Vous êtes sur la page 1sur 30

TEST REPORT FOR GENERATOR PROTECTION RELAY

DATE : 22.09.2012

PAGE 1 of 24

1. NAME PLATE DETAILS: Location Equipment Feeder Name Make Model No. 2. Measurements: : RELAY PANEL ROOM / UNIT - II : DGT801 DIGITAL GENERATOR TRANSFORMER PROTECTION : GENERATOR TRANSFORMER UNIT PROTECTION PANEL-A : GUODIAN NANJING AUTOMATION CO. LTD : DGT801B

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

Channel no. 2 3 4 5 6 7 15 16 17 18 19 20 21 22 23 45 46 47 62 63 34 35 36 37 38 39 43 44 40 41 42 50 51 55 56 57 58 59 60

Name Gen. neutral side

CT/PT Ratio 25000/5A

Injected value

Measured value

5A 4.98A TEST REPORT FOR GENERATOR 4.967A PROTECTION RELAY 4.99A/5.001

Gen. terminal side

DATE : 22.09.2012 25000/5A 5A

PAGE 2 of 24 4.967
4.99A/5.001A 4.989A 0.996A

GT HV side-1

2500/1A

1A

0.999A 0.997A 0.98A

GT HV side-2

2500/1A

1A

0.98A 0.99A 4.982A

UT HV side(I)

2500/5

5A

5.001A/4.997A 4.982A 0.994A

GT HV side GT REF Side GT zero seq. UT HV side(II)

2500/1A 2500/1A 2500/1A 2500/5A

1A 1A 1A 5A

0.987A 0.994A 0.997A 0.997A 4.982A 5.001A/4.997 4.982A 4.997A

UT-LVBranch-A Branch-A REF Branch-A ZS UT-LVBranch-B Branch-B REF Branch-B ZS UT-Branch-A

3000/5A 3000/5A 3000/5A 3000/5A 3000/5A 3000/5A 11KV/110V

5A 5A 5A 5A 5A 5A 63.51V

4.974A 5.004A 4.997 4.967A 4.982A 5.004A 4.982A 4.967A 4.967A 63.1V 62.9V 62.7V 63.0V

UT-Branch-B

11KV/110V

63.51V

62.8V 62.7V

52 62.7V Tested by VOLTECH Witness by STEAG ENERGY LTD 400KV/110 53 400KV side 63.51V 62.7V Name:Mr. SHRNIVASAM Name: SURESH PADHY/ALANKA PANDA V Designation: Sr. Protection Engineer Designation: Sr.ENGINEER62.8V 54 Sign: Sign: 8 63.0V Gen. terminal 9 22KV/110V 63.51V 63.1V side 10 62.9V 31 24 Over fluxing 22KV/110V 110V 110V(3Uo) 109.1V 109.836V

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 3 of 24

3. Generator Differential: Rating : 706 MVA CT Ratio : GEN - 25000/5A, GEN Neutral. Side 25000/5A PT Ratio : GEN - 22KV/110 V 3.1. Pickup Test: (i) Phase side: Phases R Y B Set Id 1.48 1.48 1.48 Set Time (sec) 0 0 0 Pickup Current(A) 1.52 1.52 1.52 Optd Time (msec) 39.90 39.90 39.90

(ii) Neutral side: Phases R Y B Set Id 1.48 1.48 1.48 Set Time (sec) 0 0 0 Pickup Current(A) 1.52 1.52 1.52 Optd Time (msec) 38.10 38.10 38.10

(iii) Stability Test: Current In phase Side Current In Neutral Side Relay Status

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 4 of 24

R-3.71 A 0 Y-3.71 A -120 B-3.71 A 120

R-3.72 A 180 Y-3.72 A 60 B-3.72 A 300

Stable

(iv) SLOPE TEST: Setting : 30% Current In phase Side R- 3.720A 0 Y- 3.720 A -120 B- 3.720 A 120 R- 4.836 A 0 Y- 4.836 A -120 B- 4.836 A 120 Id=0.391:; Current In Relay Status Neutral Side R-5.77 A 180 Id1-2.059 Y-5.77 A 60 Ir1-4.877 B-5.77 A 300 R-7.29 A 180 Id1-2.45 Y-7.29 A 60 Ir1-6.02 B-7.29 A 300 Ires=0.1.152 :; Slope (M)=Id/Ires=33%

