Vous êtes sur la page 1sur 24

SCHEDULE OF RATES FOR CIVIL ENGINEERING WORKS IN SARAWAK 2008

JKR Sarawak April 2009

PREAMBLES
1. All rates shall be used and read together with the Table of Adjustment to Schedule of Rates for Civil Engineering Works In Sarawak 2008. 2. All descriptions are to be read with reference to the Standard Specification for Road Works (including Bridge Structures) JKR/SPJ/1988, Addendum No. S-1 (Rev.1),all other subsequent Addendums and the drawings in the Standard Drawings for Road Construction (April 1989) issued by Unit Rekabentuk Jalan, Cawangan Jalan, Ibu Pejabat Kerja Raya, Kuala Lumpur and the following :
(A) Piling a) Rates for driving of timber piles shall include for the provision of all necessary mechanical plant, rig, temporary works, timber etc. transporting to site, erecting, dismantling, removal on completion and also for traveling of pile frame about the site. Rates for driving of precast concrete piles and reinforced concrete lengthened piles shall include for the provision of all necessary mechanical plant, rig, temporary works, etc. and for the travelling of pile frame about the site.

b)

(B) Site Clearance And Earthwork All rates herein shall be held to include for supply and delivery to site, waste on materials, carriage and cartage, carrying in and return of empties, hoisting, setting, fitting and fixing in position, making and all other labours and everything else necessary (including any customs duty, etc.) for the proper completion of each item and for establishment charges and profit. Rates for site clearance shall include: a) b) c) d) Clearing all general vegetation, tall grass, lallang, creepers, shrubs, bushes and all undergrowth. Felling of trees of all sizes including cutting, grubbing up their stumps and roots and dispose off site. Clearing all rubbish, debris and unwanted materials. Breaking up and removing disused structures, surface beds and pavings, sewers, drains and drain pipes, manholes, underground wells, sumps, fencing, posts, retaining walls and other such like structures, including disconnecting and sealing off services, plugging any pipes cut off at perimeter of site. Removing existing tree stumps and grubbing up their roots and disposal off site. Filling holes and voids caused by removal of trees, tree stumps, roots, existing structures or obstructions with hardcore or suitable approved materials.

e) f)

SOR for Civil Engineering Works 2008

(C) Excavation i Excavation shall be measured to commence at existing ground level. All excavation and filling shall be measured nett. The quantities of excavation and filling shall be measured on the assumption that the gradient of the existing surfaces between the nearest adjacent spot levels and/ or between contours is constant. Boulders not exceeding one cubic metre shall be deemed to be included in the rates for excavation. Rates for excavation (including excavation of drainage) are to include : a. keeping all excavations free from water, mud, etc. by pumping or bailing if required b. planking and strutting, leveling, ramming or preparing bottoms, any double handling required and for additional excavation for planking, strutting and formwork. c. excavating by hand or mechanical means in various soil strata and water tables d. multiple handling e. protection of all services encountered f. additional excavation and backfilling due to Contractors method or process such as excavation for working space. g. reinstating to original condition all work disturbed by excavation. h. additional concrete infill where excavated below correct levels i. giving all required notice j. to ensure safety of excavation and adjoining structures.

(D) Concrete Work i. No allowance shall be made in the weight of steel reinforcement for rolling margin, trying wires, spacers, chairs and weight of weld etc. Concrete shall be measured nett without deduction for the volume of reinforcement. Rates for concrete shall be held to include : (a) forming, leaving or cutting grooves, chases, mortices, holes (b) making good and any sundry items of alike nature. (c) providing trial mixes, tests on materials and finished product, including non destructive test on and off-site (d) hoisting or pumping or placing in position (e) compacting by suitable means (f) laying in bays and associated works (g) curing and protection. Rate for precast concrete work shall include : (a) all reinforcement and moulds (b) lifting hooks, cast-in brackets, dowels and ther fixing devices (c) finishing fair on all exposed faces, and other surface treatment to receive other finishes (d) holes, sleeve, rates, notchings, sinkings, mortices and the like (e) temporary supports (f) hoisting and placing in position; setting, bedding, jointing and pointing in cement mortar; cutting off lifting hooks.

