Académique Documents
Professionnel Documents
Culture Documents
OBRA
2,414,706.92
INCL. IGV
ENTIDAD
CONTRATISTA
:SAVIA SA
CONSTRUCTOR
SUPERVISOR
13/11/2012
2/25/2013
ACTUAL
ANTERIOR
A
SALDO
679,794.56
659,684.54
20,110.02
679,794.56
2.96%
0.00
1,366,567.24
1,288,421.91
78,145.31
1,366,567.22
5.72%
0.00
TOTAL S/IGV
2,046,361.80
1,948,106.45
98,255.35
2,046,361.80
8.68%
0.00
95.20%
4.80%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
818,544.72
818,544.72
0.00
818,544.72
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
818,544.72
818,544.72
0.00
818,544.72
0.00%
0.00
1,129,561.73
98,255.35
1,227,817.08
1,129,561.73
98,255.35
1,227,817.08
203,321.11
17,685.96
221,007.07
1,332,882.84
115,941.31
1,448,824.15
1,332,882.84
115,941.31
1,448,824.15
OTORGADO
S/.
EN EFECTIVO (VN)
IGV = VNx18%)
F
AVANCE
C AMORTIZACIONES (A)
ACTUAL
ACUMULADO
S/.
P
R
O
D
E
N
O
R
s
a
c
"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"
Item
Provincia
TALARA
DistritoTALARA
Descripcin
Unidad
1.00.00
1.01.00
1.02.00
1.03.00
1.04.00
1.05.00
1.06.00
OBRAS PROVISIONALES
CARTEL DE OBRA (2.40X3.60)
UND
DEPOSITO Y ALMACEN
M2
OFICINA Y GUARDIANIA
MES
SEALIZACION, DESVIO DE TRANSITO Y PROTECCION DE OBRA GLB
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS
GLB
AGUA P/CONSTRUCCION
GLB
2.00.00
2.01.00
2.01.01
2.01.02
2.01.03
2.01.04
ALCANTARILLADO
TRABAJOS PRELIMINARES
REPLANTEO DE EXPEDIENTE TECNICO
TRAZO, NIVEL Y REPLANTEO
TRANSVASE DE AGUAS SERVIDAS - BOMBA 4"
SUPERVISION DE EPS GRAU ALCANTARILLADO
Metrado
Precio
Parcial
ACUMULADO ANTERIOR
Monto
%
S/.
Metrado
Metrado
ACTUAL
Monto
S/.
Metrado
ACUMULADO
Monto
S/.
Metrado
SALDO
Monto
S/.
820.45
60.00
1,587.43
3,500.00
6,916.06
5,000.00
28,586.23
820.45
6,000.00
6,349.72
3,500.00
6,916.06
5,000.00
1.00
100.00
4.00
1.00
1.00
1.00
820.45
6,000.00
6,349.72
3,500.00
6,916.06
5,000.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
100.00
4.00
1.00
1.00
1.00
820.45
6000.00
6349.72
3500.00
6916.06
5000.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15,000.00
3.27
26.82
2,500.00
537,909.23
66,554.82
15,000.00
5,330.98
43,723.84
2,500.00
1.00
1,630.27
1,590.92
1.00
15,000.00
5,330.98
42,668.47
2,500.00
100.00%
100.00%
97.59%
100.00%
0.00
0.00
39.35
0.00
0.00
0.00
1,055.37
0.00
0.00%
0.00%
2.41%
0.00%
1.00
1630.27
1630.27
1.00
15000.00
5330.98
43723.84
2500.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
2.02.00
2.02.01
2.02.02
2.02.03
2.02.04
2.02.05
MOVIMIENTO DE TIERRAS
73,360.59
EXCAVACION MANUAL T. NORMAL P/TUBO PVC DN = 110mm Hprom.=1.00m
M
1,630.27
A=0.60 m INC.
19.93DESM. TUBERIA
32,491.28
REFINE Y NIVELACION FONDO DE ZANJA P/TUBO DN 110 mm M
1,630.27
5.31
8,656.73
CAMA DE ARENA MANUAL ZANJA -P/ALCANTARILLADO
M
1,630.27
8.20
13,368.21
RELLENO COMPACTADO C/MATERIAL PROPIO DE ZANJA -P/ALCANTARILLADO
M
1,630.27
DN=110mm
10.54
H=1.00m 17,183.05
PVC
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
141.63
11.73
1,661.32
1,590.92
1,590.92
1,590.92
1,590.92
138.21
31,707.03
8,447.78
13,045.54
16,768.30
1,621.20
97.59%
97.59%
97.59%
97.59%
97.59%
39.35
39.35
39.35
39.35
3.42
784.25
208.95
322.67
414.75
40.12
2.41%
2.41%
2.41%
2.41%
2.41%
1630.27
1630.27
1630.27
1630.27
141.63
32491.28
8656.73
13368.21
17183.05
1661.32
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
2.03.00
2.03.01
2.03.02
35,539.88
21,519.56
14,020.32
1,590.92
1,590.92
21,000.14
13,681.91
97.59%
97.59%
39.35
39.35
519.42
338.41
2.41%
2.41%
1630.27
1630.27
21519.56
14020.32
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.04.00
2.04.01
2.04.02
2.04.03
2.04.04
2.04.05
2.04.06
2.04.07
2.04.08
2.04.09
2.04.10
2.04.11
2.04.12
2.04.13
2.04.14
2.04.15
2.04.16
BUZONES
EMPALME DE TUBERIA PVC Dim = 110mm a BUZON EXISTENTE
UND
11.00
65.87
DADOS DE CONCRETO F'C=140 KG/CM2
UND
216.00
50.25
DOBLE PRUEBA HIDRAULICA EN TUBERIA - ALCANTARILLADO M
1,630.27
6.07
EXCAVACION DE ZANJA PARA BUZONES O CAJAS CONDOMINIALES
M3 HASTA 1.50m
36.82
33.21
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
45.83
11.73
BUZON TIPICO D=1.20 C/MARCO Y TAPA CONCRETO HASTA H=1.20m
UND DE PROFUNDIDAD
3.00
1,881.86
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.45m
2.00
DE PROFUNDIDAD
1,277.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.55m
8.00
DE PROFUNDIDAD
1,287.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.65m
4.00
DE PROFUNDIDAD
1,293.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.75m
16.00
DE PROFUNDIDAD
1,318.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.85m
23.00
DE PROFUNDIDAD
1,328.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.95m
26.00
DE PROFUNDIDAD
1,338.24
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.05m
5.00
DE PROFUNDIDAD
1,361.94
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.15m
4.00
DE PROFUNDIDAD
1,366.94
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.25m
4.00
DE PROFUNDIDAD
1,371.94
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.35m
5.00
DE PROFUNDIDAD
1,376.94
158,017.65
724.57
10,854.00
9,895.74
1,222.79
537.59
5,645.58
2,555.48
10,301.92
5,174.96
21,099.84
30,561.02
34,794.24
6,809.70
5,467.76
5,487.76
6,884.70
11.00
212.00
1,590.92
36.82
45.83
3.00
0.00
8.00
4.00
16.00
23.00
26.00
5.00
4.00
4.00
5.00
724.57
10,653.00
9,656.88
1,222.79
537.59
5,645.58
0.00
10,301.92
5,174.96
21,099.84
30,561.02
34,794.24
6,809.70
5,467.76
5,487.76
6,884.70
100.00%
98.15%
97.59%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
4.00
39.35
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
201.00
238.86
0.00
0.00
0.00
2,555.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.85%
2.41%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11.00
216.00
1630.27
36.82
45.83
3.00
2.00
8.00
4.00
16.00
23.00
26.00
5.00
4.00
4.00
5.00
724.57
10854.00
9895.74
1222.79
537.59
5645.58
2555.48
10301.92
5174.96
21099.84
30561.02
34794.24
6809.70
5467.76
5487.76
6884.70
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
UND
M
M
GLB
1.00
100.00
4.00
1.00
1.00
1.00
1.00
1,630.27
1,630.27
1.00
1,630.27
1,630.27
13.20
8.60
"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"
Item
Provincia
TALARA
Descripcin
DistritoTALARA
Unidad
Metrado
Precio
Parcial
ACUMULADO ANTERIOR
Monto
%
S/.