3.2. Generator Diff High Set: Phases R Y B Set current(A) 4.0 4.0 4.0 Set Time (sec) 0 0 0 Injected Current(A) 4.0 4.0 4.0 Optd Time ( m sec) 28.00 28.00 28.00

4. Generator Impedance: Phases R Y B Set current(A) 5 A 85 5 A 325 5 A 205 Set Time (sec) 2 2 2 Pickup Voltage (V) 19.50V 85 19.50V -35 19.50V 205 Optd Time (sec) 1.99 1.99 1.99

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 5 of 24

5. Generator Over voltage: Set Phase Value(V) RY 143 YB BR 143 143

Set time (sec) 0.5 0.5 0.5

Pickup Value(V) 142.89 142.89 142.89

Operating Time(sec) 0.507 0.507 0.507

6 Generator Overload: (i) Definite Time: Phase R Y Set Current (A) 4.1 4.1 Set time (sec) 8.0 8.0 8.0 Pickup Value(A) 4.107 4.107 4.107 Operating Time(sec) 8.04 8.04 8.04

B 4.1 (ii) Inverse Time (High): Phase R Y B Set Current (A) 15 15 15

Set time (sec) 0.3 0.3 0.3

Pickup Value(A) 15 15 15

Operating Time(sec) 0.334 0.334 0.334

(iii) Inverse Time (Low):

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 6 of 24

Phase R Y B

Set Current (A) 4.3 4.3 4.3

Set time (sec) 107 107 107

Pickup Value(A) 4.32 4.32 4.32

Operating Time(sec) 102.98 102.98 102.98

7. Generator Negative Sequence O.C: (i) Definite Time: Set Current Phase Set time (sec) (A) R Y B (ii) Phase R Y B (iii) Phase R Y B 8. Generator Reverse Power: Set Power (W) -6 Set time (sec) t1 1.5 t2 60 0.4 10.0 0.35 8.0

Operated Current (A) 0.37 A 0 0.37 A 120 0.37 A -120

Operating Time(sec) 8.00

Inverse Time (High): Set Current Set time (A) (sec) 5.6 0.5

Operated Current (A) 5.650 A 0 5.650 A 120 5.650A -120 Operated Current (A) 0.420 A 0 0.420 A 120 0.420 A -120

Operating Time(sec) 0.535

Inverse Time (Low): Set Current Set time (A) (sec)

Operating Time(sec) 10.04

Injected Current & Voltage 0.033A & 110V@180 deg Lag

Operated Power (W) - 6.6

Operating Time(Sec) t1 t2 1.5 60.00

9. Generator Low forward Power: Set Power (W) 6 Set time (sec) 1.5 Injected Current & Voltage 0.030A & 110V Operated Power (W) 5.9 Operating Time(Sec) 1.486

10. Generator Directional Power: Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign: Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 7 of 24

Set Power (W) -40

Set time (sec) 0.5

Injected Current & Voltage 0.209 A & 110V@180 deg Lag

Operated Power (W) -40.2

Operating Time(Sec) 1.486

11. Start-Stop Protection: Phase R-N Set Voltage (V) 11 Set time (sec) 2.0 Operated Voltage (V) 12.0 Operating Time(Sec) 2.006

12. Generator Over fluxing: (i) Stage1: Set Phase Voltage Set time (sec) (V/f) R-Y 1.1 6.0

Pickup Voltage@50Hz 121.58

Operating Time(Sec) 6.18

(ii) Stage2: Phase R-Y Set Voltage (V/f) 1.3 Set time (sec) 0.5 Pickup Voltage@50Hz 143.72 Operating Time(Sec) 0.576

13. Over frequency: Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120 Set value In Hz 52.0 52.0 52.0 Operated value in (Hz) 52.10 52.10 52.10 Set time (sec) 30 Operated time (sec) 32.21

