HISAC ULTIMA - Test Report


HEADER :
Substation Bay Operator Test Date Time

19-02-2013 13:13:00 7.0 Nil Nil 400

765/400 KV PUSAULI PGCIL Breaker ID 52-406 LAXMAN KUMAR


Breaker Type Serial Number Manufacturer

406 BAY GL318 161253 Areva

Gas Pressure Air Pressure Oil Pressure Voltage (kV)

SETTINGS :
Trigger Option PIR Auxiliary

Open Disabled Disabled

Sampling Speed (kC) Delay tco (ms)

5 0

Plot Length (ms) Delay toc (ms)

300 0

CLOSE TIMING (ms) :


Main 1 PIR 1 Main 2 PIR 2 Main 3 PIR 3 Main 4 PIR 4

OPEN TIMING (ms) :


Main 1 PIR 1 Main 2 PIR 2 Main 3 PIR 3 Main 4 PIR 4

21.0

21.0

21.4

21.2

21.2

21.2

19/02/2013

Page 1 of 2

www.scopetnm.com

HISAC ULTIMA - Test Report


RESULTS :
Main 1 PIR 1 Main 2 PIR 2 Main 3 PIR 3 Main 4 PIR 4

Close
Time (ms) R Y B Max Bounce R (ms) Y B Total Bounce R (ms) Y B No. of Bounces R Y B

Open
Time (ms) R 21.0 Y

21.0 21.2 21.2

21.4

B 21.2 Max Bounce R (ms) Y B Total Bounce R (ms) Y B No. of Bounces R Y B

AUXILIARY TIMING (ms) :


A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12

C L O S E O P E N

19/02/2013

Page 2 of 2