SOR for Civil Engineering Works 2008

Rates for bar reinforcement shall include : (a) allowance for rolling margin and weight of welds (b) cleaning by wire brushing or sand blasting (c) cutting to length and fabricating including bending to various bend and radii (d) providing and tying with galvanized steel wire at all intersections (e) providing seating or spacer blocks and chairs (f) providing all necessary laps and anchorages (g) submitting manufacturers mill and test certificate. Rates for fabric reinforcement shall include : (a) allowance for rolling margin and weight of welds (b) cleaning by wire brushing or sand blasting (c) cutting to length and fabricating including bending to various bend and radii (d) providing and tying with galvanized steel wire at all intersections (e) providing seating or spacer blocks and chairs (f) providing all necessary laps and anchorages (g) submitting manufacturers mill and test certificate. (h) straight, circular or raking cutting and notching. ii. Sawn formwork shall mean formwork to produce concrete surfaces suitable for plastering or tiling. Wrot formwork shall means formwork to produce fair face concrete surfaces suitable for direct application of decorations. Formwork shall be deducted for openings over one square metres. Rates for formwork shall be held to include : (a) for erection, raking and circular cutting, splayed edges, notchings, (b) allowance for overlaps and passing at angles, battens, strutting, bolting, wedging, (c) easing, striking and removal. (d) batten framing (e) stopping all holes, cracks and crevices (f) mould oil

(E) Rates for each item of paving shall be held to include for all rounded angles, arrises and making good and any other sundry items of alike nature.

(F) Rates for each item of skirtings, risers, channels and the like shall be held to include for all short lengths formed, cut and purpose made angles, junctions, ends, etc. and making good and any other sundry items of alike nature.

(G) Rates for mild steel tubing are to include for short running lengths, sockets, backnuts, elbows and bends.

SOR for Civil Engineering Works 2008

(H) Bituminous Road And Hardstandings Rates for site surface water drainage and culvert shall include: a) Sampling and testing of aggregates and bituminous mixtures as specified. b) Protecting mixed material in transit and while awaiting tripping. c) Laying, rolling and consolidating sub-base, base course, binder and wearing course in layers or sequence as required. d) Laying by hand of narrow strips remaining alongside machine work. e) Making joints, working around manhole covers and other like projections. f) Finishing surfaces to gradient and falls. g) Added filler to bituminous mixture. h) Maintenance of surface as work progress.

(I) Gabion Work Rates for gabion work shall include: a) Excavation and disposal of excavated material off site to Contractors own dump. b) Dewatering, upholding the sides of excavation and keeping the excavation free of water. c) Trimming and leveling at founding/base level. d) Cage and tying wire. e) Filling material. f) Transport, handling, assembling, tying, fixing, staking, tensioning and placing in dry condition and/or under water.

(J) Turfing And Tree Planting Rates for seeding and turfing shall include: (a) Carry out the work in such sequence or section as directed. (b) Preparatory work in forking and loosening ground surface including riding all weed, roots and debris. (c) Dressing with fertilizer, tending, watering, covering with wet sacking, moving and protection of newly seeded/turfed area. (d) Maintenance. Rates for tree planting shall include: a) Carry out the work in such sequence or section as directed. b) Selection and tagging of plant material. c) Planting operation including excavation for rootball, top soil, refilling, support and ties. d) Irrigation, pruning and trimming. e) Plant replacement. f) Spraying or other disease control operation. g) Protection. h) Maintenance.

SOR for Civil Engineering Works 2008

A Item No

EARTHWORKS Description Unit Rate (RM)

General Site Clearance: 1 2 3 4 Clearing and grubbing within the Site of all trees, bushes, etc. Stripping top soil to 150mm thick Demolition and removal of existing pavement. Scarify and remove existing pavement to the required level. Ha M M
2

2,500.00 1.00 5.00 2.50

Roadway Excavation 5 Roadway excavation in all materials other than rock including stockpiling aside for embankment construction. Roadway excavation in all materials other than rock including cart away from site. Extra over for excavation in rock including removal from site :Open excavation (including use of explosives, etc). Trench excavation. M3 M3 20.00 40.00

M3

4.00

M3

7.50

7 (a) (b)

Embankment Construction: 8 Supply, lay, grade and compact in layers imported suitable fill material to formation level. Take from stockpile on site, lay, grade and compact in layers suitable excavated fill material to formation level. Supply and lay geotextile (Polyfelt TS65 or equivalent) to receive sand fill material. Supply, lay, grade and compact in layers imported sand fill material to formation level. Construct capping layer using stockpiled materials on slopes of embankment, including excavation of embankment toe drain.

M3

15.00

3.50

10

5.50

11

M3

23.00

12

M3

8.00

Free Draining Material and Drainage Blanket 13 Supply, lay, grade and compact free draining material (eg. River gravel) on geotextile (measured separately). Supply and lay geotextile to receive free draining material. i) Polyfelt TS 50 or equivalent. ii) Polyfelt TS 65 or equivalent.

