00 Hours / Day 864 m3 / day Catchment (m2) 1,420,000 Inflow ( m 3 / day ) 21,300 Work Shop Pond Rl 43 Total Days 21,300 22,164 30,240 Cumm. Inflow ( m 3 / day ) 22,164 Static Pipeline Head Loss Friction Total Head Pump Flowrate

No

Pond

Alarm level (RL)

Outlet Highest Line

Head (m) ( meter ) (m / 100m) Head (m) 90 90 90 90 140 140 140 140 0.33 0.82 1.52 3.04 0.46 1.15 2.13 4.26

Type Number (ltr/s) (m3/hr) (m3/day) 90.46 MF 140 91.15 MF 340 92.13 MF 380 94.26 MF 420 0 0 3 0 60 100 140 280 216 360 504 1,008 30,240 -

CATCHMENT AREA = 142 HA Daily rain fall depth plan = 15 mm / DAY We have to pumping water inflow = 22164 m3/day. Currently in pit we only have 2 x MF 380, = 20160 m3 days, for safety factor = 1,36 at least we need 3 x MF 380 = 30240 m3/ day