Contractor: Consultant:
Sub-Contractor
Address:
Concreting area:
Poured item:
loading Concrete Air Inspectors
Truck No. Qty (m2) Pour started Pour finished Slump Cube Nos.
started Temp. Temperature signature
Engineers comments:
Sub-Contractor
Address:
Description of works:
Contractor to provide full Method Statement of the works as an attachment to this form.
Location: Category:
Spec. ref.:
Contractors comments:
Engineers comments:
Status:
Sub-Contractor
Address:
Manufacturer:
Country of origin:
Specification ref.
2.Inspection report
Physical damage?
Details:
Remarks:
3. Engineer's comments:
The above material has been inspected on site and found at the time of inspection to be :
The Engineer's approval of this inspection shall not relieve the Contractor of his responsibilities to incorporate in the Works only such
materials that are in conformity with the contract requirements.
Project Manager: Date: Engineer: Date:
SITE INSPECTION REQUEST
Contractor: BEC Consultant:
Contractors comments:
Engineers comments:
Architect
Structural Engineer
Mechanical Engineer
Electrical Engineer
Inspector
Surveyor
QA/QC
………………...
Resident Engineers comments:
Status:
Approved Approved with comments Not Approved revise and resubmit Rejected as comments
16019565.xls 03/30/2009
SHOP DRAWING SUBMITTAL
Contractor: BEIJING EMIRATES CO. Consultant:
Sub-Contractor MECHWATT ELE POE
Address: DUBAI
Date Submittal prepared: Submittal Reference: Rev. No.
05/03/09
4
Drawing title: DCD APPROVED FIRE ALARM DRAWINGS & CEN. BATTERY SYSTEM. Drawing No: I636/MW/FA & CBS
Manufacturer: Supplier
Address: Address:
Location: Category:
Architectural Mechanical Builders Work
Spec. ref.:
Structural ✘ Electrical As Built
B.O.Q. ref.: Purpose:
Contractors comments:
Engineers comments:
Emp.
Archt.
S.Eng.
M.Eng.
E.Eng
I.Des.
Status:
Approved Approved with comments Not Approved revise and resubmit Rejected as comments
16019565.xls 03/30/2009
Sub-Contractor Nomination
Contractor: Consultant:
Sub-Contractor
Planned Planned Required on
Nomination Category Sub-Contractors Name Actual Submittal date Actual Submittal date STATUS Comments
sumittal date approval date site
Reference
0 1 2 3 0 1 2 3
Dear Sir,
Please find attached supporting documents in respect to our proposed subcontractor for
the above works.
1. Name and classification.
2. Details of recent performance.
3. Type, number and current location of plant/equipment to be deployed on the project.
4. Full list of names, qualifications and experience of staff proposed for this project.
5. Outline method statement of proposed work and performance.
6. Written confirmation that the proposed subcontractor will act and comply, in full conformity
with the contract and the main contractor's construction programme.
7. Certificates and Licenses from all relevant Authorities.
Contractors comments:
Engineers comments:
Emp.
Archt.
S.Eng.
M.Eng.
E.Eng
Status: I.Des.
Approved Approved with comments Not Approved revise and resubmit Rejected as comments
16019565.xls 03/30/2009
Sub-Contractor Approval
Contractor: Consultant:
Sub-Contractor
Planned Planned Required on
Submittal Category Sub-Contractors Name Actual Submittal date Actual Submittal date STATUS Comments
sumittal date approval date site
reference
0 1 2 3 0 1 2 3
Engineers comments:
Emp.
Archt.
S.Eng.
M.Eng.
E.Eng
I.Des.
16019565.xls 03/30/2009
REQUEST FOR INFORMATION
Contractor: BEC Consultant:
Tower-1 –F10 Wall thickness is only 15cm where 12U cab is coming. Advise us on this.
Engineers comments:
Emp.
Archt.
S.Eng.
M.Eng.
✘ E.Eng
I.Des.
This clarification does not constitute a variation to the Contract Sum or Contract Period.
Project Manager: Date: Resident Engineer: Date:
16019565.xls 03/30/2009
1.
Tower-
1 –F5
Wall
length
change
d-now
no
space
for
Entran
ce
Light
Switch.
Tower-1 –F10 Change wall thickness from 15cm to 20cm where
16019565.xls 03/30/2009
nge wall thickness from 15cm to 20cm where 12U cab is coming.
16019565.xls 03/30/2009
REQUEST TO REMOVE EQUIPMENT OR MATERIAL OFF SITE
Contractor: Consultant:
Sub-Contractor
Address:
Engineers comments:
16019565.xls 03/30/2009
MATERIAL SUBMITTAL
Contractor: BEC Consultant:
Delvery method:
Contractors comments:
Engineers comments:
Emp.
Archt.
S.Eng.
M.Eng.
E.Eng
I.Des.
Status:
Approved Approved with comments Not Approved revise and resubmit Rejected as comments
16019565.xls 03/30/2009
CONTRACTORS DAILY SITE REPORT PAGE 1
Contractor: Consultant:
A. Weather conditions:
Max. Temp. Max. Rh
Rain Dusty Sunny Cloudy
Min. Temp Min.Rh.
B. MAN POWER (Main Contractor)
PM. ENG. FOR. SF MAS SURV C.MAN DRIVER LABOUR TOTAL
D. EQUIPMENT
Ref. Item Qty Ref. Item Qty
1 Loader / Shovel 9 Welding Equipment
2 Roller 10 Air Compressor
3 Dumper 11 Generator
4 Cocrete vibrato 12 Tower crane
5 Carpentry machine 13 Mobile crane
6 Power Float 14
7 Pick-up truck 15
8 Water cooler 16
16019565.xls 03/30/2009
CONTRACTORS DAILY SITE REPORT PAGE 2
Contractor: Consultant:
Address:
Address:
F. WORK EXECUTED
Item Description of work Location Qty
16019565.xls 03/30/2009
CONTRACTORS DAILY SITE REPORT PAGE 3
Contractor: Consultant:
Address:
Address:
16019565.xls 03/30/2009
CONFIRMATION OF VERBAL INSTRUCTION
Contractor: Consultant:
Sub-Contractor
Address:
Instruction By:
Emp.
Archt.
S.Eng.
M.Eng.
E.Eng
I.Des.
16019565.xls 03/30/2009
MATERIAL SUBMITTAL REGISTER
Contractor: Consultant: