Vous êtes sur la page 1sur 8

Status as on 31.10..

08

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Sl. Name of the Installed Estimated Cost Date of issue of Date of No. Project / Capacity including IDC (Rs. TEC letter Financial Organisation (MW) Crores) Package State (District) approval (Date of Fin. Closure) THERMAL SCHEMES NORTHERN REGION Uttar Pradesh 1. Rosa TPP 2x283.5 US$280.7267M 19.9.97 - M/s Indo-Gulf =567.0 +Rs.1435.5284 Cr. Fertilizers and (ER Chemicals Corpn. 1US$=Rs.35.50) Ltd. (Shahjahanpur) = Rs.2432.108 Crs.

Remarks

Project is being executed by M/s Rosa Power Supply Co. Ltd. Main plant order placed to M/s Shanghai Electric Corpn. China in 11/2006 for 2x300 MW

Rajasthan 2. Dholpur CCGT - M/s RPG Dholpur Power Co. Ltd. (Dholpur)

702.7

3.

Barsingsar Lignite TPP - M/s Hindustan Vidyut Corpn. Ltd. (Through competitive bidding based on tariff) ( Bikaner)

2x250 =500

US$364.29M +Rs.855.133 Cr. (ER 1US$=Rs.39.50) = Rs.2294.079 Crs. US$322.716M +Rs.1090.08 Cr. (ER 1US$=Rs.31.50) = Rs.2106.6354 Crs.

12.3.98

Project development stands closed as per GOR lr. Dated 12.7.02.

20.4.98

Development of Project by HVCL is closed. Project of 2x125 MW is being developed by NLC. Main plant order placed to BHEL on 19.8.05

Sub-total (NR) T-3 Nos.- 1769.7 MW

WESTERN REGION Chhattisgarh 1. Korba (East) TPS - M/s Daewoo Power (India) Ltd. (Bilaspur)

2x535 =1070

2.

Korba (W) TPP - M/s India Thermal Power Ltd. (Bilaspur)

2x210 =420

3.

Bhilai TPP - M/s Bhilai Power supply Co. (Durg)

2x287 =574

4.

Raigarh TPP - M/s Jindal Power Ltd. (Raigarh)

2x275 =550

US$863.95M +Rs. 1623.04 Cr. (ER 1US$=Rs.35.50) = Rs.4690.0625 Crs. US$164.643M +DEM169.73 M +Rs.834.351Cr. (ER Rs.35.50/US $ & Rs.20.50/DEM) = Rs.1766.78 Crs. US$419.699M +Rs.999.781 Cr. (ER 1US$=Rs.35.50) = Rs.2489.7124 Crs. US$85.176M +DEM 240.676 M +Rs.1628.075 Cr. (ER Rs.35.50/US$, Rs.20/DEM). =Rs.2411.8018 Crs.

30.12.96

12.9.97

3.10.97

17.11.97

Status as on 31.10..08

Sl. No.

5.

6.

7.

8.

9.

10.

11.

12.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Installed Estimated Cost Date of issue of Date of Project / Capacity including IDC (Rs. TEC letter Financial Organisation (MW) Crores) Package State (District) approval (Date of Fin. Closure) Gujarat 654.7 2298.14 25.11.93 1/96 Paguthan CCGT - M/s Gujarat Torrent Energy Corpn. Ltd. (Bharuch) Hazira CCGT 515 US$284.35M 8.8.05 - M/s Essar Power + Rs.770.87 Cr. (Achieved) Ltd. (ER (Surat) 1US$=Rs.31.50) = Rs.1666.5725 Crs. 167 368.22 30.10.95 Baroda CCGT (Achieved) - M/s GIPCL (Baroda) Surat Lignite TPP 2x125 26.8.96 US$44.538M - M/s GIPCL =250 +DM4.92M (Surat) +Rs.999.99 Crs. (ER 1US$=Rs.35, 1DM=Rs.23) = Rs.1167.189 Crs. Jamnagar Petcoke 2x250 US$434.36M 25.5.99 TPP =500 + Rs.726.429 Cr. - M/s Reliance (ER 1US$=Rs.42) Power Ltd. = Rs.2550.73 Crs. (Jamnagar) Madhya Pradesh 17.6.97 2x289 US$175.412M Bina TPS =578 + Rs.1820.627Cr. - M/s Bina Power (ER 1US$=Rs.35.50 Supply Co. Ltd. (Rev.) (Sagar) = Rs.2443.3396 Crs. 27.6.97 166 US$77.74M+ Narsingpur CCPP Rs.253.697Cr. - M/s GBL power (ER India Ltd. 1US$=Rs.35.50) (Narsinghpur) = Rs.529.674 Crs. Pench TPS 2x250 US$284.908M 19.9.97 - M/s Pench Power =500 + Rs.1172.155 Cr. Ltd. (ER (Chindwara) 1US$=Rs.35.50) = Rs.2183.5784 Crs.