M3

45.00

14

M2 M2

4.50 6.00

SOR CIVIL WORK 2008/Page 1 of 19

A Item No

EARTHWORKS Description Unit Rate (RM)

Preparation of formation: 15 Prepare, grade to fall and compact subgrade in suitable materials other than sand. Prepare and compact subgrade in sand material.

M2 M
2

2.00 1.50

16

Protective Vegetation for Erosion Control: 17 100mm square turfs for spot turfing on cut slopes, embankments and benches including top soil. Hydroseeding with protective mat (Vigormat V380e or equivalent) on cut slopes, embankments and benches. Establishing leguminous plants as specified on cut slopes, embankments and benches.

M2

5.00

18

M2

6.00

19

M2

6.00

Miscellaneous Works: 20 Supply and place 1.0m x 1.0m x 1.0m PVC coated wire gabion complete with rockfill.

NO

250.00

SOR CIVIL WORK 2008/Page 2 of 19

B Item No.

DRAINAGE WORKS Description Unit Rate (RM)

Drains 1 (a) (b) 2 (a) Surface drain - unlined: Embankment toe drain, type TD 1. Roadside earth drain, Type 2. Surface drain - lined Reinforced concrete roadside drain complete with concrete structs, all excavation and part backfill. i) Type 2. ii) Type 3. iii) Type 4. Reinforced concrete bench/berm drain complete with concrete structs, all excavation and part backfill. i) Type 1. ii) Type 2. Reinforced concrete embankment toe drain complete with concrete structs, all excavation and part backfill. i) Type 3. ii) Type 4. Reinforced concrete shoulder drain Type SD 1 complete with concrete structs, all excavation and part backfill. Interceptor drain complete with concrete structs, all excavation and part i) Type 1. ii) Type 2. Cascade drain: Cascade drain : Reinforced concrete slope drain complete with concrete structs, all excavation and part backfill. Cascade drain : Reinforced concrete outfall drain complete with concrete structs, all excavation and part backfill. Sub-soil drain complete with all excavation and part backfill. i) Type 1. ii) Type 2. 300mm Thick gabion mattress laid on ground including rockfill and laying at slope. Filling of existing stream/drain using imported suitable fill material including compaction. Borrow pit<15km. M M 10.00 8.00

M M M

80.00 130.00 150.00

(b)

M M

70.00 90.00

(c)

M M

200.00 180.00

(d)

90.00

(e)

M M

70.00 80.00

3 (a)

230.00

(b)

275.00

M M M2 M
2

55.00 70.00

150.00 18.00

SOR CIVIL WORK 2008/Page 3 of 19

B Item No.

DRAINAGE WORKS Description Unit Rate (RM)

Precast concrete Pipe Culverts: 7 Precast concrete Class "Z" butt joint pipe culvert of the following sizes complete with cast-in -situ concrete joint complete with reinforcement, formwork, well compacted granular material as surround, and reinforced concrete cradle and including excavation and part backfill : Single 600 mm diameter. Single 900 mm diameter. Twin 900 mm diameter. Single 1200 mm diameter. Twin 1200 mm diameter. Triple-cell 1200 mm diameter. Single 1500 mm diameter. Twin 1500 mm diameter. Triple-cell 1500 mm diameter. Single 1800 mm diameter. Twin 1800 mm diameter. Triple-cell 1800 mm diameter. Reinforced concrete outlet structures comprises headwall, wingwall, apron, culvert marker post and all necessary excavation and part backfill including jointing to pipe culvert of the following sizes: Single 600 mm diameter. Single 900 mm diameter. Twin 900 mm diameter. Single 1200 mm diameter. Twin 1200 mm diameter. Triple-cell 1200 mm diameter. Single 1500 mm diameter. Twin 1500 mm diameter. Triple-cell 1500 mm diameter. NO NO NO NO NO NO NO NO NO 2,350.00 2,600.00 3,900.00 3,250.00 4,940.00 5,600.00 4,680.00 7,000.00 9,000.00 M M M M M M M M M M M M 900.00 1,200.00 2,200.00 1,550.00 2,800.00 4,000.00 1,950.00 3,600.00 5,200.00 2,340.00 4,400.00 6,350.00

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) 8

(a) (b) (c) (d) (e) (f) (g) (h) (i)

SOR CIVIL WORK 2008/Page 4 of 19

B Item No. (j) (k) (l) 9

DRAINAGE WORKS Description Unit Rate (RM)

Single 1800 mm diameter. Twin 1800 mm diameter. Triple-cell 1800 mm diameter. Reinforced concrete inlet sump structure complete with hinged grating cover and frame, grating and all necessary excavation and part backfill including jointing to pipe culvert of the following sizes: Single 600 mm diameter. Single 900 mm diameter. Single 1200 mm diameter. Single 1500 mm diameter. Single 1800mm diameter. Reinforced Concrete Box Culvert

NO NO NO

5,500.00 7,150.00 10,500.00

(a) (b) (c) (d) (e)

NO NO NO NO NO

1,050.00 1,560.00 1,950.00 2,350.00 3,120.00

10 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) 11

Reinforced concrete box culvert barrel with fill height not exceeding 3.0m high complete with all excavation and part backfill and keeping trenches dry. Single 1.5m x 1.5m Twin 1.5m x 1.5m Single 2.0m x 2.0m Twin 2.0m x 2.0m Single 2.5m x 2.5m Twin 2.5m x 2.5m Triple 2.5m x 2.5m Single 3.0m x 3.0m Twin 3.0m x 3.0m Triple 3.0m x 3.0m Single 3.5m x 3.5m Twin 3.5m x 3.5m Triple 3.5m x 3.5m Reinforced concrete box culvert barrel with fill height exceeding 3.0m high and not exceeding 6.0m high complete with all excavation and part backfill and keeping trench dry. Single 1.5m x 1.5m Twin 1.5m x 1.5m Single 2.0m x 2.0m Twin 2.0m x 2.0m Single 2.5m x 2.5m Twin 2.5m x 2.5m Triple 2.5m x 2.5m Single 3.0m x 3.0m Twin 3.0m x 3.0m

M M M M M M M M M M M M M

2,550.00 3,385.00 4,540.00 6,000.00 5,950.00 7,900.00 11,000.00 6,300.00 8,400.00 15,800.00 8,620.00 11,430.00 21,500.00

(a) (b) (c) (d) (e) (f) (g) (h) (i)

M M M M M M M M M

2,880.00 3,850.00 5,130.00 6,840.00 6,770.00 8,880.00 12,400.00 6,950.00 9,250.00

SOR CIVIL WORK 2008/Page 5 of 19

B Item No. 11

DRAINAGE WORKS Description Unit Rate (RM)

(j) (k) (l) (m) 12

Reinforced concrete box culvert barrel with fill height exceeding 3.0m high and not exceeding 6.0m high complete with all excavation and part backfill and keeping trench dry. (Cont'd) Triple 3.0m x 3.0m Single 3.5m x 3.5m Twin 3.5m x 3.5m Triple 3.5m x 3.5m Reinforced concrete box culvert barrel with fill height exceeding 6.0m high and not exceeding 9.0m high complete with all excavation and part backfill and keeping trench dry. Single 1.5m x 1.5m Twin 1.5m x 1.5m Single 2.0m x 2.0m Twin 2.0m x 2.0m Single 2.5m x 2.5m Twin 2.5m x 2.5m Triple 2.5m x 2.5m Single 3.0m x 3.0m Twin 3.0m x 3.0m Triple 3.0m x 3.0m Single 3.5m x 3.5m Twin 3.5m x 3.5m Triple 3.5m x 3.5m Reinforced concrete inlet and outlet structures comprises headwall, wingwall, apron, culvert marker post complete with all necessary excavation and part backfill including jointing to reinforced concrete box culvert of the following sizes: Single 1.5m x 1.5m reinforced concrete box culvert barrel : Twin 1.5m x 1.5m reinforced concrete box culvert barrel : Single 2.0m x 2.0m reinforced concrete box culvert barrel : Twin 2.0m x 2.0m reinforced concrete box culvert barrel : Single 2.5m x 2.5m reinforced concrete box culvert barrel : Twin 2.5m x 2.5m reinforced concrete box culvert barrel : Triple 2.5m x 2.5m reinforced concrete box culvert barrel : Single 3.0m x 3.0m reinforced concrete box culvert barrel : Twin 3.0m x 3.0m reinforced concrete box culvert barrel : Triple 3.0m x 3.0m reinforced concrete box culvert barrel : Single 3.5m x 3.5m reinforced concrete box culvert barrel :

M M M M

17,815.00 9,450.00 12,600.00 24,300.00

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) 13

M M M M M M M M M M M M M

3,200.00 4,310.00 5,750.00 7,650.00 7,400.00 9,900.00 13,800.00 7,500.00 10,000.00 20,000.00 10,200.00 13,600.00 27,000.00

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)

NO NO NO NO NO NO NO NO NO NO NO

6,630.00 9,300.00 11,800.00 16,500.00 15,600.00 22,600.00 29,600.00 17,000.00 24,400.00 38,500.00 23,200.00

SOR CIVIL WORK 2008/Page 6 of 19

B Item No. (l) (m)

DRAINAGE WORKS Description Unit Rate (RM)

Twin 3.5m x 3.5m reinforced concrete box culvert barrel : Triple 3.5m x 3.5m reinforced concrete box culvert barrel : Concrete Works for Drainage

NO NO

33,150.00 52,500.00

14 15 (a) (b) (c ) 16 (a) (b) 17 (a) (b) (c ) (d) (e) 18 (a) (b) (c ) 19 (a) (b) (c ) (d) (e)

50mm thick lean concrete Grade 15P/20 as blinding for drainage works. Reinforced Concrete of the following grades for Drainage Works: Grade 20/20. Grade 25/20. Grade 30/20. Formwork as described to Class F1 & U1 Finish type To sides of drain, culverts, wingwall, headwall, and the like. To soffit of culvert cover slab and the like. High Yield Deformed Steel Reinforcement Bars as described: 10mm Diameter. 12mm Diameter. 16mm Diameter. 20mm Diameter. 25mm Diameter. Mild Steel Reinforcement Bars as described: 6mm Diameter. 8mm Diameter. 10mm Diameter. Steel Mesh Reinforcement: Type B785 ( minimum 8.14kg/m 2). Type A142 (minimum 2.22kg/m 2). Type A8 (minimum 3.55kg/m 2). Type A7 (minimum 3.02kg/m 2). Type A6 (minimum 2.22 kg/m ).
2

12.50

M3 M3 M3

220.00 250.00 280.00

M2 M
2

35.00 35.00

Tonnes Tonnes Tonnes Tonnes Tonnes

3,000.00 3,000.00 2,900.00 2,900.00 2,900.00

Tonnes Tonnes Tonnes

3,000.00 3,000.00 3,000.00

35.00 10.00 16.00 13.00 10.00

M2 M2 M2 M2

SOR CIVIL WORK 2008/Page 7 of 19

B Item No.

DRAINAGE WORKS Description Unit Rate (RM)

Miscellaneous Works 20 21 Grouted stone pitching of various thickness. 12mm Thick joint filler. M
3

155.00 25.00

M2

SOR CIVIL WORK 2008/Page 8 of 19

C Item No.

FLEXIBLE PAVEMENT AND ROAD FURNITURES Description Unit Rate (RM)

Flexible Pavement 1 2 3 4 5 6 7 8 9 Subbase course including drainage layer under compacted earth shoulder. Roadbase course. Wet-mix macadam. Bituminous tack coat. Asphaltic concrete binder course. Bituminous prime coat. Asphaltic concrete wearing course. Compacted earth shoulder. Bituminous waterproof layer. Traffic signs complete with concrete footing, post, supporting frame including all necessary excavation 10 Regulatory (Type RP & RM) road signs of various shapes and not exceeding 1.0m 2 in area. Warning (Type WD) road signs of various shapes and not exceeding 1.0m 2 in area. Guide/Information (Type GI) road signs of various shapes and not exceeding 1.0m 2 in area. Guide/Destination (Type GD) road signs of various shapes with the following areas (All Provisional): Not exceeding 1.0m in area. Exceeding 1.0m and not exceeding 2.0m in area. Post Delineator. 3mm thick Road Markings (measured nett) and Direction Arrows in Thermoplastic paint 15 16 17 Type 3 : Centre lines for straight road. Type 1b : Centre lines for Mountainous Terrain or Short Radius Curve. Type 2a- Broken Lane Lines. M2 M2 M
2 2 2 2

M M

75.00 75.00 350.00 2.00 450.00 2.50 450.00 20.00 2.50

M3 M M
2

M3 M3 M2

NO

400.00

11

NO

400.00

12

NO

400.00

13

(a) (b) 14

NO NO NO

400.00 700.00 45.00

15.00 15.00 15.00

SOR CIVIL WORK 2008/ Page 9 of 19

3mm thick Road Markings (measured nett) and Direction Arrows in Thermoplastic paint (Cont'd) 18 19 20 21 22 23 24 25 26 27 28 29 Type 2b - Unbroken Lane Lines. Type 10 - No Passing on Both Sides. Type 11 - No Passing on One Side. Type 6 - Edge Line/ Channelising line. Type 1 - Continuity Line. Type 8 - Stop Line. Type 2 - Give-way Line. Cross Hatching. Chevron Hatching for Diverging Traffic. Chevron Hatching for Merging Traffic. Yellow Box Marking. Direction arrows of various shapes. Miscellaneous Works 30 31 Reflective roadstud. Precast concrete road kerb, overall size 600mm long x 150mm wide x 305mm high, complete with laying on concrete bedding. Extra over for Precast concrete road kerb with opening, overall size 600mm long x 150mm wide x 305mm high, complete with laying on concrete bedding. NO 30.00 M2 M M
2

15.00 15.00 15.00 15.00 15.00 15.00 15.00 20.00 20.00 20.00 20.00 20.00

M2 M
2

M2 M M
2

M2 M2 M2 M2

50.00

32

NO

15.00

SOR CIVIL WORK 2008/ Page 10 of 19

D Item No.

BRIDGE WORKS Description Unit Rate (RM)

Earthworks 1 Fill spread, grade and compact in layers to formation level using imported suitable fill material. 300mm Thick rubble pitching as slope protection works complete with mortar pointing. Coarse aggregate as capping layer including laying between piles. Concrete Works 4 5 (a) (b) (c) (d) (e) 6 (a) (b) (c) (d) (e) 7 (a) (b) (c) (d) 8 50mm thick lean concrete Grade 15P/20 as blinding. Reinforced concrete of the following grades: Grade 25/20. Grade 30/20. Grade 35/20. Grade 40/20. Grade 50/20. Formwork as described to Class F1 & U1 finish type including falsework To sides of approach slab, platform slab, transition slab, and the like. to sides of abutment and the like. To sides and soffit of pile cap. To soffit of deck slab. To sides and soffit of diaphragm. Formwork as described to Class F2 & U2 Finish Type including falsework To sides of abutment wingwall and the like. To sides and soffit of pier, column, headstock and the like. To sides of kerb and the like. To sides of parapet and the like. Supply, fabricate and placing into position 125mm thick precast concrete footway slab complete with BMC A5 fabric reinforcement. 10mm Diameter mild steel reinforcement bars as described. M2 M2 M M
2

M3

22.00

M2 M3

60.00 80.00

15.00

M3 M3 M3 M3 M3

290.00 310.00 330.00 350.00 380.00

M2 M2 M2 M2 M2

40.00 45.00 45.00 45.00 45.00

50.00 50.00 50.00 50.00

M2 Tonnes

60.00 3,600.00

SOR CIVIL WORK 2008/Page 11 of 19

D 10 (a) (b) (c ) (d) (e) 11 (a) (b) (c) (d)

BRIDGE WORKS Hot Rolled Type 2 Deformed steel reinforcement bars as described. 10mm Diameter. 12mm Diameter. 16mm Diameter. 20mm Diameter. 25mm Diameter. Steel Mesh Reinforcement Type A5 (minimum 1.54 kg/m ). Type A6 (minimum 2.22 kg/m 2). Type A7 (minimum 3.02 kg/m 2). Type A8 (minimum 3.95 kg/m 2). Miscellaneous Bridge Works
2

Tonnes Tonnes Tonnes Tonnes Tonnes

3,600.00 3,600.00 3,600.00 3,600.00 3,600.00

M M M M

7.50 11.00 14.80 19.40

12 (a) (b) 13 (a)

Sub-soil drainage behind Abutment Granular backfill materials to back of abutment. 90mm Diameter P.V.C. pipe as sub-soil drain, bedded in sand. Dowel bar: 25mm Diameter Hot Rolled Type 2 Deformed steel reinforcement bar as dowel bar of various lengths, embedded into concrete. 20mm Ditto. 25mm Diameter Hot Rolled Type 2 Deformed steel reinforcement bar as dowel bar of various lengths, with one embedded 200mm into concrete, and the other end fixed to 50mm outer diameter tight fitting rubber dowel cap between prestressed girder, complete with compressive materials. 20mm Ditto. Elastometric laminated bearing pad of the following sizes on and including 20mm thick epoxy resin mortar bedding. 400 x 350 x 39mm. 350 x 500 x 69mm. 300 x 200 x 29mm. 24mm thick "Expandite natural bonded cork filler" or equivalent joint filler. 6mm Thick plywood lining as separator. NO NO NO M2 M2 800.00 1,000.00 600.00 60.00 40.00 M3 M 75.00 25.00

M M

36.00 25.00

(b) (c)

M M

50.00 35.00

(d) 14

(a) (b) (c) 15 16

SOR CIVIL WORK 2008/Page 12 of 19

D 17 18

BRIDGE WORKS Prepare and apply one coat of heavy bitumen paint on concrete surface. Type A scupper drain complete with forming inlet in asphaltic concrete wearing course, and rectangular hollow section as outlet. Therma Joint or approved deck expansion joints complete with joint filler. Hot-dip galvanised mild steel parapet railing, complete with bolts, U-shaped cast-in bolts, post, sliding joint, and end railing. M2 15.00

NO M

75.00 1,350.00

19 20

250.00

SOR CIVIL WORK 2008/Page 13 of 19

E Item No.

PILING Description Unit Rate (RM)

Timber Piles 1 Supply handle & pitch 100mm x 100mm Belian initial and extension belian timber piles. Supply handle & pitch 125mm x 125mm Belian initial and extension belian timber piles. Drive 100mm x 100mm Belian timber piles. Drive 125mm x 125mm Belian timber piles. Cut off head 100mm x 100mm Belian timber piles (not payable if whole length of pile driven in to cut off level). Cut off head 125mm x 125mm Belian timber piles (not payable if whole length of pile driven in to cut off level). Pointing and shaping end of 100mm x 100mm timber piles and shoeing with and including 3mm thick mild steel welded shoe size 100mm x 100mm x 250mm high comprising of pyramid shape end 150mm high and socket 100mm high including nailing to timber pile (for hard driving only). Pointing and shaping end of 125mm x 125mm timber piles ditto 125mm x 125mm x 250mm high, comprising of pyramid shape end 150mm high, and socket 100mm high including nailing to timber pile (for hard driving only). Mild steel welded extension sleeve or collar size 5mm thick, 95mm x 95mm (internal dimensions) x 450mm long with a seating fillet welded centrally inside and bevelling ends of piles and slipping same into and nailing. Mild steel welded extension sleeve or collar size 5mm thick, 120mm x 120mm (internal dimensions) x 450mm long with a seating fillet welded centrally inside and bevelling ends of piles and slipping same into and nailing. Provide all equipment, hydraulic jack, deflection gauges, kentledge, temporary staging, etc. and test a test pile of any size to a vertical load test including all extra cost before commencement of the main piling works. Supply, handle, pitch and drive 75mm diameter Belian pepper posts. Supply, handle and pitch 100mm diameter bakau piles. Supply, handle and pitch 125mm diameter bakau piles. Drive bakau piles (all sizes). Cut off head (all sizes), [not payable if whole length of pile driven in to cut off level]. Precast Concrete Piles 17 Supply, handle & pitch 150mm x 150mm initial/head pile 6.00m long. M 32.30

42.00

M M M

66.00 4.50 5.00

3 4 5

NO

4.00

NO

5.00

NO

20.00

NO

23.00

NO

25.00

10

NO

30.00

11

Tonne M M M M

120.00 8.00 2.50 3.00 1.50

12 13 14 15 16

NO

1.00

SOR CIVIL WORK 2008/Page 14 of 19

E Item No

PILING (CONT'D) Description Precast Concrete Piles (Cont'd) Unit Rate (RM)

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

Supply, handle & pitch 150mm x 150mm extension pile 6.00m long. Supply, handle & pitch 200mm x 200mm initial/head pile 6.00m long. Supply, handle & pitch 200mm x 200mm extension pile 6.00m long. Supply, handle & pitch 250mm x 250mm initial/head pile 6.00m long. Supply, handle & pitch 250mm x 250mm initial/ head pile 9.00m long. Supply, handle & pitch 250mm x 250mm initial/ head pile 12.00m long. Supply, handle & pitch 250mm x 250mm extension pile 6.00m long. Supply, handle & pitch 250mm x 250mm extension pile 9.00m long. Supply, handle & pitch 250mm x 250mm extension pile 12.00m long. Supply, handle and pitch 300mm x 300mm initial/head pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 300mm x 300mm extension pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 350mm x 350mm initial/head pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 350mm x 350mm extension pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 400mm x 400mm initial/head pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 400mm x 400mm extension pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long.

M M M M M M M M M M M M M M M M M M M M M M M M M M M

29.50 59.40 55.60 93.00 83.00 79.00 88.20 83.70 76.70 146.70 129.00 120.80 140.00 125.20 117.90 192.60 169.30 157.70 184.00 163.60 153.40 252.00 221.70 206.50 241.50 214.70 201.30

SOR CIVIL WORK 2008/Page 15 of 19

E Item No

PILING (CONT'D) Description Precast Concrete Piles (Cont'd) Unit Rate (RM)

45 46 47 48 49 50 51 52 53 54 55

Drive to set 200mm x 200mm pile. Ditto 250mm x 250mm pile. Ditto 300mm x 300mm pile. Ditto 350mm x 350mm pile. Ditto 400mm x 400mm pile. Drive to set 200mm x 200mm pile as raker piles. Ditto 250mm x 250mm pile. Ditto 300mm x 300mm pile. Ditto 350mm x 350mm pile. Ditto 400mm x 400mm pile. Butt weld connection 0.60m girth between edges of and including mild steel extension head, base cap plates, bars etc and including coated heavily with bituminous compound for jointing 200mm x 200mm R.C piles. Ditto for jointing 250mm x 250mm R.C piles. Ditto for jointing 300mm x 300mm R.C piles. Ditto for jointing 350mm x 350mm R.C piles. Ditto for jointing 400mm x 400mm R.C piles. Cut off and dump away surplus length of 150mm x 150mm precast concrete pile and strip off pile head, bend back reinforcement for connection as specified. Ditto 200mm x 200mm ditto. Ditto 250mm x 250mm ditto. Ditto 300mm x 300mm ditto. Ditto 350mm x 350mm ditto. Ditto 400mm x 400mm ditto. Provide all equipment, hydraulic jack, deflection gauges, kentledge, temporary staging, etc. and test a test pile of any size to a vertical load test including all extra cost before commencement of the main piling works complete with report.

M M M M M M M M M M

7.00 9.00 11.00 15.00 20.00 15.00 18.20 21.50 26.00 28.60

NO NO NO NO NO

90.00 135.00 195.00 265.00 350.00

56 57 58 59 60

NO NO NO NO NO NO

14.00 20.00 25.00 30.00 35.00 40.00

61 62 63 64 65 66

Tonne Precast Concrete Spun Piles 67 Supply, handle & pitch 250mm diameter initial/ head pile 6.00m long (Class B). M

120.00

75.70

SOR CIVIL WORK 2008/Page 16 of 19

E Item No

PILING (CONT'D) Description Precast Concrete Spun Piles (Cont'd) Unit Rate (RM)

68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94

Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 250mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 300mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 300mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 350mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 350mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 400mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 400mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 450mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 450mm diameter extension pile 6.00m long (Class B).

M M M M M M M M M M M M M M M M M M M M M M M M M M M

65.50 60.90 69.00 61.00 57.50 97.10 85.10 79.00 88.90 79.40 74.80 126.70 110.50 101.90 116.20 103.50 96.60 160.00 141.70 131.60 149.50 133.40 125.40 178.90 156.80 145.20 164.50

SOR CIVIL WORK 2008/Page 17 of 19

E Item No

PILING (CONT'D) Description Precast Concrete Spun Piles (Cont'd) Unit Rate (RM)

95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115

Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 600mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 600mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Drive 250mm diameter pile. Ditto 300mm ditto. Ditto 350mm ditto. Ditto 400mm ditto. Ditto 450mm ditto. Ditto 600mm ditto. Drive 250mm diameter pile as raker pile. Ditto 300mm ditto. Ditto 350mm ditto. Ditto 400mm ditto. Ditto 450mm ditto. Ditto 600mm ditto. Butt weld connection 0.8m girth between edges of mild steel extension head and base cap plates including coated heavily with bituminuos compound (for 250mm diameter Spun piles). Ditto 300mm diameter Spun piles. Ditto 350mm diameter Spun piles. Ditto 400mm diameter Spun piles. Ditto 450mm diameter Spun piles. Ditto 600mm diameter Spun piles.

M M M M M M M M M M M M M M M M M M M M

147.20 138.00 303.00 266.50 250.00 282.90 253.00 239.20 16.00 18.00 30.00 35.00 45.00 50.00 20.80 23.40 39.00 45.50 58.50 65.00

NO NO NO NO NO NO

100.00 120.00 150.00 180.00 220.00 280.00

116 117 118 119 120

SOR CIVIL WORK 2008/Page 18 of 19

E Item No

PILING (CONT'D) Description Precast Concrete Spun Piles (Cont'd) Unit Rate (RM)

121

Cut off 250mm diameter precast concrete spun pile to the required level and roughen the inner surface to detail. Ditto 300mm diameter ditto. Ditto 350mm diameter ditto. Ditto 400mm diameter ditto. Ditto 450mm diameter ditto. Ditto 600mm diameter ditto. Supply and install 12mm diameter high yield steel reinforcement in pile head to detail. Ditto 16mm diameter ditto. Provide and weld 6mm thick mild steel plates to detail for 250mm diameter piles. Ditto 300mm diameter piles. Ditto 350mm diameter piles. Ditto 400mm diameter piles. Ditto 450mm diameter piles. Ditto 600mm diameter piles. Supply, place and compact grade 30/20 concrete in pile hollow section as specified. Provide all equipment, hydraulic jack, deflection gauges, kentledge, temporary staging, etc. and test a test pile of any size to a vertical load test including all extra cost before commencement of the main piling works.

NO NO NO NO NO NO

30.00 35.00 40.00 45.00 50.00 75.00

122 123 124 125 126 127

KG KG

4.00 3.90

128 129

NO NO NO NO NO NO

38.00 45.00 58.00 68.00 85.00 125.00

130 131 132 133 134 135

M3

300.00

136

Tonne

120.00

SOR CIVIL WORK 2008/Page 19 of 19