CRONOGRAMA REPROGRAMADO DE EJECUCION DE OBRA

OBRA : SISTEMA DE DESAGUE CACHICOTO


Item

Descripcin

Presupuesto
Total

AVANCE

15/05-31/05

Jun-03

Jul-03

Aug-03

Set-03

10%

25%

25%

10%

30%

25,414.33

63,535.84

63,535.84

25,414.33

76,243.00

Oct-03

SUB TOTAL

SISTEMA DE DESAGUE
1.00 CONSTRUCCION DE RED COLECTORA

254,143.34

100%

254,143.34

2.00 EMISOR

12,038.83

3,679.74

75%

3,009.71

9,029.12

15%

25%

20%

40%

551.96

919.94

735.95

1,471.90

25%

129,606.62

18,183.42

32,401.66

37,932.97

5,841.00

11,050.00

40%

20%

3,636.68

3,636.68

7,273.37

3,636.68

20%

20%

40%

20%

7,586.59

7,586.59

15,173.19

7,586.59

20%

40%

129,606.63

18,183.41

37,932.96

40%

1,168.20

2,336.40

40%

10%

5%

20%

20%

2,336.40
5%

4,420.00

1,105.00

552.50

2,210.00

2,210.00

552.50

110,353.91

81,393.67

27,624.33

163,243.23

59,474.49

5,841.00

100%

11,050.00

Costo Directo
Gastos Generales 15%
Total Presupuesto Obras Civiles

45,362.32

20%

100%

5,841.00

8.00 FLETE TERRESTRE

51,842.65

20%

100%

37,932.97

7.00 CERCO DE PROTECCION PLANTA DE TRATAMIENTO

35%

100%

18,183.42

6.00 LECHO DE SECADO

3,679.75

40%

100%

129,606.62

5.00 FILTRO BIOLOGICO

12,038.83

100%

3,679.74

4.00 TANQUE IMHOFF

254,143.34

100%

12,038.83

3.00 CAMARA DE REJAS

25%

11,050.00

472,475.92

472,475.92

30,386.29

70,871.39

70,871.39

4,557.94

16,553.09

12,209.05

4,143.65

24,486.48

8,921.17

472,475.92
70,871.39

543,347.31

543,347.31

34,944.23

126,907.00

93,602.72

31,767.98

187,729.71

68,395.66

543,347.31

CRONOGRAMA PROGRAMADO DE EJECUCION DE OBRA


OBRA : REHABILITACION C.V. RICARDO PALMA - PUENTE TULUMAYO
Metrado
Item

Descripcin

UNIDAD

Total

Cantidad

1er. mes

2do. mes

SUB TOTAL

CONSTRUCCION CARRETERA VECINAL


50%

1.01 Movilizacin y Desmovilizacin

GLB

1.00

50%

100%

8,000.00

4,000.00

4,000.00

8,000.00

100%

1.02 Constrccin de Campamento

GLB

1.00

100%

3,000.00

1.03 Trazo, Replanteo y control de obra

KM

4.80

3,000.00

3,000.00
60.00%

40.00%

1,299.14

866.09

100%

2,165.23

2,165.23

100.00%

1.04 Limpieza y Deforestacion

HA

0.25

100%

460.43

460.43

460.43
100%

1.05 Eliminacin de material orgnico

M3

3,212.70

100%

12,818.67

12,818.67

12,818.67
100%

1.06 Cartel de Identificacin de Obra

GLB

1.00

100%

400.00

50.00%

2.01 Corte de Material Suelto

M3

5,491.31

6,397.375
50.00%

M3

3,212.70

27,211.57
50.00%

M3

1,331.35

9,093.12
50.00%

M3

4,651.33

M2

3,727.00

M3

3,275.24

39,396.77

39,396.77

50.00%

50.00%

1,118.10

1,118.10

40.00%

60.00%

22,193.03
40.00%

KM

7.34

18,186.24

78,793.53

2,236.20

33,289.54

55,482.57

60.00%

100%

2,825.24

Costo Directo
Gastos Generales 12%
Total Presupuesto Obras Civiles

9,093.12
50.00%

100%

55,482.57

4.01 Reconstruccion y Perfilado de cuneta

54,423.14

100%

2,236.20

3.01 Afirmado (e=0.15 Mt) en dos capas

27,211.57
50.00%

100%

78,793.53

2.05 Perfilado y Compactacin de Sub rasante

12,794.75

100%

18,186.24

2.04 Relleno con material de Prestamo

6,397.375
50.00%

100%

54,423.14