Remarks

Commissioned on 13.10.98

Commissioned on 26.5.97

Commissioned on 18.11.97

Commissioned on 16.1.2000

Status as on 31.10..08

Sl. No.

13.

14.

15.

16.

17.

18.

19.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Project / Installed Estimated Cost Date of issue of Date of Organisation Capacity including IDC TEC letter Financial State (District) (MW) (Rs. Crores) Package approval (Date of Fin. Closure) 22.7.98 US$160.50M 347.25 Guna CCGT + Rs.509.54 Cr. - M/s STI Power India (ER Ltd. 1US$=Rs.35.50) (Guna) = Rs.1079.315 Crs. US $ 152.37 M + Rs.484.86 Crs. 330 (ER (Revised) 1US$=Rs.35.50) =Rs.1025.7735 Crs.) Bhander CCGT 5.3.98 342 US$197.622M - M/s Bhander Power + Rs.346.514 Cr. Ltd. (Gwalior) (ER 1US$=Rs.35.50) = Rs.1048.0721 Crs. Pithampur DGPP 119.7 US$68.729M 10.2.98 - M/s Shapoorji Pallonji + Rs.174.053 Cr. Power Co. Ltd. (ER 1US$=Rs.39) (Dhar) = Rs.442.0961 Crs. 10.2.98 118.63 US$73.88M Ratlam DGPP (Achieved) + Rs.163.162 Cr. - M/s GVK Power (ER 1US$=Rs.39) (Ratlam) Ltd. = Rs.451.294 Crs. ( Ratlam) Khandwa Naphtha 171.17 US$76.0345M 29.5.98 CCGT + Rs.250.3315Cr. - M/s Madhya Bharat (ER energy Corp Ltd. 1US$=Rs.39.50) (East Nimar) = Rs.550.6677 Crs. Maharashtra 9051.27 26.1193 (Ph I 2015 Dabhol CCGT 9.12.96) - M/s Dabhol Power Co. (PhI695+ (Ph.II PhII1320) of M/s Enron, USA 6.5.99) 2184 (Ratnagiri) (revised to 2184 MW) (PhI740+ PhII 1444) 2x536 5187 29.12.94 Bhadravati TPS =1072 - M/s Central India Power Co. Ltd. Promoted by Nippon Denro Ispat Ltd. (Chandrapur)

Remarks

Ph I & Ph.II commissioned

Status as on 31.10..08

Sl. No.

20.

1.

2.

3.

4.

5.

6.

7.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Project / Installed Estimated Cost Date of issue of Date of Organisation Capacity including IDC TEC letter Financial State (District) (MW) (Rs. Crores) Package approval (Date of Fin. Closure) 447.1 US$319.02M 22.1.98 Patalganga CCGT + Rs.246.66 Cr. - M/s Reliance (ER Patalganga power Pvt. 1US$=Rs.35.50) Ltd. (Raigarh) (Through = Rs.1379.181 Crs. competitive Bidding based on cost) Sub-total (WR) T-20 Nos. 10729.3 MW SOUTHERN REGION Andhra Pradesh Jegurupadu CCGT 216 827.0 25.11.93 9/96 - M/s GVK Industries (East Godavari) Godavari CCGT 208 748.43 3.1.94 - M/s SPGL (East (Achieved) Godavari) 25.7.96 2x520 US$943.75M+ Vishakhapatnam TPP =1040 Rs.1324.993 Cr. (VIZAG) (ER - M/s Hinduja Nation 1US$=Rs.35.00) Power Corpn. Ltd. = Rs.4628.118 Crs. (Vishakhapatnam) 26.6.97 23.2.2001 2x260 US$369.30M Ramagundam TPP =520 + Rs.1073.56 Cr. - M/s BPL Power (ER Projects (AP) Ltd. 1US$=Rs.35.50) (Karimnagar) = Rs.2384.575 Crs. 350 US$180.616M 22.1.98 12.8.99 Kondapalli CCPP + Rs.385.254 Cr. (9.12.98) - M/s Kondapalli Power (ER Corpn. Ltd. (Through 1US$=Rs.36.00) Competitive Bidding = Rs.1035.47 Crs based on tariff) ( Krishna) 2x260 US$355.131M 16.6.98 Krishnapatnam BTPP =520 + Rs.960.614 Cr. - M/s BBI Power (ER Krishnapatnam Co. 1US$=Rs.35.50) (Through Competitive = Rs.2221.329 Crs Bidding based on cost) (Nellore) Venagiri CCGT 492 US$248.02M 14.1.99 - M/s Ispat Power Ltd. + Rs.638.223 Cr. (Through Competitive (ER 1US$=Rs.42) Bidding based on tariff) = Rs.1679.907 Crs (East Godavari)

Remarks

Commissioned on 20.6.97

Commissioned on 31.3.98

Commissioned on 18.10.2000

Status as on 31.10..08

Sl. No.