Metrado
2.05.00
2.05.01
2.05.02
2.05.03
2.05.04
2.05.05
2.05.06
2.05.07
2.05.08
2.05.09
CONEXIONES DOMICILIARIAS
201,119.01
EXCAVACION TERRENO MANUAL P/CONX. DSG TUBO DIAM 160mm
M INC DESMONTAJE
31.45
DE13.28
TUB. EXISTENTE
417.66
0.00
0.00
0.00%
EXCAVACION TERRENO MANUAL P/CONX. DSG TUBO DIAM 110mm
M INC DESMONTAJE
666.75
DE19.93
TUB. EXISTENTE
13,288.33
651.15
12,977.42
97.66%
REFINE / NIVELACION Y CAMA DE APOYO DE ZANJA P/TUBO DIAM
M = 160-110mm
698.20 e=0.10m2.97
2,073.65
651.15
1,933.92
93.26%
RELLENO Y COMPCT. C/ MATERIAL PROPIO DE ZANJA TUBO DIAM=160-110mm
M
698.20
7,324.12
651.15
6,830.57
93.26%
10.49
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
69.99
820.98
65.27
765.62
93.26%
11.73
CONEXION DOMICILIARIA CONVENCIONAL EN DESAGUE DN=160
UND
mm PVC U12.00
UF NTP ISO468.99
4435 SN-2 L=3M
5,627.88
PARA RED COLECTORA
0.00
DIAM=200
0.00 mm 0.00%
CONEXION DOMICILIARIA CONDOMINIAL EN DES. DN=110mm UND
PVC U UF NTP
237.00
ISO 4435 SN-4
L=3M P/RAMAL
111,871.11
CONDOMIN
231.00
DIAM =109,038.93
110mm
97.47%
472.03
PRUEBA HIDRAULICA A ZANJA TAPADA
M
698.20
2,995.28
651.15
2,793.43
93.26%
4.29
ADECUACION DE CONEXIONES EXISTENTES EN ACTUAL FUNCIONAMIENTO
A LA NUEVA300.00
RED
UND
189.00
56,700.00
189.00
56,700.00 100.00%
2.06.00
2.06.01
2.06.02
2.06.03
2.06.04
2.06.05
2.06.06
2.06.07
2.06.08
2.06.09
VARIOS
3,317.28
RETIRO Y REPOSICION DE PAVIMEMTO DE ASFALTO
M2
6.67
4.20
28.01
DEMOLICION DE LOSA DE CONCRETO DE E=0.10 m
M2
10.66
4.98
53.09
LOSA DE CONCRETO F'C=175kg/cm2
M2
10.66
61.24
652.82
RETIRO DE ADOQUIN (20 x 10 x 8 cm)
M2
19.42
9.96
193.42
COLOCACION DE ADOQUIN (20 x 10 x 8 cm)
M2
19.42
61.00
1,184.62
REFINE, NIVELACION Y COMPACTACION DE SUB RASANTE PARAM2
PAVIMENTO
36.75
DE ASFALTO10.25
376.69
CONFORMACION DE SUB BASE GRANULAR; e=0.20m PARA PAVIMENTO
M2
DE26.09
ASFALTO Y ADOQUIN
15.61
407.26
CONFORMACION DE BASE GRANULAR; e=0.20m PARA PAVIMENTO
M2 DE ASFALTO,
36.75 CONCRETO
9.64Y ADOQUIN354.27
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
4.65
14.43
67.10
COSTO DIRECTO
566,495.46
GASTOS GENERALES VARIABLES 9.46%
53,590.47
GASTOS GENERALES FIJOS
0.540%
3059.08
UTILIDAD
10.00%
56649.55
SUB TOTAL
679,794.56
I.G.V.
18.00%
122363.02
TOTAL PRESUPUESTO
802,157.58
6.67
10.66
10.66
19.42
19.42
36.75
26.09
36.75
4.65
28.01
53.09
652.82
193.42
1,184.62
376.69
407.26
354.27
67.10
549,737.06
52,005.13
2,968.58
54,973.71
659,684.48
118,743.21
778,427.69
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
97.04%
Metrado
ACTUAL
Monto
S/.
Metrado
ACUMULADO
Monto
S/.
Metrado
SALDO
Monto
S/.
