DAILY PROGRESS REPORT- NON PLANT BUILDINGS GANNON DUNKERLEY LIMITED REPORTING DATE: OMPL - Mangalore Aromatic Complex,

Mangalore PROGRESS DATE :


LOA NO : Date WEATHER:
SI No. Description Unit Scope Quantity Drg / Front Available Upto Previous Day For the Day Cumml. Achieved % Complete Remark

30.01.2013

29.01.2013 OMPL / 5056, 12.08.2010 CLOUDY


RAIN

Clear Day

RESOURCES MOBILISED AT SITE


COMBINED CIVIL PACKAGES (EPCM - 010, 011, 013, 014) EQUIPMENT MOB NOS SUPERVISIOR STAFF NOS NON SUPERVISIOR STAFF Nos
5 5 25 50

Bunk House DG - 15KV


1 2 3 4 5 6 7 8 9 10 11 Excavation PCC RCC Backfilling & Disposal Anti-termite Treatment Masonry Work Plastering Work Soling False Ceiling Ceramic tiles-300*300 size Ceramic tiles-300*200 size Cu.M Cu.M Cu.M Cu.M Sq.M Cu.M Sq.M Cu.M Sq.M Sq.M Sq.M 16525 1188 10408 16736 10704 3692 32843 2915 5637.00 5523 2272 16525 1188 10408 11000 10200 1500 3515 19000 5637.00 350 150 15682.0 1455.0 10042.5 7925 8535 537 3760 1872 585.00 266.00 113.00 7.0 11.0 15682.0 1462.0 10053.5 7925 8535 537 3760 1872 585.00 266 113 95% 123% 97% 47% 80% 15% 11% 64% 10% 5% 5%

1 1 2 3 2 2 1 1 2 3 4 1 3 5 4 2 1 1 22 32 1 5 4 1 1

Project Manager Planning & Billing Quality Safety Survey Sr.Engineer /Section Incharge Asst Engineers Jr.Engineer Supervisiors HR Accounts / Admin Stores Mechanical Dept Electrician Operators,Drivers& Helpers

4 5 3 8 2 7 5 8 39 2 3 8 4 7 29

Supervisor Fitter/helper Barbender/Helper Carpenter/helper Welder/Helper Mason/ Helper M/c F/c Security

DG - 25KV DG - 40KV DG - 75KV DG - 125KV DG - 200KV DG 5KVA WITH MOBILE TOWER LIGHT JCB Poclain 200/75 Tipper Batching Plant Cutting Machine Bending Machine Transit Miller Material Transportor Vehicle (407) Diesel Concrete Pump Quality Lab Set Vibrator

13 62 10 1

ANY SITE MAJOR CONSTRAINTS:

Dewatering / Curing Pump Boom Placer Welding Machine Earth Rammer (Deisel / Electrical) Hydra Hollow Block Machine

TOTAL

134

171

ANY MAJOR ACHIEVEMENT ON PROGRESS:

CLIENT / PMC SUPPORT REQUIREMENT:

* Approval for finishing items

D.Ramakumar

For M/s GDCL

For M/s OMPL

For M/s TOYO

M/s. GANNON DUNKERLEY & CO.LTD., OMPL PROJECT, MANGALORE. WORK : CONSTRUCTION OF NON PLANT BUILDINS FOR ONGC MANGALORE PETROCHEMICAL LTD. AT AROMATIC COMPLEX PROJECT, MANGALORE SPECIAL ECONOMIC ZONE, MANGALORE, KARNATAKA. LOA NO : OMPL / 5056, 12.08.2010 Reporting Date:30.01.2013 STATUS OF WORK DONE UPTO 29.01.2013

Sl.No

Description

Unit

Upto Previous Day

For the Day

Cumulative Achieved

Remarks

Excavation Training Center Canteen Building Administration Building Fire Station Building Central work shop Building Production & Maintenance Building / Laboratoty Building Ware House Sub Total : Cum Cum Cum 2162.00 7000.00 15682.00 2162.00 7000.00 15682.00 Cum Cum Cum Cum Cum 1100.00 800.00 1500.00 1300.00 1820.00 1100.00 800.00 1500.00 1300.00 1820.00

