Document of Checklist as per site manualVol-212 Earthing,Earth Mat, Risers,Equipment Iightnessof Earthing Connection withTorque wrench
C h e c k l i s t a s p e r s i t e M a n u a lV o l 2t2 Material Receipt
OK OK OK OK OK OK
12 13
OK
AUDIl-OR'S RECOMADATIONS FORCORRECTIVE ACTION properties 1 Water(Refer Physical & Chemical samplinq records should be available PointNo-6as above)
z
- In respect Cement to thecement record register, thethirdparty analysis report ref.withdateshould alsobe filled in the respective column. TheCheck listof items e.9.,shuttering, meshonary work,plastering work,flooring work,rooftretment work,road work workneeds to be improved & morecheckpoints to be inserted points ,drain as perthe FQPperameters/check Deviaion register hasbeenshown However, properly.For thecolumnfor deviation notfilled example, in a 400 kV tower
& ST9Y) 22 Nosbaseplates wererectified butthedeviation column. should showthe cause of 4 (ST9,ST9X rectification,i.e should showFOUND DEFECTIVE. During thefhysical round yardthe cable of the switch trench workwas seenandfoundquitesatiesfactory.ln conjunction withthesameit is strongly suggested phase thatduring cable laying utmost careshould be exsercised in respect to cable laying,tieing,bunching for neatness of thecable work. Alsoit is suggested thatproper design clearances should be maintained between two adjusted cableas specified in the drawings. Further to pointno.8 as above the cable termination workshould alsobe carried out neatly andwithout wastage undue of termination lead ends.