31.45
15.60
47.05
47.05
4.72
12.00
6.00
47.05
0.00
417.66
310.91
139.73
493.55
55.36
5,627.88
2,832.18
201.85
0.00
100.00%
2.34%
6.74%
6.74%
6.74%
100.00%
2.53%
6.74%
0.00%
31.45
666.75
698.20
698.20
69.99
12.00
237.00
698.20
189.00
417.66
13288.33
2073.65
7324.12
820.98
5627.88
111871.11
2995.28
56700.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,758.40
1,585.34
90.50
1,675.84
20,110.02
3,619.80
23,729.82
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.67
10.66
10.66
19.42
19.42
36.75
26.09
36.75
4.65
28.01
53.09
652.82
193.42
1184.62
376.69
407.26
354.27
67.10
566,495.46
53,590.47
3,059.08
56,649.55
679,794.56
122,363.02
802,157.58
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.96%
100.00%
0.00%
VALORIZACION N05 DE RED DE AGUA POTABLE - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:
"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"
Item
Provincia
TALARA
Descripcin
Distrito
TALARA
Unidad
Metrado
Precio
Parcial
3.27
2.49
1.33
1,682.36
ACUMULADO ANTERIOR
Monto
%
S/.
Metrado
Metrado
ACTUAL
Monto
S/.
Metrado
ACUMULADO
Monto
S/.
Metrado
SALDO
Monto
S/.
3.00.00
3.01.00
3.01.01
3.01.02
3.01.03
3.01.04
AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO, NIVEL Y REPLANTEO
DEMOLICION DE DADOS DE ANCLAJE
DESMONTAJE DE ACCESORIOS EXISTENTE
SUPERVISION DE EPS GRAU AGUA
950,997.31
18,429.75
16,483.81
171.81
91.77
1,682.36
5,040.92
69.00
69.00
1.00
16,483.81
171.81
91.77
1,682.36
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
5040.92
69.00
69.00
1.00
16,483.81
171.81
91.77
1,682.36
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
3.02.00
3.02.01
3.02.02
3.02.03
3.02.04
3.02.05
MOVIMIENTO DE TIERRAS
207,632.09
EXCAVACION C/EQUIPO T. NORMAL P/TUBO PVC DN = 110mm Hprom.=1.00m
M
5,040.92A=0.60 m
15.52
INC. DESM.78,235.08
TUBERIA
REFINE Y NIVELACION FONDO DE ZANJA P/TUBO DN 110 mm. M
5,040.92
5.31
26,767.29
CAMA DE ARENA MANUAL ZANJA P/ AGUA e=0.10 m DN =110 mm
M A= 0.60
5,040.92
m
8.54
43,049.46
RELLENO COMPACTADO C/MATERIAL PROPIO DE ZANJA -P/AGUA
M DN=110mm
5,040.92
H=1.00m 9.58
PVC
48,292.01
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
962.34
11.73
11,288.25
5,040.92
5,040.92
5,040.92
5,040.92
962.34
78,235.08
26,767.29
43,049.46
48,292.01
11,288.25
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
5040.92
5040.92
5040.92
5040.92
962.34
78,235.08
26,767.29
43,049.46
48,292.01
11,288.25
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
3.03.00
3.03.01.00
3.03.01.01
3.03.01.02
3.03.01.03
3.03.01.04
17.22
5.03
14.65
3.24
139,963.94
110,506.66
78,878.79
23,040.67
7,032.00
1,555.20
4,580.65
4,580.65
0.00
0.00
78,878.79
23,040.67
0.00
0.00
100.00%
100.00%
0.00%
0.00%
0.00
0.00
480.00
480.00
0.00
0.00
7,032.00
1,555.20
0.00%
0.00%
100.00%
100.00%
4580.65
4580.65
480.00
480.00
78,878.79
23,040.67