8.

9.

10.

11.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Project / Installed Estimated Cost Date of issue of Date of Organisation Capacity including IDC TEC letter Financial State (District) (MW) (Rs. Crores) Package approval (Date of Fin. Closure) Karnataka Torangallu TPS 2x130 US$106.87M 22.3.96 - M/s Jindal Tractebel =260 + Rs.725.16 Cr. (27.3.99) Power Co. Ltd. (ER (Bellari) 1US$=Rs.34.50) = Rs.1093.86 Crs 10.7.96 US$751.574M 4x250 Mangalore TPS + Rs.1580.89 Cr. - M/s Mangalore Power. =1000 (ER Co.-Subsidiary of 1US$=Rs.31.50) 4x253.3 Cogentrix Energy Inc., 16.1.98 = Rs.3948.35 Crs =1013.3 USA& General Electric 27.4.98 US $ 809.505 M (Revised) Capital Corp. + Rs.1671.98 Crs. (South Canara) (ER Rs.31.50/US $) = Rs.4221.92 Crs. 2x507.5 US$273.795M Nagarjuna TPP 29.4.99 =1015 + GBP 277.40 M - M/s Nagarjuna Power +F.Fr. 907.190 M Corpn. Ltd. +Rs. 1792.685 Crs. (Udupi) (ER Rs.42/US$, Rs.68.50/GBP, Rs.7.20/F.Fr.) = Rs.5495.991 Crs 20.9.99 107.6 US$56.577M Kaniminke (Bangalore) + Rs.152.969 Cr. CCPP - M/s Peenya (ER 1US$=Rs.42) Power Co. = Rs.390.59 Crs (Bangalore)

Remarks

Commissioned on 16.5.99

Counter guarantee withdrawn by MoP vide lr. No.C-7/93-IPCI (Vol.XI) dt. 20.10.2003

Under construction

Status as on 31.10..08

Sl.No .

12.

13.

14.

15.

16.

17.

18.

19.

20.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Project / Installed Estimated Cost Date of Date of Organisation Capacity including IDC (Rs. issue of Financial State (District) (MW) Crores) TEC letter Package approval (Date of Fin. Closure) Kerala Vypeen CCGT (LNG) 25.9.98 679.2 US$6.9M - M/s Siasin Energy Ltd. + S.Fr.439.84 M (Eranakulam) + Rs.771.475 Crs. (ER Rs.39.50/US$ & Rs.26.50/S.Fr.) = Rs..1964.306 Crs Kannur CCGT 513 US$210.010M 16.2.2000 - M/s Kannur Power Projects + Rs.587.971 Cr. Ltd. (ER 1US$=Rs.42) (Kannur) = Rs.1470.013 Crs Tamil Nadu 19.8.94 1x250 US$261.59M Neyveli TPS Zero Unit (3.11.99) =250 + Rs.501.10 Crs. - M/s ST-CMS Electric (ER 1US$=Rs.31.50) Company = Rs.1325.11 Crs (South Arcot) Pillaiperumalnallur CCGT 330.5 US$206.549M 24.11.95 15.5.98 - M/s PPN Power Co. + Rs.429.80 Crs. (7.12.98) (Thanjavur) (ER 1US$=Rs.33.50) = Rs.1121.739 Crs 3.4.96 2x525 US$585.96M North Madras TPS Stage-II =1050 + Rs.2402.24 Crs. - M/s Videocon Power Ltd. (ER 1US$=Rs.34.50) (M.G.R.) = Rs.4423.802 Crs Basin Bridge DGPP 4x50 US$125.82M 10.7.96 completed - M/s GMR Vasavi Power =200 + Rs.328.99 Crs. cost Corpn.Ltd. (ER 1US$=Rs.34) approved (Madras) = Rs.756.778 Crs on 2.8.2001 (18.6.97) 31.7.97 Tuticorin TPP St.IV 1x525 US$321.779M - M/s SPIC Electric Power =525 + DEM 145.893 M Corp. Ltd. + Rs.875.389 Crs. (Chidambaranar) (ER 1US$=Rs.35.50, 1 DEM= Rs.21) = Rs.2324.08 Crs Samayanallur DGPP 106 US$59.84M 10.2.98 - M/s Balaji Power Corp. + Rs.150.845 Crs. (4/2000) Ltd. (ER 1US$=Rs.39) ( Madurai) = Rs.384.221 Crs Samalpatti DGPP 10.2.98 12.8.99 106 US$61.222M - M/s Samalpatti Power Co. (24.12.99) + Rs.153.098 Crs. (Dharampur) (ER 1US$=Rs.39) = Rs.391.85 Crs

Remarks

Commissioned on 11.10.02

Commissioned on 5.4.01

commissioned on 31.12.98

Commissioned on 22.9.01

Commissioned on 3/2001

Status as on 31.10..08

Sl. No.