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 8 of 24

Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120

Set value In Hz 52.50 52.50 52.50

Operated value in (Hz) 52.6 52.6 52.6

Set time (sec) 5

Operated time (sec) 5.202

14. Under frequency: Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120 Set value In Hz 48.0 48.0 48.0 Operated value in (Hz) 47.9 47.9 47.9 Operated value in (Hz) 47.53 47.53 47.53 Operated value in (Hz) 46.95 46.95 46.95 Set time (sec) 5.0 Operated time (sec) 5.03 Set time (sec) 12.30 Operated time (sec) 12.5 Set time (sec) 30.0 Operated time (sec) 30.00

Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120

Set value In Hz 47.50 47.50 47.50

Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120

Set value In Hz 47.0 47.0 47.0

15 Stator Inter-Turn Fault: 15.1 Low set: setting: 3Uo3W:3V

3Uol:8V

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 9 of 24

Phases Phases R Y R B Y 3U0 B 3U0

Injected current (A) Injected current 3.5 A 0 (A) 5.0 A -120 3.5 A 0 5.0 A 120 5.0 A -120 5.0 A 120 -

Injected Voltage (V) Injected Voltage 50 V 41 63.5(V) -79 V 50 V 41 63.5 V 161 63.5 V -79 Low 3.1 63.5 V 161 Low 8.0

Set Time (sec) Set Time (sec) 0.2

Optd Time (sec) Optd Time (sec) 0.226 0.523

15.2 High set:3Uoh:8V

16. Stator EFP 3U0: Phase R-N(1YH) R-N(YH0) Setting value 3U0gIt-16V & 3U0gIn 9.2V Set time 0.5 Operated value(V) 16 9.20 Operated time(s) 0.509

17.1 Loss of Field (i) T1: Injected Phase Current (A) R 5A 90 Y B 5A 330 5A 210

Set time (sec) 0.1 0.1 0.1

Operated Voltage (V) >17.5 >17.5 >17.5

Operating Time(sec) 0.132 0.132 0.132

Phase R Y B

Injected Current (A) 2.5A 90 2.5A 330 2.5A 210

Set time (sec) 0.1 0.1 0.1

Operated Voltage (V) <85V <85V <85V

Operating Time(sec) 0.128 0.128 0.128

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 10 of 24

(ii) T2: Phase R Y B (iv) T4: Phase R Y B Injected Current (A) 1A 0 1A 240 1A 120 Set time (sec) 0.5 0.5 0.5 Operated Voltage (V) >21 >21 >21 Operating Time(sec) 0.506 0.506 0.506 Injected Voltage(V) 63.5 V 0 63.5 V 120 63.5 V 120 Set time (sec) 2 2 2 Operated Current (A) 3.52 40 <, 140 > 3.52 -80 <, 20 > 3.52 160 <, 260 > Operating Time(sec) 2.061 2.061 2.061

Phase R Y B

Injected Current (A) 1A 0 1A 240 1A 120

Set time (sec) 0.5 0.5 0.5

Operated Voltage (V) <34V <34V <34V

Operating Time(sec) 0.528 0.528 0.528

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 11 of 24

17.2 Out of step Protection: Phase R Y B Injected Voltage(V) 15 V 0 15 V 240 15 V 120 Injected Current (A) 3.0 A 0 3.0 A 240 3.0 A 120 Operated voltage Angle 320 200 80 Operating Time(sec) 0.11 0.11 0.11

18. Accidental Energizing: (I) PICKUP: Setting Operated Phase Set time Operated time(ms) Current(A) value(mA) R 0.3 0.5 300 512 Y 0.3 0.5 300 512 B 0.3 0.5 300 512 (II) ZONE TEST: Injected Injected Phase Operated time(msec) voltage(V) Current(A) R-N 116 31 0 5 85 Y-N B-N 31 240 31 120 5 -35 5 205 116 116

19. M.T.OVERLOAD: Setting Phase Current(A) R 2.41 Y 2.41 B 2.41

Set time 8.0 8.0 8.0

Operated value(A) 2.41 2.41 2.41

Operated time(ms) 8.01 8.01 8.01

20. M-T Differential: MT HV 2500/1A & AT LV 25000/5A MT HV - 400Kv/110 V & LV 22 Kv/110 V

(a) MT LV & MT HV-1: (i) Pickup Test: MT LV Side:

