Architectural & Structural Specifications


March 11, 2013

architects
www.agi-architects.com

Nasser B. Abulhasan Joaqun Prez-Goicoechea

TABLE OF CONTENTS Volume III: CIVIL AND ARCHITECTURAL SPECIFICATIONS DIVISION NO./ SECTION NO. DESCRIPTION PAGE No.

DIVISION 1 GENERAL REQUIREMENTS Section 01009 Section 01010 Section 01025 Section 01030 Section 01035 Section 01039 Section 01040 Section 01045 Section 01050 Section 01090 Section 01200 Section 01300 Section 01315 Section 01340 Section 01380 Section 01400 Section 01410 Section 01421 Section 01500 Section 01514 Section 01530 Section 01569 Section 01580 Section 01590 Section 01600 Section 01631 Section 01700 Section 01710 Section 01720 Section 01730 Section 01740 Section 01750 Important Note Summary of the Works Applications for Payment Alternatives Modification Procedures Coordination and meetings Project Coordination Cutting and Patching Field Engineering References Project Meetings Submittals (Product Data, Architectural Samples & Mock-ups) CPM Schedules Shop, Records and As Built Drawings Construction Photographs Quality Control Testing Laboratory Services Reference Standards and Definitions Construction Facilities and Temporary Controls Temporary Telephone Barriers and Enclosures Construction Cleaning Project Identification and Signs Project Field Offices and Sheds Materials and Equipment Equals and Substitutes Contract Closeout Final Cleaning Project Record Documents Operation and Maintenance Data Warranties Maintenance Period Duties 01009-1 - 1 01010-1 - 7 01025-1 - 2 01030- 1 - 2 01035-1 - 2 01039-1 - 3 01040-1 - 2 01045-1 - 2 01050-1 - 3 01090- 1 - 1 01200-1 - 3 01300-1 - 5 01315-1 - 6 01340-1 - 4 01380-1 - 2 01400-1 - 4 01410-1 - 3 01421-1 - 5 01500-1 -13 01514- 1 - 2 01530-1 - 2 01569-1 - 1 01580-1 - 2 01590-1 - 11 01600-1 - 3 01631-1 - 2 01700-1 - 4 01710-1 - 1 01720-1 - 2 01730-1 - 3 01740-1 - 4 01750-1 - 4

Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

TABLE OF CONTENTS 11 March 2013

TABLE OF CONTENTS Volume III: CIVIL AND ARCHITECTURAL SPECIFICATIONS DIVISION NO./ SECTION NO. DESCRIPTION PAGE No.

DIVISION 2 SITE WORKS Section 02010 Section 02100 Section 02140 Section 02200 Section 02210 Section 02281 Section 02510 Section 02525 Section 02580 Section 02760 Section 02810 Section 02900 Section 02920 Section 02925 Section 02950 Section 02960 Section 02970 Subsurface Investigation Site Preparation Dewatering Earthwork Lightweight Fill Termite Control Road Paving Precast Concrete Kerbs Roadway and Parking markings and Signs Traffic marking Paint Landscape Irrigation System Landscaping Works Planting Soil Mix Planting Procedures and Materials Trees, Shrubs, Vines and Ground Covers Hardscape Materials Landscape Maintenance 02010- 1 1 02100-1 2 02140-1 - 3 02200-1 - 7 02210-1 - 3 02281-1 3 02510-1 - 3 02525-1 - 2 02580-1 - 1 02760-1 - 1 02810-1 -10 02900-1 - 4 02920-1 - 3 02925-1 - 6 02950-1 - 4 02960-1 - 3 02970-1 - 3

DIVISION 3 CONCRETE Section 03100 Section 03200 Section 03300 Section 03345 Section 03521 Section 03532 Section 03600 Section 03998 DIVISION 4 MASONRY Section 04200 Section 04400 Section 04810 Concrete Unit Masonry Exterior Stone Works Unit Masonry Assemblies 04200-1 -14 04400- 1 - 7 04810-1 -15 Concrete Formwork Concrete Reinforcement Cast-in-place Concrete Concrete Finishes Lightweight Concrete Concrete Screed Grout Concrete Repair 03100 1 7 03200 1 6 03300 1 25 03345 1 3 03521 1 4 03532 1 5 03600 1 5 03998 1 - 3

Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

TABLE OF CONTENTS 11 March 2013

TABLE OF CONTENTS Volume III: CIVIL AND ARCHITECTURAL SPECIFICATIONS DIVISION NO./ SECTION NO. DESCRIPTION PAGE No.

DIVISION 5 METALS Section 05120 Section 05500 Section 05501 Section 05521 Section 05530 Section 05530 Structural Steel Metal Fabrications Miscellaneous Metal Work Pipe and tube Raililng Gratings Gratings (Ceiling) 05120-1 - 7 05500-1 - 8 05501-1 - 8 05521-1 - 7 05530-1 - 3 05530-1 - 3

DIVISION 6 WOOD AND PLASTIC Section 06100 Section 06420 Rough Carpentry Interior Architectural Wood Work 06100-1 - 7 06420-1 - 15

DIVISION 7 THERMAL AND MOISTURE PROTECTION Section 07100 Section 07105 Section 07120 Section 07140 Section 07160 Section 07210 Section 07243 Section 07500 Section 07600 Section 07841 Section 07900 Section 07905 Section 07920 Under slab Waterproofing Barrier Membrane Bituminous Membrane Waterproofing Fluid Applied Waterproofing Cementitious Waterproofing Bituminous Damp proofing Building Insulation External Rendering Protected Membrane Roofing Metal Flashing and Sheet Metal Work Through-Penetration Firestop System Exterior Sealants Interior Sealants Joint Sealants 07100-1 - 5 07105-1 - 4 07120-1 - 3 07140 1 - 4 07160-1 - 3 07210-1 - 3 07243-1 - 5 07500-1 - 6 07600-1 - 4 07841-1 - 7 07900-1 - 7 07905-1 - 4 07920-1 - 8

DIVISION 8 WINDOWS AND DOORS Section 08110 Section 08210 Section 08211 Interior Hollow Metal Doors and Frames Wood Doors and Frames Flush Wood Doors 08110-1 - 7 08210-1 - 6 08211-1 - 5

Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

TABLE OF CONTENTS 11 March 2013

TABLE OF CONTENTS Volume III: CIVIL AND ARCHITECTURAL SPECIFICATIONS DIVISION NO./ SECTION NO. DESCRIPTION PAGE No.

Section 08311 Section 08520 Section 08710 Section 08800 Section 08805 DIVISION 9 FINISHES Section 09200 Section 09210 Section 09225 Section 09260 Section 09271 Section 09310 Section 09410 Section 09638 Section 09650 Section 09656 Section 09680 Section 09900

Access Doors and Frames Aluminum Doors, Windows and Louvers Finish Hardware Glazing Glass and Glazing - Internal

08311-1 - 4 08520-1 - 9 08710-1 -20 08800-1 -13 08805-1 -10

Lath and Plaster Artisan Plaster Glass Fiber Reinforced Gypsum Gypsum Board Assemblies Glass Reinforced Gypsum Fabricants Ceramic Tile Precast Terrazzo Tiles Stone Flooring Resilient Flooring Resilient Terrazzo Tile Carpeting Paints and Coatings

09200-1 -10 09210-1 - 7 08225-1 7 08260-1 - 7 09271-1 - 3 09310-1 - 8 09410-1 - 5 09638-1 - 7 09650-1 - 5 09656-1 6 09680-1 6 09900-1 -12

DIVISION 10 SPECIALTIES Section 10430 Section 10440 Section 10810 DIVISION 12 FURNISHING Section 12482 Entrance Mat 10810-1 - 2 Exterior Signs Interior Signs Toilet Accessories 10430-1 - 4 10440-1 6 10810-1 - 9

DIVISION 14 CONVEYING SYSTEMS Section 14200 Elevators 14200-1 24

Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

TABLE OF CONTENTS 11 March 2013

DOCUMENT III -1 GENERAL SPECIFICATIONS Document III-1, General Specifications shall include the following: 1. MPW General Specifications roads administration December 1984. 2. MPW General Specification for building engineering work 1990. 3. MEW General Specifications for electrical installation 1984 or latest amendment. 4. Similarly for fresh and brackish water network, electrical work and other related works, the General Specification for water works and electrical works (both latest editions) as issued by MEW. 5. For telephone works, the General Specifications and regulations of MOC shall be followed when applicable and otherwise is not provided. 6. Specifications and regulations of other Ministries of the State of Kuwait shall also be taken into account where appropriate. 7. Notwithstanding anything herein the contractor shall be responsible for complying in all respect with such by laws and regulations as may be in-force at the time of execution of the works. The above specifications are not provided with the contract documents but shall be purchased by the contractor from the concerned Ministries. Clauses in the above specifications which are concerned with methods of measurement and payment, or matters relating thereto, shall not be applicable to this contract. Particular attention is drawn to Document III-2 (Particular Specification) which provides the specifications for certain items and are must be taken to adopt such, where Particular Specification are provided.

Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

TABLE OF CONTENTS 11 March 2013

SECTION 01009 IMPORTANT NOTE 1. FOR ANY WORK/S NOT COVERED BY THE FOLLOWING SPECIFICATIONS, THE GENERAL SPECIFICATION, LAWS, BYE-LAWS, RULES AND REGULATIONS ISSUED BY THE VARIOUS MINISTRIES AND STATUTORY AUTHORITIES HAVING JURISDICTION; SUCH AS THE MINISTRY OF PUBLIC WORKS (AND ITS VARIOUS DEPARTMENTS LIKE SANITARY ENGINEERING AND ROADS/HIGHWAY DEPARTMENT), THE MINISTRY OF ELECTRICITY AND WATER, THE MINISTRY OF COMMUNICATIONS, THE KUWAIT MUNICIPALITY, THE KUWAIT FIRE BRIGADE, ETC. ETC. SHALL APPLY. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO ASCERTAIN THE NAMES OF ALL THE MINISTRIES AND AUTHORITIES HAVING JURISDICTION, THE DETAILS OF THEIR APPLICABLE STATUTES, AND THE METHODS TO ENSURE COMPLIANCE WITH THEM IN CONSONANCE WITH OTHER CONTRACT CONDITIONS LIKE THE PROGRAMME OF WORK ETC. 2. INCASE THERE IS A CONFLICT BETWEEN THE VARIOUS TENDER DOCUMENTS, THE TENDERER SHALL PRICE FOR THE MOST EXPENSIVE COMBINATION OF REQUIREMENTS. SUBSTANTIAL COMPLETION DATE AND THE TURN OVER DATE MEAN THE SAME.

3.

END OF SECTION

IMPORTANT NOTE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01009-1 11 March 2013

SECTION 01010 SUMMARY OF THE WORKS PART 1 - GENERAL 1.01 SECTION INCLUDES A. B. C. D. E. F. G. H. 1.02 Work covered by this Contract Work performed under other contracts Contractor's use of premises Occupancy Standards Abbreviations and Symbols Samples of work Future Works

WORK COVERED BY THIS CONTRACT A. The scope of work to be executed under this Contract originally comprised the construction, completion, commissioning, handover and maintenance of Buildings and External Works for Site Hisham Abdullah Hamed Al-Sager Cardiac Center. The site is located at Cardiac Campus / Sabah Medical Center, Kuwait. The Project site components are identified as follows:

B.

Clinic Building and other amenities on site 4550 square meter plot belonging to the owner.

C.

The works will consist of, but not limited to the following 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Excavation. Structural reinforced concrete frame work complete including foundation Block walls/ Dry walls Floor, wall and ceiling finishes Doors, windows and glazing External and internal finishes Miscellaneous metal works. External cladding Conveying systems Plumbing and drainage works Mechanical firefighting works Swimming pool. Electrical works Home automations Hard and soft landscaping Fixed furniture, sanitary fixtures, toilet accessories etc. Parking

A complete picture of the works shall, however, be obtained from a study of all the tender documents taken together. E. F. Maintenance of all the works for two years from the Date of Substantial Completion. Guaranteed maintenance of designated works for longer periods.
01010-1 11 March 2013

SUMMARY OF THE WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.03 1.04 1.05 1.06

Nominated Contractor to be determined by Owner Nominated Contractor WORK PERFORMED UNDER OTHER CONTRACTS COORDINATION ETC. WITH OTHER CONTRACTORS A. B. C. The Contractor shall allow for all costs in connection with scheduling and executing his construction operations in conjunction with works by other Contractors. Items indicated on Drawings as NIC (Not in Contract), where indicated in Contract Documents, provide roughing and services to NIC items. Co-ordinate and co-operate fully with other separate contractors, within and outside the site boundaries, so that work under those contracts may be carried out smoothly, without interfering with or delaying work under this contract.

1.07

USE OF SITE A. Contractor shall include for scheduling and executing construction operations and works at the site to allow: 1. Public Usage of adjacent roads and facilities by the public. 2. Requirements regarding suppression of noise shall be in accordance with Specification Section 01500. In addition the Contractor is prohibited from using such machinery or executing demolition works or debris removal in a way which in the Engineer's opinion would create unacceptable noise levels.

1.08

EMPLOYER OCCUPANCY A. With the Contractor's agreement (which shall not be unreasonably withheld) the Employer may take possession of parts of the Works as they are completed, provided they can be used conveniently and all necessary access, services and other associated facilities are also complete. Schedule and substantially complete designated portions of Work for Employer's use prior to Substantial Completion of entire Work. Any such Employer occupancy in advance of Substantial completion of the entire project shall be in compliance with Clause 48 (1) of Document II.

B. C. 1.09

STANDARDS A. All reference to codes, specifications and standards referred to in the Contract Documents shall mean the latest edition, amendment or revision of such reference standard in effect as of the date of these Tender Documents.

1.10

ABBREVIATIONS AND SYMBOLS A. B. Reference to any Technical Society, Institution, Association or Government Authority is referred to in the Specifications in accordance with internationally recognized abbreviations. Refer also to List of Abbreviations contained on drawings.
01010-2 11 March 2013

SUMMARY OF THE WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.11

SAMPLES OF WORK A. Reasonable samples of all work shall be executed on site if required by and for the approval of the Engineer or Engineer's Representative, whether specifically specified as mock ups or not all at the expense of the Contractor. All materials, and workmanship thereafter shall conform fully with-the approved samples.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED END OF SECTION

SUMMARY OF THE WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01010-3 11 March 2013

SECTION 01025 APPLICATIONS FOR PAYMENT PART 1 - GENERAL 1.01 SECTION INCLUDES A. 1.02 FORMAT A. B. Application and Certificate for Payment Form and other related forms to be provided by the Engineers Representative and approved by the Engineer. For each item, provide a column for listing each of the following: 1. Item Number. 2. Description of work. 3. Scheduled Values. 4. Previous Applications. 5. Work in Place and Stored Materials under this Application. 6. Authorized Variation Orders. 7. Total Completed and Stored to Date of Application. 8. Percentage of Completion. 9. Balance to Finish. 10. Retainage. Procedures for preparation and submittal of applications for payment.

1.03

PREPARATION OF APPLICATIONS A. B. C. D. E. F. Present required information in typewritten form. Execute certification by signature of authorized personnel. Use data from approved Schedule of Values. Provide K.D. value in each column for each line item for portion of work performed and for stored (Material on Site) Products. List each authorized Variation Order as an extension on a Continuation Sheet, listing Variation Order number and K.D. amount as for an original item of Work. Insert percentage of work completed against each Variation Order. List all Material on Site (Stored Products). Attach all Purchase Orders and material Purchase invoices: utilize approved format. Prepare Application for Final Payment as specified in Section 01700.

1.04

SUBMITTAL PROCEDURES A. B. C. D. Submit two copies of each Application for Payment with supportive Data. Submit two copies of an updated construction schedule with each Application for Payment. Payment Period: Submit at intervals stipulated in the Agreement. Submit with transmittal letter as specified for Submittals in Section 01300.

1.05

SUBSTANTIATING DATA A. When Engineer requires substantiating information, submit data justifying K.D. amounts in question.
01025-1 11 March 2013

APPLICATIONS FOR PAYMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Provide one copy of data with cover letter for each copy of submittal. Show application number and date, and line item by number and description.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED

END OF SECTION

APPLICATIONS FOR PAYMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01025-2 11 March 2013

SECTION 01030 ALTERNATIVES PART 1 - GENERAL 1.01 A. B. ALTERNATIVE AND SUBSTITUTE PRODUCTS Definition: The term product shall mean any material including proprietary goods, equipment and manufactured items. The specifying of manufacturers or their products by name, trade name, catalogue number, etc., shall not act to relieve the Contractor either from his responsibility to meet other specification requirements, or from his responsibility to make material submittals for approval. Alternative Products: References herein to approved equal or similar terms shall mean that the approval of the Engineer is required to any alternative product proposed by the Contractor. The Contractors freedom, however, to propose alternatives for the Engineers review and approval, shall not be limited to those products in respect of which the term approved equal or similar has been used in the Contract Documents, and he may propose alternatives to any specified products provided such alternatives are equal in all respects to the quality, durability and performance characteristics of the specified product. Substitute products: If the Contractor is unable to obtain the specified product in spite of his best endeavours, and if he is unable to find and propose a suitable equal alternative he may propose a substitute for the Engineers review and approval, which substitute shall be similar to, and as near as possible equal if not better than the quality, durability and performance characteristics of the specified product. A substitute product will only be considered if the Contractor has proved to the Engineers reasonable satisfaction that the specified product is unobtainable. Engineers approval of alternatives and substitutes: The approval of any alternative or substitute product shall be solely at the discretion of the Engineer and such approval shall in no way relieve the Contractor of any of his liabilities and obligations under the Contract. The burden of proof in satisfying the Engineer as to the suitability of any proposed alternative or substitute product shall rest with the Contractor, and the Engineer may request and the Contractor shall provide such supporting data, carry out such tests, etc., as the Engineer may reasonably require in order tosatisfy himself as to such suitability. Any delays or extra costs suffered by the Contractor because of his failure to propose alternatives timorously so as to allow the Engineer reasonable time to review, or because of rejection of alternatives or substitutes found by the Engineer to be unsuitable, shall be the responsibility of the Contractor and he shall not be entitled to additional payment nor extra time for completion in this respect. Cost effect in approving alternatives and substitutes: Should any alternative or substitute product be approved by the Engineer, any net increase in cost over and above the specified product shall be borne by the Contractor and, any net saving in cost shall be to the benefit of the Employer. Alternative or substitute products where permitted and approved, must conform to the Engineers designed space requirements. Any such alternative or substitute product that does not meet such space requirements, whether approved or not, shall be replaced at the Contractors expense and any modification of replaced systems thereby arising shall also be made at his expense. G. Submission of details of alternatives and substitutes: With any alternative or substitute proposal, submit copies of detailed specifications, brochures, etc., and quotations, in respect of the alternative or substitute materials proposed, for the Engineers review and approval.

C.

D.

E.

F.

PART 2 PRODUCT Not Applicable.


ALTERNATIVES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 01030-1 11 March 2013

PART 3 EXECUTION Not Applicable.

END OF SECTION

ALTERNATIVES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01030-2 11 March 2013

SECTION 01035 MODIFICATION PROCEDURES PART 1 - GENERAL 1.01 SECTION INCLUDES B. C. D. E. F. G. 1.02 Documentation of variation in Contract Price and Time for Completion Variation procedures Construction Variation Directive Price of Variation Order Execution of Variation Orders Correlation of Contractor submittals

SUBMITTALS A. B. Submit name of the individual authorized to receive variation documents, and be responsible for informing others in Contractor's employ or Subcontractors of variations to the Work. Variation Order Forms: Forms will be developed by the Engineers Representative and approved by the Engineer.

1.03

DOCUMENTATION OF VARIATION IN CONTRACT PRICE AND TIME FOR COMPLETION Pursuant to Clause No. 51 and 52 of the Particular Conditions, the Contractor shall : A. B. C. Maintain detailed records of work done on a stipulated price basis. Provide full information required for evaluation of proposed variations, and to substantiate costs of variations in the Work. Document each quotation for a variation in cost or time with sufficient data to allow evaluation of the quotation. Provide additional data to support computations: 1. Quantities of products, labor, and equipment. 2. Taxes, insurance, and guarantees or bonds. 3. Overhead and profit. 4. Justification for any variation in Time for Completion 5. Unit rates for additions/deletions. Note : Price analysis is to be submitted if the contract rates are not applicable to subject variations. Support each claim for additional costs, and for work done on a stipulated price basis, with additional information: 1. 2. 3. 4. Origin and date of claim. Dates and times work was performed, and by whom. Time records and wage rates paid. Invoices and receipts for products, equipment, and subcontracts, similarly documented.

D.

1.04

VARIATION PROCEDURES

MODIFICATION PROCEDURES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01035-1 11 March 2013

A. B.

The Engineer will advise of minor variations in the Work not involving an adjustment to Contract Price or Time of Completion as authorized in writing. The Engineer may issue a Proposal Request which includes a detailed description of a proposed variation with supplementary or revised Drawings and specifications, a variation in Contract Time for executing the variation with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor will prepare and submit an estimate within the requested time. The Engineer may issue a Proposal Request which requests the Contractor to submit alternative options for specific item(s), with all related drawings and specifications for the Engineers consideration. The Contractor may propose a variation by submitting a request for variation to the Engineer, describing the proposed variation and its full effect on the Work, with a statement describing the reason for the variation, and the effect on the Contract Price and Contract Time with full documentation and a statement describing the effect on Work by separate or other contractors. Document any requested substitutions in accordance with the relevant section/s.

C. D.

1.05

CONSTRUCTION VARIATION DIRECTIVE A. B. C. The Owner may issue a directive to the Engineer/Engineer Representative instructing the Contractor to proceed with a variation in the Work, for subsequent inclusion in a Variation Order. After receiving this directive and within the period requested or within a reasonable period, the Contractor is to submit his price and details to the Engineers Representative for issuing a Variation Order. Promptly execute the variation in Work.

1.06

VARIATION ORDER PRICE A. Based on Proposal Request and Contractor's priced quotation or Contractor's request for a Variation Order by the Engineer, and negotiated with the Contractor, the Engineer will then determine the Variation Order price.

1.08

EXECUTION OF VARIATION ORDERS A. The Engineer will issue Variation Orders for signatures of parties for formalizing the variation order as provided in the Conditions of the Contract.

1.09

CORRELATION OF CONTRACTOR SUBMITTALS A. B. C. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Variation Order as a separate line item and adjust the Contract Price. Promptly revise progress schedules to reflect any variation in Time of Completion, revise sub-schedules to adjust times for other items of work affected by the variation, and resubmit. Promptly enter variations in Project Record Documents.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED


MODIFICATION PROCEDURES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 01035-2 11 March 2013

END OF SECTION

MODIFICATION PROCEDURES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01035-3 11 March 2013

SECTION - 01039 COORDINATION AND MEETINGS

PART 1 - GENERAL 1.01 A. B. C. D. E. 1.02 A. 1.03 A. B. SECTION INCLUDES Coordination Preconstruction conference Site mobilisation conference Progress meetings Preinstallation conferences RELATED SECTIONS Section 01050 - Field Engineering COORDINATION Coordinate scheduling, submittals, and Work of the various sections of Specifications to ensure efficient and orderly sequence of installation of interdependent construction elements. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

C. Coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts and conduit as closely as practicable; place runs parallel with line of building. Utilize spaces efficiently to maximum accessibility for other installations, for maintenance, and for repairs. D. In finished areas conceal pipes, ducts and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements. E. F. Coordinate completion and clean up of work of separate sections in preparation for Substantial Completion and for portions of work designated for Employers partial occupancy. After Employer occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimise disruption of Employers activities. PRECONSTRUCTION CONFERENCE Employer and Engineer will schedule a conference after Contractor has selected his major sub-trades and prior to signing of Employer/Contractor Agreement. Attendance Required; Employer, Engineer and Contractor.

1.04 A. B.

C. Agenda: 1. 2. 3. 4. Submission of list of Subcontractors, list of products, schedules of values and progress schedule. Designation of responsible personnel and manpower organization. Procedures and processing of field decisions, shop drawings, submittals, substitutions, applications for payments, proposal requests, variations, checklists and Contract closeout procedures. Scheduling and sequence of work.
01039-1 11 March 2013

CORDINATION AND MEETINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

5. 6. 1.05 A. B.

Use of premises by Employer and Contractor. Employers requirements. SITE MOBILISATION CONFERENCE

Engineer and Employer will schedule a conference at the Project Site prior to Contractor occupancy. Attendance Required: Employer, Engineer, Contractor.

C. Agenda: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 1.06 A. B. Use of premises by Employer and Contractor Employers requirements Construction facilities and controls provided by Contractor Temporary Utilities provided by Contractor Survey and building layout Security and housekeeping procedures Schedules Procedures for testing Procedures for maintaining record documents. Requirements for start-up of equipment Inspection and acceptance of equipment put into service construction period. Guarantee period for all equipments. PROGRESS MEETINGS The Engineer should schedule weekly and monthly construction progress meetings, co-ordination meetings and preinstallation conferences, throughout progress of work for the proper management and coordination of the Contract and as required by the Engineer. The Engineer make physical arrangements, prepare agenda and distribute notice of each meeting to participants, three days in advance of meeting date.

C. The Engineer will preside at meetings. Record minutes and distribute copies within two days after meeting to participants, to entities affected by decisions at meetings, with two copies to each of Engineer and Employer. D. Location of Meetings: Conference Room on Site. E. F. Attendance: Contractor, Project Manager, Subcontractors and Suppliers as appropriate to agenda; Employer, Engineer, Professional Consultants. Minimum Agenda: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Approval of minutes of previous meetings. Review of Work progress and CPM program. Field observations, problems and decisions. Identification of problems which impede planned progress. Review of submittals schedule and status of submittals. Review of off-site fabrication and deliver schedules. Maintenance of progress schedule. Corrective measures to regain projected schedules. Planned progress during succeeding work period. Coordination of projected progress. Maintenance of quality and work standards. Effect of proposed changes on progress schedule and coordination. Safety.
01039-2 11 March 2013

CORDINATION AND MEETINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

14. 15. 16. 17. 18.

Contractors Resources: management, Men, Money, Materials, Machinery. Contractors on-site staff progress report. Contractors Employers and Engineers Office Managements observations and remarks. Other business relating to work. Samples and mock-ups as required by the Engineer or the Employer before execution of the work.

G. Subcontractors Site Meetings : 1. 1.07 A. B. The Contractor should hold meetings with appropriate subcontractors and suppliers shortly before main site progress meetings to facilitate accurate reporting of progress. PREINSTALLATION CONFERENCES When requires in individual specification Section, convene a preinstallation conference at work site prior to commencing work of the Section. Require attendance of entities directly affecting, or affected by work of the Section.

C. Notify Engineer three days in advance of meeting date. D. Prepare agenda, preside at conference, record minutes and distribute copies within two days after conference to participants with two copies to Engineer. E. Review conditions of installation, preparation and installation procedures and coordination with related work.

PART 2 PRODUCT Not Applicable. PART 3 EXECUTION Not Applicable.

END OF SECTION

CORDINATION AND MEETINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01039-3 11 March 2013

SECTION 01040 PROJECT COORDINATION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes administrative and supervisory requirements necessary for coordinating construction operations including, but not necessarily limited to, the following: 1. General project coordination procedures. 2. Coordination Drawings. 3. Administrative and supervisory personnel. 4. Cleaning and protection.

1.02

COORDINATION A. Coordinate construction operations included in various Sections of these Specifications to assure efficient and orderly installation of each part of the Work. Coordinate construction operations with other Contractors if any for proper installation, connection, and operation. 1. Schedule construction operations in the sequence coordinated with other Contractors if any, and approved by the Engineer or Engineers Representative to obtain the best results where installation of one part of the work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components to assure maximum accessibility for required maintenance, service, and repair. 3. Make provisions to accommodate items scheduled for later installation. 4. Coordinate with other contractor(s) employed by the Employer, for all activities interfacing or interfering with this work. Refer also to section 01340. Where necessary, prepare memoranda for distribution to each Contractor involved, outlining special items required for coordination. Include such items as required notices, reports, and attendance at regular coordination meetings. 1. Prepare similar memoranda for the Employer and separate contractors where coordination of their work is required. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and assure orderly progress of the Work. Such administrative activities include, but are not limited to, the following: 1. Schedules Preparation 2. Install and remove temporary facilities. 3. Delivery and processing of submittals. 4. Progress meetings. 5. Project closeout activities.

B.

C.

1.03

PROCEDURES A. The Contractor shall comply with the procedures required by the Engineers Representative for the day to day administration of the Contract with respect to submittals, safety, inspection, meetings, correspondence, payment schedule, progress reports, etc. and the contract sum is deemed to include all costs associated herewith.

PROJECT COORDINATION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01040-1 11 March 2013

1.04

SUBMITTALS A. Coordination Drawings: Prepare coordination drawings where careful coordination is needed for installation of products and materials. Prepare coordination drawings where limited space availability necessitates maximum utilization of space for efficient installation of different components. 1. Show the relationship of components shown on separate Shop Drawings. 2. Indicate required installation sequences. 3. Comply with requirements contained in Section "Submittals."

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION 3.01 GENERAL COORDINATION PROVISIONS A. Inspection of Conditions: Require the Installer of each major component to inspect both the substrate and conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner. Co-ordinate temporary enclosures with required inspections and tests to minimize the necessity of uncovering completed construction for that purpose. Conduct regular coordination meetings END OF SECTION

B. C.

PROJECT COORDINATION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01040-2 11 March 2013

SECTION 01045 CUTTING AND PATCHING PART 1 - GENERAL 1.01 SECTION INCLUDES A. B. 1.02 The Contractor is responsible for all his cutting and patching works. The Contractor will coordinate with Owner or other Contractors or statutory authority/ies if he requires to carryout any cutting and patching works.

SUBMITTALS A. Submit written request seven (7) days in advance of cutting or alteration which affects: 1. Structural integrity of any element of Project. 2. Integrity of weather-exposed or moisture-resistant element. 3. Efficiency, maintenance or safety of any operational element. 4. Visual qualities of sight exposed elements. 5. Work of Owner or separate Contractor. Include in request: 1. 2. 3. 4. 5. 6. 7. 8. Identification of Project. Location and description of affected work. Necessity for cutting or alteration. Description of proposed work, and products to be used. Alternatives to cutting and patching, if available. Effect on work of Owner or separate contractor or statutory authority, if and as involved. Written permission of Owner or other Contractor or statutory authority/ies, if and as involved Date and time the work will be executed.

B.

1.04

APPROVAL A. Do not proceed with cutting and patching works until approval in writing is received from the Engineers Representative.

PART 2 - PRODUCTS 2.01 MATERIALS A. Primary Products: Those required for original installation.

PART 3 - EXECUTION 3.01 EXAMINATION A. Inspect existing conditions prior to commencing Work, including elements subject to damage or movement during cutting and patching.

CUTTING AND PATCHING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01045-1 11 March 2013

B. C.

After uncovering existing work, inspect conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

CUTTING AND PATCHING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01045-2 11 March 2013

3.02

PREPARATION A. B. C. D. Provide temporary supports to ensure structural integrity of the Work. Provide devices and methods to protect other portions of Project from damage. Provide protection to other works or installations. Provide protection from elements for areas which may be exposed by uncovering work. Maintain excavations free of water.

3.03

CUTTING AND PATCHING A. B. C. D. E. F. Execute cutting, fitting and patching to complete work. Fit products together, to integrate with other work. Uncover work to install ill-timed work. Remove and replace defective or non-conforming work. Remove samples of installed work for testing when requested. Provide openings in the work for penetration of mechanical and electrical work with required temporary support to hold in position. Provide openings in finished works, as marked by Employer or other contractors or statutory authority/ies, if and as involved

G. 3.04

PERFORMANCE A. B. C. D. E. Execute work by methods to avoid damage to other Work, and which will provide appropriate surfaces to receive patching and finishing. Cut rigid materials using masonry saw or core drill as approved by the Engineer's Representative. Pneumatic tools not allowed without prior approval. Restore work with new products in accordance with requirements of Contract Documents. Fit work to pipes, sleeves, ducts, conduit and other penetrations through surfaces. At penetration of fire rated walls, partitions, ceiling, or floor construction, completely pack voids with 96kg/cu.m. density fibreglass material to full thickness of the penetrated element and seal both ends with approved fire rated sealant. All complete to the satisfaction of the Engineer or Engineers Representative. Refinish surfaces to match adjacent finish. For continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

F.

END OF SECTION

CUTTING AND PATCHING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01045-3 11 March 2013

SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 SECTION INCLUDES A. B. 1.02 Field Engineering Services. Engineer or Engineer's Representative will identify control points and property line corner stakes.

STAFF QUALIFICATION AND REQUIREMENT. A. REQUIREMENT 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. B. Project Manager (More than 15 years experience) Full time Project Engineer Civil (More than 10 years experience) Full time Architectural engineer (More than 10 years experience) Full time Site Engineer Civil (More than 5 years experience) Full time Site Supervisor (Civil & Arch.) (More than 10 years experience) Full time Land Surveyor (More than 10 years experience) Full time Planning Engineer (More than 7 years experience) Part time. Mechanical Engineers (More than 7 years experience) Full time. Electrical Engineer (More than 7 years experience) Full time Office Secretory (More than 5 years experience) Full time

QUALIFICATIONS 1. 2. 3. 4. All Engineers should have minimum B.E. Degree in the specified trade and registered in Kuwait Society of Engineers. All Supervisors should have minimum three (3) years diploma in the specified trade. Land surveyor should have minimum two (2) years diploma in specified trade. Office secretory should have minimum three (3) years degree.

1.03

SUBMITTALS A. B. Submit name and resume of qualifications for Land Surveyor or Engineer before starting survey work. On request, submit documentation verifying accuracy of survey work.

1.04

PROJECT RECORD DOCUMENTS A. B. C. Maintain complete, accurate log of control and survey work as it progresses. On completion of major site improvements, prepare a certified survey showing dimensions, locations, angles, and elevations of construction and site work. Submit Record Documents under provisions of Section 01300.

PART 2 - PRODUCTS
FIELD ENGINEERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 01050-1 11 March 2013

NOT USED PART 3 - EXECUTION 3.01 INSPECTION A. Before ordering any material or doing any work, verify all measurements and be responsible for their correctness. No extra charge or compensation will be allowed on account of difference between actual measurements and the dimensions given in the Contract Documents. Any difference which may be found shall be submitted to the Engineer or Engineer's Representative in writing for consideration before proceeding with the works.

3.02

GENERAL A. Site Bench Marks shall be accurately and safely established, protected, maintained and cleared away upon completion of works or when no longer required all to the satisfaction of the Engineer or Engineer's Representative. Such Benchmarks must be related to the nearest permanent Benchmark; fixed by the related statutory authority. Prepare a plan detailing the location of the Benchmarks and keep up to date throughout the operational period of the Contract. Reproducible copies of the plan so prepared; shall be supplied to the Engineer or Engineer's Representative, as and when it is required. The Engineer or Engineer's Representative reserves the right to order levels to be taken at any time considered necessary for the full and proper supervision and measurement of the works. Before the works or any parts thereof are commenced the Contractor and the Engineer or their Representatives shall together survey and take levels of the Site of the works and agree upon all particulars on which setting out of the works shall be based. Such levels shall be related to the Bench marks of aforesaid and plotted by the Contractor and after agreement of the drawings shall be signed by the Engineer or Engineer's Representative and the Contractor, and shall form the basis of setting out of the Works. Failing such surveys and agreements being prepared and/or signed by the Contractor, the surveys of the Engineer or Engineer's Representative shall be final and binding upon both parties. The Contractor shall plot these levels and after they have been signed by the Engineer or Engineer's Representative and the Contractor, the original with three (3) copies of it will be submitted to the Engineer or Engineer's Representative and the Contractor shall bear the cost.

B.

C. D.

E.

F. G.

3.03

SURVEY REFERENCE POINTS A. B. Protect survey control points prior to starting site work; preserve permanent reference points during construction. Make no changes without prior written notice to Engineer or Engineer's Representative. Promptly report to Engineer or Engineer's Representative the loss or destruction of any reference point or relocation required because of changes in grades or other reasons. Replace dislocated survey control points based on original survey control.

3.04

SURVEY REQUIREMENTS A. Establish, if required by Engineer or Engineer's Representative, other permanent bench marks on site, referenced to established control points. Record locations, with horizontal and vertical data, on Project Record Documents.
01050-2 11 March 2013

FIELD ENGINEERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Establish lines and levels, locate and lay out by instrumentation and similar appropriate means: 1. Site improvements, including pavements; stakes for grading, fill and topsoil placement and utility locations, slopes, and invert elevations. 2. Grid or axis for structures. 3. Building foundations, column locations, ground floor elevations, and the like. Periodically verify layouts by same means. Provide instruments and assistance for checking the laying out and levels.

C. D. 3.05

LAYING OUT A. B. C. D. Lay out the Works using methods and necessary instruments described in BS 5606 "Code of Practice for Accuracy in Building" Section 5. Obtain the true and accurate building lines from the Municipality and lay out the Works as shown on the Drawings. Submit details of methods and equipment to be used in laying-out the Works. Check the levels and dimensions of the Site against those shown on the Drawings and record the results on a copy of the Drawings. Notify the Engineer or Engineer's Representative in writing of any discrepancies and obtain instructions before proceeding. Inform the Engineer or Engineer's Representative when overall laying out is complete. Arrange the setting out, erection, juxtaposition of components and application of finishes (working within the practical limits of the design and Specification) to ensure that there is a satisfactory fit at junctions and that the finished work has a well aligned, true and regular appearance. Wherever satisfactory accuracy, fit and/or appearance of the work is likely to be critical or difficult to achieve, obtain approval of proposals or of the appearance of the relevant aspects of the partially finished work as early as possible. Work which fails to meet the specified levels of accuracy must not be rectified without approval. Submit proposals for such rectification and meet all costs arising, including effects on other work. Allow for the possibility that approval will not be given, necessitating removal and replacement of the work. END OF SECTION

E. F.

G. H. I. J.

FIELD ENGINEERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01050-3 11 March 2013

SECTION 01090 REFERENCES PART 1 GENERAL 1.01 DESCRIPTION Comply with all codes, regulations, specifications and standards referred to throughout the contract documents. 1.02 A. REFERENCE STANDARDS All references to codes, regulations, specifications and standards referred to in the Contract Documents shall, unless otherwise stated, mean the latest edition, amendment or revision of such reference standard in effect as of the date of these Tender Documents. The Contractor shall obtain an original copy of the latest edition of all codes, regulations, standards and technical literature referred to in the Contract Documents and the same shall be kept on the project site, properly indexed and maintained in good order and available to the Engineer at all times. Proof of Compliance: Whenever the Contract Documents require that a product complies with Federal Specification, British Standard, ASTM Designation, ANSI Specification or other association, standards, etc., the Contractor shall present an affidavit from the manufacturer certifying that the product complies therewith. Where requested or specified, submit supporting test data to substantiate compliance. Where reference standard referred to herein is in the form of a recommendation or suggestion, such recommendation or suggestion shall be deemed to be mandatory under this Contract unless conflicting with particular specifications contained herein. DEFINITIONS Where as shown, as indicated, as detailed, or words of similar import are used, it shall be understood that reference to the Drawings accompanying the Specifications is made unless otherwise state. Where as approved, as reviewed, as accepted, or words of similar import are used, it shall be understood that the approval, direction, requirement, permission, authorization review, or acceptance of the Engineer is intended, unless otherwise stated. As used in the Contract Documents, provide shall be understood to mean provide complete in place, that is, furnish and install.

B.

C.

1.03 A.

B.

PART 2 PRODUCT Not Applicable. PART 3 EXECUTION Not Applicable. END OF SECTION

REFERENCES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01090-1 11 March 2013

SECTION 01200 PROJECT MEETINGS PART 1 - GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for project meetings, including, but not limited to, the following: 1. 2. 3. 4. 1.02 Pre-construction Conference Pre-installation Conferences Progress Meetings Co-ordination Meetings

PRE-CONSTRUCTION CONFERENCE A. Pre-construction meeting: will be held within 7 days of the signing of the Contract and should be attended by the Contractor and his major subcontractors together with the Engineer and Engineer's Representatives. The meeting will be chaired by the Engineer. Agenda: Discuss items of significance that could affect progress, including the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Construction schedule. Critical work sequencing. Items required long delivery periods Long hold-ups like backfill; curing periods; weather-proof enclosement of spaces; etc. Designation of responsible personnel. Procedures for processing field decisions and variation Orders. Procedures for processing Applications for Payment. Distribution of Contract Documents. Lines of Communications Submittal of Shop Drawings, Product Data, and Samples. Preparation of record documents. Use of the premises. Parking availability. Office, work, and storage areas. Equipment deliveries and priorities. Safety procedures. First aid. Security. Working hours - Normal/Ramadan/Severe Summer/Other Housekeeping.

B.

1.03

PRE-INSTALLATION CONFERENCES A. B. Conduct a pre-installation conference at the Project Site before each construction activity that requires coordination with other construction. Attendees: The Installer and representatives of manufacturers and fabricators involved in or affected by the installation, and its coordination or integration with other works, materials and installations that have preceded or will follow, shall attend the meeting. Advice the Construction Manager and the Engineer's Representative of scheduled meeting date.

PROJECT MEETINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01200-1 11 March 2013

1.

Review the progress of other construction activities and preparations for the particular activity under consideration at each pre-installation conference, including requirements for the following: a. Contract Documents. b. Options. c. Related Change Orders. d. Purchases. e. Deliveries. f. Shop Drawings, Product Data, and quality-control samples. g. Review of mock-ups. h. Possible conflicts. i. Compatibility problems. j. Time schedules. k. Weather limitations. l. Manufacturer's recommendations. m. Warranty requirements. n. Compatibility of materials. o. Acceptability of substrates. p. Temporary facilities. q. Space and access limitations. r. Governing regulations. s. Safety. t. Inspecting and testing requirements. u. Required performance results. v. Recording requirements. w. Protection. Record significant discussions and agreements and disagreements of each conference, and the approved schedule. Promptly distribute the record of the meeting to everyone concerned, including the Owner and the Engineer. Do not proceed with the installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of Work and reconvene the conference at the earliest feasible date.

2.

3.

1.04

PROGRESS MEETINGS A. Progress Meetings: Job site progress meetings will be held once a month, or as instructed by the Engineer's Representative, to review the Contractor's Construction Schedule and to discuss work progress. Attendees at this meeting shall include the Engineer and Engineers Representative, Contractor, approved Subcontractors and other Contractors as required. The Engineer and the Engineers Representative shall have the right to attend these meetings and shall be free to exercise their right at their separate discretions. The job site progress meetings shall be convened as directed by the Engineer or Engineers Representative. Such meetings will be chaired by the Engineer or Engineers Representative. Agenda: Agenda for the forthcoming meeting will be circulated Seven (7) calendar days before the meeting. Including topics for discussion as appropriate to the status of the project. Review and correct or approve minutes of the previous progress meeting. Review other items of significance that could affect progress. Review progress since the last meeting. Determine where each activity is in relation to the Contractor's Construction Schedule, whether on time or ahead or behind schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to insure that current and subsequent activities will be completed within the Time of Completion. D. Pre-Meeting Submittals: Three (3) days before each meeting, the Contractor must submit the following information to the Engineer's Representative: 1. 2. 3. List of any variations in starting dates and in duration of outstanding activities from planned dates and times. Percentage completion in every activity. Other information requested by the Engineer's Representative till say 2 days before the pre-meeting submittal date.
01200-2 11 March 2013

B. C.

PROJECT MEETINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

4. 5. 6. 1.05

Shop drawings submittals status log. Contractor's submittals status log. Material procurement status log.

COORDINATION MEETINGS A. Conduct project coordination meetings at regular intervals convenient for all parties involved. Project coordination meetings are in addition to specific meetings held for other purposes, such as regular progress meetings and preinstallation conferences. Request representation at each meeting by every party currently involved in coordination or planning for the construction activities involved.

B. 1.06

MINUTES OF MEETINGS A. The proceedings of all meetings attended by the Engineer or the Engineers Representative shall be recorded and minuted by the Engineers Representative. Distribution of the minutes of meeting shall be done by Engineers Representative to all attendees and the concerned parties with a short/reasonable time.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED

END OF SECTION

PROJECT MEETINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01200-3 11 March 2013

SECTION 01300 SUBMITTALS (Product Data, Samples and Mock-ups) PART 1 - GENERAL 1.01 SUMMARY A. This Section includes administrative and procedural requirements for submittals required for performance of Architectural Works : 1. Product Data and Manufacturer's data. 2. Quality Assurance submittals. 3. Samples. 4. Mock-ups 5. Engineer & Engineer's Representative Action 6. Field and Engineering Data and Record Other Submittals: Also refer to other Sections in Division 1 and other Specification Divisions and Sections and other Contract Documents for requirements for other submittals.

B. 1.02

DEFINITIONS A. B. Field Samples are full-size physical examples erected on-site to illustrate finishes, coatings, or finish materials. Field samples are used to establish the standard by which the Work will be judged. Mock-ups are full-size assemblies for review of construction, coordination, testing, or operation; they are not Samples.

1.03

SUBMITTAL PROCEDURES A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities at the Contractor's cost. Transmit each submittal sufficiently in advance of performance of related construction activities to avoid delay. 1. 2. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. Coordinate transmittal of different types of submittals for related elements of the Work so processing will not be delayed by the need to review submittals concurrently for coordination. The Engineer's Representative reserves the right to withhold action on a submittal requiring coordination with other submittals until all related submittals are received. 3. Processing : To avoid the need to delay installation as a result of the time required to process submittals, allow sufficient time for submittal review, including time for resubmittals. a. b. c. d. Allow 14 days for initial review. Allow additional time if the Engineer's Representative must delay processing to permit coordination with subsequent submittals. If an intermediate submittal is necessary, process the same as the initial submittal. Allow the same period in (a) above again for re-processing each submittal. No extension of Time for Completion will be authorised because of failure to transmit submittals to the Engineer's Representative sufficiently in advance of the Work to permit processing.

SUBMITTALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01300-1 11 March 2013

B.

Submittal Preparation: Place a permanent label or title block on each submittal for identification. Indicate the name of the entity that prepared each submittal on the label or title block. 1. 2. Provide a space approximately 100 x 125mm on the label to record the Contractor's review and signature and for Engineers action and remarks. Include the following information on the label for processing and recording action taken. 1. Project name 2. Date 3. Name and address of the Engineer's Representative 4. Name and address of the Contractor 5. Name and address of the subcontractor 6. Name and address of the supplier 7. Name of the manufacturer 8. Number and title of appropriate Specification Section 9. Drawing number and detail references, as appropriate. Contractor's Review: 1. Review submittals prior to transmittal; determine and verify field measurements, field construction criteria, manufacturer's catalogue numbers, and conformance of submittal with requirements of Contract Documents. 2. Coordinate submittals with requirements of Work and of Contract Documents. 3. Sign or initial each page of product data, and each sample label to certify compliance with requirements of Contract Documents, identify as Coordinated Submittal. Notify Engineer's Representative in writing at time of submittal, of any deviations from requirements of Contract Documents. 4. Contractor's submission to contain complete information regarding all drawings, materials used, and related items. 5. Do not fabricate products or begin work, which requires submittals until return of submittal with Engineer's Representative acceptance.

3.

C.

Submittal Transmittal: Pack each submittal appropriately for transmittal and handling. Transmit each submittal to the Engineer's Representative using a transmittal form approved by the Engineer. The Engineer's Representative will not accept submittals received from sources other than the Contractor. On the transmittal, record all relevant information. On the form, or separate sheet, record deviations from Contract Document requirements, including variations and limitations. Include Contractor's certification that information complies with Contract Document requirements. Submittal Procedures by Contractor 1. Samples : Three (3) sets of samples of each material or prefabricated component with transmittal forms to the Engineer's Representative. Two (2) sets will be returned marked with the action taken. Maintain one (1) set of samples, as approved by the Engineer or the Engineer's Representative, at the Project Site/sample room available for quality control comparisons throughout the course of the construction activity. 2. Catalogues : Three (3) published copies of technical (not commercial) brochures, one of which must be an original with transmittal forms to the Engineer's Representative. Brochures shall be in English or accompanied by a certified English translation. Brochures in Arabic shall be acceptable at the Engineer's Representative discretion.

D.

E.

Mock-up 1. Install at location/s and to the extent required for al important works.

F.

Submittal of Correspondence :
01300-2 11 March 2013

SUBMITTALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.

All correspondence to the Engineer's Representative shall be submitted as follows: a. b. Transmittals : One original and three photocopies of transmittals and letters, including attachments/enclosures. Letters : All correspondence from the Contractor to the Engineer's Representative shall be submitted on A4 size paper. All correspondence shall clearly indicate:

1.04

PRODUCT DATA & MANUFACTURER'S DATA A. When specified in individual specification Sections, submit manufacturers specifications, manufacturer's printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing. Also submit standard coloured charts, catalogues cuts, standard wiring diagrams, painted performance curves, operational range diagram, mill reports. Study the Manufacturers instructions and Contract Documents, to combine the two to produce the most stringent requirements to form the basis of contract price, execution method, material and time. Submit standard product operating and maintenance manuals.

B. C. 1.05

QUALITY ASSURANCE SUBMITTALS A. Submit Quality Control submittals, including design data, certifications, manufacturer's instructions, manufacturer's field reports, and other quality-control submittals as required under other Sections of the Specifications. Certifications: Where other Sections of the Specifications require certification that a product, material, or installation complies with specified requirements, submit a notarized certification from the manufacturer certifying compliance with specified requirements. 1. 2. C. Signature: Certificates shall be signed by the manufacturer's officer or other individual authorized to sign documents on behalf of the manufacturer. Inspection and Test Reports: Requirements for submittal of inspection and test reports from approved testing agencies are specified in Section 01400 Quality Control.

B.

Submittal and Approval Process shall be as follows : 1. Submission of material samples 2. Submission of material samples in system application 3. Installation of on-site mock-ups

1.06

SAMPLES A. Submit full size, fully fabricated samples, cured and finished in the manner specified, and physically identical with the material or product proposed for use. 1. Mount, display or pack samples in the manner specified to facilitate review of qualities indicated. Prepare samples to match a designated sample where so indicated. Include the following information. a. Generic description of the sample. b. Size limitations. c. Sample source. d. Product name or name of manufacturer. e. Compliance with recognized standards. f. Compliance with governing regulations. g. Availability.
01300-3 11 March 2013

SUBMITTALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

h. 2.

Delivery time, measured from the date of the Engineer's or Engineer's Representative approval till the delivery on Project Site.

For review of kind, colour, pattern and texture for a check of these characteristics with other elements and for a comparison of these characteristics between the submittal and the actual component as delivered and installed : a. Submit full range of manufacturers standard finishes (except when more restrictive or definite requirements are specified for colours, textures and patterns) for Engineer's representative selection. Where variation in colour, pattern, texture, or other characteristic is inherent in the material or product represented by a sample, submit multiple units that show full range of the variations.

b.

B.

Submission of Material Samples Submit three samples of each material to the Engineers Representative, each at least 300 x 300mm in size. No sample will be reviewed if it is submitted in sizes smaller than stated above. The Engineers Representative shall review these samples and shall approve if they are as per the specifications or reject and ask for new submittal if they are not as per the required specifications.

C.

Submission of Material Samples in System Application Submit three samples to the Engineers Representative for approval of finish building materials, shown assembled in the proposed application for the project. The application samples must be at least 600 x 600mm in size to show the total assemblage of the intended materials. No sample would be reviewed if it is submitted in sizes smaller than stated above. The Engineers Representative shall review these samples and shall approve if they are as per the specifications or reject and ask for new submittal if they are not as per the required specifications.

D. 1.07

Should requirements relating to samples be mentioned in the Tender Documents elsewhere, the combination and more stringent shall govern.

MOCK-UPS A. After the approval of materials etc., the Contractor shall prepare full size mock-ups of such portion/s of the building the Engineers Representative wishes to view on site at full scale. Exterior Mock-ups shall be installed on the site, within a specific area approved on the site plan for permanent mock-up installations. Interior Mock-ups shall be installed within the building shell structure at locations directed by Engineers Representative. Exterior mock-ups must be away from building construction works so that they are not damaged. They should remain in place until the completion of majority of the finished building faade elements, represented by them, on the main building. Should requirements relating to mock-ups be mentioned in the Tender Documents elsewhere, the combination and more stringent shall govern.

B.

C. 1.08

ENGINEER AND ENGINEER'S REPRESENTATIVE ACTION A. Except for submittals for the record or information, where action and return is required, the Engineer or Engineer's Representative will review each submittal, mark to indicate action taken, and return promptly, compatible with the requirements of the review, generally in 14 calendar days but in less time when a request for this has been accepted by the Engineer's Representative or more time when that is unavoidable in the Engineer's Representative's opinion. Compliance with specified characteristics is the Contractor's responsibility.
01300-4 11 March 2013

B.

SUBMITTALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C.

Responsibility for Review: 1. The Engineer and Engineer's Representative review of submittals by the Contractor is for general conformance with the design concept and information given in the contract Documents and such review or approval shall not relieve the Contractor from responsibility for any deviations from the requirements of Contract Documents. The Engineer's and Engineer's Representative review shall not be construed as a complete check nor shall it relieve the Contractor from responsibility for errors of any kind in submittals, or from the necessity of furnishing any work required by the Contract Documents, which may have been omitted on the submittals. The Engineer and Engineer's Representative will review and will return them to the Contractor with the Engineer's stamp applied thereto. No acceptance or approval of submittals, nor any indication or request marked by the Engineer or Engineer's Representative on any submittal, shall constitute an authorization for any increase in the Contract Sum or Time for Completion or a change in the Contract requirements. The Contractor will not be relieved from responsibility for any deviation from the requirements of the Contract after approval of submittals by the Engineer or Engineer's Representative or such deviation at the time of submitting submittals. The Contractor shall indicate on resubmitted submittals, all revisions as well as those requested by the Engineer or Engineer's Representative. Comments by the Engineer or Engineer's Representative which increase Contract cost or time of completion shall be brought to the Engineer's or Engineer's Representative attention before proceeding with the Works.

2.

3.

4.

D.

Action Stamp : 1. Each submittal will be returned to the Contractor stamped or marked by the Engineer or Engineer's Representative indicating the appropriate action as follows: Action A Action B : : APPROVED means that fabrication, manufacture, or construction may proceed. APPROVED SUBJECT TO COMMENTS OR APPROVED AS NOTED means that fabrication, manufacture, or construction may proceed provided submittal complies with the Engineer's or Engineer's Representative's comments. If, for any reason, the Contractor cannot comply with the notations, the Contractor shall make revisions and resubmit as described for submittals stamped RESUBMIT. NOT APPROVED AND RESUBMIT means that the submittal does not comply with the Contract Documents and that fabrication, manufacturer or construction shall not proceed. Submittals stamped RESUBMIT are not permitted on the Site of the Works and are not to be used. The Contractor shall make the required revisions and resubmit.

Action C

2.

The Contractor shall be responsible for the correct location of his works irrespective of approval by the Engineer or Engineer's Representative and shall pay all costs and expenses incurred by other contractors, if any, due to improper location of his works. After submittals have been approved by the Engineer or Engineer's Representative they shall not be departed from, unless resubmitted and approved by the Engineer or Engineer's Representative or modified by Variation Order as provided under the Contract.

3.

PART 2 - PRODUCTS NOT USED

SUBMITTALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01300-5 11 March 2013

PART 3 - EXECUTION NOT USED END OF SECTION

SUBMITTALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01300-6 11 March 2013

SECTION 01315 CPM SCHEDULES PART 1 - GENERAL 1.01 SUMMARY A. This Section includes administrative and procedural requirements for the Critical Path Method (CPM) of scheduling and reporting progress of the Work. 1. 1.02 DEFINITIONS A. Critical Path Method (CPM): A method of planning and scheduling a construction project where activities are arranged based on activity relationships and network calculations determine when activities can be performed and the critical path of the Project. Construction Schedule(s): The Contractor's developed schedule(s) for execution of the Contract that meets the contract requirements for the performance of this contract and the requirements of the Construction Program. Contractor's cost loaded Construction Schedule: The Contractor's approved CPM schedule with assigned cost values based on the priced Bills of Quantities and Schedule of Rates (Document III-4) that total to the contract lump sum price. See clause 1.08. Critical Path: The longest continuous chain of activities through the network schedule that establishes the minimum overall project duration, which shall equal the Contract Period or the Extend Contract Period approval by the Engineer. Network Diagram: A graphic diagram of a network schedule, showing the activities and activity relationship. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources. 1. Critical activities are activities on the critical path. 2. Predecessor activity is an activity that must be completed before a given activity can be started. Event: An event is the starting or ending point of an activity. Milestone: A key or critical point in time for reference or measurement - more particularly the starting time and completing time of every critical activity. Float is the measure of leeway in activity performance. Accumulative float time belongs to the Employer. 1. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the following activity. 2. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned project completion date. The work under this clause consists of the scheduling and reporting procedures required to be carried out by the Contractor in conjunction with the progress of the project.

B.

C.

D.

E. F.

G. H. I.

1.03

CPM SCHEDULE REQUIREMENTS A. The Contractor shall be responsible for submitting adequate planning data and acceptable cost distribution information for the development and maintenance of the Contractor's cost loaded construction schedule (hereinafter referred to as the "Construction Schedule"), all to the approval of the Engineer or Engineer's Representative detailed hereafter.
01315-1 11 March 2013

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C.

The Contractor shall use a computerized precedence Diagram CPM technique in preparing the Construction Schedule. The software proposed to be used by the Contractor for the CPM is to be approved by the Engineer or Engineer's Representative prior to generation of the construction schedule. The Contractor shall develop the construction schedule demonstrating fulfillment of all contract requirements by cost loading construction schedule activities. Each milestone activity should represent the related construction activities hammocked within it by using true connections to reflect the progress on the milestone activity as measured on the hammocked construction activities. "Summary collection" activities are not accepted as hammocking tools. Each revision of the construction schedule shall be signed by the duly authorised representative of the Contractor and these documents, upon approval by the Engineer or the Engineer's Representative, shall thereupon become incorporated in to the contract documents of the project. Failure by the Contractor to submit such information punctually and in accordance with the contract requirements may result in Contractor being penalised in the amount of KD 50/= per incident which shall be deducted from monies due to him.

D.

E.

1.04

QUALITY ASSURANCE A. Contractor's Representative: The Contractor shall designate a well experienced Scheduling Engineer (see elsewhere for qualifications etc.) who shall be responsible for the content and development of the Contractor's Construction schedule. This representative shall have direct control and complete authority to act on behalf of the Contractor in fulfilling the requirements of the Construction Schedule requirements and such authority shall not be interrupted throughout the duration of the contract.

1.05

CONTRACTORS CONSTRUCTION SCHEDULE DEVELOPMENT A. Within ten (10) days of the Signing of Contract, the contractor shall meet with the Engineer's Representative to review the scheduling requirement of the project. This review will include the specific requirements of the Contractor regarding restraints and milestones, including the interrelation with sub-contractors, if any, as they relate to the overall construction programme. The Contractor will present restraints, if any, foreseen by himself in the proposed Construction Schedule that may affect the construction programme. Within twenty-one (21) days of the Signing of Contract, the contractor shall submit for the Engineer's approval, the detailed construction schedule in a bar-chart time-scaled format, to show the sequence and interdependence of activities required for complete performance of all items of work under the contract or portion thereof Further this schedule shall reflect the milestones required by the contract documents. In preparing the construction schedule, the contractor shall: 1. Exercise care to produce a clear, legible, and accurate diagram. Activities related to specific areas of the project shall be grouped on the diagram for ease, understanding, and simplification. The diagram shall show the following for each construction activity, where applicable. a. Concise description of the work b. Early start and finish dates c. Number of calendar/working days d. Manpower loading e. Cost loading f. Equipment & Machinery Loading g. Total Float of each activity. Include any trade or material restraints to indicate the movement of trades who are performing major work. Should the Contractor's scheduling software allow open ends to be shown, critical or not critical, then the option of not critical will be adopted. Demonstrate work activities in the Contractor's Construction Schedule to have maximum duration of fifteen to thirty (15-30) days as approved by the Engineers Representative with not more than
01315-2 11 March 2013

B.

2. 3. 4.

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2% exceeding these limits, unless otherwise approved by the Engineer or Engineer's Representative except as to non construction activities (such as procurement of materials, delivery of equipment). The Construction Schedule developed above shall not be changed throughout the duration of the project without getting prior approval from the Engineer or Engineer's Representative. Include the time and/or labor and/or equipment required for activities other than actual construction; such as aging periods, drying periods, curing periods etc. Include the time and/or labor and/or equipment required for obtaining approval, placing order, manufacture, shipping, custom clearance and transportation to site of all materials and equipment. Include the time and/or labor and/or equipment required for meeting the following deadlines:1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Approval to Fire Protection and Fire Alarm equipment and working drawings shall be obtained from the relevant authorities by a maximum of three (3) months from signing of the contract. Municipal Cleanliness Certificate (NADAFA) shall be obtained a minimum of forty five (45) days before the Turn Over Date. Approval to Electrical and HVAC As-built drawings shall be obtained from the relevant authorities a minimum of thirty (30) days before the Turn Over Date. Approval of Telephone Works shall be obtained from the relevant authorities a minimum of Thirty (30) days before the Turn Over Date. Water supply and drainage works, including connections with their mains, if available, shall be made a minimum of thirty (30) days before the Turn Over Date. Permanent power (or power through generators) shall be obtained for the works and HVAC commissioned a minimum of sixty (60) days before the Turn Over Date. All soft landscaping planting shall be programmed to take advantage of the last planting season of the contract period. Kuwait Fire Brigades approval to the whole works including the Fire Protection and Fire Alarm Works shall be obtained a minimum fifteen (15) days before the Turn Over Date. All equipments shall be tested and commissioned with permanent electricity supply maximum by the Turn Over Date. The Contractor shall begin submitting (1) As-built Drawings (2) Spare Materials, and (3) Guarantees and Warranties, three (3) months before the Turn Over Date and obtain Engineers Representatives approval to the same, and finish the submittal of all the above and including proper storage of all spare materials latest one month after the end of Turn Over Date. The Contractor shall obtain from the Engineers Representative and begin attending to the snag list/s latest one month before the Turn Over Date and complete all snags latest one month after the Turn Over Date. 5.

C. D. E.

11.

F.

Within a week from the approval of the Contractors Construction Schedule and at monthly interval thereafter, the Contractor shall submit for the Engineer's approval, a detailed schedule developed from the approved Construction Schedule, covering a period of the next 60 days and relating to the contractor's daily work activities. The Contractor shall submit the undermentioned supporting data with the submittal of his Construction Schedule and any successive updates and revisions in an approved format by the Engineer or Engineer's Representative. 1. The proposed number of working days per week. 2. The holidays, and other non-working days (except Fridays), including days lost due to diminished productivity during Ramadan, observed during the duration of the contract (by date). 3. The planned number of shifts per day. 4. The number of hours per shift. 5. The planned usage of major construction equipment on the site, on a monthly basis.
01315-3 11 March 2013

G.

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

6. 7. 8. 9. 10.

The planned procurement and delivery of materials on a monthly basis. The average weekly manpower (e.g. number of carpenters, steel fixers, labourers, etc.) usage for each trade to be employed for the works considering activities, duration and production rates. Explanation of all changes in logic in duration, manpower, and equipment. Actual start dates and completion dates of activities already completed.

H.

Computer generated text reports listing activities with their early and late start and finish dates sorted by activity number, by early start and by criticality. Failure to include any element of the works required for the performance of the contract shall not excuse the contractor from completing all work required within any applicable completion date of each phase or the whole of the project, notwithstanding the Engineer's Representative's approval of the Construction Schedule.

1.06

CONTRACTOR'S SUBMITTALS LOG A. B. Within 10 days from the Signing of Contract, the Contractor should meet with the Engineer's Representative to explain the requirements and contents of the Contractor's Submittals Log. After 7 days from the above meeting, the Contractor to submit his Submittals Log, listing all the items requiring the Engineer's or the Engineer's Representative approval as per the Contract Documents, for the Engineer's Representative initial review. Within ten (10) days after the Engineer's approval of the Contractor's Construction Schedule, resubmit the Contractor's Submittals Log, for the Engineer's Representative review and approval, after inserting all particular dates and data from approved schedule. Distribution: Following response to the initial submittal, print and distribute copies to the Engineer's Representative, subcontractors, and other parties required to comply with submittal dates indicated. Post copies in the Project meeting room and field office. When revisions are made, distribute to the same parties and post in the same locations. E. F. Updating: Revise and update the schedule in a regular manner, and submit (48) hrs prior to progress meeting for the Engineer's Representative review. Format: Utilize format as provided by the Engineer's Representative and approved by the Engineer.

C.

D.

1.07

CONTRACTOR'S PROCUREMENT LOG A. B. Within 10 days from the Signing of Contract, the Contractor should meet with the Engineer's Representative to explain the requirements and contents of the Contractor's Procurement Log. After 7 days from above meeting, the Contractor to submit his Procurement Log, for the Engineer's Representative initial review, including all those items required to be submitted as per the Contract Documents. After the development and acceptance of the Contractor's Construction Schedule, Submit the Contractor's Procurement Log within 10 days, for the Engineer's Representative review and approval, after inserting all particular dates and data from approved schedule, manufacturers/suppliers and agents confirmations. Distribution: Following response to the initial submittal, print and distribute copies to the Engineer's Representative, subcontractors, and other parties required to comply with procurement dates indicated. Post copies in the Project meeting room and field office. When revisions are made, distribute to the same parties and post in the same locations. Updating: Revise and update the Log in a regular manner, and submit (48) hrs prior to progress meeting for the Engineer's Representative review.
01315-4 11 March 2013

C.

D.

E.

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

F. G.

Format: Utilize format as provided by the Engineer's Representative and approved by the Engineer. The Contractor, in addition to above, will be required to provide, at any time required by the Engineer, full and complete details of all product procurement data relating to all manufactured products which have been ordered and/or procured by the Contractor for incorporation in the works. Such details shall include copies of Letters of Credit, product order forms, confirmations from manufacturers and/or suppliers, request for quotations, letters of enquiry, etc.

H. 1.08

UPDATING OF CONSTRUCTION SCHEDULE A. B. The Contractor shall submit an updated Construction Schedule every three months. Acceptance of the updated construction schedule and all supporting data is contingent upon compliance with all other articles of this section and any other previous agreements or requirements made with or by the Engineer or his representative.

1.09

ADJUSTMENT AND REVISIONS A. Time for completion will be adjusted only in accordance with the provisions of legal clauses and conditions and its amendments in particular conditions. In the event the Contractor requests an adjustment of the time of completion, he shall furnish such justification and supporting data as the Engineer's Representative may deem necessary for evaluation by the Engineer as to whether or not the Contractor will be entitled to an extension of Time for Completion. Submission of proof based on revised activity, logic, duration, and costs is obligatory with any request. The Contractor shall submit with every request, his revised Construction Schedule whenever the actual field progress of the work does not conform to the latest approved Construction Schedule in force at the time of the alleged delay. The Engineer shall, within a reasonable time after receipt of a request for extension of time, advise the Contractor through the Engineer's Representative of his decision. When the Engineer has not yet made a decision as to any extension of time, and the parties are unable to agree as to the amount of the adjustment to be reflected in the construction programme, and should the Contractor choose to reflect the requested amount of time adjustment in this Construction Schedule, he will do so at his own risk. Such reflection of time adjustment shall only serve the purpose of monitoring the schedule of the works until such time as the Owner has made the final determination as to any extension of time. The Contractor will revise his Construction Schedule thereafter in accordance with the Engineer's decision and act and perform the works accordingly. The Contractor shall submit, as requested by the Engineer or Engineer's Representative, a revision to the Construction Schedule for any of the following reasons: 1. 2. When delays in submittals or deliveries or work stoppage are encountered which make replanning or rescheduling of the work necessary. When the schedule does not represent the actual execution and progress of the works as being performed in the field.

B.

C. D.

E.

1.10

SCHEDULING SYSTEM A. The Engineer's Representative has established Primavera Project Manager software (for windows) as the standard scheduling application for this project. The latest version of this software shall be used to develop all CPM construction schedules. The Construction Schedules information and supported data to be provided on data diskettes compatible for use on the Engineer or Engineer's Representative computer system.

1.11

SUBMITTALS
01315-5 11 March 2013

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

B. C. D.

All the submittals of the project construction schedule (for example but not limited to Master Schedule and Detail Contractor Construction Schedule, Cost loaded construction schedule/Revisions/Reports/Charts/Supporting data) shall be in soft and hard coloured copy (2 copies for the Hard coloured copies). The soft copy (electronic files) shall be compatible for use on the computer system of Engineer and Engineers Representative. The Contractor shall ensure that the provided floppy diskettes are free from any virus. The Contractor will be held liable for any damages caused to the Engineers Representative if he provides virus inflected disks. The hard copy shall be : 1. According to a format approved by the Engineers Representative. 2. 2 color copies in A0 or A3 size as required by the Engineers Representative. The Contractor has to submit the following reports: 1. 2. Monthly status report which shows detailed activities, actual start and completion dates, percent complete or remaining duration, and any other requirement by the Engineer's Representative. Material monthly status report which includes material description, unit, material delivered (during the month, accum), material planned (during the month, accum), adjusted by V.0., variance (quantity, %) and any other requirements requested by the Engineer's Representative. Weekly Manpower Report that includes the following in accordance with the approval of the Engineer's Representative: a. Profession b. Average Number c. Average working days d. Average working hours e. Total man-hours f Total man-days. Weekly production report which includes the following: a. Description of major work items b. Contract quantity c. Quantity installed during the week d. Quantity installed to-date e. Percent of the above

E.

3.

4.

The number and type of the description of the work items shall be as required by the Engineer. PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED

END OF SECTION

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01315-6 11 March 2013

CPM SCHEDULES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01315-7 11 March 2013

SECTION 01340 SHOP, RECORD AND AS BUILT DRAWINGS PART 1 - GENERAL 1.01 SUMMARY A. B. This section includes administrative and procedural requirements for submittal of Shop, Record and As Built Drawings and other miscellaneous quality control submittals. Shop, Record and As Built Drawings include, but are not limited to the following: 1. 2. 3. 4. 5. Fabrication drawings. Installation drawings. Setting diagrams. Shopwork manufacturing instructions. Templates and patterns.

Standard information prepared without specific reference to the project is not Shop, Record or as Built Drawings. C. Quality control submittals include, but are not limited to, the following: 1. D. Design data.

Related Sections : The following sections contain requirements that relate to this section: 1. 2. 3. 4. Section 01040 "Project Coordination" specifies requirements governing preparation and submittal of required coordination drawings. Section 01050 "Field Engineering" Section 01400 "Quality Control" specifies requirements for submittal of inspection and test reports and the erection of mock-ups. Section 01700 "Contract Closeout" specifies requirements for submittal of project record documents, including copies of drawings, at project closeout.

1.02

DEFINITIONS A. "Shop Drawings" shall establish actual plans, section and details of all construction assembled, manufactured or fabricated items, indicate proper relation to adjoining work, amply design details whether or not included in contract drawings of all work including but not limited to civil, architectural, interiors, mechanical, electrical and site works in proper relation to physical spaces and incorporate minor changes of design or construction to suit actual conditions at no additional cost. "Record Drawings" are a record of the works actually installed as the work progresses including records of all changes and deviations from the Contract Documents. "As-Built Drawings" embody the latest amendment of shop drawings including variations to the Contract to the standards set out in BS 308 part 2.

B. C.

SHOP, RECORD AND AS BUILT DRAWINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01340-1 11 March 2013

1.03

SUBMITTAL PROCEDURES BY CONTRACTOR A. B. Drawings - For approval, every time : Three/Four (3 or 4) paper prints of each shop, record and as-built drawing with transmittal forms to the Engineers Representative. Drawings - After approval, for record and distribution : Three (3) paper prints of to the Engineers Representative and more to all concerned sub-contractors as necessary

1.04

DESIGN REQUIREMENTS IF ANY A. Should the Contractor be required to carry out any design, then design layouts provided shall be for the propose of general guidance. The Contractor is required to submit full design shop drawings, complete with calculations, catalogues etc. for the Engineers and Engineers representative scrutiny and approval before ordering materials or proceeding with the work on site.

1.05

SHOP DRAWINGS A. Submit newly prepared information drawn accurately to scale. Do not reproduce Contract Documents or copy standard printed information as the basis of Shop Drawings. 1. Include the following information on Shop Drawings. a. b. c. d. e. 2. 3. 4. 5. Dimensions using SI units. Identification of products and materials included. Compliance with specified standards. Notation of coordination requirements. Notation of dimensions established by field measurement.

Number shop drawings for each section of the works consecutively and the numbering system shall be retained throughout all revisions. Dimension: Metric measurements shall be used in all documents and drawings. The size of shop drawings will be either A0 or A3 depending upon the content of the drawing and as agreed by the Engineers Representative. Shop Drawings shall bear the contractor's stamp and signature certifying that they have been coordinated and checked by the Contractor for completeness and compliance with the Contract and all respective sub-contractors, vendors and each subcontractor and each other contractor shall indicate his approval on the reproducible original shop drawing/composite shop drawing. In the event any one of the other contractors employed or to be employed by the Owner is not on board in a timely manner, then coordination is to be done based on design drawings made available by the Engineer or his representative. The Engineer or his representative will not accept any shop drawing without this necessary coordination step having been completed.

6.

Each shop drawing shall be clearly marked to indicate which product or item is being submitted for consideration and each product or item shall be marked for identification with the applicable page and paragraph number of the Specification and/or the detail and sheet number of the Contract Drawings. The Contractor shall submit composite Shop Drawings coordinating the work of his subcontractors for mechanical, electrical, structural architectural and site work. The composite drawings shall be in sufficient detail to show overall dimensions of ductwork, piping conduit, equipment, fixtures, structural members and related architectural features, and shall show clearance between such work. The Contractor will, apart from individual trade drawings submit composite co-ordinated shop drawings showing sections, elevations, reflected plans etc. resolving all conflicts in level, alignment, access space etc.

