Académique Documents
Professionnel Documents
Culture Documents
Pgina
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
Item
Descripcin
01
ARQUITECTURA
01.01
ALBAILERIA
Costo al
Und.
Metrado
01/04/2013
Precio S/.
Parcial S/.
241,125.79
23,666.18
01.01.01
m2
245.47
81.03
19,890.43
01.01.02
m2
129.84
29.08
3,775.75
01.02
01.02.01
m2
54.71
15.99
874.81
01.02.02
m2
784.55
36.02
28,259.49
01.02.03
m2
10.42
36.02
375.33
01.02.04
TARRAJEO EN EXTERIORES
m2
445.88
36.02
16,060.60
01.02.05
VESTIDURA DE DERRAME
347.99
9.61
3,344.18
01.02.06
14.10
5.88
82.91
01.02.07
BRUAS EN MUROS
26.05
5.88
153.17
01.02.08
m2
16.57
37.65
01.03
CIELORRASOS
49,774.35
623.86
18,571.16
01.03.01
m2
179.45
26.85
4,818.23
01.03.02
TARRAJEO DE COLUMNAS
m2
221.46
23.04
5,102.44
01.03.03
TARRAJEO DE VIGAS
m2
211.40
40.92
01.04
PISOS Y PAVIMENTOS
8,650.49
85,550.07
01.04.01
CONTRAPISO DE 48 mm
m2
549.21
14.67
01.04.02
m2
255.65
38.75
9,906.44
01.04.03
PISO PORCELANATO
m2
288.95
204.01
58,948.69
01.04.04
m2
260.26
33.19
8,638.03
01.05
CONTRAZOCALOS
7,572.52
01.06
334.18
22.66
01.07
322.82
22.66
01.08
ZOCALOS
01.08.01
ZOCALO DE PORCELANATO
01.09
CARPINTERIA DE MADERA
01.09.01
01.10
CERRAJERIA
01.10.01
pza
01.10.02
PICAPORTE
01.10.03
01.11
01.11.01
8,056.91
7,315.10
9,470.71
m2
41.48
228.32
9,470.71
8,089.30
m2
42.93
188.43
8,089.30
1,451.93
48.00
13.68
5.00
6.43
656.64
32.15
pza
21.00
36.34
763.14
m2
28.41
163.46
4,643.90
01.11.02
MAMPARA e=10mm
m2
7.26
73.40
532.88
01.11.03
p2
3.20
18.25
01.12
PINTURA
5,235.18
58.40
18,935.08
01.12.01
m2
794.97
10.04
7,981.50
01.12.02
m2
445.88
16.97
7,566.58
01.12.03
PINTURA EN CIELORASO
m2
291.48
11.62
01.13
01.13.01
pza
4.00
240.00
960.00
01.13.02
pza
4.00
60.00
240.00
01.13.03
pza
8.00
52.95
01.14
GRIFERIA
01.14.01
pza
4.00
60.00
240.00
01.14.02
pza
4.00
40.00
160.00
01.14.03
COLOCACION DE GRIFERIA
pza
4.00
65.75
01.15
ACCESO SANITARIO
01.15.01
pza
4.00
8.00
32.00
01.15.02
pza
4.00
12.00
48.00
01.15.03
TACHO DE BASURA
pza
4.00
10.00
40.00
01.15.04
COLOCACION DE ACCESORIO
pza
12.00
30.91
370.92
3,387.00
1,623.60
423.60
663.00
263.00
490.92
2,716.69
01.16
VARIOS
01.16.01
mes
12.00
220.21
2,642.52
01.16.02
glb
1.00
74.17
74.17
Fecha :
10/07/2013 02:13:50p.m.
S10
Pgina
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
Item
Costo al
Und.
Descripcin
Metrado
Precio S/.
Parcial S/.
241,125.79
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
01/04/2013
47,987.89
19.9016%
24,112.58
10%
--------313,226.26
SUBTOTAL
IMPUESTO (IGV)
56,380.73
18%
=========
369,606.99
TOTAL PRESUPUESTO
SON :
Fecha :
10/07/2013 02:13:50p.m.