II

PCC Training Center Canteen Building Administration Building Fire Station Building Central work shop Building Production & Maintenance Building / Laboratoty Building Ware House Weigh Bridge Watch tower Sanitary Pipe line Sub Total : Cum Cum Cum Cum Cum Cum 6.00 4.00 1455.00 6.00 165.00 410.00 Cum Cum Cum Cum Cum 177.50 218.00 143.50 107.50 223.50 177.50 218.00 143.50 107.50 223.50

2.00

167.00 410.00

5.00
7.00

9.00 1462.00

III

RCC Training Center Canteen Building Administration Building Fire Station Building Central work shop Building Production & Maintenance Building / Laboratoty Building Ware House Watch Tower Cum Cum Cum 2192.50 2209.50 60.00 2192.50 2209.50 Cum Cum Cum Cum Cum 553.00 762.50 1993.00 810.00 1462.00 553.00 762.50 1993.00 810.00

10.00

1472.00

1.00

61.00

Sub Total :

Cum

10042.50

11.00

10053.50

IV

Backfilling & Disposal Training Center Canteen Building Administration Building Ware House Firestation Work shop Sub Total : Cum 7925.00 7925.00 Cum Cum Cum Cum 1000.00 900.00 2700.00 3325.00 1000.00 900.00 2700.00 3325.00

FOR GDCL

D.RAMAKUMAR Sr.R.E

FOR TEIL

M/s. GANNON DUNKERLEY & CO.LTD., OMPL PROJECT, MANGALORE. WORK : CONSTRUCTION OF NON PLANT BUILDINS FOR ONGC MANGALORE PETROCHEMICAL LTD. AT AROMATIC COMPLEX PROJECT, MANGALORE SPECIAL ECONOMIC ZONE, MANGALORE, KARNATAKA. LOA NO : OMPL / 5056, 12.08.2010 Reporting Date:30.01.2013 STATUS OF WORK DONE UPTO 29.01.2013

Sl.No

Description

Unit

Upto Previous Day

For the Day

Cumulative Achieved

Remarks

Anti-Termite Treatment Training Center Canteen Building Ware House Work shop Administration Building Sub Total : Cum Cum Cum Cum Cum Cum 635.00 800.00 5600.00 500.00 1000.00 8535.00 635.00 800.00 5600.00 500.00 1000.00 8535.00

VI

Masonry Work Training Center Canteen Building Ware House Workshop Sub Total : Cum Cum Cum Cum Cum 120.00 92.00 280.00 45.00 537.00 120.00 92.00 280.00 45.00 537.00

VII

Plastering Work Training Center Canteen Building Ware House Sub Total : Sq.M Sq.M Sq.M 940.00 1120.00 1700.00 3760.00 940.00 1120.00 1700.00 3760.00

VIII

Soling Training Center Canteen Building Ware House Administration Building Firestation Work shop Sub Total : Sq.M Cum Cum Cum Cum 152.00 130.00 965.00 150.00 125.00 350.00 1872.00 152.00 130.00 965.00 150.00 125.00 350.00 1872.00

1X

False Ceiling Training Center Sq.M 585.00 585.00

Sub Total : X Ceramic tiles-300*300 size Training Center Canteen Building

Sq.M

585.00

585.00

Sq.M

266.00

266.00

Sub Total : Xi Ceramic tiles-300*200 size Training Center Canteen Building

Sq.M

266.00

266.00

Sq.M

32.00 81.00

32.00 81.00

FOR GDCL

D.RAMAKUMAR Sr.R.E

FOR TEIL

M/s. GANNON DUNKERLEY & CO.LTD., OMPL PROJECT, MANGALORE. WORK : CONSTRUCTION OF NON PLANT BUILDINS FOR ONGC MANGALORE PETROCHEMICAL LTD. AT AROMATIC COMPLEX PROJECT, MANGALORE SPECIAL ECONOMIC ZONE, MANGALORE, KARNATAKA. LOA NO : OMPL / 5056, 12.08.2010 Reporting Date:30.01.2013 STATUS OF WORK DONE UPTO 29.01.2013

Sl.No

Description

Unit

Upto Previous Day

For the Day

Cumulative Achieved

Remarks

Sub Total :

Sq.M

113.00

113.00

FOR GDCL

D.RAMAKUMAR Sr.R.E

FOR TEIL