7.

SHOP, RECORD AND AS BUILT DRAWINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01340-2 11 March 2013

8.

Shop Drawings shall show in detail, materials, dimensions, thickness, assembly, joints, attachments, relation to adjoining work, and all other pertinent data and information. In checking shop drawings, the Contractor shall verify all dimensions and site conditions and shall check and coordinate the shop drawings of any Section or Trade with the requirements of all other Sections or Trades of other contractors if any; as related thereto, as required for proper and complete installation and execution of the works. The works shall conform to the Contract Drawings or to such other Drawings as may be issued from time to time during the progress of the Works by the Engineer or Engineer's Representative. The Contractor, is required, as described elsewhere, to provide design (where it is Contractor's responsibility to carryout design), co-ordination, installation, shop and builder's drawings, composite drawings co-ordinated between architectural, structural and services works and other information as appropriate, collectively referred to as shop drawings. Allow for the completion of all such drawings, checking and inspection by the Engineer's Representative and any subsequent amendment, re-submission(s), and re-inspection(s), when preparing the Construction Schedule for the Works and checking by Contractor. Engineer's Representative Review: The Engineer's Representative will note any comments on one copy of the drawings, date and sign to show that they have been inspected, then return to the Contractor. Review of drawings, and any comments made by the Engineer's Representative will not relieve the Contractor, subcontractors and/or suppliers of responsibility for compliance with Contract requirements, design, documentation and checking as appropriate. Amendments: Ensure that any necessary amendments to drawings are made in accordance with any comments of the Engineer's Representative and resubmit without delay. Unless resubmission is not required, obtain copies of amended drawings, check, re-submit to the Engineer's Representative ensuring incorporation of necessary further amendments all as before. Distribution of final version: Obtain final version of all drawings, submit the required number of copies to the Engineer's Representative additional copies as appropriate to all concerned subcontractors and suppliers, and keep at least one copy on Site. Ensure that work is carried out in accordance with the final drawings. Variations: Should any amendment to drawings required by the Engineer's Representative, or any discrepancy, or divergence be considered a variation, notify the Engineer's Representative without delay and in any case within 7 days, and do not proceed with ordering, fabrication, erection or installation until subsequently instructed.

9.

10.

11.

12.

13.

1.05

RECORD DRAWING A. As the work progresses the Contractor shall maintain on a continuous basis a complete and accurate record of all changes and deviations from the Contract Documents which shall be kept at the Site for inspection by the Engineer, his representative, or Owners Representative.

1.06

AS BUILT DRAWINGS A. The Contractor shall prepare and furnish for the approval of the Engineer and Engineer's representative accurate as built drawings embodying as a minimum all shop drawings and record drawings etc., or their latest amendments, including variations to the Contract to the standards set out in BS 308. The as built drawings shall show the works as executed complete with existing and finished levels and all other things necessary to form an accurate pictorial record of the finished work. Prior to the preparation of as built drawings the Contractor shall obtain the approval of the Engineers representative as to the size of drawings, quality of transparent sheets, method of drawing and other relevant details. All as built drawings shall be numbered and shall have a number series approved by the Engineers representative. A drawing index shall be provided. All negatives of drawings so prepared shall be dated and signed by the Contractor and, when approved, countersigned by the Engineer's representative.
01340-3 11 March 2013

B. C.

D.

SHOP, RECORD AND AS BUILT DRAWINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E. F.

The Contractor shall submit and resubmit till final approval by the Engineers Representative, four number of copies during each submittal. Finally submit after approval, properly identified in a permanent manner, four hard copies hung in parts for the Engineers approval, in mobile drawings racks and diskettes stored in box/es also properly identified in a permanent way, of all as-built drawings using the latest format of Autocad, as well as the format which is compatible with the Owners computer system.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED END OF SECTION

SHOP, RECORD AND AS BUILT DRAWINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01340-4 11 March 2013

SECTION 01380 CONSTRUCTION PHOTOGRAPHS PART 1 - GENERAL 1.01 SUMMARY A. B. The Section includes administrative and procedural requirements for construction photographs. Related Sections: The following Section contains requirements that relate to construction photographs: Section 01300 Submittals specifies general requirements for submitting construction photographs. C. 1.02 Compare with the requirements listed elsewhere and comply with the total combined requirements.

ASSISTANCE TO OTHERS A. The Contractor shall allow all reasonable facilities for the responsible Government Authorities to take photographs and films or televise the works at no additional expense to the Employer.

PART 2 - PRODUCTS PART 3 - EXECUTION 2.01 PRE-CONSTRUCTION PHOTOGRAPHS A. 2.02 Before beginning the works at the site, take 30 colour photographs and submit in albums as during construction photographs detailed below.

PHOTOGRAPHS ETC. DURING CONSTRUCTION A. Photographs and Albums 1. Take 30 colour project photographs (4 sets) in accordance with requirements as indicated, to best show the status of construction and progress since taking previous photographs. Frequency: Take photographs monthly, coinciding with the cut-off date associated with each Application for Payment. Vantage Points: Comply with the Engineer's Representatives directions concerning desired vantage points for shots. Use the same vantage points each time to create a time-lapse sequence when so directed. Identification: Provide an attached narrative underneath each photograph indicating: Name of the Project. Date the photograph was taken. Vantage Point: Description of vantage point, in terms of location, direction (by compass point), and elevation or story of construction. Vantage Point: Provide notation of vantage point marked for location and direction of shot on a key plan of the site and building. Indicate elevation (story height). Prints: Submit 4 album mounted and labelled prints of size 120 x 180mm of each view required directly to the Engineer's Representative within 7 days of taking photographs. Each album shall have a printed cover lettered to the approval of the Engineers Representative.

2.

3. 4.

CONSTRUCTION PHOTOGRAPHS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01380-1 11 March 2013

5.

Extra Prints: When requested by the Engineer's Representative, the photographer shall prepare extra prints of photographs. The photographer shall distribute these prints directly to designated parties who will pay the costs for the extra prints.

END OF SECTION

CONSTRUCTION PHOTOGRAPHS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01380-2 11 March 2013

SECTION 01400 QUALITY CONTROL PART 1 - GENERAL 1.01 QUALITY CONTROL (GENERAL) A. B. Maintain quality control over suppliers, manufacturers, products, services, Site conditions, and workmanship, to produce work of specified quality. Provide and maintain effective Contractor Quality Control (CQC) program and perform sufficient inspections and tests of all items of work, including those of Sub-Contractors, to ensure compliance with Contract Documents. Include surveillance and tests specified in the Sections of work of the Specifications. Furnish appropriate facilities, instruments and testing devices required for performance of the quality control function. Controls must be adequate to cover construction operations and be keyed to the construction sequence. Comply with manufacturers' instructions in full detail, including each step in sequence. Should instructions conflict with Contract Documents, request clarification from Engineer or Engineer's Representative before proceeding.

C.

1.02

WORKMANSHIP A. B. C. Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship. Perform work by persons qualified to produce workmanship of specified quality. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.

1.03

QUALITY CONTROL OF ON-SITE CONSTRUCTION A. Include a control system for the following phases of inspection: 1. Preparatory Inspection : Perform this inspection prior to beginning of work on any definable feature of the Works. Include a review of the Contract requirements with the supervisors directly responsible for the performance of the work; check to assure that materials, products and equipment have been tested, submitted and approved, check to assure that provisions have been made for required control testing, examine the work area to ascertain that preliminary work has been completed; physically examine materials and equipment to assure that they conform to Shop Drawings and data and that the materials and equipment are on hand. Initial Inspection : Perform this inspection as soon as the work commences on a representative portion of a particular feature; review control testing for compliance with Contract requirements. Follow-up Inspection : Perform these inspections on a regular basis, to assure continuing compliance with Contract requirements until completion of that particular work. Documentation of CQC Program : Identify the inspections herein before specified and document in the CQC report with a brief description of the subject matter covered and the personnel involved.

2. 3. 4. 1.04

QUALITY CONTROL OF OFF-SITE OPERATIONS A. When required by individual Specifications Section, submit manufacturer's certificate, in duplicate, that products meet or exceed specified requirements.

QUALITY CONTROL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01400-1 11 March 2013

B.

The CQC representative at the fabricating plant shall be finally responsible to comply with the contract requirements and for the release of the fabricated items for shipment to the Site. The CQC representative at the Site shall receive the item and note any damage incurred during shipment. The Contractor shall be responsible for protecting and maintaining the item in good condition throughout the period of on-Site storage and during erection, installation and maintenance. Although any item found to be faulty may be rejected before it is used, final acceptance of an item by the Engineer or Engineer's Representative is based on its satisfactory incorporation into the works and acceptance of the completed Project.

1.05

SCHEDULE OF CONTRACTOR QUALITY CONTROL (CQC) PLAN A. Furnish a schedule outlining the procedure, instructions and reports to be used as follows: 1. 2. 3. 4. 5. 6. Quality Control Organization. Qualification of personnel. Authority and responsibility of personnel. Schedule of inspections and tests with personnel assigned to each task and duration of each task. Test met hods. Methods of performing and documenting control operations.

1.06

QUALITY CONTROL REPORTS A. Inspections shall be recorded and submitted daily on approved forms certifying items correctly installed and items found to be defective with a statement on corrective measures taken.

1.07

LATEST DOCUMENTS A. The Contractor's Quality Control program shall provide for procedures which will assure that the applicable portions of the Contract Documents, Shop Drawings and instructions required by the Contract are used for fabrication, testing and inspection.

1.08

TESTING AND INSPECTION DEVICES A. Provide and maintain all measuring and testing devices, equipment, instruments and supplies necessary to accomplish the required site testing and inspection. All measuring and testing devices shall be calibrated periodically against certified standards.

1.09

MANUFACTURERS' FIELD SERVICES A. When specified in respective Specification Sections, require supplier, manufacturer or appointed representative to provide qualified personnel to observe field conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance equipment as applicable, and to make appropriate recommendations. Representative shall submit written report to Engineer or Engineer's Representative listing observations and recommendations.

B. 1.10

ENGINEER'S CHECKING AND CONTRACT ADMINISTRATION PROCEDURES A. To facilitate the Engineer's Representative checking of the quality of workmanship, compliance with Specifications, etc., the Contractor shall submit signed "Request for Inspection" or "Check" lists, provided by the Engineer's Representative and approved by the Engineer. The list shall be deemed to constitute: 1. A request by the Contractor for the Engineer's Representative to inspect the preparation or completion of a certain element of the work in a particular location before proceeding with the next stage in such work.

QUALITY CONTROL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01400-2 11 March 2013

2.

A representation by the Contractor to the effect that the work for which he is requesting inspection has been properly coordinated between all trades, complies with the applicable Specifications, shop drawings and other data included in the Contract or approved by the Engineer's Representative, and is complete in itself and ready for such inspection and for the next stage of related work.

B.

"Request for Inspection" Lists shall be dated and numbered in approved sequence and submitted for each of the elements of the Works. Each of the "Request for Inspection" lists shall be signed by all concerned subcontractors thereby warranting that all trades have been properly coordinated and completed prior to the "Request for Inspection" list submission. In addition to the signature of all concerned subcontractors upon the "Request for Inspection" lists required by the preceding Sub-Clause, such shall also submit, to the Engineer's Representative through the Contractor, "Request for Inspection" for all mechanical and electrical elements of the works upon completion and testing of sections thereof, prior to embedding in concrete, covering up with finishes, etc. Mechanical and Electrical "Requests for Inspection" shall be signed by the Contractor and his concerned Sub-Contractor on a form and in a manner as required and approved by the Engineer's Representative. In case the Project is organised on the lines of multi-package contracts, a proposal for integrated "Requests for Inspection" regime will be granted if found acceptable to the Engineer and the Engineer's Representative.

C.

D. 1.11

TRANSPORTATION AND HANDLING A. B. Materials, products and equipment shall be properly packaged and protected to prevent damage during transportation and handling. More detailed requirements for transportation and handling are specified under the technical Sections.

1.12

INSTALLATION REQUIREMENTS A. Manufactured articles, materials and equipment shall be applied, installed, connected. erected, used, cleaned and conditioned as directed by the respective manufacturers, unless more stringent requirements are specified.

1.13

IDENTIFYING MARKINGS A. Name plates and other identifying markings shall not be fixed on exposed surfaces of manufactured items installed in finished spaces.

1.14

PRODUCT ACCEPTANCE STANDARDS A. Refer to Section 01600.

1.15

TESTING OF MATERIALS A. All materials and work will be tested as required in the Specifications and Testing shall be carried out at the Contractor's expense at any of the following: 1. MPW Research Station Testing Facilities 2. Approved testing agency or approved testing laboratory. The Contractor shall obtain prior approval from the Engineer or Engineer's Representative to the tests to be conducted at any or all of the above facilities. B. C. The Contractor shall allow for all necessary labour, containers, wrappings and labelling in connection with the samples for testing and for all transport charges. Samples for testing will be taken at the place of origin, or working site or from the works as appropriate and as required by the Engineer or Engineer's Representative.
01400-3 11 March 2013

QUALITY CONTROL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D. 1.16

The Contractor shall provide all facilities including testing equipment in connection with tests required to be conducted at site.

MOCK-UPS A. When required by individual specification section, erect complete full-scale mock-up of assembly at project site. Test will be performed in accordance with this section. Remove mock-up at completion, when approved and directed by the Engineer or Engineer's Representative. Mock-up may remain as finished work if so indicated in specification section and approved. All relative further materials and workmanship shall conform to standards of the approved mock-up.

B. C. 1.17

PROJECT CONTROL FORMS A. Format of required Project Control Forms to be provided by the Engineer to the Contractor at the commencement of the project and updated/supplemented as may be necessary from time to time thereafter. The Contractor will be required to utilize these formats/forms as directed by the Engineer.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED

END OF SECTION

QUALITY CONTROL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01400-4 11 March 2013

SECTION 01410 TESTING LABORATORY SERVICES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Administrative and supervisory requirements necessary for coordinating construction operations including but not necessarily limited to the following: 1. 2. 3. 4. 5. 6. 7. 1.02 REFERENCES A. B. C. D. E. F. G. H. I. J. K. ASTM C802 ASTM C1021 ASTM C1077 ASTM C1093 ASTM D290 ASTM D3740 ASTM D4561 ASTM E329 ASTM E543 ASTM E548 ASTM E699 Practice for Conducting and Inter laboratory Test Program to Determine the Precision of Test Methods for Construction. Practice for Laboratories Engaged in the Testing of Building Sealants. Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation. Practice for Accreditation of Testing Agencies for Unit Masonry. Recommended Practice for Bituminous Mixing Plant Inspection. Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction. Practice for Quality Control Systems for an Inspection and Testing Agency for Bituminous Paving Materials. Practice for Use in the Evaluation of Inspection and Testing Agencies as Used in Construction. Practice for Determining the Qualification of Nondestructive Testing Agencies. Practice for Preparation of Criteria for Use in the Evaluation of Testing Laboratories and Inspection Bodies. Practice for Criteria for Evaluation of Agencies Involved in Testing, Quality Assurance, and Evaluating Building. Components in Accordance with Test Methods Promulgated by ASTM Committee E6. Selection and payment. Contractor submittals. Laboratory responsibilities. Laboratory reports. Limits of testing laboratory authority. Contractors responsibilities. Schedule of inspections and tests.

1.03

SELECTION AND PAYMENT A. Employment and payment for services of either the MPW laboratory or any other testing laboratory approved by the Engineers representative to perform specified inspecting and testing, by Contractor.
01410-1 11 March 2013

TESTING LABORATORY SERVICES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. 1.04

Employment of testing laboratory in no way relieves the Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

QUALITY ASSURANCE A. B. C. D. Comply with requirements of ASTM C802, ASTM C1021, ASTM C1077, ASTM C1093, ASTM D290, ASTM D3740, ASTM D4561, ASTM E329, ASTM E543, ASTM E548, ASTM E699. Laboratory: Authorized to operate in the State of Kuwait. Laboratory Staff: Maintain a full time registered Engineer on staff to review services. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable to either National Bureau of Standards or accepted values of natural physical constants.

1.05

CONTRACTOR SUBMITTALS A. Prior to start of Work, submit testing laboratory name, address, and telephone number, and names of full time registered Engineer.

1.06

LABORATORY RESPONSIBILITIES A. B. C. D. E. F. G. Test samples of mixes submitted by Contractor. Provide qualified personnel at site. Cooperate with Engineer's Representative and Contractor in performance of services. Perform specified inspecting, sampling, and testing of Products in accordance with specified standards. Ascertain compliance of materials and mixes with requirements of Contract Documents. Promptly notify Engineer's Representative and Contractor of observed irregularities or non-conformance of Work Products. Perform additional inspection and tests required by Engineer's Representative. Attend preconstruction meetings and progress meetings.

1.07

LABORATORY REPORTS A. B. After each inspection and test, promptly submit two (2) copies of laboratory report to Engineer's Representative and to Contractor. Include: 1. Date issued, 2. Project title and number, 3. Name of inspector, 4. Date and time of sampling or inspection, 5. Identification of product and specifications section, 6. Location in the Project, 7. Type of inspection or test, 8. Date of test, 9. Results of tests, 10. Conformance with Contract Documents. When requested by Engineer's Representative provide interpretation of test results.
01410-2 11 March 2013

C.

TESTING LABORATORY SERVICES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.08

LIMITS ON TESTING LABORATORY AUTHORITY A. B. C. Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. Laboratory may not approve or accept any portion of the Work. Laboratory may not assume any duties of Contractor.

1.09

CONTRACTOR RESPONSIBILITIES A. B. C. Deliver to laboratory at designated location, adequate samples of materials proposed to be used which require testing, along with proposed mix designs. Cooperate with laboratory personnel, and provide access to the Work. Provide incidental labour, transport and facilities: 1. 2. 3. 4. 5. D. to provide access to Work to be tested to obtain and handle samples at the site or at source of Products to be tested to facilitate tests to facilitate inspection by the Engineer and the Engineer's representative. to provide storage and curing of test samples.

Notify Engineer's Representative and laboratory 24 hours prior to expected time for operations requiring inspecting and testing services.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED END OF SECTION

TESTING LABORATORY SERVICES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01410-3 11 March 2013

SECTION 01421 REFERENCE STANDARDS AND DEFINITIONS PART 1 - GENERAL 1.01 DEFINITIONS A. B. C. General: Basic contract definitions are included in the Conditions of Contract II and Part III, Section 2. Where "as shown", "as indicated", "as detailed", or words of similar import are used, it shall be understood that reference to the Drawings accompanying the Specifications is made unless otherwise stated. "Regulations": The term "regulations" includes laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, as well as rules, conventions, and agreements within the construction industry that control performance of the Work. "Furnish": The term "furnish" means to supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation, and similar operations. "Install": The term "install" describes operations at the Project site including the actual unloading, temporary storage, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations. "Provide": The term "provide" means to furnish and install, complete and ready for the intended use. "Installer": An installer is the Contractor or another entity engaged by the Contractor, either as an employee, subcontractor, or contractor of lower tier, to perform a particular construction activity, including installation, erection, application, or similar operations. Installers are required to be experienced in the operations they are engaged to perform. 1. The term "experienced", when used with the term "installer", means having successfully completed a minimum of five previous projects similar in size and scope to this Project; being familiar with the special requirements indicated; and having complied with requirements of authorities having jurisdiction. 2. Trades: Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter". It also does not imply that requirements specified apply exclusively to trades persons of the corresponding generic name. 3. Assigning Specialists: Certain Sections of the Specifications require that specific construction activities shall be performed by specialists who are recognized experts in those operations. The specialists must be engaged for those activities, and their assignments are requirements over which the Contractor has no option. However, the ultimate responsibility for fulfilling contract requirements remains with the Contractor. a. This requirement shall not be interpreted to conflict with enforcing building codes and similar regulations governing the Work. It is also not intended to interfere with local trade-union jurisdictional settlements and similar conventions. "Project Site" is the space available to the Contractor for performing construction activities, either exclusively or in conjunction with others performing other work as part of the Project. The extent of the Project site is shown on the Drawings and may or may not be identical with the description of the land on which the Project is to be built. "Testing Agencies": A testing agency is an independent entity engaged to perform specific inspections or tests, either at the Project site or elsewhere, and to report on and, if required, to interpret results of those inspections or tests.

D. E.

F. G.

H.

I.

REFERENCE STANDARDS AND DEFINITIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01421-1 11 March 2013

J.

Abbreviations and Symbols: The following abbreviations are used in the Bills of Quantities and other documents. Other abbreviations may be used and explained in drawings. Kg m or M mm cm m2 or M2 m3 or M3 No IT or ITEM T Hrs Mths L LS Kilogram Meter Millimeter Centimeter Square meter Cubic meter Number Item Tonne Hours Months Litre Lump sum

Should different but similar abbreviation/s be used in the various Tender Documents, the Contractor shall obtain confirmation about its/their true meaning from the Engineer or the Engineer's Representative during the tender period. 1.02 SPECIFICATION FORMAT AND CONTENT EXPLANATION A. B. Specification Format: The Specifications are organized into Divisions and Sections based on the 16-Division format and CSI/CSC's "Master Format" numbering system. Specification Content: These Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be interpolated as the sense requires. Singular words shall be interpreted as plural and plural words interpreted as singular where applicable as the context of the Contract Documents indicates. Imperative mode and streamlined language are generally used in the Specifications. Requirements expressed in the imperative mode are to be performed by the Contractor. At certain locations in the Text, subjective language is used for clarity to describe responsibilities that must be fulfilled indirectly by the Contractor or by others when so noted. The words "shall", "shall be", or "shall comply with", depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2.

1.03

INDUSTRY STANDARDS A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable Kuwaiti governmental and municipal, as well as USA and UK design and construction codes, regulations, specifications and standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such codes, regulations, specifications and standards are made a part of the Contract Documents by this reference and the Contractor shall comply therewith. Publication Dates: All references to codes, regulations, specifications and standards referred to in the Contract Documents shall, unless otherwise stated, mean the latest edition, amendment or revision of such reference standard in effect as of the date this tender was submitted by the Contractor to the issuing authority. Conflicting Requirements: Where compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most
01421-2 11 March 2013

B.

C.

REFERENCE STANDARDS AND DEFINITIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

stringent requirement. Refer uncertainties and requirements that are different but apparently equal to the Engineer's Representative for a decision before proceeding. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of the requirements. Refer uncertainties to the Engineer's Representative for a decision before proceeding. D. Within 15 days from the Date of Enterprise, the Contractor shall provide the Engineer adequate proof that the referenced codes, regulations and standards have been ordered or are in the Contractor's possession and available for use on site. Failure to provide this proof within the said 15 days or to have the codes etc. on site within 30 days of the Date of Enterprise shall entitle the Engineer to purchase the referenced codes, regulations and standards and the costs will be recovered from the Contractor. Proof of Compliance: Whenever the Contract Documents require that a product complies with Federal Specification, British Standards Institute, American Society of Testing and Materials, American National Standards Institute or other association, standards, etc., the Contractor shall present an affidavit from the manufacturer certifying that the product complies therewith. Where requested or specified, submit supporting test data to substantiate compliance. Where reference standards referred to herein is in the form of a recommendation or suggestion, such recommendation or suggestion shall be deemed to be mandatory under this Contract unless conflicting with the particular specifications contained herein. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where abbreviations and acronyms are used in the Specifications or other Contract Documents, they mean the recognized name of the trade association, standard s-generating organization, authorities having jurisdiction, or other entity applicable to the context of the text provision. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. The following abbreviations and acronyms, as referenced in the Contract Documents, mean the associated names. Unless otherwise stated the following abbreviations and names are from the U.S.A.: AA Aluminum Association AABC Associated Air Balance Council AAMA Architectural Aluminum Manufacturers Association ACI American Concrete Institute ADC Air Diffuser Council AFT Air Filter Institute AIA American Institute of Architects AIEE American Institute of Electrical Eng. AISC American Institute of Steel Construction AITC American Institute of Timber Construction ALS American Lumber Standards AMCA American Moving & Conditioning Association ANSI American National Standards Institute ARI Air Conditioning & Refrigeration Institute ASAHC American Society of Architectural Hardware Consultants ASHRAE American Society of Heating, Refrigerating & Air-Conditioning Engineers ASSE American Society of Sanitary Engineers ASTM American Society for Testing & Materials AWI Architectural Woodwork Institute AWPI American Wood Preservers Institute
01421-3 11 March 2013

E.

F.

G.

H.

REFERENCE STANDARDS AND DEFINITIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

AWS AWWA BIA BRI BS BSCP BSI CDA CEE CRSI CTI EWS FSIWA FTI GA HPMA IEC IEE IEEE IES ISO KSS MIA MLMA MSSVFI NBHA NEC NEMA NEMI NFC NFPA NHLA NHPMA NRMCA NSC NSF NWC OSHA PCI PDI RTI SDI SIGMA SMACNA SSPC SWFPA TCA TIMA

American Welding Society American Water Works Association Brick Institute of America Building Research Institute British Standard Specification British Standard Code of Practice British Standard Institute Copper Development Association International Commission on Rules for Approval of Electrical Equipment (Europe) Concrete Reinforcing Steel Institute Cooling Tower Institute Engineered Wood Association Federation of Sewage & Industrial Waste Association Facing Tile Institute Gypsum Association Hardwood plywood Manufacturers Association International Electro-technical Commission Institute of Electrical Engineers of London (UK) Institute of Electrical & Electronics Engineering (UK) Illuminating Engineering Society (UK) The International Organization for Standardization Kuwait Standard Specification Marble Institute of America Metal Lath Manufacturers Association Manufacturers Standardization Society of the Valves and Fittings Industries National Concrete Masonry Association National Electrical Code (NPFA No. 70) National Electrical Manufacturers Association National Elevator Manufacturing Industry, Inc. National Fire Code National Fire Protection Association National Hardwood Lumber Association National Hardwood & Pine Manufactures Association. National Ready Mixed Concrete Association National Safety Council National Sanitation Foundation National Water Council (UK) Occupational Safety & Health Administration Portland Cement Association. Prestressed Concrete Institute Plumbing & Drainage Institute (USA) Resilient Tile Institute Steel Door Institute Sealed Insulating Glass Manufacturers Association Sheet Metal & Air Conditioning Contractors National Association Steel Structure Painting Council Structural Wood Fiber Products Association Tile Council of America Thermal Insulation Manufacturers Association
01421-4 11 March 2013

REFERENCE STANDARDS AND DEFINITIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

TPI UBC UL UPC USGS WRI 1.04

Truss Plate Institute Uniform Building Code Underwriters Laboratories, Inc. Uniform Plumbing Code U.S. Geodetic Survey Wire Reinforcement Institute

KUWAIT GOVERNMENT AGENCIES A. The following list of Kuwait Government Agencies is not intended to be exhaustive and the Contractor shall carry out all works in strict accordance with current Codes and Regulations of all Government Agencies whether listed hereunder or not. a. The Ministry of Electricity and Water (MEW) b. The Ministry of Communications (MOC) c. The Kuwait Fire Brigade (KFB) d. The Kuwait Municipality (KM) e. The Ministry of Health (MOH) f. The Ministry of Interior (MOI) - General Traffic Department g. The various departments of the Ministry of Public Works (MPW)

1.05

TECHNICAL LITERATURE A. Provide the Engineer's Representative with one complete, latest edition copy of all standard specifications referred to in these documents and further copies as necessary of all manufacturer's catalogues and the like dealing with proprietary products specified or proposed as substitutes. Make such submissions within three months of the Date of Enterprise or earlier as required by the Contractor's construction schedule or in the case of substitute materials, as soon thereafter as is reasonably practicable.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED END OF SECTION

REFERENCE STANDARDS AND DEFINITIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01421-5 11 March 2013

SECTION 01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. The Contractor shall submit, for the Engineer or Engineer's Representative's approval, fully dimensioned details of his proposed layout (based on drawing and information provided) of temporary site accommodations and storage materials areas, showing access routes to or upon the site, fences and gates, (only as required) location of Contractor's offices with accommodation, details, personnel accommodation (senior and junior) including canteen facilities, sanitary accommodation, location of Fire Fighting, first aid stations and the like, storage areas and all other things necessary for the execution of the Contract. Except as stated otherwise, all such temporary work shall be executed, maintained, operated and relocated whenever necessary by the progress of work, and under the Engineer's direction, at the Contractor's own expense. All shall be cleared away and the areas cleaned on completion of the Contract and made good to the satisfaction of the Engineer and Engineer's Representative. The Contractor shall be deemed to have allowed for providing, maintaining and operating an approved system for refuse collection surface water drainage and sewage disposal for the duration of the Contract and for clearing away. De-odorizing, sterilizing and backfilling same as necessary upon completion to the satisfaction of the Engineer and Engineer's Representative. Adequate and proper provision shall be made for the storage and protection of materials, plant and equipment to the satisfaction of the Engineer and Engineer's Representative. All temporary facilities shall be constructed to the standards for similar permanent facilities. Provide and maintain all temporary connections to utilities and services in locations and in a manner acceptable to the Engineer, Engineer's Representative and local authorities having jurisdiction thereof. Remove temporary installations and connections, and restore the services and sources of supply to proper operating condition at the completion of the Works. Temporary fencing and gates to areas of work and storage to details indicated on the drawings and to temporary site accommodation and storage and workshop areas. Barricades around hazardous open areas, openings in slabs, stair wells, excavations, etc. Contractor shall be responsible for obtaining the relevant authorities' approval to construct all temporary facilities.

2.

3.

4. 5. 6.

7.

8. 1.02

USE OF PERMANENT FACILITIES A. Permanent facilities shall not be used for storage without the approval of the Engineer.

1.03

TEMPORARY STORAGE AND PLANT A. B. Owner's & Engineer's Representatives Offices : Refer to Section 01590 Contractors and Sub-contractors Offices and Storage and Plant : The Contractor shall make his own arrangement for the provision and maintenance during the Contract of offices and parking sheds, for his own and his Sub-contractors use. Adequate fire prevention measures shall be provided to the satisfaction of the Engineer. Such offices shall be sited as approved by the Engineer or Engineer's Representative and shall be cleared away on completion to the satisfaction of the Engineer.

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-1 11 March 2013

Provide and maintain in good condition, suitable open and watertight storage all at the Contractor's cost and responsibility required for materials that may be damaged by storage in open. Provide adequate Fire Protection as approved by the Engineer or Engineer's Representative. C. D. E. The owner will permit reasonable use of open space within the property limit for this purpose. Any additional space required is the responsibility of the Contractor. Include for timely obtaining all permissions from all statutory authorities having jurisdiction and for paying all charges and fees. On completion of the works, or when directed by the Engineer or Engineer's Representative, clear away all temporary storage, plant and reinstate areas to their previous condition to the satisfaction of the Engineer or Engineer's Representative.

1.04

TEMPORARY COVERINGS A. B. Protect finished surfaces including jambs and soffits of openings used as passageways or through which materials are handled against possible damage resulting from conduct of work by trades. Tight wood sheeting shall be laid under all materials stored on finished surfaces. Planking shall be laid before moving materials over finished areas. Wheelbarrows used for such areas shall have rubber-tyre wheels. Finished surfaces including factory finished and job-finished items shall be clean and not marred upon delivery of the Project to the Owner. The Contractor shall without extra compensation refinish such spaces where such surfaces prove to have been inadequately protected and are damaged. Waterproofed and roof surfaces shall not be subjected to heavy traffic nor used for storage of materials. Where some activity must take place in order to carry out the work, adequate protection, subject to approval by the Engineer or Engineer's Representative, shall be provided. Provide all necessary protection to executed work to the approval of the Engineer or Engineer's Representative, including but not limited to temporary coverings and protective measures stated herein.

C.

D.

E. 1.05

TEMPORARY CONSTRUCTION OPENINGS A. Provide openings in slabs, walls and partitions where required for moving in or out large pieces of equipment and plant. Close or restore and finish all openings after the equipment and plant is in place or removed. Structural modifications shall be subject to review by the Engineer or Engineer's Representative.

1.06

PROJECT IDENTIFICATION A. B. No signs or advertisements to be displayed on the Site without the approval of the Owner, Engineer or Engineer's Representative. Refer to section 01580 Project Identification and Signs.

1.07

TEMPORARY FIRE PROTECTION A. B. Provide all fire fighting facilities and equipment required by the Kuwait Fire Department, whether or not specifically detailed herein. Take adequate safety precautions during metal welding and torch cutting operations as follows: 1. Welding or torch cutting operations shall be carried out only in well ventilated spaces having little or no combustible materials in the vicinity, and preferably in an area designated and used exclusively as a 'welding shop.'

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-2 11 March 2013

2.

Where welding or torch cutting operations are carried out in-situ, surrounding areas shall be suitably protected by the covering or screening off, and suitable portable fire extinguishers shall be kept immediately available with an attendant standing-by. The number of gas cylinders in any working area and the storage of such cylinders, full or empty, shall be in accordance with the FOC leaflet, "Precautions to be observed in connection with the use of gas or electric welding and cutting apparatus".

3.

C. D. E. F. G.

Gasoline and other flammable liquids shall be stored in and dispensed from 'UL' listed safety containers and in conformance with requirements of the local fire authority. Storage shall not be within the building. Tarpaulins used during construction work shall be made of material, which is resistant to fire, water and weather. Tarpaulins shall have 'UL' approval and comply with US Federal Specifications CCC-D-746. Make all arrangements for statutory inspection by Kuwait Fire Brigade and Insurance Inspectors, co-operate with these authorities and experts and promptly carry out their recommendations. Ensure that adequate, unimpeded means of egress from all parts of the Works, is available at all times in case of fire. At the completion of the Work, or at such times as the Engineer or Engineer's Representative may direct, remove all temporary fire fighting installations and equipment and replace all worn or damaged parts of the permanent systems leaving such systems in first-class condition equal to new.

1.09

TEMPORARY LIGHT AND POWER A. Make all arrangements for temporary electrical service to the construction site, pay all expenses, provide all equipment necessary for temporary power and lighting. The electrical service shall be of adequate capacity for all construction tools and equipment (including welding equipment) without overloading the temporary facilities and shall be made available for power, lighting and construction operations of all trades. If temporary supply is not granted by the MEW, then the Contractor must make his own arrangements for providing supply of electricity in order to complete the works. Provide main feeding power points, as required throughout the Works for power tools of all kinds. Termination of power distribution shall be at locations approved by the Engineer or Engineer's Representative. Termination shall be provided complete with circuit breakers, disconnect switches and other electrical devices as required to protect the power supply system. Temporary lighting system shall be installed and maintained by the Contractor as required to satisfy minimum requirements of safety and security. Temporary lighting system shall be adequate for illumination in all areas of work. Where work is being performed at night, increase the illumination level. The Contractor shall provide adequate outdoor lighting to illuminate staging, stockpiles, trenches, projections, etc., to the satisfaction of the Engineer or Engineer's Representative and general illumination throughout, adequate for watchmen and emergency personnel and all other persons. Temporary equipment and wiring for power and lighting shall be in accordance with the applicable provisions of the governing codes. Temporary wiring shall be maintained in a safe manner and utilized so as not to constitute a hazard to persons or property. All temporary light and power installations shall conform to the requirements and standards of MEW, At the completion of the works remove all temporary electrical equipment and wiring.

B.

C.

D.

E. F. 1.10

TEMPORARY ROADS AND ACCESS TO SITE A. The Contractor shall be deemed to have satisfied himself regarding the suitability and availability for his use during the Construction Period of access routes and the like and shall be entirely responsible for the provision of any signs or directions on such routes that may be considered necessary for the guidance of his
01500-3 11 March 2013

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

personnel, Sub-Contractors, suppliers and the like and for obtaining all necessary permission from Government, Ministry or Landowner concerned, for the use of such routes or the provisions of such signs or directions. The Owner shall not be held responsible for any claims that may be made by any Landowner. The Owner will not guarantee the suitability or availability of any particular access routes and will not entertain any claim in respect of the non-suitability or non-availability for continuous use during the Contract Period of any such route. The Contractor shall provide and maintain all necessary means of access to the Site from the nearest permanent roadway together with any necessary crossovers and all necessary temporary site roads leading to or upon the site and/or working areas. The Contractor shall take over the existing temporary roads, utilize them and maintain the same during the Contract Period, but the Contractor must co-ordinate and co-operate and share these roads as necessary with the Owner, the Engineer, the Engineer's Representatives and other Contractors. The means of access, crossovers and temporary roads shall be maintained, altered, adapted, etc., as may be found necessary during the course of the Contract and excavated and cleared away upon completion including forking over and leaving same to the satisfaction of the Engineer or Engineer's Representative. Access to the site storage area for delivery of construction material or equipment shall be made only from locations approved by the Engineer or Engineer's Representative. Contractor must ensure that access remains clear to provide access to other users such as may be required for emergency vehicles, service vehicles and other contractors. Construct and maintain temporary parking, as specified and indicated in the drawings and contract documents, for the use of students and employees. Remove and demolish whenever instructed by the Engineer.

C.

D.

E. F. G.

1.11

TEMPORARY STAIRS, SCAFFOLDING, LADDERS, RAMPS, RUNWAYS, ETC. A. B. Provide and maintain all equipment such as temporary stairs, scaffolding, ladders, ramps, runways, chutes, tower cranes and/or other hoisting facilities etc., as required for the proper execution of works. As soon as permanent stairs are erected, provide temporary protective treads, handrails and shaft enclosures.

1.12

TEMPORARY MATERIAL AND PERSONNEL HOISTS A. Provide temporary material hoists to the Engineer's or Engineer's Representative's approval and as required facilitating the execution of Works. Such hoists shall be erected and maintained in compliance with any local regulations and in accordance with ANSI A10.5 "Safety Requirements for Material Hoists", and shall not be used for transporting personnel. Hoists shall be erected and maintained in compliance with any local regulations and in accordance with ANSI A10.4 "Safety Requirements for Personnel Hoists". All hoists shall be constructed, maintained and removed so as not to cause damage, staining or marring of the permanent work.

B. C. 1.13

BARRIERS AND ENCLOSURES PLEASE SEE SECTION 15300

1.14

TEMPORARY SANITARY ACCOMMODATION A. The sanitary accommodation at the ground level shall comprise temporary toilet building(s) in an approved location, of approved construction in compliance with the local authority having jurisdiction.
01500-4 11 March 2013

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. D. 1.15

Comply with Municipal and Health Authorities regulations and provide the facilities ready for inspection by such authorities whenever requested. Toilets must be kept clean and sanitary. Labour, workmen or staff found to be using areas other than this facility shall be discharged immediately.

TEMPORARY WATER A. Furnish all water required for the performance of the contract. All water shall be clean, drinkable and free of deleterious substances. No brackish water allowed to be used for construction of the Works. Water outlets shall be conveniently located for Sub-Contractors and other contractors, about the Site at ground level. All costs of providing temporary water and running costs shall be borne by the Contractor. Provide an adequate supply of drinking water from approved sources of acceptable quality, satisfactorily cooled, for employees. where required, furnish drinking water in suitable containers and provide hygienically clean cups for use of employees. Drinking water dispensers shall be conveniently located where work is in progress. Make provisions for drainage or collection of excess or spilled water. These facilities to remain in operation until the completion of the Works, then remove all temporary water service equipment and piping.

B. C. 1.16

TEMPORARY DRAINAGE A. Upon taking possession of the Site, the Contractor shall assume full responsibility for draining rainwater, ground water and water arising from construction processes. Also the Contractor shall provide and maintain such temporary drainage installations as may be necessary during the period of construction in a manner approved by the Engineer's Representative and so as not to adversely affect the permanent works or adjacent areas and properties. Temporary drainage installations (storm water and foul water) may be connected to existing drains provided written permission is obtained from the local authorities that have jurisdiction thereof, and provided such connection work is executed and maintained in strict accordance with those authorities' regulations and directions. At completion of the work, or at such times as the Engineer's Representative may direct, remove all temporary drainage installations and make good existing to the Engineer's Representative satisfaction and as required by the concerned authorities.

B.

C.

1.17

SECURITY A. B. C. D. Protect work, products, materials, plant, temporary work, and Owner's operations, from theft, vandalism and unauthorised entry. Safeguard Engineer's staff Initiate programme at job mobilisation, maintain throughout construction period until Engineer occupancy or Engineer acceptance precludes the need for Contractor security. Restrict entrance of persons and vehicles into Project site. Allow entrance only to authorised persons with proper identification. Maintain log of workmen and visitors, make available to Owner or Engineer or Construction Manager on request. Coordinate access of Owner's personnel to site.

E.

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-5 11 March 2013

1.18

KITCHENS AND CANTEENS A. B. No Kitchens and Canteens allowed within the Project site. Food and beverages served from all kitchens shall be prepared and provided in conformance with the latest requirements of the Ministry of Public Health and the Kuwait Municipality. All kitchens shall be open to inspections for hygiene conducted by the concerned governmental authorities.

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-6 11 March 2013

1.19

CLEANING AND PROTECTION A. Clean and protect construction in progress and adjoining materials in place, during handling and installation. Apply protective covering where required to assure protection from damage or deterioration till substantial completion. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to assure operability without damaging effects.

B.

C.

1.20

Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. Where applicable, such exposures include. but are not limited to, the following: 1. Excessive static or dynamic loading. 2. Excessive internal or external pressures. 3. Excessively high or low temperatures4. Thermal shock. 5. Excessively high or low humidity. 6. Air contamination or pollution. 7. Water, hailstone, ice 8. Solvents. 9. Chemicals. 10. Light. 11. Radiation. 12. Puncture. 13. Abrasion. 14. Heavy traffic. 15. Soiling, staining, and corrosion. 16. Bacteria. 17. Rodent and insect infestation. 18. Combustion. 19. Electrical current. 20. High-speed operation. 21. Improper lubrication. 22. Unusual wear or other misuse. 23. Contact between incompatible materials. 24. Destructive testing. 25. Misalignment. 26. Excessive weathering. 26. Unprotected storage. 27. Improper shipping or handling. 28. Theft. 29. Vandalism. TEMPORARY CONTROLS Dust Control 1. Execute work by methods to minimise raising dust from construction operations. Provide positive means to prevent airborne dust from dispersing into atmosphere.

A.

B.

Erosion and Sediment Control 1. Plan and execute construction by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.
01500-7 11 March 2013

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2. 3. 4. 5. C.

Minimise amount of bare soil exposed at one time. Provide temporary measures such as berms, dikes and drains, to prevent water flow. Construct waste areas by selective placement to avoid erosive surface silts or clays. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures.

Water Control 1. Rough grade site and provide all necessary drainage to prevent standing water and to direct surface drainage away from excavations, trenches, adjoining properties, and public right-of-way until permanent drainage is accepted. Allow for removal of temporary drainage upon acceptance of the whole work. Maintain excavations and trenches free of water. Provide and operate pumping equipment of a capacity to control water flow. Provide dewatering system to maintain excavations dry and free of water inflow on a 24 hours basis. Provide piping to handle pumping outflow to discharge in a manner to avoid erosion. Remove equipment and installation when no longer needed. Comply with the Local Authorities Regulations.

2. 3. 4. 5. 6. 7. D.

Noise Control 1. 2. 3. Fit all generators, compressors, percussion tools and vehicles with effective silencers of a type recommended by manufacturers of generators, compressors, tools, or vehicles. Comply with Municipality Regulations. Electrical generators and other heavy equipment are to be housed in soundproof enclosure.

E.

Pest and Rodent Control 1. Provide proper measures to control pests in occupied temporary accommodation and storage areas.

F.

Pollution Control 1. Provide methods, means and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations.

G.

Fire Control 1. 2. Provide methods, means and facilities to prevent nuisance for smoke, dust, trash and the like. Provide temporary fire protection system for the site as required by Clause 1.08 of this section. Allow for removing temporary fire protection on completion and acceptance of the whole works.

1.21

SAFETY MEASURES AND STANDARDS A. Accident Prevention Programme 1. Within 30 days of contract signing, the contractor will submit, for the Engineer's approval, his Accident Prevention Programme naming the key person in his organization who will be responsible for administering of Safety Programme, which follows, and in particular the safety requirements listed in the safety check list. All employees will be physically qualified for performing the duties to which they are assigned. Operators of equipment and vehicles shall be able to read and understand the signs, signals and operating instructions is use. Prior to start of work, arrangements will be made for assistance from medical services in existence in the vicinity of the project site. Communication and transportation to effectively care of injured workers will be provided as necessary. First Aid Kits, in the ratio of one unit for each 25 persons or less, will be provided on the job. They shall be easily accessible to all the workers.
01500-8 11 March 2013

2.

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-9 11 March 2013

B.

Safety Programme 1. The safety programme established and maintained on this project will incorporate the requirements of the Safety and Health Requirements of the Government of Kuwait, the AGC manual of Accident Prevention in construction, and all other local codes and regulations. The purpose of the Programme is to elicit the interest and efforts of all personnel both management and supervisory, required for the prevention of injuries and accidents, through proper and through training and instructions to employees and labour. The Contractor and all his subcontractors are responsible for the administration of a comprehensive safety programme. 3. This safety programme embodies the prevention of accident injury, occupational illness and property damage. Each contractor shall provide and maintain a safe, hazard free workplace for their employees, for fellow workers and the general public. As a minimum, the contractor's safety programme shall incorporate all of the principals of the project safety programme. This project safety programme shall ensure the involvement and active participation of all project employees by requiring safety training will promote recognition of unsafe acts, potential and actual hazards and the immediate corrective action to be taken. All employees shall be constantly aware of their responsibility to work in a safe manner.

2.

4.

C.

Management Organization 1. A Safety Co-ordinator shall be responsible for the implementation and further development of the safety programme. His duties will include the following: a. Conduct monthly safety meeting with personnel and subcontractors b. Inspect the project daily, and record all visible safety hazards, including identification of violators. c. Follow through on timely correction of safety hazards, making immediate corrections as necessary. d. Monitor on-the-job safety meetings and report the same on this Daily Report. e. Foster a "Safety Awareness" in all tradesmen and supervisors on the Project. f. Follow up, for insurance purposes, all relevant safety reports. g. Check all areas at least once a day for housekeeping and cleanup. Take immediate action to ensure compliance with requirements. h. Submit Job Hazards Analysis for each major phase or element of work as necessary. i. Post Safety signs on the project.

D.

Subcontractor and Other Contractors Participation The officers and personnel of all subcontractors shall be responsible for compliance with this safety programme. This will entail indoctrinating their on-the-job representatives with a working knowledge of the General Safety Programme on the job. They are further responsible to have their firms represented at all project safety meetings.

E.

Accident Prevention Responsibility 1. Safety Meetings will be held at least once a month at the job site. The meetings will be convened and conducted by the safety coordinator. All supervisors and foremen are expected to be in attendance. Each subcontractor will have a responsible representative present to follow through on information and resolutions discussed and adapted at these meetings. The Engineer's representative may attend these meetings. The Agenda for the safety meetings will generally include inter-alia. a. b. Development of timely topics for discussion and dissemination of safety bulletins, Signs and Notices. A review of the Safety Co-ordinator's inspection.

2.

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-10 11 March 2013

c. d. 3.

Identification of potential safety hazards in the coming month and discussion and implementation of steps to be taken to avoid the same. Appoint of safety Representatives for subcontractors.

All supervisors and foremen are responsible to plan and accomplish their work with due regard for the safety of all individuals on the job site. They will be expected to eliminate all possible accident hazards when planning the work under their control. It is expected the subcontractors will observe and correct any accident producing practices before injury occurs. If an accident does occur, they will investigate to determine the cause and take the required corrective action to prevent a recurrence. All accidents shall immediately be reported to the Engineers Representative and to the Engineer.

F.

First Aid and Medical Facilities The Contractor shall provide first aid and medical services as required by the relevant municipal and ministerial authorities of Kuwait.

G.

Accident Reporting 1. All lost time injuries, property damage accidents (excluding of project vehicle accidents) and material losses in which the property damage exceeds KD 100/- will be reported in writing to the Engineer within 48 hours of the accident or incident. Immediate notification will be provided in advance of the written report. In the event of any employees being sent to a doctor for treatment, a release will be obtained from the doctor stating whether (1) the employee is not fit for duty; (2) the employee is fit for light duty; or (3) the employee is fit for duty. A copy of this release will be accompanied with the accident report.

2.

H.

Protective Equipment 1. 2. Minimum requirements for protective equipment shall be the wearing of hard hats by all personnel, including subcontractors, as well as protective clothing, as warranted. Supplemental requirements for protective equipment shall be developed to cover specific areas of the work for such items as eye protection, protective clothing, life belts and life lines as per the requirements of this safety specifications.

I.

Hand Tools and Power Tools 1. All hand tools and portable power tools to be used shall be of good order and shall be used for the purpose intended. All electric power tools will be grounded and will be inspected frequently for worn out parts and connections. Circular saws shall be equipped with guards that automatically enclose cutting edges. Radial arm power saws shall be equipped with automatic brakes. Explosives actuated tools and the use will be discouraged, and must have prior written Engineer's Representative's approval before delivery to the project. 1. Minimum Protective Clothing a. b. 2. Hard hats are required at all times. Protective eye covering will be worn when welding, hammering metal, stone, or concrete, grinding or cutting metal units.

2.

Minimum Safety Observances a. Work areas and access ways are to be free of trash, material and all tripping hazards b. c. Temporary electrical wiring will be protected form damage by traffic, be in good condition and protected by ground fault interrupters. All portable containers for gas and other inflammable liquids shall be UL or FM approved, with self-sloshing lids. No plastic containers are allowed.
01500-11 11 March 2013

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

d. e.

Maximum speed for automobiles and vehicles on the site is 10 Kilometres per hour. All accidents are to be reported directly to supervisors, the Engineer and the Engineer's Representative. If serious injury is apparent or suspected, utilize the pre-established emergency hospital service. The telephone number shall be prominently displayed at all site telephone locations. Then attempt to put out the fire with available fire extinguishers and water hoses until help arrives. Do not endanger personnel in fighting the fire. Heavy Equipment Operators/Sub-Contractors must obtain clearance from the Engineer's Representative before commencement of their work. All equipment must meet the Safety Standards, described in these specifications. No site visiting during nights weekends or holidays without prior permission.

f. g. h. K. Safety Check List 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25.

Prepare safety programme Post safety programme on job bulletin. Prepare and post fire prevention programme Analyse job for potential hazards and hazardous procedures Establish plan for location of shanties, material storage, and personal facilities and traffic flow Arrange for sanitary facilities Arrange for debris removal Establish procedure to obtain Subcontractor Safety Programme Arrange-for Doctor Arrange for Hospital Arrange for ambulance service Post phone numbers for police, fire, medical and ambulance service at each of the on site telephone locations Obtain claims forms Contract loss Prevention Department of Insurance Carrier Arrange for exposure check by Insurance Carrier Obtain form the Engineer's Representative a report form for reporting accidents and injuries Establish adequate first aid kit and stretcher facilities Post chart to signify weekly check of first aid kits. Hire qualified first aid personnel, if more than ten minutes from a medical facility with which normal and emergency medical service link has been established Conduct a pre-construction survey of surrounding property existing condition, if appropriate Prepare and post at each on site telephone location "off hours emergency notification list" Arrange for watchman service Prepare a watchman's log Obtain any required state forms and posters Verify insurance on sub-contractors starting work on site prior to start of work by sub-contractors. Obtain safety equipment appropriate to operations a. Hard hats
01500-12 11 March 2013

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. Safety belts c. Goggles d. Ear protection e. Carbon monoxide tester Please see clause 2.01. 26. 27. 28. 29. 30. 31. L. Post sketch, showing location of fire alarm boxes, hydrants and first aid facilities Arrange for and post, safety posters and warning signs Establish weekly tool box and safety talks Set up an accident control chart Establish monthly safety meeting Appoint a safety supervisor and set date for the first safety meeting

Non-Compliance With Safety Requirements 1. Where the Contractor violates any of the safety provisions described within this section 01500, the Engineer shall take the appropriate remedial action, and all costs associated therewith for the Contractor's account. On the occurrence of the first violation, the contractor shall be warned in writing by the Engineer's Representative and shall be instructed to remedy the violation within a specified time. Where the contractor fails to remedy the violation within the time stipulated, the contractor will be prohibited from carrying out any further work within the affected area until the specific exposure has been corrected. On the occurrence of all further violations, the severity of each violation, shall be considered by the Engineer's Representative. The contractor instructed accordingly. Where the contractor unreasonably ignores the Engineer's Representative's instructions, then the foreman responsible for operations in the area where the safety violations are occurred shall be dismissed from the site. Should the contractor persistently breach the safety requirements with undue reason, then the principal of the contractor shall be summoned to the site and instructed to take the appropriate action to ensure that his employees comply with the safety requirements of the contract. The following is a summary of engineer's action in the event of the contractor's non-compliance with safety requirements.

2.

3.

4.

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-13 11 March 2013

Summary of Engineer's Action In the Event of Contractor's non-Compliance with Safety Requirements CATEGORY SAFETY ITEM ORDER ACTION 1.0 2.0 ACTION

Material Or Equipment

- Scaffolding - Guard Rails - Excavation Protection - Safe Hand & Power Tools - Temporary Elect. Grounding - Machinery & Mech. Equipment

Contractor warned to rectify. If Contractor fails to rectify, Contractor is barred from working in exposed area. In the case of continuous breach, employees and foreman responsible for exposed area shall be dismissed from site. Responsible employee prevented from continuing work until properly attired. When same employees is in breach a second time, he will be dismissed from the site. When more than 2 employees are dismissed per week, then responsible foreman shall be dismissed. Contractor warned to supply. If contractor fails to supply, engineer shall supply and deduct the cost from the contractor.

3.0

Protective Garments

- Head Protection - Eye Protection - Hearing Protection - Respiratory Protection - Hand Protection - Foot Protection - Body Protection

1.0

2.0

3.0

Facilities

First Aid Sanitation Material Storage Fire Protection

1.0 20

1.22

FURTHER/OTHER SAFETY REGULATIONS A. Safety regulations are also specified in Part III, Section IV of the Tender Documents. The Contractor shall comply with the combination of the requirements detailed there and above.

1.23

PARKING A. B. Provide or construct temporary parking areas to accommodate use of construction personnel. Maintain traffic and parking areas including that of the Engineer's Representative in a sound condition free of excavation material, construction equipment, products and mud.

PART 2 - PRODUCTS 2.01 MATERIALS A. B. All safety gears should be as to the approval of Kuwait Fire Brigade and KNPC Standards. Products and Manufacturers specified herein are the only products that will be acceptable.
01500-14 11 March 2013

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

a. b. c. 2.02

Safety Shoes Safety Helmets Belts, Goggles, Gloves etc.

LABOURS SANITARY/TOILET FACILITIES A.

Redwing, USA SEI, Kuwait - model certified by KNPC to ANSI Z89, Jan. 86, Class A These should be as to the approval of Kuwait Fire Brigade and KNPC Standards.

Provide sufficient number of prefabricated structure buildings as site toilets with all necessary plumbing, electrical, electrical and ventilation connections required making the system operational. Type of facility, location and relocation to be to the approval of the Engineer's Representative. Each of the site toilets units shall comprise of the following: 1. Steel frame with sandwich panel to walls and partitions, and corrugated metal sheet roofing. Size and layout to be determined by the Contractor and approved by the Engineer's Representative. 2. Wall mounted lavatories with faucet, plastic shelf and mirror. At least 1 No. for the use of and per each (25) persons. 3. Wall hung urinals with water stop valves. At least 1 number for the use of, and per each (25) persons. 4. Water closets with plastic flush tank and flexible wash hose. At least 1 No. f or the use of and per each (25) persons. 5. Electrical water heaters complete with safety valves. 6. Electrical connection for power and lighting. 7. Exhaust fans and ventilators. 8. Water supply connection from source provided by the Contractor. 9. Plumbing and drainage connections. 10. Percolating (collection) pits of proper capacity. 11. Drainage manholes as required. Toilets must be kept clean and sanitary The Contractor shall clear away and remove all structures, buildings, tanks, manholes, pits and to make the area clean and tidy as and when instructed by the Engineer. Comply with Municipal and Health Authorities regulations and provide the facilities ready for inspection by such authorities whenever requested. Labour, workmen or staff found to be using areas other than these facilities shall be discharged immediately.

B.

C. D. E. F.

PART 3 - EXECUTION NOT USED END OF SECTION

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01500-15 11 March 2013

SECTION 01514 TEMPORARY TELEPHONES PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 This Section concerns only the Temporary Telephone to the Municipality and Engineers Representative Offices.

RELATED WORK A. Section 01010 - Summary of Work.

1.03

SECTION INCLUDES A. B. C. Temporary telephone service. Maintenance. Removal.

1.04

SERVICE REQUIREMENTS A. B. B. C. D. E. Two MOC lines (without international call facility) 3 mobile telephones with line. Telephone service shall be for local calls only Each receiver shall have equal access to outside lines. Each internal receiver shall enable caller to dial each others receiver. Provide one telephone instrument to kitchen and each desk specified under Section 01590. Wreless Internet connection service (not less than 7.2MB/s) for the whole duration of the Project alongwith the required network sharing software or appropriate hardware to match the number of computers required under Section 01590.

1.05

COSTS A. Pay costs of supply, installation, maintenance, monthly phone bills and removal of services.

1.06

SUBMITTAL A. Submit any relevant product data for approval.

PART 2 - PRODUCTS 2.01 MATERIALS A. Must be new and adequate for the purpose.
01514-1 11 March 2013

TEMPORARY TELEPHONE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. 2.02

Telephone Exchange (EPABX) shall be Panasonic, latest model and shall be as approved by the Engineer. Telephone sets shall be equipped with display screen.

EQUIPMENT A. Products locally used or speciality devices compatible with Ministry of Communications.

PART 3 - EXECUTION 3.01 INSTALLATION A. B. 3.02 Install service at time of site mobilization. Modify and extend service as Work progresses.

MAINTENANCE A. Maintain system to provide uninterrupted service.

3.03

REMOVAL A. Remove temporary system after obtaining Engineers Representatives approval.

END OF SECTION

TEMPORARY TELEPHONE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01514-2 11 March 2013

SECTION 01530 BARRIERS AND ENCLOSURES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Provision of safety fence and gates around all work areas, work includes the following: 1. 2. 3. 1.02 Installation Maintenance Removal

EXISTING SITUATION A. Examine the site to familiarize with the existing situation where there is no existing boundary wall of required height, provide safety fence as required by the various statutory authorities having jurisdiction.

1.03

SYSTEM DESCRIPTION A. Safety fence and gates 2.00 m high of braced construction with fully closed panel construction to completely enclose the site and prevent unauthorized persons violating the works site area. The site shall also include all areas and lands approved by the Engineer for the use by Contractor for storage or as borrow pits, etc. The safety fence and gates should be positioned to comply with the following requirements: 1. To provide sufficient and secure access gates as necessary 2. To make any adjustments as necessary to suit the various phases of the works, and to suit the Contractor's approved Construction Schedule. 3. To comply with any instructions of the Engineer or Engineer's Representative in accordance with the requirements of the Contract Documents.

B.

1.04

SUBMITTALS A. B. C. Submit to the Engineer's Representative shop drawings under provisions of Section 01300. Show layout, details of construction, foundations, sizes, and grades of members. Obtain Engineer's Representative approval and approvals of Authorities.

1.05

QUALITY ASSURANCE A. B. Erect fence/gate posts and framing on secure foundation, rigidly braced and framed to resist wind loadings, resulting from a wind speed of 80 miles per hour - exposure C as per the Uniform Building Code, 1997. Finish: Adequate to withstand weathering, fading, and chipping for duration of project.

PART 2 - PRODUCTS 2.01 MATERIALS A. B. Materials and products specified herein shall take precedence over the safety program Section 1500. Post and Gate Construction: Primed and painted steel and structurally sound, as shown on the drawings.
01530-1 11 March 2013

BARRIERS AND ENCLOSURES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C. D. E.

Fence Panels: 2.00 m high Steel Sheet Panels 26 gauge Kirby or similar factory painted finish, color Ral9007 Gate Hardware: Secure locks and bolts to all gates. Paint and Primers: Exterior quality, two coats. Colors designated by Engineer's Representative.

PART 3 - EXECUTION 3.01 INSTALLATION A. B. C. D. 3.02 Install safety fence and gates complete before areas of work may commence. Erect safety fence and gates in approved location as approved on Site Layout Organization Chart submitted by Contractor. Install safety fence surface plumb and level. Anchor securely. Paint sight-exposed surfaces of safety fence, posts and gates.

MAINTENANCE A. B. Maintain safety fence and gates including cleaning and repairing deterioration and damages throughout the contract period, as required by the Engineer's Representative at no extra cost. Repaint as necessary and whenever instructed by the Engineer or Engineer's Representative.

3.03

REMOVAL A. Remove safety fence and gates at completion of project after getting permission from the Engineer or Engineer's Representative. END OF SECTION

BARRIERS AND ENCLOSURES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01530-2 11 March 2013

SECTION 01569 CONSTRUCTION CLEANING PART 1 - GENERAL 1.01 RELATED WORK A. B. 1.02 Section 01710 - Final Cleaning. Individual Specifications Sections: Specific cleaning for Product or Work.

SECTION INCLUDES A. Daily cleaning and disposal of waste materials, debris, and rubbish during construction.

PART 2 - PRODUCTS 2.01 EQUIPMENT A. B. Provide covered containers and chutes for deposit of waste materials, debris, and rubbish and include in the Site Layout Plan. Cleaning materials for products to be cleaned shall be according to the manufacturer of the product and as approved.

PART 3 - EXECUTION 3.01 CLEANING A. B. C. D. Maintain areas, floors and buildings under Contractor's control free of waste materials, debris, and rubbish at all times. Maintain site in a clean and orderly condition. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces and other closed or remote spaces, prior to closing the space. Clean interior areas and all floors and stairs daily to provide suitable conditions for work. The Contractor must keep all working areas clear of obstructions, surplus materials unused plant and debris that are unsightly as determined by the Engineers Representative, obstructive and/or hazardous to the safety of all persons-expected to be on the premises at any time.

3.02

DISPOSAL A. B. Comply with regulations of the local Authorities. All debris to be shifted from site by main contractors cost and responsibility. Provide cover as necessary, place and relocate at site as directed by the Engineer's Representative.

END OF SECTION

CONSTRUCTION CLEANING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01569-1 11 March 2013

SECTION 01580 PROJECT IDENTIFICATION AND SIGNS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Two nos. well lit project identification signs, each in both English and Arabic, of types as shown on the drawings.. 1. Design 2. Installation 3. Maintenance 4. Removal

1.02

SYSTEM DESCRIPTION A. Each project identification sign board will have the following information: 1. Perspective of Project 2. Name of the Owner/ 3. Name of the donor 4. Name of the Project 5. Name of Consultant 6. Name of Contractor 9. Names of Approved Sub-contractors, one per slat. The size of each board shall be 2.4 meter x 7.000 meter including the size of Perspective of Project which shall be 1.9 x 2.40 meter. The English letters shall be in capital, of approx. size 20cm high x 1.25cm thick x 1cm distant within the same word and 2cm distant between adjacent words; the Arabic digits and letters shall be similar and shall match; all to the approval of Engineer. The lettering shall be in black color, over white background Or as specified by the The sign boards shall be erected within twenty-one (21) calendar days from the Date of Enterprise and shall be dismantled and cleared away after completion of the project and the ground below made good. The signboards should be illuminated with sufficient flood light projectors as shown on the drawings. The Contractor to connect and provide all means of power supply.

B.

C. D. E. 1.03

SUBMITTALS A. B. C. D. Submit shop drawings to the Engineers Representative (ER) for approval. Submit design calculations of sign surface metal plates, foundations, supports, framing etc. to the Engineers Representative for approval. For wind speeds etc, follow 80 miles/hour, exposure D as per UBC 97. Show content, layout, lettering, colors, foundation, structure, sizes and grades of members. Obtain approval of Engineers Representative and of Local Authorities having Jurisdiction.

1.04

QUALITY ASSURANCE A. Installer : Engage professional installer with not less than five years experience in similar kind of work. Submit details to the Engineers Representative for approval.
01580-1 11 March 2013

PROJECT IDENTIFICATION AND SIGNS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

PART 2 - PRODUCTS 2.01 SIGN MATERIALS A. B. Structure and Framing : Steel, structurally sound. Paint and Primers : Exterior quality, two coats. Colours as approved by the Engineer.

PART 3 - EXECUTION 3.01 INSTALLATION A. B. C. 3.02 Ensure that project identification signs are installed to the Engineer's Representative approval and in accordance with Project Construction Schedule. Erect supports and framing on secure foundation, rigidly braced and framed to resist wind loadings. Install sign surface in plumb and level and anchor securely.

MAINTENANCE A. B. Maintain signs and supports, clean and repair where deterioration or damages have occurred to the satisfaction of the Engineer's Representative at no additional cost. Repaint as necessary.

3.03

REMOVAL A. The project identification and signs shall be removed after obtaining the Engineers approval.

END OF SECTION

PROJECT IDENTIFICATION AND SIGNS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01580-2 11 March 2013

SECTION 01590 FIELD OFFICES FOR ENGINEERS SUPERVISION & TRANSPORT FACILITIES PART 1 GENERAL 1.01 A. B. C. D. 1.02 A. B. REQUIREMENTS INCLUDED Temporary Field Offices Maintenance and Cleaning Removal Obtain approvals from Authorities having jurisdiction, pay fees and provide guarantees as required. RELATED REQUIREMENTS Section 01010 Summary of Work Section 01500 Temporary Facilities and Controls

PART 2 - PRODUCTS 2.01 A. 2.02 A. B. MATERIALS, EQUIPMENT, FURNISHINGS Serviceable, new, adequate for required purpose. APPROVED MANUFACTURERS / SUPPLIER Midas, Kuwait IKEA, Kuwait

C. Al Balad Al Amin Furniture & Decoration PART 3 - EXECUTION 3.01 A. 3.02 A. 3.03 A. PREPARATION Fill and grade sites for temporary structures to provide drainage away from buildings. INSTALLATION Install Field Offices ready for occupancy by supervision staff within 30 days after Date of Commencement of Works. CONSTRUCTION Portable or mobile buildings, or buildings constructed with floors raised above ground, securely fixed to foundations, with steps and landings at entrance doors.
01590-1 11 March 2013

FIELD OFFICES FOR ENGINEER'S SUPERVISION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. D. E. F. G. H. I. 3.04 A. B. C. 3.05 A. B.

Construction: Structurally sound, secure, weathertight enclosures for office and storage spaces. Maintain during progress of the Works and until removal is authorised. Temperature Transmission Resistance of Floors, Walls and Ceilings: Compatible with occupancy and storage requirements. Exterior Materials: Weather-resistant, and heat insulated finished in one colour acceptable to Engineer or Engineers Representative. Interior Materials in Offices: Laminated plywood sheet type materials for walls and mineral fibre tiles for ceilings, heat and sound insulated resilient floors and bases. Lighting for Offices: Fluorescent to all rooms, 500 lux at desk-top height, exterior lighting at entrance doors. Fire Extinguishers: Appropriate type fire extinguisher at each office area and each storage area. Interior Materials in Storage Sheds: As required to provide specified conditions for storage of products. Name plates to all offices doors. ENVIRONMENTAL CONTROL Heating, Cooling and Ventilating for Offices: Automatic equipment to maintain comfort conditions. Storage Spaces: Ventilation as needed to maintain products in accordance with Contract Documents; adequate lighting for maintenance and inspection of products. Exhaust fan with automatic shutter, one per W.C. (fitting), kitchen and meeting rooms. EMPLOYER AND ENGINEERS SUPERVISION OFFICES Furniture & Equipment: All to be new. Employer and Resident Engineers Furniture per room (two rooms 24 sq.m. minimum area each) 1 No. Desk size 1800 x 800 mm approx. including high back arm chair. 1 No. Side drawer unit 1600 x 400 x 600 mm approx. 2 Nos. Easy chairs for visitors. 1 No. Tack board size 2400 x 1200 mm approx. 1 No. Coffee table 1 No. Lockable filing cabinet 2600 x 400 x 1500 mm approx. 1 NO. 3 seater sofa and 2 Nos. single seat sofa

C.

Corridor: Notice Board: 2 nos. Fibre board with wood framing overall size 1200 x 600 mm approx. Engineers offices. (4 Nos) two rooms 24 sq.m. minimum area each) 1 No. Desk size 1800 x 800 mm approx. including chair. 1 No. Side drawer unit 1600 x 400 x 600 mm approx. 2 Nos. Easy chairs for visitors. 1 No. Tack board size 2400 x 1200 mm approx. 1 No. Lockable filing cabinet 2600 x 400 x 1500 mm approx. 1 NO. 3 seater sofa and 2 Nos. single seat sofa

FIELD OFFICES FOR ENGINEER'S SUPERVISION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01590-2 11 March 2013

D.

Meeting Room (one room of area to suite the follwing furniture): 1 No. Table and chairs to seat 10 persons 1 No. Fibre writing wall board size 2400 x 1200 mm approx. 1 No. Telephone table 1 No. Telephone

E.

Pantry, furniture/equipment (one room) : 1 No. Refrigerator with freezer compartment (12 cu.ft, double door). 1 No. Waste bin (plastic with cover). 1 No. Minimum of 1200mm length floor cabinet with stainless steel sink and 1200 mm wall cabinet. 1 No. 2 hot plates electric and 1 unit gas with table gas cylinder and connection. 1 No. Crockery and cutlery for coffee and tea making. 1 No. Coffee set for 20 persons 20 Nos. Glasses 1 No. Water filter 1 No. Water cooler 1 No. Kitchen table 1 No. Water heater 1 No. Vacuum cleaner with spare bags.

F.

Samples Room (one room 24sq.m. minimum area) Complete shelving covering the whole room perimeter, demountable type with adjustable shelving height 6 Nos. shelves are required.

G.

Miscellaneous Complete bevarges as required for the site like coffee ,tea, milk, soft drinks, cool drinks ctc. Air conditioning: a) to all staff rooms, split A/C units as appropriate for heating and cooling, All to be new, quite operating and convenient. Lighting: Fluorescent lighting to all rooms Plumbing and Drainage: As required to provide a workable acceptable system, clear away on completion. Sundries: Provide adequate number of waste baskets, ash trays, coat hangers and mail trays in each room.

H.

Toilets The following toilets are to be provided: 1. 2. One toilet for the Employer / Engineers representative Two toilet for the Contractors Staff.

Each toilet shall include W.C. with flexible hose, toilet roll holder, coat hooks, wash basin as required with hot and cold water supplies, 1 disposable towel paper holder, 1 mirror above each wash basin I. 3.06 A. Provide shaded parking to accommodate atleast 4 Cars for the sole use of the Engineer and the Employer. MAINTENANCE AND CLEANING Attendance: Provide power, water, gas and clean and maintain offices daily.
01590-3 11 March 2013

FIELD OFFICES FOR ENGINEER'S SUPERVISION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. D. E. F. G. H. 3.07

Daily janitorial services for offices and sanitary facilities and daily cleaning and maintenance for office and storage areas. Maintain and clean office including equipment and furnishings until completion of the Project. Maintain approach walks free of mud and water. Provide delivery service between Employers offices, Engineers offices and Contractors offices. Provide one full time tea boy to attend upon Employer and Engineers staff. Provide all necessary consumable in connection with kitchen, toilet and janitorial services. Provide mineral drinking water for Employer and Engineer staff. REMOVAL At completion of work and subject to Engineers approval remove buildings, foundation, furniture, utility services and debris. Restore areas, obtain and submit Municipality clearance certificate.

3.08

PROJECT OFFICE REQUIREMENTS Provide the following items including assembly, delivery, installation and consumables at the Engineers Representatives office within 30 days of the date of appointment. All items to be new.

A. B. C. D.

Camera: Provide digital camera Sony, (Latest model) Binding Machine: Provide portable manual punch and wire bind machine for A4 size papers with adequate wire binding elements. Photo Copier: Provide one heavy duty photo copier model Canon NP or other equal and approved of double unit providing A4 and A3 size copying with document feeder and collator. Fax Machine: Provide two numbers fax (telephone plain paper photo copier A4 size) machine combined with telephone handset for use of Employer and Engineer with dedicated MOC telephone line to fax without international calls facility. Provide table and consumables for fax machine. Computer: The Contractor is to supply and install one no of the latest model DELL laptop computer and software for the use of Engineers repersantive for the duration of the Project including maintenance and consumables supplies: Consumables & Office Maintenance throughout Project Period: 1. 2. 3. 4. Paper for photo copies, facsimile and computer. Files of various sizes for correspondences. Stationery items for each supervision staff. Maintenance for photo copier, facsimile and computer.

E.

F.

G.

Transportation & Other Fascilities for Supervision Engineers: a. b. 3No. of (Rented) Jeep (worth 150/month). for the whole project duration Prividing 50 KD fuel voucher for all engineers (max 5nos) for the whole project duration END OF SECTION

FIELD OFFICES FOR ENGINEER'S SUPERVISION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01590-4 11 March 2013

SECTION - 01600 MATERIAL AND EQUIPMENT PART 1 - GENERAL 1.01 A. B. 1.02 A. RELATED SECTIONS Section 01030 - Alternatives Section 01400 - Quality Control : Product quality monitoring PRODUCTS Products: means new material, machinery, components, equipment, fixtures and system forming the work. Does not include machinery and equipment used for preparation, fabrication, conveying and erection of the Work. Products may also include existing materials or components required for reuse. Provide interchangeable components of the same manufacturer, for similar components. TRANSPORTATION, DELIVERY, RECEIVING AND HANDLING PACKAGING, TRANSPORTATION 1. 2. 3. B. Transport materials and plant from source, whether inside or outside Kuwait to site. Require supplier to package products in boxes or crates for protection during shipment, handling and storage. Protect sensitive products against exposure to elements and moisture. Protect sensitive equipment and finishes against impact, abrasion and other damage. Effect insurance to the full value of the shipped product.

B. 1.03 A.

DELIVERY AND RECEIVING 1. 2. Arrange deliveries of products to the Site in accordance with construction progress schedules. Allow time for inspection prior to installation. Coordinate deliveries to avoid conflict with Work and conditions at site; work of other contractors; or Employer; limitations on storage space; availability of personnel and handling equipment; and Employers use of premises. Deliver products in undamaged, dry condition, in original unopened containers or packaging with identifying labels intact and legible. Programme delivery and unloading to avoid traffic back-ups on or adjacent to Site. 4. 5. Clearly mark partial deliveries of component parts of equipment to identify equipment and contents to permit easy accumulation of parts and to facilitate assembly. Immediately on delivery, inspect shipment to assure: a. b. c. Product complies with requirements of Contract Documents and reviewed submittals. Quantities are correct. Accessories and installation hardware are correct.
01600-1 11 March 2013

3.

MATERIAL AND EQUIPMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

d. e. 6. C.

Containers and packages are intact and labels legible. Products are protected and undamaged.

Replace damaged products and plant at no expense to the Employer.

PRODUCT HANDLING 1. 2. 3. 4. 5. Provide equipment and personnel to handle products, by methods to prevent soiling and damage. Provide additional protection during handling to prevent marring and otherwise damaging products, packaging and surrounding surfaces. Handle product by methods to avoid bending or overstressing. Lift large and heavy components only at designated lift points. Comply with suppliers/manufacturers and Engineers recommendations and instructions. Observe safety regulations.

1.04 A. B. C. D. E. F. G. H. I.

STORAGE AND PROTECTION Store and protect Products in accordance with manufacturers instructions, with seals and labels intact and legible. Store sensitive products in weathertight, dustproof, climate controlled enclosures. For exterior storage of fabricated Products, place on sloped supports, above ground and sand. Provide off-site storage and protection when site does not permit on-site storage or protection. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation. Storage loose granular materials on solid flat surfaces in a well drained area. Prevent mixing with foreign matter. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement or damage. Provide surface drainage to prevent erosion and ponding of water. Prevent mixing of refuse or chemically injurious materials or liquids. Maintenance of Storage: 1. 2. 3. 4. Periodically inspect stored products on a schedule basis. Maintain a log of inspections, make available to Engineer on request. Verify that storage facilities comply with manufacturers product storage requirements. Verify that manufacturer required environmental conditions are maintained continually. Verify that surfaces of products exposed to the elements are not adversely affected; that any weathering of finishes is acceptable under requirements of Contract Documents.

J.

Maintenance of equipment storage: 1. For mechanical and electrical equipment in long-term storage, provide manufacturers service instructions to accompany each item, with notice of enclosed instructions shown on exterior of package.

MATERIAL AND EQUIPMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01600-2 11 March 2013

2. 1.05 A. B.

Service equipment on a regularly scheduled basis, maintaining a log of services; submit as a record document.

PRODUCT OPTIONS Products specified by reference standard or by description only: any product meeting those standards or description. Products specified by naming one or more manufacturers is deemed to include or approved alternative or (approved substitute). Submit a request for substitutions for any equal product of any manufacturer not specifically named. Or approved alternative or (approved substitute) means the products of a different manufacturer may be substituted if prior approval has been obtained, but the Engineer reserves the right to insist on the named product(s). Rates or prices will be held to be based on the product(s) specified, unless otherwise agreed and any cost arising out of the use of any substitute material or product shall be borne by the Contractor and any saving arising therefrom shall be passed on to the Employer. Where used in this combination: 1. 2. Manufacturer means the firm under whose name the particular product is marketed. Reference means the proprietary brand name and/or reference by which the particular product is identified.

C. D.

E.

F.

Where a choice of manufacturer or source of supply is allowed for any particular product or material, the whole quantity required to complete the work must be of the same type, manufacturer and/or source. Do not change without prior approval of the Engineer. Product written evidence of sources of supply when requested by the Engineer. PRODUCTS LIST Within 30 days after date of Employer-Contractor Agreement, transmit four copies of a list of all products which are proposed for installation, including name of manufacturer. Tabulate products by Specifications section number, title and Article number. For products specified only by reference standards, give manufacturer, trade name, model or catalogue designation and reference standards. Engineer will reply in writing within (21) days stating whether there is reasonable objection to listed items. Failure to object to a listed item shall not constitute a waiver of requirements of Contract Documents. All materials and systems to be incorporated in the Project are subject to the approval of the Employer. SUBSTITUTIONS Except in special instances, the Specification gives one to three manufacturers of products specified and the products of the listed manufacturers have been used for detailing and as the standard of quality appearance and function. Products proposed for substitution shall conform basically to design and performance requirements. Written requests for substitutions or approved alternatives (substitutions) products will be considered only within 45 days after date of Employer-Contractor Agreement. Subsequent requests will be considered only in case of product unavailability or other conditions beyond control of Contractor. Allow sufficient time for Engineers review.

G. 1.06 A. B. C. D. E. 1.07 A.

B.

MATERIAL AND EQUIPMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01600-3 11 March 2013

C.

Substitutions will not be considered when indicated on shop drawings or product data submittals without separate formal request, when requested directly by subcontractor or supplier, or when acceptance will require submittal revision of Contract Documents. Substitute products shall not be ordered or installed without written acceptance and approval by the Engineer and Employer. Only ON REQUEST FOR SUBSTITUTION for each product will be considered. When substitution is not accepted, provide specified product. Engineer will determine acceptability of substitution. REQUESTS FOR SUBSTITUTIONS Submit separate request for each substitution. Document each request with complete data substantiating compliance of proposed substitution and detailed drawing with requirements of Contract Documents. Identify product by Specifications section and Article numbers. Provide manufacturers name and address, trade name of product and model or catalogue number. List fabricators and suppliers as appropriate. Attach product data as specified in Section 01340. List similar projects using product, dates of installation and names of Engineer and Employer. Give itemised comparison of proposed substitution with specified product, listing variations and reference to Specifications section and article number. Give quality and performance comparison between proposed substitution and the specified product and compatibility with adjacent components. Give cost data comparing proposed substitution with specified product and amount of net change to Contract Sum. List availability of maintenance services and replacement materials. State effect of substitution on construction schedule and changes required in other work or products. CONTRACTOR REPRESENTATION Request for substitution constitutes a representation that Contractor has investigated proposed product and has determined that it is equal to or superior in all respects to specified product or that the cost reduction offered or advantageous delivery dates is ample justification for accepting the offered substitution. Only with these reasons and justifications would the Engineer consider the request for substitution. Contractor will provide same warranty for substitution as for specified product. Contractor will coordinate installation of accepted substitute, making such changes as may be required for Work to be complete in all respects. Contractor certified that cost data presented is complete and includes all related costs under this Contract. Contractor waives claims for additional costs related to substitution which may later become apparent. SUBMITTAL PROCEDURES Submit three copies of request for substitution. Engineer will review Contractors request for substitutions with reasonable promptness.
01600-4 11 March 2013

D. E. F. 1.08 A. B. C. D. E. F. G. H. I. 1.09 A.

B. C. D. E. 1.10 A. B.

MATERIAL AND EQUIPMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C. D. E.

During the bidding period, no submittals for substitutions is allowed unless specifically requested. After award of Contract, Engineer will notify Contractor, in writing of decision to accept or reject requested substitution within 21 days. For accepted products, submit shop drawings, product data and samples under provisions of Section 01340.

PART 2 PRODUCTS Not Applicable. PART 3 EXECUTION Not Applicable.

END OF SECTION

MATERIAL AND EQUIPMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01600-5 11 March 2013

SECTION 01631 EQUALS AND SUBSTITUTES PART-1 - GENERAL 1.01 SUMMARY A. B. This Section includes administrative and procedural requirements for handling requests for approving equals or substitutes presented by the Contractor. Related Sections: 1. 1.02 DEFINITIONS A. B. The term "product" shall mean any material including proprietary goods, equipment and manufactured items. Wherever more than one manufacturer or item is listed in the contract documents, then the choice lies with the Contractor, while the approval of the actual details shall be with the Engineer or the Engineer's Representative. Equal Manufacturers and Products: References herein to "approved equal" or similar terms shall mean that the approval of the Engineer is required to any manufacturer and product not named in the contract but proposed by the Contractor as equal to the named ones. Substitute Products: If the Contractor is unable to obtain the named product or named manufacturers product and if he is also unable to find and propose an approvable equal manufacturer and product in spite of his demonstrated sufficient (in the opinion of the Engineers Representative) endeavors, he may propose a substitute for the Engineer's review and approval, which substitute shall be similar to, and as near as possible to the specified ones. All Sections considered by the Engineer as relevant to this section shall be considered as Related Sections.

C.

D.

1.03

SUBMITTALS A. Equal or Substitute Request Submittal: The Engineer's Representative will receive requests as follows: 1. 2. 3. Submit 3 copies of each request for consideration. Submit requests in the form and according to procedures required. Identify the manufacturer and product, the fabrication, installation method in each request. Include related Specification Sections and Drawing numbers. Provide complete documentation showing compliance with the requirements and the following as appropriate: a. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the owner and separate contractors, if any, that will be necessary to accommodate the proposed equal or substitute. A detailed comparison of all the specified and significant qualities of the proposed equal or substitute with those of the Work specified. Significant qualities will include elements, such as performance, weight, size, durability, and visual effect etc. Product Data, including Drawings and descriptions of products and fabrication and installation procedures. Samples, where applicable or requested. A statement indicating the effect on the Contractor's Construction Schedule.
01631-1 11 March 2013

b.

c. d. e.

EQUALS AND SUBSTITUTES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

f.

Cost information, including a proposal of the net saving if any in the Contract Sum. Additional costs are not accepted. This should be substantiated by comparative quotations with complete rate breakdown for both the proposed equal/substitute item and the specified item. The Contractor's waiver of rights to additional payment or time, that may subsequently become necessary because of the failure of the equal or substitute to perform adequately. Warranty Reimbursement for review and redesign services, if applicable in the opinion of the Engineers Representative.

g.

h. i. B.

Engineer's Action: The approval of any equal or substitute product shall in no way relieve the Contractor of any of his liabilities and obligations under the Contract. The burden of proof in satisfying the Engineer as to the suitability of any product shall rest with the Contractor. The Engineer may request and the Contractor shall provide such supporting data, carryout such tests, etc., as the Engineer may reasonably require in order to satisfy him as to such suitability. Any extra costs of delay by the Contractor, because of his failure to propose equals or substitute in a timely manner, so as to allow the Engineer reasonable time to review, or because of rejection of equals or substitute found by the Engineer to be unsuitable, shall be the responsibility of the Contractor, and he shall not be entitled to additional payment nor to extra time for this reason. Cost effect in approving equals or substitutes : Should any equal or substitute product be proposed by the Contractor and approved by the Engineer, any increase in cost over and above the specified product shall be borne by the Contractor. Should a substitute product be proposed by the Contractor and approved by the Engineer, then any saving in cost shall be to the benefit of the Employer.

C.

PART 2 - PRODUCTS 2.01 EQUALS AND SUBSTITUTES A. Specifying of manufacturers or their products by name, trade name, catalogue number, etc., shall not act to relieve the Contractor either from his responsibility to meet other specification requirements, or from his responsibility to make material submittals for approval. Equal or substitute products where permitted and approved, must conform to the Engineer's designed space requirements. Any such product that does not meet such space requirements, whether approved or not, shall be replaced at the Contractor's expense and any modification of replaced systems thereby arising shall also be made at his expense. Refer to item 1.03E of Section 01600 Materials and Equipment and consider it repeated here.

B.

C.

PART 3 - EXECUTION NOT USED

END OF SECTION

EQUALS AND SUBSTITUTES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01631-2 11 March 2013

EQUALS AND SUBSTITUTES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01631-3 11 March 2013

SECTION 01700 CONTRACT CLOSEOUT PART-1 GENERAL 1.01 RELATED WORK A. B. C. 1.02 Section 01569 - Construction Cleaning Section 01730 - Operation and Maintenance Data. Section 01750 - Operation and Maintenance

SECTION INCLUDES A. Closeout Procedures. 1. Substantial Completion. 2. Closeout Submittals. 3. Statement of Adjustment of Accounts. 4. Contractor's Obligations. Final Cleaning Adjusting Warranties Spare Parts and Maintenance Materials.

B. C. D. E. 1.03

CLOSEOUT PROCEDURES A. Substantial Completion 1. 2. When Contractor considers work is about to be substantially complete, submit written notice with list of items to be completed or corrected and the expected date of substantial completion. Should Engineer inspection find Work is not substantially complete, he will promptly notify Contractor in writing, listing observed deficiencies, citing his own date of completion of deficiencies snags etc. Contractor shall remedy all deficiencies and send a second written notice of substantial completion. When Engineer finds Work is substantially complete he will prepare a Certificate of Substantial Completion in accordance with provisions of the Contract Conditions and Documents Work will be considered substantially complete when all works and systems and particularly the electrical systems are tested and found to be acceptable to the Engineer and to the statutory authorities.

3. 4. 5.

B.

Closeout Submittals 1. 2. 3. 4. Evidence of Compliance with Requirements of Governing Authorities, and as requested by the Engineer. Project Record Documents: Under provisions of Section 01720. Operation and Maintenance Data: Under provisions of Section 01730. Spare Parts and Maintenance Materials.

CONTRACT CLOSEOUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01700-1 11 March 2013

5. 6. 7. C.

Keys and Keying Schedule. Evidence of Payment: In accordance with Conditions of the Contract.

Certificates of Insurance for Products and Completed Operations: In accordance with Particular Conditions. Statement of Adjustment of Accounts Submit final statement reflecting adjustments to Contract Sum indicating: a. Original Contract Sum. b. Previous variations c. Deductions for uncorrected work d. Deductions against Advance Payment if any e. Deductions for delays penalties f. Deductions for Engineer's fees g. Other adjustments to Contract Sum h. Total Contract Sum as adjusted i. Previous payments j. Sum remaining due Engineer will issue a final Variation List reflecting approved adjustments to Contract Sum not previously made by variations, for Company Authorization.

1.

2. D.

Contractor's Obligations during the last weeks of the Contract Period and during the Period determined by the Engineer to enable the Contractor to attend tot he Snag List 1. 2. 3. 4. Make good all damage consequent upon the work. Touch up minor faults in newly painted/re-painted work, carefully matching colour, and brushing out edges. Repaint badly marked areas back to suitable breaks or junctions. Adjust, ease and lubricate moving parts of new work as necessary to ensure easy and efficient operation, including doors, windows, drawers, hardware, appliances and controls. Leave the Works secure with all accesses locked. Account for and adequately label all keys and hand over to the Company with itemised schedule, retaining a duplicate schedule signed by the Company as a receipt. Where any section of the Works will, after its practical completion, depend for its adequate functioning on work located elsewhere in the Work, complete such other work in time to permit Sectional Completion as required. During execution of the remainder of the Works insure that completed sections of the Works have continuous and adequate provision of services, fire precautions, means of escape and safe access. Make arrangements with the Company's Representative and give him reasonable notice of the precise dates of access to the various parts of the Works for purposes of making good defects. Inform the Engineer when remedial works to the various parts of the Works are completed.

5.

6.

7.

1.04

FINAL CLEANING A. Description 1. Execute final cleaning in accordance with Section 01710

1.05

ADJUSTING A. Adjust operating products and equipment to ensure smooth and unhindered operation.

1.06

WARRANTIES
01700-2 11 March 2013

CONTRACT CLOSEOUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Form of Submittals 1. 2. 3. Bind in commercial quality 210 X 297mm (A4) two-ring side binders, with hardback, cleanable, plastic covers. Label cover of each binder with typed or printed title WARRANTIES AND BONDS, with title of project; name, address and telephone number of Contractor; and name of responsible principal. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the Project Manual, with each item identified with the number and title of the specification section in which specified, and the name of Product or work item. Separate each warranty or bond with index tab sheets keyed to the Table of Contents listing. Provide full information, using separate typed sheets as necessary. List subcontractor, supplier, and manufacturer, with name, address, telephone and fax numbers of responsible agent in Kuwait principal elsewhere.

4.

B.

Preparation of Submittals 1. Obtain warranties and bonds, executed in duplicate by responsible subcontractors, suppliers, and manufacturers, within fourteen days after completion of the applicable item of work. Except for items put into use with Company's permission, leave date of beginning of time of warranty until the Date of Substantial completion is determined. Verify that documents are in proper form and contain full information. Co-execute submittals when required. Retain warranties and bonds until time specified for submittal.

2. 3. 4. C.

Time of Submittals 1. For equipment or component parts of equipment put into service during construction with Company's permission, submit documents within fourteen days after acceptance, listing the date of acceptance as the beginning of the warranty period. For items of work when acceptance is delayed beyond Date of Substantial Completion, submit within fourteen days after acceptance, listing the date of acceptance as the beginning of the warranty period. Make other submittals within fourteen days after Date of Substantial Completion, prior to final Application for Payment, listing the date of substantial completion as the beginning of the warranty period.

2.

3.

1.07

SPARE PARTS AND MAINTENANCE MATERIALS A. Products Required 1. 2. Submit master spare list for review. Provide quantities of products, spare parts, maintenance tools, and maintenance materials specified in individual sections to be provided to Company, in addition to that required for completion of Work. Products: Identical to those installed in the Work. Include quantities in original purchase from supplier or manufacturer to avoid variations in manufacture.

3. B.

Storage, Maintenance 1. Store products with products to be installed in the work, under provisions of Section 01600.

CONTRACT CLOSEOUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01700-3 11 March 2013

2. 3.

After delivery of products to site, maintain spare products in same space and condition as products to be installed in the Work. When adequate, secure storage facilities are available at site, capable of maintaining conditions required for storage and not required for Contract work or storage, spare products may be stored in available space. Maintain spare products in original containers with labels intact and legible, until delivery to Company

4. C. Delivery 1.

Coordinate with Company: Deliver and unload spare products to Company at Project site or designated storage location and obtain receipt prior to final payment.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED

END OF SECTION

CONTRACT CLOSEOUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01700-4 11 March 2013

SECTION 01710 FINAL CLEANING PART 1 - GENERAL 1.01 SECTION INCLUDES A. 1.02 Final cleaning of project at substantial completion.

DESCRIPTION A. Execute final cleaning prior to inspection for Substantial Completion of each designated portion of the Work.

PART 2 - PRODUCTS 2.01 CLEANING MATERIALS A. B. Use materials which will not create hazards to health or property, and which will not damage surfaces. Use only materials and methods recommended by manufacturer of material being cleaned. Submit to Engineer for approval.

PART 3 - EXECUTION 3.01 FINAL CLEANING A. To be executed by an industrial cleaning (Specialist) Subcontractor (and not by the Contractors own staff) immediately prior to handing over the works at substantial completion . Cleaning operation shall include: 1. 2. 3. 4. 5. 6. 7. 8. In addition to removal of debris and cleaning specified in other sections, clean interior and exterior exposed to-view surfaces. Remove temporary protection, wrappings, markings and labels not required to remain. Clean finishes free of dust, stains, paint films and mortar splashes and other foreign substances. Clean transparent and glossy materials inside and out to a polished condition; remove foreign substances. Polish reflective surfaces to a clear shine. Clean, scrub, damp, mop or wax and polish resilient and hard surfaced floors as specified. Clean surfaces of equipment; remove excess lubrication. Clean and polish plumbing fixtures and equipment to a sanitary condition. Clean permanent filters of ventilating equipment and replace disposable filters when units have been operated during construction; in addition, clean ducts, blowers, and coils when units have been operated without filters during construction. Clean light fixtures and lamps. Maintain cleaning until Substantial Completion. Remove waste, foreign matter, and debris from roofs, gutters, area, and drainage systems. Remove waste, debris, and surplus materials from site. Clean grounds; remove stains, spills, and foreign substances from paved areas and sweep clean. Rake clean other exterior surfaces.

9. 10. 11. 12.

FINAL CLEANING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01710-1 11 March 2013

END OF SECTION

FINAL CLEANING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01710-2 11 March 2013

SECTION 01720 PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.01 SECTION INCLUDES A. B. 1.03 Maintenance of Record Documents and Samples. Submittal of Record Documents and Samples.

MAINTENANCE OF DOCUMENTS AND SAMPLES A. In addition to requirements in General and Particular Conditions maintain in the Project Record Document Room at the site for Engineer and Construction Manager one record copy of : 1. 2. 3. 4. 5. 6. 7. 8. B. C. D. Contract Drawings Project Manual Addenda Variations and other modifications to the Contract Reviewed and stamped shop drawings, product data, and samples Field test records Inspection certificates and checklists Manufacturer's certificates

Store Record Documents and samples in Field Office apart from documents used for construction. Provide files, racks, and secure storage for Record Documents and samples. Label and file Record Documents and samples in accordance with Section number listings in Table of Contents of this Project Manual. Label each document "PROJECT RECORD" in neat, large, printed letters. Maintain record Documents in a clean, dry and legible condition. Do not use Record Documents for construction purposes, and do not remove from record document room without prior approval from the Engineers Representative. Keep Record Documents and samples available for inspection by Engineer.

E. 1.04

RECORDING A. B. C. D. Record daily "as-built" information on a set of blue or black line opaque drawings, and in a copy of a Project Manual. Provide felt tip marking pens, maintaining separate colors for each major system, for recording information. Record daily information concurrently with construction progress. Do not conceal any work until required information is recorded. Contract Drawings and Shop Drawings: Legibly mark each item to record actual construction, including: 1. 2. Measured depths of elements of foundation in relation to finish first floor datum. Measured horizontal and vertical locations and sizes of underground utilities and appurtenances, referenced to permanent surface improvements.

PROJECT RECORD DOCUMENTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01720-1 11 March 2013

3. 4. 5. 6. 7. E.

Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of construction. Field changes of dimension and detail. Changes made by Modifications. Details not on original Contract Drawings. References to related shop drawings and Modifications.

Specifications: Legibly mark each item to record actual construction, including: 1. 2. Manufacturer, trade name, and catalogue number of each product actually installed, particularly optional items and substitute items. Changes made by Addenda and Modifications.

F. G.

Other Documents: maintain manufacturer's instruction manuals and certifications, inspection certifications, field test records, and other Documents required by individual Specifications sections. Labour Record 1. Each day, provide for verification by the Engineer a record showing the number and description of craftsmen, labours. and other persons employed on or in connection with the Works including those employed by Assigned Subcontractors.

H.

Visitors Record 1. Maintain a record of visitors to the Site, and submit at weekly intervals to the Engineer. Weather Records 1. Keep an accurate record of: a. Daily maximum and minimum air temperatures (including overnight). b. Number of hours per day in which work is prevented by inclement weather. 2. Provide at least two maximum and minimum thermometers at agreed locations inside the buildings.

I.

1.05

SUBMITTALS A. Within 45 days of the Date of Substantial Completion, for each of the relevant portions of the Work, submit two original sepia prints (one regular size and one reduced size) and five printed sets of Record (As Built) Documents plus four complete Drawings copies reduced to size 600 x 40Omm. Obtain approval of size of drawings, quality of transparent sheets, method of drawing and the like, prior to preparation of drawings. Also provide 2 copies of computer diskettes of all project drawings. Transmit with cover letter in duplicate, listing: 1. 2. 3. 4. 5. C. Date Project Title and Number Contractor's Name, Address, and Telephone Number Number and title of each Record Document and arrange in correct sequence Signature of Contractor or authorized representative

B.

Where provision of "record" drawings is required by Ministries or the Municipality as a precondition to providing their service connections, approvals and the like, submit drawings at the correct time.

PART 2 - PRODUCTS

PROJECT RECORD DOCUMENTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01720-2 11 March 2013

NOT USED PART 3 - EXECUTION NOT USED END OF SECTION

PROJECT RECORD DOCUMENTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01720-3 11 March 2013

SECTION 01730 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL This section is applicable to this contract to the extent that this contract includes such systems which require operation and maintenance data. 1.01 SECTION INCLUDES A. B. C. 1.02 Format and content of manuals. Instruction of Company's personnel. Schedule of submittals.

QUALITY ASSURANCE A. Prepare instructions and data by approved personnel experienced in maintenance and operation of described products.

1.03

FORMAT A. B. C. D. E. F. G. Prepare data in the form of an instruction manual. Binders: Commercial quality, size A4 two-ring binders with hardback, cleanable, plastic covers; 25mm maximum ring size. When multiple binders are used, correlate data into related consistent groupings. Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE INSTRUCTIONS; list title of Project and identify subject matter of contents. Arrange content by systems under section numbers and sequence of Table of Contents of this Project Manual. Provide tabbed fly leaf for each separate product and system, with typed description of product and major component parts of equipment. Text: Manufacturer's printed data, or typewritten data. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.

1.04

CONTENTS, EACH VOLUME A. Table of Contents: Provide title of Project; names, addresses, and telephone numbers of Engineer, Construction Manager and Contractor with name of responsible parties; schedule of products and systems indexed to content of the volume. For Each Product or System: List names, addresses and telephone numbers of subcontractors and suppliers, including local source of supplies and replacement parts. Product Data : Mark each sheet to clearly identify specific products and component parts, and data applicable to installation; delete inapplicable information. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings.
01730-1 11 March 2013

B. C. D.

OPERATION AND MAINTENANCE DATA Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure.

1.05

F. Warranties and Bonds: Bind in copy of each. MANUAL FOR MATERIALS AND FINISHES A. Building Products, Applied Materials, and Finishes: Include product data, with catalog number, size, composition, and color and texture designations. Provide information for re-ordering custom manufactured products. Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning agents and methods, precautions against 'detrimental agents and methods, and recommended schedule for cleaning and maintenance. Moisture-protection and Weather-exposed Products: include product data listing applicable reference standards, chemical composition, and details of installation. Provide recommendations for inspections, maintenance, and repair. Additional Requirements: As Specified in individual Specifications sections. Provide a listing in Table of Contents for design data, with tabbed fly sheet and space for insertion of data.

B.

C.

D. E. 1.06

MANUAL FOR EQUIPMENT AND SYSTEMS A. Each Item of Equipment and Each System: Include description of unit or system, and component parts. Give function, normal operating characteristics, and limiting conditions. Include performance curves, with engineering data and tests, and complete nomenclature and commercial number of replaceable parts. Panel board Circuit Directories: Provide electrical service characteristics, controls, and communications. Include as-installed colour coded wiring diagrams. Operating Procedures: Include start-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shut-down, and emergency instructions. Include summer, winter, and any special operating instructions. Maintenance Requirements: Include routine procedures and guide for trouble shooting; disassembly, repair, and reassemble instructions; and alignment, adjusting, balancing, and checking instructions. Provide servicing and lubrication schedule, and list of lubricants required. Include manufacturer's printed operation and maintenance instructions. Include sequence of operation by controls manufacturer. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance. Provide as-installed control diagrams by controls manufacturer. Provide Contractor's coordination drawings, with as installed colour coded piping diagrams. Provide charts of valve tag numbers, with location and function of each valve, keyed to flow and control diagrams.

B. C. D.

E. F. G. H. I. J. K. L.

OPERATION AND MAINTENANCE DATA Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01730-2 11 March 2013

M. N. O. P. 1.07

Provide list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage. Include test and balancing reports. Additional Requirements: As specified in individual Specifications sections. Provide a listing in Table of Contents for design data, with tabbed fly sheet and space for insertion of data.

SUBMITTALS A. B. C. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Engineer will review draft and return one copy with comments. For equipment, or component parts of equipment put into service during construction and operated by Company, submit documents within ten days after acceptance. Submit one copy of completed volumes in final form 15 days prior to final inspection. Copy will be returned after final inspection, with Engineer comments. Revise content of documents as required prior to final submittal. Submit four copies of revised volumes of data in final form within ten days after final inspection.

D.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED END OF SECTION

OPERATION AND MAINTENANCE DATA Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01730-3 11 March 2013

SECTION 01740 WARRANTIES PART 1 - GENERAL 1.01 SUMMARY A. This Section includes administrative and procedural requirements for warranties required by the Contract Documents both here and elsewhere, including manufacturers standard warranties on products and special project warranties. Compare the various requirements as stated here and elsewhere and provide for the more/most stringent combination of the requirements. Disclaimers and Limitations: Manufacturer's disclaimers and limitations on product warranties do not relieve the Contractor of the warranty on the work that incorporates the products. Manufacturer's disclaimers and limitations on product warranties do not relieve suppliers, manufacturers, and subcontractors required to countersign special project warranties with the Contractor.

B.

1.02

DEFINITIONS A. B. Standard product warranties are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to the Employer. Special project warranties are written warranties required by or incorporated in the Contract Documents, either to extend time limits provided by standard warranties or to provide greater rights for the Employer.

1.03

WARRANTY REQUIREMENTS A. Related Damages and Losses: When correcting failed or damaged warranted construction, remove and replace construction that has been damaged as a result of such failure or must be removed and replaced to provide access for correction of warranted construction. Reinstatement of Warranty: When work covered by a warranty has failed and been corrected by replacement or rebuilding, reinstate the warranty by written endorsement. The reinstated warranty shall be equal to the original warranty with an equitable adjustment for depreciation. Replacement Cost: Upon determination that work covered by a warranty has failed, replace or rebuild the work to an acceptable condition complying with requirements of the Contract Documents. The Contractor is responsible for the cost of replacing or rebuilding defective work regardless of whether the Employer has benefited from use of the work through a portion of its anticipated useful service life. Employer's Recourse: Expressed warranties made to the Employer are in addition to implied warranties and shall not limit the duties, obligations, rights and remedies otherwise available under the law. Expressed warranty periods shall not be interpreted as limitations on the time in which the Employer can enforce such other duties, obligations, rights or remedies. 1. E. Rejection of Warranties: The Employer reserves the right to reject warranties and to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

B.

C.

D.

Where the Contract Documents require a special project warranty, or similar commitment on the work or part of the work, the Employer reserves the right to refuse to accept the work, until the Contractor presents evidence that entities required to countersign such commitments are willing to do so.

1.04

SUBMITTALS

WARRANTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01740-1 11 March 2013

A.

Submit written warranties to the Engineer's Representative prior to the date certified for Substantial Completion. If the Certificate of Substantial Completion designates a commencement date for warranties other than the date of Substantial Completion for the work, or a designated portion of the work, submit written warranties upon request of the Engineer's Representative. 1. When a designated portion of the work is completed and occupied or used by the Employer by separate agreement with the Contractor during the construction period, submit properly executed warranties to the Engineer's Representative within 15 days of completion of that designated portion of the work.

B.

When the Contract Documents require the Contractor, or the Contractor and a Subcontractor supplier or manufacturer to execute a special project warranty, prepare a written document that contains appropriate terms and identification, ready for execution by the required parties. Submit a draft to the Engineer's Representative for approval prior to final execution. List of special warranties and form formats for special project warranties are included at the end of this section. Prepare a written document utilizing the appropriate form, ready for execution by the Contractor. 1. Refer to Divisions 2 through 16 sections for specific content requirements and particular requirements for submitting special project warranties.

C.

D.

Form of Submittal: At Substantial Completion compile three (3) copies of each required warranty properly executed by the Contractor. Organize the warranty documents into an orderly sequence based on the table of contents of the Project Manual. Bind warranties and bonds in heavy-duty, commercial-quality, durable vinyl-covered loose-leaf binders, thickness as necessary to accommodate contents and sized to receive A4 paper. 1. Provide heavy paper dividers with celluloid covered tabs for each separate warranty. Mark the tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product, and the name, address and telephone number of the Installer. Identify each binder on the front and spine with the typed or printed title "Warranties", Project title or name and name of the Contractor. When warranted construction requires operation and maintenance manuals, provide additional copies of each required warranty, as necessary, for inclusion in each required manual.

E.

2. 3.

PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION 3.01 LIST OF WARRANTIES A. Schedule: Provide warranties on products and installations if and as specified in the following sections: 1. Section 02580 "Pavement Marking" 2. Section 02700 "Drainage" 3. Section 02800 "Site Improvements" 4. Section 02810 "Irrigation systems" 5. Section 07160 "Damp/ water Proofing" 7. Section 07722 "Roof Hatches" 8. Section 09310 "Ceramic Tiles" 9. Section 10800 "Toilet and Bath Accessories"
01740-2 11 March 2013

WARRANTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10. 11. 12. 13. 14. 15. 16. 17. 18. B.

Section 11460 Section 14200 Section 14640 Section 15300 Section 15400 Section 15480 Section 15500 Section 15785 Division 16

"Unit Kitchens" "Conveying Systems" "Gantry Cranes" "Fire Protection" "Plumbing" "Gas Service" "General Requirement HVAC Works" "Split DX Cooling Units" "Electrical"

Schedule: Provide Special Project Warranties on products and installations if and as specified in the following sections: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Section 02282 Section 05161 Section 07110 Section 07120 Section 07145 Section 07920 Section 08110 Section 08210 Section 08410 Section 08520 Section 08710 Section 08800 "Termite Control" "Space Frame" "Waterproofing" "Fluid Applied Waterproofing" "Cementitious Waterproofing" "Sealants" "Steel Doors and Frames" "Flush Wood Doors" "Aluminum Entrances "Aluminium Windows" "Doors Hardware" "Glazing"

C.

Any other warranties if and as specified in any other sections.

3.02

WARRANTY FORM A. The Contractor shall submit warranty forms in the format shown: CONTRACTOR LETTER HEAD Special Project Warranty

WARRANTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01740-3 11 March 2013

Date : Contract Ref. No. : Name of Project : Employer : Contractor : Warranted System Validity : Commencement Date : _______________ Expiry Date : _______________

We the undersigned (insert full name and address of Employer): Contractor : ______________________________________________________

Agree to provide the special project warranty of the (description and location of product/system) ...................................................................... agreeing to repair or replace subject to the warranty requirements below and conditions stated in the contract documents during the period of (state period) from the above mentioned commencement date at our own complete cost and expense to the full satisfaction of the Employer or his approved Representative. Warranty Requirements: 1. 2. _____________________________ (describe nature of warranty responsibility) . Related Damages and Losses: When correcting failed or damaged warranted construction, remove and replace construction that has been damaged as a result of such failure or must be removed and replaced to provide access for correction of warranted construction. Reinstatement of Warranty: When work covered by a warranty has failed and been corrected by replacement or rebuilding, reinstate the warranty by written endorsement. The reinstated warranty shall be equal to the original warranty with an equitable adjustment for depreciation. Replacement Cost: Upon determination that work covered by a warranty has failed, replace or rebuild the work to an acceptable condition complying with requirements of the Contract Documents. The Contractor is responsible for the cost of replacing or rebuilding defective work regardless of whether the Employer has benefited from use of the work through a portion of its anticipated useful service life. Employer's Recourse: Expressed warranties made to the Employer are in addition to implied warranties and shall not limit the duties, obligations, rights and remedies otherwise available under the law. Expressed warranty periods shall not be interpreted as limitations on the time in which the Employer can enforce such other duties, obligations, rights or remedies. a. Rejection of Warranties: The Employer reserves the right to reject warranties and to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

3.

4.

5.

6.

Where the Contract Documents require a special project warranty, or similar commitment on the work or part of the work, the Employer reserves the right to refuse to accept the work, until the Contractor presents evidence that entities required to countersign such commitments are willing to do so.

Signatures

Date

WARRANTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01740-4 11 March 2013

Contractor

_________________________________

_________________

END OF SECTION

WARRANTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01740-5 11 March 2013

SECTION 01750 MAINTENANCE PERIOD DUTIES PART 1 - GENERAL 1.01 WORK INCLUDED A. Operation, Preventive Maintenance, Running Maintenance and Guaranteed Maintenance of all the works carried out by the Contractor for a period of two years starting from the date/s the works are certified as substantially complete comprising : 1. 2. 3. 4. Administrative, logistical and supervisory requirements for co-ordinating activities during the said 2 years period Reliability Tests Training of Owners Personnel Preventive Running and Guaranteed Maintenance as per the respective manufacturers recommendation, including all materials, Tools and Spare Parts required as per the respective manufacturers recommendation. Keeping plant rooms and areas of work clean and tidy from the uncleanliness resulting from the Contractors activities. Maintenance of Records Completion Certificate

5. 6. 7. B. C. D.

Replanting of seasonal flowers six times during the said two year period. All maintenance period duties mentioned anywhere else in the Tender/Contract. Guaranteed Maintenance of the following works for a further period after the above period of two years is over : 1. All roofing and waterproofing works for a further period of three years. 2. All sealed compressors; for a further period of three years. The faultless operation/maintenance of the following will be considered as duties of utmost urgent importance :- Air-conditioning, Power and Elevators. The faultless operation/maintenance of the rest will also be considered as duties of utmost importance but of urgency as determined on a case to case basis by the Employer.

E.

1.02

OWNER RESPONSIBILITIES A. B. The Owner will supply all kinds of water from the turn over date for complete needs of the project and its occupants, tree of cost to the Contractor. Similarly, the Owner will supply all power needs of the Project and its occupants from the MEW also free of cost to the Contractor.

1.03

RELATED WORK(S) A. B. C. Section 01400 - Quality Control Section 01700 - Contract Closeout: Spare Parts Section 01730 - Operation and Maintenance Data

MAINTENANCE PERIOD DUTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01750-1 11 March 2013

D. E. F. 1.04

Section 01740 - Warranties Section 02970 - Landscape Maintenance All other sections where maintenance period duties and staff etc. are mentioned.

REFERENCES A. The Chartered Institute of Building Services Engineering (CIBSE), UK.

1.05

QUALITY ASSURANCE A. Operation and maintenance manuals shall be used as the basis for maintenance.

1.06

SUBMITTALS A. Submit and resubmit to the Engineer till his approval operational and maintenance manuals with respect to each and every work system, sub system or equipment requiring such a manual, listing or maintenance program, method, tools, consumables, spares etc. Begin this submittal process six months before and complete it min. one month before the Turn Over Date. B. Submit and resubmit to the Engineer till his approval the CVs of the staff proposed for the maintenance works. Begin this submittal process three months before and complete it min. one month before the Turn Over Date. C. Begin to submit to the Owner the following at the beginning of the second year of the maintenance period of two years. 1. Tools and Spare parts lists (for use by the Owner after the 2-year maintenance period is over) for the Owner to approve, order and receive before the end of the said 2 years maintenance period.

1.07

REMEDY OF CONTRACTORS FAILURE A. At the end of the maintenance period, or soon thereafter, and provided either that all works during that period had been attended to promptly and satisfactorily by the Contractor or that the Owner is satisfied that the costs of the works that the Owner, had to carry out, consequent upon the failure of the Contractor to attend to them, shall not reasonably exceed the retention amount, the Owner shall release the retention amount to the Contractor. However, if the Owner in his sole discretion, had already released a certain amount against a bank guarantee then the Contractor shall be at liberty to allow the said bank guarantee to lapse at the end of its validity unless he receives a written communication from the Owner within the said validity period, instructing the Contractor to extend the said bank guarantee for the reason that works that had arisen during the maintenance period & which were being carried out by the Owner for reasons hereinabove, were expected to cost an amount exceeding the retention. The Owner shall then be at liberty, to encash the said bank guarantee, spend the necessary and certified amounts as detailed hereinabove and pay the residue to the Contractor promptly upon the completion of the relevant works. The attention and diligence that the Contractor shall bestow on calls from the Owner and/or the Engineer shall be as follows : (i) First visit by the Contractor to site and meetings with the Owner Within a reasonable period, or Maximum, within one calendar day of the Owner's call to the Contractor.
01750-2 11 March 2013

B.

C.

D.

MAINTENANCE PERIOD DUTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

(ii)

Completion of work Within a reasonable period, or Maximum, within the time agreed with the Owner when the first visit was paid by the Contractor.

1.08

The Owner shall be free to consider that the Contractor had defaulted on his obligations if the time designated in (i) and/or (ii) above elapses and the first visit is not made and/or the work is not completed or not completed satisfactorily. CONTRACTORS STAFF DURING MAINTENANCE PERIOD A. The Contractor shall provide the following staff and such additional staff as mentioned elsewhere in the Tender/Contract, throughout the maintenance period of two years : Position 1. Qualification Exp. 10 Duration of Availability at Site 2 hours/day + for meetings and emergencies + to be on call at all other times -DoPenalty KD/ Day 50

Operation and Graduation Electrical/ Maintenance Manager Mechanical Engineer with overall knowledge of building services Civil Supervisor 1 - for building & external works Landscape Maintenance Supervisor Landscape Foreman Diploma, Civil Engineering

2.

10

30

3.

Degree in horticulture/ Plant Science etc. Degree in horticulture/ Plant Science etc.

8 hours/day

40

4. 5. 6. 7. 8. 9.

6 10 10 10 10 10

8 hours/day 8 hours/day + on call at all other times -Do-Do8 hours/day 8 hours/day

40 30 30 30 20 20

Mechanical Supervisor Diploma Mechanical Engineering HVAC Supervisor Electrical/Controls Supervisor Mechanical/HVAC Technician, 1 No. Electrical/Controls Technician, 1 No. 1. 2. Diploma Mechanical Engineering Diploma Electrical Engineering Trade Certificate Trade Certificate

Note :

If a position requires more than one person to fill, the Contractor shall provide these according to the Kuwait labour laws. A day means a calendar day

B.

The penalty noted above will be levied if, in the knowledge/opinion of the Owner : 1. the staff is absent, or 2. the staff fails to perform his duty inspite of being present. The Owner shall provide free of cost the offices space and stores space for the Contractors maintenance period staff. It will be the Contractors responsibility to provide all his maintenance period staff with all their other requirements such as furniture, mobile telephones, tools, instruments, stationery, etc. complete. Please also see other parts of the Tender Documents for further requirements in this regard.

C. D. E.

MAINTENANCE PERIOD DUTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01750-3 11 March 2013

E.

The above positions and their hours of work are the minimum. Additional hours or additional staff will have to be provided without additional cost if it becomes necessary in the reasonable opinion of the Owner.

PART 2 - PRODUCTS NOT USED

MAINTENANCE PERIOD DUTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01750-4 11 March 2013

PART 3 - EXECUTION 3.01 GENERAL Following activities shall be allowed for by the contractor. A. Relaibility Tests 1. Conduct reliability tests for the HVAC system in accordance with specification Section 15500. Guaranteed Maintenance 1. Repair/replacement of works, systems, sub-systems, equipment or components which may prove defective due to design, manufacture, installation, testing, commissioning and where stipulated, then due to reliability tests etc.

B.

D.

Soft Landscaping 1. 2. The Contractor shall replant seasonal flowers six times during the said two year period. The Contractor shall carryout all other works detailed in the relevant section or required in the opinion of the Engineer to maintain the soft landscaping in a lush green and tidy, well-pruned, one hundred percent live manner including replacing sick or dead trees and plants etc.

E.

Spare Parts and Tools 1. Tools / equipment required for proper maintenance of the works shall be provided by the contractor(s) and handed over to the Company / Owner at the end of the maintenance period.

F.

Maintenance of Records 1. 2. Log-books, log-sheets, maintenance job cards, etc. shall be maintained at site by the Contractor(s). A written report, including dates, parts replaced etc., detailing the maintenance work performed, shall be provided to the Company / Owner, at the end of the maintenance period.

G.

Training of Owners Personnel 1. 1. 2. 3. Owner's personnel shall be trained by the contractor for the operation and maintenance of all the works of the Project such as :HVAC Systems Pumps and all other rotating systems Electrical and low voltage system such as fire alarm system, data communication system, access control system, CCTV system, public address system, audio visual system, TV and satellite system and telecommunication system etc. etc. Building management system All other works, systems and equipment. Test run Diesel Generator once every 15 days with his own diesel for 30 minutes.

4. 5. 6.

END OF SECTION

MAINTENANCE PERIOD DUTIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

01750-5 11 March 2013

DIVISION 2 SITE WORK SECTION 02010 SUBSURFACE INVESTIGATION PART 1 GENERAL 1.01 A. DESCRIPTION SOILS REPORT AND BORE HOLES 1. 2. A soils report has been prepared for guidance and convenience only (as they do not form part of the Contract Documents). A copy is included in the Tender Package. The availability of this report to the Contractor does not relieve the Contractor of obligations to thoroughly investigate the nature of the Site and the Sub-soil conditions therein, nor does it relieve the Contractor of any obligations and responsibilities under the terms and conditions of the Contract Documents.

B.

CONTRACTORS RESPONSIBILITY The Contractor shall be deemed to have visited the Site prior to submitting his Tender and made all necessary inspections and investigations and, to have decided for himself the means of access and working space, the nature of the ground and sub-soil, the presence of existing foundations or other hidden obstructions, the level of the water table, the extent of rock, support to neighbouring properties and structures and all factors affecting the Work and shall be deemed to have allowed for these in his Tender. Any information made available to the Contractor, either in these documents or the soils reports will not relieve the contractor of his responsibility to decide for himself the nature and extent of the work, nor will it guarantee that similar conditions will apply on other parts of the Site.

PART 2 PRODUCTS Not Applicable. PART 3 EXECUTION Not Applicable.

END OF SECTION

SUBSURFACE INVESTIGATION Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center11 March 2013

02010-1

SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 A. B. C. D. E. F. 1.02 SECTION INCLUDES General preparation of the site by removal of all impediments prior to the commencement of the work. Clear the site from trees, plant and grass. Remove complete roots of trees and shrubs. Remove surface debris. Divert utilities and other services (if any) in compliance with regulations. Disposal of removed materials away from site and in a legal manner in full compliance with local authorities rules and regulations. RELATED SECTIONS These hereinafter listed related sections are intended to be used as a helpful indication of the related sections within the Project Specifications. They are not necessarily comprehensive are complete and it is the Contractors responsibility to ascertain all applicable sections required to understand the full scope of works intended. 1. 2. 1.3 A. B. Section 02010 Section 02200 Subsurface Investigations. Earthwork

REGULATORY REQUIREMENTS Conform to local codes and regulations for disposal of debris. The approval of the Engineer that the site has been properly prepared shall be obtained before subsequent earthworks are put into operations.

PART 2 - PRODUCTS Not Applicable. PART 3 - EXECUTION 3.01 A. B. GENERAL Remove all debris from the site of the Works inclusive of loose and semi-buried pieces of concrete, etc. which require disposal, to avoid incorporation with excavated material which may be used in filling into excavations. Scrape out all growing vegetation including roots, which require disposal, to avoid incorporation with excavated material which may be used in filling into excavations.

SITE PREPARATION Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center11 March 2013

02010-1

C.

All material removed under this section shall be disposed of in a place of deposit found by the Contractor who shall be responsible for all charges in connection therewith. Burning of materials on site will not be allowed.

END OF SECTION

SITE PREPARATION Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center11 March 2013

02010-2

SECTION 02140 DEWATERING PART 1 - GENERAL 1.01 DESCRIPTION The work included in this Section covers the complete dewatering of the Site as required during the excavation and construction of the building, including the provision of temporary piezometer. 1.02 SCOPE OF WORK The work includes but is not limited to the labour, materials, equipment and services required for designing, furnishing, installing, maintaining, operating, monitoring and moving systems for dewatering the site, controlling surface water and collecting and disposing of discharge water during the construction process, and until sufficient dead load of the structure is in place to prevent floatation. 1.03 DEWATERING SYSTEM (S) DESIGN A. The Contractor shall submit for approval his proposed design and detailed layout for the dewatering system or systems he intends to install. The proposed system(s) shall be designed to ensure the following: i) ii) iii) The lowering of the water table over the site to allow excavation to proceed and maintaining the water level below the base of excavation as it proceeds (drawdown period). The reduction of piezometric levels in the underlying strata sufficiently during the drawdown stage to ensure stability of the excavation. Once excavation is complete the water level in the ground must be maintained, during the construction period, at least 0.50 meter below the deepest excavation level until the Engineer decides that dewatering may be stopped. Restoring the water level to its initial position shall be made after the space between the face of the excavation and the basement wall is backfilled and once the weight of the structure exceeds the hydrostatic uplift. In any event, the decision as to when dewatering operations shall cease or be reduced shall be exclusively that of the Engineer. iv) v) That heave of the excavation base due to upward groundwater pressure does not occur. The System(s) must run twenty-four (24) hours a day and the design shall include sufficient standby pumps connected in the system(s) so as to operate automatically in case of pump failure.

1.04

REQUIREMENTS OF REGULATORY AGENCIES Perform dewatering work in accordance with applicable rules, regulations, codes and ordinances of local authorities, and in accordance with the requirements of the public utility owners having jurisdiction over the work. Obtain and pay for all necessary permits, licenses and certificates and give all notices as required during the performance of the dewatering work.

1.05

SUBMITTALS A. Before commencing any work under this Section submit the following for approval by the Engineer:
02140-1 11 March 2013

DEWATERING Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

i) ii)

Detailed shop drawings system(s) layout, pumps, standby pumps, generators, access, temporary piezometers etc., and complete design criteria and calculations. A dewatering programme showing commencement and completion dates for the various stages of the dewatering works and indicating the methods and sequence of operations involved, with full details of the necessary attendant labour to be provided on a full time round-the-clock basis.

B.

The Engineers approval to the above referred submittals shall not relieve the Contractor from his obligations and liabilities under the Contract and the Contractor shall be responsible for selecting, operating and maintaining an efficient dewatering system(s) such as will ensure dry working conditions throughout the drawdown and construction periods.

PART 2 - PRODUCTS 2.01 DEWATERING EQUIPMENT AND MONITORING PIEZOMETERS A. B. C. Provide and maintain complete dewatering equipment necessary for lowering and maintaining the water table at the required level. Provide all necessary perimeter trenches, pipes, pumps, etc., as required for the purpose of collecting and disposing of all excess water inflow into the bottom of excavations. Provide and maintain minimum one temporary piezometer for monitoring the water table levels on site on a daily basis during the drawdown and construction phases. The location and design of the temporary piezometer shall be approved by the Engineer. Failure of equipment or system(s) installed by the Contractor shall not entitle the Contractor to additional payment or extra time for completion in respect of any additional measures necessarily employed by him in order to provide and maintain dry working conditions.

D.

PART 3 - EXECUTION 3.01 GENERAL: A. B. Install and maintain complete dewatering system(s) and temporary piezometer in accordance with the approved shop drawing and dewatering program. All pumps and other equipment shall have proper safety guards and locations of all equipment shall be properly lit and supervised at all times. Stations in the Contractors Watchmans Tour System shall include the dewatering system(s). Provide and maintain easy and safe access to all pumps and valves in the dewatering system(s). Maintain the area between the shoring line and the structure and keep free of any oil, fuel, rubbish, etc., arising from the operation and maintenance of the dewatering system.. END OF SECTION

C. D.

DEWATERING Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02140-2 11 March 2013

SECTION 02200 EARTHWORK PART 1 GENERAL 1.01 SCOPE OF WORK Excavation of all types of material to elevations and limits indicated, including removal of existing foundations abandoned utilities and other sub-surface structures. Removal of all loose and unsuitable soil, as defined by the Engineer, below foundations, if encountered at the required bearing elevation, and backfilling of such over-excavation with Lean Concrete Fill or Compacted Structural Fill. Placement of working mats of the type, thickness and to the limits indicated after final excavation for protection of foundation bearing surfaces. Backfill, fill and grade as required to complete all work shown on the drawings. Co-ordination of the work specified in this section with other ongoing works. 1.02 SUBMITTALS Submit to the Engineer for approval at least two weeks prior to the start of any excavation work, a site plan showing limits and sequence of excavation stages, proposed locations of access ramps and benched excavations. The plan shall contain sufficient detail and written explanation to fully describe the work. Deliver to the Engineer for approval at least five working days prior to use, a representative bag sample for each proposed backfill material. Each sample shall be clearly labeled as to source of material, sieve analysis, proposed use, date of delivery and shall weigh approximately 22 kg. 1.03 REQUIREMENTS, RESTRICTIONS AND QUALITY CONTROL Work shall comply with all rules, regulations, laws and ordinances of all authorities having jurisdiction. Obtain all necessary permits. Labour, materials, equipment and services necessary to make the work comply with such requirements shall be provided at no additional cost to the Owner. Contractor's quality control of earthwork operations will be monitored by the Engineer. During final stages of excavation, subgrade preparation, placement of working mats, and controlled filling operations, the Contractor shall provide sufficient notice to the Engineer prior to the work and shall co-operate with the Engineer in all respects to facilitate any testing or observations required. 1. 04 NATURE OF SOIL The Contractor shall visit the Site, make such inspections as he deems necessary and reach his own conclusions regarding the nature of the ground and the conditions likely to be encountered. The Contractor is referred to the Site Investigation Report which is issued with the Tender and Contract Documents. Making this Report available shall in no way or guarantee that similar conditions as revealed therein will apply generally to the Site or at the time of executing the Works. The Contractor shall at his own expense verify the soil bearing capacity with the one considered in the design and report his findings to the Engineers Representative.
EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 02200-1 11 March 2013

No claim due to site conditions, nature of soil and obstacles encountered will be entertained. PART 2 - PRODUCTS 2.01 MATERIALS Earth materials used as fill shall be as designated herein. A. Structural Fill Compacted Structural Granular Fill shall be sandy gravel or gravelly sand, free of organic material, loam, and other objectionable materials, well-graded within the following limits. ASTM Sieve Size Total % Passing By Weight 51mm 100 38mm 70 - 100 25mm 55 - 85 19mm 50 - 80 9mm 40 - 70 No. 4 30 - 60 No. 10 20 - 50 No. 40 10 - 30 No. 200 5 - 15 Crushed stone shall consist of clean, hard, durable natural rock, free of organic matter, rock dust and other contaminates. Gradations in the table above represent the limits which shall determine the suitability of aggregate for use from the sources of supply. Structural fill may be classified as well-graded granular soils - Group 1 (non-plastic soils with a uniformity coefficient exceeding 10.) Use structural fill under concrete slabs, sidewalks, paving, under utility pipes, and at other soil bearing situations for fill within 300mm measured horizontally of foundation walls, retaining walls, edges of footings and other below-grade vertical surfaces as approved by the Engineers Representative, except where drainage fill is indicated or specified. If sufficient structural fill materials is not available from excavations under this Contract or spoil heaps excavated under separate Contracts, then additional fill, suitable for use, shall be brought to the Site from other sources. Both excavated material from the Site or spoil heaps for use as structural fill and material brought to the Site for use as structural fill, shall meet the above requirements. B. Ordinary fill Shall consist of well-graded natural soil substantially free of organic materials, loam, wood, trash and other objectionable materials which may be compressible or which cannot be compacted properly. Ordinary Fill shall not contain stones larger than 150mm in largest dimension and shall have physical properties such that it can be readily spread and compacted. Ordinary fill may be classified as uniformly graded material - Group 2 (non-plastic soils with a uniformity coefficient of 10 or less). Use ordinary fill for spot reinforcement, general grading and backfilling except in areas where structural or drainage fill is required. If sufficient ordinary fill material is not available from excavations under this Contract or spoil heaps excavated under separate Contracts, then additional fill, suitable for use, shall be brought to the Site from other sources. Both excavated material from the Site or spoil heap for use as ordinary fill and material brought to the Site for use as ordinary fill, shall meet the above requirements.
EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 02200-2 11 March 2013

C.

Drainage Fill Unless otherwise specified, drainage fill material shall be fine aggregate, clean, well-graded, free-draining sand, complying with ASTM C33. Shall be washed, hard, durable crushed stone, and/or crushed or uncrushed gravel and well-graded within the following limits: Sieve Size (16mm) (12mm) (10mm) #4 #8 Percent Finer by Weight 100 85 - 100 15 - 45 0 - 15 0 - 5

D.

Lean Concrete Fill Shall be concrete having compressive strength of 15 N/mm2 at 28 days, and having a slump not exceeding 150mm as measured at the time of placement. Other requirements shall be as specified for Section: CAST-IN-PLACE CONCRETE. Provide adequate quantities of fill materials listed hereinbefore where existing on-site materials are insufficient or unsuitable for use as specified.

E.

Sand The sand shall be as specified in section 03300 herein.

PART 3 - EXECUTION 3.01 INSPECTION Examine the site and all work prepared by others and report to the Engineer in writing any conditions detrimental to the proper and timely completion of the work of this section. 3.02 EXCAVATION Excavation consists of the removal and disposal of materials encountered when establishing the required limits and grade elevations. Excavate to elevations and dimensions indicated on the drawings or required for the work and approved by the Engineer. Except where noted otherwise on the drawings, excavate and remove below grade portions of previous foundations, abandoned utilities, etc. Remove from the site all debris and other excavated material not suitable for use as fill, to a dump area approved by competent authorities. Rock or boulders encountered in the excavation shall be removed within required excavation limits and to such additional depth and extent as directed and authorized by the Engineer. When excavation has reached the required subgrade elevation, notify the Engineer who will make an inspection of conditions to observe the strength and bearing capacity of the soils. If disturbed and otherwise unsuitable bearing materials are encountered at the required subgrade elevations, carry excavations deeper and replace the excavated material with Lean Concrete Fill or Compacted Structural Granular Fill as directed by the Engineer.
EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02200-3 11 March 2013

Removal of disturbed material and its replacement as directed shall be at the Contractor's own expense. In excavation for foundations, take care not to disturb the bottom of the excavation. Excavate by hand or smooth-blade bucket to final grade just before the working mat is placed. Trim and groom bottom of excavation by hand to the required lines and grades to leave a solid base to receive concrete. Bearing surfaces for foundation mat shall be compacted with two passes with a vibratory plate compactor or other similar equipment. Dewatering shall be performed as required in accordance to section 02140, DEWATERING. If water has been allowed to accumulate or stand in foundation excavations, such water shall be removed and softened or disturbed soil removed to firm bearing. Excavation and backfilling with Lean Concrete Fill or Compacted Structural Granular Fill of such disturbed or softened soil shall be conducted, at no additional cost to the contract. Deepening during intermediate stages of excavation shall commence at least 6 meters from the earth support system and then advance in successive stages toward the perimeter of the excavation. As soon as a section of the required excavation for foundation has been approved by the Engineer, a working mat of the type, thickness and limits proposed by the contractor and approved by the Engineers representative, shall be placed over the soil bearing surface within the same work day. If excavation is begun for foundation which will not be protected by a working mat prior to the end of that work day, the excavation bottom shall remain at least 300mm above the design bottom of foundation bearing level until just before the working mat is placed. Excavate trenches to the depth indicated or required. Carry the depth of trenches for piping to establish the indicated flow lines and invert elevations. Grade bottoms of trenches as indicated, notching under pipe bells to provide solid bearing for the entire body of the pipe. 3.03 REMOVAL OF WATER The excavations shall at all times be kept free from stormwater, percolating water or subsoil water by any means necessary, on condition not to disturb the excavation surface. The Contractor shall provide, maintain and clear away on completion any equipment necessary together with temporary drains and the like. In pumping out excavations and in any lowering of the water table the Contractor shall pay due regard to the stability of neighbouring structures. Dewatering shall be carried out by competent staff and adequate equipment. The Contractor shall verify for himself the soil type and conditions and plan his dewatering system accordingly. Well points with filters must be used. The Contractor shall ensure adequate safety for excavation walls, beds, existing and proposed structures and guard against undesirable settlements or movement of the soil. Dewatering must continue until a) All foundation work and damp proofing has been carried out to the satisfaction b) Adequate compensation of uplift forces, increased by a suitable factor of safety 3.04 FILLING AND COMPACTING Materials: Materials for fill and backfill shall be as hereinbefore specified, obtained from the required excavation on Site, if acceptable, or from borrow sources. of the Engineers Representative. has been attained.

EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02200-4 11 March 2013

Suitable excavated material for fill and backfill as defined in Paragraph Materials, shall be approved by the Engineer. Material which is suitable for use as fill under exterior slabs and pavings and for backfill shall be separated from material which is only suitable for general grading. Provide additional material, if required, at no additional cost to the Employer. Acceptable borrow shall consist of suitable material as hereinbefore specified. Representative samples of each type of borrow material considered suitable shall be delivered to the Engineer for approval. Place fill materials in horizontal loose layers in such manner as to produce a uniform thickness of material. Placement shall start in the deepest area and progress approximately parallel to the finished grade. Thickness of layers after compacting shall not exceed 200 mm for cohesive soils nor 30 mm for cohesion less soils. 1. No fill material shall be placed on areas where free water is standing or on surfaces which have not been approved by the Engineer.

Compact each layer of fill with equipment to achieve the following percentages of maximum density at optimum moisture content when tested in accordance with ASTM D1557: LOCATION Under Isolated and Continuous Footings. Under Paved Areas and Kerbs. Under Mat Slabs and Slabs on Grade. General Grading. 95 95 95 90 % MAX. DENSITY

Do not compact soil when the moisture content varies more than 3% from the optimum moisture content. Maintain moisture content by wetting or drying manipulation. Suspend compacting operations when satisfactory results cannot be obtained because of rain or other unsatisfactory conditions. In lieu of drying by manipulation, hydrated lime, monohydrated lime or similar beneficial ingredients may be used to reduce the moisture content, reduce the plasticity index or improve workability. Apply such ingredients in a manner and quantity as recommended by the manufacturer or as required by the Government Testing Station and approved by the Engineer. 3.05 BACKFILLING AGAINST FOUNDATION WALLS After completion of foundation walls and removal of forms, clean the excavation of all rubbish and debris before application of waterproofing and placement of backfill. Backfill as hereinbefore specified for fill operations. Maintain symmetrical backfill loading and compact each layer by hand tampers or other suitable equipment. Do not backfill against foundation or basement walls until completion of supporting floor construction to top of backfill or to first level above top of backfill unless approved by the Engineer. In placing backfill, take special care to prevent wedge action, eccentric loading or overloading of the structure by equipment used in compacting backfill material, and to prevent damage to waterproofing on walls. 3.06 QUALITY CONTROL A. B. Employ, at no extra cost to the Employer, the Government Testing Station to perform all tests and submit reports specified in this Section. The Government Testing Station shall be responsible for conducting and interpreting the tests, shall state in each report whether or not the test specimens comply with all requirements of the Contract Documents and shall specifically note any deviations therefrom. Testing of Materials: The Government Testing Station shall perform all tests herein specified and any additional tests as may be required and submit test reports to the Engineer, include the following :

C.

EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02200-5 11 March 2013

1.

One optimum moisture maximum density curve for each type of soil encountered in subgrades and fills under isolated and continuous footings, slabs on grade and paved areas. Determine maximum densities in accordance with ASTM D1557. Each type of borrow material shall receive : a. b. c. d. Mechanical Analysis. ASTM D422/AASHTO T88. Plasticity Index Determination. ASTM D4318/AASHTO T91. Moisture-Density Curve Determination. ASTM D1557. CBR test as a measure for bearing capacity when required.

2.

3. D.

The Government Testing Station shall determine the suitability of materials to be used for fills and to the approval of the Engineer.

Testing of Subgrade and Fill Layers: Subgrades and fill layers shall be approved by the Government Testing Station and the Engineer before construction of any further work thereon. Tests of subgrades and fill layers shall be taken as follows: 1. The top 300 mm of subgrade resulting from excavation shall have the maximum density at optimum moisture as hereinbefore specified. In fill areas, each layer of fill shall meet the required density as hereinbefore specified. Make at least one (1) field density test of the subgrade for every two hundred square metres (200 M2) of isolated and continuous footings, paved area or slabs on grade, but in no case less than three (3) tests. In each compacted fill layer, make one (1) field density test for every overlaying two hundred square metres (200 M2) of isolated and continuous footings, paved area or slabs on grade, but in no case less than three (3) tests. Perform field density tests in accordance with ASTM D1556 or ASTM D2167. 2. At foundation wall backfill take at least three (3) field density tests (ASTM D1556 or ASTM D2167) at locations and elevations as directed by the Engineer. Cooperate with the Government Testing Station in every respect in the performance of the required. Tests. If, based on reports of the Government Testing Station and inspection, the subgrade or backfills are found to be below the specified density, the Engineer may require additional compaction and testing and all this shall be carried out at the expense of the Contractor.

E. F.

3.07

DISPOSAL OF EXCAVATED MATERIALS A. The following material shall be disposed of legally off the site unless otherwise directed by the Engineer. 1. Unsuitable excavated materials. 2. B. C. Excess excavated material.

Excess suitable excavated material may, if approved by the Engineer, be deposited in spoil heaps at locations, within the boundary of the Campus, directed by the Engineer. Material resulting from clearing and grubbing operations must not be burnt on the site. Dispose of all such material legally off the Employers property and surrounding areas.

3.08

SAFETY AND AVOIDANCE OF NUISANCE A. Perform all work in such manner as to ensure the safety of the Works, the public and adjoining sites and so as to cause as little inconvenience as possible to the public and adjoining Owners, and allow in the Tender for all necessary precautions to that end.

EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02200-6 11 March 2013

END OF SECTION

EARTHWORK Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02200-7 11 March 2013

SECTION 02210 LIGHTWEIGHT FILL PART 1 - GENERAL 1.1 SUMMARY A. The Work covered in this Section of the Specifications includes the construction described in Paragraph B, including all labor necessary to perform and complete such construction, all materials and equipment incorporated or to be incorporated in such construction and all services, facilities, tools and equipment necessary or used to perform and complete such construction. The Work of this Section shall include but not be limited to the following: 1. Furnish and install lightweight aggregate fill. 2. Furnish and install lightweight foam filler.

B.

1.2

SUBMITTALS A. Submit samples and manufacturer's cut sheets and specification for all products and material herein specified for Landscape Architect's approval.

PART 2 - PRODUCTS 2.1 AGGREGATE A. B. Lightweight aggregate to be used as fill shall be Rotary Kiln Expanded shale aggregate of the extruded type. The shape of the extruded material shall be subangular to angular. When delivered to the project site, expanded shale aggregate shall conform to the following requirements: GRADATION Sieve Size 19.05mm 12.7mm 9.52mm 6.35mm 4.75mm Test Density Minimum Resistivity Chlorides Sulfates 2.2 Percentage Passing 100 90-100 55-65 5-15 0-10 Requirements 608kg/cubic meter minimum 673 kg/cubic meter maximum 1000 chm-crn min. 500 ppm maximum 2000 ppm max.

LIGHTWEIGHT FOAM FILLER UNDER PLANTED AREAS, LANDSCAPE STRUCTURES AND NON-VEHICULAR PAVING

LIGHTWEIGHT FILL Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02210-1 11 March 2013

A.

Lightweight Foam filler under planted areas shall be .8476kg/square meter - 1.1189kg/square meter type # IX density expanded polystyrene rigid foam insulation material, or 1.0172kg/square meter extruded polystyrene rigid foam insulation material. This foam filler does not need to be aged. Lightweight Foam filler under non-vehicular paving and all landscape concrete structures shall be .8476kg/square meter - 1.1189kg/square meter # IX density expanded polystyrene rigid foam insulation material, or 1.0172kg/square meter extruded polystyrene rigid foam insulation material. This foam filler shall be aged sufficiently (minimum 57 degrees C for 5 days or manufacturered by Pentane Extraction process), prior to installation, to prevent shrinkage. Size of panel or special shapes shall be as shown on Drawings or approved by Landscape Architect.

B.

C. 2.3

LIGHTWEIGHT FOAM FILLER UNDER VEHICULAR PAVING A. Lightweight Foam filler under vehicular paving shall be Type VI, 1.3562 kg/square meter extruded polystyrene rigid foam insulation material. This foam filler shall be aged sufficiently (minimum 57 degrees C for 5 days or manufactured by Pentane Extraction process), prior to installation, to prevent shrinkage. Size of panel or special shapes shall be as shown on Drawings or approved by Landscape Architect. LIGHTWEIGHT FOAM FILLER UNDER HARD & LOOSE FINISH AND ROOF. A. Lightweight Foam filler shall be minimum 900kg/cum density for all hard finish roofs and 600kg/cum for all loose laid roof.

B. 2.4

PART 3 - EXECUTION 3.1 INSTALLATION A. B. C. Examine all surfaces to receive lightweight fill to verify it is acceptable and proper to the application. Correct all defects before installation of accessory. Install per all Manufacturers project specific instructions and approvals and per all additional project requirements as requested by the Landscape Architect and as detailed and shown on the Drawings. The lightweight aggregate fill shall be placed in layers not exceeding 30cm in thickness. The lift shall be compacted by hand held or hand guided compacting equipment. Compact to achieve a density of 90% percent of the maximum density. The bulk density for in place compacted lightweight aggregate fill shall not exceed 1121.3kg/m3. Maximum depth of lightweight aggregate fill shall not exceed 60cm. During the course of the project test samples are to be taken for gradation, bulk and particle density, moisture content, and in place density by an independent testing laboratory. For more specific details the manufacturer's methods of laying in place or as directed by the Landscape Architect shall be applicable to obtain maximum desirable results.

D.

3.2

LIGHTWEIGHT FOAM FILLER A. Loose-Laid Over Insulation. 1. Verify that exposed conditions are consistent with work requirements, will provide a sound, smooth, continuous level surface suitable for foam filler installation and subsequent work and will in no way deleteriously affect proper installation of this work and subsequent installations.

LIGHTWEIGHT FILL Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02210-2 11 March 2013

2. 3. 4. B.

Proceed with no work until Insulation Layer has been completely installed. Lay-out per details on drawings and as instructed by Landscape Architect. Provide vertical drainage channels as shown on drawings.

Lightweight Foam filler shall be placed in sheets or blocks, stacked in accordance with layout and spacing shown on drawings. Where necessary shape or taper foam fill to achieve correct profiles. Provide sufficient temporary or permanent overburden to maintain sheets in place prior to final placement of overlying materials. Provide vertical drainage channels as shown on the drawings. Where indicated or as necessary, adhere foam sheets to insulation or other foam sheets.

C. 3.3

CLEAN-UP A. The Contractor shall remove from the Site all leftover foam filler.

END OF SECTION

LIGHTWEIGHT FILL Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02210-3 11 March 2013

SECTION 02281 TERMITE CONTROL PART 1 - GENERAL 1.01 RELATED WORK : A 1.02 Section 02200 Earthwork : Backfill materials

SECTION INCLUDES : A. B. Soil treatment below slabs-on-grade for subterranean insects. Soil treatment at interior and exterior foundation perimeter, for subterranean insects.

1.03

REFERENCES A. 1. Building Research Establishment. Overseas Building Notes No.170 : Termites and Tropical Building.

1.04

QUALITY ASSURANCE A. B. C. Applicator: Company specializing in soil treatment for termite control with five years documented experience. Materials : Provide certification that toxicants conform to specified requirements. Materials Packaging: Manufacturers labels and seals identifying contents.

1.05

PRODUCT DATA A. B. C. Submit product data under provisions of Section 01340. Indicate toxicants to be used, composition by percentage, dilution schedule, and intended application rate. Submit manufacturers installation instructions under provisions of Section 01340.

1.06

PROJECT RECORD DOCUMENTS A. Accurately record moisture content of soil before treatment, date and rate of application, areas of applications, diary of meter readings and corresponding soil coverage.

1.07

WARRANTY ( Defined in General conditions as defects liability) A. B. Provide ten year warranty for material and installation under provisions of contract from the date of certified completion. Warranty: Cover against invasion or propagation of subterranean termites, damage to building or building contents caused by termites; repairs to building or building contents so caused. Inspect work annually and report in writing to Employer.

C.

TERMITE CONTROL Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02281-1 11 March 2013

PART 2 - PRODUCTS 2.01 MATERIALS A.

Toxicant Chemical: Water based emulsion, uniform composition and synthetic dye to permit visual identification of treated soil, of the generic chemical chlordane, aldrin or dieldrin. Recommended manufacturers 2.02 RECOMMENDED MANUFACTURERES Hamilton Pest & Weed Control Or equal Applicators: 1. Vangaurd Pest Control, Kuwait 2. Modern Cleaing Methods Co. W.L.L. (Chemdry), Kuwait 3. Or equal approved by the Consultant 2.03 solution. B. Dilute toxicant chemical chlordane to a one percent solution. MIX DILUTION A. Dilute toxicant chemical aldrin or dieldrin to a 0.5 percent

PART 3 - EXECUTION 3.01 INSPECTION A. B. conditions. 3.02 Verify the soil surfaces are sufficiently dry to absorb toxicant, ready to receive treatment. Beginning of application means acceptance of soil

APPLICATION A. B. C. Apply toxicant immediately prior to installation of slab-on-grade or finish grading outside foundation walls. Apply toxicant in accordance with manufacturers instructions. Apply toxicant to soil at the following rates, using metered applicator: 1. 2. D. Under floor slabs-on-grade : 5 litters/m2 Both sides of foundation wall 6 litters/linear meter/300mm depth of soil backfilling.

Apply extra treatment to structure penetrations, pipe, ducts, and other soil penetrations.

TERMITE CONTROL Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02281-2 11 March 2013

E. F. 3.03

Apply as a coarse spray to ensure uniform distribution. Coordinate soil treatment at foundation perimeter with finish grading and landscaping work to avoid disturbance of treated soil. Retreat disturbed treated soil.

RETREATMENT A. B. If inspection identifies the presence of termites, retreat soil and retest. Use same toxicant as for original treatment. END OF SECTION

TERMITE CONTROL Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02281-3 11 March 2013

SECTION 02510 ROAD PAVING PART 1 - GENERAL 1.01 DESCRIPTION A. The work covered by this section comprises furnishing all plant, labor, equipment, appliances and materials and performing all operations in connection with :i) Asphaltic concrete paving to extent indicated on drawings. ii) Connections to existing roads. iii) Surface sealer.

1.02

RELATED WORK SPECIFIED ELSEWHERE A. B. C. D. E. Section 02100 - Site Preparation Section 02200 - Earthwork Section 02525 - Concrete Krebs Section 02545 - Aggregate Surfacing Section 02580 - Roadway and Parking Marking

1.03

REFERENCE STANDARDS A. B. C. General Specifications of the Roads Administration of MPW - Latest Edition ASTM D946 - Penetration - Graded Asphalt Cement for use in Pavement Construction TAI - (The Asphalt Institute) MS-2 Mix Design Methods for Asphalt Concrete and other mix Types MS-3 Asphalt Plant Manual MS-83 Asphalt Paving Manual MS-19 Basic Asphalt Emulsion Manual Where these standards conflict with the other specified requirements, the must restrictive requirement shall govern.