7,032.00
1,555.20
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
57.39
6.61
29,457.28
26,414.90
3,042.38
430.27
430.27
24,693.20
2,844.08
93.48%
93.48%
30.00
30.00
1,721.70
198.30
6.52%
6.52%
460.27
460.27
26,414.90
3,042.38
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,323.81
6,658.40
0.00
432.50
203.24
3,890.52
44,808.66
525.72
430.48
700.96
735.48
1,171.44
0.00
0.00
99.20
0.00
2,111.56
1,454.25
1,454.25
51,120.05
3,985.60
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
0.00%
100.00%
50.00%
100.00%
90.87%
100.00%
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
3.00
0.00
4.00
0.00
1.00
0.00
460.27
0.00
0.00
0.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.00
375.00
0.00
6,589.96
0.00
1,454.25
0.00
5,136.62
0.00
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
50.00%
0.00%
9.13%
0.00%
3.00
35.00
2.00
2.00
1.00
3.00
39.00
3.00
2.00
4.00
3.00
6.00
2.00
3.00
1.00
4.00
4.00
2.00
1.00
5040.92
106.00
1,323.81
6,658.40
360.00
432.50
203.24
3,890.52
44,808.66
525.72
430.48
700.96
735.48
1,171.44
250.00
375.00
99.20
6,589.96
2,111.56
2,908.50
1,454.25
56,256.67
3,985.60
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.04.00.00
3.04.01.00
3.04.02.01
3.04.02.02
3.04.03.00
3.04.04.00
3.04.05.050
3.04.06.00
3.04.07.00
3.04.08.00
3.04.09.00
3.04.10.00
3.04.11.01
3.04.11.02
3.04.11.03
3.04.12.00
3.04.13.00
3.04.14.00
3.04.15.00
3.04.16.00
3.04.17.00
3.04.18.00
M
UND
UND
GLB
5,040.92
69.00
69.00
1.00
VALORIZACION N05 DE RED DE AGUA POTABLE - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:
"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"
Item
Provincia
TALARA
Descripcin
Distrito
TALARA
Unidad
Metrado
Precio
3.05.00.00
3.05.01.00
3.05.02.00
3.05.03.00
3.05.04.00
3.05.05.00
3.05.06.00
CONEXIONES DOMICILIARIAS
EXCAVACION MANUAL T. NORMAL P/TUBO PVC DN = 15mm Hprom.=0.60m
M
4,195.25
10.96
REFINE Y NIVELACION FONDO DE ZANJA P/TUBO DN 15 mm
M
4,195.25
0.80
CAMA DE ARENA MANUAL ZANJA P/ AGUA e=0.05 m DN = 15 mm
M A= 0.60
4,195.25
m
4.62
CONEXION DOMICILIARIA P/ RED DE AGUA DN = 160mm, L = 5.50
UNDm
882.00
255.59
PRUEBA HIDRAULICA TUBERIA PVC
M
4,195.25
11.16
RELLENO COMPACTADO C/ MATERIAL PROPIO DE ZANJA - DN=15mm
M
H=0.60m
4,195.25PVC
2.22
3.06.00.00
3.06.01.00
3.06.03.00
3.06.05.00
3.06.07.00
3.06.10.00
VARIOS
ROTURA DE PAVIMENTO DE ASFALTO
M2
REPOSICION DE PAVIMENTO DE ASFALTO EN FRIO
M2
DEMOLICION DE LOSA DE CONCRETO DE E=0.10 m
M2
RETIRO DE ADOQUIN (20 x 10 x 8 cm)
M2
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
915.43
915.43
2,470.86
688.97
250.00
3.07.00.00
3.07.01.00
3.07.02.00
3.07.03.00
4.00.00.00
4.01.00.00
4.02.00.00
4.03.00.00
4.04.00.00
4.05.00.00
4.06.00.00
4.07.00.00
Parcial
ACUMULADO ANTERIOR
Monto
%
S/.
Metrado
Metrado
ACTUAL
Monto
S/.
Metrado
ACUMULADO
Monto
S/.
Metrado
SALDO
Monto
S/.