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 12 of 24

Phases R Y

Set Id 1.576 1.576

Pickup Current(A) 1.586 1.586 1.586

Optd Time (ms) 492.8 492.8 492.8

B 1.576 (ii) Pickup Test:MT HV Side-1 Phases R Y B (iii)Stability: MT Trfr LV Side R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 (iv) SLOPE TEST: MT Trfr LV Side AT Trfr HV Side-1 R-0.433A 0 Y-0.433 A -120 B-0.433 A 120 Set Id 0.17 0.17 0.17

Pickup Current(A) 0.17 0.17 0.17

Optd Time (ms) 492.8 492.8 492.8

Relay Status

Stable

AT Trfr HV Side-1

Relay Status

R-3.936 A 30 R-0.412 A 0 Y-3.936 A -90 Y-0.412 A -120 B-3.936 A 150 B-0.412 A 120 R-5.04 A 30 R- 0.892 A 0 Y-5.04 A -90 Y- 0.892 A -120 B-5.04 A 150 B-0.892 A 120 Id=2.15:; Ires=4.40:; SLOPE=48% (b) MT LV & MT HV SIDE-2: (i)Pickup Test: MT LV Side:

Relay Stable.

Relay Operated.

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 13 of 24

Phases R Y B

Set Id 1.576 1.576 1.576

Pickup Current(A) 1.580 1.580 1.580

Optd Time (ms) 36.80 36.80 36.80

(ii) Pickup Test:MT HV Side-2 Phases R Y B Set Id 0.17 0.17 0.17 Pickup Current(A) 0.17 0.17 0.17 Optd Time (ms) 31.30 31.30 31.30

(iii)Stability: MT Trfr LV Side R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (iv) SLOPE TEST: MT Trfr LV Side AT Trfr HV Side-2 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status

Stable

Tripped

AT Trfr HV Side-2

Relay Status

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 14 of 24

R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 Id=4.3:;

R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R- 0.882 A 0 Y- 0.882 A -120 B-0.882 A 120 Ires=8.5:; SLOPE=50.58%

Relay Stable.

Relay Operated.

(c) UT HV SIDE & AT HV SIDE-1: (i)Pickup Test: UT HV Side: Phases R Y B Set Id 1.576 1.576 1.576 Pickup Current(A) 1.598 1.598 1.598 Optd Time (ms) 36.10 36.10 36.10

(ii) Pickup Test:MT HV Side-1 Phases R Y B Set Id 0.17 0.17 0.17 Pickup Current(A) 0.168 0.168 0.168 Optd Time (ms) 33.70 33.70 33.70

(iii)Stability:

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 15 of 24

MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (iv) SLOPE TEST: MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 Id=4.4:;

AT Trfr HV Side-1 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120

Relay Status

Stable

Tripped

AT Trfr HV Side-1 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R- 0.884 A 0 Y- 0.884 A -120 B-0.884 A 120 Ires=8.4:; SLOPE=52.3%

Relay Status

Relay Stable.

Relay Operated.

(c) UT HV SIDE & AT HV SIDE-2: (i)Pickup Test: UT HV Side

Phases R Y B

Set Id 1.576 1.576 1.576

Pickup Current(A) 1.598 1.598 1.598

Optd Time (ms) 35.80 35.80 35.80

(ii) Pickup Test:MT HV Side-2

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 16 of 24

Phases R Y B

Set Id 0.17 0.17 0.17

Pickup Current(A) 0.17 0.17 0.17

Optd Time (ms) 36.10 36.10 36.10

(iii)Stability: MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (iv) SLOPE TEST: MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 Id=4.5:; Ires=8.6:; (d) Diff Stage II: Phases R Y B Set Id 5.0 5.0 5.0 AT Trfr HV Side-2 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status

Stable

Tripped

AT Trfr HV Side-2 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R- 0.892 A 0 Y- 0.892 A -120 B-0.892 A 120 SLOPE=52.32% Injected Current(A) 5.03 5.03 5.03

Relay Status

Relay Stable.

Relay Operated.