D. 1.04

PERFORMANCE REQUIREMENTS A. Paving : Designed for parking and light duty commercial traffic movement of trucks up to 15000 Kg.

1.05

QUALITY ASSURANCE A. B. C. Perform work in accordance with MPW Standards Mixing Plant : Conform to MPW Standards Obtain materials from same source throughout.

1.06

ENVIRONMENTAL REQUIREMENTS A. Do not place asphalt when ambient air or base surface temperature is less than 4oC or surface is wet.

ROAD PAVING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02510-1 11 March 2013

1.07

TESTS A. B. C. Testing and analysis of asphaltic mix will be performed under provision of Section 01400 -Quality Control. Submit proposed mix design for review one month prior to commencement of work. Contractor will take samples from completed work and perform tests in accordance with specified standards.

1.08

SUBMITTALS A. B. Submit product data for seal coat. Submit manufacturer's instructions.

PART - 2 - PRODUCTS 2.01 MATERIALS ASPHALTIC CONCRETE MIX MATERIALS: A. B. C. D. Primer : Homogeneous medium curing liquid asphalt, MC 70 in accordance with AASHTO M-82. Tack Coat : Emulsified Asphalt Cationic in accordance with AASHTO M-208. Asphalt Cement : 60/70 penetration grade in accordance with AASHTO M-20. Coarse aggregate : Retained in No. 8 sieve. Crushed natural stone, and gravel, cement coated in accordance with : Sampling AASHTO T-2 Sieve Test AASHTO T-27 And T-11 Soundness AASHTO T-104 Maximum sodium sulphate soundness of 10% Abrasion loss AASHTO T-96 40% Max. Fine Aggregate : Natural sand passing No. 8 sieve. Clean and free from organic matter. Sampling : AASHTO T-11, T-27; Sand Equivalent : AASHTO T-104 10% Maximum. Mineral Filler: Finely ground particles of limestone, hydrated lime, or other approved mineral dust, free of foreign matter in accordance with AASHTO M-17 and T-219. Hydrated lime in accordance with ASTM C-50. Seal Coat: Asphalt Institute Manual MS-4, Sand type.

E. F. G. 2.02

ASPHALT PAVING MIX A. B. C. D. Use dry materials to avoid foaming. Mix uniformly. Asphalt Base Course: 3.5 to 5 percent of asphalt cement by weight in mixture. Air voids 3-8%. Asphalt Binder/Leveling Course: 4 to 6.5 percent of asphalt cement by weight in mixture. Air voids 3-8%. Topping Course: 5.5 to 7.5 percent of asphalt cement by weight in mixture. Air voids 3% minimum. Gradation includes hydrated lime.

PART 3 - EXECUTION 3.01 EXAMINATION


02510-2 11 March 2013

ROAD PAVING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B.

Verify compacted subgrade is dry and ready to support paving and imposed loads. Check for any "soft spots" Verify gradients and elevations of base are correct.

ROAD PAVING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02510-3 11 March 2013

3.02

PREPARATION A. B. C. D. E. F. Compact subgrade to 95% maximum dry density, conforming to levels and slopes (refer to Items 3.01 H & 3.02 E, Part III - Execution, Section 02200 - Earthwork. Apply primer over base course at uniform rate of 1 KG./sq.m. Apply primer to 1/3 or 1/2 the surface width at a time, overlap adjacent applications. Use clean sand to blot excess primer after 24 hours from time of application. Apply primer to contact surfaces of concrete curbs, gutters. Coat surfaces of manhole catch basin frames with oil to prevent bond with asphalt paving.

3.03

PLACING ASPHALT PAVEMENT A. B. C. D. E. F. G. Place asphalt base course to thicknesses indicated within 24 hours of priming base surfaces. Place Tack coat at rate of 0.5 Kg./sqm. Place binder/leveling course to thickness indicated within two hours of placing and compacting base course. Place wearing course to thickness indicated. Compact pavement by rolling. Do not displace or extrude pavement from position. Develop rolling with consecutive passes to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment. Joints to be constructed so that even, integrated, compatible waterproof surface transitions are achieved, where a cold joint must be made, cut back already placed asphalt concrete to a clean, vertical surface and paint surface with hot asphalt cement immediately prior to application of fresh mix. Make connections to existing asphaltic concrete where indicated on the drawings at correct elevations. Prime edges of existing asphaltic concrete first.

H. 3.04

TOLERANCES A. B. C. Flatness : Maximum variation of 6 mm measured with 3 M straight edge. Compacted Scheduled Thickness : Within 6 mm of design thickness. Variation from True Elevation : Within 12 mm.

3.05

SEAL COAT A. Apply seal coat in accordance with Asphalt Institute Manual MS-13 and manufacturers instructions.

3.06

FIELD QUALITY CONTROL A. Field inspection and testing will be performed under provisions of Section 01400 - Quality Control.

3.07

PROTECTION A. B. Immediately after placement, protect pavement from mechanical injury. Do not allow vehicular traffic on newly paved areas until surface has cooled to atmospheric temperature. END OF SECTION

ROAD PAVING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02510-4 11 March 2013

SECTION 02525 PRECAST CONCRETE KERBS PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 The work included in this section comprises furnishing all plant, labor, equipment, appliances and materials and performing all operations in connection with Precast Concrete Krebs.

RELATED WORK SPECIFIED ELSEWHERE Section 02200 - Earthwork Section 03100 - Concrete Formwork Section 03200 - Concrete Reinforcement Section 03300 - Cast-in-Place Concrete

1.03

REFERENCE STANDARDS The work shall conform to the codes and standards of the following agencies as further cited herein. 1. 2. 3. 4. BS 368 ASTM C33 ASTM C39 ASTM C150 Precast Concrete Flags. Concrete Aggregates Compressed strengths of cylindrical concrete specimens. Portland cement

1.04

SHOP DRAWINGS A. Prepare and submit shop drawings in accordance with the requirements of the contract and as directed by the Engineer and obtain the Engineer's approval before proceeding with the fabrication and work.

1.05

SUBMITTALS A. Submit all samples and other information as requested by the Engineer of materials specified herein in accordance with requirements of the contract, and before ordering materials, obtain written approval from the Engineer. After the material samples have been approved, build for the Engineer's approval sample lengths of precast concrete kerbs, in conjunction with the sample panel of concrete pavers, showing materials and jointing to be used. Combined sample of concrete pavers and precast concrete kerbs to be retained as assurance of the minimum standard acceptable, protect sample for the duration of the works and remove upon completion.

B.

1.06

DELIVERY, STORAGE AND HANDLING A. All materials, in so far as practicable shall be delivered in the manufacturer's original packing and shall be stored in a dry place. Materials such as cements which are partially caked, the containers for which show water stains, or which are otherwise damaged or unsuitable for use, shall be removed from the site immediately. Take all necessary precautions to prevent chipping, cracking, or other damage, during the unloading, and storage on the site. Damaged kerbs will not be allowed to be installed, and should any damage be found in installed work, such work shall be removed immediately and replaced with new material. The Contractor shall assume all expenses incurred therefrom.
02525-1 11 March 2013

B.

PRECAST CONCRETE KERBS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.07

COORDINATION The work of this Section shall be completely coordinated with the work of other Sections. Verify dimensions and work of other trades which adjoin materials of this Section before the installation of items herein.

1.08

Approved Local supplier National Industries Aziz Block Kuwait Building Materials Or equal approved.

PART 2 - PRODUCTS 2.01 PRECAST CONCRETE KERBS A. B. C. D. E. Precast Concrete Kerbs shall be formed on hydraulic presses and shall have a 28 day cube strength of 350 kg/cm2. Face Section of Precast Concrete Kerbs shall consist of Portland Cement conforming to ASTM : C-150, Type v and BS No. 12 sulphate resistant cement. Desert sand to BS 882 or 1201. The maximum clay and silt content should not exceed 3%. Coarse aggregate to BS 882. Aggregate shall be free of deleterious materials and organic matters. Bitumen impregnated 18 mm thick celotax board will be used in expansion joints.

The Contractor shall purchase all the required type of precast kerb stones from M/s National Industries Company or any other local source as approved by the Engineer. 2.02 BEDDING MATERIALS A. Concrete Bedding materials shall be in accordance with Specifications Section 03300.

PART 3 - EXECUTION 3.01 WORKMANSHIP A. B. C. D. 3.02 The Contractor shall be responsible for preparing a proper surface to receive precast concrete kerbs. Provide plain concrete backing and foundation (K140) to all concrete kerbs as shown on the drawings. Floor slabs and concrete to receive precast concrete kerb finish shall be clean and free of all foreign matter detrimental to the bond. 18mm thick bitumen impregnated celotax board will be used every 2 - 3 meter as directed by the Engineers Representative while installing precast kerbs.

PROTECTION AND CLEAN-UP A. At the end of each day, remove from the site and dispose of all cartons, rubbish and debris resulting from the work of this section.
02525-2 11 March 2013

PRECAST CONCRETE KERBS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

END OF SECTION

PRECAST CONCRETE KERBS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02525-3 11 March 2013

SECTION 02580 ROADWAY AND PARKING MARKINGS AND SIGNS PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 The work included in this section comprises furnishing all plant, labour equipment appliances and materials and performing all operations in connection with Roadway and Parking Marking

REFERENCE STANDARDS A. Provide Roadway and Parking Markings and Signs as specified below. 1. All markings and signs shall be in accordance with the State of Kuwait Traffic Signs Manual Volumes 1 and 2 of September, 1988.

PART 2 - PRODUCTS 2.01 MATERIALS A. All materials shall comply with the above two documents. 2.02 - MANUFACTURERS A. Hempel B. GTC C. Jotun PART 3 - EXECUTION 3.01 All roadway and parking markings and sings shall be executed as per the above two documents.

END OF SECTION

ROADWAY AND PARKING MARKINGS AND SIGNS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02580-1 11 March 2013

SECTION 02760 TRAFFIC MARKING PAINT PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 The work included in this section comprises furnishing a plant, labour equipment appliances and materials and performing all operations in connection with Roadway and Parking Marking

REFERENCE STANDARDS A. B. Ministry of Public Works Traffic Manual dated September 1988. General Specifications for Kuwait Motorway/Expressway System dated September, 1987.

1.03

GENERAL Provide Roadway and Parking Marking as specified below. A. Traffic Markings All roadway markings shall be in accordance with the Traffic Signs Manual prepared by the Kuwait Municipality and shall be constructed in white thermoplastic in accordance with the General Specification, Roads Administration. Traffic signs and Traffic markings shall comply with Ministry of Public Works Traffic Manual dated September 1988. B. Parking Markings 1. Traffic markings such as lines, arrows, parking bays, and areas of no parking shall be marked out in paint. All markings shall be in white, except arrows for the exit path and markings for no parking areas shall be in yellow. The dimensions of markings shall comply with the above.

2. PART 2 - PRODUCTS 2.01 MATERIALS A. B. C.

All materials shall comply with the General Specification, Roads Administration. Marking Paint : Modified alkyd synthetic resin paint with elastomeric additive such as chlorinated rubber especially manufactured for pavement marking. Glass powder as recommended by paint manufacturer for mixing in paint prior to application.

PART 3 - EXECUTION NOT USED END OF SECTION

TRAFFIC MARKING PAINT Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02760-1 11 March 2013

TRAFFIC MARKING PAINT Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02760-2 11 March 2013

SECTION 02810 LANDSCAPE IRRIGATION SYSTEM PART 1 - GENERAL 1.01 WORK INCLUDED A. B. C. D. E. 1.02 A. B. C. D. E. 1.03 Irrigation Heads Pipes, Fittings and Valves Remote Control Valves and Automatic Controllers Wiring and Related Electrical Works Fog System Section 02200 Section 02950 Section 15245 Section 15400 Division 16 Earthwork Landscape Planting Electrical Works in connection with Mechanical Services Plumbing Services Electrical Services

RELATED WORK(S)

REFERENCES STANDARDS A. ASTM D 1785 Polyvinyl Chloride (PVC) Pipes, Schedules 40, 80 and 120 B. ASTM D 2241 Polyvinyl Chloride (PVC) Pressure Rated Pipe (SDR series) C. ASTM D 2466 Socket type PVC Pipe-fittings, Schedule 40 D. ASTM D 2564 Solvent Cement for PVC Pipes and Fittings E. ASTM D 2855 Standard Practice for Making Solvent Cemented Joints with PVC Pipes and Fittings F. ASTM D 2239 Polyethylene (PE) Pipe - SDR-PR G. ASTM D 2737 Polyethylene (PE) Tubing H. ASTM D 2609 Plastic Insert Fittings for Polyethylene Plastic Pipe I. NEMA 1 - CS Enclosures for Electrical Appliances J. BS 6004 Copper Conductors, PVC Insulated and PVC Sheathed (Suitable for Direct Burial) K. ASTM D 2666 Polybutylene Plastic Tubing (SDR-PR) L. ASTM F 845 Plastic Insert Fittings for Polybutylene Tubing

1.04

QUALITY ASSURANCE A. Landscape irrigation system shall be executed by a contractor, engaged in the installation and maintenance of such systems as primary business for at least three (3) immediately preceding years in Kuwait and approved for the purpose by the Public Authority for Agricultural Affairs and Fish Resources (PAAFR). Equipment used in the system shall have local agents, certified by the manufacturer to check, test, adjust, commission and maintain the same. Materials 1. Materials incorporated in the work covered by this Section shall be unused, new products in good condition. Materials spoiled due to improper storage or mishandling shall be rejected 2. Materials of similar nature shall be products of the same manufacturer. Mixing up products of different standards or those of different manufactures shall not be permitted for the same service 3. System components shall be of the type and construction, capable of withstanding the local ambient conditions and shall be resistant to deterioration from high incidence of ultra violet rays 4. Materials to equivalent British (BS), German (DIN), or Japanese (JIS) or other international standards shall be acceptable, provided that the Contractor substantiates their equivalence and ensures their compatibility with other components of the system. Copies of current version of reference standards shall be submitted for comparison, if required by the Engineer 5. Test certificates for materials used in the work covered by this Section, from approved independent laboratories or testing agencies shall be furnished at no extra cost if required by the Engineer
02810-1 11 March 2013

B. C.

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

6. 7.

Copper alloys used in the construction of valves etc., which comes in contact with water, shall be dezincification resistant type. Requirements of product quality, workmanship, materials etc. are identified by a known product of a particular manufacturer and is written as Ref. : ... This shall be construed to include the term or approved equal as well

D.

Irrigation system and the system components described herein and detailed in the drawings are intended to supply adequate amount of water to the various kinds and configurations of planting, for their sustained growth, throughout the seasons. Contractor shall, in his tender, high light and allow for alterations / modifications to the system or the system components; which in his opinion are necessary to accomplish the intended purpose. Product data and shop drawings shall be submitted in accordance with the General Conditions of Contract: 1. Manufacturers printed brochures and catalogues (one original and three copies) with relevant information high lighted (or irrelevant information struck out), along with write up of selection criteria 2. General piping layout drawings to a scale not smaller than 1:200 3. Irrigation piping layout plans of planted areas to a scale not smaller than 1:50, clearly indicating the throw / area of coverage of each individual head. 4. Builder's work layout plans to a scale of 1:200 with details to a scale not smaller than 1:20 5. Installation details of Irrigation heads, valve boxes etc to a scale of 1:10 6. Electrical wiring diagrams (NTS) and controller installation details (1:20) 7. Calculations / details to substantiate the shop drawings 8. Test and performance certificates of equipment, where required Copies of irrigation heads and valves ordering schedules shall be submitted for approval, prior to ordering the same. Project record documents of all works installed under this section shall be submitted in accordance with the General Conditions of Contract. Three (3) hard bound copies of Operation and Maintenance Manual" shall be submitted in accordance with the General Conditions of Contract, with complete data for each piece of equipment installed, as detailed below: 1. Manual shall contain: a. Table of contents b. Irrigation system material submittal with the Engineer's and local authoritys approval c. Manufacturer's installation instructions d. Manufacturer's internal wiring diagrams e. Manufacturer's assembly details f. Replacement, parts number listings and description g. Preventive maintenance schedules listing frequency of service and or replacement h. Name and addresses of manufacturer, sales and service agency and local representative / distributor including telephone and Fax numbers i. Names and address of Contractor's maintenance department, including emergency contact telephone numbers 2. Contents of the manual shall be arranged in sections with tags, grouping each class of equipment as piping, valves, irrigation heads, controls, etc. Contents of each section shall be arranged in sequence as listed above Contractors inability to comply with the requirements of the Contract shall be billed to the Review of Submittals: Time expended for repetitive reviewing (more than twice) due to Contractor at the Engineers standard hourly rates. A set of below grade reinforced cement concrete (RCC) tanks receive inflow from the city water supply mains through in-line, automatic, self-cleaning filters of 100 microns filtration fineness.
02810-2 11 March 2013

1.05

SUBMITTALS A.

B. C. D.

E.

1.06

SYSTEM DESCRIPTION A.

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. D.

One (1) nos. packaged, pressure controlled booster pump set draw water from the tanks and supply under pressure to the irrigation system. Automatic, self-cleaning, screen filter of 200 mesh filtration fineness filtration fineness will be installed at the system side. A pilot operated, diaphragm type pressure reducing / sustaining valve is installed on the fresh water supply mains, at the discharge side of the screen filter, so as to: 1. Maintain constant system pressure irrespective of varying demand and / or filter conditions, and 2. To shut-off the booster pump set in runaway conditions (rupture of piping) Pressure reducing type control valves will be used for the various zones, as appropriate, in order to attain optimum performance and to retain flexibility. Pressurised fresh water supply points are furnished within the open courtyards in buildings for irrigating the planting therein. All piping from these points of connection (POC) and the rest of the system are in the scope of this section. Pop up type spray will generally be used for irrigating turf. Drip system will be used for ground cover and trees. Bubblers will be used for narrow strips, trees in paved areas and seasonal planting beds irrespective of the type of planting. Quick coupling valves will be provided at reasonable intervals, all over the area, for manual watering. Flush valves will be provided in each zone, as appropriate. Products shall be delivered to site, stored and protected under provisions of the General Conditions of Contract. Products shall be stored in manufacturers original packing in a neat and orderly manner, with labels on each container. Plastic and rubber products shall be stored out of direct sunlight. Pipes shall be stored on elevated racks only.

B. C. D. E. F. G. H. I. 1.07 A. B. C. D.

DELIVERY STORAGE AND HANDLING

PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Irrigation System Components 1. Rainbird, USA 2. Weathermatic, USA 3. Hunter, USA 4. Torro, USA 5. Approved alternatives / substitutions under provisions of the General Conditions of Contract Valves 1. Nibco, USA 2. Crane, USA 3. Kitz, Japan 4. Approved alternatives / substitutions under provisions of the General Conditions of Contract PVC pipes and fittings shall be manufactured from virgin Polyvinyl Chloride compound to ASTM D 1784 type 12454-B (PVC 1120) or approved equal. Threads of fittings shall be side gated injection moulded type. Nipples shall be standard weight, moulded type.

B.

2.02

PIPING - GENERAL A. B.

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02810-3 11 March 2013

C.

Pipes shall have the following, continuously printed on them. 1. Manufacturer's name 2. Nominal pipe size 3. Schedule or class 4. Pressure rating 5. Date of manufacture

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02810-4 11 March 2013

2.03

PIPES AND FITTINGS Service A. B. C. D. Pressure lines All sizes Distribution lines for all systems Other than drip Distribution lines for Drip systems Supply laterals for Drip system From POC to control valve From control valves onwards From control valve onwards From emitter onwards Location Type

uPVC schedule 40 uPVC schedule 40 PE tubing PE capillary

2.04

PIPE JOINTS A. B. C. UPVC - Socket type: Solvent cemented joints. Threaded adapters / flanges shall be used as appropriate. PE: Plastic inserts (compression) type joints. Threaded adapters / flanges shall be used as appropriate. Joints shall be rated for 1034 kPa (150 psig) working water pressure at ambient temperature.

2.05

VALVES A. General 1. Valves from same manufacturer shall be provided throughout the project, where possible 2. Pressure Rating a. Valves shall be rated for 1379 kPa (200 psig) working water pressure at ambient temperature, unless otherwise indicated or dictated by selection b. Contractor shall allow for selecting higher pressure rated valves to meet the valve construction features 3. Valve Operators a. Hand wheels / operating levers shall be provided for valves as appropriate. Hand wheels for gate and globe valves 50 mm (2 inch) nom. dia. and smaller, shall be non-ferrous metal (die cast zinc / aluminium alloy etc.) b. One key / wrench of appropriate size shall be provided for each lever operated valve installed B. Gate Valves 1. Up to 50 mm (2 inch) nom. size: Bronze body, non-rising stem and union bonnet, solid wedge or disc, threaded ends 2. Over 50 mm (2 inch) nom. size: Iron body, bronze mounted (IBBM), outside screw and Yoke (OS&Y), solid wedge, renewable seats, flanged ends C. Globe Valves 1. Up to 50 mm (2 inch) nom. size: Bronze body, rising stem, union bonnet, renewable composition disc, threaded ends 2. Over 50 mm (2 inch) nom. size: Iron body, bronze mounted (IBBM), rising stem, OS&Y, renewable seat, flanged ends Ball Valves 1. Up to 50 mm (2 inch) nom. size: Bronze body, stainless steel ball, Teflon seats and stuffing box ring, lever operated, threaded ends 2. Over 50 mm (2 inch) nom. size: Cast steel body; stainless steel, full bore, floating ball; Teflon seat and stuffing box seals, lever or key operated flanged ends

D.

E.

Check Valves 1. Up to 50 mm (2 inch) nom. size: Bronze, in-line, resilient seat and disc, spring loaded, screwed ends 2. Over 50 mm (2 inch) nom. size: Iron body, bronze trim, spring loaded, renewable composite disc and seat, flanged ends
02810-5 11 March 2013

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

F. G.

Drain Valves: Bronze angle globe pattern; key operated; threaded inlet and hose connection outlet with cap and chain. Flush Valves: Ball valves of uPVC construction, with solvent weld / compression ends. Ref. : Rain Bird BLT - S series

2.06

REMOTE CONTROL VALVES A. For Spray Zones (Ordinary Type) 1. Type Globe pattern, normally closed, electrically operated 2. Construction Heavy duty, glass filled nylon with nylon reinforced rubber diaphragm and stainless steel / brass trim 3. Connections Threaded inlet / outlet 4. Inlet Pressure 1034 kPa (150 psig) 5. Outlet Pressure 100 to 1034 kPa (15 to 100 psig) 6. Accessories Grit Strainer, manual open / close facility 7. Electrical Power supply 24 volts / 1 phase / 50 Hz Ref. : B. Rain Bird EP - F series OR EFA - CP series For Spray Zones (Pressure Reducing Type) 1. Type Globe pattern, normally closed, electrically operated 2. Construction Heavy duty, glass filled nylon with nylon reinforced rubber diaphragm and stainless steel / brass trim 3. Connections Threaded inlet / outlet 4. Inlet Pressure 1034 kPa (150 psig) 5. Outlet Pressure 100 to 1034 kPa (15 to 100 psig) 6. Accessories Grit Strainer, manual open / close facility, pressure reducing module 7. Electrical Power supply 24 volts / 1 phase / 50 Hz Ref. : C. Rain Bird EP - F -PRS series OR EFA - CP - PRS series Drip Zones 1. Type Y - Globe / angle pattern, normally closed, electrically operated compression type 2. Construction uPVC with stainless steel / brass trim 3. Connections Threaded inlet / outlet 4. Inlet Pressure 860 kPa (125 psig) 6. Accessories Manual open / close facility 7. Electrical Power supply 24 volts / 1 phase / 50 Hz Ref. : Rain Bird EY / ECV series

2.07

IRRIGATION HEADS A. Schedules / legend on drawing shall be referred to for details of selection and performance of respective heads.

2.08

VALVE BOXES A. High density polystyrene body and locking type cover, of approved colour and size and appropriate size. The valve boxes shall have approved identification code lettering stencilled on them. Ref. : Carson

2.09

QUICK COUPLING VALVE A. Red brass construction with 3/4 inch female threaded inlet, key operated retracting stop, quick coupling outlet with self closing thermoplastic rubber cover and coupling adapter (key) and swivel elbow with 3/4 inch hose threaded outlet. Ref. : Rain Bird 33 DRC with 33 K and SH - 0
02810-6 11 March 2013

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.10

AUTOMATIC CONTROLLERS A. Electro-mechanical or independent station computer type, with appropriate no. of stations, capable of fully automatic or manual operation; as appropriate. Details of selection shall be as follows: 1. Housing: Weather proof, heavy duty, lockable, steel cabinet 2. No. of programs: Two (2) 3. No. of valves per station: 3 (as appropriate) 4. Station timing: 0 to 99 minutes 5. Automatic starts: Any quarter hour (up to 4 per day per station) 6. Programming schedule: 14 days dial for every day, every other day starts etc. for a two-week period 7. Interruption facility: Master on / off switch (with out loss of program) 8. Electrical supply: 240 v / 1 ph / 50 Hz input and 24 v / 1 ph / 50 Hz output

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02810-7 11 March 2013

9. 10.

Overload protection: a. Circuit breaker with manual reset for the controller b. Value output surge protection Accessories: a. Wall mounting bracket / pedestals appropriate Ref. : Rainbird

2.11

WIRING CABLES A. Solid copper, PVC insulated and PVC sheathed, single conductor cables, rated for 600 volts and suitable for direct burial. The cable shall have a minimum sectional area of 1.5 mm2. Water proof and corrosion resistant housing with 3 # flapped openings for insertion of wires; copper crimp sleeves and snap on cover, UL listed for this application. Ref. : Rain Bird ST 03

2.12

WIRE CONNECTORS A.

2.13

WATER METER PIT ACCESSORIES A. Manhole cover and frame: Medium duty, single seal, 1100 x 450 mm clear opening, cast iron cover and frame with closed key holes. Ref. : B. Kuwait Foundry (Similar to Code no. M 02017) Screen Filter: All plastic construction with opaque top with threaded ends, transparent bowl and 140 mesh filtration fineness replaceable screen; suitable for 120 US gpm flow. Ref. : C. Rain Bird RB 120 - 140 In line Y - Strainers, 50 mm (2 inch) nom. dia. and smaller: Bronze body with threaded ends, screwed on retainer cap with threaded plug and twenty (20) mesh stainless steel screen. Provide blow off connection with valve on the retainer cap, where required. Ref. : D. Watts 777 series Valves: Clause 2.04 above shall be referred to and complied with as appropriate. Pumps: Vertical, multistage, centrifugal type of 2900 rpm speed. Materials of construction shall be as follows: 1. Impellers Stainless steel 2. Shaft Stainless steel 3. Stage pieces .......................................... Stainless steel 4. Base and head ...................................... Cast iron 5. Seal Mechanical System piping: uPVC with solvent welded joints; with flanged manifold ends. Valves: All bronze gate valves at suction and discharge of each pump and bronze wafer type self closing (non-slam) check valve at discharge of each pump. Base frame: Fabricated steel, with resilient mounting for pumps, where required. Pressure vessel (for pressure controlled sets only): Welded steel construction with polypropylene lining on wetted areas, butyl rubber diaphragm, hooded charging valve etc. suitable for 1600 kPa (232 psig) working pressure, pre-charged with nitrogen. Capacity to be suitable for limiting the number of pump starts to 15 per hour. Relief Valve: Bypass pressure relief valve shall be provided between discharge and suction manifolds to prevent pump operation at shutoff head.

2.14

BOOSTER PUMP SETS A.

B. C. D. E.

F.

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02810-8 11 March 2013

G. H. I. J. 2.15

Accessories: Compound gauge at suction manifold and pressure gauge at discharge manifold, flexible connections at suction and discharge connections. Finishing: The assembly shall be given two (2) coats of primer and one (1) coat of gloss enamel at the factory. Capacity: Schedules on drawings shall be referred to for types and capacities. Pump motor and control panel: Section 15245 shall be referred to for details. Ref. : Grundfos CP / CR series

FOG SYSTEM A. System will comprise the following, factory pre-engineered to create fog in designated areas of the project: 1. 2. 3. 4. 5. 6. 7. High pressure pump of bronze/stainless steel fitted construction and GRP enclosure, as appropriate. In-line cartridge filter, electrical solenoid valve and piping at the suction side of the pump . High pressure nylon tubing with bronze, compression fittings at the discharge side of the pump. Fog nozzles of appropriate type and size. Supports, hangers etc. as appropriate Controller for programmed operation of the system with interfaces with other systems. Electrical works starting from the outgoing terminals of the isolator/switch-fuse, as appropriate.

Ref.: Arizona Mist., USA

PART 3 - EXECUTION 3.01 CO-ORDINATION A. B. C. D. E. Contractor shall study all drawings and specifications and familiarise with the structural and architectural details and the work of other trades. Contractor shall ensure that the work under this section will not interfere with those of other trades and are compatible with the surrounding finishes; prior to placing orders, fabrication and installation. Contractor shall co-ordinate with the electrical trade for the exact power requirements and the location and type of interface(s). Information as required by MEW for obtaining approvals shall be furnished. Necessary templates, patterns, setting out plans and other items shall be furnished to relevant trades for incorporation or leaving necessary provisions in the work. Conflicts in requirements with other trades shall be resolved by the Contractor. Only those which cannot be solved, without changes to structure or those which involves major changes to system design shall be referred to the Engineer. Acceptability of sizes and locations of the points of connection (POC) shall be checked and confirmed to the plumbing trade. Piping layout and the installation of the irrigation heads shall be co-ordinated with the planting plans; accomplishing changes / modification necessary to attain a harmonious installation. Piping shall be routed in an orderly manner, maintaining gradient. Factory manufactured fittings shall be used where changes in pipe direction occur. Bending or forming of rigid piping shall not be permitted (flexible polyethylene lines for drip system excluded). During progress of work, the ends of piping shall be kept closed with factory manufactured plugs to prevent the entry of foreign matter.
02810-9 11 March 2013

F. G. 3.02

PIPING INSTALLATION - GENERAL A. B. C.

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D. E. F.

Piping, control valves, quick coupling valves and other system components shall be installed within the planting bed, unless otherwise noted or directed by the Engineer. Threaded pipe fittings shall be assembled using Teflon thread sealing tapes. Piping trenches shall be wide enough to allow a minimum of 100 mm (4 inch) between parallel pipe lines. The depth of the same shall be to provide a minimum cover from finished grade as follows: 1. Pressurised supply lines .......................................450 mm (18 inch) 2. Non-pressurised distribution lines ........................300 mm (12 inch) Piping shall not be installed one over the other, in the same trench. Trenches shall be back-filled with clear agricultural soil and manually compacted, to a dry density equal to that of the adjoining soil, to the adjoining finished grade. If settlement occurs after completion of the work, necessary adjustments shall be made to piping and the system components, as directed by the Engineer. Schedule 40 galvanized steel sleeves / UPVC duct shall be used for irrigation piping crossing roads and similar areas subjected to traffic loading. Only approved (recommended by the piping manufacturer) solvent cement shall be used for making the joints. Solvent joints shall not be made in humid or dusty atmosphere. Prior to making the joint, the required penetration and fitting alignment shall be marked in a clearly visible manner on the pipe end, for later verification. Pipelines shall be filled only after allowing a minimum period of twenty-four (24) hours from the time of making the joint. Valves shall be same size as pipeline, except where shown otherwise on the contract drawings. Valves with flanged ends shall be used in valve pits, irrespective of size. Valves shall be installed with stem upright or horizontal, not inverted; except with written permission of the Engineer for each location. Ball / gate valves shall be used for shutoff and to isolate equipment, part of systems or risers. Appropriate valve gland packing, sealing and gasket materials shall be selected for the temperature, pressure and chemical properties of the water encountered. Low voltage cables shall be installed in the same trench as the pressure supply lines or in a separate trench as approved by the Engineer. When more than one cable is placed in a trench, these shall be bound together with dead locking type plastic cable ties at intervals not exceeding 1,000 mm (40 inch). 300 mm (12 inch) of extra length of cable shall be provided at each termination. Continuous single length of cable shall be used between controller and the control valves. Where splices are essential (generally not permitted), the same shall be executed only after obtaining written approval of the Engineer, providing a valve box with identification at the splice. Connector housing shall be filled with jelly (sealant) after connections are made. Grounding wires for the controllers / control valves shall be coloured green / green and yellow. Crimped on brass terminal lugs shall be used for termination of cables and terminals shall be numbered with slip-on ferrules for quick identification. Cables shall be sized such that the voltage available at the valve shall be within 24 2 volts.

G. H.

I. 3.03

PIPING INSTALLATION - PARTICULAR FOR UPVC PIPING A. B. C. D.

3.04

VALVES A. B. C. D. E.

3.05

ELECTRICAL CABLING - PARTICULAR REQUIREMENTS A. B. C. D.

E. F. G. 3.06

AUTOMATIC CONTROLLERS
02810-10 11 March 2013

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B. C. 3.07 A. B. C. D. E. F. G. 3.08 A. B. 3.09

Internal transformer shall be selected to suit the local system power supply parameters and to furnish the power supply at the control valve at 24 2 volts. Two (2) nos. keys shall be furnished for each of the controllers along with an identification tag, registered with the suppliers. Power supply to the controller shall be obtained from the standby power supply system, where possible. Irrigation heads shall be located and adjusted to minimise splash of water on non-planted areas. Spacing recommended by the manufacturer shall not be exceeded, in respect of irrigation heads, under any circumstance. Turf sprinkler and rotor heads shall be set to finished grade. Schedules and details on drawings shall be referred to for the installation details of other types of heads. Irrigation heads shall be installed on branches with offsets, swing joints etc. even if they are not specifically indicated in the drawings. Approved type spikes or similar rigid supports shall be provided for all irrigation heads. Irrigation heads shall not be installed, until after the complete piping system has been thoroughly flushed. Co-ordinated valve identification schedule shall be submitted for the approval of the Engineer. The approved schedule shall be used for locating the control stations in the as-built drawings. Approved, identification codes shall be painted on the valve boxes in 50 mm (2 inch) high lettering with white, resin based epoxy paint. During the manufacture (at Contractor's premises only), installation and after completion of works; the system, sections of the system or its components shall be tested by the Contractor / specialist Subcontractor in the presence of the Engineer, as directed below or else where. Contractor shall procure all testing instruments and accessories and bear all costs in connection with the same. 1. Basic materials for conformity with the specified standards 2. Controller for start, operating period and cut off; tolerances, alarms etc. 3. Control valves for water tightness; cut-in and cut-out; pressure and flow 4. Electrical wiring for continuity and dielectric resistance Following shall be balanced and regulated, prior to start of planting: 1. Irrigation program - flow matched with the source capacity 2. Control valve discharge pressure 3. Irrigation heads throw and direction Irrigation water supply piping starting from the main isolating valve up to the control valve, shall be pressure tested by this section. Piping shall be filled with clean water, leaving all high points open to allow purging of air. System shall be pressurised using manual pumps in increments of 25 % of the test pressure. A standing period of 10 minutes shall be allowed after each pressure increment. Pressure testing using motor driven pumps will not be permitted. System shall not be over-pressurised under any circumstance. If the test pressure is close to the maximum permissible working pressure of any of the system components, calibrated pressure relief valves shall be installed in the tested circuit.

IRRIGATION HEADS

VALVE BOXES

INSPECTION, TESTS AND ADJUSTMENTS A.

B.

3.10

TESTING OF SUPPLY PIPING A. B. C.

D.

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02810-11 11 March 2013

E.

Piping system shall be tested with water at a pressure of 1,034 kPa (150 psig) for a minimum period of 4 hours. Circuit temperature shall be recorded along with the pressure readings and pressure fluctuations due to temperature variations allowed for in computations. Joints shall be checked for leaks by swabbing with a dry tissue. Drop in pressure to the order of 10 kPa (1.5 psig) per hour shall be considered as acceptable. Leakage through the seat shall be considered as reasonable grounds for rejecting the control value. Because of the limitations in conducting a pressure test on the piping system, this requirement is waived; but the piping shall be tested for line and gradient. Integrity of the pipe joints, in respect of pressure tightness, shall be subject to scrutiny and piping with leaking joints shall be repaired / replaced.

F. G. 3.11 A. B. 3.12

TESTING OF DISTRIBUTION PIPING

SYSTEM FLUSHING A. On completion of the piping, but prior to the installation of the heads, the complete system shall be thoroughly flushed to remove all debris.

3.13

IRRIGATION SYSTEM PROGRAMMING A. Plant watering shall preferably be done before sunrise and after late in the evening to facilitate the optimum use of the landscaped areas. This restriction shall not be applicable to systems which do not have surface sprays and which are watering areas not used for sitting. Alternate programs shall be furnished for summer and winter so as to economise the water use without sacrificing the basic intent. Services of a competent engineer shall be provided by the Contractor to supervise the commissioning of all equipment and to train the Owner's personnel in all aspects of the same during a five (5) working days period, during normal working hours. All expenses in connection with the above shall be allowed for by the Contractor. System demonstrations shall be conducted only after the substantial completion of the project. A minimum of one week's written notice shall be given and the Owner's written consent obtained, prior to such demonstrations.

B. 3.14

SYSTEM DEMONSTRATIONS A.

B.

3.15 A.

GUARANTEE (Defect Liability) AND MAINTENANCE Requirements of the General Conditions of Contract shall be referred to and complied with as appropriate. END OF SECTION

LANDSCAPE IRRIGATION SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02810-12 11 March 2013

SECTION 02900 LANDSCAPING WORKS PART 1 - GENERAL 1.01 WORK INCLUDED A. B. All labor, materials, equipment and services necessary to furnish and install all exterior landscape works. All works included in the following sections : Section 02900 Landscaping Works Section 02905 Plant Procurement and Delivery. Section 02920 Planting Soil Mix Section 02925 Planting Procedures and Materials Section 02930 Lawns Section 02950 Trees, Shrubs, Vines and Ground Covers. Section 02960 Hardscape Materials Section 02965 Kool Deck Section 02970 Landscape Maintenance.

1.02

ORDINANCES AND REGULATIONS A. All local ministry, municipality, State of Kuwait laws and rules and regulations governing or relating to any portion of this work are hereby incorporated into and made a part of these specifications and their provisions shall be carried out by the Contractor. Anything contained in the specifications shall not be construed to conflict with any of the above rules and regulations or requirements of same. However, when the specifications and/or drawings call for or describe materials, workmanship or construction of a better quality, higher standard or larger size, specifications and/or drawings shall take precedence over the requirements of said rules and regulations.

1.03

JOB CONDITIONS A. B. Prior to any landscape work, locate all existing underground installations and protect same. Repair any damage to these installations at no cost to the Owner. Coordinate all work with other trades so that conflicts will not exist nor delay the work in any way.

1.04

GRADING A. At all landscaped areas, the landscape contractor shall be responsible for providing final grades in accordance with the requirements of the drawings, soils report and site work specification requirements.

1.05

QUALITY ASSURANCE A. Work must be performed with personnel experienced in the landscape work required. The Contractor must show proof of the qualifications and experience of the Sub-contractor and/or all personnel proposed for this contract to the satisfaction of the Engineers Representative. The following items must be included within each individual's curriculum vitae in addition to experience and/or education. 1. 2. Major Landscape and Irrigation Projects on which the person has worked, the respective client, construction cost of each project, and the specific responsibility and position of the person in question. Three references who can attest to the ability of the person. This information must be submitted to the Engineer/Resident Engineer for review and approval at least six weeks prior to construction start up date. The Contractor will be fined a minimum of KD. 200/- per day for each member of his
02900-1 11 March 2013

LANDSCAPING WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

previously approved Construction Crew, who is not on site at the beginning of a particular portion of the work for which that member is necessary. Personnel : This Contract will require a minimum of the following personnel : 1. The Landscape Architect who must have a BS Degree in Ornamental Horticulture or Landscape Architecture and a minimum of eight years experience in Landscape Construction. Seven (7) years of additional experience in Landscape Construction may substitute for the Degree. He must have a minimum of four years experience as overall Project Manager on Major Landscape Projects in arid climates similar to Kuwait. Experience in farming or plant production operations shall not be acceptable. The Landscape Foreman Must be skilled in the installation of planting and associated landscape elements with a minimum of 10 years experience in Landscape Construction. A minimum of three years of this ten years experience must have been in arid climates similar to Kuwait. Experience in the handling and planting of up to 10 meter height Phoenix dactylifera palms, Washingtonia filifera palms, Washingtonia Robusta Palms and 24 box, 36 box and 48 box size trees is required. 3. 4. All Landscape Labourers must be skilled in the installation of planting and associated Landscape elements with a minimum of 2 years experience in Landscape Construction. Horticulturist/Arborist must have a BS degree in Ornamental Horticulture and a minimum of five years field experience. Five years additional field experience in Ornamental Horticulture may be substituted for BS degree. Forestry or agriculture degrees or experience may not be substituted. The experience must be in an arid climate similar to Kuwait.

2.

C.

Equipment The Contractor or his Sub-contractor must show proof of his ability to mobilize the following list of equipment (or a list which has been previously approved by the Engineer/Resident Engineer) and have it on site when beginning a particular part of the work for which that piece of equipment is necessary. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Air compressor Back hoes Mini loaders Bus and minibus Concrete mixer Dumper Dump trucks Earth compactor Jack hammer Loaders Pick up Renovator Sedan cars Trenchers - sizes as needed Truck Tractor with disk harrow Augers of required sizes Water tanker with spray mister hose attachment Rotary type mowers Pruning equipment

LANDSCAPING WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02900-2 11 March 2013

21. 22. 23. D. 1.06 GUARANTEE A. B. C. D. E.

Tractor trailer for transporting large palms (Upto 10 meters brown trunk height) and large trees upto 48 box size. Crane for loading and planting large palms and trees The Contractor may be fined KD. 300/- per day for not supplying the previously approved equipment when beginning a particular part of work in which that piece of equipment is necessary. Planting Season : Ensure that the planting of the soft landscape works is done during an appropriate planting seasons compatible with other activities and the contract period of the contract.

The guarantee period for all plant material shall begin at the date of acceptance of the planting operation as complete. Planting operations will be accepted as complete when the Contractor receives a Notice of Substantial Completion from the Engineer/Resident Engineer. All plant material shall be guaranteed by the Contractor, for a period of two (2) years from the date of notice of substantial completion to be in good, healthy, and flourishing condition. When the work is accepted in parts, the guarantee periods shall extend from each of the partial acceptances to the terminal date of the last guarantee period. Thus, all guarantee periods terminate at one time. The Contractor shall replace, immediately and without cost to the Owner all dead plants and all plants not in vigorous, thriving condition. The plants shall be free of dead or dying branches and branch tips, and shall bear foliage of a normal density, size and colour. Replacements shall match adjacent specimens of the same species. Replacements shall be provided immediately and shall be subject to all requirements stated in this Specification. The Contractor shall make all necessary repairs due to plant replacements. Such repairs shall be done at no extra cost to the Employer and within a reasonable time as determined by the Engineer/Resident Engineer. The guarantee of all replacement plants shall extend until the end of the two year guarantee period. Any plant not found in an acceptable condition during the guarantee period will be replaced immediately and if said replacement occurs within 120 days of the end of the guarantee period this period will be extended by 120 days from the date the last plant was installed.

F. G. H.

1.07

ACCEPTANCE A. Substantial Completion 1. The Engineer/Resident Engineer will inspect all work for substantial completion upon written request of the Contractor. The request shall be received at least ten (10) calendar days before the anticipated date of inspection. Acceptance of plant material by the Engineer/Resident Engineer will be for general conformance to specified size, character and quality and shall not relieve the Contractor of responsibility for full conformance to the contract documents including correct species. Upon completion and reinspection of all repairs or renewals necessary in the judgement of the Engineer/Resident Engineer, the Engineer/Resident Engineer will recommend to the Owner that he accept the work as substantially complete. The work may be accepted as substantially complete in parts when it is deemed to be in the Owner's best interest to do so, and when permission is given to the Contractor in writing to complete the work in parts. Acceptance and use of such areas by the Owner shall not waive any other provisions of this contract.
02900-3 11 March 2013

2.

3.

4.

LANDSCAPING WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

5. B.

The guarantee period shall commence upon acceptance as substantially complete.

Final Acceptance 1. At the end of the maintenance and guarantee periods, the Engineer/Resident Engineer will inspect all work for Final Acceptance upon written request of the Contractor . The request shall be received at least thirty (30) calendar days before the anticipated date for Final Inspection.

1.08

Upon completion and reinspection of all repairs or renewals necessary in the judgement of the Engineer/Resident Engineer, the Engineer/Resident Engineer shall certify in writing to the Owner as to the Final Acceptance of the work. AS-BUILT DRAWINGS A. The Contractor shall keep reproducibles of the drawings exclusively for the purpose of recording all changes and deviations in the locations of plants or materials. All changes shall be indicated thereon as the job progresses. Contractor shall deliver these modified Mylar reproducibles to the Engineer/Resident Engineer upon completion of the work. As-built drawings shall also be provided on CDs.

2.

1.09

CLEAN UP A. The Contractor shall clean up all areas on a regularly scheduled basis or whenever deemed necessary by the Engineer/Resident Engineer, as well as upon completion of the work before acceptance and during the guarantee period. Waste materials shall be removed daily. The Contractor shall restore, to previously established grade elevations, all areas damaged by irrigation equipment, rainfall, or other natural or man made causes, such as contour grading. Prepared planting soil mix and mulch top dressing shall also be restored to levels and conditions shown on the plans and in the specifications. This work shall be incidental to all other work, and no additional compensation shall be made for it. The Contractor shall protect new plants from injury during installation and until acceptance of the work as specified herein. Adjacent walks, paved surfaces and road shoulders shall be kept clean during the installation of landscape works.

B.

C. D.

END OF SECTION

LANDSCAPING WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02900-4 11 March 2013

SECTION 02920 PLANTING SOIL MIX PART 1 - GENERAL 1.01 WORK INCLUDED A. B. C. 1.02 Procurement of materials Stockpiling of materials Mixing planting soil mix

REFERENCES A. American Society for Testing and Materials (ASTM) Standards: 1. 2. 3. 4. 5. B. C 136-81 Sieve or Screen Analysis of Fine and Coarse Aggregates D 442-63 (1972) Particle - Size Analysis of Soils D2974-71 D2974-71 D2976 Standard Classification of peats, mosses, humus and related products. Standard method of test for moisture, ash and organic matter of peat materials. Standard method of testing pH of Peat Materials.

Official Methods of Analysis (11th Edition, 1 October, 1970).

1.03

QUALITY ASSURANCE A. B. Perform work with personnel experienced in the work required of this section under direction of an experienced foreman. Quality Assurance, Section 02900 Landscaping Works.

1.04

SUBMITTALS A. The following data shall be submitted: 1. 2. 3. 4. 5. Manufacturer's certified analysis of standard packaged products. An independent laboratory analysis of all materials submitted to the Engineer/Resident Engineer for review. Manufacturer's or Vendor's certified analysis for fertilizer materials. Organic Amendment: Prior to shipping material to the project submit an analysis to the Engineer/Resident Engineer. Sand: Prior to the beginning of borrowing activities submit to the Engineer/Resident Engineer laboratory analysis showing items under fertility, agricultural suitability and particle sizes or as required by the Engineer/Resident Engineer. Prepared soil mix: Prior to placement of prepared soil mix in the landscape, submit to the Engineer/Resident Engineer laboratory analysis showing items in fertility and agricultural suitability as required. To ensure prompt proceeding of the work, stock piling of material after it has been tested and approved is permitted.

6.

7. B.

The following samples shall be submitted :

PLANTING SOIL MIX Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02920-1 11 March 2013

1. 2. 3. 1.05

Water: Samples of irrigation water in use shall be submitted to Engineer/Resident Engineer. Submit 1 1/2 litres. Sand and Organic Amendments: Samples of sand and organic materials shall be submitted to the Engineer/Resident Engineer. Submit 1 kg of each. Fertilizer: Samples of fertilizers shall be submitted to the Engineer/Resident Engineer. Submit 1 kg.

DELIVERY, STORAGE AND HANDLING A. Packaged Materials 1. 2. 3. 4. Store fertilizer separately from pesticides in a dry storage area away from contaminants and plant materials as approved by the Engineer/Resident Engineer. Stockpile bulk materials on site, covered and protected to prevent deterioration from sun and wind. Packaged materials will be delivered in labelled sealed containers showing the weight, analysis, name of manufacturer, point of origin and dealer, including expiration date. All pesticides shall be stored in a locked container in an air conditioned room. Herbicides shall be stored separately from other chemicals. Both storage areas shall be locked.

PART 2 - PRODUCTS 2.01 PLANTING SOIL MIX COMPONENTS A. Sand Sand for prepared soil mix shall be obtained from approved borrow sources. It will conform to the following physical and chemical characteristics. 1. Physical Characteristics: a. b. c. d. 2. Material passing a No. 10 sieve Material passing a No. 35 sieve Material passing a No.140 sieve Material passing a No.270 sieve 100% 90% - 100% 0% - 10% 0% - 3%

Chemical Characteristics: a. b. c. d. Salinity (Ece x 1000) SAR (Sodium Absorbtion Ratio) Boron (saturation extract) pH less than 4 less than 4 less than 1.5 ppm less than 8.0

B.

Organic Amendment - Bark Mulch Soil organic amendment shall be composted fir bark mulch as supplied by (1) Sequoia Horticultural Products, P. O. Box 963, Dinuba, CA 93618 (Tel : 209-528-2118), (2) Nordig Bark A8 (Tel : 46-454-640-00), (3) Bulrush Peat Co. Ltd., New Ferry Road, Bellaghy, Magherafelt, Coderry, BT458ND (Tel : 44-1-648386555) or approved equal. 1. Physical Characteristics: a. b. 2. Particle size shall be not less than 6mm diameter and not greater than 20mm diameter. Bulk Density : 300 - 400 kg/m3

Chemical Characteristics:
02920-2 11 March 2013

PLANTING SOIL MIX Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

a. b. c. d. e. f. g. h. C. Fertilizers

Organic matter greater than 80% pH 5.0 - 6.5 Salinity (ECe x 1000) 0.5 - 2.0 Total nitrogen 0.7 - 2.0 Available phosphorous 100 - 500 ppm CEC (meg/100 gms) 80 - 120 ppm Boron (by hot water extraction) less than 5 ppm SAR less than 2.0

Provide fertilizers as indicated below for soil mix. 1. Controlled release Fertilizer shall be Osmocote as manufactured by Sierra Chemical Company, Strijkviertel 35 II, 3454 PJ De Meern, Netherlands, or approved equal and shall be organic resin coated complete fertilizer with an analysis of 20-10-5+Fe and a release longetivity of 12-14 months at 21 degrees C soil temperature. Agriculture grade sulphur, 99% sulphur content with 100% passing a 16 mesh screen and 50% passing a 100 mesh screen.

2.

PART 3 - EXECUTION 3.01 PREPARATION A. Soil mix shall conform to the following requirements: 1. 2. 3. 4. B. Salinity (ECe x 1000) SAR pH less than 4.0 less than 4.0 6.5 to 7.5

Boron (by saturation extraction) less than 0.7 ppm

Soil mix is to be mixed in the quantities of proportions as indicated below according to the procedures outlined in 3.01 E 1. Planting Soil Mix: a. 75% Sand b. 25% Composted fir bark mulch c. 2 Kg Controlled Release Fertilizer per cubic meter. d. 2 Kg Soil Sulphur per cubic meter

C.

In the event that the pH of soil mix exceeds 7.5 the sand portion of the mix will be amended with suitable additives (soil sulphur, sulphuric acid, or other approved amendments) to bring the resultant soil mix into the specified range of 6.5 to 7.5. Such additives will be added to the sand prior to addition of the organic amendment. After adding such additives the sand will be leached to bring the salinity, SAR, pH and Boron of the resultant mix within the ranges indicated in Part 3.01 A. One trial lot of two (2) m3 will be prepared by the Contractor prior to the start of full soil mixing operations. Samples of these trials will be submitted for analysis. The analysis will include specific recommendations for changes in the soil mix formulations. The Contractor shall submit such analysis and recommendations to the Engineer/Resident Engineer. With the Engineer's/ Resident Engineer's approval, the Contractor may begin full soil mixing operations. Soil mixing procedure:

D.

E.

PLANTING SOIL MIX Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02920-3 11 March 2013

1.

Mix physical ingredients (sand, sulphur, composted fir bark mulch and fertilizer) to a uniform mixture. Mixing method shall be by wind rowing/tilling on an approved hard surface area and according to acceptable horticultural practices as approved by the Engineer/Resident Engineer. The organic portion should be moist. Apply fertilizer ingredients and mix until homogenous.

2. F.

The resultant mix will be moistened to about 5-10%.

END OF SECTION

PLANTING SOIL MIX Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02920-4 11 March 2013

SECTION 02925 PLANTING PROCEDURES AND MATERIALS PART 1 - GENERAL 1.01 WORK INCLUDED A. B. C. D. E. F. G. 1.02 Setting out by staking on site the location of all individual plants prior to construction of irrigation works. Transporting plants from plant holding area. Digging plant pits to size specified in planting details. Placing, compacting and leveling planting soil. Planting all trees, palms, shrubs, ground covers and vines. Supplying and installing tree staking and guying materials. Maintain plant material and associated landscape materials throughout the installation and maintenance period.

REFERENCES A. American National Standards Institute Z60.1 (ANSI).

1.03

QUALITY ASSURANCE A. B. Perform work with personnel experienced in the work required of this Section under direction of a skilled foreman. Personnel and equipment shall be as specified in Section 02900/1.05.

1.04

SUBMITTALS A. Samples shall be submitted in the approved form to the Engineer/Resident Engineer for review/approval. No materials shall be used until they are approved in writing by the Engineer/Resident Engineer. Samples shall be retained by the Engineer/Resident Engineer and all subsequent delivery of materials shall conform to the approved samples. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Prepared soil mix (1 kg) with laboratory test report Tree stakes (one), tree tie (one) Soil separator (one square meter) Decomposed granite top dressing (2 kg.) Stone surfacing (2 kg.) Wood battens for palms (3 Nos.) Burlap and wire for wrapping palms (1 sq. m & 1m) Drainage stone (1 kg) Clay fired brick pavers Stone paving materials i.e. granite, limestone, etc. Ceramic tile Drainage matt GRP Liner
02925-1 11 March 2013

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

14. 15. 16. B.

Fir bark mulch top dressing (1 kg) Kool deck surface (one square meter) Wood decking

Manufacturer's Literature: 1. Submit two (2) copies of manufacturer's literature for the following products. Products shall be reviewed and approved in writing by the Engineer/Resident Engineer. Materials shall not be used until approved by the Engineer/Resident Engineer. Samples shall be retained by the Engineer/Resident Engineer and all subsequent delivery of materials shall conform to the approved samples and labels. a. b. c. d. Fertilizer Pesticide Anti-desiccant Tree wound paint

PART 2 - PRODUCTS 2.01 PLANT MATERIALS A. 2.02 All plant materials are as specified in drawings and plant list.

ACCESSORIES A. B. C. Prepared soil mix as per approved soil mix of this section. Mulch: Nitrified composted fir bark mulch with iron by "Forest Magic" or approved equal. Guying and Staking Material: 1. Stakes shall be straight and sound of approved soft wood. They shall be not less than 5 cm square or 6 cm diameter if round. If insect repellant wood is not used, stakes shall be treated with an approved preservative. Stakes to be approved by the Engineer/Resident Engineer. Tree ties: Guying cable shall be 12 gauge U.S. pliable galvanized steel. Hose for protecting the tree against abrasion of the cable shall be reinforced two-ply rubber or plastic hose of suitable length and diameter. D. Fertilizer 1. 2. 3. E. F. Fertilizer to be added to tree, palm and shrub pits shall be SIERRATABS 21 gram slow release fertilizer tablets manufactured by Sierra Chemical Co., or approved equal. Fertilizer to be added to trees, palms and shrubs during maintenance period shall be as specified elsewhere in this specification. Agriculture grade sulphur, 99% sulphur content with 100% passing a 16 mesh screen and 50% passing a 100 mesh screen.

2.

Fungicide : Fungicide shall be as required to be reviewed and approved by the Engineer/Resident Engineer. Anti-desiccant : Anti-desiccant shall be an emulsion which provides a protective film over plant surface and permeable enough to permit transpiration. It should be delivered in containers of the manufacturer, mixed according to the manufacturer's directions, and shall be equal to "Wiltpruf", manufactured by Nursery

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02925-2 11 March 2013

Speciality Products, Inc., Groton Falls, New York,; "D-Way" manufactured by Plant Produce Company, Blue Point, Long Island; or "Foli-Gard, manufactured by E-Z F10 Chemical Company, Columbus, Ohio, U.S.A. G. H. Herbicide : Pre-emergence and post emergence herbicide shall be as approved by the Engineer/Resident Engineer. Tree Wound Paint : Tree Wound paint shall be Cabot's dressing or approved equal.

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02925-3 11 March 2013

I.

Soil Separator : Soil separator shall be "TERRAM 1000" by ICI Fibers-Gwent, UK, "Weed-check Landscape Mat" by Brighton By-products Co. Inc, New Brighton, PA, USA, "Mirafi 140S" 30 mil, nonwoven polypropylene and polyethylene fabric 150 pounds, by Celanese Fibers Marketing Co., distributed by Bowman Construction and Supply Inc., Denver, Colorado, U.S.A. or approved equal. Drainage Stone : Drainage Stone shall consist of minimum 2.5 cm diameter angular crushed stone. It shall be washed free of dirt, organic matter, clay, clay film and objectionable material and be in conformance with ASTM C-33 Table 2. It shall be located as shown on details and plans. Decomposed granite top dressing : Decomposed granite top dressing shall be inch minus size, Madison gold colour. Protective Fencing: Protective fencing shall consist of wire fencing and steel posts. 1. Wire fencing shall be galvanized steel 10 gauge wire with wires spaced not more than 15 cm vertically and 15 cm horizontally. Total height of fencing shall be not less than 1.2 meters from grade to the highest wire. Steel posts shall be specifically made for the purpose and of a length appropriate to the height of the fence. Posts shall have provision for attaching wire fencing integral with the construction of the post. Posts shall be galvanized and painted black.

J.

K. L.

2.

M.

Stone surfacing: Stone surfacing for water feature shall be a minimum of 1 cm. diameter and maximum of 2.5 cm. diameter. It shall be of hard, igneous rock with smooth, rounded form. It shall be in earth tone colors of brown, beigh, gray, etc. It shall be free of dirt, organic matter, clay and other objectionable material.

N.

Fir bark mulch top dressing : Mulch top dressing shall be composted fir bark mulch. Particle size shall be not less than 5mm dia and not greater than 8mm dia.

PART 3 - EXECUTION 3.01 PREPARATION A. The Contractor shall review the applicable architectural or engineering drawings and shall be familiar with the alignment of utility lines, ducts, irrigation lines and buried cables existing in the area. The Contractor shall field check the location of utilities shown on the drawings before any installation of material or plants. The Contractor shall be responsible for all damage resulting from any neglect or failure to comply with this requirement. Rough grading shall be examined to ensure that rough grading and all other subsurface work in planting beds is done prior to starting of planting. After the installation of all planting and irrigation, the Contractor shall also fine grade all areas other than those receiving ground cover. These areas shall be recompacted where necessary and raked to remove any rocks, stones, or other debris greater than 12 mm in diameter. The grade shall be smooth, even, and continuous with variations from finish grade to be no greater than plus or minus 25 mm.

B. C.

3.02

MARKING AND LAYOUT A. Prior to the construction of irrigation works the contractor shall set the following groups of plant species using a suitable marker, flag etc. to denote the location of the plants for approval by the Engineer/Resident Engineer. i) Palm Trees ii) Canopy Trees
02925-4 11 March 2013

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

iii) iv) v) vi) B.

Small Trees Large Shrubs Small shrubs and Vines Ground cover plants (typical sample areas only)

No excavation or placement of planting soil mix shall begin until layout of the planting beds and trees has been approved by the Engineer/Resident Engineer. Contractor shall supply replacement soil at no additional cost to the Owner. Layout of bed outlines shall be staked and stakes shall be driven in at tree and shrub locations. All shrub and typical sample ground cover plant rows shall be marked and coordinated with tree locations. The Contractor shall give the Engineer/Resident Engineer a fifteen (15) day notice in writing before the inspection of staking. Daily inspections will be made as necessary. The Engineer/Resident Engineer reserves the right to refuse inspection if, in his opinion, an insufficient quantity of work is available to be checked. The Engineer/Resident Engineer will inspect the staked locations of the bed outlines and palm tree and canopy tree locations in the field, and will direct the Contractor to adjust their locations as required.

C. D.

E. 3.03

GROUND COVER BED PREPARATION A. Protect all existing underground improvements and utilities from damage. Any damage to such improvements and utilities must be repaired or replaced by the Contractor at no additional cost to the Employer. Remove all foreign material, debris, roots, stones, plant parts and contaminated soil from the site. Do not bury such material on site. The planting soil mix shall be placed over the compacted sub-base and compacted using water saturation to the full mix depth. The area shall be levelled to within plus or minus 50 mm and then again be thoroughly irrigated with water to eliminate air pockets and settle soil. The soil shall be evenly moistened to a depth of 300 mm. After the irrigation system has been installed the Contractor shall recompact and settle all disturbed areas and fine grade to a smooth continuous grade. All germinating weeds shall be removed from the area and the soil shall form a smooth continuous grade, after planting and during maintenance.

B. C.

D. 3.04

EXCAVATION OF PLANTING PITS A. Excavation for planting shall extend to the required subgrades as indicated on the Drawings. The minimum depths of plant pits or beds shown on the Drawings shall be measured from finished grade. If sides of planting pits become glazed, the glazed surfaces shall be scarified. The Contractor shall take precautions not to damage the previously installed irrigation system. Damage to irrigation shall be corrected at no cost to the Owner. Remove all excavated material from the site on a daily basis. If rock, underground construction, or other obstructions are encountered in the excavation of plant pits, alternate locations may be selected as determined by the Engineer/Resident Engineer. Where location cannot be changed, as determined by the Engineer/Resident Engineer, the Contractor shall alter or remove the obstruction to a depth of not less than 500 mm below the required pit depth. The Engineer/Resident Engineer shall determine if a drainage test is required and shall instruct the contractor accordingly.
02925-5 11 March 2013

B. C. D.

E.

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.05

PLANT PIT DRAINAGE TEST A. Testing the drainage of plant pits shall be done by auger hole percolation test procedure which includes filling each pit 10 cm deep with water. The Engineer/Resident Engineer shall be notified of any plant pit that does not drain the water in Three (3) hours. Planting shall not proceed until the Engineer/Resident Engineer has reviewed test pit results. If remedial action is required because of unsatisfactory drainage of planting pits, the Engineer/Resident Engineer will advise the Contractor as to what remedial action should be taken. The Contractor shall not undertake remedial action until approved by the Engineer/Resident Engineer.

B.

3.06

PLANTING A. B. C. D. E. Where possible planting operations shall be confined to one area at a time. The object being to prepare, plant and finish each landscape area in one operation complete with its own functioning irrigation system. Excavate soil from pits as required. Remove all excavated material from the site. Loosen subsoil at base of planting pits. Place drainage rock and soil separator, if required, before addition of prepared soil mix. Set the plants at the same relationship to finished grade as they bore to the ground from which they were dug or soil level in their container. This does not apply to planting palms. Move and handle plants by container or rootball only. Large Palms and Trees which are moved by crane or front end loader must be protected so as not to damage the rootball, trunk, branches or fronds, See Section 02905. Set all planting plumb and brace trees, palms and shrubs rigidly in position until the prepared soil mix has been consolidated around rootball by water settlement. When planting Trees and Palms, backfill the tree pits in 500 mm lifts of prepared soil mix, water thoroughly and lightly tamp to eliminate all air pockets in the prepared soil mix. Cut ropes or strings from the tops of all plants after plant has been set and guyed, except palms. Plant containers shall be cut off all container grown plants and removed. Do not break or disturb rootball while planting. Shape grade around tree pits and planting beds as shown on the drawings and correct all compaction deficiencies. Ground cover and small shrub areas shall be planted in neat rows with spacing as shown on drawings. Water all plants immediately after planting. Install a water basin around each plant during the plant establishment period as directed by the Engineer/Resident Engineer. Immediately after planting, all plant material should be sprayed with anti-desiccant, applying an adequate film over trunks, branches, twigs, and/or foliage. Each fifteen (15) gallon tree shall be staked in accordance with the details, immediately following planting and spraying. Plants shall stand plumb after staking. Apply fir bark mulch, stone or other top dressing at the specified depth to all planting beds as noted on the drawings.

F. G. H. I. J. K. L. M. N. O.

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02925-6 11 March 2013

P. 3.07

Contractor shall take extreme care in the handling of plant material to avoid breaking or damaging the root ball. Plants that have been damaged by poor handling may be rejected by the Engineer/Resident Engineer.

PRUNING A. B. Pruning shall be done after planting and staking operations are complete. Pruning shall be done only by an experienced horticulturist or arborist. Do not prune until guidelines for pruning have been established in the field with the Engineer/Resident Engineer. The Engineer/Resident Engineer shall require that several trees or shrubs be pruned by the Horticulturist or Arborist in his presence, such pruning being prototypical for the entire job. Plants shall be pruned according to standard horticultural practice to preserve the natural character of the plant. Tip back crowns if so instructed. Remove all dead wood, suckers and broken or badly bruised branches. All saw cuts on branches larger than 2 cm, to be made with 3 cuts, i.e. undercut, stub cutoff and final cut. Only clean sharp proper tools shall be used. Do not use pruning shears where loppers are required or loppers where a pruning saw is required. All cuts over 1.0 cm in diameter shall be covered with tree wound paint.

C. D. E. F. G. 3.08

INSTALLATION OF PROTECTIVE FENCING A. B. C. D. Fences shall be erected around planting beds or as directed by Engineer/Resident Engineer. Fence posts shall be spaced at intervals not to exceed 2.5 meters. Posts shall be driven such that they are plumb. Wire fencing shall be stretched taut and secured to posts. Fences and posts shall be removed from the site by the Contractor as directed by the Engineer/ Resident Engineer.

3.09

INSTALLATION OF GRAVEL MULCH TOP DRESSING A. B. Gravel mulch to be used as a top dressing around the base of trees and palms except as otherwise shown on plans and details. Gravel mulch top dressing shall be placed in designated areas in an even layer 4cm thick.

3.10

INSTALLATION OF FIR BARK MULCH TOP DRESSING A. B. C. Fir Bark mulch to be used as top dressing in planting beds where gravel mulch is not specified. Fir Bark mulch top dressing shall be placed in an even layer 2cm thick. Fir Bark mulch top dressing should be placed immediately after planting and installation of the irrigation systems.

END OF SECTION

PLANTING PROCEDURES AND MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02925-7 11 March 2013

SECTION 02950 TREES, SHRUBS, VINES AND GROUND COVERS PART 1 GENERAL 1.01 WORK INCLUDED A. B. 1.02 Preparation of subsoil Plant quality and size

REFERENCES A. B. American Standard for Nursery Stock, ANSI Z 60.1-1990 FS O-F-241 - Fertilizers, mixed, commercial.

1.03

QUALITY ASSURANCE A. B. Nursery: Company specializing in growing and cultivating plants and approved by the Agricultural Department of Kuwait. Installer: Company specializing in installing and planting plants and approved by the Agricultural Department of Kuwait.

1.04

DELIVERY, STORAGE AND HANDLING A. B. C. D. E. Deliver products to site under provisions of Section 02905. Store and protect products under provisions of Section 02905. Deliver fertilizer in waterproofing bags showing weight, chemical analysis, and name of manufacturer. Protect plants until planted. Deliver plant materials immediately prior to placement. Keep plants moist.

1.05

ENVIRONMENTAL REQUIREMENTS A. Consider local conditions and the planting and growing season in Kuwait.

1.06

SEQUENCING AND SCHEDULING A. Coordinate the work of this Section with installation of underground irrigation system, utilities, piping and watering heads.

PART 2 - PRODUCTS 2.01 PLANT SIZE AND QUALITY A. Palms:

TREES, SHRUBS, VINES AND GROUND COVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02950-1 11 March 2013

1.

The Contractor shall supply palm trees as specified in the plant list. They shall be of a quality equal to palms designated as "Florida Fancy", in the Florida Department of Agriculture and Consumer Service Publication - Part II Palms and Trees referred to in this section. All palms shall be of sound health, vigorous and free of disease or insect infestation or damage. Fronds shall exhibit no signs of moisture stress. All palms shall have straight trunks. Any tree having a weak or thin trunk not capable of supporting itself when planted in the open will not be accepted. The minimum acceptable sizes are as follows: Ten meter and six meter - The trunk portion, exclusive of fronds shall be ten meter or six meters in length. The root ball shall be full and fibrous and 120 cm in diameter or 1.5 times the diameter of the trunk measured at the base of the crown whichever is larger.

2. 3. 4.

B.

Trees: 1. 2. 3. All parts shall be of sound health, vigorous and free of all disease or insect infestation or damage. The Contractor shall supply trees as specified in the plant list. They shall be of a quality equal to standards set forth in referenced standard ANSI Z60.1 - 1990. Trees shall have a straight trunk throughout their height and any tree with a weak, thin trunk not capable of supporting itself when planted in the open will not be accepted. The minimum acceptable size of all plants measured before pruning, with branches in normal position, shall conform to the measurements specified within the plant list. Plants larger in size than specified may be used, but the use of larger plants shall not affect the contract price. If larger plants are used, increase the ball of earth or spread of roots proportionately.

C.

Container Grown Plants: 1. All container grown plants shall be healthy, vigorous, well rooted and established in the container which they are to be planted from. They shall have tops which are of good quality, normal size for the species, and are in healthy growing condition. Plants shall not be root bound. Plants shall conform to the varieties specified in the plant list and be true to botanical name as listed in Hortus Third Standardized Plant Names. Plants shall be in accordance with ANSI Z60.1 - 1990 except as otherwise stated in the specifications or shown on the plans. Where the drawings or specifications are in conflict with ANSIZ60.1 - 1990 the drawings and specifications shall prevail. a. Container grown plant shall be a plant transplanted to a container and grown in that container sufficiently long for the new fibrous roots to have developed so that the root mass will retain its shape and hold together when removed from the container. b. Liner stock shall be free from abnormal circling, kinking or twisting of the root systems. Container size shall be 2-1/4 inches or 5.0cm (trade designation). c. The Engineer/Resident Engineer reserves the right to have the contractor remove any plant from its container to inspect the roots for binding or inadequate development. Container sizes are of the following trade designations. Sizes for most standard trees and shrubs are as follows: SIZE 1 Gallon 5 Gallon 15 Gallon 24 Box 36 Box 48 Box CONTAINER SIZE OR EQUIVALENT VOLUME 15 cm dia x 20 cm deep 23 cm dia.x 26 cm deep 40 cm wide x 45 cm deep 60 cm wide x 60 cm deep 90 cm wide x 90 cm deep 120 cm wide x 120 cm deep
02950-2 11 March 2013

2.

3.

TREES, SHRUBS, VINES AND GROUND COVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.02

PLANTING SOIL MIX A. Planting soil mix shall be as specified in Section 02920.

2.03

B. Mix prepared soil as herein specified prior to being placed in planting pits. ACCESSORIES A. B. C. D. Wrapping Materials: Burlap. Stakes: Softwood lumber, pointed end. Cable, Wire, Eye Bolts and Turnbuckles: Non-corrosive, of sufficient strength to withstand wind pressure and resultant movement of plant life. Plant Protectors: Rubber sleeves over cable to protect plant stems, trunks and branches.

2.04

VERIFICATION A. Provide certification of inspection by the Agricultural Department of Kuwait.

PART 3 - EXECUTION 3.01 EXAMINATION A. B. C. 3.02 Verify that prepared subsoil is ready to receive work of this section. Saturate soil with water to test drainage. Verify that required underground utilities are available, in proper location, and ready for use.

PREPARATION OF SUBSOIL A. B. C. Prepare subsoil to eliminate uneven areas. Maintain profiles and contours. Make changes in grade gradual. Blend slopes into level areas. Remove foreign materials, weeds and undesirable plants and their roots. Remove contaminated subsoil. Dig pits and beds larger than plant root system as shown on drawings and details.

3.03

PLANTING A. B. C. D. E. Place plants for best appearance for review and final orientation by Engineer/Resident Engineer. Set plants vertical. Set plants in pits or beds, partly filled with planting soil mix. Remove wires or containers from the root ball. Place plant materials so roots lie in a natural position. Backfill planting soil mix in layers. Maintain plant materials in vertical position. Saturate soil with water when the pit or bed is half full of prepared soil mix and again when full.

3.04

PLANT LOCATIONS A. Place trees no closer than 1 meter to a fence, wall, 1 1/2 meters to a building foundation.
02950-3 11 March 2013

TREES, SHRUBS, VINES AND GROUND COVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. 3.05

Place shrubs at least 50 cm from foundation, walls and walks for protection of stem walls, and as much further as character of growth demands. The Engineer/Resident Engineer will check the stakeout of all planting areas and planting pit locations prior to excavation.

PLANT SUPPORT Brace plants vertically with plant protector wrapped guy wires and stakes to the following; Tree Size 15 gallon 24 box 4 meter Ht. Date Palms Tree Support Method 3 stakes with two ties 3 stakes or guyed Wood braces (3) as shown in details

END OF SECTION

TREES, SHRUBS, VINES AND GROUND COVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02950-4 11 March 2013

SECTION 02960 HARDSCAPE MATERIALS PART 1 - GENERAL Hardscape materials to include clay fired brick pavers, granite pavers and limestone pavers and cladding. Limestone pavers and cladding to be as specified in section 04400, exterior stonework of the architectural specification. 1.01 WORK INCLUDED A. 1.02 The work covered by this section comprises furnishing all plant, labour, equipment, appliance and materials and performing all operations in connection with hardscape materials.

