Vous êtes sur la page 1sur 2

BAR BENDING SCHEDULE

a
a

a
b

d
c

Description
S.No
Grid / Location Des' Bars
of Item
1 RB
Beam
Main
Top Extra
Battom Extra
Strip
2

RB

Slab

c
b
Bar
Mark

Main
Top Extra
Battom Extra
Strip

c
b

Shape No of Dia of
IDs Members Bar
D
2
20
A
2
10
A
2
10
C
2
8
D
A
A
C

2
2
2
2

20
10
10
8

a
0.370
2.000
2.000
0.180
0.370
2.000
2.000
0.180

d
b
a

All Dimensions are in meters


Data to Entered as per the given Drawing / Shape .

a b

Length of Shape
b
c
d
e
5.000 0.370

Bar
f
g
Length
5.740
2.000
2.000
0.400 0.180 0.400 0.000 0.000 0.000 1.290
5.000 0.370

0.400 0.180 0.400 0.000 0.000 0.000


Total

Note :

5.740
2.000
2.000
1.290

Nos
4
2
2
20
4
2
2
20

d
8

10

c
b

Dia wise Weight


12
16
20
113.383

a
b

c
25

32

4.938
4.938

Weight
in Kgs
143.644

20.385
113.383
4.938
4.938

143.644

20.385
40.770 19.753 0.000 0.000 226.765

0.000

0.000

287.289

Remarks