SAUDI ELECTRIC COMPANY [EASTERN OPERATING AREA]

FIELD TEST FORMAT FOR

Drawing # SMSS : Cont.# 30531168/00 Date:

LV CABLES
Make: Riyadh Cables, Saudi Arabia.. Project :NEW AL-JOUF 132 KV S/S
Location: AL-JOUF.

Sheet1 of 2

Mechanical Checks & Visual Inspection Sl. No.


1. 2. 3. 4. 5. 6. 7. 8. 9.

Description
Inspect for physical damage Verify all cable connections per drawing. Check for proper cable support, clamping and blocking etc. Verify shield grounding as per design (single point, both ends, via voltage limiters, etc.) Check tightness of all bolted connections (torque wrench method). Check that phases are identifies and colorcoded. Check cable entry path as ducts are to be properly sealed. Visual Insulation, size and ratings conformation Check cable size against rating required. Electrical Tests

Observation

Remarks

Sl. No.

Description

Observation

Remarks

1. Phase continuity test. 2. Insulation Resistance Test with 2.5KV DC insulation tester.

TESTED BY: Mohd. Al-Ojaimi Cont. Est. NAME : SIGNATURE:

WITNESSED BY : SEC-(EOA) NAME : SIGNATURE :

MOHAMMED AL-OJAIMI CONT. EST. H. O. Dammam

SAUDI ELECTRIC COMPANY [EASTERN OPERATING AREA]

FIELD TEST FORMAT FOR

Drawing # SMSS : Cont.# 30531168/00 Date:

LV CABLES
Make: Riyadh Cables, Saudi Arabia. Project: NEW AL-JOUF 132 KV S/S
Location: AL-JOUF.

Sheet 2 of 2

Electrical Test Insulation Resistance Test TESTED AT 2.5KV


R-Phase Core Reading Cable Size Y-Phase Core Reading Cable Size B-Phase Core Reading Cable Size Neutral Core Reading Cable Size

TESTED BY: Mohd. Al-Ojaimi Cont. Est. NAME: Ahmad Ibrahim Sabti SIGNATURE:

WITNESSED BY : SEC-(EOA) NAME:

SIGNATURE: MOHAMMED AL-OJAIMI CONT. EST. H. O. Dammam