2.03 Corte en roca Fija

50.00%

100%

12,794.75

2.02 Reposicin de material orgnico

400.00

400.00

2,825.24

1,130.10

1,695.14

251,586.00

128,524.20

123,071.80

251,586.00

30,190.32

15,422.90

14,768.62

30,190.32

281,776.32

143,947.10

137,840.42

281,776.32

CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA


OBRA : REHABILITACION C.V. RICARDO PALMA - PUENTE TULUMAYO
Metrado
Item

Descripcin

UNIDAD

Total

Cantidad

1er. mes

2do. mes

3er. mes

SUB TOTAL

CONSTRUCCION CARRETERA VECINAL


50%

1.01 Movilizacin y Desmovilizacin

GLB

1.00

50%

100%

8,000.00

4,000.00

4,000.00

8,000.00

100%

1.04 Constrccin de Campamento

GLB

1.00

100%

3,000.00

1.03 Trazo, Replanteo y control de obra

KM

4.80

3,000.00

3,000.00
14.58%

85.42%

315.69

1,849.54

100%

2,165.23

2,165.23

100.00%

1.05 Limpieza y Deforestacion

HA

0.25

100%

460.43

2.02 Eliminacin de material orgnico

M3

3,212.70

460.43

460.43
78%

22%

9,975.49

2,843.18

100%

12,818.67

12,818.67

100%

1.02 Cartel de Identificacin de Obra

GLB

1.00

100%

400.00

400.00

400.00
54.63%

Corte de Material Suelto

M3

5,491.31

45.37%

100%

12,794.75

6,989.77
46.69%

2.04 Reposicin de material orgnico

M3

3,212.70

12,794.75

5,804.98
53.31%

100%

54,423.14

25,410.16

54,423.14

29,012.98
100.00%

3.04 Corte en roca Fija

M3

1,331.35

100%

18,186.24

4.04 Relleno con material de Prestamo

M3

4,651.33

M2

3,727.00

29.00%

M3

3,275.24

67,762.44

11,031.09

75.00%

25.00%

1,677.15

559.05

61.00%

10.00%

16,089.94

33,844.37
6.81%

KM

7.34

5,548.26

55,482.57

93%

100%

2,825.24

Costo Directo
Gastos Generales 12%
Total Presupuesto Obras Civiles

2,236.20

100%

55,482.57

4.01 Reconstruccion y Perfilado de cuneta

78,793.53

100%

2,236.20

3.01 Afirmado (e=0.15 Mt) en dos capas

14.00%

100%

78,793.53

2.05 Perfilado y Compactacin de Sub rasante

18,186.24

18,186.24
86.00%

192.40

2,632.84

2,825.24

251,586.00

66,644.71

161,178.63

23,772.66

251,586.00

40,253.76

10,663.15

25,788.58

3,803.63

40,253.76

291,839.76

77,307.86

186,967.21

27,576.29

291,839.76

CRONOGRAMA DE EJECUCION DE OBRA


OBRA : SISTEMA DE AGUA POTABLE DE CASTILLO GRANDE

FECHA DE INICIO: 17-08-99

Metrado
Item

Descripcin

UNIDAD

Total

Cantidad

1ra. semana

2da. semana

3ra. semana

4ta. semana

5ta. semana

6ta. semana

50%

1.01 Movilizacin y Desmovilizacin

GLB

1.00

TOTAL

50%

100%

100.00
50%

1.02 Limpieza General

1.03 Trazo, Replanteo y control de obra

50%

100.00

100%

ML

400.00

17%

17%

17%

35%

35%

30%

35%

35%

17%

16%

16%

100%

100.00

1.04 Excav. de zanjas

M3

312.00

100%

100.00

1.05 Preparacin de cama de apoyo

ML

400.00

30%

100%

100.00

1.06 Relleno con material propio manual

M3

249.60

35%

35%

25%

25%

30%

100%

100.00
25%

1.07 Tendido de tubera de 8", 6" y 3"


Red de Distribucin

ML

400.00

25%

100%

100.00
100.00%

1.08 Tendido de tubera de 12"


Salida del Reservorio

ML

12.00

100%

100.00
12%

1.09 Replanteo total y Prueba Hidrulica

GLB

1.00

22%

22%

22%

22%

100%

100.00