REFERENCES A. Comply with the applicable provisions and recommendations of the following ; 1. 2. 3. 4. BS 7533-1 : 2001 BS 7533 : Part 3 : 1997 BS 6677 : Part 1 : 1986 ASTM Standards : C43, C67, C88, C410 and C418

1.03

QUALITY ASSURANCE A. The fabricator shall have a minimum of 10 years successful experience in the fabrication of granite and brick pavers in sizes, shapes and finishes to units required for this project and shall have adequate facilities to provide the units.

1.04

SUBMITTALS A. Shop Drawings : Submit shop drawings indicating the dimensions of units, details of special shapes and reinforcing for each unit and installation layout indicating reference to nearest grids and any other important features. Samples : 1. Submit 200 x 100 x 65mm samples of clay fired brick pavers in all colours and finishes for preliminary approval of colour and finish. The colour range and texture for the finished units shall be within limits established by the approved samples. Submit 300 x 600 x 65mm samples of granite pavers in all colours and finishes for preliminary approval of colour and finish. The colour range and texture for the finished units shall be within limits established by the approved samples. Submit 100x100x80mm Basalt stone sample in all colours and finishes for preliminary approval of colour and finish. The colour range and texture for the finished units shall be within limits established by the approved samples.

B.

2.

3.

C. 1.05

Product Data : Submit manufacturers technical data for the types of manufactured hardscape units. Including certification that the types of manufactured units comply with specified requirements.

VISUAL MOCK-UP

HARDSCAPE MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02960-1 11 March 2013

A.

Following approval of the samples construct full scale visual mock-ups of hardscape materials showing all patterns and edge conditions, to simulate final condition. Mock-up, if approved, may be used in the final work.

1.06

DELIVERY, STORAGE AND HANDLING A. All materials, in so far as practicable shall be delivered in the manufacturers original unopened containers and packages with seals unbroken and labels intact and shall be stored in a dry place. Materials such as cements which are partially caked, the containers for which show water strains, or which are otherwise damaged or unsuitable for use, shall be removed from the site immediately. Take all necessary precautions to prevent chipping, cracking or other damage during the unloading, and storage on the site. Damaged hardscape materials will not be allowed to be installed, and should any damage be found in installed work, such work shall be removed immediately and replaced with new material. The Contractor shall assume all expenses incurred therefrom.

B.

1.07

COORDINATION A. The work of this Section shall be completely coordinated with the work of other Sections. Verify dimensions and work of other trades which adjoin materials of this Section before the installation of items herein.

PART 2 - PRODUCTS 2.01 MATERIALS A. Clay Fired Brick Pavers The clay pavers shall be wirecut chamfered pavers with integral spacers and shall be classified as Type PB to BS 6677 : Part 1 : 1986. The pavers shall exhibit the following technical characteristics : Classification Durability Transverse breaking load Limits of Size Standard Work Size Dry weight per paver Density Skid Resistance Abrasion resistance Clay type PB type paver, BS 6677 : Part 1 : 1986, Table 1 FL Designation, BS 3921 : 1985, Table 3 > 40 kN (mean) Type PB BS 6677 : Part 1 : 1986, Table 2 200 x 100 x 65mm (including integral spacers) 2.8 kg (typically) 2300kg/m3 (typically) Mean wet unpolished skid resistance value (UPV) : >70 Mean wet polished skid resistance value (PPV) : > 50 < 300mm3 Coal measure clay shale

Colours : To be Selected by the clients B. Approved manufacturer National Industries Kuwait AZIZ Blocks Kuwait. Or equivalent approved

HARDSCAPE MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02960-2 11 March 2013

C.

Sand : 1. 2. Sand to be pure silica sand complying with ASTM C144 sieve size. The clay and silt content shall not exceed 3%.

PART 3 - EXECUTION 3.01 WORKMANSHIP A. B. 3.02 The Contractor shall be responsible for preparing a proper surface to receive the hardscape materials. Floor slabs and concrete to receive a hardscape paving finish shall be clean and free of all foreign matter detrimental to the bond.

PROTECTION OF CLEAN UP A. At the end of each day, remove from the site and dispose of all cartons, rubbish and debris resulting from the work of this section.

END OF SECTION

HARDSCAPE MATERIALS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02960-3 11 March 2013

SECTION 02970 LANDSCAPE MAINTENANCE PART I - GENERAL 1.01 WORK INCLUDED A. B. C. D. E. 1.02 The Contractor shall furnish and supply all materials, equipment and labor for maintenance of all landscaped areas installed as part of this contract. The work shall include, but not be limited to mowing, weed control, insect control, disease control, pruning and replacement of sub-standard or dead plant material. The Contractor shall perform all work in a manner to comply with the original installation specifications. The Contractor shall also be responsible for required maintenance as contained in other Sections of the contract. Contractor shall perform maintenance for a period of two years commencing with substantial completion of the project.

REFERENCES A. B. C. ASTM ANSI BS : : : American Society for Testing and Materials American National Standards Institute British Standard

1.03

QUALITY ASSURANCE A. Ordinances and Regulations: Local Ministry, Municipality, State of Kuwait laws, and rules and regulations governing or relating to any portion of this work, are hereby incorporated into and made a part of these specifications, and their provisions shall be carried out by the Contractor. Anything contained in these specifications shall not be construed to conflict with any of the above rules and regulations of requirements of the same. However, when these specifications and drawings call for or describe materials, workmanship, construction operations/ maintenance of a better quality, higher standard, or larger size than is required by the above rules and regulations, the provisions of these contract documents shall take precedence. B. Manufacturer's Directions: Manufacturer's directions and detailed drawings shall be followed in all cases where the manufacturers used in the contract furnish directions covering points not explained in the contract documents.

1.04

STANDARDS AND CODES A. Unless otherwise stated, the standards, codes and publications in their latest edition at date of enterprise shall be considered as part of this specification.

1.05

SUBMITTALS A. The following shall be submitted unless otherwise approved elsewhere. 1. Manufacture's certified analysis of standard packaged products.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-1 11 March 2013

2. 3. 4.

For other than standard products, analysis by a laboratory and methods approved by the Engineer/Resident Engineer. Manufacturer's or vendor's certified analysis for fertilizer micronutrients and chemical control (weed, insect, disease) products. Sand and organic amendments: a laboratory analysis containing the items as indicated below by methods and a laboratory approved by the Engineer/Resident Engineer. a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. Salinity (EC) pH Boron (by hot water extraction method) Particle sizes and percent passing using U.S. Standard sieves. Moisture content Bulk density Organic matter (by ash) Total Nitrogen (%) Organic Nitrogen (%) Nitrate Nitrogen (ppm) Ammonium Nitrogen (ppm) Available Phosphorous (ppm) Available Potassium (ppm) Available Calcium (ppm) Available Magnesium (ppm) Dilute Acid Soluble Ion (%) Half Saturation percentage

Note: Values for items d-q based on dry weight 5. Contractor shall submit a schedule of materials within 30 days after acceptance of the contract. This schedule shall include: a. b. c. 1.06 RECORD A. The Contractor shall keep on site a maintenance log. The Contractor shall record daily all operations performed. Copies of the daily work sheets log shall be sent to Owner and Engineer/Resident Engineer. This log shall include: 1. 2. 3. 4. 5. 6. Materials used including unit quantity, total quantity and method of application including water and fertilizer consumption. Repair work performed including plant replacements and equipment status. Directions from Engineer/Resident Engineer and course of action taken. A log of all required tests and inspections as outlined in these specifications. Any other documentation necessary to provide a clear, traceable maintenance procedure. A maintenance manual stipulating a complete schedule of resources including equipment, consumables, and tasks to be performed, together with a list of suppliers and costs for each maintenance function and resource. A list of all maintenance personal and their C.V.'s shall be submitted to the Engineer/Resident Engineer for approval. The designated personnel shall be on site full time during normal working hours. All maintenance personnel shall wear uniforms during normal working hours. Contractor shall
02970-2 11 March 2013

Proposed equipment Chemicals and fertilizers which the Contractor anticipates using on the job, including those for the fertilizer injection units of the pump house. A sample label for each producer being submitted for approval.

7.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

submit a sample of the uniforms for approval. Penalty for non-compliance with this requirement shall be KD. 10/- (Kuwaiti Dinars Ten only) per man per day. 1.07 ALTERNATE MATERIALS A. Substitution of any product, material or equipment without prior written approval of the Engineer/Resident Engineer shall not be permitted.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-3 11 March 2013

1.08

PRODUCT HANDLING A. Deliver materials in manufacturer's original unopened containers, with each container identified with manufacturer's name, brand or type. Materials shall be stored at location and in a manner approved by the Engineer/Resident Engineer.

1.09

SCHEDULING A. The Contractor shall coordinate with the facilities program coordinator monthly all of the activities scheduled for the complex and the allowable forms of maintenance, any restricted areas and priorities. After schedule has been prepared it shall be submitted to the Engineer/Resident Engineer for approval.

PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT 2.01 GENERAL A. Safety - Contractor shall be responsible for using, maintaining and storing all equipment and products in a safe manner. this safety requirement includes but is not limited to, providing additional safety equipment, training of all employees, protection of environment, protection of all persons within the area and determination of proper weather conditions for safe use. Suitability - The Contractor shall be responsible for determining suitability of any specific product for his need. Use of an unsuitable or non-effective product does not release Contractor from his responsibility for the project. Testing and Submittals 1. Contractor shall have a minimum of 6 soil samples and 2 water samples (one brackish and one fresh) at locations as directed by Engineer/Resident Engineer, tested and analyzed for all items shown in Section 1.05 A, 4. These tests shall be performed by a competent licensed soils testing laboratory as approved by the Engineer/Resident Engineer. Contractor shall cause to be performed, any and all tests necessary to identify or confirm a disease, pest, nutrient or herbicide problem or suspected problem. These tests shall be at Contractor's expense. Engineer/Resident Engineer may cause to be performed, any tests which in his opinion will identify a heretofore unidentified problem. Should these tests indicate or identify the problem, they shall be at Contractor's expense. Contractor shall submit, within 30 days of the date of enterprise, an anticipated list of products to be used. This list must be approved by the Engineer/Resident Engineer prior to use. Should additional unanticipated products be required, these must be approved prior to use on site. In addition to regularly scheduled soil testing, the contractor shall supply the following equipment for use in monitoring soil fertility. Two (2) Model B Oakfield Tube Soil samplers, each sample shall include: one (1) 12" handle two (2) 12" extension rods one (1) 12" tube with No. S-2 tip one (1) No. 13 carrying case One (1) No. SD 3006S Solu-bridge Soil Tester Kit including the following: one (1) SD-BI5 Soil Tester one (1) CEL-PS2 Conductivity Cell one (1) Thermometer two (2) Measuring Flasks one (1) Carrying Case

B. C.

2.

3.

4.

5.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-4 11 March 2013

D.

Warranty of Products - Should any product not perform as per manufacturer's warranty, the Contractor shall immediately remedy the problem on site. Contractor may then elect to pursue the issue with the manufacturer. Under no circumstances shall contractor delay treatment or remedy, pending manufacturer's honor or warranty. Likewise, non-effectiveness of products does not release contractor from any and all responsibilities as outlined in these specifications.

2.02

CHEMICAL PRODUCTS The following products are suggested for use. These products must be approved by the Engineer/Resident Engineer prior to use. Other products may also be used and should be included on the list of anticipated products by the Contractor. A. Pesticides 1. 2. 3. B. Malathion or Diazinon - Contact, leaf applied pesticide. recommendations. Use according to manufacturer's

Metasystox-R [2-(ethsulfinyl) ethol] 0.0 - dimethyl phoshorothioate - Systemic, leaf-applied pesticide. Di-system 0.0 - diethyl X-[z-8 ethylthiote) ethyl] phosphorotioate - Systemic, soil applied pesticide.

Herbicides - The Contractor shall not, under any circumstances, use soil sterilants on this site. 1. 2. 3. 4. 5. 6. Surflan 75-WP-oryzalin - Pre-emergent herbicide Ronstar-G-4%-oxa-dizaon - Pre-emergent herbicide. Dacthal-DCPA - Pre-emergent herbicide Buctril and Brominal - Both made from Bromoxynil. Should be used while weeds are young. Fusilade - Fluzaisop - Buryl - For control of grasses in broadleaf shrubs. Roundup - Glyphosate - Systemic herbicide. Contractor must be careful to avoid contact with desirable vegetation.

C.

Fertilizers: 1. 2. 3. 4. 5. Flowering ground covers - use fertilizer with 8-15% N, 30-45% p, 15-20% k. the use of a soluble product for use through the drip system is recommended. Ground Covers - 20-20-20 is recommended in soluble form for use through the drip system. Shrubs and Trees - A high nitrogen fertilizer is recommended. Iron - Iron chelate molecule 138. Zinc - In form of zinc chelate, EDTA.

2.03

PLANT MATERIAL A. Plant material shall be replaced in the same sizes as the original material with the following exceptions: plants which have declined or died as a result of disease, pests, lack of water or negligence on the part of the Contractor, shall be replaced with the same species of plant and of a size equal to the adjacent plant or the average of all plants on site of the same species at the discretion of the Engineer/Resident Engineer. Replacement material shall be the same as the original quality specified.

B. 2.04

INERT MATERIALS A. Inert materials shall conform to original installation specifications in all aspects.

2.05

PERSONNEL

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-5 11 March 2013

A.

Maintenance Supervisor - The maintenance Supervisor shall have eight years experience in arid lands landscape maintenance, of which six years are in a supervisory capacity. Four years of the supervisory experience. In lieu of eight years experience, the landscape maintenance supervisor may have a degree in Horticulture, plant Science, Agronomy or related Field and have four years supervisory experience Landscape Foreman - The landscape Foreman shall have six years experience in arid lands landscape maintenance, of which four years are supervisory over a crew of at least five people. In lieu of six years experience, the landscape Foreman shall have a degree in Horticulture, Plant Science, Agronomy or a related field and have two years maintenance experience in a supervisory capacity over a crew of at least five people. Horticulturist - The Horticulturist should have a background in plant protection and be fully knowledgeable in arid lands plant diseases, pests and other problems. The Horticulturist shall have a degree in Horticulture and 5 years experience or shall have 10 experiences in Horticulture. Degrees in agronomy and or farming shall not be acceptable. The following skills are required on site. These skills do not necessarily have to be different personnel from those specified above. 1. 2. Mechanic - An equipment maintenance mechanic with two years experience in maintaining landscape equipment. This person should have the capability to perform a major engine overhaul. Soil test analysis - One member of the maintenance staff shall have the ability to read and interpret a soil analysis report. This person shall be able to formulate a course of action to correct any problems indicated in the soils reports. Plant disease and pest identification - One member of the maintenance staff must have the ability to identify and diagnose and pest problems. In addition, this person shall be able to select an appropriate course of action to correct or eradicate those problems.

B.

C.

D.

3.

F.

Above Personnel shall begin work immediately after the first area has been planted subject to the stipulations in Section 02900. This shall not be construed as the Commencement of the Maintenance Period.

PART 3 - EXECUTION 3.01 GENERAL A. 3.02 The Contractor shall perform all operations in a safe and workmanlike manner. All operations shall conform to any applicable codes and environmental safety standards.

CHEMICAL APPLICATIONS A. Pesticide Program 1. Safety - The Contractor shall supply all workers handling pesticides with proper clothing and equipment necessary to insure worker safety. This includes, but is not limited to, coveralls, gloves, eye protection and/or face protection. All pesticide application equipment shall be kept in a working condition that will not endanger workers. Training - The Contractor shall be responsible for training all workers utilizing pesticides. This includes, but is not limited to, mixing techniques, rates and timing of application, use and maintenance of equipment, safety precautions, disposal of waste. Performance a. Contractor shall submit to the Engineer/Resident Engineer a list of anticipated pesticides for approval. Along with this list, contractor shall submit a label sheet from each pesticide. Additional pesticides not anticipated in the list must be approved by the Engineer/Resident Engineer prior to use on the job. Non-approval or delays in approval shall not release contractor from responsibility as outlined in d. below.
02970-6 11 March 2013

2.

3.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b.

c. d.

Contractor shall inspect, on a monthly basis, all plant material for presence of pests. This inspection shall be noted in the maintenance log. Contractor shall also make casual inspection during the course of other work for pest problems. These problems shall also be noted in the maintenance log. Upon detection of a pest problem, contractor shall immediately cause proper correctional measures to be taken. These measures shall also be noted in the maintenance log. Contractor shall be responsible for all damage caused by pests, whether detected or not. Repair of damages may include additional fertilizers, amendments or replacement as deemed necessary by the Engineer/Resident Engineer.

4.

Storage - Contractor is responsible for storing all pesticides in a safe manner. This includes complying with all recommendations on the label as well as all applicable codes. No pesticides shall be left unlabelled on site. All pesticides shall be stored in an air conditioned locked storage room or building located in the Contractor's site maintenance area. Herbicides shall be stored separate from other chemicals.

B.

Herbicide Program 1. Safety - The Contractor shall supply all workers handling herbicides with proper clothing and equipment necessary to insure worker safety. This includes, but is not limited to protective clothing and properly functioning equipment. Training - The Contractor shall be responsible for training all workers utilizing herbicides. This training shall include, but not necessarily be limited to, mixing techniques, rates of applications methods of application, use and maintenance of equipment, safety precautions, disposal of waste and protection of desirable vegetation. Performance - The Contractor shall be responsible for maintaining all landscape areas under this contract in a weed free condition. a. Contractor shall submit to the Engineer/Resident Engineer a list of anticipated weed control products. Along with this list, Contractor shall submit a label sheet for each product. Additional products not included on the list must be approved by the Engineer prior to use on the job. Non-approval or delays in approval shall not relieve contractor from responsibility as outlined in b. below. b. Contractor shall inspect and remove, by chemical or manual means, all weeds and unwanted vegetation from the project on a weekly basis. c. Pre-emergent - The Contractor shall supply pre-emergent twice annually to reduce the occurrences of weeds on the site. This pre-emergent shall be applied to all turf, rock and shrub areas except those adversely affected by such chemicals. d. Broadleaf Weed Control - The Contractor shall spot treat broadleaf weeds as they occur. If needed, selective herbicides may be applied in areas of broad leaf infestation. e. General weed Control - The Contractor may apply systemic herbicides in areas heavily infested by weeds and unwanted grasses. Contractor shall exercise care not to damage any desirable vegetation. Any plant material indicating herbicide damage shall be immediately replaced at Contractor's expense. f. Exclusions - Under no circumstances are soil sterilants to be used in this site. Storage - Contractor is responsible for storing all herbicides in a safe manner. This includes complying with all recommendations on label as well as all applicable codes. No herbicides shall be left unlabled on site. All herbicides shall be stored in a locked interior storage room located in the Contractor's maintenance area. If the Engineer/Resident Engineer advises the Contractor of a pest/disease problem, the contractor shall implement a control program immediately upon receipt of such notification.

2.

3.

4.

5. C. Fertilizers

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-7 11 March 2013

1.

Safety - The Contractor shall supply all workers handling fertilizers with proper clothing and equipment necessary to insure worker safety. This includes, but is not limited to, protective clothing and properly functioning equipment. Training - The Contractor shall be responsible for training all workers applying fertilizers. This training shall include, but not necessarily be limited to, rates of application, methods of application, use and maintenance of equipment, safety precautions & disposal of waste. Performance a. Upon receipt of quarterly soil and water reports, Contractor shall develop a program to supply adequate nutrients indicated in the report. This program shall be approved by the Engineer/Resident Engineer but does not release Contractor from providing additional nutrients needed to maintain plants in healthy condition. b. The contractor shall perform a quarterly walk-through with the Engineer/Resident Engineer to inspect the plant material. The Contractor shall, as part of the quarterly program, design proper nutrient feedings to alleviate any specific problem areas identified by the Engineer/Resident Engineer. c. Should any plant materials show continuing nutrient deficiencies through two consecutive quarters, contractor shall replace such material and supply proper soil mixes to alleviate this deficiency problem. d. The Contractor shall supply, furnish, mix and place in tanks at the pump house, all fertilizers and micronutrients required by the plants and duly approved by the Engineer/Resident Engineer.

2.

3.

D.

Disease Program 1. 2. Safety - The Contractor shall supply all workers handling chemicals with proper clothing and equipment necessary to insure worker safety. Training - The Contractor shall be responsible for training all workers applying disease control and preventive products. This training shall include, but not necessarily be limited to, rates of application, methods of application, use and maintenance of equipment, safety precautions and disposal of waste. Performance a. Contractor shall submit to the Engineer/Resident Engineer a list of anticipated disease control agents for approval. Along with this list, Contractor shall submit a label sheet from each product. Additional products not anticipated on the list must be approved by the Engineer/Resident Engineer prior to use on the job. Non-approval or delays in approval shall not release contractor from responsibility as outlined in d. below. The contractor shall implement a preventative control program once a disease is identified or discovered. The implementation of such a program shall be at the direction of the Engineer/Resident Engineer and shall be considered incidental to the maintenance program and no additional payment will be made for it. Contractor shall inspect all plant material for presence or indication of disease on a monthly basis. This inspection shall be noted in the maintenance log. Contractor shall also make casual inspection during the course of other work for indications of disease problems. These problems shall be noted in the maintenance log. Once identified, the Contractor shall advise the Engineer/Resident Engineer in writing of the disease problem and submit a control program for review by the Engineer/Resident Engineer. At that time the decision to implement a preventative or a curative control program will be made by the Engineer/Resident Engineer. Upon detection of a disease problem, Contractor shall immediately institute a program to eradicate this disease. This program shall be noted in the maintenance log. Contractor shall be responsible for all damage caused by disease, whether detected or not. Repair of damages may include disease control products, fertilizers and/or replacement. Should any plants show moderate decline due to disease (as judged by the Engineer/Resident Engineer), Contractor shall immediately replace these plants.
02970-8 11 March 2013

3.

b.

c. d.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.03

TREES, SHRUBS, VINES AND GROUND COVERS A. Addition of Nutrients 1. Iron - The Contractor shall add iron in the form of iron chelates - Molecule 138 to all plants as needed. Iron will be deemed as needed whenever soil tests show a deficiency or plant material shows indication of iron chlorosis. Contractor is to add iron chelates at manufacturer's prescribed rate. The sulfate forms of iron will not be considered appropriate action for iron deficiency. Fertilizer - Trees, shrubs, vines and ground covers may be fertilized utilizing a liquid fertilizer injected through the drip system or by hand applying fertilizers to each plant. Should hand-applied methods be used, these must be hand- watered to assure dissolving of fertilizers into soil. Plants are to be fertilized according to a schedule as approved by the Engineer/Resident Engineer. Should soils indicate or general plant condition indicate need for additional nutrients, these shall also be added. a. All plant material shall be fertilized as indicated by soil tests and plant conditions. b. Flowering shrubs and ground covers shall be encouraged to bloom by use of a high phosphorous fertilizer.

2.

B.

Pest and Disease Control 1. 2. Contractors shall conform to all inspection and treatments listed under Section 3.02. Contractor is responsible for replacement of all plants which are significantly deformed or damaged by pests and disease. Any replacements shall be at no additional cost to the Owner.

C.

Trimming and Pruning 1. Trees a. Palms shall have old frond bases cut as directed by the Engineer/Resident Engineer. This work shall be executed immediately after substantial Completion. b. Frequency - The primary pruning of trees will be once per year, however certain species which grow quickly may require more frequent pruning. Additional pruning is required if there is damaged, dead or deformed growth on the tree. c. Performance - Contractor shall: * Prune trees to select and develop permanent scaffold branches that are smaller in diameter than the trunk or branch to which they are attached. These scaffold branched should be encouraged at 18"-48" spacing with radial orientation so as not to overlay one another. * Prune trees to eliminate diseased or damaged growth. * Prune trees to eliminate narrow U-shaped branch forks that lack strength. * Prune trees to maintain growth within space limitations. * Thin crown to reduce toppling and wind damage. * Prune palm trees to remove dead fronds. d. Restrictions - Under no circumstances shall the Contractor strip lower branches from young trees. Lower branches shall be retained in a "tipped back" or pinched condition with as much foliage as possible to promote caliper trunk growth. Lower branches may be cut from trunk only after the tree is able to stand erect without staking or other support. 2. Shrubs and Ground Covers a. Frequency - Shrubs and ground covers are to be trimmed twice per year. However certain species which grow quickly may require more frequent pruning. Additional prunings are required if shrub or ground covers are overgrowing walks or entrances or if there is diseased, damaged or deformed growth. b. Performance - The Contractor shall: * Prune shrubs to develop thick, full foliage and growth indicative of the species. * Prune ground covers to promote full coverage of the area. * Prune lateral branches or buds or prune flush with trunk. "Stubbing" is not permitted.
02970-9 11 March 2013

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

c. D. Staking 1. 2. 3.

Pruning: Shrubs and ground covers (except Wedelia) shall be clipped into boxed forms as required by the Engineer/Resident Engineer.

Inspection - Staking of trees shall be inspected on a regular basis. Any broken stakes shall be replaced immediately as per original construction standard. Removal - The Contractor shall remove staking when a tree can stand in a vertical and erect form and can withstand climatic conditions or as directed by the Engineer/Resident Engineer. Girdling - Contractor shall assure that no staking is girdling the tree. Should this occur, the Contractor shall either remove the stake if Item #2 above applies, or adjust the wire to alleviate this problem. Girdled trees are not acceptable and shall be replaced with another like tree of same current tree size at Contractor's expense. Responsibility - Contractor shall be responsible for any trees damaged by improper staking or lack of staking. These trees shall be replaced with same species and current size tree and at no additional cost to the Owner.

4.

E.

Replacement Contractor shall be responsible for maintaining all trees, shrubs, vines and ground covers in a healthy condition. Any dead or diseased or declining plant material shall be immediately replaced and at no additional cost to the Owner.

F.

Leaching 1. 2. Contractor shall flush salts from the root zone. This shall be done whenever plants show indication of salt burn or soil tests indicate salts beyond levels agreed as acceptable in brackish irrigation water. Contract shall leach as follows:a. Run system as normally run. b. Probe rootzone to determine normal water penetration levels. c. Run system with fresh water for three times the normal running time (a normal one-hour cycle will be run for three hours). d. Check penetration of water. Water zone should be expanded well beyond the root system. If not, increase timing to four times normal. e. Use increased timing and fresh water for three days. f. Return system to brackish water use. Allow landscape to partially dry out prior to commencement of regular irrigation. Leaching should be done based upon tests and visual observation of the plants.

3. 3.04

INERT MATERIALS A. Weed Control - The Contractor shall be responsible for maintaining all planting areas in a weed-free condition. This may be attained using herbicides (in completiance with other Sections of these specifications) or by manual removal. Weed removal shall occur on a weekly basis. Debris Removal - All debris, including trash, leaves and organic debris, shall be removed on a weekly basis. All gravel surfaces are to be raked to a neat, clean and even appearance on a weekly basis. Any mulch or other soil that has moved out of bounds (i.e. onto paving or turf) is to be removed and/or replaced in planting beds. All edges of mulch areas to be neat and even. Contractor shall add additional material to areas not conforming to original specified thickness every six months.

B. C.

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-10 11 March 2013

E.

Contractor shall maintain all planting areas in a neat and raked condition. Area shall be inspected and raked as needed on a weekly basis. Planting area maintenance shall include weekly weed control and removal, erosion repair and litter removal.

END OF SECTION

LANDSCAPE MAINTENANCE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

02970-11 11 March 2013

SECTION 03100 CONCRETE FORMWORK PART 1 GENERAL 1.01 A. B. 1.02 A. B. C. 1.03 GENERAL: Drawings and general provisions of the Contract, including General and Particular conditions and Division 1 Specifications, apply to this Section. The responsibility for the design, fabrication, erection, striking, safety and adequacy of the whole of the formwork shall rest entirely with the Contractor. RELATED WORK SPECIFIED ELSEWHERE: Section 03200 - Concrete Reinforcement. Section 03300 - Cast-in Place Concrete. Section 03451 Plant-Precast Architectural Concrete. REFERENCES Comply with the following codes and practices in addition to all regulations and standards set by local authorities having jurisdiction over the project. A. American Concrete Institute: 1. ACI 117 Standard Specification for Tolerances for Concrete Construction and Materials. 2. ACI 301 Specification for Structural Concrete. 3. ACI 318M Metric Building Code Requirement for Structural Concrete. 4. B. ACI 347 Guide to Formwork for Concrete.

American Forest and Paper Association: 1. AF&PA National Design Specifications for Wood Construction.

C. The Engineered Wood Association: 1. D. APA/EWA PS 1 Voluntary Products Standard for Construction and Industrial Plywood.

American Society of Mechanical Engineers: 1. ASME A17.1 Safety Code for Elevators and Escalators.

E. American Society for Testing and Materials: 1. ASTM D1751 Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types). F. West Coast Lumber Inspection Bureau: 1. WCLIB Standard Grating Rules for West Coast Lumber.
CONCRETE FORMWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 03100-1 11 March 2013

1.04

QUALITY ASSURANCE: A. B. Personnel's Qualification: Design and construction shall be executed and supervised by fully qualified personnel MOCK-UP 1. 2. 3. 4. Section 01400 Quality Requirements: Requirements for mock-up. Construct mockup, 3.00x3.00 m in size, including formwork, form liners, form and Locate where directed by Engineer. Incorporate accepted mockup as part of Work. accessories.

1.05

DESIGN CRITERIA A. B. Formwork systems shall be prefabricated and properly designed to meet the requirements herein and any portion which shows signs of sagging or displacement shall be rectified. All formwork shall be constructed plumb, true water and mortar tight, sufficiently rigid and strong to prevent sagging between supports and to maintain true position and shape during and after placing of concrete without bowing and distortion. Exceptional care shall be taken to minimize fins, ridges, offsets, leaking of fins and other defects. Design shall take into account: 1. 2. 3. 4. 5. 6. 7. 8. 9. Height of pour Thickness of member Rate of pour Concrete slump Placing temperature Texture of finish Concrete density Construction joints Wind load

C. D.

10. On soffit forms (in addition to concrete weight): a. OR b. If a motorized cart is used, an additional live load of 3.75 KN/sq.m An additional live load of 2.5 KN/sq.m,

11. Minimum design load for combined dead and live load: a. 5.00 KN/sq.m
03100-2 11 March 2013

CONCRETE FORMWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b.

If a motorized cart is used, 6.24 KN/sq.m

12. The worst combination of: a. b. c. d. e. f. g. h. Self-weight Formwork forces Reinforcement Weight Wet concrete weight Construction loads Wind loads Incidental dynamic effects caused by placing, vibrating and compacting concrete. The use of externally applied vibrators.

13. Methods of concrete discharge. E. Design formwork to be: 1. Sufficiently rigid to maintain the correct position shape and profile so that the structure is within the dimensional tolerance specified in ACI-301, Chapter 4. final concrete

2. Demountable without shock, disturbance or damage to concrete. Soffit formwork, properly supported on props only, shall be capable of being remained in position during concrete maturing period. F. G. 1.06 Adjustable steel supports and props shall allow form boards and framework to be accurately adjusted to line and level. Design shall allow free movement and accessibility under formwork. Props for abnormal ceiling heights shall be specially designed.

SUBMITTALS A. B. Submit samples of all materials proposed for use in formwork. Submit samples of ties proposed for use in the following situations: 1. 2. 3. C. Water retaining structures Above water table in general situations In fair faced concrete.

Submit all other information requested by the Engineer.

1.07

SHOP DRAWINGS: A. Submit shop drawings of formwork design, including plans and sections, giving the following minimum information for each level: 1. Details of individual panels.
03100-3 11 March 2013

CONCRETE FORMWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2. 3. 4. 5.

Position, size and spacing of adjustable steel props. Position, size and spacing of joints, soldiers, ties and the like. Details of formwork for columns, beams, parapets, slabs and kickers. Detail of formwork for column, beam junctions.

6. Details of retaining walls and deep beams showing the position and size of ties, joints, soldiers and sheeting, together with detailed information on erection and casting sequences and construction joints. 7. 8. 9. General assembly details. Full calculation sheets. Proposals at the penetrations through concrete.

10. Proposed sequence of de-propping beams and slabs for different spans and floor heights and number of floor heights and number of floors propped, and the striking time for supported and suspended structural elements, clearly identifying the supported element and suspended element. B. Scales of shop drawings: 1. 2. C. Details 1:1, 1:5, 1:10, 1:20. Construction 1:50

Allow fourteen (14) days for the Engineer's review of shop drawings.

PART 2 MATERIALS 2.01 MANUFACTURERS: A. B. S C. D. 2.02 Doka Formwork Technology Quebeisi SGB Sharja Golf Scaffolding Company Substitution under provisions of Section 01600

FORM WORK: A. For unexposed surfaces and rough work, use exterior Type Douglas Fir, Grade B-B (concrete form) plywood, conforming to NBS PS-1, minimum 19mm thick. Before reusing forms, withdraw nails and thoroughly clean surfaces to be in contact with concrete. For exposed surfaces not otherwise specified use special exterior Type Douglas Fir, Grade A-B plywood, conforming to NBS PS-1, minimum 19mm thick OR density (60-60) overlay ply-form, Class 1 EXTDFPA, sanded grade trade marked by the American Plywood Association having a hard semi-opaque resin-fibre overlay on both sides, minimum 19mm thick and constructed so that finished concrete will be straight, smooth, dense, free from honeycombs, bulges, or depressions. Keep joints between plywood sections to a minimum and make tight and strongly backed so that adjoining edges remain flush and true. Unsightly joint marks will not be permitted. Cover
03100-4 11 March 2013

B.

CONCRETE FORMWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

joints on exposed surfaces will be smooth-faced fibre reinforced tape as manufactured by Techtrade International, 54 Old Christchurch Road, Bournemouth, Dorset, U.K. or other equal and approved of proprietary brand to be approved by the Engineer. C. D. Location of joints must be submitted to Engineer for approval. Prefabricated formwork systems may be used for all classes of concrete provided the manufacturer's printed instructions and recommendations are followed and the system has been approved by the Engineer. Joints between sections of prefabricated forms shall be taped unless otherwise recommended by the manufacturer and provided always, in the case of such recommendation, the forms are water and mortar-tight to the Engineer's satisfaction.

2.03

FORM COATING: A. B. P. CM3 (British Petroleum) or B. P. CCM3 (V Petroleum) or Calform (Caltex) or from wax of a type which does not import any stain to concrete nor interfere with the adhesion of any finish, sealant, or waterproofing material applied to any concrete surface and which must be approved by the Engineer.

2.04

FORM TIES: A. Surface retarding agents shall not be used when securing forms where surfaces will be exposed in the finish work. In such cases use tie screws with removable plastic cones, removable bolts, special removable ties, tie wires or Series 300 stainless steel snap ties. For all other forms, either bolts or wires maybe used. Use ties of such type that when forms are removed, no metal is closer than 40mm from the finished concrete surface.

B. 2.05

FILLET AND CHAMBER MOULDING STRIPS: A. PVC, or timber to the approvals of the Engineer.

2.06

TAPES: A. Tapes for sealing joints formwork panels for smooth finished concrete shall be plastic faced adhesive type to the approval of the Engineer.

2.07

SAMPLES: A. The Contractor shall provide free of charge samples of all the materials he proposes to use for formwork together with samples of each type of facing necessary for the special finishes required. Samples for ties, chambers, tapes, and all other related materials to be used along with the formwork system shall also be supplied. EXECUTION

PART 3 3.01

ERECTION: A. B. C. Supports: Props and supports shall be, to the Engineer's opinion is sufficient strong to support the work. Supports shall in all cases be in accordance with the formwork design approved by the Engineer. Ties: Position of ties to be strictly as per approved shop drawings, especially for exposed concrete surfaces and in all cases the approval of the Engineer must be obtained prior to construction. Release Agents: 1. 2. Apply evenly to face to formwork, where required. Avoid contact with reinforcement and previously cast concrete at construction joints.
03100-5 11 March 2013

CONCRETE FORMWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3. 4. D.

Where concrete is to be permanently exposed, use one approved agent over the whole area. The Contractor must allow in his Tender for testing the type of form releasing agent he proposes to use.

Cambers: 1. Unless otherwise shown on the drawings, the soffit of beams exceeding 5m span shall be laid to the following cambers. Camber = ( span x span) / ( 7200 x depth) 2. Depth of beam at all points in the span shall be as indicated and shown on the drawings.

E.

Anchor bolts, plates, sleeves, pipes, inserts, fixtures, electrical boxes, reinforcing steel, duct openings, conduits, etc., shall be installed as per drawings. Ample time shall be allowed for the proper installation of such items.

3.02

STRIKING: A. B. C. Forms for beams shall be designed to permit removal of at least one side without shock to the partially set concrete and without disturbing the bottom portion of the forms or its supports. Where finished surfaces have re-entrant angles, remove formwork as early as possible to avoid shrinkage cracks. Where re-propping is required to implement early striking whilst minimizing sag or creep, the capacity and spacing of such props shall be adequate for the purpose and to the satisfaction of the Engineer and shall be carried out immediately after striking the original formwork. The following shall be the minimum periods before striking formwork, unless otherwise directed by Engineer's Representative, at normal temperatures: 1 2 3 4 5 6 Vertical formwork to columns, walls and large beams Beam sides Beam soffit formwork Props to beam Soffit formwork to slab Props to slab 2 days 2 days 15 days 21 days 7 days 15 days

D.

The periods above are to be considered after the day of casting. E. 3.03 Striking of formwork: Striking of formwork within the time limits listed above is subject to successful crushing cube, compressive strength results etc.

FORM CLEANING A. All forms shall be thoroughly cleaned before placement of concrete and suitable temporary openings provided to permit removal of undesirable materials from the interior without disturbing the whole formwork. All surfaces in contact with concrete shall be wetted or treated with an approved form releasing agent before placing of reinforcement. All formwork shall be thoroughly cleaned of any old concrete, other deposit etc. before reuse. Ensure that during concreting, formwork and supports are inspected and approved by the Engineer and that any portion which shows signs of sagging or displacement is straightened. END OF SECTION

B.

CONCRETE FORMWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03100-6 11 March 2013

SECTION 03200 CONCRETE REINFORCEMENT PART 1 GENERAL 1.01 GENERAL A. B. Drawings and general provisions of the Contract, including General and Particular conditions and Division 1 Specifications, apply to this section. Before any order is placed by the Contractor, he shall notify the Engineer of the prime source of supply where the reinforcement is drawn or rolled. The Contractor shall ensure that all steel deliver to the site shall come from the source accepted by the Engineer. Merchants and stockholders will not be an acceptable source unless it can be shown to the satisfaction of the Engineer that the whole of the reinforcement applied to the contract complies with this Specification. All batches or reinforcement in which unacceptable material has been mixed with acceptable material shall be rejected and shall be removed from the site forthwith. Reinforcement shall be protected at all times from contamination and corrosion from the ground and atmosphere during all storage, bending and handling operations.

C. D. 1.02

RELATED WORK SPECIFIED ELSEWHERE: A. B. Section 03100 Section 03300 Concrete Formwork Cast-in Place Concrete

1.03

STANDARDS A. American Concrete Institute: 1. 2. 3. 4. B. ACI 301 Specifications for Structural Concrete. ACI 318 Building Code Requirements for Structural Concrete. ACI 318M Metric Building Code Requirements for Structural Concrete. ACI SP-66 ACI Detailing Manual.

ASTM International: 1. ASTM A82 Standard Specification for Steel Wire, Plain, for Structural Reinforcement. 2. ASTM A184/A184M Standard Specification for Fabricated Deformed Steel Bar Mats for Concrete Reinforcement. 3. ASTM A497 Standard Specification for Steel Welded Wire Fabric, Deformed, for Concrete Reinforcement. 4. ASTM A615/A615M Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement.

5. ASTM A641/A641M Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire. 6. ASTM A704/A704M Standard Specification for Welded Steel Plain Bar or Rod Mats for Concrete Reinforcement.

CONCRETE REINFORCEMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03200-1 11 March 2013

7. 8. 9. 10. 11. 12. 13.

ASTM A706/A706M Standard Specification for Low Allow Steel Deformed and Plain Bars for Concrete Reinforcement. ASTM A767/A767M Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement. ASTM A775/A775M Standard Specification for Epoxy-Coated Reinforcing Steel Bars. ASTM A884/A884M Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Fabric for Reinforcement. ASTM A934/A934M Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars. ASTM A996/A996M Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement. ASTM A615/A615M Standard Specification for Fabrication and Jobsite Handling of Epoxy-Coated Reinforcing Steel Bars.

C.

American Welding Society: 1. AWS D1.4 Structural Welding Code Reinforcing Steel.

D.

Concrete Reinforcing Steel Institute: 1. 2. CRSI Manual of Standard Practice. CRSI Placing Reinforcing Bars.

1.04

QUALITY ASSURANCE A. B. Supervisory staff shall at least the qualifications and experience to meet the requirements of this Specification. Welders: Only certified welders shall be employed for welding reinforcement.

1.05

SUBMITTALS A. B. Samples: Provide cut lengths of reinforcing as request by the Engineer for testing or evaluation by the Testing Laboratory. Shop Drawings: Submit detail fabrication and placement drawings for all reinforcing steel which are correlated wit forming and concrete placement techniques and requirements. 1. Reinforcing shall be detailed based on construction joint locations which have been shown on shop drawings reviewed by the Engineer. 2. The drawings shall be in such detail as to ensure that there will be a minimum, if any, of difficulties in execution of the work in the field. 3. The drawings shall consist of sections, plans and details clearly showing locations, sizes and spacing of all reinforcing steel, supporting bars and accessories. Include schedules and diagrams to indicate bends, sizes and lengths of all reinforcing bars.

CONCRETE REINFORCEMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03200-2 11 March 2013

4.

A separate set of shop drawings, which shows the construction joint locations, shall show all floor openings, wall openings and edges of concrete. Floor openings, wall openings and sleeves for all mechanical, plumbing and electrical work shall be coordinated with the respective trades and shown on these shop drawings in accordance with the criteria indicated on the Contract Drawings. No work shall be fabricated until both sets of shop drawings (Reinforcing Steel and Concrete Dimensions) have been reviewed and approved by the Engineer (with corrections and re-submittals as required by the Contacts Documents). After approval by the Engineer, furnish all copies needed for fabrication and erection and for use of other trades. Be fully responsible for furnishing and installing all materials called for or required by the Contract Documents even though these materials may have been omitted from the approved shop drawings. Allow fourteen (14) days for the Engineer's review of shop drawings.

5.

6.

7. C.

Certificates 1. Submit for each consignment from each source a certificate verifies compliance with this Specification. 2. Submit Reinforcement Manufacturer's routine test records.

PART 2

PRODUCTS

Suppliers The United Steel Industrial Company (UNISTEEL) Kuwait. UGS Saudi Or equal approved. 2.01 BAR REINFORCEMENT A. B. C. D. Bar reinforcement shall be high strength deformed bars complying with ASTM 615M having a characteristic strength not less than 4200 Kg/cm (60,000 psi). Refer General Notes on Drawing # S-01. Mesh reinforcement and wrapping fabric shall conform to ASTM 497. Reinforcement shall be cut and/or bent in accordance with CRSI manuals. Bends in reinforcement shall have a substantially constant curvature. Where the temperature of the steel is below 50C, special precautions may be necessary such as reducing the speed of bending or, with the Engineer's approval, increasing the radius of bending. Where it is necessary to bend reinforcement projecting from concrete, care should be taken to ensure that the radius of bend is not less than that specified in CRSI manuals. No welding of reinforcement should be carried out without the Engineer's approval. Bundle and tag reinforcement with suitable identification to facilitate sorting, transporting, storing and placing at the Site. All reinforcement shall be cut and bent to shape as per the approved bar bending schedule. All bars shall be tagged showing the correspondence bar number as shown on the relevant Bar Bending Schedule.
03200-3 11 March 2013

E. F. G. H.

CONCRETE REINFORCEMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.02

BAR SUPPORTS: A. Spacer blocks with cast in tie wire maybe used with written agreement of the Engineer for support of the bottom layer of reinforcing in the raft foundation slab only. The blocks shall be of minimum size and made from cement sand small aggregate mix to match surrounding concrete strength appearance and durability. B. Other spacers shall be of such materials and designs as will be durable, not lead to corrosion of the reinforcement and not cause spoiling of the concrete cover. The type spacers acceptable shall be one of the following: a. b. High density plastic Hot-dipped galvanized bar supports with plastic feet.

2.03

TIE WIRE: A. Tire wire shall be annealed iron wire not less than No. 16 gauge or approved fasteners, unless shown otherwise on the drawings.

2.04

TESTING: A. Tests will be required by the Engineer on steel reinforcement and they shall be carried out in strict accordance with the provisions of the above British Standards. B. Tensile tests providing information on elastic limit, ultimate strength, and stressstrain curve will be required from each delivery of reinforcement and measurements will also be required of cross-sectional area and deformation/bond characteristics of deformed bars. C. The Contractor is to allow for four tensile and four bond tests, at his own cost, for be used in the concrete construction. each size of bar to

D. One set of test results for each bar size shall be submitted to the Engineer three (3) weeks before concrete work commences on Site. Remaining tests will be carried out at the discretion of the Engineer. E. Further tests may be called for when the source of supply of reinforcement changes in which case the cost of such extra testing will be borne by the Contractor. When any test results do not conform to the above standard the reinforcement steel shall be removed from the Site and the cost of subsequent testing and any remedial work shall be borne by the Contractor. PART 3 EXECUTION 3.01 GENERAL A. The Contractor shall supply and incorporate in the work all such steel reinforcement including the wire, support and spacer blocks and the like whether shown or not on the drawings which are necessary to complete the work, all to the satisfaction of the Engineer. B. The Contractor shall check his bending schedules against the latest drawings and any discrepancy must be immediately referred to the Engineer. The Contractor is responsible for ordering all materials required to complete the job according to normal good practice and to the approval of the Engineer.

CONCRETE REINFORCEMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03200-4 11 March 2013

C. All reinforcement will be properly stored under cover to avoid contact with the ground, moisture, dust and salts and to avoid distortion once bent to shape. Improper storage will be sufficient cause for rejection of reinforcement. D. All steel, before being placed in position, shall be thoroughly cleaned of loose rust, scale and any other coating that will destroy or reduce bond. If reinforcement has been badly rusted or pitted it will be rejected. Mechanical brushes shall be used in cleaning the steel bar. E. Where there is delay in depositing concrete after the placement of the reinforcement the Engineer may require the Contractor to restore the reinforcement to a satisfactory condition and may require protection of same from further corrosion. F. Ends of bars which are left projecting for any period exceeding 4weeks shall be painted with a heavy coat of neat cement grout which shall be removed prior to continuation of concreting. G. 3.02 Reinforcement that has in any way been previously used shall not be used in the work.

CUTTING AND BENDING A. B. No welding (including spot welding) will be permitted. Cut and bend reinforcement to approved shop drawings and details, unless otherwise instructed.

C. Re-bending if specially allowed by the Engineer in writing, bars shall be bent at the ambient temperature; in mild steel the internal radius of bend shall not be less than 4 x bar diameter and, in hot-rolled and cold-worked high yield steel, not less than 6 x bar diameter. Inspect each re-bent bar for signs of fracture. D. E. Reinforcement projecting from concrete shall not be bent without prior written approval from the Engineer. All reinforcing bars must be bent cold unless otherwise permitted by the Engineer.

F. The Engineer's approval is to be obtained in writing before cutting or heating any reinforcement detailed on the drawings. 3.03 SPLICES A. The splice lengths of all reinforcing bars which have to be spliced shall, unless otherwise shown on the drawings, be in conformity with the following: a. b. c. d. Plan round bars (60x Bar diameters) 600mm min. Deformed bars (60 x Bar diameters) 600mm min, Epoxy coated bars (65 x Bar diameters) 650mm min, Fabric 200mm min, but overlap measured between outermost wires of each sheet not less than pitch of secondary reinforcement wires. Spliced bars are to be securely tied together.

e. B. C.

Splices to be staggered to the approval of the Engineer, and the fabric is to be securely tied layer to layer. Bars shall have the minimum anchorage and lap lengths in accordance with ACI 318 requirements unless specifically required by Contract Document.
03200-5 11 March 2013

CONCRETE REINFORCEMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.04

ERECTION: A. Give the Engineer at least 24 hours notice before commencing fixing reinforcement of formwork. B. Ensure that spaces to receive reinforcement are clean and free debris. to allow inspection

C. All reinforcement shall be placed accurately in position and securely fastened in place to prevent displacement during the placing of the concrete. Particular care shall be taken to ensure that protective cover to reinforcement specified on the drawings is obtained by the use of approved plastic tipped steel chairs for lower reinforcement and cranked bars for upper reinforcement. All bars shall be securely tied together at every alternate intersection, or as approved by the Engineer. D. Secured reinforcement against displacement outside the specified limits to Comply with ACI Standard 301 unless specified otherwise. 1. The actual concrete cover shall be not less than the required nominal cover minus 5mm.

2. Where reinforcement is located in relation to only one face of a member (e.g. a straight bar in a slab) the actual concrete cover shall not be more than the required nominal cover plus: i) ii.) iii.) 5mm on bars up to and including 12mm size. 10mm on bars over 12mm up to and including 25mm size. 15mm on bars over 25mm size.

E. Spacer chairs or other support detailed on Drawings, together with such other support as may be necessary shall be used to maintain the reinforcement in its correct position. In a member where the nominal cover is dimension as the nominal cover. Spacers shall be of such materials and designs as will be durable, not lead to corrosion of the reinforcement and not cause spoiling of the concrete cover. Non-structural connections for the positioning of the reinforcement shall be made with steel wire, tying devices or by welding. Care should be taken to ensured that the projecting ends of ties or clips do not encroach into the concrete cover. The position of reinforcement shall be checked before and during concreting, particular attention being paid to the position of the top reinforcement in cantilever sections. F. Surface Condition of Reinforcement: Reinforcement shall not be surrounded by concrete unless it is free from mud, oil, paint, retarders, loose rusts, loose mill scale, Grease or any other substance which may adversely affect the steel or concrete chemically or reduce the bond. G. Laps and Joints of Reinforcement: Laps and joints shall only be made by methods specified and at the position shown on the Drawings or as agreed by the Engineer. END OF SECTION

CONCRETE REINFORCEMENT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03200-6 11 March 2013

SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 A. 1.02 A. DESCRIPTION General: Provide cast-in-place concrete in accordance with the requirements of the Contract Documents. STANDARDS Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following. In addition to other Standards and Codes refered to through this section (latest editions): ACI 211.1 ACI 301 ACI 305 ACI 318 ASHTO M148 AASHTO M182 ASTM A105 ASTM C33 ASTM A615 ASTM A706M-01 ASTM A 775 ASTM C40 ASTM C88 ASTM C94 ASTM C114-00 ASTM C117 ASTM C125 ASTM C131 ASTMC138 ASTM C142 ASTM C143 ASTM C150 ASTM C156 ASTM C171 ASTM C227 ASTM C260 ASTM C289 ASTM C309 ASTM C332 ASTM C494 ASTM C495 ASTM C641 ASTM C979 ASTM E96 ASTM E154 BS 4449 Practice for selecting proportions for Normal, Heavyweight, and Mass Concrete. Specifications for Structural Concrete for Buildings Hot Weather Concreting. Building Code Requirement for Reinforced Concrete and Commenting. Liquid Membrane Forming Compounds for Curing Concrete. Burlap Cloth Made from Jute or Kenaf. Welded wire Fabric for Concrete Reinforcement Concrete Aggregate Deformed and Plain Billet Steel Bards for Concrete Reinforcement. Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement Epoxy Coated Reinforced Steel Bars. Test Method for Organic impurities in Fine Aggregates for Concrete Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate. Ready-Mixed Concrete. Standard Test Methods for Chemical Analysis of Hydraulic Cement Test Method for Material Finer Than 75 um (No.200) Sieve in Mineral Aggregates by Washing. Definitions of Terms Relating to Concrete and Concrete Aggregates. Test Method for Resistance to Degradation of small-size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. Test Method for Unit Weight, Yield, and Air Content (Gravimetric)of Concrete. Test Method for Clay Lumps and Friable Particles in Aggregates. Test Method for Slump of Portland Cement Concrete. Portland Cement. Test Method for Water Retention by Concrete Curing Materials. Sheet Materials for Curing Concrete. Test Method for Potential Alkali Reactivity of Cement Aggregate Combinations. Air-Entraining Admixtures for Concrete. Test Method for Potential Reactivity of Aggregates (Chemical Method). Liquid Membrane-Forming Compounds for Curing Concrete. Specification for Lightweight Aggregates for Insulating Concrete. Chemical Admixtures for Concrete. Test Method for Compressive Strength of Lightweight Insulating Concrete. Test Method for Staining Materials in Lightweight Concrete Aggregates. Specification for Pigments for Intergrally Coloured Concrete. Test Methods for Water Vapour Transmission of Materials. Methods of Testing Materials for Use as Vapour Barrier Under Concrete Slabs and as Ground Cover in Crawl Spaces. Hot rolled Steel bars for the reinforcement of Concrete
03300-1 11 March 2013

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

BS 4466 BS 4483 BS 8110 ACI 318 K.S.S. 36 K.S.S. 39 K.S.S100 FHWA-RD-77-85 CIRA Data Sheet

Bending Dimensions and scheduling of Bars for the Reinforcemetn of Concrete Steel Fabric for the Reinforcement of concrete The Structural use of Concrete Part 1 Design and construction Building Code Requirements for Reinforced Concrete Ordinary and Quick-solidifying Portland Cement. Sulphate Resisting Portland Cement Testing Techniques for Portland Cement Properties. Standard Method of Sampling and Testing for Total Chloride Ion in Concrete. Concrete Pressive on Formwork )Concrete Society Technical Report No.13)

Copies of all the above codes shall be submitted to the Engineer within 30 days from the Date of Enterprise. B. This Specification section shall govern all cast-in-place concrete work for the complete project except where more stringent or specialized requirements are indicated. All work shall be performed to secure for the entire project homogeneous concrete having the required strength, surface finish, materials, durability and weathering resistance, without planes of weakness or other structural defects, and free of honeycombs, air pockets, voids, projections, offsets of plane and other defacements of concrete. The Contractor will be fully responsible for any defects or damage in the building arising from faulty materials or workmanship and the costs of remedial measures in order to ensure that the completed work complies with the Contract Documents. Base construction methodology on the construction indicated in the Contract Documents. No alterations or substitutions of the structural systems shown on the Drawings will be permitted unless otherwise specified. Supervise and coordinate all phases of the concrete construction process and be responsible for the complete manufacturing process for all concrete work. All methods of manufacture and practices of handling raw materials and manufactured concrete shall be reviewed by the Engineer prior to execution of the concrete work. Only materials of known quality shall be incorporated in the work. All materials shall be properly selected, reviewed with the Engineer before use, and maintained during shipment, storage and use. Construction systems and techniques shall be properly selected, reviewed with the Engineer before use, and maintained throughout the complete concrete construction phase. Adequate spare equipment, parts, additional components and repair facilities shall be available for all tools and equipment. Regardless of reviews and approvals by the Engineer, be responsible for all materials, methods and the work, and if any work does not satisfy the Contract Documents, implement removal, replacement or remedial work and revise procedures or materials to prevent recurrence of unacceptable work at no additional cost to the Employer. SUBMITTALS Shop Drawings: Submit detail fabrication and placement drawings for all formwork reinforcing steel which are correlated with forming and concrete placement techniques and requirements. 1. 2. 3. Reinforcing shall be detailed based on construction joint locations which shall have been shown on shop drawings reviewed and approved by the Engineer. The drawings shall be in such detail as to assure that difficulties in execution of the work in the field are minimized. The drawings shall consist of sections, plans and details clearly showing locations, sizes and spacing of all reinforcing steel, supporting bars and accessories. Include on the shop drawings, schedules and diagrams to indicate bends, sizes and lengths of all reinforcing steel bars. A separate set of shop drawings, which shows the construction joint locations, shall show all floor openings, wall openings and edges of concrete. Floor, wall openings and sleeves for all mechanical, plumbing and electrical work shall be coordinated with the respective trades and shown on these shop drawings in
03300-2 11 March 2013

C. D.

E.

F.

1.03 A.

4.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

accordance with the criteria indicated on the Contract Drawings and contained in the various applicable sections of the Specifications. 5. No work shall be fabricated until all shop drawings have been reviewed and approved by the Engineer (with corrections and re-submittals as required by the Contract Documents). After review and approval by the Engineer, furnish all copies needed for fabrication and erection, and for use of other trades. Be fully responsible for furnishings and installing all materials called for or required by the contract Documents even though these materials may have been omitted from the reviewed shop drawings. Submit shop drawings for all formwork showing locations of joints, tie bolts, cones, dummy cones, openings, chamfers, inserts, fittings and accessories for the approval of the Engineer before fabrication of formwork. Submit design calculations in accordance with ACI Standard 301, Chapter 4, Para. 4.2, wherever required for the supporting system of the formwork along with the shop drawings for the supporting system, for approval of the Engineer.

6. 7. 8.

B.

Samples 1. Provide cut lengths of reinforcing as requested by the Engineer for testing or evaluation by the Government Research Station Laboratory, or any other Laboratory as required by the Engineer. The Contractor shall not fabricate any reinforcing bars prior to the approval of the Engineer. Provide samples of all materials and concrete accessories of every type proposed for use including component parts of prefabricated formwork systems and manufacturers technical literature relating thereto. Prepare mock-ups and carry out such tests on the proposed prefabricated formwork systems as may be required by the Engineer in order that he may be satisfied as to the systems suitability.

2.

3. C. D. E.

Furnish reinforcement and accessories for sample panels and mocked-ups portions of the structure as required using all materials and techniques as they will be used in actual construction.

Mill Tests: Furnish the Engineer with certified mill test reports for cement, steel reinforcement, welded wire fabric and pre-stressing strands. Certifications for Admixtures: As specified under admixtures. Test Reports: Submit preliminary test results for the Engineers approval at least three weeks prior to the beginning of the work. In addition to the test reports specified under Quality Control, submit the following directly to the Engineer: 1. 2. 3. 4. Preliminary Design Mix Reports (BS 8110 Section 6) Aggregate Soundness Test Reports (ASTM C88) Aggregate Staining Test Reports (ASTM C641) Air Entrainment Test Reports (ASTM C260)

1.04

PRODUCT HANDLING A. Comply with BS 8110, Section 6.

1.05

ENVIRONMENTAL CONDITIONS A. Hot Weather Concreting: Refer to Clause 1.02 STANDARDS. (ACI 305).

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-3 11 March 2013

1.06

Aproved Supplaires A. B. C. KBRC (Kuwait British Ready Mix) National Industries. Bubiyan Ready Mix.

1.06 A.

QUALITY CONTROL Preliminary Tests (Trial Tests) 1. Target Mean Strength: The concrete mix shall have at least the required minimum cement content and mean strength greater than the required characteristic strength by at least the current margin. The current margin shall be taken as the lesser of: a. 1.64 times the standard deviation of cube tests on at least 100 separate batches of concrete of nominally similar proportions of similar materials and produced over a period not exceeding 12 months by the same plant under similar supervision, but not less than one sixth (1/6) of the characteristic strength for concrete of grade 140 or not less than 37.50 kg/cm2 for concrete of grade 200 or above. 1.64 times the standard deviation of cube tests on at least 40 separate batches of concrete of nominally similar proportions of similar materials and produced over a period exceeding 5 days but not exceeding 6 months by the same plant under similar supervision, but not less than one third (1/3) of the characteristic strength for concrete of grade 140 or not less than 75 kg/cm2 for concrete of grade 200 or above. If enough data is not available to satisfy the requirements of either (a) or (b) above mentioned, the margin shall be taken as two-thirds (2/3) of the characteristic strength for concrete of grade 140 or 100 kg/cm2 for concrete of grade 200 or above. When required characteristic strength approaches maximum possible strength of concrete a smaller margin but not less than 75 kg/cm2 shall be permitted. Evidence shall be submitted to the Engineer for each grade of concrete showing that at the intended workability, the proposed mixed proportions and manufacturing method will produce concrete of required quality. Declare any change in source of material and any change in cement content, nature and source of each material, full details of tests on trail mixes, proposed quantities of each ingredient per cubic metre of fully compacted concrete. 2. To establish the suitability of any material used in the concrete work, unless specified otherwise, make preliminary tests and prepare design mixes, in accordance with ACI-301, Chapter 3, paragraph 3.8, Method 1 or Method 2, in a design laboratory acceptable to the Engineer. In addition to the tests required to establish the suitability of materials, make one test for each design mix to verify that the total chloride (CI) iron content and the total Sulphate (SO3) content of each mix is within the specified limits. Perform Chloride tests in accordance with Standards Method of Sampling and Testing for Total Chloride Iron in concrete as contained in Report no. FHWA-RD-77-85 published by U.S. Department of Transportation, Federal Highway Administration. Perform Sulfate (SO3) tests in accordance with ASTM C114. Trial Mixes a. Where trial mixes are requested by the Engineer, three separate batches of concrete shall be made using materials likely to be typical of the proposed supply and preferably under full scale production conditions. If circumstances make this inconvenient the batches may be mixed in the laboratory only if approved by the Engineer. Sampling and testing shall be strictly in accordance with B.S.1881. The workability of each batch of concrete shall be determined and three (3) cubes made from each batch of concrete for test at 28 days. A further three (3) cubes from each batch shall be made for test at earlier age. The trail
03300-4 11 March 2013

b.

3.

4.

b.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

mix proportions shall be approved by the Engineer if the average strength of nine (9) cubes tested at 28 days exceeds the specified characteristic strength by the appropriate margin or if nine(9) cubes tested at an earlier age indicate that it is likely to be exceeded by this amount. The appropriate margin is the margin as given in Clause 1.06.A.1 herein for concrete of nominally similar proportions and of similar materials to the trial mix. For this purpose if the trial mix does not differ by more than 30 kg/m3 of cement from reference mix of similar workability, then the proportions may be regarded as nominally similar and the current margin for the reference mix can be taken as the appropriate margin for the trial mix. If trail mixes are required to demonstrate that the maximum free water/cement ratio is not exceeded, two batches shall be made in a laboratory with cement and saturated sand surface dry aggregate known from past records of the suppliers of the materials to be typical. The proposed mix proportions shall be accepted only if both batches have the correct cement content and free water/cement ratio below the maximum specified value at the proposed degree of workability. 5. Have a representative present at the laboratory when the preliminary tests are made. Whenever a change of brand or source for any of the concrete ingredients occurs, additional Preliminary tests will be required and the cost of these tests shall be borne by the Contractor.

B.

Plant and Field Tests and Inspection 1. Concrete work will be subject to detailed inspection and tests. Notify the Engineer one day in advance of concrete work. Inspection, field tests and sampling of concrete taken from the job will be carried out under the direction of the Engineer. Concrete shall be produced in accordance with BS 5328. BS 5328 requires that tests are made on the constituent materials in accordance with the relevant British Standard, (Refer to part 2 of this Section), and that control tests are made on concrete to ensure compliance with the specified requirements. When tested, the concrete shall meet the appropriate requirements specified in BS 5328, i.e.: a. Characteristic compressive strength; b. Specified mix proportions; c. Minimum or Maximum cement content; d. Maximum free-water/cement ratio; e. Workability; f. Air content of concrete; g. Temperature of fresh concrete; Density of fully compacted concrete. 4. 5.

2.

3.

h.

Rate of sampling and testing shall be as specified and/or as directed by the Engineer. The cost of sampling and testing shall be borne by the Contractor. Facilitate sampling procedure and provide labour and material as required. Notify the Engineer when reinforcing steel is in place in order to facilitate any inspection he deems necessary. Submit checking sheets placing concrete. Do not place concrete until these inspections have been completed and all deficiencies reported by the Engineer have been corrected to the Engineers satisfaction. Supply all moulds required for tests as described below, using moulds of the same type and manufacture for making all test specimens. If field tests show excessive slumps or other violations of the Contract Documents, the entire batch of concrete from which the sample in question was taken will be rejected and shall be removed from the site at the Contractors expense. The Engineer will inspect all concrete operations in the plant and in the field. If ready mix concrete is used, each load of concrete arriving at the job shall be accompanied by the delivery ticket which shall be subject to checking by the Engineer at the plant and which shall contain the following information:

6.

7.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-5 11 March 2013

a. b.

The strength of the mix of concrete being delivered. The exact time the cement and aggregate were discharged into the delivery truck. If upon reaching the job the concrete cannot be placed within the time limits stated, or if the type of concrete delivered is incorrect, the Engineer will reject the load and it shall be removed from the Site at the Contractors expense.

c. 8.

List of admixtures and concentration percentage.

Under the supervision and direction of the Engineer the Contractor will take specimens of each class of concrete from different locations on the job as follows: a. b. c. d. e. At least twelve (12) specimens for each 40 cubic metres or fraction thereof of each class of concrete and in any case not less than twelve (12) specimens for any one days operations. Test specimens will be taken at pouring locations to give a fair average of the concrete in the part of the contraction indicated. Samples will be obtained in accordance with B.S.1881. At least two slump tests: ASTM C143 Testing shall conform to B.S. 1881 in making, curing and subsequently handling test specimens, except as modified herein. Cubes shall be engraved with the date of placing and the serial number of the cubes (1 to 12) plus a universal serial number representing the number of the pour. The cubes shall be placed in laboratory storage on site under moist curing conditions at approximately 21C within 24 hours after molding and maintained therein until ready for testing at the site Laboratory. Three cube specimens will be tested at seven days, and if the seven day strength is deficient, the Contractor will be notified. Three cubes will then be tested at 14 days, three cubes at 28 days, and the remaining 3 cubes will be tested as directed by the Engineer, having been cured with curing compound for 28 days. Two unit weight and yield tests: ASTM C138

f.

g. 9.

Under the supervision and direction of the Engineer the Contractor will take specimens of each class of concrete, and an independent Testing Agency, approved by the Engineer, will perform one test for each 100 cubic metres to verify that the total chloride ion content and the total sulfate content are each within the specified limits. As soon as the concrete is no longer plastic, but in no event more than 24 hours after placement, the Testing Agency will perform tests in accordance with the procedures herein specified under paragraph 1.06.A.3. Keep records of all specimens taken and tests made using a proforma approved by the Engineer. Such records shall be signed by the Contractor and the Engineer.

10. C.

Change of Current Margin: When the results of a sufficiently large number of tests show that the previously established margin is significantly too large or too small, a change in the current margin used for judging compliance with the specified characteristic strength may be appropriate. Recalculation of the margin shall be carried out as before, but the adoption of recalculated value will not generally be justified if the two values differ by less than 18% when based on tests on 40 separate batches or less than 11% when based on tests on 100 separate batches, or less than 5% when based on tests on 500 separate batches. This recalculated margin if adopted becomes the current margin for the judgement of compliance with the specified characteristic strength of concrete.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-6 11 March 2013

D.

Testing Plan 1. Each set of 3 cubes shall be made from a single sample taken from a randomly selected batch of concrete. The sample shall be taken from the point of discharge from the delivery vehicle. The characteristic strength of concrete shall comply with the following requirements: a. b. The average strength determined from any group of four consecutive sets of test cubes exceeds the specified characteristic strength by not less than 0.3 times the current margin. Each individual test result is greater than 85% of the specified strength. The current margin shall be taken as given in Paragraph 1.06.A.1. If only one cube result fails to meet the second requirement mentioned above, that result may be considered to represent only the particular batch of concrete from which that cube was taken, provided the average strength of the group satisfied the first requirement. If more than more cube fails to meet the second requirement or if the average strength of any group of four consecutive test cubes fail to meet the second requirement, then all the concrete in all the batches represented by all such cubes shall be deemed not to comply with the strength requirements. 2. Enforcement: When the average strength of four consecutive test cubes fail to meet the first requirement mentioned in the testing plan, the mix proportions of subsequent batches of concrete shall be modified to increase the strength. The Engineer shall decide as to what action may be taken for test cubes that fail to meet the requirements mentioned. In estimating the quality of the sub-standard concrete and in determining the action to be taken the following shall be considered. a. The validity of test results and confirmation that specimen sampling and testing have been carried out in accordance with B.S. 1881. Concrete shall be judged by the strength of specified characteristic strength, together with the cement content, in comparison with the specified minimum cement content. The mix proportions actually used in concrete under investigation. The actual section of the structure represented by the test cubes. The possible influence of any reduction in concrete quality in the strength and durability of this section of structure. The Engineer may require tests to be carried on the hardened concrete in structure. Where tests show that concrete is below specified strength remove all, or a part of, the concrete in all of the batches deemed not to comply with the strength requirements as directed by the Engineer. Full cost of removal of low strength concrete and its replacement with concrete of proper specified strength shall be borne by the Contractor. 3. Strength: Compliance with the specified characteristic strength shall be judged by tests made on cubes at an age of 28 days. Not more than 5% of the cube test results shall be allowed to fall below the characteristic strength of concrete.

b. c. d.

E.

Lightweight Insulating Concrete: Refer to Section 0352 Light Weight Concrete

PART 2 - PRODUCTS 2.01 MATERIALS

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-7 11 March 2013

A.

Manufacturers: The products and manufacturers specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than those specified, will be considered acceptable. The decision of acceptability will rest with the Engineer. Cement 1. 2. 3. 4. 5. Alkali Content For all Types of Cement: Maximum 0.6% equivalent of Sodium Oxide (Na2O) (ASTM C227). Ordinary Cement: B.S. 12 or ASTM C150, Type I or K.S.S.36, non-staining. Sulphate resisting Portland Cement: B.S.4027 or ASTM C150, Type V.

B.

Sulphate resisting cement shall be used as directed by the Engineer in all work below the ground floor level which is in contact with soil or waterproofing or protection board or vapour barrier. Cement shall originate from sources and manufactures acceptable to the Engineer and shall be delivered in sealed bags. Only one brand of cement shall be used for each type of cement. When received at the batch plant, all bags shall be intact and cement shall be completely dry. Cement exposed to moisture or wetting of any kind during shipment or storage shall not be used on the job. Stale cement or cement with cakes or lumps shall not be used. All cement stored at site shall be kept thoroughly dry and shall be stored in water tight sheds on a floor raised at least 200mm above ground. Cement stacks shall have labels indicating dates of manufacture and arrival at the storage site. A maximum of fifteen bags shall be stacked if the storage period is not more than weeks and eight bags if the storage period is over four weeks but not more than three months. Any cement stored for more than three months shall not be used without the explicit written permission of the Engineer.

6. 7.

8.

When tests performed on field samples, subsequent to the original approval tests, show that the cement does not comply with the Specifications, the entire consignment from which the sample was taken shall be rejected. Rejected cement shall not be permitted in storage areas or on the site and shall be removed within twenty four hours. Cement shall be protected from direct exposure to sun. Cement temperature shall not exceed 50C. All Type V Cement shall have tricalcium aluminate content not exceeding five percent (5%).

9. 10. C.

Aggregate 1. In general, aggregate shall comply with B.S. 882, Concrete Aggregates from Natural Sources, or ASTM C33, and shall be graded in accordance with these requirements, irrespective of whether concrete is mixed on site or elsewhere. The Contractor shall nominate the source of supply and shall provide grading curves of aggregates for approval. Aggregate shall consist of fine sand or stone aggregates and crushed stone, crushed rock or gravel. Separate stockpiles of fine aggregate and each size of coarse aggregate gradation shall be used. Each aggregate type shall be from a single consistent source. Storage piles of aggregates shall be placed on concrete hardstand which has good drainage. Stockpiles shall have walls separating adjacent materials and shall be covered to preclude segregation or intrusion of foreign materials and to preserve the gradation. Sufficient storage shall be maintained to assure placement of concrete at the necessary rate. Use properly constructed sheds to protect aggregates from direct sun radiation and from blowing sands.

2.

3.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-8 11 March 2013

4. 5.

Aggregates shall be hard, durable, clean and free from adherent coatings and dust and when directed by the Engineer, shall be washed and sieved to remove deleterious substances. Aggregates shall not contain harmful materials, such as salts, iron pyrites, coal, mica, shale or similar particles which may reduce the strength or durability of the concrete. Aggregates shall not contain nay material that may be chemically active with reinforcement or that may react to cause efflorescence or that may be alkali reactive. Alkali reactive limestone aggregates such as Dolomitic shall not be used. The grading of each size of aggregate from each pit, quarry or other source of supply shall be determined at least once weekly. The results of such tests shall be reported to the Engineer and shall be used to check whether the gradings are similar to those of the samples used in the establishment of bath weight used. Suppliers certificate shall be submitted to the Engineer for approval of the source of aggregate. Aggregate for exposed unpainted concrete shall be specially selected for colour as approved by the Engineer and shall come from a single source. All aggregates shall be screened and washed and shall have less than the following maximum salt contents as acid soluble chlorides and sulphates. The table also shows the maximum salt content allowed in the mixed concrete. Aggregates for coloured concrete must be approved by the Engineer prior to use. Percent of weight of Fine aggregate Percent of weight of Course aggregate Total percent in concrete as Percent by weight of cement a. b. c. d. e. Chloride 0.06 0.03 0.1 (OPC) 0.2 (SRPC) 0.4 0.4 Sulphate

6. 7.

8. 9. 10.

0.4

Fineness modulus shall not vary more than 0.20 from value used in establishing mix proportions. If greater deviation, the use of such aggregates shall be discontinued until suitable adjustments in mix proportions can be made and reviewed. Magnesium Sulfate Soundness: Max. 5% loss, ASTM C88, 5 cycles. Potential Reactivity: Content of Clay Lumps: Not reactive ASTM C289 Max. 1% by weight ASTM C142.

