Académique Documents
Professionnel Documents
Culture Documents
50
FOUNDATION
50
100
200
50
50
B.O.L. 6mm DIA. VENT HOLES (TYP. 4 PLACES) (SEE NOTE 3) 350 20mm TH. BASE PLATE (BOTTOM) | 120 GUSSET PLATE 20mm THK. (TYPICAL) 20mm TH. STL. PLATE STOPPER (SEE DET.1) (TYPICAL) 28mm CHAMFER ALL AROUND
200
100
OF PIPE
500
B
BOLT HOLES 4 PLACES
GRADE
450
50
300
100
150
50
EQ.
EQ.
350
750
550
W14 X 43
A TYPE 1
100
EQ.
73
TYPE 2 12 SCH. NO. M1 1 M2 MARK NO. 1602 1601 SIZE OF BAR 16 16 NO. REQ. 7 10 DIMENSION A 568 2425 B 198 CUTTING LENGTH (mm) 1826 2425 NO. x CUTTING LENGTH = TOTAL LENGTH (METERS) 12.8 24.25 37.10 QTY (MTRS.)
BASEPLATE (TOP)
102
204
73
C
100
102
6 EA. ANCHOR BARS TYPE-1 25mm DIA. (SEE NOTE 9 & 18)
550
28mm CHAMFER
228
1290
350
FOUNDATION PLAN
12
75
75
X (FDN. HEIGHT)
200
250
75
450
PLANT NO.
990
| OF PIPELINE AND ANCHOR PIPE SLEEVE (SEE NOTE 2) 30^ | OF PIPELINE AND ANCHOR TYP. 1.5 60^ TYP. 1.5 60^ | 45^ PIPE SLEEVE (SEE NOTE 2) FOR VENT HOLE 30^ LOCATION (4 PLACES) (TYP.)
INDEX
AA-036007 002 00
DRAWING NUMBER
SHT. NO. REV. NO.
NOTES:
1. PROVIDE 1.6mm OR 1/16 " CLEARANCE BOTH SIDES TO ALLOW SMOOTH REMOVAL AND INSERTION. FILL GAP WITH SHIM PLATES.
2. THE PIPE BEING USED FOR THE SLEEVE SHALL BE EXPANDED AROUND THE CARRIER PIPE AND WELDED, BEFORE THE BASE IS WELDED ON. 3. SLEEVE TO PIPE CONNECTION SHALL BE AIRTIGHT, VENT HOLES TO BE FILLED WITH MASTIC AFTER WELDING. ANCHOR SPOOL SHALL NOT BE WELDED TO PIPELINE UNTIL CONCRETE HAS ATTAINED THE REQUIRED MINIMUM COMPRESSIVE STRENGTH. ALL STRUCTURAL STEEL FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE WITH AES-M-001 AND 12-AMSS-007. ALL WELDING SHALL BE IN ACCORDANCE WITH AWS-D1.1 AND SAES-W-001 AND SAES-W-012. BACKFILLING AND COMPACTION AROUND CONCRETE SHALL BE IN ACCORDANCE WITH AES-M-100. ALL REINFORCING BARS SHALL BE MILD STEEL DEFORMED BARS WITH A MINIMUM YIELD STRENGTH OF 50 KSI AND COATED PER 09-AMSS-106. ANCHOR BARS SHALL NOT TOUCH THE REINFORCEMENT. CONCRETE SHALL BE MIXED, PLACED AND CURED PER SAES-Q-001 AND 09-AMSS-097. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 28 MPa AFTER 28 DAYS. GROUT SHALL BE 09-AMSS-092, TYPE II PER SAES-Q-010 AND SHALL BE POURED IN A HIGH FLUIDITY RANGE, PER THE MANUFACTURERS INSTRUCTIONS. MINIMUM CONCRETE COVER FOR REBARS SHALL BE 75mm. ALL STEEL WORK SHALL BE COATED PER SAES-H-101, APCS-26B. GROUT AND BASE PLATE SHALL BE COATED PER SAES-H-101, APCS-1B. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE. THE SIDES AND TOP OF THE CONCRETE THAT COMES IN DIRECT ONTACT WITH EARTH SHALL BE COATED WITH TWO COATS COAL TAR OR BITUMEN COATING THAT CONFORMS TO APCS-10 OF SAES-H-101. A PLASTICIZED SHEET VAPOR BARREIR SHALL BE PLACED AROUND THE SIDES OF CONCRETE THAT IS PLACED DIRECTLY INTO EXCAVATION WITHOUT THE USE OF FORMWORK, WHERE BITUMEN CAN NOT BE APPLIED.
A
2575 = LENGTH OF FOOTING AND CARRIER PIPE 1290 124 1042 | 275 (TYP.) 124 6 TYP. 4-36mm DIA. HOLE FOR 32mm DIA. x159mm LG. STUD BOLT 20mm TH. STL. PLATE STOPPER BOLT | HOLE FOR VENT HOLE LOCATION (4 PLACES) (TYP.) W14 x 43 30^
4. W14 x 43 20m TH. STL. GUSSET PLATE 4-36mm DIA. HOLE FOR 32mm DIA. x159mm LG. STUD BOLT 20mm TH. STL. PLATE STOPPER BOLT | HOLE 20mm TH. STL. GUSSET PLATE 5.
