SHIPWRIGHT DEPARTMENT

EXTERNAL HULL BLASTING

KPM DATA FORM


VESSEL:
CONTRACTOR : ARLYN

REPAIR
MAIN CODE: 5665 LOCATION: QUAY WALL DATE:

STEP 1
MANPOWER USE : 8 HOPPER 4

M/T PILOT 3

19-Apr-13

ISSUED COPPER SLUG: CONSUMED COPPER SLAG:

ENG'R./SUPERVISOR IN CHARGED: D. EBREO NO. OF DAYS IN BLASTING PER SESSION NO. OF DAYS
1

MAN HOUR USED


3

NO. OF GUNS 2

DATE & TIME STARTED DATE 04/19/13 TIME 2300

DATE & TIME FINISHED TIME 500 DATE 04/20/13

HOURS
CONSUME

FORMULA ( A )

3 HOPPER FORMULA ( B )

TOTAL WORKING HRS


FORMULA ( A ) - FORMULA ( B)

hrs. consumed X no. of guns = ______hrs-gun 1.5 hrs. X no. of guns = _______hrs-gun

hrs - gun 6 x 2 = 12
1.5 x 2 = 3

1 session 2 session 3 session 4 session 5 session 6 session 7 session TOTAL:

12 - 3 = 9

2
1.) REST TIME 2.) REFUELING = =

12 1 hr
30 min

DEDUCTION OF 1HR & 30MIN

SUMMARY :
NO. OF DAYS BLASTING 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7 DAY TOTAL : 9

WHERE: 1.5 HRS ARE DEDUCTED IN PER SESSION PER GUN.

SUMMATION OF TOTAL WORKING HRS. WITH DEDUCTED


9

REMARKS
2 gun = 2 men + 1 pottender + 1 operator = 4 MH

THE TOTAL WORKING HRS. ARE TO BE DEDUCTED TO THE CONSTANT LOSSED TIME
FOR ( s.a 1.0 ) FACTOR OF LOSS TIME = 2.21 HRS ( CONSTANT ) WHERE : > FACTORS OF LOSS TIME * FILLING OF GRITS TO POT ( 10 MIN) * TRANSFERRING OF HOPPER ( 10 MIN) * TRANSFERRING OF POSITION OF BLASTER ( 1 MIN.) * REFRESHING ( 2 HRS. ) TO COMPUTE THE TOTAL TIME
TOTAL WORKING HRS.

STEP 2

FOR ( s.a 2.0 ) FACTOR OF LOSS TIME = 2.21 HRS ( CONSTANT ) WHERE : > FACTORS OF LOSS TIME * FILLING OF GRITS TO POT ( 10 MIN ) TOTAL OF 2.21 HRS * TRANSFERRING OF HOPPER (10 MIN) * TRANSFERING OF POSITION OF BLASTER ( 1 MIN ) * REFRESHING ( 2 HRS. ) TO COMPUTE THE TOTAL TIME
TOTAL WORKING HRS.

TOTAL OF 2.21 HRS.

CONSTANT LOSS TIME

- CONSTANT LOSS TIME = _______________X


x __3__

MANPOWER USED ( M-H -gun)

EX: ______

EX:

- 2.21 hrs = _______

x _____

M-H-gun = _____ M-H-gun

_9_

- 2.21 hrs = __6.79__

M-H-gun = _20.37__ M-H-gun

TOTAL AREA BLASTED & TOTAL GRITS CONSUMPTION

"COMPUTATION"

FOR ( s.a 2. 0 )

STEP 3

< TO COMPUTE THE TOTAL AREA BLASTED >

AB

BLASTED AREA ( 2.0 ) TOTAL MAN -HRS._GUN 97 m2 20.37


< TO COMPUTE THE TOTAL GRITS CONSUMPTION >

>
m/M-H-gun

____4.76____m/M-H-gun

COMPUTATION :

4.76

B
COMPUTATION :

T
780 97

GU= No. Of hoppers used x 10 % x 2600 kg = ____780___ kg/m

= 3 x 10% x 2600 = 780

note : For ( s.a 2.0 ) deduction of 10 % constant due to remaining of grits per hopper

TGC = TOTAL GRITS CONSUMPTION

TGU = TOTAL GRITS USED

TGC =

TGU
BLASTED AREA ( s.a 2.0 )

>

8.04

kg/m

BLASTED AREA ( s.a 2.0 )