Académique Documents
Professionnel Documents
Culture Documents
TQDC20131 Date:17March2013
ROUGHCALCULATIONSCHECKFORLIGHTPOLEFOUNDATION:
1.Thiscalculationisbasedona22mhighpolewith750mmdia.baseshowninDwg.5089236/008/SL/1313. Topdiameteroftaperedcircularpoleisassumedas250mmforpurposesofcalculatingprojectedarea. Otherpoleconfigurationswithequivalentprojectedareamaybeused. 2.Resultantwindforcesonelements,fixturesandfixingsonthepoleareapproximateintheabsenceof specificdataoneffectiveprojectedareas(EPAs)fromthepoleandfixturesmanufacturer. 3.Netwindpressureisassumedat1KN/m2
P4
P3
20m
22m
P1 P2 12m
7.33m 6.2m
Prepared:RN Page1
where:
2 c= shearstrengthofsoil(KN/m ) c= 492
Prepared:RN Page2