Gradation requirements as follows: Size of Sieve opening (Square openings) 3/8 inch (9.5 mm) No.4 (4.75 mm) No.8 (2.36 mm) No. 16 (1.18 mm) No. 30 (0.60 mm) No.50 (0.30 mm) No.100 (0.15 mm) Percentage by weight Passing ASTM C33, C117 100 95-100 80-100 50 -85 25-60 15-30 3-10
03300-9 11 March 2013

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

No.200 (0.075 mm)

0.5

Other gradations not meeting the above requirements may be permitted upon submission of relevant data and review by the Engineer. f. 12. Fine aggregates shall be free of organic materials (ASTM C40) and other foreign matter.

Coarse aggregates for concrete shall consist of crushed gravel or crushed stone. The crushing shall be regulated so that the material retained on the No.8 (2.36 mm) sieve, at least 90 percent by weight shall consist of pieces with at least one fractured face and at least 75 percent by weight shall consist of material with at least two fractured faces. In addition, the coarse aggregates shall meet the following requirements: a. b. c. d. e. f. g. h. Magnesium sulfate soundness: Max. 5% loss. ASTM C88, 5 cycles. Potential Reactivity: Not Reactive ASTM C289 Abrasion: Max. 10% loss ASTM C131, 100 revolutions. Flat and Elongated Particles: 3:1max. 30% ASTM C125 5:1 max. 10% Content of Clay Lumps: Max. 0.5% by weight ASTM C142 Shale: Max.2% by weight.

Bulk saturated surface Dry Specific Gravity: Min. 2.58 ASTM C125. Gradation requirements as follows: Size of Sieve Opening (Square Opening) Percentage by weight Passing ASTM C33 1-1/2 inch 1 inch (37.5mm) (25.4mm) (19.0mm) Size 100 95-100 100 60-85 95-100 35-70 60-85 20-50 25-60 10-30 15-45 0-5 0-10 0-5 inch -

Size 2 inch (50.0 mm) 1-1/2 inch (37.5mm) 1 inch (25.4 mm) inch (19.0 mm) inch (12.7 mm) 3/8 inch(9.5 mm) No. 4 (4.75 mm) No.8 (2.36 mm)

100 95-100 60-75 20-55 0-10 0-6

Other gradations not meeting the above requirements may be permitted upon submission of relevant data and review by the Engineer. i. The maximum size of aggregates shall be 1 inch (25.4mm) for columns, walls and basement slabs, and inch (19.0 mm) for slabs and beams. In addition, the maximum aggregate size shall not exceed 20 percent of the narrowest member that is being concreted, nor shall it exceed 75 percent of the clear spacing between adjacent steel reinforcement or between reinforcement and adjacent formwork.

13. D. Water:

Lightweight Aggregates for insulating concrete shall comply with ASTM C332.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-10 11 March 2013

1.

Water for washing aggregates and for mixing of concrete shall be clean, fresh and free of harmful matter such as oil, salts, acids, alkali, sewage, deleterious minerals or organic matter. Water shall be filtered to remove any colour or residues present due to contamination from water piping or transportation or storage methods. Water shall comply with the requirements of BS 5328 Water shall be tested in accordance with BS 3148

2. 3. E.

Admixtures: 1. Suitable admixtures of the following approved types may be incorporated in the concrete only with the prior written approval of the Engineer. a. b. c. d. 2. Water reducing set retarders. Set retarders Water reducing agents. Air entraining admixtures for lightweight concrete.

The Engineer shall be advised in advance of the following data: a. b. c. d. e. f. g. h. The typical dosage and detrimental effects of under-dosage and over-dosage. Chemical name(s) of the main active ingredient(s) in the admixtures. Whether or not the admixture leads to the entrainment of air when used at manufacturers recommended dosage. Admixtures containing chlorides in excess of 0.03% by mass of the cement, nitrates, calcium chloride, sulphides and sulphates shall not be used. Admixtures submitted for Engineers approval shall be certified in writing by the manufacturer to be in compliance with B.S.5075 or ASTM C494. Air-entraining admixtures for lightweight concrete shall comply with ASTM C260 or B.S. 5075 : PART (2). The type of admixtures selected in accordance with the above mentioned standards must be to the approval of the Engineer. All admixtures must be mutually compatible. Admixtures used in the work shall be obtained from reliable manufactures whose products have previously been used successfully in Kuwait or on other international projects in countries having similar climate to Kuwait. Admixtures shall be used in strict accordance with manufacturers printed instructions and recommendations and shall be certified by the manufactures to be suitable for use during hot weather extremes. Admixtures shall be stored safe from adverse temperatures in accordance with manufacturers printed instructions or recommendations. The suitability and effectiveness of any admixture approved by the Engineer, shall be verified by trial mixes with the cements, aggregates and other materials to be used in the works before final approval is given. Notwithstanding what has been stated above, the Contractor must allow in his Tender for testing the type of admixture he proposes to use.

i.

j.

k.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-11 11 March 2013

l. m.

Admixtures where approved may be added only by using the manufacturers recommended dispensers no adding of admixtures by hand is allowed. The entire amount of materials used for concrete shall have controlled sources of individual components such that the total mix meets the requirements of the Contract Documents. Unless specified otherwise, the total Chloride (C1) ion content in the entire mix shall not exceed 0.20 percent of the weight of cement when SRPC is used and 0.1 percent when OPC is used. The total water-soluble Sulfate (SO3) content in the entire mix shall not exceed 4 percent SO3 of the weight of cement in the mix. The total Calcium chloride (ca C12) content in the total mix shall not exceed 0.01 percent of the weight of cement. The total alkali content of the concrete mix of Na2O equivalent shall not exceed 3 kg/m3. All sources of alkali shall be taken into account for calculating the total alkali content. In particular the contribution of Sodium Chloride whether from aggregate or from mixing water must be included.

n.

F.

Reinforcement: 1. Bar reinforcement shall be deformed bars complying with BS 4449 type 2 deformation having a characteristic strength (fy) not less than 4100 kg/cm2 (410 N/mm2) or complying with ASTM A615 grade 60 steel. Dowels projecting from typical flow beams to be re-bent into concrete topping shall be grade 40 (ASTM) grade 50 (BS) hot rolled mild steel having a characteristic strength (fy) not less than 2500 kg/cm2. Mesh reinforcement and wrapping fabric shall conform to BS 4483 or to ASTM A185. Reinforcement shall be cut and/or bent in accordance with BS 4466. Bends in reinforcement shall have a substantially constant curvature. Where the temperature of the steel is below 5C, special precautions may be necessary such as reducing the speed of bending or, with the Engineers approval, increasing the radius of bending. Where it is necessary to bend reinforcement projecting from concrete, care should be taken to ensure that the radius of bend is not less than that specified in BS 4466. Where it is necessary to reshape mild steel bars previously bent, this should only be done with the Engineers approval and each bar should be inspected for signs of fracture. No welding of reinforcement shall be carried out without the Engineers approval. Welding shall be in compliance with ACI 318 or BS 8110. Bundle and tag reinforcement with suitable identification to facilitate sorting, transporting, storing and placing at the site. All reinforcement bars shall be cut and bent to shape as per the approved bar bending schedule. All bars shall be tagged showing the corresponding bar number as shown on the relevant Bar Bending Schedule.

2. 3. 4.

5. 6. 7. 8. 9.

G.

Bar Support: 1. Spacer blocks with cast in tie wire may be used with written agreement of the Engineer for support of the bottom layer of reinforcing in the raft foundation slab only. The blocks shall be of minimum size and made from cement sand small aggregate mix to match surrounding concrete strength, appearance durability. Other support devices and spacers shall be of such materials and of adequate strength and approved design as to be durable and so as to prevent displacement and corrosion of reinforcing steel and prevent discoloration and spalling of concrete cover. The type of spacers acceptable shall be one of the following: a. High density plastic.
03300-12 11 March 2013

2.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. c. 3.

Hot-dipped galvanized bar supports with plastic feet. Stainless Steel.

Individual and continuous slab bolsters and chairs shall be of a type to suit the various conditions encountered and must be capable of supporting a 140 kg (1.37 KN) concentrated load without measurable permanent deformation of the reinforcement or indentation of the supporting surface.

H.

Testing of Reinforcement Steel 1. 2. Tests will be required by the Engineer on steel reinforcement and they shall be carried out in strict accordance with the provisions of the above British Standards. (BS 4449, 4757 and 4483). Tensile tests providing information on elastic limit, ultimate strength, and stress-strain curve will be required from each delivery of reinforcement and measurements will also be required of cross-sectional area and deformation/bond characteristics of deformed bars. The Contractor is to allow for four tensile and four bond tests, at his own cost, for each size of bar to be used in the Concrete construction. One set of test results for each bar size shall be submitted to the Engineer three (3) weeks before concrete work commences on Site. Remaining tests will be carried out at the discretion of the Engineer. Further tests may be called for when the source of supply of reinforcement changes in which case the cost of such extra testing will be borne by the Contractor. When any test results do not conform to the above standard the reinforcement steel shall be removed from the site and the cost of subsequent testing and any remedial work shall be borne by the Contractor.

3. 4. 5.

I. J.

Vapour Barrier: Polyethylene sheeting minimum 0.15 mm thick of approved manufacture tested in accordance with ASTM E96 and E154. Curing Materials: 1. Liquid Membrane Compound: ASHTO M148 or ASTM C309, Type 1-D with fugitive dye and Type 2; formulated to disintegrate after 28 days, and guaranteed not to affect the bond of applied finishes. Polyethylene Film: ASTM C171, 0.10mm thick, opaque black. Reinforced Waterproof Building Paper: ASTM C171, opaque. Burlap: Water: AASHTO M182. B.S. 5328 and B.S.148.

2. 3. 4. 5. 6. 7. K.

Methods for determining the efficiency of curing compounds shall be in accordance with ASTM C156. Notwithstanding what has been stated above, the Contractor must allow in his Tender for testing the type of curing compound he proposes to use.

Moist Cure, Hardener and Sealer 1. Hardeners a. b. 2. Berleburger Schaumstoffwerk GmbH, www.berleburger.de Or equal approved

Sealers
03300-13 11 March 2013

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

a. b. c. d. e. f. g. L.

Son-No-Mar A-H Clear CureTraz Eucopoxy I Tiah Surcoat Or approval equal.

Sonneborn Contech, U.S.A. Anti Hydro Co., U.S.A Chem Masters Corp., U.S.A. The Euclid Chemical Co., U.S.A W.R. Meadows Inc., U.S.A. Al Hamra Co. Kuwait

Waterstops: Extruded shapes formed of virgin polyvinyl-chloride, tensile strength 134 kg/cm2, minimum elongation 200%. The type and size of the waterstop shall be suitable to its particular application as recommended by the manufacturer and be subject to the approval of the Engineer Expansion Joint Filler: Refer to Section 07910, Joint Fillers and Gaskets for expansion joint fillers. Sealants: Refer to Section 07920, Sealants for joint sealants. Formwork 1. For unexposed surfaces and rough work, use Exterior Type Douglas Fir plywood, complying with BS 1204 Part 1(4) type BR, minimum 19mm thick. Before reusing forms, withdraw nails and thoroughly clean surfaces to be in contact with concrete. For exposed surfaces not otherwise specified use special exterior type Douglas Fir, complying with BS 1204 Part 1(4) type to BP, minimum 19mm thick or high density (60-60) overlay plyform, Class 1 EXT-DFPA, sanded grade trade marked by the American Plywood Association having a hard semi-opaque resin-fibre overlay on both sides, minimum 19mm thick and constructed so that finished concrete will be straight, smooth, dense, free from honeycombs, bulges, or depressions. Keep joints between plywood sections to a minimum and make tight and strongly backed so that adjoining edges remain flush and true. Unsightly joint marks will not be permitted. Cover joints on exposed surfaces with smooth-faced fibre reinforced tape as approved by the Engineer. 3. 4. Location of joints must be submitted to the Engineer for approval. Prefabricated formwork systems may be used for all classes of concrete provided the manufacturers printed instructions and recommendations are followed and the system has been approved by the Engineer. Joints between sections of prefabricated forms shall be taped unless otherwise recommended by the manufacturer and provided always, in the case of such recommendation, the forms are water and mortar-tight to the Engineers satisfaction.

M. N. O.

2.

P.

Form Coating: B.P. CCM3 (British Petroleum) Or B.P. CM3 (British Petroleum) or Calform (Caltex) or Form wax of a type which does not import any stain to concrete nor interfere with the adhesion of any finish, sealant, waterproofing material applied to any concrete surface and must be approved by the Engineer. Form Ties: For securing forms where surfaces will be exposed in the finished work, use tie screws with removable plastic cones, removable bolts, special removable ties, tie wires or series 300 stainless steel snap ties. For all other forms, either bolts or wires may be used. Use ties of such type that when forms are removed, no metal is closer than 40mm from the finished concrete surface. Pigmented Concrete: Pigments for integrally colored concrete submitted for the Engineers approval shall be certified in writing by the Manufacturer to be in compliance with ASTM C979.

Q.

R.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-14 11 March 2013

2.03 A.

MIXES Proportioning of Concrete 1. Comply with ACI Standard 211.1, or BS 8110, Section 6, Para. 6.2.4. Assume full responsibility for the strength, consistency, water/cement ratio, and handling of concrete. Cement, fine aggregate and the various sizes of coarse aggregate shall be measured by weight. Water/Cement Ratio: Comply with BS 8110, Section 6, Para. 6.2.4, OR ACI 301, Chapter 3, Para 3.8, Method 1 or 2. The water/cement ratio of a batch of concrete shall not exceed the specified maximum value by more than 5% of that value. If a maximum water/cement ratio has been determined the ability to comply with that requirement at a suitable level of workability, shall be determined by trial mixes. Maximum water/cement ratio may be judged from workability tests and approved by the Engineer. Cement Content: The cement content of any batch of concrete shall not be less than the specified minimum value minus 5% of that value, nor more than the specified maximum value plus 5% of that value. The cement content may be determined from samples representative of any batch of concrete provided suitable test is used to measure the cement content of fresh concrete to an accuracy of +-5% of the actual value with a confidence of 95% and approved by the Engineer. Table 6.1 of BS 8110. Part 1: 1985 gives the minimum cement required when using a particular size of aggregate in a Portland cement concrete, to provide acceptable durability under appropriate conditions of exposure. The reduced minimum cement contents shall only be used when trial mixes have verified that concrete with a maximum free water/cement ratio not greater than that given for a particular condition can be consistently produced and it is suitable for the conditions of placing and compacting. The Engineer shall determine the degree of exposure to be adopted for mix design. 4. Requirements for Fresh Concrete: Workability of concrete shall be such that the concrete is suitable for the conditions of handling and placing so that after compaction it surrounds all reinforcement and completely fills the formwork. Workability shall be assessed by means of the slump test or compacting factor test. An acceptable value for the mean slump for each concrete mix shall be agreed with the Engineer and a value of 65mm can be taken as a guide. Following are the limits of workability of concrete for these tests: Slump +-25mm or CF +.03 where required value is 0.9 or more ++.04 where the required value is less than 0.9 but more than 0.8 .05 Where required value is 0.8 or less.

2.

3.

The amount of water shall be measured by volume or by weight. The batch weights of aggregates shall be adjusted to allow for a moisture content typical of the aggregates being used. The accuracy of the measuring equipment shall be within +- 3% of the quantity of cement, water or total aggregates being measured and within +- 5% of the quantity of any admixture being used. All measuring equipment shall be maintained in a clean, serviceable condition. The mixer shall comply with the requirements of B.S. 1305 or B.S.4251 where applicable. The mixing time shall be not less than that used by the manufacturer in assessing the mixer performance. 5. Adjustment to Mix Proportions: During production adjustments of mix proportions will be made in order to minimise the variability of strength and to approach more closely the target mean strength as approved by the Engineer. Such adjustments are regarded as part of the proper control of production but the specified limits of minimum cement content and maximum water/cement ratio shall be maintained. Such adjustments to mix proportions shall not be taken to imply any change tot he current margin.

Clauses of Concrete

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-15 11 March 2013

GRADE 150 350

CHARACTERISTIC CUBE STRENGTH (28 DAYS) 150 Kg/cm2 350 Kg/cm2

TYPE AND USE Blinding Concrete All Cast-in- Place reinforced concrete, unless otherwise noted on drawings

Where a sudden change in weather conditions occurs or is imminent during continuous casting operations such as will, in the Engineers opinion, affect the quality of the concrete, the specified characteristic cube strength for cast-inplace reinforced concrete shall be increased by 50 kg/cm2. PART 3 EXECUTION 3.01 A. FORMWORK General 1. 2. 3. 4. B. The responsibility for the safety and adequacy of the whole of the formwork shall rest entirely with the Contractor. Coordinate the work of all other trades affecting or affected by work of this Section. Except when they are varied by the requirements of these Specifications, the requirements of the British Standard BS 8110 Section 6 shall form a binding part of these specifications. Give 24 hours minimum notice to the Engineer as to when formwork will be ready for inspection and allow sufficient time for inspection and adjustment. Any work showing signs of damage through premature loading shall be demolished and reconstructed at the Contractors expense.

Workmanship: 1. Reference shall be made to BS 5975 and appendix C of the Concrete Society Technical Report No. 13, Formwork and the CIRIA Data Sheet, Cement Pressure on Formwork.

2.

Except for areas having suspended false ceiling within the project, most of the structure is either exposed or receiving applied finish. Tolerances specified under this part are more stringent than those specified in BS 5606 or ACI 301. Provide cambers as specified on drawings. All formwork shall be constructed plumb, true, water and mortar tight, sufficiently rigid and strong to prevent sagging between supports and to maintain true position and shape during and after placing of concrete without bowing and distortion. Exceptional care shall be taken to minimize fins, ridges, offsets, leaking of fins and other defects. Only workmen experienced in formwork shall be used for this work. Supports shall be designed to withstand the worst combination of self-weight and other loads including formwork, reinforcement, wet concrete, construction and wind loads together with all incidental dynamic effects caused by placing vibrating and compacting of concrete.

3. 4.

5. 6. 7.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-16 11 March 2013

8. 9. 10. 11. 12.

Deflection: The maximum permissible deflection under all loads shall not exceed 2mm or 1/600 of the free span, whichever is less. Forms for beams and girders shall be designed to permit removal of at least one side without shock to the partially set concrete and without disturbing the bottom portion of the forms or its supports. Prefabricated formwork shall be used in strict accordance with manufacturers printed instructions and approved shop drawings. Provide 15 x 15mm wrought hardwood fillet or other suitable material in the angles of the formwork as shown on drawings or as required by the Engineer to provide chamfers in columns and beams and walls. Anchors bolts, plates, sleeves, pipes, inserts, fixtures, electrical boxes, reinforcing steel, duct openings, conduits, etc.., shall be installed as per drawings. Ample time shall be allowed for the proper installation of such items. All steel items (other than reinforcement) embedded in concrete shall be hot-dipped galvanized. Form Cleaning: All forms shall be thoroughly cleaned before placement of concrete and suitable temporary openings provided to permit removal of undesirable materials from the interior without disturbing the whole formwork. All surfaces in contact with concrete shall be wetted or treated with an approved form releasing agent before placing of reinforcement. All formwork shall be thoroughly cleaned of any old concrete or other deposit before re-use. During concreting, formwork and supports shall be inspected by experienced workmen and any portion showing signs of sagging or displacement shall be rectified. All formwork shall be inspected and approved by the Engineer. This approval, however, does not relieve the Contractor of any of his liabilities and responsibilities under the Contract. The Contractor must allow in his Tender for cost of testing the type of form releasing agent he proposes to use.

13.

14. 15. 16. 3.02

REINFORCEMENT A. B. General: Comply with B.S.4449; B.S. 4461; B.S.4482; B.S 4483 OR ACI 301, Chapter 5, Paragraph 5.1, and ASTM A775. Fixing 1. Comply with BS 8110, Section 7, Para. 7.3 OR ACI Standard 301, Chapter 5, Para. 5.5 Reinforcement shall be secured against displacement outside the specified limits unless specified otherwise: a. b. The actual concrete cover shall be not less than the required nominal cover minus 5mm. Where reinforcement is located in relation to only one face of a member (e.g. a straight bar in a slab) the actual concrete cover shall not be more than the required nominal cover plus: (i) (ii) (iii) 2. 5mm on bars up to and including 12mm size. 10mm on bars over 12mm up to and including 25mm size. 15mm on bars over 25mm size.

Spacer chairs or other supports detailed on shop drawings, together with such other supports as may be necessary shall be used to maintain the reinforcement in its correct position. In a member

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-17 11 March 2013

where the nominal cover is dimensioned to the links, spacers between the links and formwork shall be of the same dimensions as the nominal cover. 3. Non-structural connections for the positioning of reinforcement shall be made with steel wire or tying devices. Care should be taken to ensure that the projection ends of ties or clips do not encroach into the concrete cover. The position of reinforcement shall be checked before and during concreting, particular attention being paid to the position of top reinforcement in cantilever sections. Where there is delay in depositing concrete after the placement of the reinforcement the Engineer may require the Contractor to restore the reinforcement to a satisfactory condition and may require protection of same from further corrosion. Surface condition of Reinforcement: Concrete shall not be placed unless reinforcement is free from mud, oil, paint, retarders, loose rust, loose mill scale, grease or any other substance badly rusted or pitted reinforcement will be rejected. Mechanical brushes shall be used in cleaning steel bars. All reinforcement shall be stored under cover to avoid contact with the ground, moisture, dust and salts and to avoid distortion once bent to shape. Improper storage will be sufficient cause for rejection of reinforcement. Laps and joints of Reinforcement: Laps and joints shall only be made by methods specified and at the positions shown on the Drawings or as agreed by the Engineer. The splice lengths of all reinforcing bars which have to be spliced shall, unless otherwise shown on the drawings, be in conformity with the following: a. Deformed bars (60 diameter) 600mm minimum b. Fabric (175 mm minimum, but overlap measured between outermost wires of each sheet not less than pitch of secondary reinforcement wires)

4.

5.

6.

7. 8.

c. Spliced bars are to be securely tied together. 9. 10. Splices to be staggered, to be approved from the Engineer, and the fabric is to be securely tied layer to layer. All reinforcement shall be placed accurately in position and securely fastened in place to prevent displacement during the placing of the concrete. Particular care shall be taken to ensure that the protective cover to reinforcement specified on the drawings is obtaining by the use of approved plastic tipped steel chairs for lower reinforcement and cranked bars for upper reinforcement. All bars shall be securely tied together at every alternate intersection, or as approved by the Engineer. Ends of bars which are left projecting for any period exceeding 4 weeks shall be painted with a heavy coat of neat cement grout which shall be removed prior to continuation of concreting. Concrete cover to reinforcement shall be as shown on the drawings and the allowable tolerance shall be in accordance with BS 8110. Tie wire shall be annealed iron wire not less than No.16 gauge or approved fasteners, unless shown otherwise on the drawings. Reinforcement that has in any way been previously used shall not be reused in the work.

11. 12. 13. 14.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-18 11 March 2013

15.

Welding of Reinforcement: Welding on site shall be avoided if possible, but where suitable safeguards and techniques are employed and provided that the types of steel (including high yield steel to B.S. 4449 and B.S.4461) have the required welding proportions, it may be undertaken. Generally, however, all welding shall be carried out under controlled conditions in a factory or workshop. The competence of the operators shall be demonstrated prior to and periodically during the welding operations. Cutting and Bending Reinforcement: Reinforcement shall be cut and/or bent in accordance with B.S.4466. Bends in reinforcement shall have a substantially constant curvature. Where the temperature of the steel is below 5C, special precautions may be necessary such as reducing the speed of bending or, with the Engineers approval, increasing the radius of bending. Where it is necessary to bend reinforcement projecting from concrete, care should be taken to ensure that the radius of bend is not less than that specified in B.S. 4466. The Engineers written approval shall be obtained before cutting or heating any reinforcement detailed on the drawings. All reinforcement bars, coated and uncoated, shall be bent cold unless otherwise approved by the Engineer. Where it is necessary to reshape steel previously bent, this shall only be done with the Engineers approval and each bar shall be inspected for signs of fracture. Reinforcement (particularly grade 410/425 should not be subjected to mechanical damage or shock loading prior to embedment. It is permissible to bend grade 250 reinforcement projecting from concrete provided that care is taken to ensure that the radius of bend is not less than that specified in BS 4466. Grade 410/425 bars should not be rebent or straightened without the Engineers approval.

16.

17.

3.03 A.

MIXING CONCRETE Ready Mixed Concrete 1. 2. 3. Comply with ASTM C94 / C 94 M. Mixing of concrete in the batching plant only. Discharge the concrete completely at the site within one hour after the introduction of the water to the aggregates. In hot weather reduce this time limit so that no stiffening of the concrete shall occur until after it has been placed. Begin the mixing operation within thirty minutes after the cement has been intermingled with the aggregates. Excessive mixing requiring the addition of water to preserve the required consistency will not be permitted. Mix concrete to a consistency which can be readily placed without segregation. Where admixtures are specified, equip mixers with a device for measuring and dispensing the admixture.

4. 5. 6. B. 3.04 A.

Hand Mixed Concrete: This is not permitted. JOINTS AND EMBEDED ITEMS Construction and Control Joints 1. 2. Comply with BS 8110, Section 6, Paragraph 6.12, OR ACI 301, Chapter 6, Paragraph 6.1 and B.S.5337. Construction joints other than when formed at movement joints shall be kept to a minimum possible consistent with convenience of construction and design consideration. Concreting shall be carried out continuously up to locations of construction joints.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-19 11 March 2013

3.

Where it is necessary to introduce construction joints, careful consideration shall be given to their exact location. The location of construction joints shall be subject to agreement between the Engineer and the Contractor before any work commences. Construction joints shall be at right angles to the general direction of the member and shall take due account of shear and other stresses. Vertical joints shall be formed against a stop board. The top surface of a layer of concrete shall be level and reasonably flat unless design considerations make this undesirable. Joint lines shall be so arranged that they coincide with features of the finished work. Kickers (i.e. a starter stub) shall be at least 150mm high and carefully constructed and shall be cast along with the main concrete. Immediately prior to recommencement of concreting on a joint, the surface of the concrete against which new concrete will be cast shall be free from laitance and shall be roughened to the extent that the largest aggregate is exposed but not disturbed. Care shall be taken that the joint surface is cleaned immediately before the fresh concrete is placed against it Saturate the cleaned surface with water and slush with a coating of 1:1/2 cement sand grout. Place new concrete before grout has attained its initial set. Clean horizontal construction joints and pour the cementsand mortar over joints in walls to a depth of 25mm before depositing concrete. In walls, do not space construction joints more than 15 metres apart, unless otherwise shown. Care shall be taken in the placing of the new concrete close to the joint. This concrete shall be well compacted and vibrated. Control joints for control of thermal cracking should be formed using crack inducers or waterstops having built-in inducers. Control joints shall be placed in slabs-on-grades, tanking walls and retaining walls at spacings indicates on structural drawings. Control joints in concrete topping to PC beams at typical floors and at other locations in slabs and cast-in-place beams and shall be formed in accordance with the details shown on structural drawings.

4.

5. 6.

7.

8. 9.

B. C.

Waterstops: Comply with B.S.5337, Appendix D, Paragraph D4, or ACI 301, Chapter 6, Paragraph 6.3. Clamp waterstops at top to prevent displacement. Embedded Items: 1. 2. 3. Comply with ACI 301, Chapter 6, Paragraphs 6.4 and 6.5. Set anchorage devices by line and transit, and coordinate the locating of all anchorage devices to be set for the accommodation of the work of other trades. Locate anchor bolts and/or threaded type inserts and bars as shown on the drawings and on shop drawings. Obtain necessary templates from the mechanical trades as required for the setting of anchor bolts and other items for mechanical equipment, as required. Assist other trades in the installation of piping, pipe sleeves, conduit and similar items where such items are to be installed in concrete. Provide frames to securely hold anchor bolts and anchorage devices in place during construction, and take care that no displacement occurs during the placing of concrete. Under this Section furnish and set items not furnished by other trades using approved standard type items suitable for their intended purpose.

4.

3.05 A.

PLACING CONCRETE Comply with ACI Standard 301, Chapter 8, Para 8.1 for preparation before placing and with BS 8110, Section 6, Para 6.5 and 6.8. Notify the Engineer 24 hours before each placement so that the forms and reinforcement may be examined. Do not place concrete until inspection has been made or waived.
03300-20 11 March 2013

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Concrete shall not be mixed or placed at shade air temperature below 2C on a rising thermometer, or at a shade air temperature below 3C on a falling thermometer. When the shade air temperature is 32C and rising, special precautions shall be taken during concrete operations, such as shading of the aggregates, formwork and plant, cooling of the mixing water or other methods approved by the Engineer so that the temperature of the concrete when placed shall not exceed 30C. The temperature of the concrete can be reduced by cooling the water and the aggregate. Fresh concrete placed at these temperatures shall be shaded from the direct rays of the sun to the satisfaction of the Engineer for a period of 24 hours. Concrete is not to be mixed and placed when the shade air temperature is 38C or above. Before concrete is placed, clean mixing and conveying equipment from hardened concrete and foreign matter. Check forms for construction and detail. Secure reinforcement sleeves and inserts in correct position. Forms shall be free of water and all debris. Sprinkle with water any semi-porous sub-grade to eliminate suction. Water shall be removed from excavation before depositing concrete, such water shall not be allowed to wash over newly formed concrete. Comply with ACI Standard 301, Chapter 8, Para 8.2 for conveying concrete. Concrete shall be transported from the mixer to the formwork as rapidly as practicable by methods which will prevent the segregation or loss of any of the ingredients and maintain the required workability. Concrete shall be placed and compacted without addition of water. Care shall be taken to avoid displacement of reinforcement or movement of formwork and damage to faces of formwork. Care shall be exercised to prevent segregation of concrete and to prevent splashing the forms while placing concrete. Concrete shall be placed through canvas tremie tubes only equipped with suitable hopper heads. Chutes or trunking shall be of variable lengths so that the free fall of the concrete from the end shall not exceed one metre and a sufficient number shall be used to ensure that the concrete surface is approximately level at all times. Where alternative provisions can be made, which are acceptable to the Engineer, then low slump concrete can be dropped vertically through greater heights than one metre. Concrete shall be thoroughly compacted by vibration, pressure, shock or other means during the operation of placing and thoroughly worked around the reinforcement, around embedded fixtures and into corners of the formwork to form a solid mass free from voids and which will have required surface finish when formwork is removed. Vibration shall be applied continuously during the placing of each batch of concrete until the expulsion of air has practically ceased and there is no secretion of ingredients. Care shall be taken that the vibrator is not used any closer than 75mm from the formed surface. Where permanent precast concrete formwork is used in the structure, its energy absorption should be taken into account when deciding on the method of vibration to be used and the Engineers prior approval shall be obtained in respect thereof. Concrete which has achieved its initial set and cannot be properly compacted shall not be placed in the forms. Concrete Topping: Before application the surfaces shall be thoroughly wetter and brushed over with a coat of neat cement grout. The topping shall be placed before the grout has started to set. Slope surfaces to drains where indicated. Slope shall be as indicated on Drawings. CURING General 1. 2. Comply with BS 8110, Section 6, Para. 6.6 and 6.8 and ACI Standard 301, Chapter 12. The methods of curing and their duration shall be such that the concrete will have satisfactory durability and strength, and the member will suffer a minimum distortion, be free of excessive efflorescence and will not cause by its shrinkage, undue cracking in the structure. Insulate the concrete so that it is maintained at a suitable temperature or both to prevent excessive moisture loss from the concrete. Curing shall be appropriate to different members and products. Where necessary special care shall be taken to ensure that similar components are cured under the same conditions.
03300-21 11 March 2013

C.

D.

E.

F.

G.

H. I. J. 3.06 A.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3. B.

Curing shall be promptly commenced, be total in coverage and continued without interruption.

Curing Methods Curing compounds shall be used for curing concrete unless otherwise approved by the Engineer. 1. Curing Compounds a. b. c. Curing membrane solution shall be applied at the coverage rate recommended by the manufacturer (two coats, one at right angles to the other), immediately after placing concrete. Concrete surfaces shall be damp when the coating is applied. Curing compounds shall not be used if bond is necessary such as in base slab of two course floor. Conventional curing compounds shall not be used if a special finish is to be applied. In such cases, special resin solutions that do not affect adhesion of finishes may be used as approved by the Engineer.

C.

The following curing methods may be considered for use subject to the Engineers approval 1. 2. Ponding with Water: Effective for flat surface. Curing water shall not be more than 11C (52F) cooler than the concrete and shall be free of substances that may stain or discolour concrete. Saturated Material: Saturated material shall be held in close contact with concrete surfaces and maintained in moist condition so that a film of water remains on the concrete surface throughout the curing period. Saturated materials shall be kept wet for a minimum of seven days after stripping. Intermittent Spraying with water: Care shall be taken that newly finished concrete is not damaged by water erosion. If spraying is done at intervals, concrete surfaces shall not dry out between applications of water. Top of columns and walls shall be cured after initial setting. As soon as formwork is loosened water curing shall be applied to sides of columns and walls, and shall continue uninterrupted for a minimum of seven days. Slabs and flat surfaces shall be cured by flooding. Flat concrete surfaces shall be covered immediately after concrete is placed, tamped and levelled, with polyethelene sheet and flooded with water as soon as initial hardening of concrete occurs. Covering surface shall follow progress of concrete placement until the whole surface is covered and flooded. Polyethelene sheet may be removed after 24 hours and regular flooding maintained for a minimum of 7 days. Use special thermometers of sufficient length of stem to monitor the concrete temperature of the raft foundation slab as soon as concrete is placed to the required level. Monitor temperature of concrete for 7 days and provide the Engineer with daily records.

3.

4.

5.

6.

D. 3.07 A. B.

Curing Periods: Seven (7) days is the minimum curing period for all cast-in-place concrete. At the discretion of the Engineer the curing period may be extended. STRIKING OF FORMWORK Comply with BS 811:85, Section 6, Para.6.9.3 or ACI 301, Chapter 4, Para 4.5. Do not remove forms or supports until the concrete has thoroughly hardened and has attained sufficient strength to support its own weight and construction live loads to be placed thereon, without damage to the structure. Do not disturb forms or supports until the concrete has attained at least 40% of design strength
03300-22 11 March 2013

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

for side forms and 80% of design strength for bottom forms. Be responsible for proper form removal and replace any work damaged due to inadequate maintenance or improper or premature form removal. C. The following shall be the minimum periods before striking formwork, unless otherwise directed by the Engineer: 1. 2. 3. 4. 5. 6. D. E. F. G. H. Vertical formwork to columns, walls and large beams Beam Sides Beam soffits formwork Props to beams Soffit formwork to slab Props to slab 24 hours 24 hours 15 days 21 days 6 days 15 days

The removal time may be decreased with the Engineers approval where surface temperature of concrete is 16C and above; refer to Table 6.6, Section 6 of BS 8110, part 1. Protect the newly placed concrete from high and low temperatures using suitable means of insulation for the duration of the curing. Care shall be exercised in form removal to prevent chipping of corners and other damage. Experienced foremen shall supervise form removal. Removal of bottom form linings between props prior to the removal of supports may be permitted, provided the formwork has been designed to allow such removal without disturbing the supports. No new permanent structure shall be constructed on any part of the erected structure while the latter is still supported by formwork unless walls are built above another wall carried on a properly supported base. This requirement does not prohibit the use of props to take the load of more than one level of framing. TOLERANCES Comply with B.S. 5606 OR ACI Standard 117-81, Part 5, unless noted otherwise. CLEANING FINISHED EXPOSED CONCRETE SURFACES Efflorescence, stains, oils, grease or any unsightly accumulation of foreign materials that are visible on the exposed exterior and/or interior surface of finished concrete, shall be removed. Such action may cover all exposed concrete or when irregular lapping can be avoided, only such parts as are affected by the stains or other unsightly appearances. No such remedial action shall be taken without the approval of the Engineer. PATCHING Comply with ACI 301, Chapter 9. FINISHING General Requirements for Flatwork: Strike off top surfaces of finished fill and monolithic slabs true and level within a tolerance of 3mm in 3 meters and measured with a 3 metre straight edge placed in any direction at any location. Monolithic Floor Finish (CSFI): Level surface and remove excess laitance by tamping, screeding, and preliminary wood floating. When the slab has hardened sufficiently so that water and fine material will not be worked to the top, compact the surface with motor-driven floats of the disc type and trowel smooth with
03300-23 11 March 2013

3.08 A. 3.09 A.

3.10 A. 3.11 A. B.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

two steel trowelling operations. Do the second trowelling after the concrete has becomes so hard that no mortar will adhere to the edge of the trowel. Leave floors with a smooth, hard finish free of blemishes and true to a maximum tolerance of 3mm in 3 metres. Monolithically finish surfaces scheduled to receive the following: 1. C. Hardener and Sealer

Mortar Float Finish: Level surface and remove excess laitance by tamping, screeding, and preliminary wood floating. When the slab has hardened sufficiently so that water and fine material will not be worked to the top, compact the surface with motor-driven floats of the disc type. Leave floors/roofs with a smooth finish and true to a maximum tolerance of 3mm in 3 metres. Motor float finish surface scheduled to receive the following: 1. Membrane Waterproofing

D.

Rough Slab Finish: Tamp the concrete using special tools to force the aggregate away from the surface, then screed with straight edges to produce a reasonably true and uniform surface. Rough slab finish surfaces scheduled to receive the following: 1. Floor beds.

E.

Wood Float Finish (CSF2): Tamp the concrete using special tools to force aggregate away from the surface, then screed with straight edges to bring surfaces to the required lines. While the concrete is still green, wood float to a true and uniform plane to a 3mm in 3m tolerance with no coarse aggregate visible and apply a medium stiff broom finish striated uniformly at right angles to traffic pattern and in the direction indicated then moisture and seal the following: 1. Driveway, Ramps and parking

F.

Interior Exposed Concrete Surfaces of Slab, Beams, Columns and Walls: Unless otherwise shown, leave a smooth finish, even-textured and free of blemishes. Repair or replace defective areas, as directed. As soon as the face forms are removed, remove all fins and other projections carefully, level offsets and grind where necessary. Repairing, replacing and pointing and filling voids shall be done to the Engineers satisfaction. Patch as specified under paragraph Patching. Refer to architectural drawings to determine surfaces scheduled to receive paint. Im-printed Concrete surface: 1. Concrete shall be placed and screeded to the required grades, and then floated. Apply an even application the approved colour hardener to the concrete surface as per the manufacturere instructions. Apply the release agent to the surface of the concrete as per the manufactuere instructions. While concrete is still in its plastic state, apply the stamped concrete tool, of the approved pattern, to the suface of concrete. Tools shall be properly tamped into the surface to achieve the required texture. Control joints shall be cut at pre-determend areas no later than 12 hours after concrete has been placed or as otherwise instructed by the manufacturer. Excess release agent shall be removed in accordance with the manufactuere instructions. Apply minimum of one coat of clear protective coating as per the manufacturer instructions.

G.

2. 3

4.

5 3.12 A.

FLOOR SLABS ON GRADE Examine condition of porous fill and remedy any unsatisfactory portions prior to applying vapour barrier.

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-24 11 March 2013

B. C. 3.13 A.

Cover porous fill with vapour barrier of polyethylene sheeting. Do not lay sheeting until immediately prior to placing of reinforcing mesh and concrete. Seal seams as recommended by the manufacturer. Do not place concrete over vapour barrier until all breaks have been patched and sealed. HARDENER AND SEALER Apply in accordance with the approved manufacturers printed instructions, on the following concrete floor surfaces:

END OF SECTION

CAST-INPLACE CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03300-25 11 March 2013

SECTION 03345 CONCRETE FINISHING PART 1 - GENERAL 1.01 Reference Standards Conform to requirements of the following Reference Standards or as modified and supplemented hereinafter. 1. 2. 3. 1.02 ACI Specifications for Structural Concrete for Buildings, ACI 301 ACI Recommended Practice for Cold Weather Concreting, ACI 306 ACI Recommended Practice for Hot Weather Concreting, ACI 605

Quality Assurance Concrete Work: Concrete work where indicated to be exposed is architecturally finished concrete; special care must be taken to provide specified, finished surfaces without gravel pockets, and other defacements. Engineer shall inspect concrete after removal of forms and before concrete repair work begins.

1.03

Protection Protect persons and adjacent materials and finishes from dust, dirt and other surface or physical damage during finishing operations, including materials driven by wind.

PART 2 - PRODUCTS Fosroc Construction Solutions Alghanim Specialist Jotun PART 3 - EXECUTION 3.01 Repairs A. Immediately after removal of forms and inspect all surfaces for defects. Repair or patch defects only after defects are inspected by the Engineer and then only with the Engineers permission. Do all cutting and repair within 48 hours after removal of forms; cure repairs same as new concrete. Defective Areas: Where patches are allowed, repair and patch areas; must match the surrounding areas in color and texture so as to be indistinguishable after completion, including curing and finishing. Determine mix for color by trial mixes before patching; after initial cure, dress patch or repair area mechanically or by hand for texture match.

B.

3.02

Finishes for Formed Surfaces A. Rough Form Finish: Provide for surface of walls and footings adjacent to grade or below grade. This is the concrete surface having texture imparted by form facing material use with tie holes and defective areas repaired and patched and fins and other projections exceeding 1/4 inch in height rubbed down or chipped off. Smooth Formed Finish: Provide a smooth formed finish on formed concrete surfaces exposed to view. This is an as-cast concrete surface obtained with selected form facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Remove fins and other projections completely and
03345 - 1 11 March 2013

B.

CONCRETE FINISHING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

smoothed. Repair and patch honeycombs and defective areas as directed by the Engineer. Tie holes shall not be filled. C. Sacked Finish: 1. 2. 3. 4. 5. 6. 7. D. On all designated surfaces of the exposed concrete, provide a sacked finish by coating the concrete with sacking mortar. Sacking of patched or defective concrete surfaces may be required by the Engineer for areas not other wise already requiring this work. Repair and patch tie holes, honeycombs and defective areas and trowel to smooth finish. Remove fins and other projections completely and smoothed. Thoroughly wet surface to prevent absorption. Coat entire surface with sacking mortar as soon as surface of concrete approaches surface dryness. Thoroughly and vigorously rub mortar over area with clean burlap pads to fill all voids. While mortar is still plastic but partially set (so it cannot be pulled from voids), sack-rub surface with dry mix of sacking mortar (leave out water). There should be no discernible thickness of mortar on concrete surface, except in voids; all surfaces should be uniformly textured. Immediately begin a continuous moist cure for 72 hours.

Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated. Provide for face surface of walls adjacent to plaza, walks and stairs.

3.03

Finishes for Unformed Surfaces A. Screed all slabs, for whatever finish, to true levels or slopes, work surfaces only to the degree required to produce the desired finish; do no finishing in areas where water has accumulated, drain and rescued; in no case use cement and sand sprinkling to absorb moisture. Carefully finish all joints and edges with proper tools, unless otherwise specified. Applay minimum 4 mm thick self leveling epoxy grout with 2 cots of PU finish. Rough Screed Finish: Consolidate, level, and screed all surfaces to obtain evenness and uniformity; remove all surplus concrete after consolidation by striking off with sawing motion against guide strips. Provide for top horizontal surfaces of non-exposed footings. Provide for concrete slab under synthetic safety surfacing. Float Finish: Apply float finish to monolithic slabs to receive trowel or other finishes. After screeding, consolidating, and leveling concrete slabs, do not work surface until ready for floating. Begin floating, using float blades or float shoes only, when surface water has disappeared, or when concrete has stiffened sufficiently to permit operation of power-driven floats, or both. Consolidate surface with power driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to tolerances of F(F) 18 (floor flatness) and F(L) 15 (floor levelness) measured according to ASTM E 1155. Cut down high spots and fill low spots. Uniformly slope surfaces to drains. Immediately after leveling, re-float surface to a uniform, smooth, granular texture. Broom Finish: Apply a non-slip broom finish to all exterior concrete slabs, stairs, walks, and ramps, and elsewhere as indicated. Immediately after float finishing, slightly roughen concrete surface by brooming with fiber bristle broom perpendicular to main traffic route. Defective Work: Remove and replace when directed by the Engineer, surfaces which show excessive shrinkage cracks.

B.

C.

D.

E. 3.05 Curing

CONCRETE FINISHING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03345 - 2 11 March 2013

A.

Protect freshly deposited concrete from premature drying and excessively hot or cold temperatures; maintain minimal moisture loss at relatively constant temperature for necessary hydration time and proper relatively constant temperature for necessary hydration time and proper hardening of concrete. Duration of Curing: In addition to the initial overnight curing, continue final curing operations until the cumulative number of days or fractions thereof (not necessarily consecutive) occurs, during which time the temperature of the air in contact with the concrete is above 50 degrees F, equals 7 days. If highearly strength concrete has been used, continue final curing operation for 3 days total time, calculated as before. Take care to prevent rapid drying at the end of the curing period. If early removal of forms is approved and forms are removed during the curing period, apply one of the curing methods specified in City of Seattle Standards Specifications (most recent edition), Section 9-23 and continue curing for the remainder of the required curing period.

B.

3.06

Inspection Contractor shall notify Engineer that they are starting concrete finish repair work at least 48 hours prior to the beginning of work.

3.07

Cleaning Leave premises clean and free of residue from work in this section.

END OF SECTION

CONCRETE FINISHING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03345 - 3 11 March 2013

SECTION 03521 LIGHTWEIGHT CONCRETE PART 1 GENERAL 1.01 A. 1.02 A. 1.03 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Particular Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY This Section includes lightweight concrete fill over structural slabs to extend, thickness and slopes indicated on drawings. DEFINITIONS Lightweight Concrete: Low-density concrete, with an oven-dry weight not exceeding 50 lb/cu.ft.(900 kg/cu.m): 1. 2. 1.04 A. Aggregate Type Lightweight Concrete: Low density concrete made with Portland cement, water, airentraining admixture, and perlite mineral aggregates. Cellular type lightweight Concrete: Concrete made with Portland cement, water air-producing foaming agents.

REFERENCES American Society for Testing and Materials (Latest Edition) 1. 2. 3. 4. 5. 6. ASTM C 138: Test Method for unit weight, yield and Air content (Gravimetric) of concrete. ASTM C 150: Specification for Portland Cement ASTM C 260: Specification for Air-Entraining Admixtures for concrete. ASTM C 332 (R91): Specification for Lightweight Aggregates for Insulating Concrete. ASTM C 495: Test Method for Compressive strength of lightweight insulating concrete. ASTM C 612: Specification for Mineral Fiber Block and Board Thermal Insulation.

1.05 A.

SUBMITTALS Product Data for each type of product specified. Include mixing and application instructions for each type lightweight concrete. 1. Include lightweight concrete design designations of a qualified testing and inspecting agency evidencing compliance with requirements.

B. C.

Shop Drawings including plans, sections, and details showing roof slopes, insulation thickness, roof penetrations, roof perimeter terminations and curbs, control and expansion joints, and roof drains. Design mixes for each lightweight concrete mix, including oven-dry unit weight, and compressive strength.

LIGHTWEIGHT CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03521-1 21 July 2011

1.06 A. B. C.

DELIVERY, STORAGE, AND HANDLING Delivery materials in manufacturers original undamaged packages or acceptable bulk containers. Store packaged materials to protect them from elements or physical damage. Do not use cement that shows indications of moisture damage, caking, or other deterioration.

PART 2 - PRODUCTS 2.01 A. ACCEPTABLE MANFACTURERS Aggregate Lightweight Concrete 1. W.R.Grace & Co. Construction Products Div. 62 Whittemore Ave. Cambridge, MA 02140 Tel: (617) 876-1400 Fax: (617 498-4311 Mandoval Vermiculite Products Inc. 3340 Bingle Rd. Houston, TX 77055 Tel: (713) 462-1709 Fax: (713) 462-8707 Saudi Perlite Ind. P.O. Box 42010 Riyadh 11541 Saudi Arabia Tel: 4792473, Fax: 4775719 Or approved equal

2.

3.

4.

LOCAL SUPPLIERS 1. 2. 3. 4. 2.02 A. B. C. D. E. Jassim Al Nisf Al Hamra Kuwait Company Al Bahar & Bardawil Or equal aproved

MATERIALS Portland Cement: ASTM C 150, Type I. Mineral Aggregate: ASTM C 332, Group I, perlite or vermiculate. Water: Clean, Portable. Air-Entraining Admixture: ASTM C 260 Control Joint Filler: ASTM C 612, Class 2, glass-fibre type; compressing to one-half thickness under a load of 25 psi (172 kPa)
03521-2 21 July 2011

LIGHTWEIGHT CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.03 A.

DESIGN MIXES Prepare design mixes for type and strength of lightweight concrete by either laboratory trial batch or field test data methods. For the trial batch method, use a qualified independent testing agency for preparing and reporting proposed mix designs. 1. Limit use of fly ash to not exceed 25 percent of portland cement by weight.

B. 2.04 A.

Limit water-soluble chloride ions to the maximum percentage by weight of cement or cementitious material permitted by ACI 301. AGGREGATE TYPE LIGHTWEIGHT CONCRETE Design mix to produce lightweight concrete with the following minimum physical properties using the minimum amount of water necessary to produce a workable mix. 1. Do not exceed maximum air content recommended by aggregate manufacturer.

B.

Perlite Aggregate Mix: As follows: 1. 2. 3. As-Cast Unit Weight: 610 to 705 kg/cu.m at point of placement, when tested according to ASTM C 138. Oven-Dry Unit Weight: 385 to 480 kg/cu.m, when tested according to ASTM C 495. Compressive Strength: Minimum 125 psi (860 kPa), when tested according to ASTM C 495.

PART 3 - EXECUTION 3.01 A. PREPARATION Control Joints: Install control joints at perimeter of roof deck and at junctures with vertical surfaces, including curbs, walls, and vents, for full depth of lightweight concrete. Fill joints with glass-fibre control joint filler. 1. 3.02 A. B. C. D. 3.03 Provide 25mm wide joints for roof areas with dimensions up to 30m in length; 38mm wide joints for roof area dimensions exceeding 30m.

MIXING AND PLACING Mix and place lightweight concrete according to manufacturers instructions, using equipment and procedures to avoid segregation of mix and loss of air content. Deposit and screed lightweight concrete in a continuous operation until an entire panel or section of roof area is completed. Do not vibrate or work mix except for screeding or floating. Place to depths and slopes indicated. Finish top surface smooth, free of ridges and depressions, and maintain surface in acceptable condition to receive subsequent roofing application. Begin curing operations immediately after placement, and air cure for not less than 3 days according to manufacturers recommendations. FIELD QUALITY CONTROL
03521-3 21 July 2011

LIGHTWEIGHT CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Testing Agency: Engage a qualified independent testing agency, acceptable to Engineer, to take samples and conduct tests to evaluate lightweight concrete. Do not use same testing service that provided initial mix designs. 1. Determine compressive strength and oven-dry unit weight according to ASTM C 495. Make a set of at least 6 molds for each days placement, but not less than 1 set of molds for each (465 sq.m) of roof area.

3.04 A. B.

DEFECTIVE WORK Refinish, or remove and replace, lightweight concrete surfaces that are excessively scaled or too rough to receive roofing, according to current published requirements of roofing manufacturer. Remove and replace lightweight concrete that fails to meet compressive strength and oven-dry unit weight requirements.

END OF SECTION

LIGHTWEIGHT CONCRETE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03521-4 21 July 2011

SECTION 03532 CONCRETE SCREED PART 1 GENERAL 1.01 A. 1.02 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Particular Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY 1. A. This Section includes concrete screed with hardener and sealer

Related Sections: 1. Section 03300 Cast-in-Place Concrete

1.03 A.

STANDARDS Comply with the applicable provisions and recommendation of the following (Latest Edition): ASTM ASTM ASTM ASTM ASTM ASTM ASTM ASTM A 185 C 150 C 171 C 309 C 404 C 881 D 224 D 4263

1.04 A. 1.05 A. B.

SUBMITTALS Product Data: For each type of manufactured material and product indicated. DELIVERY, STORAGE, AND HANDLING Deliver materials in original packages and containers, with seals unbroken, bearing manufacturers labels indicating brand name and directions for storage, mixing with other components, and application. Store materials to comply with manufacturers written instructions to prevent deterioration from moisture or other detrimental effects.

PART 2 - PRODCUTS 2.01 A. B. C. RELATED MATERIALS Epoxy joint filler: Two component, semi-rigid, 10 percent solids, epoxy resin with a shore a hardness of 80 per ASTM D 224. Portland Cement: ASTM C 150, type I or II Sand: ASTM C 404, fine aggregate passing No. 16 (1.2 mm) sieve.

CONCRETE SCREED Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03532-1 11 March 2013

D. E. F. 2.02 A. B. C. D. 2.03 A.

Water: Potable Epoxy Adhesive: ASTM C 881, Type V, two component epoxy resin, capable of humid curing and bonding to damp surfaces, of class and grade to suit requirements. Mesh reinforcement: Shall conform to ASTM A 185 CURING MATERIALS Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet. Water: Potable Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, 25 percent solids content, minimum. SCREED Mix: 1. 2. 3. Grout: 1 Part cement to 11/4 part sand, with sufficient water to make a stiff slurry. Bond Coat: 1 part cement to 11/4 part sand to 2 parts coarse aggregate mixed with bonding agent as approved by the Engineer. The amount of water shall not exceed 19 liters per 50 kg bag of cement. Top Coat: Same mix as bond coat.

2.04

Aproved Supplaires A. B. C. KBRC Kuwait British ready mix National Industries. Bubiyan Ready Mix.

B.

Handener: 1. Floors shall be surfaced with a monolithic surface hardening compound containing non-metallic rust free aggregates which shall be applied to the freshly laid concrete floor by the dry-shake method. The compound shall have the ability to improve the abrasion resistance of concrete by 225%. Properties: a. b. The aggregate shall have a hardness value of 7 on Moh Scale 28 days compressive strength of cubes shall be 70N/mm2

2.

C.

Sealer

CONCRETE SCREED Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03532-2 11 March 2013

1. 2.

Multi-role curing and sealing compound, complying to the requirements of ASTM C309 for Type 1 Class B materials, based on a blend of piolite/acrylic resins in a solution of quick drying solvents. Properties: Appearance: Specific gravity: Flashpoint: Finished Film Appearance Clear liquid 0.82 at 20 degrees C. 88 degrees C Clear, tack free water repellent film

A.

Bounding Agent. a. b. FOSROC Alghanim Specialist

2.05 B.

ACCEPTABLE MANUFACTURERS (HARDENER AND SEALER) FOSROC

C. Alghanim Specialist C. Or approved equal PART 3 - EXECUTION 3.01 A. B. 3.02 A. EXAMINATION Examine substrates, for conditions affecting performance of screed. Proceed with application only after unsatisfactory conditions have been corrected. Verify that base slabs are visibly dry and free of moisture. Test for capillary moisture by the plastic sheet method accordingly to ASTM D 4263. PREPARATION Existing Concrete: Remove existing surface treatments and deteriorated and unsound concrete. Mechanically abrade base slabs to produce a heavily scarified surface profile with an amplitude of 6mm. 1. 2. 3. B. Prepare and clean existing base slabs. Fill voids, cracks, and cavities in base slabs. Mechanically remove contaminants from existing concrete that might impair bond of screed. Saw cut existing contraction and construction joints to a depth of inch (13 mm) and fill with epoxy joint filler.

Install joint-filler strips where screed abuts vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated. 1. 2. Extended joint-filler strips full width and depth of joint, terminating flush with screed surface, unless otherwise indicated. Terminate full-width joint-filler strips inch (13mm) below screed surface where joint sealant, specified in Division 7 Section Joint Sealant, are indicated.

CONCRETE SCREED Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03532-3 11 March 2013

3. 3.03 A. B. C. D. E.

Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

APPLICATION Existing Concrete: Apply epoxy-bonding adhesive, mixed according to manufacturers written instructions, and scrub into dry base slabs to thickness of (1.5 to 3mm), without pudding. Place screed while adhesive is still tacky. Completely cover the wet substrate surfaces with grout, applied with force and brushed in to assure full coverage. Apply bond coat not less than 16 mm thick immediately after application of grout and bring to true lines, levels and profiles. Thoroughly compact and roughen the bond coat to form a key for the top coat. Before the bond coat has set, apply the top coat to such thickness that the total of the work measured from substrate to finished surface will be shown, less only thickness of finish covering. Place screed continuously in a single layer, tamping and consolidating to achieve tight contact with bonding surface. Do not permit cold joints or seams to develop within pour strip. 1. 2. 3. Screed surface with a straightedge and strike off to correct elevations. Slope surfaces uniformly where indicated. Begin initial floating using bull floats to form a uniform and open-textured surface plane free of humps or hollows.

F.

Finishing: Consolidate surface with power-driven floats as soon as screed can support equipment and operator. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture. 1. Hard Trowel Finish: After floating surface, apply first trowel finish and consolidate screed by power-driven trowel so no blisters develop. Continue troweling passes and restraighten until surface is smooth and uniform in texture. a. Finish and measure surface so gap at any point between screed surface and an unleveled freestanding 3m long straightedge, resting on two high spots and placed anywhere on the surface, does not exceed 6.4mm.

2. G.

Apply hardener and sealer in accordance with recommendations of the manufacturer.

Construction Joints: Construct joints true to line with faces perpendicular to surface plane of screed, at locations indicated or as approved by Engineer. 1. Coat face of construction joint with epoxy adhesive at locations where screed is placed against hardened or partially hardened screed.

H.

Construction Joints: Form weakened-plane contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut (3mm) wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before screed develops random contraction cracks. 1. 2. Form joints in screed over contraction joints in base slabs, unless otherwise indicated. Construct contraction joints for a depth equal to one-half of screed thickness, but not less than 13mm deep.

3.04

PROTECTION AND CURING

CONCRETE SCREED Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03532-4 11 March 2013

A. B.

General: Protect freshly placed screed from premature drying and excessive cold or hot temperatures. Evaporation Retarder: Apply evaporation retarder to screed surfaces in hot, dry, or windy conditions before and during finishing operations. Apply according to manufacturers written instructions after placing, screeding, and bull floating or darbying screed, but before float finishing. Begin curing immediately after finishing screed. Cure by one or a combination of the following methods, according to screed manufacturers written instructions: 1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with water or absorptive cover, water saturated and kept continuously wet. Cover screed surfaces and edges with 12 inch (300 mm) lap over adjacent absorptive covers. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches (300mm), and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape. Curing Compound: Apply uniformly in two coats in continuous operations by power spray or roller according to manufacturers written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.

C.

2.

3.

3.05 A. B. C. 3.06 A.

JOINT FILLING Prepare and clean contraction joints and install epoxy joint filler, according to manufacturers written instructions, once screed has fully cured. Remove dirt, debris, saw cutting, curing compounds, and sealers from joints; leave contact faces of joint clean and dry. Install epoxy joint filler full depth of contraction joints. Overall joint and trim joint filler flush with top of joint after hardening. REPAIRS Repair and patch defective screed areas, including areas that have not bonded to concrete substrate.

END OF SECTION

CONCRETE SCREED Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03532-5 11 March 2013

SECTION 03600 GROUT PART 1 - GENERAL 1.01 A. B. C. 1.02 A. B. 1.03 A. RELATED WORK: Section 03300 Section 04200 Section 05500 SECTION INCLUDES Pre-mixed and packaged non-shrinking grout. Site mixed grout/concrete containing an expanding additive. STANDARDS Comply with the applicable provisions and recommendations of the following (Latest Edition): CRD C 621 ASTM C 827 ASTM C 309 1.04 A. QUALITY ASSURANCE CONTROL SAMPLE: 1. Complete a sample of the premixed and site mixed work in an approved location and obtain Engineer or Engineers Representatives approval before proceeding. Additive Manufacturers representative to be present to supervise control sample. Cast in Place Concrete Unit Masonry Metal Fabrications

1.05 A.

SUBMISSIONS: SAMPLES: 1. 2. Submit sample of any proposed additives before delivery of material generally. Submit sample of any proposed premixed grout before delivery of material generally.

B.

PRODUCT DATA: 1. 2. 3. Submit name of manufacturer of premixed grout and additives and specific brand name. Submit copies of manufacturers technical data. Submit copies of manufacturers recommended mixing and placing instructions.

C.

METHODS: 1. Prior to commencing work submit details of methods and techniques proposed for the design and execution of the work.

1.06

PRODUCT DELIVERY, STORAGE

GROUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03600-1 11 March 2013

A.

DELIVERY: 1. 2. Cement: As specified in Section 03300. Premixed Grout and Additive: Materials to be delivered to site in manufacturers unopened containers, the labels of which shall bear the date of manufacture. Shelf life shall not exceed one year.

B.

STORAGE: 1. 2. 3. Cement: As specified in Section 03300. Aggregates: As specified in Section 03300. Premixed Grout and Additives: in accordance with manufacturers recommendations.

1.07 A.

ENVIRONMENTAL CONDITIONS: TEMPERATURE: 1. As specified in Section 03300, and to manufacturers instructions.

PART 2 - PRODUCTS 2.01 A. APPROVED MANUFACTURER Non Metallic: Use one products of the following manufacturer or approved equal. 1. 2. 3. 4. 5. 2.02 A. Sono Grout Five Star Grout Masterflor 713 Conbextra Sika Level AE (Sonneborn Contech) (U.S. Grout Ciro.) (Master Building Company) (FOSROC) (Sika Australia Pty Limited)

PREMIXED GROUT Non shrink non metallic grout formulated to comply with U.S. Corps of Engineers Specification CRD-C-621 and indicating no decrease in volume change when tested under conditions of ASTM C827. Early volume change of Cementitious Mixtures. Curing compound (for application to exposed surfaces of grout) conforming to ASTM C-309. CEMENT: CEMENT GENERALLY: 1. Portland cement as specified in Section 03300.

B. 2.03 A.

2.04 A.

AGGREGATES: GENERALLY: 1. To be as specified in Section 03300.

GROUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03600-2 11 March 2013

2. B.

Selected to reduce bleeding to a minimum.

FINE AGGREGATE: 1. Washed dry sand.

C.

COARSE AGGREGATE: 1. 2. Rounded and evenly graded, 10mm nominal size except where pumping is employed when 6mm nominal size to be used. Percentage passing No. 16 sieve not to exceed 5%.

D.

ADDITIVES: 1. To the approval of the Engineer or Engineers Representative.

E.

WATER: 1. As specified in Section 03300.

2.05 A. B. C.

MIXES: Select the mix proportions and workability for each type of grout to produce the required performance. The minimum characteristic strength of the grout shall be equal to the strength of concrete. Grout for filling uncongested areas over 50mm wide: 1. 2. Mix proportions-1:1.25:1.75 (Cement/fine aggregate/course aggregate) by weight. Or adjusted to meet B above. Workability - slump 100-200mm.

D.

Grout for filling narrow areas less than 50mm wide: 1. 2. Mix proportions - 1:2 (cement : fine aggregate) by weight. Workability - slump to be kept to a minimum to allow placing.

E.

Dry packing for area over 75mm wide: 1. 2. Mix proportions - 1:1:2 (cement/fine aggregate/course aggregate 10mm nominal size) by weight. Workability - Slump not to exceed 5 mm.

F.

Dry packing for areas less than 75mm wide: 1. 2. Mix proportions - 1:2 (cement : fine aggregate) by weight. Workability - slump not to exceed 5mm.

G. H.

Alternative mixes incorporating additives to be used with the Engineers prior approval. Premixed grout to voids of small widths and apertures of limited accessibility.

GROUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03600-3 11 March 2013

2.06 A. B.

FORMWORK: As specified in Section 03300. For smaller areas to manufacturers instructions.

PART 3 - EXECUTION 3.01 A. B. 3.02 A. B. C. 3.03 A. B. C. D. 3.04 A. B. EXAMINATION Examine surfaces and conditions to which the work of this Section is to be applied to ensure that they are adequate to provide a satisfactory application. Report any unsatisfactory conditions to the Engineer or Engineers Representative. PREPARATION: Scab concrete surfaces to provide key. Ensure spaces to receive grout are clean and free from debris. Thoroughly wet surfaces and allow free water to disperse prior to application of grout. FORMWORK: Generally refer to Section 03300. Fix edge formwork where necessary. Edge formwork to base plates to be to the level of the plate. Clearance between formwork and plate normally 75mm. Strike formwork within 24 hours of filling or as manufacturers recommendation. APPLICATION - PREMIXED GROUT Mix non shrink grout in accordance with manufacturers instructions in relationship to temperature and workability conditions. Basically in all conditions, materials shall be applied in a plastic or trowelable workable condition, firmly pressed, rubbed into place or hand trowelled. Should conditions be such that flowable condition be considered more practical, obtain Engineer or Engineers Representatives prior approval. Flowable application must allow for high points to be adequately vented to allow entrapped air to escape, and an approved method of containing grout until set. Strike edges clean and compress to conditions as indicated on the drawings. Materials shall be applied in position within one hour of mixing (unless manufacturers literature states otherwise). After half an hour discard any grout mix that shows signs of stiffening. As soon as grout sets, cure exposed surfaces with curing compound applied in strict accordance with manufacturers instructions. APPLICATION SITE MIXED GROUT

C. D. E. 3.05

GROUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03600-4 11 March 2013

A,

MIXING: 1. 2. 3. 4. 5. 6. Mix grout by mechanical mixer (colloidal type) for large quantities or by hand for small quantities (one quarter of cubic metre or less) on a clean, level banker board. Thoroughly mix grout so that all individual constituents are incorporated early. Do not over mix. Use grout as soon as possible after mixing, maximum period 1 hour. Do not use grout after commencement of initial set. Do not re-mix or re-temper grout after commencement of initial set.

B.

GENERALLY: 1. 2. 3. 4. 5. 6. 7. 8. Pour grout into recesses or formwork and work into position to completely fill the void. Ram dry packing to ensure optimum compaction. Work from one side to avoid formation of air pockets or voids. Preferably bolt pockets shall be filled at same time as packing to base plates. If separate operation, fill bolt pockets to within 50mm of the level of the concrete surface before main filling. Do not vibrate grout. Form neat chamfered edge to packing under plates. Do not place grout when concrete temperature is less than 5 Deg. C. or more than 35 Deg. C. Cure grout by covering with moist hessian for not less than 5 days.

3.06 A.

CLEAN-UP Promptly, as the Work proceeds and upon completion, scrape off and remove all grout materials from adjacent surfaces. Clean up and remove any surplus material and rubbish resulting from the work of this Section.

END OF SECTION

GROUT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03600-5 11 March 2013

SECTION 03998 CONCRETE REPAIR PART - 1 GENERAL 1.01 A. 1.02 A. DESCRIPTION The work included in this Section comprises furnishing all plant, labour, equipment, appliances and materials and performing all operations in connection with concrete repair works. REFERENCE STANDARDS The work shall conform to the Codes and Standards of the following agencies as further cited herein: BS 1881 Concrete Repair 1.03 A. QUALIFICATIONS The manufacturer shall provide evidence indicating that the specified materials have been successfully utilised on work of a similar scope to that shown and specified for this Project. The system examples cited shall have been completed and in use for a minimum two (2) years without any evidence of failure. Concrete repair works shall be executed under supervision of the approved manufacturer. SUBMITTALS Manufacturers Data: Submit to the Engineer Manufacturers specifications and installation instructions for the concrete repair materials and other data to show compliance with the Contract Documents. Contractors Review: Before commencing work submit written statement signed by the Contractor stating that the Contract Documents for the Concrete repair system have been reviewed with a qualified representative of the Concrete repair system materials manufacturer and that he is in agreement that the selected materials for Concrete repair system are proper, compatible and adequate for the application shown. DELIVERY, STORAGE AND HANDLING The Contractor shall deliver the approved products to the job site in their original unopened containers clearly labelled with the manufacturers name, brand, designation, type and class as applicable, and the date of manufacture and expiration (if any). Products shall be stored in an approved dry area. Products shall be kept dry at all times. Products shall be handled in a manner that will prevent breakage of containers and/or damage to the products. 1.06 A. 1.07 A. ENVIRONMENTAL CONDITIONS Do not fix concrete repair system during inclement weather or when air temperature is outside the range recommended by the manufacturer. PROTECTION Protect of the concrete repair material from damage during construction period so that it will be without any indication of abuse or damage at time of completion or covering with other materials.

B. 1.04 A. B.

1.05

CONCRETE REPAIR Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03998-1 11 March 2013

B. C. D.

Protect the building from damage resulting from spillage, dripping and dropping of materials. Repair and restore other work damaged during operations. Prevent materials from running into and clogging drains. Take all necessary precautions against fire and other hazards during delivery, storage and installation of flammable materials specified herein. Comply with local ordinances and fire regulations in the installation of hazardous materials specified or required under this Section.

PART 2 - PRODUCTS 2.01 A. MATERIALS Shrinkage compensated polymer fibre reinforced, thixotropic repair mortar in powdered form and when mixed with the correct amount of water produces a thixotropic, high strength repair mortar, reinforced with acrylic polymer fibres. The material must possess bond characteristics to steel reinforcement and to concrete. Material must be shrinkage compensated, low permeability and durable. Must be able to be both spray or trowel applied. MANUFACTURERS The product and manufacturer specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than, those specified may be acceptable subject to the Engineers approval. 1. . 2. 3. 4. Emaco S 88 CT FOSROC Alghanim Or Engineers equally approved alternative.

2.02 A.

PART 3 - EXECUTION 3.01 A. 3.02 A. B. 3.03 A. B. CONDITIONS OF SURFACES Examine all surfaces to which the Concrete repair is to be done. Do not proceed with the application until all unsatisfactory conditions have been corrected and approved by the Engineer. PREPARATION Clean substrate of debris and deleterious material which would impair the work. Preparation of surface shall be conducted in accordance with the manufacturer instructions. INSTALLATION Application of concrete repair material shall be in accordance with manufacturers printed instructions except as hereinafter specified. Prime surfaces in accordance with manufacturers instructions.

CONCRETE REPAIR Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03998-2 11 March 2013

C.

Application of concrete repair material / system in accordance to the manufacturers instructions. It shall not be applied during, or when rain or dust storms are to be expected.

END OF SECTION

CONCRETE REPAIR Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

03998-3 11 March 2013

SECTION 04200

CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnish and install: 1. Concrete masonry unit construction as back-up for exterior stone walls. 2. Ties or anchorage items as indicated in the Drawings. 3. Reinforcing, ties, anchors, and other metal accessories, for anchoring unit masonry together and to other materials. 4. Compressible joint fillers for control joints in unit masonry work 5. Built-in masonry flashing. 6. Control joints in concrete masonry.

1.03

REFERENCES A. Comply with applicable requirements of the following standards and those others referenced in this Section, under the provisions of Section 01420 - REFERENCES. Where these standards conflict with other specified requirements, the most restrictive requirements shall govern. 1. American Concrete Institute (ACI) and American Society of Civil Engineers (ASCE): ACI 530.1/ASCE 6 - Specifications for Masonry Structures a. Revise ACI 530.1/ASCE 6 - Specifications for Masonry Structures to exclude Sections 1.4 and 1.7; Parts 2.1.2, 3.1.2 and 4.1.2; and Articles 1.5.1.2, 1.5.1.3, 2.1.1.1, 2.1.1.2, and 2.3.3.9 and to modify Article 2.1.1.4 by deleting requirement for installing vent pipes and conduits built into masonry. "TEK" Information Series, Published by the National Concrete Masonry Association (NCMA). ASTM A 82 - Steel Web, Plain, for Concrete Reinforcement. ASTM A 123 - Zinc (Hot-Dip Galvanized) Coating on Iron and Steel Products. ASTM A 153 - Zinc Coating (Hot-Dip) on Iron and Steel Hardware. ASTM A 641 - Zinc-Coated (Galvanized) Carbon Steel Wire. ASTM C 5 - Quicklime for Structural Purposes. ASTM C 90 - Load-Bearing Concrete Masonry Units. ASTM C129 - Non-Load Bearing Concrete Masonry Units. ASTM C 140 - Method of Sampling and Testing Concrete Masonry Units. ASTM C 144 - Aggregate for Masonry Mortar. ASTM C 150 - Portland Cement. ASTM C 207 - Hydrated Lime for Masonry Purposes. ASTM C 270 - Mortar for Unit Masonry. ASTM C 404 - Aggregates for Masonry Grout. ASTM C 476 - Grout for Masonry. ASTM C 595 - Blended Hydraulic Cement. ASTM C 780 - Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry.
04200-1 11 March 2013

2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

19. 20. 21. 22. 23. 24. 25. 26. 27. B.

ASTM C 1019 - Method of Sampling and Testing Grout. ASTM C 1072 - Method for Measurement of Masonry Flexural Bond Strength ASTM C 1093 - Accreditation of Testing Agencies for Unit Masonry. ASTM D 1056 - Flexible Cellular Materials - Sponge or Expanded Rubber. ASTM D 2000 - Classification System for Rubber Products. ASTM D 2287 - Nonrigid Vinyl Chloride Polymer and Copolymer Molding and Extrusion Compounds. ASTM E 119 - Fire Tests of Building Construction and Materials. ASTM E 447 - Compressive Strength of Masonry Prisms. IMIAC - Recommended Practices and Guide Specifications for Hot Weather Masonry Construction

The following reference materials are hereby made a part of this Section by reference thereto: 1. UL Fire Resistance Directory. 2. IMI: Masonry Construction Guide Manual. 3. PCA, Concrete Masonry Handbook. 4. NCMA applicable TEK Bulletins. Where the language in any document referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract. In the event of conflict between referenced standards, this specification or within themselves, the more stringent standard or requirement shall govern.

C.

