ANALYSIS OF RATES OF VARIOUS BUILDING ITEMS.

http://www.supercivilcd.com/WEB_SRA/RATE_ANALYSIS.htm

ANALYSIS OF RATES OF VARIOUS BUILDING ITEMS


( FOLLOWING 63 ITEMS ARE INCLUDED IN SRA )

EXCAVATION
1 2 3 4 5 6 7 8 9
EXCAVATION IN ORDINARY SOIL EXCAVATION IN MURUM EXCAVATION IN SOFT ROCK EXCAVATION IN HARD ROCK RUBBLE SOLING

PLAIN & REINFORCED CONCRETE


CONCRETE GRADES M5, M7.5, M10 & M15 CONCRETE GRADES M20, M25, M30 & M35 CONCRETE GRADE M5
( General ) ( General ) ( Large Project + Batching Plant ) ( Large Project + Batching Plant )

CONCRETE GRADE M7.5

10 CONCRETE GRADE M10 ( General ) 11 CONCRETE GRADE M15 IN FOUNDATION


( General ) ( General ) ( General ) ( General )

12 CONCRETE GRADE M15 IN SUPER STRUCTURE BEAMS 13 CONCRETE GRADE M15 IN SUPER STRUCTURE SLABS

14 CONCRETE GRADE M15 IN SUPER STRUCTURE COLUMNS 15 CONCRETE GRADE M15 IN STAIRCASE
( General )

16 CONCRETE GRADE M15 IN PARDI / PARAPET / WALL 17 CONCRETE GRADE M20 IN FOUNDATION
( General )

( General )

18 CONCRETE GRADE M20 IN SUPER STRUCTURE BEAMS 19 CONCRETE GRADE M20 IN SUPER STRUCTURE SLABS

( General ) ( General ) ( General )

20 CONCRETE GRADE M20 IN SUPER STRUCTURE COLUMNS 21 CONCRETE GRADE M25 IN FOUNDATION
( General )

22 CONCRETE GRADE M25 IN SUPER STRUCTURE BEAMS 23 CONCRETE GRADE M25 IN SUPER STRUCTURE SLABS

( General ) ( General ) ( General )

24 CONCRETE GRADE M25 IN SUPER STRUCTURE COLUMNS

1 of 3

3/30/2013 1:38 PM

ANALYSIS OF RATES OF VARIOUS BUILDING ITEMS.

http://www.supercivilcd.com/WEB_SRA/RATE_ANALYSIS.htm

REINFORCEMENTS
25 REINFORCEMENTS

MASONRY WORKS
26 350 THICK RUBBLE MASONRY 27 230 THICK BRICK MASONRY 28 150 ( 6 " ) THICK BRICK MASONRY 29 115 ( 4 " ) THICK BRICK MASONRY 30 200 THICK HOLLOW BLOCK MASONRY 31 100 THICK HOLLOW BLOCK MASONRY

PLASTER
32 10 THICK NEERU PLASTER 33 15 THICK NEERU PLASTER 34 15 THICK PLAIN PLASTER WITH WATER PROOFING COMPOUND 35 PROOFING COMPOUND IN 2 COATS
RATE ANALYSIS FOR 20 mm THICK PLAIN PLASTER WITH WATER

MORTARS
36 RATE ANALYSIS FOR CEMENT MORTAR CM 1:2 37 RATE ANALYSIS FOR CEMENT MORTAR CM 1:3 38 RATE ANALYSIS FOR CEMENT MORTAR CM 1:4 39 RATE ANALYSIS FOR CEMENT MORTAR CM 1:5 40 RATE ANALYSIS FOR CEMENT MORTAR CM 1:6 41 RATE ANALYSIS FOR LIME MORTAR LM 1:2 42 RATE ANALYSIS FOR LIME MORTAR LM 1:3 43 RATE ANALYSIS FOR LIME MORTAR LM 1:4 44 RATE ANALYSIS FOR LIME MORTAR LM 1:5 45 RATE ANALYSIS FOR LIME MORTAR LM 1:6

FLOORING
46 RATE ANALYSIS FOR 50 mm THICK IPS 47 RATE ANALYSIS FOR MOSAIC FLOORING 48 RATE ANALYSIS FOR MOSAIC TILE SKIRTING

2 of 3

3/30/2013 1:38 PM

ANALYSIS OF RATES OF VARIOUS BUILDING ITEMS.

http://www.supercivilcd.com/WEB_SRA/RATE_ANALYSIS.htm

49 RATE ANALYSIS FOR KOTAH STONE FLOORING 50 RATE ANALYSIS FOR KOTAH STONE RISERS & TREADS 51 RATE ANALYSIS FOR KOTAH STONE SKIRTING 52 RATE ANALYSIS FOR GLAZED / CERAMIC TILE FLOORING 53 RATE ANALYSIS FOR GLAZED DADO 54 RATE ANALYSIS FOR MARBLE FLOORING

WATER PROOFING
55 RATE ANALYSIS FOR GLAZED CHINA MOSAIC W/P FOR TERRACE 56 RATE ANALYSIS FOR BRICK BAT W/P FOR TERRACE 57 RATE ANALYSIS FOR BRICK BAT W/P FOR TOILET

Note: 1. Material cost should include all taxes, such as sales, octroi, excise etc. 2. We have added 5 % as wastage wherever applicable. 3. Rates should include equipments, machineries, temporary approaches, water, fuel & electrical consumptions, contingencies & sundries. 4. Over head should include office expenses, supervision, administration, accounting, insurance, safety / security & storage costs.