Vous êtes sur la page 1sur 11

800000

700000

600000

500000

1
Index

400000

Uraian

Harga Satuan (Rp)


Jumlah Harga (Rp)
300000

Jumlah Total (Rp)

200000

100000

0
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Harga
Jumlah Harga
Satuan (Rp)
(Rp)
1 M3 MEMBUAT BETON MUTU f'c= 21.7 Mpa (K 250), Slump (12 2) ,w/c=0.56 (RIGID PAVEMENT)
Bahan
384.000
kg
Semen Portland
1240.00
476160.00
692.000
kg
Pasir Beton
140.00
96880.00
140.00
1039.000
kg
Kerikil (diameter max 30 mm)
145460.00
215.000
ltr
Air
3.08
Tenaga Kerja
OH
Pekerja
50000.00
0.00
OH
Tukang Batu
60000.00
0.00
OH
Kepala Tukang
70000.00
0.00
OH
Mandor
75000.00
0.00
Index

Uraian

1 M3 MEMBUAT BETON MUTU f'c = 9.8 Mpa (K 125), Slump (12 2) cm, w/c = 0.87 (LEAN CON.)
Bahan
276.000
kg
Semen Portland
1240.00
342240.00
828.000
kg
Pasir Beton
140.00
115920.00
140.00
1012.000
kg
Kerikil (diameter max 30 mm)
141680.00
215.000
ltr
Air
0.00
Tenaga Kerja
OH
Pekerja
50000.00
0.00
OH
Tukang Batu
60000.00
0.00
OH
Kepala Tukang
70000.00
0.00
OH
Mandor
75000.00
0.00
1 M2 PEMBERSIHAN DAN STRIPING/KOSREKAN
Tenaga Kerja
OH
Pekerja
0.009
OH
Tukang Batu
0.001
OH
Mandor
0.003
1 M3 GALIAN TANAH BIASA
Tenaga Kerja
0.563 OH
Tukang Gali
0.019 OH
Mandor

50000.00
60000.00
75000.00

450.00
60.00
225.00

Jumlah Total
(Rp)
c=0.56 (RIGID PAVEMENT)

718503.075

718503.075
, w/c = 0.87 (LEAN CON.)

599,840.00

0.00
599,840.00

735.00

NO

URAIAN

SATUAN KOEFISIEN

HARGA SATUAN
(Rp)

1 M2 PEMBERSIHAN DAN STRIPING

A.
1
2
3

TENAGA KERJA
Pekerja
Tukang Bebas
Mandor

OH
OH
OH

0.009
0.003
0.001

Rp50,000.00
Rp60,000.00
Rp75,000.00

PASANG PROFIL MELINTANG GALIAN TANAH JARAK 25M

A.
1
2
3
4

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

OH
OH
OH
OH

0.100
0.100
0.100
0.010

Rp50,000.00
Rp60,000.00
Rp70,000.00
Rp75,000.00

B.
1
2
3

BAHAN
Kaso 4/6 cm
Papan 2/20 cm
Paku

m3
m3
m3

0.010
0.010
0.400

Rp6,500,000.00
Rp704,825.00
Rp12,500.00

bh

0.001

C. Peralatan
1 Waterpass

Rp

200,000.00

1M3 GALIAN TANAH BIASA


3

A. TENAGA
1 Tukang Gali
2 Mandor

OH
OH

0.563
0.019

Rp60,000.00
Rp75,000.00

1 M3 PEKERJAAN TIMBUNAN TANAH


A. TENAGA
1 Pekerja
2 Mandor
4

B. PERALATAN
Pemadat timbunan
1
(stamper)

OH
OH

0.330
0.012

Rp50,000.00
Rp75,000.00

unit/m3

0.050

Rp15,000.00

1 M3 PEKERJAAN PEMADATAN TANAH


A. TENAGA
1 Pekerja
2 Mandor
5

B. PERALATAN
Pemadat timbunan
1
(stamper)

OH
OH

0.500
0.050

Rp50,000.00
Rp75,000.00

unit/m3

0.050

Rp15,000.00

1M3 BETON MUTU, f'c=9.8 Mpa. (K125), SLUMP 12, wc = 0,78

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

1.150
0.200
0.020
0.060

Rp50,000.00
Rp60,000.00
Rp70,000.00
Rp75,000.00

B.
1
2
3
4

BAHAN
Semen
Pasir Beton
Kerikil
air

kg
kg
kg
L

247.00
869.00
999.00
215.00

Rp1,240.00
Rp140.00
Rp140.00
Rp3.08

1M3 BETON MUTU, f'c=21,7 Mpa. (K250), SLUMP 12, wc = 0,78 (READY MIX)