350,281.03
45,979.94
3,356.20
19,382.06
225,430.38
46,818.99
9,313.46
4,195.25
4,195.25
4,195.25
882.00
4,195.25
4,195.25
45,979.94
3,356.20
19,382.06
225,430.38
46,818.99
9,313.46
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4195.25
4195.25
4195.25
882.00
4195.25
4195.25
45979.94
3356.20
19382.06
225430.38
46818.99
9313.46
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.20
42.00
4.98
28.28
14.43
77,689.32
3,844.81
38,448.06
12,304.88
19,484.07
3,607.50
915.43
0.00
2,470.86
688.97
250.00
3,844.81
0.00
12,304.88
19,484.07
3,607.50
100.00%
0.00%
100.00%
100.00%
100.00%
0.00
915.43
0.00
0.00
0.00
0.00
38,448.06
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
915.43
915.43
2470.86
688.97
250.00
3,844.81
38,448.06
12,304.88
19,484.07
3,607.50
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
9.96
37.28
14.43
21,729.23
5,278.80
15,016.38
1,434.05
530.00
402.80
99.38
5,278.80
15,016.38
1,434.05
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
530.00
402.80
99.38
5,278.80
15,016.38
1,434.05
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
187,808.73
1,000.00
1,000.00
45,808.73
8,000.00
70,000.00
60,000.00
2,000.00
1,138,806.04
107,731.05
6149.55
113880.6
1,366,567.24
245982.1
1,612,549.34
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1,000.00
1,000.00
45,808.73
8,000.00
70,000.00
60,000.00
0.00
1,073,684.95
101,570.60
5,797.90
107,368.50
1,288,421.95
231,915.95
1,520,337.90
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
2,000.00
65,121.09
6,160.46
351.65
6,512.11
78,145.31
14,066.16
92,211.47
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1,000.00
1,000.00
45,808.73
8,000.00
70,000.00
60,000.00
2,000.00
1,138,806.04
107,731.05
6,149.55
113,880.60
1,366,567.24
245,982.10
1,612,549.34
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
94.28%
5.72%
100.00%
0.00%
VALORIZACION N05 DE RED DE AGUA POTABLE - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:
"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"
Item
Provincia
TALARA
Descripcin
Distrito
TALARA
Unidad
Metrado
Precio
Parcial
ACUMULADO ANTERIOR
Monto
%
S/.
Metrado
Metrado
ACTUAL
Monto
S/.
Metrado
ACUMULADO
Monto
S/.
Metrado
SALDO
Monto
S/.
VALORIZACION N 05
DEL 05 DE MARZO AL 04 DE ABRIL DE 2013
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y ALCANTARILLADO CONDOMINIAL DEL A.H SAN PEDRO"
CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC
SUPERVISOR: ING. LUIS RAMOS TIMANA
RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES
CONCEPTO
IGV
TOTAL
2,046,361.80
368,345.12
2,414,706.92
818,544.72
147,338.05
965,882.77
SUB TOTAL
DETALLE VALORIZACION
FECHA
MONTO VALORIZADO
TOTAL
IGV
AMORTIZACION
MONTO
INCLUIDO IGV
01
VALORIZACION N01
312,237.06
124,894.82
22,481.07
147,375.89
02
VALORIZACION N02
478,429.21
191,371.68
34,446.90
225,818.58
03
VALORIZACION N03
912,653.78
365,061.51
65,711.07
430,772.58
04
VALORIZACION N04
98,255.35
137,216.71
24,699.01
161,915.72
05
VALORIZACION N05
0.00
0.00
0.00
0.00
818,544.72
147,338.05
965,882.77
0.00
0.00
0.00
TOTAL AMORTIZADO
Saldos pendientes en funcin al adelanto total
CURVA "S"
CRONOGRAMA REAL vs. CRONOGRAMA PROGRAMADO
OBRA
ENTIDAD
CONTRATISTA
:SAVIA SA
CONSTRUCTOR
INICIO DE OBRA
13/11/2012
PLAZO CONTRACTUAL
:105 DC
TERMINO DE OBRA
2/25/2013
PROGRAMADO
Item
Descripcion
Presupuesto
2,414,706.92
