Standard Maintantance Practice Tittle :Excecution of Pump Purpose:- Supply Water in CCS

Purpose:-

Smooth Running of Pump

Sl No 1 2 3 4 5 6 7

Parameter Take Shut down,close inlet &outlet valve ,open vent and drain Valve Check & Tighten the Coupling and Foundation bolt Untie the bolt of top cover & Remove it Check wear ring gap,if it is >0.8mm then change it Check wear ring lock pin if it is worn out then change it. Check & Tighten the Sleeve lock nut & Screw Check the condition of gland packing if it worn out,Change it. Open the BRG.Housing &check the condition of BRG.if found OK.Apply new grease &Fit it Back or if not OK.Then change the complete Rotor assly. By a ready spare Check the condition of gland cooling valve & Hoses if NOT OK change them then put back pump top cover & fit the bolt. While tightening the top cover bolt ,check the rotor is freely rotating,if Not free check the clearnce between the cover,Put proper size of Gasket to make it free Tighten the gland Bush As required close the drain valves,then open the suction & delivery valves Remove the air from pump & close the vent valves Remove all extra material lying around the pump Return the shut down & Take Trail if permitted

Responsibilty

10

11 12 13 14

Vous aimerez peut-être aussi