1.04

SUBMITTALS A. Submit the following under provisions of Division I General Requirements: 1. Literature: Manufacturers product data sheets, specifications, performance data, physical properties for each item furnished hereunder. 2. Material certificates: Provide for the following, signed by manufacturer and Contractor certifying that each material complies with requirements. a. Each different cement product required for mortar and grout, including name of manufacturer, brand, type, and weight slips at time of delivery. b. Each material and grade indicated for reinforcing bars. c. Each type and size of joint reinforcement. d. Each type and size of anchors, ties, and metal accessories. 3. Material test reports from a qualified independent laboratory employed and paid by Contractor indicating and interpreting test results relative to compliance of the following proposed masonry materials with requirements indicated: a. Mortar complying with property requirements of ASTM C 270. b. Grout mixes: Include description of type and proportions of grout ingredients. c. Masonry units; report for tests performed within the previous six months. 4. Samples: a. Samples of each masonry accessory or anchorage item required, if requested by Engineer 5. Shop Drawings a. Submit shop drawings for fabrication, bending and placement of reinforcement bars and details for all reinforced masonry. Comply with ACI 315 "Details and Detailing of Concrete Reinforcing". Submit bar schedules, stirrup spacing, bending diagrams for bars and arrangement of masonry reinforcement.

1.05

QUALIFICATIONS

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-2 11 March 2013

A. 1.06

Installer: Work shall be done by skilled workmen, fully instructed as to the requirements of this Specifications and adequately supervised during the work.

QUALITY CONTROL A. General: Provide and maintain an effective Quality Control program and perform sufficient inspections, surveys and tests of all items of Work, including those of other trades, to ensure compliance with the Contract Documents. Furnish appropriate facilities, accurately calibrated instruments and testing devices required to perform the quality control operations and with sufficient work forces to cover the construction operations within the actual construction sequences. Coordinate this work with the quality control requirements of other technical Sections of the Specifications and with requirements of the Employer and governing authorities having jurisdiction. Single-source responsibility for concrete masonry units: Obtain concrete masonry units for the project from a single manufacturer. Single-source responsibility for mortar materials: Obtain mortar ingredients of uniform quality, including color for exposed masonry, from one manufacturer for each cementitious component and from one source and producer for each aggregate. Contractor's Testing: Perform testing in an independent certified testing laboratory acceptable to the Engineer. Furnish the laboratory sufficient quantities of specimens to comply with referenced testing standards. Test and furnish test reports for materials specified. 1. Concrete Masonry Unit Testing: After the Engineer's review of samples, test each type, class and grade of concrete masonry unit specified in accordance with ASTM C140. Provide testing specimens from actual production batches. Perform the following tests: a. Compressive strength. b. Absorption. c. Moisture content. d. Weight. e. Dimensions. Prism Test: Provide a prism test for each type of wall construction indicated. Prism test concrete masonry units to determine the actual f'm of the CMU wall construction. Construct and test CMU prisms in accordance with ASTM E447, Method B, and to comply with requirements of local authorities having jurisdiction. Test grouted and hollow CMU wall specimens. Test all CMU thickness and mortar types intended for use on the Project. Test prisms a minimum of 16 in. in height. Aggregate Testing: Test aggregate as follows: a. Mortar Aggregate: ASTM C144. b. Grout Aggregate: ASTM C404. Mortar Testing: Test mortar samples in accordance with ASTM C780 for mortar composition and properties. Test each mortar type and color each week. Prior to commencement of Work, provide preconstruction tests to establish a basis for comparison. Grout Testing: Test and submit test reports of grout samples in accordance with ASTM C1019. Test grout during construction for each 5000 sq. ft. of wall area or portion thereof. Prior to commencement of Work, provide preconstruction tests to establish a basis for comparison. Chloride Ion Testing: Test each mortar and grout mix to verify that the total chloride (Cl) ion content of each mix is within the specified limits. Perform chloride tests in accordance with ACI 318.

B. C.

D.

2.

3.

4.

5.

6.

1.07

REGULATORY REQUIREMENTS

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-3 11 March 2013

A.

Fire performance characteristics: Where indicated, provide materials and construction identical to those of assemblies whose fire resistance has been determined per ASTM E 119 by a testing and inspecting organization, by equivalent concrete masonry thickness, or by another means, as acceptable to authorities having jurisdiction.

1.08

DELIVERY, STORAGE, AND HANDLING A. General: Do not deliver cement, lime, and similar perishable materials to the site until suitable storage is available. Store such materials in weatherproof structures, and ensure that materials are in perfectly fresh condition when brought for use. Protect masonry units and manufactured products of all types from wetting by rain or snow, and keep covered when not in use. Masonry face units: Handle all masonry units carefully in transit and on the site, so as to keep units whole, with edges sharp, and faces clean and undamaged. Deliver all masonry units on pallets; or handle units individually, and properly stack same.

B.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-4 11 March 2013

C.

Aggregates: Deliver, store and handle aggregate materials so as to prevent contamination with earth or other foreign materials. 1. Store cement, lime and similar products under cover and from direct contact with earth or floor slabs. Manufactured items: Deliver manufactured products in original containers plainly marked with product identification and manufacturers name. 1. Store metal accessories and the like under cover and from direct contact with ground, and in manner to prevent rust. Damaged material: Remove any damaged or contaminated materials from job site immediately, including materials in broken packages, packages containing water marks, or which show other evidence of damage, unless Engineer specifically authorizes correction thereof and usage on project.

D.

E.

1.09

ENVIRONMENTAL CONDITIONS A. Do not erect masonry when the temperature is below 40 deg. F. unless provisions for heating and drying the materials and protecting the completed work comply with the requirements specified in Paragraph 2.3.2.2 of ACI 530.1/ASCE 6 "Specifications for Masonry Structures". Do not build upon frozen work. Do not lay masonry units having a film of water or frost on their surfaces. Do not erect masonry when the temperature is above 100 deg. F. or 90 deg. F with a wind velocity greater than 8 mph to comply with the requirements specified Paragraph 2.3.2.3 of ACI 530.1/ASCE 6 "Specifications for Masonry Structures".

B.

1.10

MOCK-UP A. B. Build sample wall panels at job site, where directed. Build separate wall panels for each of the following masonry units: Clean mock-ups with materials and techniques intended for use on the Project.

1.11

COORDINATION AND SEQUENCING A. B. Coordinate work with that of other trades which require placement and building-in of, as work progresses, anchor bolts, wood blocking, hollow metal frames, and anchorage items. Examine all Drawings as to requirements for the accommodation of work of other trades. Provide all required recesses, chases, slots, and cutouts. Place anchors, bolts, sleeves and other items occurring in the masonry work. Take every precaution to minimize future cutting and patching. Closely coordinate the location and placement of such items.

PART 2 - PRODUCTS 2.01 Approved Manufacturers 1. 2. 3. 4. Aziz Block Factories Maseelah Blocks & Tiles Company National Industries Hebel Blocks (Light weight)

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-5 11 March 2013

2.02

CONCRETE MASONRY UNITS A. Load bearing solid concrete masonry units for walls to which architectural finishes such as marble, granite etc. are attached. Conform to ASTM C90, Type 1, Class 1, normal weight : 1. Plain-faced units of nominal thickness indicated on the Drawings, nominal 200 mm by 400 mm face dimension with light gray color and uniform medium-fine texture, sound, true to plane and line, and free from chips, cracks, and other defects. 2. Aggregate: sand and gravel: conform to ASTM C 33. 3. Minimum allowable compressive strength for an individual unit of not less than 130 Kg/cm2 when tested in accordance with ASTM C 140. 4. Oven dry density: 2 Kg/l (125 pounds per cubic foot). 5. Moisture content for average of 3 units, when delivered, not exceeding 35 percent of the total absorption, when tested in accordance with ASTM C 140. 5. Provide units clearly labeled as Load-bearing. Non-loadbearing solid concrete masonry units at all locations other than those listed in A above. Conform to ASTM C129, Type 1 : 1. Plain-faced units of nominal thickness indicated on the Drawings, nominal 200 mm by 400 mm face dimension with light gray color and uniform medium-fine texture, sound, true to plane and line, and free from chips, cracks, and other defects. Aggregate: sand and gravel, conform to ASTM C 33. Minimum allowable compressive strength for an individual unit of not less than 50 Kg/cm2; when tested in accordance with ASTM C 140. Oven dry density: a. Normal weight units: 2 Kg/l (125 pounds per cubic foot). Moisture content for average of 3 units, when delivered, not exceeding 35 percent of the total absorption, when tested in accordance with ASTM C 140. Provide units clearly labeled as non-load-bearing.

B.

2. 3. 4. 5. 6. 2.03 MORTAR A. B.

Mortar: Site-mixed portland cement mortar complying with ASTM C 270 as specified herein. Mortar materials for site mixed mortar: 1. 2. 3. 4. 5. Portland cement for masonry conforming to ASTM C 150, Type I, non-staining, without air entrainment. Aggregates for grout: Conforming to ASTM C 144 for fine aggregate and ASTM C 404, Size 8 or 89. Aggregate for concrete masonry mortar: Clean, washed uniformly well graded sand conforming to ASTM C 144. Seive Size Percentage Passing Mortar: Approved brand of plastic hydrated lime, conforming to ASTM C 207, Type S. Water: Clean and fresh without contaminants.

C.

Mortar types: 1. 2. General: The total chloride (CL) ion content in the entire mortar or grout mix shall not exceed 0.10% of the weight of cement. Mortar and grout with excess chlorides will be subject to removal. Mortar for masonry below grade or in contact with earth: ASTM C 270 type M using the property specification.
04200-6 11 March 2013

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3. 4. 2.04 GROUT MIXES A. 2.05 *

Mortar for load bearing masonry: ASTM C 270 type S using the property specification. Mortar for non-load bearing masonry above grade: ASTM C 270 type N using the property specification.

Grout: ASTM C476, Portland Cement Grout; provide individual mixes for fine aggregate grout and coarse aggregate grout as specified.

REINFORCEMENT AND ANCHORAGE MATERIALS A. B. C. Rod Reinforcement: 6mm steel pencil rods. Deformed Bar Reinforcement: ASTM A615 steel, Grade 60; hot-dipped galvanized in accordance with ASTM A123. Provide sizes and spacing as shown. Anchors and Ties: ASTM A951; Steel, hot-dipped heavily galvanized steel in accordance with ASTM A153, Class B-2, complying with the following requirements: 1. Partition Top Anchors: Provide hot dip galvanized steel partition top anchors developed to provide lateral shear resistance at the upper limit of the masonry walls and permitting

vertical deflection of the slab above; Provide "#PTA420 Partition Top Anchor" and/or "#PTA422 Partition Top Anchor" (Hohmann & Barnard, Inc.) or approved equal. 2. Anchor Bolts: 2 in. dia., complying with ASTM A307, Grade A, hot-dipped galvanized in accordance with ASTM A153, Class C; 12 in. long with a 2 in. turned leg, unless otherwise shown. Provide bolts with galvanized hex nuts and flat washers. Column and Beam Anchors: ASTM A36 steel, 3 in. minimum thickness; hot-dipped galvanized in accordance with ASTM A153, Class B-1. Provide units of profiles and sizes as required for locations shown. Wire Ties: 10 gage, looped at both ends. Wire Mesh Ties: 16 gage, 2 in. mesh, 3 in. wide, length as required. Hardware Cloth: 16 ga. 2 in. mesh, size as required. Anchor Straps: 1-3 in. x 1/8 in. by length required, with ends turned up 2 in.

3.

4. 5. 6. 7. D.

Horizontal Joint Reinforcement: Truss type, fabricated from 9 ga. cold drawn steel wire complying with ASTM A82; hot dip galvanized as per ASTM A153 Class B2; deformed side rods; smooth cross rods; out to out spacing of side rods not less than 2 in. less than nominal wall dimension. Provide manufacturer's standard or custom fabrications to comply with the specified requirements. Reinforcing steel, additional to rods which are embedded in concrete: As specified under Section 03300 Cast-in-Place Concrete. Stone anchors, dowels, ties, cramps and supports: ASTM A 580 Type 304 stainless steel; of sizes and configurations required for horizontal and vertical support of stone and applicable superimposed loads. 1. Bolts, washers and nuts used with stone anchors and supports shall be type 316 stainless steel.

E. F.

2.05

FLASHING MATERIALS A. Exposed flashing: cold-rolled sheet copper 16 ounce per square foot, lead coated at rate of 3.40 kg per 9.29m2 (7.5 pounds per 100 square feet).
04200-7 11 March 2013

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Concealed flashing: Copper-fabric flashing consisting of 5 ounce (per square foot) sheet copper permanently bonded between two layers of ductile asphalt impregnated woven fiberglass fabric, equal to: 1. Afco Products, Somerville MA, 001-617-623-7700, product Copper-Fabric Flashing. 2. Advanced Building Products, Inc., Springvale ME, 001-207-490-2306, product Copper-Fabric Flashing. 3. Sandell Manufacturing Company, Inc., Amsterdam NY, 001-518-843-0093, product CopperFabric. Lap sealant for concealed flashing: Cut-back fibered asphalt type recommended by flashing manufacturer.

C. 2.06

ACCESSORIES A. Compressible filler: Closed cell polyvinyl chloride; oversized 50 percent to joint width; self-expanding, continuous in length, and in width to fill the joint to a point 20 mm (3/4 inch) back from each face of wall or partition. Compressible filler for joints at tops of non-load bearing masonry partitions, and for expansion joints in masonry walls: Closed cell PVC foam board, soft grade, 25 percent thicker than joint width, continuous in length, and in width to fill the joint to a point 20 mm (3/4 inch) back from each face of wall or partition. Premolded control joints for concrete masonry construction: Solid rubber of profile as indicated (to maintain lateral stability of wall), 60-80 shore A hardness. Weeps: 9 mm (3/8 inch) outside diameter, minimum 90 mm (3-1/2 inches) long polyethylene hollow tubes, with stainless steel mesh screen insert and cotton wick. 1. Dur-O-Wal, Aurora IL, 001-630-851-8400, model 1005. 2. Hohmann & Barnard, Hauppauge NY, 001-516-234-0600, model 341. Or equal approved by engineer. Mortar netting: High Density Polyethylene (HDPE) course geotextile fabric having a 90 percent open weave mesh, with stepped topped edging, shaped in a manner to catch and hold mortar droppings and preventing blockage of weep hole vents, nominal 25 mm (1 inch) thick by 1.5 m (5 feet) long by 250 mm (10 inches) high. 1. Hohmann & Barnard, Hauppauge NY, 001-516-234-0600, product Mortar Net. 2. Mortar Net USA, Ltd., Highland IN., 001-219-972-6320, product Mortar Net. Cleaning solution: Non-acidic, not harmful to masonry work or adjacent materials. Stone setting buttons shall be of plastic or lead.

B.

C. D.

E.

F. G. 2.07

MIXING MORTARS AND GROUT A. Mix mortar and grout in accordance with the requirements of ASTM C 270, ASTM C 94, and ASTM C 476 as applicable. Control batching procedure to ensure proper proportions by measuring materials by volume. Amount of mixing water and mortar consistency shall be controlled by mason. Compressive Strength: Minimum 28-day strength as follows: 1. Type N: 750 psi. 2. Type S for Reinforced Masonry Only: 1800 psi. Use accurate measuring devices to mix materials by volume. The use of shovels for measurement is prohibited. Maintain sand uniformly damp immediately before mixing process.
04200-8 11 March 2013

B.

C. D.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E. F. G. 2.08

Add mortar color and admixtures in accordance with manufacturers instructions. Provide uniformity of mix and coloration. Pouring grout shall be fluid consistency (as fluid as possible for pouring without separation of constituent parts). Mix only sufficient mortar as required at a given time. Retempering will be permitted only within the first two hours of initial mix. Discard mortar that has partially set.

SOURCE QUALITY CONTROL A. Preconstruction testing: Contractor will employ and pay a qualified independent testing laboratory to perform the following preconstruction testing indicated as well as other inspecting and testing services required by referenced unit masonry standard or indicated herein for source and field quality control: 1. Concrete Masonry Unit Tests: For each different concrete masonry unit indicated, units will be tested for strength, absorption, and moisture content per ASTM C 140. 2. Prism tests: For each type of wall construction indicated, masonry prisms will be tested per ASTM E 447, Method B.

PART 3 - EXECUTION 3.01 EXAMINATION A. B. C. D. 3.02 Verify that field conditions are acceptable and are ready to receive the work of this Section. Verify built-in and other items provided by separate Sections of the work are properly sized and located. Verify foundation walls supporting masonry is constructed within tolerances required by code Beginning of installation means acceptance of site conditions.

PREPARATION A. Foundations: 1. Do not commence installation until foundations are clean, rough, and level. 2. Sandblast the foundation tops, if necessary, and remove all laitance and foreign material. 3. Verify that the foundation elevation is such that the bed joint thickness shall not vary from specified thickness, and that the foundation edge is true to line with masonry not projecting over more than 6 mm (1/4 inch). Provide temporary bracing during installation of masonry work. Maintain in place until building structure provides permanent bracing. Protect surfaces of windows, door frames, louvers and vents as well as similar finish products with painted and integral finishes from mortar droppings and stains.

B. C. 3.03

INSTALLATION - GENERAL A. B. Comply with the applicable provisions and recommendations of the related documents as specified in Paragraph "Standards". Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint widths and for accurate locating of openings, movement-type joints, returns, and offsets. Avoid the use of less-than-half-size units at corners, jambs, and where possible at other locations.
04200-9 11 March 2013

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C.

Lay masonry plumb, true to line with level and accurately spaced courses; corners plumb and true; each course breaking joint with the course below, except as may be otherwise indicated or specified. Maintain plumb bond. Build nonload-bearing interior partitions full height of story to underside of solid floor or roof structure above and install compressible filler in joint between top of partition and underside of structure above. Anchor, tie, reinforce and bond masonry at corners and intersections in accordance with the applicable requirements of governmental authorities having jurisdiction. Leave openings for equipment to be installed before completion of masonry. After installation of equipment, complete masonry to match construction immediately adjacent to the opening. Stopping and Resuming Work: In each course, rack back 2-unit length for one-half running bond or 1/3-unit length for one-third running bond; do not tooth. Clean exposed surfaces of set masonry, wet clay masonry units lightly (if required), and remove loose masonry units and mortar prior to laying fresh masonry. No cracked, chipped, broken, discolored, defaced or open celled units will be permitted on exposed masonry. Cutting, patching and repairing in connection with masonry work as required to accommodate the work of other trades shall be performed under this Section. Use motor driven diamond saw designed to cut masonry units with clean sharp corners. Cut units as required to provide pattern shown and to fit adjoining work neatly. Use full units without cutting wherever possible. Avoid the use of less than half-size units at corners, jambs and at other locations. Joints: Tool exposed joints slightly concave unless otherwise shown. For surfaces to be plastered, rake joints to obtain bond. Lay masonry unit with uniform joint widths. Tool joints to squeeze mortar back into joints. Tool after mortar has taken its initial set. At inside face of exposed masonry air shafts, strike joints flush. Anchors and Ties: Provide loose anchors and ties where shown and where required to supplement other reinforcement specified and in accordance with the applicable requirements of governmental authorities having jurisdiction.. 1. 2. 3. 4. Space loose anchors and ties a maximum of 16 in. o.c. horizontally and vertically. Set anchors, with vertical legs, within the core of the masonry wythe and fill core solid with mortar or grout. Provide wire mesh ties, hardware cloth, or expanded lath below core space to retain mortar or grout at embedded anchors. Provide loose anchors at columns, beams and other structural elements as shown and as required to support imposed loads. Install anchors to structural elements to prevent rattle and lateral displacement in any direction.

D. E. F.

G. H. I.

J.

K.

L.

Install loose lintels, relieving angles and other miscellaneous support steel where shown. Adjust as required to provide square, level, plumb and true openings for attachment and alignment of other work. Grout lintels fully. Provide minimum lintel bearing at each jamb of 4 in. for openings that do not exceed 6 ft. and 8 in. for openings in excess of 6 ft. 1. 2. Fill cores in hollow concrete masonry units with grout 3 courses (24 in.) under bearing plates, beams, lintels, posts, and similar items, unless otherwise shown. At underside of relieving angles and other miscellaneous support steel where shown or required, provide compressible filler.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-10 11 March 2013

3.04

CONSTRUCTION TOLERANCES A. Maximum variation from true surface level for exposed to view walls and partitions: 1. Unit-to-unit tolerance: 2 mm (1/16 inch). 2. Surface, overall tolerance: 6 mm (1/4 inch) in 3000mm (10 feet) in any direction and 12 mm (1/2 inch) in 6000 mm (20 feet) or more. a. Where both faces of single wythe wall or partition will be exposed to view, request and obtain decision from the Engineer as to which face will be required to conform to the specified surface level tolerance. Maximum variation from plumb: For lines and surfaces of walls do not exceed 6 mm (1/4 inch) in 3000mm (10 feet), 9 mm (3/8 inch) in any story up to 6000 mm (20 feet) maximum. At expansion joints and other conspicuous lines, do not exceed 6 mm (1/4 inch) in 3000mm (10 feet). Maximum variation from level: For lines of sills, tops of walls and other conspicuous lines, do not exceed 3 mm (1/8 inch) in 900 mm (3 feet), 6 mm (1/4 inch) in 3000mm (10 feet), and 12 mm (1/2 inch) in 9000mm (30 feet). Maximum variation of linear building line: For position shown in plan relating to columns, walls and partitions, do not exceed 12 mm (1/2 inch) in 6000 mm (20 feet) or 19 mm (3/4 inch) in 12000mm (40 feet). Maximum variation in specified height: 12 mm (1/2 inch) per story. Maximum variation of joint thickness: 3 mm (1/8 inch) in 75 mm (3 feet). Maximum horizontally projected unsupported masonry unit: 28 mm (1-1/8 inches).

B.

C.

D. E. F. G. 3.05

COURSING, BONDS AND JOINTS A. Coursing, joints and bond pattern: Running bond except as otherwise indicated on the Drawings. 1. Exposed to view masonry: except as specified below, fill all joints with mortar, strike off flush, and when mortar is thumb print hard tool joints with a non-staining tool. Joints shall be free of drying crack. a. Horizontal joints i. Exterior joints at concrete masonry units: Rake joints, brush clean, point with mortar to a flat cut joint. When thumbprint hard, the joints and beds shall be tooled with a round jointer having a diameter 1/8 inch larger than the width of the joint ii. Interior joints (all): Tool joints flush. b. Vertical joints (all): Tool joints flush. 2. Concealed from view masonry, including masonry which will be concealed by flashings and similar materials: Fill joints with mortar and strike joints flush. Concave tool exterior joints below grade.

3.06

CONTROL JOINTS A. B. C. D. Do not continue horizontal joint reinforcement through control joints. Install preformed control joint device in continuous lengths. Seal butt and corner joints in accordance with manufacturers recommendation. Locate control joints where shown on Drawings, at corners adjacent to openings in masonry, changes in wall height and intersections with structural walls as approved by Engineer. Size control joints in accordance with the requirements of Section 07900 - Joint Sealers.

3.07

LAYING MASONRY - GENERAL


04200-11 11 March 2013

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B.

Build the masonry walls and partitions in the various combinations and thickness as indicated on the Drawings. Erect all masonry work in compliance with the line and level tolerances specified herein. Hold uniform joint sizes. Correct, or replace, as directed by the Engineer, non-conforming masonry work at no additional cost to the Contract. Lay out coursing before setting to minimize cutting closures or jumping bond, Avoid the use of less-than-halfsize units. Laying masonry units: 1. Lay masonry units in full bed of mortar, with full head joints; uniformly joint with other work. 2. Lay hollow masonry units with face shell bedding on head and bed joints. 3. Buttering corners of joints or excessive furrowing of mortar joints are not permitted. 4. Interlock intersections and external corners. 5. Cut all exposed masonry with a motor-driven carborundum blade saw to ensure straight and clean, unchipped edges. a. Lay no unit having chipped edges or face defects where such unit would be exposed to view. Remove any such unit, if installed, and replace with an undamaged unit, and bear all costs therefor. 6. Do not spread any more mortar than can be covered before surface of mortar has begun to dry. 7. Do not shift or tap masonry units after mortar has achieved initial set. Where adjustment must be made, remove entirely, clean off mortar, and reset with fresh mortar. 8. Except for cleaning down and repointing, finish all masonry as the walls and partitions are carried up. Build-in reinforcement and anchorage items as the work progresses, grouting for secure anchorage. 1. Where steel reinforcing rods have been cast into concrete slabs, and left with upturned ends, carefully place masonry units down over the upturned ends of the rods, and fill cells of masonry units with specified grout. Except as indicated otherwise, isolate masonry from overhead structure: 1. Isolate masonry partitions from vertical structural framing members with a control joint. 2. Isolate top joint of masonry partitions from horizontal structural framing members and slabs or decks with compressible joint filler. Provide control joints at 9000 mm (30 feet) on center maximum spacing, and keep clean of mortar droppings. Provide complete protection against breakage and weather damage to all masonry work, including substantial wood boxing around door jambs, over the tops of walls and wherever necessary to protect work at all stages of completion. Protect masonry when not roofed over, at all times when masons are not working on the walls. Apply tarpaulins or waterproof paper, properly weighted, or nailed, to assure their remaining in place to protect masonry from all possible hazards. Point and fill all holes and cracks in new mortar joints with additional fresh mortar; do not merely spread adjacent mortar over defect or use dead mortar droppings. Do all pointing while mortar is still soft and plastic. If hardened, chisel defect out and refill solidly with fresh additional mortar, and tool or rake joints as specified herein. If the temperature is in excess of 80 degrees Fahrenheit at time of installation, lightly moisten contact surfaces of masonry units by brushing with water.

C. D.

E.

F.

G. H.

I.

J.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-12 11 March 2013

3.08

FLASHING A. Provide and build-in through-wall flashings at lintels, heads and sills of openings and infill openings. Additionally provide flashing where indicated on the Drawings, as specified herein and all conditions which may be considered similar to those indicated on the Drawings. 1. Install flashing dripedge with hemmed 45 degree edge extending beyond face of masonry. Ensure through-wall flashing is in proper position in wythe without forming pockets. Lap through-wall flashing over top of dripedge 12 mm to 19 mm (1/2 to 3/4 inch) behind face of masonry; mastic between flashings. 2. Extend flashing to back up wall, turn up a minimum of 200 mm (8 inches) and terminate as follows: a. Concrete - terminate into reglet. b. Masonry - terminate into horizontal joint of masonry, extending to 12 mm (1/2 inch) of interior face of wall, turning back 25 mm (1 inch) on itself. c. Metal stud and gypsum sheathing - terminate behind sheathing, securing top edge of flashing to face of stud with 12 mm (1/2 inch) type S-12 low profile head screws. 3. Form end dams at horizontal terminations; turn flashing, fold and seal (not cut) at corners, bends and interruptions. Seal watertight using flashing manufacturers recommended adhesive and sealer. 4. Carry head flashing 150 mm (6 inches) beyond both ends of lintels. At steel lintels, apply a heavy bed coat of compatible adhesive mastic and embed thru-wall flashing in the mastic before laying brick. 5. Apply surface conditioner over dirty and dusty surfaces, over concrete block, over surfaces having irregular or rough texture, and those conditions where recommended by wall flashing manufacturer. 6. Apply flashings to substrates, when properly positioned, remove release paper and adhere to substrate, press firmly into place. 7. Overlap adjacent pieces of flashings 50 mm (2 inches), roll all overlaps with steel hand roller or blunt object. 8. At heads, sills and other horizontal terminations of flashing, turn-up ends a minimum of 50 mm (2 inches), cut and make careful folds to form a pan and seal with flashing mastic. 9. Seal all punctures with an elastic cement mastic recommended by flashing manufacturer. Build-in counter flashing as indicated in the Drawings and as specified herein. 1. Clean surface of masonry smooth and free from projections that might puncture or otherwise damage flashing membrane. 2. Carefully fit flashing around projections, neatly fold and bed in mastic or mortar so as to direct moisture to the outside. Form flashing to required profiles without wrinkles or buckles and install in such a manner as to direct moisture to the outside.

C.

3.09

CAVITY WALL CONSTRUCTION A. Build inner wythe of cavity walls ahead of outer wythe to receive insulation and air/vapor barrier adhesive. 1. Install continuous row of mortar netting at base of wall and over all wall openings directly onto flashing. Install multiple thickness of mortar as required to match cavity widths and if excessive droppings are expected. Install mortar netting against back of outside wythe with dovetail section facing up. Cut netting as required to prevent contact with wall ties, conduit, plumbing and or other materials that bridge or intrude into cavity. Remove excess mortar as work progresses. Do not permit mortar to drop or accumulate into cavity air space or to plug weeps.

B. C.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-13 11 March 2013

D.

Anchorage for stone veneer: Install specified anchors as shown on Drawings, if not shown, install one anchor every 400 mm (16 inches) horizontal and vertical. 1. Place additional anchors around perimeter of openings and within 300 mm (12 inches) of ends of walls. 2. Place additional wall ties on each side of expansion joints, install within 100 mm (4 inches) of joint.

3.10

WEEP HOLES A. B. C. Provide weep holes in head joints in first course of veneer immediately above all through-wall flashing, shelf angles, lintels and bottoms of walls. Install weep hole tube/rope in head joint., provide 800 mm (32 inch), or greater, lengths. Space weep holes as follows: 1. Stonework: 600 mm (24 inches) on center maximum. Keep weep holes and area above flashing free of mortar droppings.

D. 3.11

ENGINEERED MASONRY A. B. C. D. E. F. G. H. Lay masonry units with core cells vertically aligned and clear of mortar and unobstructed. Place mortar in masonry unit bed joints back 6 mm(1/4 inch) from edge of unit grout spaces, bevel back and upward. Permit mortar to cure 7 calendar days before placing grout. Refer to the Drawings for locations where vertical steel reinforcing rods will be required in masonry walls. Reinforce masonry unit cores with reinforcement bars and grout. Retain vertical reinforcement in position at top and bottom of cells and at intervals not exceeding 192 bar diameters. Splice reinforcement in accordance with Section 03300. Wet masonry unit surfaces in contact with grout just prior to grout placement. Grout spaces less than 50 mm (2 inches) in width with fine grout using low lift grouting techniques. Grout spaces 50 mm (2 inches) or greater in width with course grout using high or low grouting techniques. When grouting is stopped for more than one hour, terminate grout 38 mm (1-1/2 inches) below top of upper masonry unit to form a positive key for subsequent grout placement. Low lift grouting: Place first lift of grout to a height of 400 mm (16 inches) and rod for grout consolidation. Place subsequent lifts in 200mm (8 inch) increments and rod for grout consolidation.

3.12

BUILDING-IN WORK A. B. C. As work progresses install built-in metal door and glazed frames, fabricated metal frames, window frames, wood nailing strips, anchor bolts, plates and other items to be built-in the work. Install built-in items plumb and level; take care not to distort alignment of such items. Bed anchors of metal frames in adjacent mortar joints. Fill frame voids solid with grout except where joints are indicated to receive caulking and sealant. Fill adjacent masonry cores with grout minimum 25 mm (1 inch) from framed openings. 1. Rake joints to receive sealant to a uniform depth of 19 mm (3/4 inch) for installation of caulking and sealant.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-14 11 March 2013

D. 3.13

Do not build-in organic materials subject to deterioration.

BUILDING-IN LINTELS A. B. Install loose lintels over all openings, whether or not scheduled. Where not detailed otherwise, maintain 200 mm (8 inches) minimum bearing for lintels on each side of opening.

3.14

REINFORCEMENT AND ANCHORAGE A. B. C. D. E. F. G. Reinforce horizontal joints with continuous masonry joint reinforcement, spaced 400 mm (16 inches) vertically commencing one course above supporting concrete slab. Place masonry joint reinforcement in first and second horizontal joint above and below openings. Extend 400 mm (16 inches) each side of opening. Place joint reinforcement in first and second joint below top of walls. Lap joint reinforcement ends minimum 150 mm (6 inches). . Install preformed units (or optional field-formed units) at corners, reveals, and offsets in exterior masonry, at intersections of all masonry walls and partitions, and wherever walls and partitions change directions. Do not bridge control and expansion joints in the wall system. Embed anchors in concrete. Attach to structural steel members. Embed anchorages in every second block. Embed anchorages in sixth brick joint.

3.15

PROTECTION OF WORK A. B. Loading: Do not apply loading for at least 12 hours after building masonry walls and partitions. Do not apply concentrated loads for at least 3 days after building masonry columns, walls or partitions. Protection of Masonry: During erection, cover tops of walls, projections, and sills with waterproof sheeting at end of each days work. Cover partially completed masonry when construction is not in progress. 1. Extend cover a minimum of 600 mm (24 inches) down both sides and hold cover securely in place. 2. Where one wythe of multi-wythe masonry walls is completed in advance of other wythes, secure cover a minimum of 600 mm (24 inches) down face next to un-constructed wythe and hold cover in place. Stain prevention: Provide protection and prevent grout, mortar, and soil from staining the face of exposed masonry and building finishes. Protect base of walls from rain-splashed mud and mortar splatter. 1. Remove immediately all grout, mortar, and soil that come in contact with such masonry. Curing Block to be properly wet before using on site to avoid absorbing moister from the mortar. Start curing the block walls 8 hours after construction for a minimum period of 7 days.

C.

D.

3.16

CLEANING A. During the progress of the work, keep the exposed surfaces of masonry clean at all times, and protected against damage. As each segment of the masonry is erected, dry-brush the surfaces free from mortar spots and droppings.

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-15 11 March 2013

B.

Prior to performing the final cleaning work, examine all face joints in exposed masonry to locate cracks, holes or other defects in the mortar; and point up all such defects and fill with mortar as specified herein. Where necessary, in the opinion of the Engineer, cut out defective joints in masonry and replace with new materials, exercising extreme care to match original work. At a time approved by the Engineer, perform final cleaning operations on all masonry as specified herein. 1. Perform the final cleaning work only when the ambient temperature is above 40 degrees Fahrenheit, and rising. 2. Do not use wire brushes or other abrasive tools in the cleaning operations. 3. Perform final cleaning operations from the top down. If masonry cleaning work is performed after windows, doors, frames, and other work has been installed, provide complete protection for said items; be fully responsible for any damage due to the cleaning operations. 4. Remove large mortar particles by hand with wooden paddles and non-metallic scrape hoes or chisels. 5. Perform final cleaning of masonry units by scrubbing with stiff bristle fiber brushes and clear water, changing the water frequently. Provide suitable protective coverings for all other surfaces and materials during the final cleaning procedures, and bear full responsibility for correcting any damage caused by these operations, to the satisfaction of the Engineer.

C.

D.

END OF SECTION

CONCRETE UNIT MASONRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04200-16 11 March 2013

SECTION 04400 EXTERIOR STONEWORK PART 1 - GENERAL 1.01 SUMMARY A. Work Included: 1. Exterior random ashlar stone facing to walls including all fixings and accessories. 2. Exterior stone facing. 3. Exterior stone paving 4. Stone copings. 5. Stone kerbs and dividing strips. 6. Window surrounds cills and base to glass screen Etc. As shown in the drawings.

1.02

QUALIFICATIONS A. Fabricator: A firm with a minimum of 5 years successful experience in the fabrication of stone units of similar sizes, shapes, materials and finishes to the units required for this Project, and which has ample production facilities to produce, furnish and supply the units as required for installation without delay to the Work. Erector: A firm with a minimum of 5 years experience in the successful erection of stone units of similar sizes and shapes and of similar quantities to the units required for this Project.

B. 1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. National Building Granite Quarries Association (NBGQA) "Specifications For Building Granite". 2. Indiana Limestone Institute of America ( ILI) "Indiana Limestone Institute Handbook". 3. Marble Institute of America (MIA) "Design Manual". Where the language in any document referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

B. 1.04

MOCK-UPS A. Following approval of sample slabs construct mock-ups as follows to the satisfaction of the Engineer: 1. Provide approx. 3 meter high by 5 meter wide mock-ups of every type of stonework and location. Assemble mock- ups to simulate final condition, direction of graining, and showing joint conditions. Erect the mock-ups adequately reinforced and braced to sustain imposed loads. Build in all items of anchorage and supports. Show pointing where relevant. Alter or revise mock-ups as directed, to the satisfaction of the Engineer. The approved mock-ups shall remain as the standards of aesthetics and workmanship for the Project. Mock-ups, if approved, may be utilized in the final work.

2.

1.05

DESCRIPTIONS OF EXTERIOR WALL FACING SYSTEM


04400-1 11 March 2013

EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

(Stone Type: To be Selected by Owner) A. 1. 2. 3. 4. 5. D. Mandatory Dimensions : Heights and lengths and pattern of stones will be as shown on drawing No. A-222, Detail 2. Dimensions : Height of courses and length of stones as measured from the drawings. Corners shall be cut and rounded to form L shaped profiles. Provide stone shapes as shown on drawing. The thickness and number of supports shown in the drawing are minum.

Joints for Stone: Wherever mechanical fixation is not indicated, joints shall be pointed and finished with a depressed square section over the entire width of the joint, 5mm deep; Color of pointing mortar to match stone. Joint pattern shall be continuous and random horizontal joints and random vertical joints as defined on the drawings. Width of joints shall be as shown on drawings.

1.06

SUBMITTALS A. Shop and Setting Drawings: Submit shop and setting drawings of stonework. Show in detail the dominant face grain pattern, the jointing, anchors and dowels, dimensions, sizes and locations of cut-outs, relation to work of other trades, and all other pertinent data and information. Number each piece on the setting drawings to correspond to the identification number on the back of each stone. 1. 2. Submit procedures for the replacement of stones after installation for each type of setting method. Submit shop and setting drawings of stone installations. Show in detail the wall and paving patterns, differentiating between finishes, dimensions, jointing, setting bed system and underlayment, edge conditions, anchors and locations of cut-outs, relation to work of other trades, and all other pertinent data and information.

B.

Samples: Submit the following: 1. 2. Stone Samples: 12 in. sq. x thickness shown sample slabs of each type and finish of stone specified, indicative of the entire range of materials and their respective finishes. Grout Samples: For each color required, showing the full range of exposed color and texture expected in completed Work.

C.

Single Source Availability Certification: After review of samples by the Engineer and prior to fabrication, certify in writing and submit evidence required indicating that sufficient quantity of materials within the range of accepted mock-up materials is available from a single quarry to satisfy the total requirements of the Project. Test Results: Provide coefficient of friction test results for all stone pavers assemblies. Substrate Acceptability: Prior to commencing erection, submit a certified statement issued by each firm awarded stone paver and facing work attesting that all areas to receive stone facings and pavers have been inspected and found satisfactory for the reception of this Work. Application will be construed as acceptance of surfaces. Maintenance Manual: Submit two copies of an assembled and bound maintenance manual, describing the materials, devices and procedures to be followed in cleaning and maintaining each specified type stone and glass paver. Provide information re : procedures for replacement of stonework for all different systems.

D. E.

F.

EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04400-2 11 March 2013

1.07

PERFORMANCE CRITERIA A. Stone Pavers 1. 2. Stone Abrasion Resistance: Minimum abrasive hardness of 10, as determined per ASTM C241. Static Coefficient of Friction: Per ASTM C1028: a. Level Surfaces: Minimum 0.6. b. Step Treads: Minimum 0.6. c. Ramp Surfaces: Minimum 0.8. Coefficient of Friction Testing: ASTM C1028: "Standard Test Method For Evaluating the Static Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the Horizontal Dynamometer Pull Method"; 12 tests in total, 6 tests each wet and dry. Samples shall be finished as proposed for use on the Project.

3.

1.08

PRODUCT HANDLING A. Carefully pack and load finished stone for shipment and take necessary precautions against damage in transit. Do not use material for blocking and packing that would cause staining or discoloration and exercise care to prevent staining during the storage period. Deliver packaged setting materials in the original packages and containers of the manufacturer. Keep aggregate dry and free from soiling.

B. 1.09

WARRANTIES A. Warranties specified in this Article shall not deprive the Employer of other rights the Employer may have under other provisions of the Contract Documents and are in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents.

PART 2 - PRODUCTS 2.01 STONE A. General: Provide stone of soundness (hardness and density), texture, graining, finish, crystal patterning, color and tone matching samples available for viewing at the Gulf Consult Offices. Stone shall be sound and free from defects which will impair strength, durability, finish appearance and is supplied from a single quarry source, with sufficient capacity to satisfy the total requirements of the project. 1. 2. 3. Single Quarry : Quarry and fabrication plant facilities shall be available for the Employer's inspection at any time. Stone: Provide the stone types in the materials schedule shown on drawings A7.950 Visual Qualities of Stone: The color, grain and general character of all stone provided shall be of a range consistent with the samples approved by the Engineer. Stone which, in the opinion and judgement of the Engineer, fails to comply with this requirement may be rejected by the Engineer at any time during the course of the Work. The Contractor shall bear all the costs associated with the removal and replacement of such rejected stone with acceptable material.

2.02

FIXINGS A. Stone Anchors: Provide anchors embedded within stone in sizes, configurations and profiles as shown or as required to sustain imposed loads without exceeding allowable design stresses, and install anchorages and supports free from rattle or displacement. Select stainless steel for this project : 1. Stainless Steel: AISI Type 302 or 304.
04400-3 11 March 2013

EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

a. b. c. d. 2.

Plate and Sheet: ASTM A666, Stretcher level sheets. Bar Stock: ASTM A276. Angles: AISI Type 304. Pins, Dowels, Rods and Other Custom Anchors: AISI Type 304.

Fasteners and Anchorage Devices: Type, grade, class and style best suited for the respective purpose. a. Fasteners for Stainless Steel Stone Anchors: Fasteners for Stainless-Steel Anchors: Annealed stainless-steel bolts, nuts, and washers of same alloy as anchors. ASTM F593 for bolts and ASTM F594, for nuts.

C. D.

Anchor Inserts: Provide stainless steel inserts located in masonry or concrete for the attachment of stone anchors with capability to sustain, without failure, load imposed. Cushions: Clear plastic shims and/or 50 Durometer neoprene pads non-staining, sized to suit joint thicknesses and bed depths of stonework involved without intruding into required depths of mortar joints or joint sealants or causing third-side adhesion between sealant and cushions.

2.03

MIXES AND MORTARS A. B. C. D. E. F. G. H. I. Epoxy Cement: Epoxy resin based adhesive in grade (liquid or knife grade) as recommended by manufacturer for purpose intended. White Portland Cement: ASTM C150, Type I, non-staining in accordance with the definition and test requirements of ASTM C91. Hydrated Lime: ASTM C207, Type S. Sand: Pure silica sand complying with ASTM C144 sieve size or white marble dust. Shrinkage Reducing Accelerator: "Sika Set" (Sika Corp.), or equal. Mineral Coloring Pigments: Finely ground, synthetic, limeproof, non-fading mineral oxides having purity of 98%; maximum additive of 5% of the cement by weight. Water: Clear and free of deleterious material which would impair the Work. Mortar for Setting Stone Paving: One part waterproof white Portland cement, four parts sand. Mix as dry as can be worked. Latex-Modified Portland Cement Setting-Bed Mortar: Proportion and mix Portland cement, aggregate, and latex additive for setting bed to comply with directions of latex additive manufacturer and as necessary to produce stiff mixture with a moist surface at time stone is set. Mortar for Setting All Other Stone: One part white Portland cement, one part hydrated lime, five parts sand. Provide waterproof admixture for exterior stone. Pointing Mortar: One part white Portland cement, two parts sand, mineral coloring admixture as required to match stone. Mixed as dry as can be worked. Provide waterproof admixture for exterior pointing. Grout for Paving Joints: Mix grout in proportions by volume of one part Portland cement to 2 parts aggregate to match Engineers sample for color. Use only enough water to produce grout with consistency of thick cream. Add latex additive in proportion and concentration recommended by admixture manufacturer. Select and proportion pigments with other ingredients to produce color required. Do not exceed pigment-to-cement ratio of 1-to-10, by weight.

J. K. L.

PART 3 - EXECUTION
EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 04400-4 11 March 2013

3.01

CONDITION OF SURFACES A. Prior to installation examine surfaces to receive stone and do not proceed until any defects detrimental to the finished work are corrected, including moisture protection, structural supports, provisions for expansion, or any other condition which might affect the finished work in appearance, or integrity of the completed installation. Verify all measurements and dimensions, coordinate the installation of inserts for this work and coordinate and schedule this work with the work of other trades. Give particular attention to the location and size of cutouts required to accommodate mechanical, electrical, and other work or adjoining construction, in accordance with the reviewed shop drawings for such trade. Review and approve shop drawings of items or assemblies related to the support or anchorage of stone work, including requirements for clearances for proper installation.

B.

C. 3.02

FABRICATION, GENERAL A. B. C. Accurately cut, dress, drill, fit and finish stone work to shapes and dimensions shown on Drawings and final shop and setting drawings. Make exposed plane surfaces true in line. Cut all joints and edges square and at right angles to face, and with backs parallel to face. Make arises straight, sharp, true, and continuous at joints. Cut and drill stones in shop as required for supports, anchors, ties, bolts, and other inserts. Cut slots, kerfs, holes and other recessed cutouts leaving smooth surfaces and eased intersections between changes of surfaces planes, free from sharp edges and arises, to reduce stresses at anchor locations. Allow for expansion and contraction within the limits of the joint material when cutting for anchorage devices. Carefully inspect finished stones at fabrication plant for compliance with requirements relative to qualities of appearance, material, and fabrication; replace defective stones with ones that do comply. Grade and mark stones for overall uniform appearance when assembled in place. Natural variations in appearance are acceptable if installed stones match range of colors and other appearance characteristics represented in approved samples and field-constructed mock-ups. Dimensional Tolerances : As follows : a. Height : +/- 1.5 mm b. Width : +/- 1.5 mm c. Thickness : + 1.5 mm 0.0 mm d. Out of Square : +/- 1.5 mm e. Exposed Face Flatness : +/- 1.5 mm

D. E.

F.

3.03

INSTALLATION A. B. C. D. E. Furnish items requiring building in to concrete or masonry work, along with location drawings, in sufficient time so as not to delay job progress. Set and anchor stone in accordance with applicable requirements and specifications of the trade association referenced in Paragraph "Standards" unless otherwise shown or specified. Set stone in accordance with final setting drawings, level, plumb, square, and true with uniform joints, accurately aligned with grain running in the direction shown. The quality of field cutting shall be the same as for shop cutting. Provide fixings in sufficient quantity to eliminate "rattle" or loose pieces and to ensure a rigid installation. Extent of anchorage and installation details shown are intended to indicate minimum requirements.
04400-5 11 March 2013

EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

Additional anchorage shall be provided where necessitated by size, thickness, setting or shape. Where shown or required, provide stone liners properly sized and secured to backside of stone facing with epoxy adhesive. Adhesives, when utilized shall not be allowed to contribute to the structural capacity of the anchor assembly. F. G. Make joint widths, as shown on the drawings. Exterior Wall Facing : Set wall stones before landscape finishes or paving are completed. Secure with fixings as required for rigid installation, cemented in place with material used for spotting. Butter joints fully as each panel is set, using mortar with mineral color added to match stone. Use plastic cushions and spacers where required to maintain uniform joints. After setting, tool joints flush and smooth. Paving (Mortar Set) 1. 2. Saturate substrate with clean water several hours before placing setting bed. Remove surface water about one hour before placing setting bed. Apply cement-paste slush coat over surface of substrate about 15 minutes before placing setting bed. Limit area of slush coat to avoid its drying out before placing setting bed. Do not exceed 1.5mm thickness for cement-paste slush coat. Apply mortar setting bed over cement-paste slush coat immediately after slush coat has been applied. Spread and screed setting bed to uniform thickness at subgrade elevations required for accurate setting of stone to finished grades indicated. Mix and place only as much mortar setting bed as can be covered with stone before initial set. Cut back, bevel edge, remove, and discard setting-bed material that has reached initial set before placing stone. Place reinforcing wire fabric, lapped at joints by at least one full mesh and supported so mesh becomes embedded in middle of setting bed. Do not butt edges against vertical surfaces. Place stone before initial set of cement occurs. Immediately before placing stone on setting bed, apply uniform 1.5mm thick, slurry bond coat to bed or to back of each stone unit with a flat trowel. Tamp stone into setting bed with mallet until firmly bedded to the proper level. Set each unit in a single operation before initial set of mortar; do not return to areas already set and disturb stone for purposes of realigning finished surfaces or adjusting joints. Where grinding is required to completely align and level joints, permit a minimum of six days of setting time to elapse before commencing. Perform grinding by wet abrasion, in a manner as to retain the finish, to match the balance of stone paving, and so as to be free of depressions and grind marks. Exercise care to avoid damage or soiling of adjacent work. Grout joints as soon as possible after initial set of setting bed. Force grout into joints, taking care not to smear grout on adjoining stone and other surfaces. After initial set of grout, finish joints by tooling to produce a slightly concave polished joint, free from drying cracks. Do not use sanded grout for polished stone. Cure grout by maintaining in a damp condition for 7 days, except as otherwise recommended by latex additive manufacturer. Installation Tolerances a. Variation in Line: For position shown in plan and continuous joint lines, do not exceed 3mm in 3.0 m, 4.5mm in 7.0m or 4.5mm maximum. b. Variation in Surface Plane of Paving: Do not exceed 3mm in 3.0 m, 4.5mm in 7.0m or 4.5mm maximum. maximum from level or slope indicated. c. Variation in Joint Width: Do not vary joint thickness more than 1.50 mm or one-fourth of the nominal joint width, whichever is less. d. Variation in Plane between Adjacent Units (Lipping): Do not exceed 0.75m difference between planes of adjacent units.

H.

3.

4. 5.

6.

7.

8.

3.04

ERECTION TOLERANCES A. General


04400-6 11 March 2013

EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2. B. 3.05

Variation from Plumb: Variation from level for horizontal lines:

1.5mm in 3 meter 3mm in story height, noncumulative +/- 1.5mm in any bay or 7m, noncumulative

Match finished work to mock-up.

PROTECTION A. B. After initial cleaning, provide non-staining temporary wood guards at corners and other surfaces subject to damage. Stone Paver Protection: Rope off pavings to permit curing of setting bed and prohibit traffic from installed stone for a minimum of 72 hours. Protect stone paving during construction with nonstaining craft paper or other materials as recommended by the Installer. Protect work from damage due to subsequent building operations. Remove all protection when directed. Protect work from damage due to subsequent building operations. Repellent coating to be added on final handover as recommended by the supplier.

C. D. 3.06

CLEANING A. B. Immediately prior to completion of the Work clean stone by washing with water and bristle brushes; removing all stains, dirt and other discolorations. Do not use acids, cleaning compounds or wire brushes. On completion of construction, remove all temporary protection.

3.07

ACCEPTANCE A. The completed installation shall have the acceptance of the Owner and the Engineer. Installed units which are chipped, cracked, or otherwise damaged or which, in the opinion of the Owner or the Engineer, do not conform to the Specification requirements shall be removed and replaced.

END OF SECTION

EXTERIOR STONEWORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04400-7 11 March 2013

SECTION 04810 UNIT MASONRY ASSEMBLIES GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 A.

SUMMARY This Section includes unit masonry assemblies consisting of the following: 1. 2. 3. 4. 5. 6. B. Concrete masonry units (CMUs). Mortar and grout. Reinforcing steel. Masonry joint reinforcement. Ties and anchors. Miscellaneous masonry accessories.

Products furnished, but not installed, under this Section include the following: 1. Dovetail slots for masonry anchors, installed under Division 3 Section "Cast-in-Place Concrete."

C.

Products installed, but not furnished, under this Section include the following: 1. Manufactured reglets in masonry joints for metal flashing, furnished under Division 7 Section "Sheet Metal Flashing and Trim."

1.3 A.

DEFINITIONS Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.

1.4 A. B.

PERFORMANCE REQUIREMENTS Provide structural unit masonry that develops indicated net-area compressive strengths (f'm) at 28 days. Determine net-area compressive strength (f'm) of masonry from average net-area compressive strengths of masonry units and mortar types (unit-strength method) according to Tables 1 and 2 in ACI 530.1/ASCE 6/TMS 602.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-1 11 March 2013

1.5 A. B.

SUBMITTALS Product Data: For each type of product indicated. Shop Drawings: For the following: 1. Reinforcing Steel: Detail bending and placement of unit masonry reinforcing bars. Comply with ACI 315, "Details and Detailing of Concrete Reinforcement." Show elevations of reinforced walls. C. Material Certificates: the following: 1. Masonry units. a. b. 2. 3. 4. 5. 6. 7. D. Include material test reports substantiating compliance with requirements. For masonry units used in structural masonry, include data and calculations establishing average net-area compressive strength of units. Cementitious materials. Include brand, type, and name of manufacturer. Preblended, dry mortar mixes. Include description of type and proportions of ingredients. Grout mixes. Include description of type and proportions of ingredients. Reinforcing bars. Joint reinforcement. Anchors, ties, and metal accessories. Include statements of material properties indicating compliance with requirements

including compliance with standards and type designations within standards. Provide for each type and size of

Mix Designs: For each type of mortar and grout. Include description of type and proportions of ingredients. 1. 2. Include test reports, per ASTM C 780, for mortar mixes required to comply with property specification. Include test reports, per ASTM C 1019, for grout mixes required to comply with compressive strength requirement.

E.

Statement of Compressive Strength of Masonry: For each combination of masonry unit type and mortar type, provide statement of average net-area compressive strength of masonry units, mortar type, and resulting netarea compressive strength of masonry determined according to Tables 1 and 2 in ACI 530.1/ASCE 6/TMS 602.

1.6 A.

QUALITY ASSURANCE Testing Agency Qualifications: An independent agency qualified according to ASTM C 1093 for testing

indicated, as documented according to ASTM E 548. B. Source Limitations for Masonry Units: Obtain exposed masonry units of a uniform texture and color, or a uniform blend within the ranges accepted for these characteristics, through one source from a single manufacturer for each product required.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-2 11 March 2013

C.

Source Limitations for Mortar Materials: Obtain mortar ingredients of a uniform quality, including color for exposed masonry, from a single manufacturer for each cementitious component and from one source or producer for each aggregate.

D.

Preconstruction Testing Service:

Owner will engage a qualified independent testing agency to perform

preconstruction testing indicated below. Payment for these services will be made by Owner. Retesting of materials that fail to meet specified requirements shall be done at Contractor's expense. 1. 2. 3. E. Concrete Masonry Unit Test: For each type of unit required, per ASTM C 140. Mortar Test (Property Specification): For each mix required, per ASTM C 780. Grout Test (Compressive Strength): For each mix required, per ASTM C 1019.

Fire-Resistance Ratings: Where indicated, provide materials and construction identical to those of assemblies with fire-resistance ratings determined per ASTM E 119 by a testing and inspecting agency, by equivalent concrete masonry thickness, or by other means, as acceptable to authorities having jurisdiction.

1.7 A.

DELIVERY, STORAGE, AND HANDLING Store masonry units on elevated platforms in a dry location. If units are not stored in an enclosed location, cover tops and sides of stacks with waterproof sheeting, securely tied. If units become wet, do not install until they are dry. B. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp. C. Store aggregates where grading and other required characteristics can be maintained and contamination avoided. D. Deliver preblended, dry mortar mix in moisture-resistant containers designed for lifting and emptying into dispensing silo. Store preblended, dry mortar mix in delivery containers on elevated platforms, under cover, and in a dry location or in a metal dispensing silo with weatherproof cover. E. Store masonry accessories, including metal items, to prevent corrosion and accumulation of dirt and oil.

1.8 A.

PROJECT CONDITIONS Protection of Masonry: During construction, cover tops of walls, projections, and sills with waterproof sheeting at end of each day's work. Cover partially completed masonry when construction is not in progress. 1. Extend cover a minimum of 600 mm down both sides and hold cover securely in place.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-3 11 March 2013

B.

Do not apply uniform floor or roof loads for at least 12 hours and concentrated loads for at least 3 days after building masonry walls or columns.

C.

Stain Prevention: Prevent grout, mortar, and soil from staining the face of masonry to be left exposed or painted. Immediately remove grout, mortar, and soil that come in contact with such masonry. 1. 2. 3. 4. Protect base of walls from rain-splashed mud and from mortar splatter by spreading coverings on ground and over wall surface. Protect sills, ledges, and projections from mortar droppings. Protect surfaces of window and door frames, as well as similar products with painted and integral finishes, from mortar droppings. Turn scaffold boards near the wall on edge at the end of each day to prevent rain from splashing mortar and dirt onto completed masonry.

D.

Hot-Weather Requirements: 530.1/ASCE 6/TMS 602.

Comply with hot-weather construction requirements contained in ACI

PART 2 - PRODUCTS

2.1 A.

MASONRY UNITS, GENERAL Defective Units: Referenced masonry unit standards may allow a certain percentage of units to exceed tolerances and to contain chips, cracks, or other defects exceeding limits stated in the standard. Do not uses units where such defects, including dimensions that vary from specified dimensions by more than stated tolerances, will be exposed in the completed Work or will impair the quality of completed masonry.

2.2 A.

CONCRETE MASONRY UNITS (CMUs) Shapes: Provide shapes indicated and as follows: 1. 2. B. Provide special shapes for lintels, corners, jambs, sashes, movement joints, headers, bonding, and other special conditions. Provide square-edged units for outside corners, unless otherwise indicated.

Concrete Masonry Units: ASTM C 90. 1. 2. 3. Weight Classification: Normal weight, unless otherwise indicated. Size (Width): As indicated on the Drawings. Faces to Receive Plaster: Where units are indicated to receive a direct application of plaster, provide textured-face units made with gap-graded aggregates.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-4 11 March 2013

2.3 A. B.

CONCRETE AND MASONRY LINTELS General: Provide either concrete or masonry lintels, at Contractor's option, complying with requirements below. Concrete Lintels: Precast units made from concrete matching concrete masonry units in color, texture, and compressive strength and with reinforcing bars indicated or required to support loads indicated. Cure precast lintels by same method used for concrete masonry units. C. Masonry Lintels: Prefabricated or built-in-place masonry lintels made from bond beam concrete masonry units with reinforcing bars placed as indicated and filled with coarse grout. Cure precast lintels before handling and installing. Temporarily support built-in-place lintels until cured.

2.4 A.

MORTAR AND GROUT MATERIALS Portland Cement: ASTM C 150, Type I or II, except Type III may be used for cold-weather construction. Provide natural color or white cement as required to produce mortar color indicated. B. C. Hydrated Lime: ASTM C 207, Type S. Portland Cement-Lime Mix: Packaged blend of portland cement complying with ASTM C 150, Type I or Type III, and hydrated lime complying with ASTM C 207, Type S. D. Aggregate for Mortar: ASTM C 144. 1. 2. E. F. For mortar that is exposed to view, use washed aggregate consisting of natural sand or crushed stone. For joints less than 6.5 mm thick, use aggregate graded with 100 percent passing the 1.18-mm sieve.

Aggregate for Grout: ASTM C 404. Water: Potable.

2.5 A. B.

REINFORCEMENT Uncoated Steel Reinforcing Bars: ASTM A 615/A 615M or ASTM A 996/A 996M, Grade 420. Masonry Joint Reinforcement, General: ASTM A 951. 1. 2. 3. 4. 5. 6. Interior Walls: Hot-dip galvanized, carbon steel. Exterior Walls: Hot-dip galvanized, carbon steel. Wire Size for Side Rods: W1.7 or 3.8-mm diameter. Wire Size for Cross Rods: W1.7 or 3.8-mm diameter. Wire Size for Veneer Ties: W1.7 or 3.8-mm diameter. Spacing of Cross Rods, Tabs, and Cross Ties: Not more than 407 mm o.c.
04810-5 11 March 2013

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

7. C.

Provide in lengths of not less than 3 m, with prefabricated corner and tee units.

Masonry Joint Reinforcement for Single-Wythe Masonry: Either ladder or truss type with single pair of side rods.

2.6 A.

TIES AND ANCHORS Materials: Provide ties and anchors specified in subsequent paragraphs that are made from materials that comply with eight subparagraphs below, unless otherwise indicated. 1. 2. 3. Hot-Dip Galvanized, Carbon-Steel Wire: ASTM A 82; with ASTM A 153/A 153M, Class B-2 coating. Galvanized Steel Sheet: ASTM A 653/A 653M, Commercial Steel, Z180 zinc coating. Steel Sheet, Galvanized after Fabrication: ASTM A 1008/A 1008M, Commercial Steel, hot-dip galvanized after fabrication to comply with ASTM A 153/A 153M. B. Wire Ties, General: Unless otherwise indicated, size wire ties to extend at least halfway through veneer but with at least 16-mm cover on outside face. Outer ends of wires are bent 90 degrees and extend 50 mm parallel to face of veneer. C. Adjustable Anchors for Connecting to Structure: Provide anchors that allow vertical or horizontal adjustment but resist tension and compression forces perpendicular to plane of wall. 1. 2. 3. Anchor Section for Welding to Steel Frame: Crimped 6.4-mm- diameter, hot-dip galvanized steel wire. Connector Section for Concrete: Dovetail tabs for inserting into dovetail slots in concrete and attached to tie section; formed from 2.5-mm- thick, steel sheet, galvanized after fabrication. Tie Section for Concrete: Corrugated metal ties with dovetail tabs for inserting into dovetail slots in concrete and sized to extend to within 25 mm of masonry face. D. Partition Top anchors: 2.5-mm- thick metal plate with 10-mm- diameter metal rod 150 mm long welded to plate and with closed-end plastic tube fitted over rod that allows rod to move in and out of tube. Fabricate from steel, hot-dip galvanized after fabrication.

2.7 A.

MISCELLANEOUS ANCHORS Anchor Bolts: Headed or L-shaped steel bolts complying with ASTM F 568M, Property Class 4.6; with

ASTM A 563M hex nuts and, where indicated, flat washers; hot-dip galvanized to comply with ASTM A 153/A 153M, Class C; of dimensions indicated. B. Postinstalled Anchors: Provide chemical or torque-controlled expansion anchors, with capability to sustain, without failure, a load equal to six times the load imposed when installed in solid or grouted unit masonry and equal to four times the load imposed when installed in concrete, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-6 11 March 2013

1.

Corrosion Protection: Carbon-steel components zinc plated to comply with ASTM B 633, Class Fe/Zn 5 (5 microns) for Class SC 1 service condition (mild).

2.8 A.

MISCELLANEOUS MASONRY ACCESSORIES Compressible Filler: Premolded filler strips complying with ASTM D 1056, Grade 2A1; compressible up to 35 percent; of width and thickness indicated; formulated from neoprene. B. Preformed Control-Joint Gaskets: Made from styrene-butadiene-rubber compound, complying with

ASTM D 2000, Designation M2AA-805 or PVC, complying with ASTM D 2287, Type PVC-65406 and designed to fit standard sash block and to maintain lateral stability in masonry wall; size and configuration as indicated. C. Bond-Breaker Strips: Asphalt-saturated, organic roofing felt complying with ASTM D 226, Type I (No. 15 asphalt felt). D. Reinforcing Bar Positioners: Wire units designed to fit into mortar bed joints spanning masonry unit cells with loops for holding reinforcing bars in center of cells. Units are formed from 3.6-mm steel wire, hot-dip galvanized after fabrication. Provide units with either two loops or four loops as needed for number of bars indicated.

2.9 A.

MASONRY CLEANERS Proprietary Acidic Cleaner: Manufacturer's standard-strength cleaner designed for removing mortar/grout stains, efflorescence, and other new construction stains from new masonry without discoloring or damaging masonry surfaces. Use product expressly approved for intended use by cleaner manufacturer and manufacturer of masonry units being cleaned.

2.10 A.

MORTAR AND GROUT MIXES General: Do not use admixtures, including pigments, air-entraining agents, accelerators, retarders, waterrepellent agents, antifreeze compounds, or other admixtures, unless otherwise indicated. 1. 2. Do not use calcium chloride in mortar or grout. Limit cementitious materials in mortar to Portland cement and lime.

B.

Preblended, Dry Mortar Mix: Furnish dry mortar ingredients in form of a preblended mix. Measure quantities by weight to ensure accurate proportions, and thoroughly blend ingredients before delivering to Project site.

C.

Mortar for Unit Masonry: Comply with ASTM C 270, Proportion Specification. Provide the following types of mortar for applications stated unless another type is indicated or needed to provide required compressive strength of masonry. 1. For masonry below grade or in contact with earth, use Type S.
04810-7 11 March 2013

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2. 3. D.

For reinforced masonry, use Type S. For interior non-load-bearing partitions, Type O may be used instead of Type N.

Grout for Unit Masonry: Comply with ASTM C 476. 1. 2. Use grout of type indicated or, if not otherwise indicated, of type (fine or coarse) that will comply with Table 1.15.1 in ACI 530.1/ASCE 6/TMS 602 for dimensions of grout spaces and pour height. Provide grout with a slump of 200 to 280 mm as measured according to ASTM C 143/C 143M.

2.11 A.

SOURCE QUALITY CONTROL Owner will engage a qualified independent testing agency to perform source quality-control testing indicated below: 1. 2. Payment for these services will be made by Owner. Retesting of materials failing to comply with specified requirements shall be done at Contractor's expense.

B.

Concrete Masonry Unit Test: For each type of unit furnished, per ASTM C 140.

PART 3 - EXECUTION

3.1 A.

EXAMINATION Examine conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work. 1. 2. 3. B. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of work. Verify that foundations are within tolerances specified. Verify that reinforcing dowels are properly placed.

Before installation, examine rough-in and built-in construction for piping systems to verify actual locations of piping connections.

C.

Proceed with installation only after unsatisfactory conditions have been corrected.

3.2

INSTALLATION, GENERAL

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-8 11 March 2013

A.

Thickness: Build cavity and composite walls and other masonry construction to full thickness shown. Build single-wythe walls to actual widths of masonry units, using units of widths indicated.

B. C.

Build chases and recesses to accommodate items specified in this and other Sections. Leave openings for equipment to be installed before completing masonry. After installing equipment, complete masonry to match the construction immediately adjacent to opening.

D.

Use full-size units without cutting if possible. If cutting is required to provide a continuous pattern or to fit adjoining construction, cut units with motor-driven saws; provide clean, sharp, unchipped edges. Allow units to dry before laying unless wetting of units is specified. Install cut units with cut surfaces and, where possible, cut edges concealed.

E.

Select and arrange units for exposed unit masonry to produce a uniform blend of colors and textures. 1. Mix units from several pallets or cubes as they are placed.

F.

Comply with construction tolerances in ACI 530.1/ASCE 6/TMS 602 and with the following: 1. 2. 3. 4. For conspicuous vertical lines, such as external corners, door jambs, reveals, and expansion and control joints, do not vary from plumb by more than 3 mm in 3 m, 6 mm in 6 m, or 12 mm maximum. For vertical alignment of exposed head joints, do not vary from plumb by more than 6 mm in 3 m, or 12 mm maximum. For conspicuous horizontal lines, such as lintels, sills, parapets, and reveals, do not vary from level by more than 3 mm in 3 m, 6 mm in 6 m, or 12 mm maximum. For faces of adjacent exposed masonry units, do not vary from flush alignment by more than 1.5 mm except due to warpage of masonry units within tolerances specified for warpage of units.

3.3 A.

LAYING MASONRY WALLS Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint thicknesses and for accurate location of openings, movement-type joints, returns, and offsets. Avoid using less-than-half-size units, particularly at corners, jambs, and, where possible, at other locations. B. Bond Pattern for Exposed Masonry: Unless otherwise indicated, lay exposed masonry in running bond; do not use units with less than nominal 100-mm horizontal face dimensions at corners or jambs. C. Lay concealed masonry with all units in a wythe in running bond or bonded by lapping not less than 100-mm. Bond and interlock each course of each wythe at corners. Do not use units with less than nominal 100-mm horizontal face dimensions at corners or jambs.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-9 11 March 2013

D.

Stopping and Resuming Work: Stop work by racking back units in each course from those in course below; do not tooth. When resuming work, clean masonry surfaces that are to receive mortar, remove loose masonry units and mortar, and wet brick if required before laying fresh masonry.

E.

Built-in Work: As construction progresses, build in items specified in this and other Sections. Fill in solidly with masonry around built-in items.

F. G.

Fill space between steel frames and masonry solidly with mortar, unless otherwise indicated. Where built-in items are to be embedded in cores of hollow masonry units, place a layer of metal lath, wire mesh, or plastic mesh in the joint below and rod mortar or grout into core.

H.

Fill cores in hollow concrete masonry units with grout 600 mm under bearing plates, beams, lintels, posts, and similar items, unless otherwise indicated.

I.

Build non-load-bearing interior partitions full height of story to underside of solid floor or roof structure above, unless otherwise indicated. 1. 2. Install compressible filler in joint between top of partition and underside of structure above. Fasten partition top anchors to structure above and build into top of partition. Grout cells of CMUs solidly around plastic tubes of anchors and push tubes down into grout to provide 13-mm clearance between end of anchor rod and end of tube. Space anchors 1200 mm o.c., unless otherwise indicated. 3. Wedge non-load-bearing partitions against structure above with small pieces of tile, slate, or metal. Fill joint with mortar after dead-load deflection of structure above approaches final position.

3.4 A.

MORTAR BEDDING AND JOINTING Lay hollow concrete masonry units as follows: 1. 2. 3. 4. With face shells fully bedded in mortar and with head joints of depth equal to bed joints. With webs fully bedded in mortar in all courses of piers, columns, and pilasters. With webs fully bedded in mortar in grouted masonry, including starting course on footings. With entire units, including areas under cells, fully bedded in mortar at starting course on footings where cells are not grouted. B. Lay solid masonry units with completely filled bed and head joints; butter ends with sufficient mortar to fill head joints and shove into place. Do not deeply furrow bed joints or slush head joints. C. Tool exposed joints slightly concave when thumbprint hard, using a jointer larger than joint thickness, unless otherwise indicated. D. Cut joints flush for masonry walls to receive plaster or other direct-applied finishes (other than paint), unless otherwise indicated.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-10 11 March 2013

3.5 A.

MASONRY JOINT REINFORCEMENT General: Install entire length of longitudinal side rods in mortar with a minimum cover of 16 mm on exterior side of walls, 13 mm elsewhere. Lap reinforcement a minimum of 150 mm. 1. 2. 3. Space reinforcement not more than 406 mm o.c. Space reinforcement not more than 203 mm o.c. in parapet walls. Provide reinforcement not more than 203 mm above and below wall openings and extending 305 mm beyond openings. a. B. C. D. E. Reinforcement above is in addition to continuous reinforcement.

Interrupt joint reinforcement at control and expansion joints, unless otherwise indicated. Provide continuity at wall intersections by using prefabricated T-shaped units. Provide continuity at corners by using prefabricated L-shaped units. Cut and bend reinforcing units as directed by manufacturer for continuity at returns, offsets, column fireproofing, pipe enclosures, and other special conditions.

3.6 A.

ANCHORING MASONRY TO STRUCTURAL MEMBERS Anchor masonry to structural members where masonry abuts or faces structural members to comply with the following: 1. 2. 3. Provide an open space not less than 25 mm in width between masonry and structural member, unless otherwise indicated. Keep open space free of mortar and other rigid materials. Anchor masonry to structural members with anchors embedded in masonry joints and attached to structure. Space anchors as indicated, but not more than 610 mm o.c. vertically and 915 mm o.c. horizontally.

3.7 A.

CONTROL AND EXPANSION JOINTS General: Install control and expansion joint materials in unit masonry as masonry progresses. Do not allow materials to span control and expansion joints without provision to allow for in-plane wall or partition movement. B. Form control joints in concrete masonry using one of the following methods: 1. 2. Install preformed control-joint gaskets designed to fit standard sash block. Install interlocking units designed for control joints. Install bond-breaker strips at joint. Keep head joints free and clear of mortar or rake out joint for application of sealant.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-11 11 March 2013

3.

Install temporary foam-plastic filler in head joints and remove filler when unit masonry is complete for application of sealant.

C.

Provide horizontal, pressure-relieving joints by either leaving an air space or inserting a compressible filler of width required for installing sealant and backer rod specified in Division 7 Section "Joint Sealants," but not less than 10 mm.

3.8 A.

LINTELS Provide concrete or masonry lintels where shown and where openings of more than 610 mm for block-size units are shown without structural steel or other supporting lintels. B. Provide minimum bearing of 200 mm at each jamb, unless otherwise indicated.

3.9 A.

REINFORCED UNIT MASONRY INSTALLATION Temporary Formwork and Shores: Construct formwork and shores as needed to support reinforced masonry elements during construction. 1. Construct formwork to provide shape, line, and dimensions of completed masonry as indicated. Make forms sufficiently tight to prevent leakage of mortar and grout. Brace, tie, and support forms to maintain position and shape during construction and curing of reinforced masonry. 2. Do not remove forms and shores until reinforced masonry members have hardened sufficiently to carry their own weight and other temporary loads that may be placed on them during construction. B. C. Placing Reinforcement: Comply with requirements in ACI 530.1/ASCE 6/TMS 602. Grouting: Do not place grout until entire height of masonry to be grouted has attained enough strength to resist grout pressure. 1. 2. Comply with requirements in ACI 530.1/ASCE 6/TMS 602 for cleanouts and for grout placement, including minimum grout space and maximum pour height. Limit height of vertical grout pours to not more than 1520 mm.

3.10 A.

FIELD QUALITY CONTROL Inspectors: Owner will engage qualified independent inspectors to perform inspections and prepare reports. Allow inspectors access to scaffolding and work areas, as needed to perform inspections. 1. Place grout only after inspectors have verified compliance of grout spaces and grades, sizes, and locations of reinforcement.

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-12 11 March 2013

B.

Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections indicated below and prepare test reports: 1. 2. Payment for these services will be made by Owner. Retesting of materials failing to comply with specified requirements shall be done at Contractor's expense.

C. D. E.

Testing Frequency: One set of tests for each 465 sq. m of wall area or portion thereof. Concrete Masonry Unit Test: For each type of unit provided, per ASTM C 140. Mortar Test (Property Specification): For each mix provided, per ASTM C 780. Test mortar for mortar air content and compressive strength.

F.

Grout Test (Compressive Strength): For each mix provided, per ASTM C 1019.

