Vous êtes sur la page 1sur 1

FIT-UP INSPECTION & MATERIAL TRACEABILITY REPORT FOR STRUCTURAL

Form No.: M201TPL-MPT-M-REP-6201 REV A2 Project Client PMC Sl.No :MANGALA PHASE II; ASSOCIATED FACILITIES PROJECT-EPC1 :CAIRN ENERGY PTY LIMITED :ENGINEERS INDIA LIMITED Drg No./ Line No./ Iso No. Rev. Spool No. JOINT SW/ DIA JOINT TYPE FW (INCH) NO. Report Number: Date : INSPECTION TPL Remarks

TRACEABILITY REPORT JOINT JOINT HEAT/ JOINT HEAT/ ACCEPTANC E COMP.1 (**) COL. COMP.2 (**) COL.

* G = BUTT WELD, S= SOCKET WELD, B= BRANCH WELD, M= MITRE WELD, SW= SHOP WELD, FW= FIELD WELD,(**)- PIPE, ELBOW, REDUCER, FLANGE, etc., TOTAL ACCEPTED INCH DIA. TODAY: PREVIOUS INCH DIA: CUMULATIVE INCH DIA TILL DATE: Form No.:M201TPL-MPT-M-REP-6201 REV A2 TPL EIL/CEIL

Vous aimerez peut-être aussi