Set Time(sec) 0 0 0

Optd Time (ms) 22.50 22.50 22.50

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 17 of 24

21. OVERALL DIFFERENTIAL (G-T UNIT DIFFERNTIAL) (a)Gen Neutral side & AT H.V Side-1 (i) Pickup Test: Gen Neutral Side Phases R Y B Set Id 1.48 1.48 1.48 Pickup Current(A) 1.51 1.51 1.51 Optd Time (ms) 35.40 35.40 35.40

(ii)

Pickup Test: Phases R Y B

H.V Side-1 Set Id 0.16 0.16 0.16 Pickup Current(A) 162 162 162 Optd Time (ms) 35.40 35.40 35.40

(iii)

Stability: Gen. Neutral. Side R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 AT HV Side-1 R-0.412 A 150 Y-0.412 A 30 B-0.412 A 270 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status Stable

Tripped

(iv)

Slope: Gen. Neutral. Side R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 AT HV Side-1 R-0.412 A 150 Y-0.412 A 30 B-0.412 A 270 Relay Status Relay Stable.

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 18 of 24

R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 Id=4.5:;

R-0.894 A 150 Y-0.894 A 30 B-0.894 A 270 Ires=8.7:; SLOPE=51.72%

Relay Operated.

(B)Gen Neutral side & AT H.V Side-2 (I)Pickup Test: Gen Neutral Side Phases R Y B Set Id 1.48 1.48 1.48 Pickup Current(A) 1.51 1.51 1.51 Optd Time (ms) 33.40 33.40 33.40

(II)Pickup Test: Phases R Y B

H.V Side-2 Set Id 0.16 0.16 0.16 Pickup Current(A) 162 162 162 Optd Time (ms) 37.80 37.80 37.80

(III)Stability: Gen. Neutral. Side R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (IV) Slope: Gen. Neutral. Side AT HV Side-1 Relay Status AT HV Side-2 R-0.412 A 150 Y-0.412 A 30 B-0.412 A 270 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status Stable

Tripped

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 19 of 24

R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 Id=4.4:;

R-0.412 A 150 Relay Stable. Y-0.412 A 30 B-0.412 A 270 R-0.880 A 150 Relay Operated. Y-0.880 A 30 B-0.880 A 270 Ires=8.6:; SLOPE=51.16%

22. GT Comp V block over Current:(I) Set Time t1 R Y B 0.8 0.8 0.8 0.5 0.5 0.5 Set Voltage(V) U1 U2 (ph-ph) 80 80 80 10 Operatin g Current (A) 0.8 0.8 0.8 Operating Voltage(V) U1 U2 (ph-E) 45.51 45.51 45.51 33.51 63.51 63.51 Optd Time (Sec) t1 0.52 0.52 0.52 t2 79 79 79

Phases

Set I(A)

23. GT Zero Sequence over Current: Set time t11 R-N 10 1.2 t12 1.5 Injected Current(A) 10.02 Operated time(Sec) t11 1.21 t12 1.517

Phase

Set Current(A)

24. GT VENTILATION: Phases R Y B Set Id 2.2 2.2 2.2 Set Time(sec) 1 1 1 Pickup Current(A) 2.2 2.2 2.2 Optd Time (s) 1.037 1.037 1.037

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 20 of 24

25. GT Restricted Earth Fault:(Setting Iq and Ig inter changed) (i) LV Side: Phase N (ii) Set Current(A) 0.1 Neutral Side: Set Current(A) 0.1 Set time 0 Operated value(A) 0.25 Operated time(ms) 42.10 Set time 0 Operated value(A) 0.120 Operated time(ms) 41.0

Phase N

(iii) Stability: Current In LV phase Side R-0.120A 0

Current In Neutral Side N-0.25 A 180

Relay Status Stable

R-0.120A 0 (iv Slope test: Current In LV phase Side R-0.120A 0

N-0.25 A 0

Tripped

Current In Neutral Side N-0.25 A 180

Relay Status Stable

R-0.120A 0 Id=0.13

N-0.48 A 180 Ires=0.19: slope=68%

Tripped

26. Unit Transformer Differential: CT Ratio : HV - 2500/5A, LV Side1&2 3000/5A PT Ratio : HV - 22kV/110 V LV 1&2 11kV/110V

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 21 of 24

(A) UT HV SIDE AND UT LV SIDE-1 (i) HV Side: Phases R Y B Set Id 1.65 1.65 1.65 Set Time(sec) 0 0 0 Pickup Current(A) 1.672 1.672 1.672 Optd Time (ms) 63.0 63.0 63.0

(ii) LV Side-1: Phases R Y B Set Id 2.66 2.66 2.66 Set Time(sec) 0 0 0 Pickup Current(A) 2.69 2.69 2.69 Optd Time (ms) 53.0 53.0 53.0

(iii) Stability: Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 (iv) Slope: Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-8.486 A 0 Y-8.486 A -120 B-8.486 A 120 Id=5 Current in LV Side-1 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Ires=8.6 slope=58.13% Relay Status Stable Current in LV Side-1 R-5.511 A 150 Y-5.511 A 30 B-5.511 A 270 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Relay Status Stable

Tripped

Tripped

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 22 of 24

(B) UT HV SIDE AND UT LV SIDE-2 (i) HV Side: Phases R Y B Set Id 1.65 1.65 1.65 Set Time(sec) 0 0 0 Pickup Current(A) 1.680 1.680 1.680 Optd Time (ms) 59.0 59.0 59.0

(ii) LV Side-2: Set Time(sec) 0 0 0 Pickup Current(A) 2.678 2.678 2.678 Optd Time (ms) 51.0 51.0 51.0

Phases R Y B

Set Id 2.66 2.66 2.66

(iii) Stability: Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 (iv) Slope: Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign: Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign: Current in LV Side-2 R-5.511 A 150 Y-5.511 A 30 B-5.511 A 270 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Relay Status Stable

Tripped

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 23 of 24

Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-8.368 A 0 Y-8.368 A -120 B-8.368 A 120 Id=4.8 UT Differential High Set: Phases R Y B Set Id 7 7 7

Current in LV Side-2 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Ires=8.5 slope=56.47%

Relay Status Stable

Tripped

Set Time(sec) 0 0 0

Pickup Current(A) 7 7 7

Optd Time (ms) 31.02 31.02 31.02

27. UT Ventilation: Phases R Y B Set Id 2.2 2.2 2.2 Set Time(sec) 1 1 1 Pickup Current(A) 2.2 2.2 2.2 Optd Time (s) 1.037 1.037 1.037

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 24 of 24

28. UT Overload: Phases R Y B Set Current(A) 3.8 3.8 3.8 Set Time 0.5 0.5 0.5 Pickup Current(A) 3.79 3.79 3.79 Optd Time (Sec) 0.51 0.51 0.51

29. UT Comp V block over Current:(I) Set Voltage(V) U1 (ph-ph) 62 62 62 8 U2 Operatin g Current (A) 4.4 4.4 4.4 Operating Voltage(V) U1 (ph-E) 35.51 35.51 35.51 U2 49.50 63.51 63.51 Optd Time (mSec) t1 709 709 709 t2 709 709 709

Phases

Set I(A)

Set Time t1 t2 0.7 0.7 0.7

R Y B

4.4 4.4 4.4

0.7 0.7 0.7

30. UT Comp V block over Current:(II) Set Voltage(V) U1 (ph-ph) 62 62 62 8 U2 Operatin g Current (A) 4.403 4.403 4.403 Operating Voltage(V) U1 (ph-E) 35.71 35.71 35.71 U2 49.50 63.51 63.51 Optd Time (mSec) t1 715 715 715 t2 715 715 715

Phases

Set I(A)

Set Time t1 t2 0.7 0.7 0.7

R Y B

4.4 4.4 4.4

0.7 0.7 0.7

31. UT branch-A O/C Inst. & Time Delay:

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 25 of 24

Phases R Y B

Set Current(A) 11 11 11

Set Time 0.4 0.4 0.4

Injected Current(A) 11.02 11.02 11.02

Optd Time (Sec) 0.41 0.41 0.41

32. UT branch-B O/C Inst. & Time Delay: Phases R Y B Set Current(A) 16 16 16 Set Time 0.4 0.4 0.4 Injected Current(A) 16.04 16.04 16.04 Optd Time (Sec) 0.416 0.416 0.416