A.
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

1.000
0.138
0.018
0.050

Rp50,000.00
Rp60,000.00
Rp60,000.00
Rp75,000.00

B.
1
2
3
4

BAHAN
Semen
Pasir Beton
Kerikil
air

kg
kg
kg
L

384.00
692.00
1039.00
215.00

Rp1,240.00
Rp140.00
Rp140.00
Rp3.08

hari

0.020
0.120

Rp400,000.00

C. PERALATAN
1 Molen 0,35 m3
2 Pompa beton

1 M3 BETON DICOR PADA TAPAK BERJARAK < 25 M DENGAN KETINGGIAN/KEDALAM


A TENAGA
1 Pekerja
OH
0.410
Rp50,000.00
8

C PERALATAN
1 Vibrator

Hari

0.100

Rp134,750.00

PEMBESIAN 100 KG DENGAN POLOS ATAU ULIR

A.
1
2
3
4

TENAGA
Pekerja
Tukang besi
Kepala Tukang
Mandor

B. BAHAN
1 Besi beton (polos/ulir)
2 Kawat beton
10

C. PERALATAN
1 Mesin potong besi

OH
OH
OH
OH

0.700
0.700
0.070
0.040

Rp50,000.00
Rp60,000.00
Rp70,000.00
Rp75,000.00

kg
kg

105.000
1.500

Rp6,356.00
Rp15,000.00

Hari

0.050

Rp25,000.00

1 M2 BEKISTING DINDING BETON BIASA DENGAN PAPN UKURAN 3/20 CM

11

A.
1
2
3
4

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Rp50,000.00
Rp60,000.00
Rp70,000.00
Rp75,000.00

B.
1
2
3
4

BAHAN
Papan 3/20 kayu kelas II
Kaso 5/7 cm
Paku 5 cn dan 7 cm
Minyak bekisting

M3
M3
KG
L

0.040
0.180
0.400
0.200

Rp8,635,000.00
Rp6,500,000.00
Rp12,500.00
Rp4,500.00

1 M2 BONGKAR BEKISTING SECARA BIASA


12

12

A. TENAGA
1 Pekerja
2 Mandor

OH
OH

0.400
0.020

Rp50,000.00
Rp75,000.00

CURING MENGGENANGI ARI 100 M2 PERMUKAAN BETON


13

A TENAGA
1 Pekerja
2 Mandor

OH
OH

0.800
0.040

Rp50,000.00
Rp75,000.00

JUMLAH
HARGA (Rp)

TOTAL (Rp)

NG
Rp
Rp
Rp

450.00
180.00
75.00
Rp
Rp

705.00
705.00

Rp

18,750.00

Rp

77,048.25

Rp
Rp

200.00
95,998.25

Rp

35,205.00

Rp

17,400.00

Rp
Rp

750.00
18,150.00

IAN TANAH JARAK 25M


Rp
Rp
Rp
Rp

Rp
Rp
Rp

Rp

5,000.00
6,000.00
7,000.00
750.00

65,000.00
7,048.25
5,000.00

200.00

H BIASA
Rp
Rp

33,780.00
1,425.00

UNAN TANAH
Rp
Rp

Rp

16,500.00
900.00

750.00

DATAN TANAH
Rp
Rp

Rp

25,000.00
3,750.00
Rp

28,750.00

Rp
Rp

750.00
29,500.00

Rp

86,900.00

Rp
Rp

568,461.13
655,361.13

750.00

125), SLUMP 12, wc = 0,78


Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

69,000.00
12,000.00
1,400.00
4,500.00

306,280.00
121,660.00
139,860.00
661.13

LUMP 12, wc = 0,78 (READY MIX)


Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp

50,000.00
8,280.00
1,080.00
3,750.00
Rp

63,110.00

Rp

719,161.13

Rp

8,000.00

476,160.00
96,880.00
145,460.00
661.13

8,000.00
-

Rp

727,161.13

M DENGAN KETINGGIAN/KEDALAM 1M
Rp

20,500.00

Rp

Rp

20,500.00

Rp
Rp

13,475.00
33,975.00

Rp

84,900.00

Rp

689,880.00

Rp
Rp

1,250.00
691,130.00

13,475.00

POLOS ATAU ULIR


Rp
Rp
Rp
Rp

35,000.00
42,000.00
4,900.00
3,000.00

Rp
Rp

667,380.00
22,500.00

Rp

1,250.00

DENGAN PAPN UKURAN 3/20 CM


Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

33,000.00
19,800.00
2,310.00
2,475.00
Rp

57,585.00

Rp
Rp

1,521,300.00
1,578,885.00

345,400.00
1,170,000.00
5,000.00
900.00

G SECARA BIASA

Rp
Rp

20,000.00
1,500.00
Rp

21,500.00

Rp

43,000.00

M2 PERMUKAAN BETON
Rp
Rp

40,000.00
3,000.00

Vous aimerez peut-être aussi