VALORIZACIONES PROGRAMADAS
MES 1
MES 2
MES 3
MES 4
227,939.41
683,983.63
876,059.04
626,724.84
9.44
9.44
28.33
37.77
36.28
74.05
25.95
100.00
REAL
VALORIZACIONES REALES
Item
Presupuesto
13/NOV AL
13/DIC/12
14/DIC AL
12/ENE/13
MES 3
MES 4
2,414,706.92
15.26
23.38
44.60
16.76
15.26
38.64
83.24
100.00
100.00%
100
VALORIZACION ACUMULADA (%)
Descripcion
90
80
70
60
AVANCE PROGRAMADO
50
40
AVANCE REAL
30
20
10
0
VALORIZACIONES
OB SERVACION
OB RA CULMINADA
ITEM
COSTO
DIRECTO
DESCRIPCION
MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y
ALC CONDOMINIAL DE SAN PEDRO
NOVIEMBRE DICIEMBRE
13
30 1
30 1
ENERO
FEBRERO
30 1
25
1,715,451.25
1.00.00
OBRAS PROVISIONALES
2.00.00
ALCANTARILLADO
2.01.00
TRABAJOS PRELIMINARES
70,700.23
2.02.00
MOVIMIENTO DE TIERRAS
77,047.05
2.03.00
66,025.94
2.04.00
BUZONES
165,912.54
2.05.00
CONEXIONES DOMICILIARIAS
211,171.22
2.01.06
VARIOS
3.00.00
AGUA POTABLE
3.01.00
TRABAJOS PRELIMINARES
19,333.53
3.02.00
MOVIMIENTO DE TIERRAS
239,251.93
3.03.00
234,639.27
3.04.00
142,039.58
3.05.00
CONEXIONES DOMICILIARIAS
383,797.24
3.06.00
VARIOS
41,202.67
3.07.00
22,815.00
4.00.00
6,500.00
6,306.40
7,883.02
9,459.62
35,350.12
21,210.07
14,140.04
23,114.11
26,966.47
26,966.47
19,807.78
23,109.08
23,109.08
74,660.64
58,069.39
33,182.51
73,909.93
73,909.93
7,883.02
31,532.06
1,393.20
63,351.36
2,089.79
3,482.99
19,333.53
95,700.77
143,551.16
82,123.74
105,587.67
46,927.86
63,917.81
56,815.83
21,305.94
95,949.31
287,847.93
10,300.67
1,300.00
COSTO DIRECTO
1,715,451.25
% DE AVANCE DE OBRA
GASTOS GENERALES VARIABLES
8.80%
161,932.25
30,902.00
6,844.50
15,970.50
1,300.00
1,950.00
1,950.00
485,914.27
622,368.12
445,236.61
100.00%
9.44%
28.33%
36.28%
25.95%
150,959.71
14,250.04
42,760.46
54,768.39
39,180.82
0.49%
8,405.71
793.47
2,380.98
3,049.60
2,181.66
UTILIDADES
10.00%
171,545.13
16,193.23
48,591.43
62,236.81
44,523.66
2,046,361.80
193,168.99
579,647.14
742,422.92
531,122.75
368,345.12
34,770.42
104,336.49
133,636.12
95,602.09
2,414,706.92
227,939.41
683,983.63
876,059.04
626,724.84
SUB-TOTAL
I.G.V.
TOTAL
18.00%
OBRA
2,414,706.92
INCL. IGV
ENTIDAD
CONTRATISTA
:SAVIA SA
CONSTRUCTOR
SUPERVISOR
13/11/2012
2/25/2013
RESUMEN DE PRESUPUESTOS
CONTRATADO, ADICIONAL, DEDUCTIVO, Y MAYORES G.G.
S/IGV
A
2,046,361.80
2,046,361.80
B
ADICIONAL DE OBRA N 01
AGUA POTABLE
36,157.42
0.00
2,042,637.00
2,042,637.00
E AGUA POTABLE Y
TE TALARA, PROVINCIA DE
C/IGV
(18.00%)
2,414,706.92
2,414,706.92
42,665.76
0.00
47,061.02
2,410,311.66
2,410,311.66
VALORIZACION N 05
DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:
"MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y ALCANTARILLADO CONDOMINIAL DEL A.H SAN
PEDRO"
DETALLE VALORIZACION
MONTO
VALORIZADO
DESCRIPCION
01
VALORIZACION N01
312,237.06
02
VALORIZACION N02
478,429.21
564,546.47
03
VALORIZACION N03
912,653.78
1,076,931.46
04
VALORIZACION N04
244,786.40
TOTAL CANCELADO
1,948,106.45
CONCEPTO
368,439.73
288,847.95
2,298,765.61
IGV
TOTAL
2,042,637.00
367,674.66
2,410,311.66
1,948,106.45
350,659.16
2,298,765.61
SUB TOTAL
111,546.05
PAGO FINAL
(F)
R- C
S/.
111,546.05
NOTA: LA SUMA TOTAL A PAGAR A PROYECTOS DEL NORTE SAC ES CIENTO ONCE MIL QUINIENTOS
CUARENTA Y SEIS CON 05/100 NUEVOS SOLES.
CONCEPTO
SUB TOTAL
IGV
TOTAL
VALORIZACION N 05
98,255.35
17,685.96
115,941.31
PAGO FINAL ( F )
94,530.55
17,015.50
111,546.05
4,395.26
4,395.26