FOUNDATION
6. 7.
T.O.C.
8.
40
100
40 73
100
40 100 73
40 73 100
9. 10.
73
TYP. FOR 6
11.
6 EA. ANCHOR BOLTS TYPE-1 25mm DIA. (SEE NOTE 9) (SEE NOTE 10)
TABLE A
HEIGHT SCHEDULE SCH NO. 1 2 3 X FOUNDATION HEIGHT (MM) 380 460 535 610 685 760 840 915 VOL. OF CONCRETE (CU. M.) ANCHOR BAR LENGTHS (L) TYPE 1 (6 PCS.) mm 930 1010 1085 1160 1235 1310 1390 1465 950 950 950 950 950 TYPE 2 (4 PCS.) mm TYPE 3 (4 PCS.) mm 700 700 700 TOTAL BAR LENGTH (M) 50
14. 15.
ANCHOR ELEVATION
4 EA. 25mm DIA. BARS TYPE-2 FOR SCH. NO. 4-8 AND TYPE-3 25mm DIA. BARS FOR SCH. NO. 1-3 (SEE NOTE 9 & 18) (SEE SECTION C-C AND TABLE A)
TYP.
6 50 8
TYP. TYP.
10 11 11 12 13 13 13 14 16.
TYP.
C
2575 545 545 545 545 EQ.
6 9
4 5 6
SHIM PLATE
7 8
BEFORE THE INSTALLATION, THE TOP SURFACE OF ROCKY AREA SHOULD BE LEVELED BY SUITABLE CONSTRUCTION EQUIPMENT SUCH AS SCRAPER OR JACK HAMMER. LEVELING BY SAND OR GRAVEL IS NOT ACCEPTABLE BECAUSE OF REDUCTION OF FRICTION COEFFICIENT. CLEAN THE ROCK SURFACE WITH WATER. 17. ROCK IS DEFINED AS HARD MATERIAL WHICH CAN NOT BE EXCAVATED BY USISING NORMAL TECHNIQUES SUCH AS A BACKHOE.
DETAIL-1
1290 | 100 20mm TH. BASE PLATE (BOTTOM) 124 521 1090 521 100 124 STEEL BAR 45^ 50mm
CONTRACTOR SHALL ESTABLISH EXISTING TOP OF ROCK ELEVATION, CALCULATE DEPTH OF STRUCTURAL STEEL, MAINTAINING BOTTOM OF PIPE ELEVATIONS. SELECT A FOUNDATION HEIGHT FROM TABLE A WHICH WILL PROVIDE A PROJECTION OF 6" ABOVE NATURAL GRADE. ROCK WILL BE EXCAVATED TO SUIT. FORMWORK WILL BE USED FOR ALL CONCRETE ABOVE THE ROCK ELEVATION. CONCRETE BELOW THIS LEVEL SHALL BE POURED AND KEYED DIRECTLY INTO THE ROCK. 18. ANCHORS SHALL BE GRADE 50 BARS, 25mm DIA. GROUT ANCHORS IN DRILLED HOLES OF 100mm DIA. AND 450mm DEEP. THE ANCHOR BOLTS SHOULD BE INSTALLED IN COMPETENT ROCK AS DEFINED IN NOTE 17 . 19. THESE ANCHORS ARE FOR ABOVE GRADE INSTALLATION AND DESIGNED FOR MAXIMUM FULL THRUST FORCE AND OF 27 KIPS. 20. THIS DESIGN DRAWING SHOULD BE USED ONLY IF EXCAVATION TO DEPTHS REQUIRED BY SHEET NO. 1 FOR " SANDY AREAS " CAN NOT BE ACHIEVED.
REFERENCE DRAWINGS
SAUDI ARAMCO STANDARD DRAWING AA-036531 AB-036322 T/O-09800201
1602 1601
16 16
7 10
568 2425
278
1986 2425
750
1602 1601
16 16
7 10
568 2425
353
2136 2425
75
SECTION B-B
4
M1 M2
1602 1601
16 16
8 10
568 2425
428
2286 2425
TYPE-3 200 5
M1 M2
1602 1601
16 16
9 10
568 2425
503
2436 2425
DESCRIPTION
CHKD.
CERT.
APPD.
M1
SEE NOTE 17
M1
1602 1601
16 16
10 10
568 2425
578
2586 2425
M2
M2
CHECKED BY
MMD
SCALE:
NONE APR. 95
APR. 95
D=150 ROCK
M1 7 M2
1602 1601
16 16
11 10
568 2425
658
2746 2425
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
CERTIFIED
BY DATE
SECTION C - C
4 EA. 25mm DIA. BARS TYPE-2 FOR SCH. NO. 4-8 AND TYPE-3 FOR SCH. NO. 1-3 (SEE ANCHOR BOLTS DET. AND TABLE A
M1 8 M2
1602 1601
16 16
12 10
568 2425
733
2896 2425
990
CopyrightSaudi Aramco 2009. All rights reserved.
AA-036007 002 00
Saudi Aramco 2615 ENG. (3/91)
CADD-02