Purpose

You are expected to master the following knowledge after this course:
Know how to make preparations for UMTS SDR commissioning Get familiar with data configuration of UMTS SDR Get familiar with UMTS SDR version management Know the standard workflow of commissioning Note: the interfaces may be different for different software versions.

2012/6/14

Internal Only

Contents
Introduction Preparations Power-on Check

Data Configuration and Version Management


Test after Commissioning

Internal Only

UMTS SDR commissioning procedure


Start Configure data offline

Preparations

No need to upgrade NodeB version

Need to upgrade NodeB version

Power on/off equipment

Online logon

Upgrade LMT version

Install LMT Configure all tables

End

Service verification

Iub interface integration

Internal Only

General cares in commissioning


1. 2.

3.

Anti-static protection: please wear anti-static wrist strap when checking equipment. Please follow the instructions described in engineering specifications to perform operations on modules. For redundant modules, please pack them with anti-static bags. The engineers participating UMTS SDR commissioning must get the following documents at least
ZXSDR ****** Installation Manual.pdf ZXSDR ****** O&M Manual.pdf ZXSDR ****** Commissioning and Configuration Manual.pdf ZXSDR ****** Hardware Manual.pdf ZXSDR ****** Technical Manual.pdf

****** represents SDR type, such as B8200+R8840, BS8800 and BS8900.

Internal Only

Contents
Introduction Preparations Power-on Check

Data Configuration and Version Management


Test after Commissioning

Internal Only

UMTS SDR commissioning preparation flow


Get information (sites for commissioning and contacts)
Get information about equipment configuration and networking Prepare spare parts, tools and technical documents required for commissioning Estimated time Contact the person in charge to decide when to start

Internal Only

Preparations for UMTS SDR Commissioning


Preparing tools Prepare software Prepare documents

Data configuration

Internal Only

UMTS SDR commissioning preparations - tools

PC configuration requirements:
CPU main frequency: PIII 800 or higher Memory > 256MB; Hard disk > 10GB; OS: Windows XP professional

Others Screwdriver, power socket and multi-meter

Internal Only

UMTS SDR commissioning preparations - software

LMT software match to the SDR version

SDR software package

Internal Only

UMTS SDR commissioning preparations - documents

Installation acceptance report (ensure the installation has been completed and passed the acceptance)

Unpacking acceptance report (ensure boards and all hardware equipment are available

Internal Only

UMTS SDR commissioning preparations - data

Node B configuration file, for example: SDR No-IP S101 B1001.xml

Internal Only

Contents
Introduction Preparations Power-on Check

Data Configuration and Version Management


Test after Commissioning

Internal Only

Checking connection of LMT


Checking cable connection

Checking connection of Iub interface Checking connection of racks

Power on/off equipment

Power-on procedure

Check the internal jumper switch of other boards Check the internal jumper switch of the SA
Checking boards

Checking input power supply

Start

End

Internal Only

UMTS SDR power-on check

Checking boards Checking input power supply


Checking cable connections Power-on the equipment

Internal Only

Power-on procedure checking boards


Check whether the SDR has been configured with the right quantity of boards as planned. Check whether boards have been inserted into the correct slots. Check the internal jumper DIP switch of the SA board

X5 jumper status [3, 2]


[open circuit, open circuit] [short circuit, short circuit] [open circuit, short circuit] [short circuit, open circuit]

Mode
Uplink short cable, downlink short cable Uplink long cable, downlink long cable Uplink short cable, downlink long cable Uplink long cable, downlink short cable

Internal Only

Power-on procedure checking boards


X5 jumper status [1, 0] [short circuit, short circuit] [short circuit, open circuit] [open circuit, short circuit] E1/T1 mode Reserved T1, 100 E1, 120

[open circuit, open circuit]


X6 jumper status [2, 1, 0] [open circuit, open circuit, open circuit] [open circuit, open circuit, short circuit] [open circuit, short circuit, open circuit] [open circuit, short circuit, short circuit] [short circuit, open circuit, open circuit]

E1, 75 (by default)


BBU Cabinet No. 0 1 2 3 4

[short circuit, open circuit, short circuit]


[short circuit, short circuit, open circuit] [short circuit, short circuit, short circuit]

5
6 7

Internal Only

Power-on procedure check input power supply

Check whether the polarities of the power supply are correctly connected. Check whether the input power range of the DC power cabinet is within the range of - 40VDC - -57VDC. If 220V-AC power supply is adopted, B8200 must be used together with the PSU. Check whether the singlephase voltage is within the range of 200V AC 240V AC, and whether the frequency is span is within the range of 47 Hz 53 Hz.

Power-on procedure check cable connection

Internal Only

If fibers are used for the Iub interface connection, check whether fibers are correctly connected from RNC and B8200 to the CC board. If E1 cables are used for the Iub interface connection, check whether the E1 cables between the DDF and B8200 are correctly connected. If FE cables are used for the Iub interface connection, check whether the FE cables between the Switch and B8200 are correctly connected. Check whether the fibers between the B8200 FS board and RRU are correctly connected Check whether the LMT port on the CC board is normal. Connect to the LMT port on the CC board and the PC debugging port with cables Check whether cables to dry contacts, the 232 serial port and the 485 serial port are correctly connected.

Power-on procedure power on/off BBU

Internal Only

Power-on steps
Check whether the equipment is grounded Plug out all of the boards of B8200 except the PM. Set the switch connecting B8200 in the DC power cabinet to ON position. Check whether the RUN LED on the PM board flashes at the frequency of 1Hz, and whether the ALM LED is OFF. Check whether the RUN LED on the FA board flashes at the frequency of 1Hz, and whether the ALM LED is OFF. After the PM is powered on normally and the fan runs normally, insert the CC, BPC, SA and FS boards to see whether they are powered on normally, and whether every LED is in normal status.

Power-off steps
Set the switch connecting B8200 in the DC power cabinet to OFF position.

Power-on procedure power-on/off RSU

Internal Only

Power-on steps
Check whether the equipment is grounded After confirming the power cables are correctly connected, set the switch connecting R8840 in the DC power cabinet to ON position. Observe whether the LED status is normal. If there is an indoor lightning protection box, set the switch connecting R8840 in the indoor lightning protection box to ON position. Observe whether the LED status is normal. If there is a power distribution box providing multiple DC-outputs, set the switch connecting R8840 in that lightning protection box to ON position. Observe whether the LED status is normal.

Power-off steps
If there is an indoor lightning protection box, then set the corresponding switch in the indoor lightning protection box to OFF position. If there is no indoor lightning protection box, then set the corresponding switch in the DC power cabinet to OFF position.

Power-on procedure power-on/off RSU

Internal Only

Power-on step
Switch on the power supply of the RSU

Power off step


Switch off the power supply of the RSU

Internal Only

Contents
Introduction Preparations Power-on Check

Data Configuration and Version Management


Test after Commissioning

Internal Only

Import UMTS SDR data configuration

Start the PC LMT software (installed already)

When EOMS is starting, select data configuration of the SDR and import them (the file is ready, *.xml)

Internal Only

UMTS SDR Version Management

Import the version and download it

Activate the version

Internal Only

UMTS SDR version management-import and download

Internal Only

UMTS SDR version management - activate

Internal Only

Contents
Introduction Preparations Power-on Check

Data Configuration and Version Management


Test after Commissioning

Internal Only

UMTS SDR service test


Speech service

Data service
Other services

For test items, please refer to ZXSDR ****** Test Guide

Internal Only

Review

1. Commissioning procedure

2. Commissioning preparations
3. How to configure and manage

version information