21.

22.

23.

1.

2.

3.

4.

*5.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Project / Installed Estimated Cost Date of Date of Organisation Capacity including IDC (Rs. issue of Financial State (District) (MW) Crores) TEC letter Package approval (Date of Fin. Closure) 31.7.98 North Madras TPP-III 1x525 US$147.915M - M/s Tri Sakthi Energy =525 + GBP 122.927 M Pvt. Ltd. + F.Fr. 458.023 M (MGR ) + Rs.736.56 Crs. (ER Rs.35.50/US$, Rs. 57.00/GBP and Rs.6.21/F.Fr.) = Rs.2246.774 Crs Cuddalore TPP 13.8.99 2x660 US$488.193M - M/s Cuddalore Power Co. =1320 + GBP 203.922 M (South Arcot) + F.Fr.1258.811 M + Rs.2036.501 Crs. (ER Rs.42.50/US$, Rs. 68.00/GBP and Rs.7.00/F.Fr.) = Rs.6379.159 Crs 24.9.99 1873 US$694.94M Vembar CCGT (LNG) + Rs.2106.67 Crs. - M/s India Power Projects (ER 1US$=Rs.42.50) Ltd. = Rs.5060.165 Crs (Ramanathapuram & Tuticorin) Sub-total (SR)T-23 Nos.-13219.5 MW EASTERN REGION Orissa Ib Valley TPP Unit 5 & 6 2x250 US$326.02M 26.2.99 - M/s AES Ib Valley =500 + Rs.983.90 Crs. Corpn. (ER 1US$=Rs.42.50) (Jharsuguda) = Rs.2369.485 Crs 29.4.99 2x250 US$313.596M Duburi TPP =500 + Rs.952.83 Crs. - M/s Kalinga Power (ER 1US$=Rs.39.50) Corpn. (Jajpur) = Rs.2191.5342 Crs Jharkhand Jojobera TPS 2x120 1025.19 17.12.97 - M/s Jamshedpur Power =240 (17.12.98) Co. Ltd. (Jamshedpur) West Bengal 16.8.95 2x250 US$227.96M Balagarh TPS =500 + Rs.1517.02 Crs. - M/s BPCL (ER 1US$=Rs.31.50) (Hoogly) = Rs.2234.69 Crs 23.6.98 2x210 US$23.400M Bakreshwar TPP =420 + J Yen 20544.270 M - M/s Bakreshwar Power + Rs.925.157 Crs. Gen. Co. Ltd. (ER Rs.39.50/US$ and (Through MOU route) Rs.0.294/J Yen) (Birbhum) = Rs.1621.5885 Crs

Remarks

Status as on 31.10..08

Sl. No.

**6 .

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA (UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948) Name of the Project Capacity Estimated Cost Date of issue Date of State (District) (MW) including IDC (Rs. of TEC letter Financial Crores) Package approval (Date of Fin. Closure) Gouripore TPP 1x150 US$28.07M 19.4.99 - M/s Gouripore Power Co. =150 + Rs.548.566 Crs. Ltd. (ER 1US$=Rs.39.50) (North 24 Pargana) = Rs.659.4425 Crs Sub-total (ER)T-6 Nos.-2310 MW NORTH-EASTERN REGION NIL

Remarks

Total All India (Thermal) 52 Nos. 28028.5 MW Grand Total All India (T+H)-61 Nos. 30824.5 MW (Rs.126726.65 Crs.) Hydro 9 Nos. 2796 MW (Rs.13515.74 Crs.) Thermal-52 Nos. 28028.5 MW (Rs.113210.91 Crs.) * M/s WBPDCL requested for transfer of TEC of the project to them as per Govt. of West Bengal decision. A DPR submitted in State sector by WBPDCL as Bakreshwar TPS Unit 4 & 5 (2x210 MW) had been accorded TEC by CEA on 31.5.02 at an estimated completed cost of US$ 80.0M+Rs.920.715 Crs. Including IDC and F.C. at F.E. rate of Rs.49.0/US$. ** State govt. have revoked the authorisation u/s 18 A given to M/s GPC and authorised WBPDCL to establish, own, operate and maintain the Gouripore TPS. WBPDCL had submitted a project profile for a capacity of 2x125 MW in 6/01, which was returned on 8.9.01. WBPDCL have however intimated vide lr. Dt.9.10.01, that the proposal has to be dropped as per the present stringent norms of West Bengal Pollution Control Board in regard to environmental aspect.