33. UT Branch-A over Current:

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 26 of 24

Phases R Y B

Set I(A) 5 5 5

Set Time 1.2 1.2 1.2

Pickup Current(A) 4.99 4.99 4.99

Optd Time (Sec) 1.209 1.209 1.209

34. UT Branch-B over Current: Phases R Y B Set I(A) 5 5 5 Set Time 1.2 1.2 1.2 Pickup Current(A) 4.98 4.98 4.98 Optd Time (Sec) 1.213 1.213 1.213

35. UT Branch-A Zero Sequence over Current: Phase R-N Set Current(A) 10 Set time t11 1.2 t12 1.5 Injected Current(A) 10.02 Operated time(Sec) t11 1.21 t12 1.517

36. UT Branch-B Zero Sequence over Current: Set Current(A) 10 Set time t11 1.2 t12 1.5 Injected Current(A) 10.01 Operated time(Sec) t11 1.19 t12 1.511

Phase R-N

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 27 of 24

37. UT Branch-A Restricted Earth Fault: (i) LV Side: Set Set Phase Current(A) time N 0.6 0

Operated value(A) 0.63

Operated time(ms) 47.20

(ii) Neutral Side: (High impedance) Phase N Set Current(A) 0.6 Set time 0 Operated value(A) 9.67 Operated time(ms) 49.40

(iii) Stability: Current In LV phase Side R-0.63 A 0

Current In Neutral Side N-9.67 A 180

Relay Status Stable

R-0.63 A 0

N-9.67 A 0

Tripped

(iv) Slope test: Current In LV phase Side R-0.63 A 0

Current In Neutral Side N-9.67 A 180

Relay Status Stable

R-1.750 A 0 Id=1 37.2. AT REF (Stage2): Phase N Set Current(A) 4

N-9.67 A 180 Ires=1.7 slope=58.8%

Tripped

Set time 0

Operated value(A) 4.0

Operated time(ms) 30.70

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 28 of 24

38. UT Branch-B Restricted Earth Fault: (i).LV Side: Phase N Set Current(A) 0.6 Set time 0 Operated value(A) 0.631 Operated time(ms) 43.70

(ii) Neutral Side: (High impedance) Phase N (iii) Stability: Current In LV phase Side R-0.631 A 0 Current In Neutral Side N-9.602 A 180 Relay Status Stable Set Current(A) 0.6 Set time 0 Operated value(A) 9.602 Operated time(ms) 44.90

R-0.631 A 0 (iv) Slope test: Current In LV phase Side R-0.631 A 0

N-9.602 A 0

Tripped

Current In Neutral Side N-9.602 A 180

Relay Status Stable

R-1.716 A 0 Id=0.97 38.2. AT REF (Stage2): Phase N Set Current(A) 4

N-9.602 A 180 Ires=1.71 slope=56.72%

Tripped

Set time 0

Operated value(A) 4.0

Operated time(ms) 28.10

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 29 of 24

39. Rotor EFP: (I) Single point EFP: Setting value Rg1 8 k 40. TV Wire Break: (i) 22KV: Phases R Y B ( ii) 400KV: Phases R Y B 41. FUNCTIONAL CHECKS: 7.0 Set V(U2) Set Time(Sec) 10.0 10.0 10.0 Operated Value(V) 42.0 63.50 63.50 U2-7.1 10.11 Optd Time (sec) 7.0 Set V(U2) Set Time(Sec) 10.0 10.0 10.0 Operated Value(V) 42.3 63.50 63.50 U2-7.05 10.08 Optd Time (sec) Set time 6.0 Injected value Below 7.89kohm Operated time(s) 6.02

iii.

i. ii.

iv.

Terminals of current & voltage inputs to relay are checked Function of output signals are checked Harmonics test in all differential protection are checked Whether equipment is earthed

YES YES YES YES

42. REMARKS:

1. For Over frequency and Over fluxing protection output relays are not configure
as per scheme.

2. Both Over & Under Frequency operates only when 400Kv Breaker is open
condition unless it will in blocking mode.

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:

TEST REPORT FOR GENERATOR PROTECTION RELAY


DATE : 22.09.2012

PAGE 30 of 24

3. In stator earth fault 3W protection channels are not measured the current input. 4. Relay works healthy.

Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign:

Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign: