Difference between PERT & CPM 1. PERT stands for Program evaluation & review technique.

CPM stands for Critical path method. 2. PERT is event oriented. CPM is activity oriented. 3. PERT is probabilistic tool. CPM is deterministic tool. 4. PERT is basically a tool for planning. CPM is a tool which controls cost & time. 5. PERT is suitable for R&D projects. CPM is suitable for routine and for projects whose cost & time can be estimated.

(10Marks)