3.11 A.

REPAIRING, POINTING, AND CLEANING Remove and replace masonry units that are loose, chipped, broken, stained, or otherwise damaged or that do not match adjoining units. Install new units to match adjoining units; install in fresh mortar, pointed to eliminate evidence of replacement.

B.

Pointing: During the tooling of joints, enlarge voids and holes, except weep holes, and completely fill with mortar. Point up joints, including corners, openings, and adjacent construction, to provide a neat, uniform appearance. Prepare joints for sealant application, where indicated.

C.

In-Progress Cleaning: Clean unit masonry as work progresses by dry brushing to remove mortar fins and smears before tooling joints.

D.

Final Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as follows: 1. 2. 3. 4. 5. 6. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or chisels. Test cleaning methods on sample wall panel; leave one-half of panel uncleaned for comparison purposes. Obtain Architect's approval of sample cleaning before proceeding with cleaning of masonry. Protect adjacent stone and nonmasonry surfaces from contact with cleaner by covering them with liquid strippable masking agent or polyethylene film and waterproof masking tape. Wet wall surfaces with water before applying cleaners; remove cleaners promptly by rinsing surfaces thoroughly with clear water. Clean masonry with a proprietary acidic cleaner applied according to manufacturer's written instructions. Clean concrete masonry by cleaning method indicated in NCMA TEK 8-2A applicable to type of stain on exposed surfaces.

3.12

MASONRY WASTE DISPOSAL


04810-13 11 March 2013

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Salvageable Materials: Unless otherwise indicated, excess masonry materials are Contractor's property. At completion of unit masonry work, remove from Project site. END OF SECTION

UNIT MASONRY ASSEMBLIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

04810-14 11 March 2013

SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.01 DESCRIPTION A. The work covered by this Section comprises furnishing all plant, labour, equipment, appliances and materials and performing all operations in connection with Structural Steelwork. The work includes this sections covers frames, columns, perlins, gutters 1. Structural steel works for parking canopy. 1.02 REFERENCE STANDARDS A. All structural steel except as otherwise shown shall comply with the applicable provisions and recommendations of the following Codes, Specifications and Standards: 1. ASTM A6/A6M-99 Specification for the General Requirements for Rolled Plates, Shapes, Sheet Piling, and Bars for Structural Use. 2. ASTM A36/A36M-00 Specification for Structural Steel. 3. ASTM A325-97 Specification for Structural Bolts, Heat Treated, 120/105 KSI Minimum Tensile Strength. 4. ASTM A325M-97 Specifications for High Strength Bolts for Structural Steel Joints (Metric). 5. ASTM A490-97 Specification for Heat-Treated, Steel Structural Bolts, 150 KSI Minimum Tensile Strength. 6. ASTM A490M-97 Specification for High Strength Steel Bolts for Structural Steel Joints (Metric). 7. ASTM E709-95 Guide for Magnetic Particle Examination. 8. AWS D1.1-92 Structural Welding Code - Steel. 9. AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings latest Edition. 10. AISC Code of Standard Practice for Steel Buildings and Bridges. 11. AISC Manual of Steel Construction (Allowable Stress Design), Latest Edition. 12. AISC Manual of Steel Construction (Connections), Latest Edition 13. Industrial Fasteners Institute "Fastener Standards Book" 14. AISC Specifications for Structural Joints Using ASTM A325 or ASTM A490 Bolts. 15. SSPC Steel Structures Painting Manual, Volume 2, Systems and Specifications". Copies of all the above codes and standards shall be submitted to the Engineer.

B. 1.03

QUALIFICATIONS A. Structural steel work shall be executed by an approved well-experienced specialist Sub-Contractor unless the Contractor can satisfy the Engineer that he (the Contractor) has sufficient experience and expertise in this field to execute this work himself in which case his tradesmen and their supervisory personnel engaged in such work must have successful experience with work comparable to that shown and specified including organized quality control and testing procedures.

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05120-1 11 March 2013

B.

Engineering: Provide the services of a Professional Structural Engineer, registered in Kuwait to design and certify that the work of this section meets or exceeds the performance requirements specified in this section and as required by applicable local and international codes.

1.04

SUBMITTALS A. Shop Drawings: Submit to the Engineer for approval shop drawings including structural calculations for all structural steel components and their connection all in accordance with the requirements of the Contract Documents showing the following: 1. Shop fabrication drawings which show type of material, size and weight of members and other information necessary for the fabrication of each member and for shop assembly of members of the structure. The drawings shall include the type, size, location and extent of all welds and bolts. The drawings shall clearly distinguish between shop and field, bolts and welds. Wind load for space frame at stairs 1 and 7 shall be determined as defined in Section 08900. Field assembly and erection drawings which show all field assembly prior to erection and after erection. The drawings shall indicate all details, schedules, procedures and diagrams showing field assembly and sequence of erection. The information shall indicate locations of shorings and how shoring is stabilized and controlled. The drawings shall indicate elevations of shored points and splice locations. The procedures shall indicate step by step erection sequences including intermediate surveys and allowances for temperature. Diagrams shall indicate erection equipment size and weight and additional elements which may be required to support or stabilize elements during erection. The Contractor shall prepare and submit to the Engineer written procedures for fabrication of the steel work. The procedure shall describe the complete welding process including machine, current, voltage, preheat, filler metal, welding system (manual, semi-automatic or automatic), positions of welding, number of passes for each weld size, preparation of surfaces prior to welding, etc. These procedures shall indicate the Contractor's quality control measures, monitoring and repair procedures. The Contractor shall be responsible for the arrangement of all joints and their load carrying capacities. The connection may or may not be shown on the Contract Drawings. Submit all details along with calculations to Engineer prior to fabrication for approval.

2. 3.

4.

5.

B.

Manufacturer's Literature 1. Submit to the Engineer manufacturer's specifications and installation instructions for the following products, including laboratory test reports and such other data to show compliance with these Specifications (including specified standards): a. Structural steel, (each type) including certified copies of mill reports covering the chemical and physical properties, country and rolling mill of origin, and including a statement indicating that the steel is new billet steel and that testing has been performed in accordance with ASTM or equivalent standards. b. High strength bolts (each type) including nuts and washers. c. Welding electrodes (each type). d. Shop coat primer paint, field touch-up paint. e. Coal tar epoxy paint. f. Bearing materials or assemblies.

C.

Testing Reports 1. The following reports shall be submitted in triplicate directly to the Engineer by the Testing Laboratory, with copy to the Contractor. a. Shop Welders Certification. b. Field Welders Certification. c. Magnetic particle tests, shop welds and field welds.
05120-2 11 March 2013

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.05

TESTING A.

d. e.

Ultra-sonic tests, shop welds and field welds. High strength bolted connection tests, shop and field.

The Contractor shall engage, at his own expense, an independent certified Testing Laboratory approved by the Engineer to inspect high strength bolted connections and welds, and to perform all tests and submit test reports to the Engineer as herein specified. The Contractor shall submit evidence regarding qualification of the proposed Testing Laboratory. The Contractor shall provide the Testing Laboratory with the following: 1. 2. A complete set of shop fabrication and erection drawings. Cutting lists, order sheets, material bills, shipping bills and mill test reports. Provide certified copies of mill test reports of bolts, nuts and washers, including names and locations of mills and shops and analyses of chemical and physical properties. Information as to time and place of all rollings and shipment of material to shops. Representative sample pieces requested for testing. Full and ample means and assistance for testing all material. Proper facilities, including scaffolding, temporary work platforms, hoisting facilities, etc., for inspection of the work in the mills, shop and field.

B. C.

3. 4. 5. 6. D. E.

Bolted connections shall be inspected by the Testing Laboratory in accordance with AISC Specifications for "Structural Joints Using ASTM A 325-97, ASTM 325M-97 and ASTM 490-97 or ASTM 490M-97. Welding shall be inspected and tested by a Testing Laboratory approved by the Engineer during fabrication and erection of structural steel as follows: 1. Certify all welders in accordance with AWS and make inspections and tests as required. Record types and locations of all defects found in the work, and measures required and performed to correct such defects. In addition to visual inspection of all welds, magnetic particle and ultra-sonic inspection shall be made of all welds indicated on the Drawings. Magnetic particle inspection shall be made on the root pass and finished weld. The method of magnetic particle inspection shall be in accordance with ASTM E109. Any type of crack or zone of incomplete fusion or penetration will not be acceptable. Ultra-sonic inspection shall be performed in accordance with AWS D1.1.

2.

3. 4. F.

Each bolting crew and welder shall be assigned an identifying symbol or mark and all shop and field connections shall be so identified so that the inspector can refer back to the crew or person making the connection. The Testing Laboratory shall be responsible for conducting and interpreting the tests, shall state in each report whether or not the test specimens conform to all requirements of the Contract Documents, and shall specifically note any deviations therefrom. Access to places where material for this Contract is being fabricated or produced shall be provided to the Engineer and the Testing Laboratory for the purpose of inspection and testing. All costs relating to the Engineer and his staff travel, lodging, and board etc. shall be paid for by the contractor. The Engineer and the Testing Laboratory may inspect structural steel at the plant before shipment, however, the Engineer reserves the right to reject any such material, which does not conform to all of the requirements of the Drawings and Specifications, at any time before final acceptance.

G.

H.

I.

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05120-3 11 March 2013

J.

The Testing Laboratory shall perform specified tests and submit reports to the Engineer. Corrective measures, including additional and more complete testing, which may result from these tests shall be the Contractor's responsibility; all costs of which shall be paid for by the Contractor. The Contractor shall coordinate and allow for necessary time for the Testing Laboratory to complete all testing and inspections prior to shop painting. The Testing Laboratory shall prepare test specimen from steel samples cut from delivered material and shall conduct tension tests in accordance with ASTM. The Contractor shall mill order 1.0 metre extra length for the members noted on the Drawings to provide the steel for testing.

K. L.

1.06

SUBSTITUTIONS A. B. The Contractor shall fabricate and erect the structural steelwork as shown on the drawings and specifications. Substitutions of the structural system shown or member sizes of similar steel strengths will be permitted providing the architecture is not changed and the structural strength and deflections are maintained. No reduction in member sizes shall be permitted if steel strength exceeds the specified strength. See Section 01631 - Substitutions.

1.07

DELIVERY, STORAGE AND HANDLING A. B. C. Do not handle structural steel until paint has thoroughly dried. Care shall be exercised to avoid abrasions and other damage. Stack material above ground out of mud and dirt and provide for proper drainage. Protect from damage or soiling by adjacent construction operations. Do not deliver material to the project site until the proposed method and sequence of erection has been reviewed by the Engineer. Method and sequence shall be planned so as to avoid delay or damage to the work of other trades. Storage of fabricated steel at the job site shall be the responsibility of the Contractor. Material stored at the job site shall not exceed design loads on existing or newly-constructed structures so that members will not be distorted or otherwise damaged; and shall be protected against corrosion or deterioration.

D.

PART 2 - PRODUCTS 2.01 STRUCTURAL STEEL A. 2.02 BOLTS A. 2.03 All bolts, nuts and washers shall conform to the requirements of ASTM A490 and A325. All bolts shall be cold forged with rolled threads. All structural steel shall conform to as shown on the drawings.

WELDING ELECTRODES A. B. All welding electrodes shall be E70XX and shall comply with the provisions of AWS Specifications A5.1, A5.5, A5.17, A5.18, A5.20. All welds not specified shall be continuous fillet welds using not less than the minimum size based on thickness of the thicker part jointed. 1. Thickness to 12mm - min. size 4mm 2. Over 12mm to 20mm - min. size 6mm 3. Over 20mm to 40mm - min. size 8mm
05120-4 11 March 2013

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

4. 2.04 PAINT A.

Over 40mm to 50mm - min. size 10mm

B. C.

Primers 1. Steel surfaces which are not embededed in concrete to be painted with coal tar epoxy: Anticorrosive primer (KPID), complying with B.S.5493, minimum dry film thickness 50 microns for all members that will receive finishing coat. The surfaces required to be painted will be sand blasted immediately before applying the first coat of paint. All other members/surfaces will receive 3 coats of total thickness 150 microns. Finishing Coat : All steel members exposed to view shall have at least 3 coats of epoxy paint with minimum dry film thickness of each coat 100 microns Submit colour chart for Engineer selection. Use spray application for painting. The minimum thickness shall be maintained on all corners, edges and ends of pieces. The surface to be painted shall be dry and above 2oC; the temperature of the air shall be over 5oC. Do not paint outdoors in rainy and dusty weather. Allow paint at least 24 hours drying time in good weather before re-coating.

2.05

BEARINGS A. Bearings for the steel columns shall be set over 5cm thick non-shrink grout suitable for such use. The steel used in the plates shall be mild steel to ASTM A36.

2.06

SOURCE QUALITY CONTROL A. Testing and inspection of structural steel will be performed by an independent structural steel testing agency engaged by the Contractor, at his own expense and approved by the Engineer. Provide the testing agency with the following: 1. 2. 3. 4. 5. 6. B. A complete set of accepted documents required under Paragraph "Submittals". Cutting lists, order sheets, materials bills and shipping bills. Information as to time and place of all rollings and shipments of materials to shops. Representative sample pieces as requested by the testing agency. Full and ample means and assistance for testing all material. Proper facilities, including scaffolding, temporary work platforms, etc., for inspection of the work in the mills, shop and field.

The inspector will perform his duties in such a way that fabrication and erection are not unnecessarily delayed or impeded, and as follows: 1. 2. The Inspector will make all tests and inspections as required by "Structural Welding Code". The edges of material to be welded will be ultrasonically examined for evidence of laminations, inclusions or other discontinuities. The extent to which such defects will be permitted and the extent of repair permitted shall be determined by the Inspector and made in accordance with ASTM A6, Paragraph 9. Repairs made by welding shall be done in compliance with the requirements of AWS D1.1 and the accepted welding procedures. The root layer of all multiple pass welds and the backside of groove welds made from both sides, after back gouging or chipping, will be examined by magnetic particle inspection (or dye penetration if magnetic particle inspection is not feasible). All shop and field welds shall be listed as stated on Drawings. The technique of radiographic inspection will be in accordance with the requirements of AWS D1.1. A double film technique will be used. One copy of each film will be sent to the Engineer, the other will be retained by the Inspector.
05120-5 11 March 2013

3.

4. 5.

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

6.

Where inspection reveals defects, the extent of inspection will be increased as much as necessary to ensure that the full extent of the defects in a joint has been found and to ensure that the same defects are not present in welds made on similar parts or under similar circumstances. Work that is not acceptable will be designated by "Repair" or "Reject", as applicable. Shop welds will be inspected in the shop before the work painted or approved for shipment. The Inspector will maintain a daily record of the work he has inspected and its disposition. Reports of tests will be made in form prescribed in AWS D1.1. One copy of each of the reports will be submitted to the Engineer on a weekly basis. The Inspector will make all tests and inspections of high strength bolt connections as required by AISC S314.

7. 8. 9.

10. PART 3 3.01 EXECUTION

BENCH MARKS A. The Contractor shall employ the services of a registered professional Engineer, in accordance with the requirements of the Contract Documents, who shall establish permanent bench marks, field check all elevations of concrete on which structural steel is to be placed and locations of anchor bolts, reporting any discrepancies to the Engineer and obtaining the Engineer's approval before the work proceeds.

3.02

ERECTION A. The Contractor shall be responsible for the accurate setting and levelling of all bearing plates or setting plates. Bearing plates or setting plates shall be levelled on steel wedges or shims or as otherwise detailed. Bearing and setting plates shall be grouted as specified. Furnish templates for accurate setting of all anchor bolts. Furnish shim plates or developed fills where required to obtain proper fit and alignment. Oxygen cutting of structural steel in excess of 3mm for "fitting-up" purposes shall not be done except with the prior approval of the Engineer. The use of an oxygen cutting torch for correcting fabrication errors will be permitted only when the member is not under load, and only after prior written approval of the Engineer to the procedures to be followed in the event corrective work is necessary.

B. C. D.

3.03

ERECTION TOLERANCE A. The Contractor alone shall be responsible for the correct fitting of all structural members and for the elevation and alignment of the finished structure. Any adjustments necessary in the steel work because of discrepancies in elevations and alignment shall be the responsibility of the Contractor. Unless otherwise noted, the structure shall be levelled and plumbed to an accuracy of 1 to 1000, but not to exceed 12mm. The actual centrelines of truss chords shall not vary from theoretical centrelines by more than 12 mm at any point. The difference between offsets to the actual centrelines of truss chords at adjacent panel points shall not exceed 3mm. All levelling and plumbing shall be done based on the mean operating temperature of the structure. Allowances shall be made for the difference in temperature at time of erection and the mean temperature at which the structure will be when completed and in service. All measurements relating to the above shall be on the theoretical centrelines of the members.

B.

C. 3.04

CONNECTIONS A. No welding or bolting shall be done until as much of the structure as will be stiffened by the welding or bolting has been properly aligned.
05120-6 11 March 2013

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Drift pins shall not be used to enlarge unfair holes in main material. Holes that must be enlarged to admit bolts shall be reamed. Burning and drifting may be used to align unfair holes in secondary bracing members only, when acceptable to the Engineer. When high strength bolts or high strength bearing bolts are used, the AISC specifications shall apply including values as noted therein, and installation by either "turn of nut tightening" or with torque wrenches. In using manual torque wrenches, the required torque can be read from the wrench dial. Care should be taken that the wrench is properly calibrated. Nuts shall be in motion when torque is measured. In using power wrenches, the recommendations of the wrench manufacturer shall be followed. Use Hardened washer under bolt head or nut whichever is turned in tightening, unless the specified standards require hardened washer under both head and nut. All bolts shall be kept in dry storage until needed for installation. A325 bolts 1-1/8 inch (28mm) and 1-1/4 inch (32mm) diameter and A490 bolts 1 inch (25mm) diameter and over shall first have Johnson's Stick Wax No. 140 applied to their threads before being assembled in the work. If bolts have been left out and have become rusty before use, they shall be rejected and shall not be used until they have been cleaned and waxed with Johnson's Stick Wax No. 140.

C.

D. E. 3.05 SURVEY A.

Bolted connections shall be tested in accordance with the requirements of Para. TESTING and as indicated on the Drawings. Welded connections shall be tested in accordance with the requirements of Para. TESTING and as indicated on the Drawings.

Make an accurate survey of actual locations of steel members immediately upon the completion of erection of steel but before removal of shoring and promptly submit same to the Engineer. Should locations very beyond the allowable tolerances, take necessary corrective measures and modify details and/or procedure as required. Survey the final erected structural steel after release of shoring but prior to removal of shoring elements and prior to the application of any other work, reporting any discrepancies from Contract requirements to the Engineer. END OF SECTION

B.

STRUCTURAL STEEL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05120-7 11 March 2013

SECTION 05500 METAL FABRICATIONS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnish and install the following steel fabrications: 1. Interior handrails as detailed in the drawings. 2. Security Fence. 3. Elevator pit ladders and sill support angles. 4. Loose lintels. 5. Overhead support for suspended ceilings. 6. Supports for millwork counters and counter tops.. 7. Galvanized and painted gratings over airways, electrical and drainage trenches. 8. Custom canopies. 9. Loose bearing and leveling plates. 10. Miscellaneous framing and supports for overhead doors and grilles. 11. Miscellaneous framing and supports for elevator hoisting machines and sheaves. 12. Miscellaneous steel trim. 13. Steel angle corner guards. 14. Edgings. 15. Structural steel door frames. 16. Floor plate and supports. 17. Pipe guards. 18. Wheel guards. 19. Pipe bollards. 20. Steel plate column guards. 21. Rough hardware. 22. External Perforated cladding Furnish and install the following stainless steel grade A-316L fabrications: 1. Stainless steel gratings for planters and fountains 2. Stainless steel rung ladder in water tanks. Furnish and install the following stainless steel grade A-304 fabrications: 1. Struts and cables for canopy and atrium end curtain wall on grid 6 and 22.

B.

C. 1.02

RELATED SECTIONS A. B. C. D. E. F. G. Section 04810 - Unit Masonry Assemblies: Building in of anchors into masonry walls. Section 05400 - Cold Formed Metal Framing: Structural stud framing. Section 06100 - Rough Carpentry: Wood framing, blocking, subflooring and underlayment. Section 06400 - Architectural Woodwork: Plastic Laminate counters requiring fabricated steel supports. Section 08333 - Overhead Coiling Door: Steel framing for coiling grilles. Section 09960 - High Performance Coatings: Applied high build coatings for painted rails and guards. Section 09910 - Paints: Applied finish coatings other than those specified herein.

1.03

REFERENCES A. Comply with applicable requirements of the following standards and those others referenced in this Section, under the provisions of Section 01420 - REFERENCES. Where these standards conflict with other specified requirements, the most restrictive requirements shall govern. 1. ASTM A 123 - Zinc Coatings on Products Fabricated From Rolled, Pressed and Forged Steel Shapes, Plates, Bars, and Strip.
05500-1 11 March 2013

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 1.04 SUBMITTALS A.

ASTM A 153 - Zinc-Coating on Iron and Steel Hardware. ASTM A 167 - Stainless and Heat Resisting Chromium-Nickel Steel Plate, Sheet and Strip. ASTM A 276 Stainless and Heat- Resisting Steel Bars and Shapes. ASTM A 283 - Carbon Steel Plates, Shapes, and Bars. ASTM A 307 - Carbon Steel Externally Threaded Standard Fasteners. ASTM A 36 - Structural Steel. ASTM A 361 - Zinc Coated (Galvanized) Iron or Steel Roofing sheets. ASTM A 386 - Zinc Coating on Assembled Steel Products. ASTM A 446 - Zinc Coated (Galvanized) Steel Sheets of Structural Quality, Coils and Cut Lengths. ASTM A 480 General requirements Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet and Strip. ASTM A 500 - Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Round and Shapes. ASTM A 501 - Hot-Formed Welded and Seamless Carbon Steel Structural Tubing. ASTM A 525 - Specification for Sheet Steel, Zinc Coated (Galvanized). ASTM A 53 - Hot-Dipped, Zinc-coated Welded and Seamless Steel Pipe. ASTM A 569 - Steel, Carbon (0.15 Maximum Percent), Hot-Rolled Sheet and Strip Commercial Quality. ASTM F 593 - Stainless Steel Bolts, Hex Cap Screws. ASTM F 594 - Stainless Steel Nuts. AGAI - Inspection Manual for Hot-Dipped Galvanized Products. AISC - Code of Standard Practice for Steel Buildings and Bridges. AISC - Specifications for the Design, Fabrication and Erection of Structural Steel for Buildings. AISI. referenced standards. AWS - Standard Code for Arc and Gas Welding in Building Construction.

Submit the following under provisions of Division 1 General Requirements: 1. 2. Literature: Manufacturer's complete product data and specifications for all prefabricated items, shop primer paints, liquid zinc coating, and hydraulic cements, to be furnished hereunder. Shop drawings: a. Include large scale details of items of all metal fabrications to be furnished hereunder, showing proposed methods of anchorage to surrounding structure and conditions. b. Include large scale details of stairs, intermediate landings and railings, bearing registration stamp of a Professional Structural Engineer registered in Kuwait c. Indicate on the shop drawings all erection marks for various places of miscellaneous metals, and ensure that the actual field pieces bear corresponding marks. Provide calculations for loading and stresses for metal stairs, landings and handrails. Show how design load requirements and other performance requirements as required by applicable local and national codes have been satisfied. Selection samples: a. Sample card indicating Manufacturer's full range of colors of shop applied finishes available for selection by Engineer. Quality standards sample: Fabricate a sample showing a typical handrail section demonstrating component connections. Sample section shall be minimum 450 mm (18 inches) in horizontal length and 300 mm (12 inches) in height and include a corner post. Provide a shop primed finish. a. Accepted sample will be used to establish the quality standard for handrail and guardrail fabrication and workmanship. Verification samples: Two 75 mm (3 inch) by 150 mm (6 inch) samples of factory-applied coatings and colors proposed for use for approval prior to coating application.
05500-2 11 March 2013

3.

4.

5.

6.

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.05

QUALIFICATIONS A. Fabricator, with a minimum of 3 years documented experience demonstrating previously successful work of the type specified herein.

1.06

QUALITY ASSURANCE A. Engineering: Provide the services of a Professional Structural Engineer, registered in Kuwait to design and certify that the work of this section meets or exceeds the performance requirements specified in this section and as required by applicable local and international codes. 1. Prepare Shop Drawings for stairs, handrails, and handrail brackets under direct supervision of a same Engineer experienced in design of this work. Welders Certificates: Submit certifying welders employed on the Work, verifying AWS qualification within the previous 12 months.

B. 1.07

COORDINATION A. Be responsible for establishing locations and levels for all work of this Section, except such parts as may be delivered to others and set by them. In such cases assist them in properly locating said parts.

1.08

DELIVERY, STORAGE AND HANDLING A. All materials under this Section shall be carefully prepared for delivery, and handled and stored under cover in a manner to prevent defacement, deformation, or other damage to the materials and to shop finishes, and to prevent the accumulation of foreign matter on the metal work. All such work shall be repaired and cleaned prior to erection.

PART 2 PRODUCTS APPROVED MANUFACTURER / SUBCONTRACTOR A. B. C. 2.01 Metal Center, Kuwait Khaled Al Khorafi, Kuwait Bassem International Trading Co.

MATERIALS A. All materials shall be new stock, free from defects impairing strength, durability or appearance, and of best commercial quality for each intended purpose. Unless specifically called for otherwise, work shall be fabricated from the following: 1. Stainless Steel shapes, plates and bars: ASTM Designation A 36. 2. Stainless Steel pipe: ASTM A53, grade A, seamless pipe, black finish unless otherwise noted. 3. Stainless Structural steel tubing, square and rectangular shapes; ASTM A500 4. Stainless Steel tubular shapes: ASTM A 501. 5. Stainless Steel plates to be bent or cold-formed: ASTM A283, grade C. 6. Stainless Steel bars and bar-size shapes: ASTM A306, grade 65, or ASTM A36. 7. Stainless steel bars: ASTM A108. 8. Stainless steel sheets: ASTM A336. 9. Stainless steel sheets: ASTM A526. 10. Stainless Steel Plate, Sheet and Strip: ASTM A 167, Type 304. 11. Stainless Steel Bars and Shapes: ASTM A 276, Type 304. 12. Stainless Steel Bolts, Hex Cap Screws: ASTM F 593, Type 304. 13. Stainless Steel Nuts: ASTM F 594, Type 304.
05500-3 11 March 2013

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

14. B.

Bolts, Nuts and Washers: ASTM A325 or A307,as required for strength,

C.

Metal surfaces, general: For metal fabrications exposed to view upon completion of the Work, provide materials selected for their surface flatness, smoothness and freedom from surface blemishes. Do not use materials whose exposed surfaces exhibit pitting, seam marks, roller marks, rolled trade names, roughness, and, for steel sheet, variations in flatness exceeding those permitted by reference standards for stretcherleveled sheet. Steel materials: to be hot dip-galvanized, provide steel chemically suitable for metal coatings complying with the following requirements: Carbon below 0.25 percent, silicon below 0.24 percent, phosphorous below 0.05 percent, and manganese below 1.35 percent. Notify galvanizer if steel does not comply with these requirements to determine suitability for processing. Provide all fasteners and attachments of the same material and finish as the metal to which it is applied unless otherwise noted. Provide all fasteners and attachments as required for work specified herein and as indicated on the Drawings. Welding rods: AWS E70XX grade, or select in accordance with AWS specifications for the metal alloy to be welded and in accordance with the recommendation of the welding rod manufacturer.

D.

E. 2.02

ACCESSORIES A. Grout: Ready mixed, non-metallic high strength controlled expansion grout of flowable consistency, conforming to ASTM C 1107 with minimum compressive strength of 8,000 pounds per square inch (55.2 MPa) at 28 days. 1. 2. B. Five Star Products, Inc., Fairfield CT, 001-203-336-7900, product Five Star Grout. L&M Construction Chemicals, Omaha NE, 001-402-453-6600, Product: Crystex..

Metal paste filler: 2 component epoxy, high strength, structural adhesive putty: 1. 2. 3. Abatron, Inc. Gilberts IL, product: Ferrobond-P. Dynatron/Bondo Corp., Atlanta, GA, product: Bondo Plastic Filler. U.S. Chemical & Plastics Company., Massillon OH, product Metal filled epoxy.

C.

Liquid zinc coating, for touch-up of welds, scratches, and abrasions in galvanized steel: Galvanic Zinc-rich coating containing 95 percent metallic zinc, by weight in the dried film; recognized under the Component Program of Underwriters Laboratories, Inc. as an equivalent to hot-dip galvanizing; conforming to FS DODP-21035A (formally MIL-P-21035A) for repair of hot-dip galvanizing and meeting the requirements of MIL-P26915A USAF Specification for Zinc-Rich Paints. Acceptable products include: 1. 2. 3. Z.R.C. Chemical Products Company, Quincy MA, product: Z.R.C. Duncan Galvanizing, Everett MA, 001-617-389-6721, product: ZIRP. American Polywater Corp., Stillwater, MN, CG Zinc-Rich Cold Galvanizing.

D.

Primer for non-galvanized steel surfaces, modified alkyd rust-inhibitive, high solids primer, equal to the following: 1. 2. 3. International (Courtaulds Coatings), Louisville KY, 001-502-588-9200, product Interlac 260HS. Rust-Oleum, Vernon Hills IL, 001-847-367-7700, product 1069 Heavy Duty Rust Inhibitive Red Primer. Sherwin Williams, Cleveland OH, 001-216-566-2000, product Kem Flash Primer HS, Red Oxide E61R702.

2.03

FABRICATION - GENERAL A. Metal surfaces shall be clean and free from mill scale, flake, rust and rust pitting; well formed and finished to shape and size, true to details with straight, sharp lines, and angles and smooth surfaces. Curved work shall be to true radii. Exposed sheared edges shall be eased.
05500-4 11 March 2013

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C.

Shop fabricate items wherever practicable, accurately fitting all parts and making all joints tight. Do not fabricate materials until all specified submittals have been submitted to, and approved by, the Engineer. Do all cutting, punching, drilling, and tapping required for attachment of anchor bolts and other hardware and for attachment of work by other trades. All such work shall be done prior to hot-dip galvanizing of the various components. Grind all edges of bars and plates completely free from nicks and machine marks, prior to galvanizing and/or shop priming. Weld all permanent connections, make all welds in a continuous manner; tack-weld only where specifically indicated on the Drawings. Grind all exposed-to-view welds completely smooth and flush to the surface plane of the base metals. Perform welding work prior to galvanizing in all cases, except where field welding is necessary, in which case, completely coat all such welds with two coats of specified liquid zinc coating, after performing grinding operations. Use screws and bolts only where welding cannot be performed, of sufficient size to ensure against loosening from normal usage of miscellaneous metal items furnished hereunder. 1. 2. Countersink all screw heads and bolt heads as far as practicable. Use not less than two screw, bolts, or other anchorage items, at each connection point. Draw up all threaded connections tightly, after buttering same with pipe joint compound, to exclude water.

D. E.

F.

G.

Carefully coordinate the installation of metal fabrications with the work of trades responsible for the installation of interfacing work, and for the installation of work into the various assemblies furnished hereunder, and permit the installation of the related materials to be made at the appropriate times. Fit and assemble metal fabrications in largest practical sections for delivery to site, ready for installation. 1. Galvanized assemblies: Where size of assembly is too large for galvanizing kettle, galvanize components prior to fabrication and assemble after galvanizing.

H.

2.04

FABRICATION - HANDRAILS A. Refer to the Drawings for location and details of handrails to be furnished and installed hereunder. 1. B. Verify heights shown in Drawings comply with referenced codes and regulations.

Railing performance requirements; conform to requirements of applicable codes and regulations, but design for the following minimum loads: 1. Design, fabricate and install all railings in a manner which will ensure the railings will be capable of withstanding loads required by applicable codes.

2.05

FABRICATION FENCE A. Refer to the Drawings for location and details of fence to be furnished and installed hereunder. 1. B. Verify heights shown in Drawings comply with referenced codes and regulations.

performance requirements; conform to requirements of applicable codes and regulations, but design for the following minimum loads, wind resistance, special protection etc.:

2.06

FABRICATION STAINLESS STEEL SEPERATION STRIP A. Factory fabricated stainless steel SS316 (Pickled and passivated) to be installed in position as a separation between different finishing as shown in the drawings
05500-5 11 March 2013

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.07

FABRICATION - SUPPORTS A. Supports for folding panel partitions: Fabricate support system to carry the entire load of moveable walls to the structure above without transferring any horizontal or vertical load to ceiling system. Provide frequently spaced holes for multiple adjustment. Provide diagonal bracing. Use of Unistrut type members are acceptable.

2.08

HOT-DIP GALVANIZING A. B. Surface preparation prior to galvanizing: Pickle steel prior to galvanizing in conformance with SSPC-SP8. Remove all rust, dirt, weld flux, weld spatter, and other foreign matter. Hot-dip galvanizing: Provide coating for iron and steel fabrications applied by the hot-dip process Deltagalv by Duncan Galvanizing, meeting all requirements of this specification. Comply with ASTM A 123 for fabricated products and ASTM A 153 for bolts, nuts, washers, and other rough hardware. Provide thickness of galvanizing specified in referenced standards. 1. 2. 3. Wherever possible, perform galvanizing after assembly of items. Galvanized items shall be straightened to remove all warpage and distortion caused by the galvanization process. Touch-up all breaks on hot-dip surfaces caused by cutting, welding, drilling or undue abrasion with liquid zinc coating as specified herein above. Apply liquid zinc by brush or spray on all damaged areas in two coats to a total dry film thickness of not less than 3 mils. Apply first coat within two hours after damage to hot-dip film to prevent undue oxidation of exposed surface. On all welds remove weld spatter by power wire brushing or equivalent before applying liquid zinc coating. Repair material should extend at least 75 mm (3 inches) beyond all edges of the damaged galvanized area as possible to assure continuity of galvanic protection. Touch-up of galvanized surfaces with aerosol spray, silver paint, bright paint, brite paint, or aluminum paints is not acceptable.

4. 2.09

SHOP APPLIED COATINGS A. B. Schedule: Shop applied coatings as scheduled at end of Section and as indicated on Drawings. For non-galvanized steel surfaces: 1. Surface preparation prior to priming: Thoroughly clean all steel of all loose mill scale by power wire brushing or sandblasting. Remove all rust, dirt, weld flux, weld spatter, and other foreign matter by wire-brushing or scraping (power wire-brushing, if necessary). Grind smooth any sharp projections. Shop apply specified primers thoroughly and evenly on the surfaces and worked into the joints and other open areas on the surfaces. Surfaces inaccessible after assembly shall be given two coats. Dry film thickness of primer shall be not less than 2.4 mils per coat.

2.

C.

For hot-dipped galvanized steel items scheduled for field applied painted finish: 1. 2. Touch-up all breaks on hot-dip surfaces caused by cutting, welding, drilling or undue abrasion with liquid zinc coating as specified above under the Article entitle Hot Dip Galvanizing. Provide factory-applied polyamide epoxy primer, 2.0 mils dry film thickness minimum, Primergalv by Duncan Galvanizing meeting all requirements of this specification. Apply primer within 12 hours after galvanizing at the galvanizer's plant in a controlled environment meeting applicable environmental regulations, and as recommended by coating manufacturer. Engage the services of a galvanizing facility which will assume single-source responsibility for galvanizing and primer coating. Touch-up finish in conformance with manufacturer's recommendations. Provide touch-up such that repair is not visible from a distance of 1800 mm (6 feet).
05500-6 11 March 2013

3.

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.10

A.

Standard Bar Grating : Typical: Carbon Steel galvanized and painted with high performance coating after fabrication; see Hot Dip Galvanizing above and Section 09960 for painting. Standard twisted or straight cross bars. 1. Types suitable for application. Provide as required to conform to load requirements below. a. Standard Bar Grating: NAAMM MBG 531, Type W. b. Heavy Duty Grating: NAAMM MBG 532, Type W or R. 2. Load Requirements: As required for dead load plus live load meeting requirements of applicable Building Code. Maximum deflection under design load not to exceed L/240. a. Public Sidewalks and Areas subject to Vehicular Traffic: Whichever produces the greater stress: 1) Minimum 1221 kg/rn2. 2) Minimum 3630 kg concentrated load placed over 0.23 m2 area located to produce maximum stress. b. Private Areaways subject to Pedestrian Traffic but not Vehicular Traffic : 488kg/m2. c. Other Conditions: As required by Code. Minimum 488 kg/m2. 3. Bearing Bars: a. Provide abrasive bearing bar tops ; see "Anti-Slip Finish" under SHOP FINISHES below. b. At areas subject to normal public pedestrian traffic, space bars not greater than 13 mm clear.

2.11

ALUMINUM COMPOSITE CLADDING WITH METAL SUPPORTING SYSTEM 1. Supporting system Fabricate support system to carry the entire load of cladding to the structure. All the metal fabricated elements to be in galvanized and special super durable powder coated. 2. Cladding System Supply and installation of aluminum cladding lacquered finish with external thermal insulation system as shown in the drawings and recommended by the manufacturer.

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05500-7 11 March 2013

PART 3 - EXECUTION 3.01 ERECTION A. Accurately set all work to established lines and elevations, and rigidly fasten in place with suitable attachments to the construction of the building. At the completion of the work, check all work, re-adjust as required, and leave in perfect condition. Grind all exposed to view welds smooth to the touch. Construct and install stairs in strict accordance with the details, the approved shop drawings, and requirements of all codes, laws, and ordinances bearing on the work. 1. Pipe rails set in exposed concrete surfaces shall be grouted with molten lead or expanding grout. Hole to receive pipe shall be formed with galvanized sheet metal sleeve and provide at least 12 mm (1/2 inch) clearance around entire perimeter. Hold expanding grout back 12 mm (1/2 inch) from finish surface and fill void with Portland cement grout to match color and texture of adjacent surface.

B.

3.02

FIELD WELDING A. B.

Field weld components indicated on Shop Drawings in accordance with AWS D1.1. Immediately after welding, touch-up welds, burned areas and damaged surface coatings. 1. Thoroughly remove all spatter by power wire-brushing (or if inaccessible, wire brushing) per SSPC, surface preparation specification SP2 or SP3. Allow surface to cool to ambient temperature. Clean surface with solvent wipe to remove oils, grease and dirt in accordance with SSPC surface preparation specification SP1. 2. Apply one coat of liquid zinc to attain a minimum of 1.5 mils dry film thickness. Coating should extend at least two inches beyond either side of weldment to ensure complete coverage of welded area.

3.03

FIELD BOLTING A. Accurately drive all bolts into holes, protecting the bolt heads so as not to damage the thread during the driving. Ensure that bolt heads and nuts rest squarely against the metal. Where structural members have sloping flange faces, provide approved beveled washers at the bolted connections to afford square seating for bolt heads or nuts. Nick bolt threads for unfinished bolts to prevent the nuts from backing off. Use an approved calibrated manual or power torque wrench to obtain the proper torque and tension as recommended by the bolt manufacturer for all A 325 bolts.

B. 3.04

TOUCH-UP A. B. Touch-up all welds, burned areas, scratches, abrasions, on galvanized metals, using specified liquid zinc coating. Touch-up all welds, scratches, abrasions, and other surface damaged on shop-primed or painted metals, using the same coatings as specified under shop applied finishes, herein above.

3.05

SCHEDULES A. General: Items listed hereinbelow provide further description of those already indicated in the Drawings. This list does not represent a complete list of miscellaneous metal components or types required to complete the Work. 1. Carefully review all Drawings and furnish and install metal fabrications required by the various trades, whether or not specifically listed herein, such as miscellaneous clip angles, miscellaneous steel bracketing, and other miscellaneous metal items as indicated on the Drawings, reasonably implied therefrom, or reasonably necessary for the thorough completion of the work.

B.

Steel pan stair and related support components, as detailed on the Drawings and specified herein above.
05500-8 11 March 2013

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C.

Steel stair and related support components: 1. 2. 3. 4. Stair treads and landing: Cold-formed steel plate, 1.9 mm (14 gage). Risers: 1.5 mm (16 gage) steel plate. Channel stringer: 300 mm (12 inch) width of size to meet engineering requirements. Handrails, stiffeners, clip angles and other structural components, of size and as required to meet engineering and code requirements specified herein above.

D. E.

Interior railings, as detailed on the Drawings. Connections and sizing to conform to engineering and code requirements specified herein above. Exterior handrails: 50 mm (1-1/2) inch (O.D.) stainless steel pipe as detailed on the Drawings. Where fabricated assemblies are not indicated to be stainless steel, they shall be hot-dipped galvanized. 1. Pipe railings: To prevent unnecessary damage to the galvanized coating by field welding, provide slip-fit method of connecting pipe railings. Fabricate pipe railing from mechanical steel tubing internally vented with holes 3/4 the size of the pipe's internal diameter.

F.

Elevator pit ladders: Stringers 9 mm (3/8-inch) by 38 mm (1-1/2 inch) flat bar, rungs 16 mm (5/8 inch) diameter solid steel rods. Offset ladder from wall surface by 180 mm (7 inches) to centerline of rungs, with brackets. 1. 2. Fabricate ladders in accordance with OSHA requirements, and ANSI A14.3 standards. Hot dip galvanized finish assembled elevator pit ladders.

G. H. I.

Loading dock edge: 4 by 4 by 3/8 inch hot-dipped galvanized steel angle, for entire length of loading dock, with welded studs, for placement by Section 03300 - Cast-in-Place Concrete. Elevator sill support angles: 100 mm by 100 mm (4 by 4 inch) by 9 mm (3/8 inch) thick, shop primed. Lintels: As scheduled on Structural Drawings. 1. 2. Provide lintels 300 mm (12 inches) longer than masonry openings. Where lintel abuts column, provide structural clip connection. Lintels occurring in exterior walls shall be galvanized in conformance with the requirements of ASTM A 143, and ASTM A 123.

J.

Overhead Support system: Provide Unistrut type system, Unistrut Corp, Wayne MI, 001-734-721-4040. meeting the following requirements in configuration shown on Drawings. 1. 2. 3. 4. 5. Material: 2.7 mm (12 gage) cold formed low carbon steel. Finish: electrostatically applied, rust-inhibiting, baked-on, acrylic enamel paint. Size: 40 mm x 40 mm (1-5/8" x 1-5/8") Series P1000 H3 with perforations at 50 mm (2") on center. nominal. Fasteners: P1047 and as required for configurations shown. Accessories: Paintable PVC closure strip P1184 PVC for exposed channels. END OF SECTION

METAL FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05500-9 11 March 2013

SECTION 05501 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION A. B. Drawings and general provisions of the Contract, including Contract General Conditions and Special Conditions apply to the Work of this Section. Work Included: 1. Rough hardware. 2. Ladders. 3. Shelf and relieving angles. 4. Miscellaneous steel framing. Manufacturer/Fabricator Location: International/Local Installer/Erector Location: Local

C. D. 1.02

QUALITY ASSURANCE A. Fabricator/Installer: A firm specializing in miscellaneous metal work similar to that indicated for this project for a minimum of 5 years and with sufficient production capacity to produce required units without causing delay to the Work.

1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. AWS D1.1 "Structural Welding Code". 2. AWS D1.2 "Structural Welding Code -Sheet Steel" 3. D1.2 Structural Welding Code Aluminum 5. NAAMM "Pipe Railing Manual". 6. NAAMM "Metal Stairs Manual". 7. SSPC "Steel Structures Painting Manual, Volume 2, Systems and Specifications". 8. Industrial Fasteners Institute "Fastener Standards Book".

1.04

SUBMITTALS A. Shop Drawings: Submit shop drawings detailing fabrication and erection of each miscellaneous metal item, including dimensioned plans and elevations, details of sections, connections, anchorage and accessory items. Setting Drawings: Provide setting drawings and templates for the location of miscellaneous metal items that are to be embedded in or anchored to concrete or masonry.

B.

PART 2 - PRODUCTS 2.01 FERROUS METALS A. Metal Surfaces, General: For metal fabrications exposed to view upon completion of the Work, provide materials selected for their surface flatness, smoothness, and freedom from surface blemishes. Do not use materials whose exposed surfaces exhibit pitting, seam marks, roller marks, rolled trade names, roughness,
05501-1 11 March 2013

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

and, for steel sheet, variations in flatness exceeding those permitted by reference standards for stretcher-leveled sheet. B. C. D. E. F. G. H. I. Steel Plates, Shapes and Bars: ASTM A36. Steel Tubing: ASTM A501; hot-formed, welded or seamless process. For exterior use and other locations noted, provide hot-dip galvanized tubing in accordance with ASTM A53. Steel Bars and Bar Size Shapes: ASTM A675, Grade 65, or ASTM A36. Gray Iron Castings: ASTM A48, Class 30. Malleable Iron Castings: ASTM A47, grade 32510. Ductile Iron Castings: ASTM A536, grade as selected by fabricator. Brackets, Flanges and Anchors: Cast or formed metal of the same type material and finish as supported rails, unless otherwise indicated. Concrete Inserts: Threaded or wedge type; galvanized ferrous castings, either malleable iron, ASTM A 47, or cast steel, ASTM A 27. Provide bolts, washers, and shims as required, hot-dip galvanized per ASTM A 153. Steel Pipe: ASTM A53, Type S, Grade A, suitable for close coiling, black finish unless galvanizing is required; standard weight (Schedule 40), unless otherwise indicated or required to satisfy performance criteria.

J.

2.02

MISCELLANEOUS MATERIALS A. Welding Electrodes and Filler Metal: Type and alloy of filler metal and electrode recommended by producer of metal to be welded, complying with applicable AWS specifications, and as required for color match, strength and compatibility in the fabricated items. Anchors and Inserts: Provide anchors of type, size, and material required for type of loading and installation condition shown, as recommended by manufacturer, unless otherwise indicated. Use nonferrous metal or hot-dipped galvanized anchors and inserts for exterior locations and elsewhere as required for corrosion resistance. Use toothed steel or expansion bolt devices for drilled-in-place anchors.

B.

2.03

GROUT AND ANCHORING CEMENT A. Non-shrink Non-metallic Grout: Premixed, factory-packaged, non-staining, non-corrosive non-gaseous grout specifically recommended by manufacturer for exterior applications of the types specified in this Section:

2.04

FASTENERS A. Fasteners and Anchorage Devices: Provide fasteners complying with the requirements of Industrial Fasteners Institute standards. Type, grade, class and style best suited for the respective purpose. Use countersunk flat-head Phillips type machine screws for exposed fasteners, except where Allen head screws are required. Use galvanized steel or stainless steel fasteners for exterior construction and for fastening components fabricated of galvanized steel. 1. Bolts and Nuts: Regular hexagon head type 2. Lag Bolts: Square head type 3. Machine Screws: Cadmium plated steel. 4. Plain Washers: Round, carbon steel. 5. Toggle Bolts: Tumble-wing type. 6 Lock Washers: Helical spring type carbon steel.

2.05

GALVANIZING AND PAINT


05501-2 11 March 2013

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Galvanizing 1. ASTM A153, Classes A and B, for galvanizing iron and steel hardware. 2. ASTM A123, for galvanizing rolled, pressed and forged steel shapes, plates, bars, strip 3mm thick and heavier and for assembled steel products. Paint: 1. 2. Provide primer and finish paint supplied by a single manufacturer for the entire project. Refer to Section 05120 for paint specifications.

B.

2.06

FABRICATION, GENERAL A. Temperature Change: To prevent buckling, opening up of joints, and overstressing of welds and fasteners, design, fabricate and install exterior components to provide for expansion and contraction over an ambient temperature range of 49 deg. C. and a surface temperature range of 100 deg. C. without buckling, undue stress on members or anchors, and other detrimental effects. Shear and punch metals cleanly and accurately. Remove burrs. Form exposed work true to line and level with accurate angles, smooth surfaces and straight sharp edges. Ease exposed edges to a radius of approximately 0.75 mm, unless otherwise indicated. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work. Weld corners and seams continuously. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. Obtain fusion without undercut or overlap. Remove welding flux immediately. At exposed connections, finish exposed welds and surfaces smooth and blended so that no roughness shows, and contours of welded surfaces match those adjacent. Locate exposed connections where least conspicuous, with hairline joints, flush and smooth, and with threaded connections tight so that threads are concealed. Using concealed fasteners wherever possible. Where exposed, use fasteners of type indicated or, if not indicated, Phillips flat-head countersunk screws or bolts. Shoulder and head, dowel and pin abutting bars. Machine, fit and secure removable members with Allen-head set screws. Provide for anchorage of type indicated; coordinate with supporting structure. Fabricate and space anchoring devices to provide adequate support for intended use. Shop Assembly: Preassemble items in shop to greatest extent possible to minimize field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation. Cut, reinforce, drill and tap miscellaneous metal work as indicated to receive finish hardware, screws, and similar items. Make joints as strong and rigid as adjoining sections. Make welds continuous along entire line of contact, except where spot welding is indicated. Welded connections may be used where bolted connections are shown. Fabricate joints that will be exposed to weather in a manner to exclude water, or provide weep holes where water may accumulate. Verify measurements and dimensions at the job site and cooperate in the coordination and scheduling of the work of this Section with the work of related trades (with particular attention given to the installation of items embedded in concrete and masonry). Galvanize all exterior ferrous metal and all items embedded in concrete, unless otherwise specified. Galvanize all other items where specified or shown.

B. C. D. E.

F.

G. H.

I. J.

K.

L. 2.07

SHOP PAINTING
05501-3 11 March 2013

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B. C. D.

Shop paint metal fabrication work, except members or portions of members to be embedded in concrete or masonry, surfaces and edges to be field welded and stainless steel, unless otherwise specified. Remove oil, grease and other contaminants in prior to any additional surface preparation specified. Clean and prepare metal surfaces before applying shop coat. Remove rust and mill scale in accordance with SSPC SP-3 "Power Tool Cleaning". Immediately after surface preparation, apply primer in accordance with manufacturer's instructions or as specified in section 05120. Use painting methods which will result in full coverage and dry film thickness specified. Apply one shop coat of primer to fabricated metal items, except apply 2 coats of primer to surfaces inaccessible after assembly or erection. In addition, apply one shop coat of finish paint to entire surfaces of exterior loose lintels, shelf and relieving angles, dunnage and other items as noted or specified. Change color of second or finish coat to distinguish it from the first coat. Separate dissimilar metals with one coat of dielectric separator. Do not extend coating onto exposed or finished surfaces.

E.

F. 2.08

ROUGH HARDWARE A. Furnish bent or otherwise custom fabricated bolts, plates, anchors, hangers, dowels, and other miscellaneous steel and iron shapes as required for framing and supporting woodwork, and for anchoring or securing woodwork to concrete or other structures. Straight bolts and other stock rough hardware items are specified in Division 6 sections. Fabricate items to sizes, shapes, and dimensions required. Furnish malleable-iron washers for heads and nuts which bear on wood structural connections; elsewhere, furnish steel washers.

B. 2.09

FABRICATION, SPECIFIC ITEMS A. Steel Ladders: The Contractor shall fabricate ladders for the locations shown on the drawings, with dimensions, spacings, details and anchorages as indicated. The Contractor shall provide hot dipped galvanized steel ladders as shown on the drawings, complete with supporting brackets, stringers and rungs. 1. Extend side rails above top rung as shown on the drawings on the drawings, and return rails to wall or structure unless other secure handholds are provided. If the adjacent structure does not extend above the top rung, goose-neck the extended rails back to the structure to provide secure ladder access. The Contractor shall provide non-slip surface on top of each rung, either by coating the rung with aluminum oxide granules set in epoxy resin adhesive, or by using a type of manufactured rung which is filled with aluminum oxide grout. Hot dip galvanize ladders.

2.

3. B.

Open Riser Stairs: The Contractor shall provide open riser steel stairs as shown on the drawings, The Contractor shall provide steel stringers, supporting brackets, toe guards, carrying angles, treads, platforms and railings. Comply with requirements specified hereinafter for railings. The Contractor shall provide bracing of steel framing as required to sustain torsional loads applied by hanging stairs from the framing. Steel treads shall be light duty welded plain surfaced steel with an abrasive coated steel nosing. Structural Steel Door Frames for Overhead Coiling Doors: Fabricate steel door frames from structural shapes and bars of size and to dimensions indicated, fully welded together, with steel bar stops, unless otherwise indicated. Weld built-up members and continuously weld exposed joints. Secure removable stops to frame with countersunk machine screws, uniformly spaced at not more than 254 mm on center. Reinforce frames and drill and tap as required to accept finish hardware. The Contractor shall provide steel strap anchors for securing door frames into adjoining concrete or masonry. Weld anchors to frame jambs Extend
05501-4 11 March 2013

C.

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D.

bottom of frames to floor elevation indicated with steel angle clips welded to frames for anchoring frame to floor with expansion shields and bolts. Galvanize all steel door frames and anchors for overhead coiling doors and grilles. Metal Bar Gratings The Contractor shall provide gratings, including supplementary framing and supports. The Contractor shall provide gratings of electro-pressure welded type construction, rectangular pattern accurately fabricated free from warps, twists or other defects affecting their serviceability or appearance. Fabricate gratings from hot rolled carbon steel sheet and strip and structural steel bars. The Contractor shall provide saddle clip fasteners as required to fasten gratings to each steel support. Steel Finish: Hot-dip galvanized with a coating weight of not less than 50.94 gram per .0929 m2 of coated surface. Catwalks: The Contractor shall provide hot dipped galvanized steel catwalks complete with gratings, toe guards, railings, steel framing, bracing and support members. Comply with requirements specified for railings. Hot-dip galvanized with a coating weight of not less than 50.94 gram per .0929 m2 of coated surface. Steel Pipe Railings, Handrails and Guardrails: Fabricate pipe railings and handrails to comply with requirements indicated for design, dimensions, details, finish, and member sizes, including wall thickness of pipe, post spacings, and anchorage, but not less than that required to support structural loads. 1. Interconnect railing and handrail members by butt-welding or welding with internal connectors, at fabricator's option, unless otherwise indicated. At tee and cross intersections, notch ends of intersecting members to fit contour of pipe to which end is joined and weld all around. Form changes in direction of railing members by bending. Form simple and compound curves by bending pipe in jigs to produce uniform curvature for each repetitive configuration required; maintain cylindrical cross-section of pipe throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of pipe. The Contractor shall provide expansion joints at intervals not to exceed 12m unless otherwise shown on the drawings. The Contractor shall provide slip joints with internal sleeves extending 50mm minimum beyond joint each side. Fasten internal sleeve securely to one side without exposed fasteners. Locate joints within 150mm of posts as shown on the drawings. If required to accommodate expansion and contraction, provide pressure relief holes at bottom ends of pipe in concealed locations. The Contractor shall provide wall returns at ends of wall-mounted handrails, unless otherwise indicated. Close exposed ends of pipe by welding 5 mm thick steel plate in place or by use of prefabricated fittings, except where clearance of end of pipe and adjoining wall surface is 6 mm or less. Brackets, Flanges, Fittings, and Anchors: The Contractor shall provide wall brackets, end closures, flanges, miscellaneous fittings, and anchors for interconnections of pipe and attachment of railings and handrails to other work. Furnish inserts and other anchorage devices for connecting railings and handrails to concrete or masonry work. For railing posts set in concrete fabricate sleeves from steel pipe not less than 150 mm long and with an inside diameter not less than 13 mm greater than the outside diameter of post, with steel plate closure welded to bottom of sleeve. The Contractor shall provide friction fit, removable covers designed to keep sleeves clean and hold top edge of sleeve 13 mm below finished surface of concrete. For removable railing posts, fabricate slip-fit sockets from steel pipe whose inside diameter is sized for a close fit with posts and to limit deflection of post without lateral load, measured at top, to not more than 1/12 of post height. The Contractor shall provide socket covers designed and fabricated to resist accidental dislodgment. Fillers: The Contractor shall provide steel sheet or plate fillers of thickness and size indicated or required to support structural loads of handrails where needed to transfer wall bracket loads through wall finishes to structural supports. Size fillers to suit wall finish thicknesses. Size fillers to produce adequate bearing to prevent bracket rotation and overstressing of substrate. For steel railings and handrails formed from steel pipe with hot dipped galvanized finish, galvanize fittings, brackets, fasteners, sleeves, and other ferrous components. Hot-dip galvanized with a
05501-5 11 March 2013

E.

F.

2.

3.

4. 5. 6.

7.

8.

9.

10.

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

coating weight of not less than 50.94 gram per .0929 m2 of coated surface. G. Corner Guards: The Contractor shall provide hot dip galvanized steel angle corner guards of size as shown on the drawings, with anchors welded to backs of angles at 600 mm centers with a minimum of three (3) anchors per unit. Edge Angles: The Contractor shall provide hot dip galvanized steel edge angles of size as shown on the drawings, with welded-on strap anchors 600 mm on centers. The Contractor shall provide angles in as long lengths as possible. Miter and weld corners and provide splice plates for alignment between sections. Trench Drain Cover System: Trench drain assemblies, gratings and frames fabricated from heavy duty hot dip galvanized ductile iron castings or hot dip galvanized gray iron castings designed for vehicular loads, of size as shown on the drawings. Provide units with continuous machined surfaces, integral anchors, outlet pipes, end closures, bolts, and machined joints. Miscellaneous Framing and Supports: The Contractor shall provide steel framing and supports for applications indicated or which are not a part of structural steel framework, as required to complete work. Fabricate units to sizes, shapes, and profiles indicated and required to receive adjacent other construction retained by framing and supports. Fabricate from structural steel shapes, plates, and steel bars of welded construction using mitered joints for field connection. Cut, drill, and tap units to receive hardware, hangers, and similar items. Equip units with integrally welded anchors for casting into concrete or building into masonry. Furnish inserts if units must be installed after concrete is placed. Except as otherwise indicated, space anchors 600 mm on center and the Contractor shall provide minimum anchor units in the form of steel straps 32mm wide x 6mm thick x 200mm long. Galvanize miscellaneous framing and supports in exterior locations and as noted on the drawings. Miscellaneous Steel Trim: The Contractor shall provide shapes and sizes indicated for profiles shown on the drawings. Unless otherwise indicated, fabricate units from structural steel shapes, plates, and steel bars, with continuously welded joints and smooth exposed edges. Use concealed field splices wherever possible. The Contractor shall provide cutouts, fittings, and anchorages as required for coordination of assembly and installation with other work. Galvanize miscellaneous steel trim.

H.

I.

J.

K.

PART 3 - EXECUTION 3.01 ERECTION A. Accurately set all work to established lines and elevations, and rigidly fasten in place with suitable attachments to the construction of the building. At the completion of the work, check all work, re-adjust as required, and leave in perfect condition. Grind all exposed to view welds smooth to the touch. Construct and install stairs in strict accordance with the details, the approved shop drawings, and requirements of all codes, laws, and ordinances bearing on the work. 1. Pipe rails set in exposed concrete surfaces shall be grouted with expanding grout. Hole to receive pipe shall be formed with galvanized sheet metal sleeve and provide at least 12 mm (1/2 inch) clearance around entire perimeter. Hold expanding grout back 12 mm (1/2 inch) from finish surface and fill void with Portland cement grout to match color and texture of adjacent surface.

B.

3.02

FIELD WELDING A. B. Field weld components indicated on Shop Drawings in accordance with AWS D1.1. Immediately after welding, touch-up welds, burned areas and damaged surface coatings. 1. Thoroughly remove all spatter by power wire-brushing (or if inaccessible, wire brushing) per SSPC, surface preparation specification SP2 or SP3. Allow surface to cool to ambient temperature. Clean surface with solvent wipe to remove oils, grease and dirt in accordance with SSPC surface preparation specification SP1.
05501-6 11 March 2013

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.

Apply one coat of liquid zinc to attain a minimum of 1.5 mils dry film thickness. Coating should extend at least two inches beyond either side of weldment to ensure complete coverage of welded area.

3.03

FIELD BOLTING A. Accurately drive all bolts into holes, protecting the bolt heads so as not to damage the thread during the driving. Ensure that bolt heads and nuts rest squarely against the metal. Where structural members have sloping flange faces, provide approved beveled washers at the bolted connections to afford square seating for bolt heads or nuts. Nick bolt threads for unfinished bolts to prevent the nuts from backing off. Use an approved calibrated manual or power torque wrench to obtain the proper torque and tension as recommended by the bolt manufacturer for all A 325 bolts.

B. 3.04

TOUCH-UP A. B. Touch-up all welds, burned areas, scratches, abrasions, on galvanized metals, using specified liquid zinc coating. Touch-up all welds, scratches, abrasions, and other surface damaged on shop-primed or painted metals, using the same coatings as specified under shop applied finishes, herein above.

3.05

SCHEDULES A. General: Items listed below provide further description of those already indicated in the Drawings. This list does not represent a complete list of miscellaneous metal components or types required to complete the Work. 1. Carefully review all Drawings and furnish and install metal fabrications required by the various trades, whether or not specifically listed herein, such as miscellaneous clip angles, miscellaneous steel bracketing, and other miscellaneous metal items as indicated on the Drawings, reasonably implied therefrom, or reasonably necessary for the thorough completion of the work. Steel pan stair and related support components, as detailed on the Drawings and specified herein above. Steel stair and related support components: 1. Stair treads and landing: Cold-formed steel plate, 1.9 mm (14 gage). 2. Risers: 1.5 mm (16 gage) steel plate. 3. Channel stringer: 300 mm (12 inch) width of size to meet engineering requirements. 4. Handrails, stiffeners, clip angles and other structural components, of size and as required to meet engineering and code requirements specified herein above. Interior railings, as detailed on the Drawings. Connections and sizing to conform to engineering and code requirements specified herein above. 1. Stainless steel cable system at Lobby Stairs: Handrails shall be 5 mm (3/16 inch) vinyl coated stainless steel, complete with adjustable and non-adjustable termination studs and turnbuckles, swage terminals, toggle jaws, threaded studs, and other fittings required for complete installation. Jobsite installation shall be performed using Nicropress hand swaging tool used to apply a series of crimps to secure the cable to the fittings. Exterior handrails: 38 mm (1 inch) internal diameter steel pipe as detailed on the Drawings. Where fabricated assemblies are not indicated to be stainless steel, they shall be hot-dipped galvanized. 1. Pipe railings: To prevent unnecessary damage to the galvanized coating by field welding, provide slip-fit method of connecting pipe railings. Fabricate pipe railing from mechanical steel tubing internally vented with holes 3/4 the size of the pipe's internal diameter.

B. C.

D.

E.

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05501-7 11 March 2013

F.

Elevator pit ladders: Stringers 9 mm (3/8-inch) by 38 mm (1-1/2 inch) flat bar, rungs 16 mm (5/8 inch) diameter solid steel rods. Offset ladder from wall surface by 180 mm (7 inches) to centerline of rungs, with brackets. 1. Fabricate ladders in accordance with OSHA requirements, and ANSI A14.3 standards. 2. Hot dip galvanized finish assembled elevator pit ladders. Floor mat frame at Entrances (having stone flooring surround): 12 mm (1/2 inch) high (upturned edge) by minimum 25 mm (1 inch) (bottom edge) by 3 mm (1/8 inch) thick stainless steel with US 32D finish. 1. Fabricate frame to be straight, level and square. Provide frame pieces in longest available lengths to minimize joints. Form corners with tightly mitered joints or use prefabricated joint-less corners. 2. Shop fabricate framework to the greatest extent possible. Loading dock edge: 4 by 4 by 3/8 inch hot-dipped galvanized steel angle, for entire length of loading dock, with welded studs, for placement by Section 03300 - Cast-in-Place Concrete. Elevator sill support angles: 100 mm by 100 mm (4 by 4 inch) by 9 mm (3/8 inch) thick, shop primed. Lintels: As scheduled on Structural Drawings. 1. Provide lintels 300 mm (12 inches) longer than masonry openings. Where lintel abuts column, provide structural clip connection. 2. Lintels occurring in exterior walls shall be galvanized in conformance with the requirements of ASTM A 143, and ASTM A 123. Overhead Support system: Provide Unistrut type system, Unistrut Corp, Wayne MI, 001-734-721-4040. meeting the following requirements in configuration shown on Drawings. 1. Material: 2.7 mm (12 gage) cold formed low carbon steel. 2. Finish: electrostatically applied, rust-inhibiting, baked-on, acrylic enamel paint. 3. Size: 40 mm x 40 mm (1-5/8" x 1-5/8") Series P1000 H3 with perforations at 50 mm (2 inches) on center. nominal. 4. Fasteners: P1047 and as required for configurations shown. 5. Accessories: Paintable PVC closure strip P1184 PVC for exposed channels. Ventilation stacks : Fabricate as detailed on the Drawings of thickness sufficient to prevent distortion, buckling, or oil-canning. Security grate stainless steel fabrications: Fabricate as detailed on the Drawings.

G.

H. I. J.

K.

L. M.

END OF SECTION

MISCELLANEOUS METAL WORKS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05501-8 11 March 2013

SECTION 05521 PIPE AND TUBE RAILINGS


PART 1 - GENERAL

1.1 A.

RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. This Section includes the following: 1. B. Steel pipe and tube railings.

1.2

Related Sections include the following: 1. 2. 3. 4. Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs. Division 5 Section "Ornamental Railings" for ornamental railings fabricated from pipes and tubes. Division 6 Section "Rough Carpentry " for wood blocking for anchoring railings. Division 9 Section " Gypsum Board Assemblies and Gypsum Board Shaft-Wall Assemblies" for metal backing for anchoring railings.

1.3 A.

SUBMITTALS Product Data: For the following: 1. 2. B. C. D. Manufacturer's product lines of mechanically connected railings. Grout, anchoring cement, and paint products.

Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. Samples for Initial Selection: For products involving selection of color, texture, or design. Samples for Verification: For each type of exposed finish required. 1. 2. Sections of each distinctly different linear railing member, including handrails, top rails, posts, and balusters. Fittings and brackets.

E. F. 1.4 A. B.

Welding certificates. Qualification Data: For professional engineer. QUALITY ASSURANCE Source Limitations: Obtain each type of railing through one source from a single manufacturer. Welding: Qualify procedures and personnel according to the following: 1. AWS D1.1, "Structural Welding Code--Steel."

1.5 A.

PROJECT CONDITIONS Field Measurements: Verify actual locations of walls and other construction contiguous with railings by field measurements before fabrication and indicate measurements on Shop Drawings.
05521-1 11 March 2013

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2. 1.6 A.

Established Dimensions: Where field measurements cannot be made without delaying the Work, establish dimensions and proceed with fabricating railings without field measurements. Coordinate wall and other contiguous construction to ensure that actual dimensions correspond to established dimensions. Provide allowance for trimming and fitting at site.

COORDINATION AND SCHEDULING Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy structural performance requirements.

B.

PART 2 - PRODUCTS

2.1 A.

MANUFACTURERS Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Steel Pipe and Tube Railings: Local supplier as accepted by the engineer. .

2.2 A. B.

METALS, GENERAL Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails, unless otherwise indicated. STEEL AND IRON A. B. Tubing: ASTM A 500 (cold formed). Pipe: ASTM A 53/A 53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads. 1. Provide Mild steel with weather proof epoxy coating finish for exterior installations and where indicated. Plates, Shapes, and Bars: ASTM A 36/A 36M. Castings: Either gray or malleable iron, unless otherwise indicated. 1. 2. E. Gray Iron: ASTM A 48/A 48M, Class 30, unless another class is indicated or required by structural loads. Malleable Iron: ASTM A 47/A 47M.

2.3

C. D.

Expanded Metal: ASTM F 1267, Type I (expanded), Class 1 (uncoated). 1. Style Designation: 3/4 number 13.

F.

Woven-Wire Mesh: Intermediate-crimp, diamond pattern, 50-mm woven-wire mesh, made from 3.5-mm nominal diameter wire complying with ASTM A 510M. FASTENERS
05521-2 11 March 2013

2.4

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

General: Provide the following: 1. Steel Railings: Plated steel fasteners complying with ASTM B 633, Class Fe/Zn 25 for electrodeposited zinc coating.

B. C.

Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated. Fasteners for Interconnecting Railing Components: 1. 2. 3. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless otherwise indicated. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless exposed fasteners are unavoidable or are the standard fastening method for railings indicated. Provide Phillips flat-head machine screws for exposed fasteners, unless otherwise indicated.

D.

Anchors: Provide cast-in-place, chemical or torque-controlled expansion anchors, fabricated from corrosionresistant materials with capability to sustain, without failure, a load equal to six times the load imposed when installed in unit masonry and equal to four times the load imposed when installed in concrete, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency. MISCELLANEOUS MATERIALS

2.5 A. B. C.

Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded. Shop Primers: Provide primers that comply with Division 9 painting Sections. Zinc-Rich Primer: Complying with SSPC-Paint 20 or SSPC-Paint 29 and compatible with topcoat. 1. 2. 3. Use primer with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24). Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: Products: Subject to compliance with requirements, provide one of the following: a. b. c. d. e. f. g. Benjamin Moore & Co.; Epoxy Zinc-Rich Primer CM18/19. Carboline Company; Carbozinc 621. ICI Devoe Coatings; Catha-Coat 313. International Coatings Limited; Interzinc 315 Epoxy Zinc-Rich Primer. PPG Architectural Finishes, Inc.; Aquapon Zinc-Rich Primer 97-670. Sherwin-Williams Company (The); Corothane I GalvaPac Zinc Primer. Tnemec Company, Inc.; Tneme-Zinc 90-97.

D. E. F. G.

Shop Primer for Steel: Zinc-dust, zinc-oxide primer formulated for priming zinc-coated steel and for compatibility with finish paint systems indicated, and complying with SSPC-Paint 5. Galvanizing Repair Paint: High-zinc-dust-content paint for re-galvanizing welds in steel, complying with SSPCPaint 20. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187. Nonshrink, Nonmetallic Grout: Factory-packaged, non-staining, non-corrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior and exterior applications. FABRICATION

2.6 A.

General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage.

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05521-3 11 March 2013

B.

Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1 mm, unless otherwise indicated. Remove sharp or rough areas on exposed surfaces. Form work true to line and level with accurate angles and surfaces. Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items. Connections: Fabricate railings with either welded or nonwelded connections, unless otherwise indicated. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings. 1. 2. 3. 4. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. Obtain fusion without undercut or overlap. Remove flux immediately. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces. Fabricate

C. D. E. F. G. H.

I.

Nonwelded Connections: Connect members with concealed mechanical fasteners and fittings. members and fittings to produce flush, smooth, rigid, hairline joints. 1.

Fabricate splice joints for field connection using an epoxy structural adhesive if this is manufacturer's standard splicing method.

J.

Form changes in direction as follows: 1. As detailed.

K.

Form simple and compound curves by bending members in jigs to produce uniform curvature for each repetitive configuration required; maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components. Close exposed ends of railing members with prefabricated end fittings. Provide wall returns at ends of wall-mounted handrails, unless otherwise indicated. Close ends of returns unless clearance between end of rail and wall is 6 mm or less. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work, unless otherwise indicated. 1. At brackets and fittings fastened to plaster or gypsum board partitions, provide fillers made from crushresistant material, or other means to transfer wall loads through wall finishes to structural supports and prevent bracket or fitting rotation and crushing of substrate.

L. M. N.

O.

Provide inserts and other anchorage devices for connecting railings to concrete or masonry work. Fabricate anchorage devices capable of withstanding loads imposed by railings. Coordinate anchorage devices with supporting structure. For railing posts set in concrete, provide steel sleeves not less than 150 mm long with inside dimensions not less than 13 mm greater than outside dimensions of post, with steel plate forming bottom closure. Woven-Wire Mesh Infill Panels: Fabricate infill panels from woven-wire mesh crimped into 25-by-13-by-3-mm metal channel frames. Make wire mesh and frames from same metal as railings in which they are installed.
05521-4 11 March 2013

P. Q.

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2.7 A. B. 2.8 A.

Orient wire mesh with diamonds vertical.

FINISHES, GENERAL Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. Provide exposed fasteners with finish matching appearance, including color and texture, of railings. STEEL AND IRON FINISHES Galvanized Railings: 1. 2. 3. 4. B. C. D. E. F. Hot-dip galvanize exterior steel and iron railings, including hardware, after fabrication. Hot-dip galvanize indicated steel and iron railings, including hardware, after fabrication. Comply with ASTM A 123/A 123M for hot-dip galvanized railings. Comply with ASTM A 153/A 153M for hot-dip galvanized hardware.

Fill vent and drain holes that will be exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and other ferrous components. For nongalvanized steel railings, provide nongalvanized ferrous-metal fittings, brackets, fasteners, and sleeves, except galvanize anchors to be embedded in exterior concrete or masonry. Preparation for Shop Priming: After galvanizing, thoroughly clean railings of grease, dirt, oil, flux, and other foreign matter, and treat with metallic-phosphate process. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with minimum requirements indicated below for SSPC surface preparation specifications and environmental exposure conditions of installed railings: 1. 2. Exterior Railings (SSPC Zone 1B): SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning." Interior Railings (SSPC Zone 1A): SSPC-SP 7/NACE No. 4, "Brush-off Blast Cleaning."

G.

Apply shop primer to prepared surfaces of railings, unless otherwise indicated. Comply with requirements in SSPC-PA 1, "Paint Application Specification No. 1: Shop, Field, and Maintenance Painting of Steel," for shop painting. Primer need not be applied to surfaces to be embedded in concrete or masonry. 1. 2. Do not apply primer to galvanized surfaces. Stripe paint corners, crevices, bolts, welds, and sharp edges.

PART 3 - EXECUTION

3.1 A.

EXAMINATION Examine plaster and gypsum board assemblies, where reinforced to receive anchors, to verify that locations of concealed reinforcements have been clearly marked for Installer. Locate reinforcements and mark locations if not already done. INSTALLATION, GENERAL A. B. Fit exposed connections together to form tight, hairline joints. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack.
05521-5 11 March 2013

3.2

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2. 3. C. D.

Do not weld, cut, or abrade surfaces of railing components that have been coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting. Set posts plumb within a tolerance of 2 mm in 1 m. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 5 mm in 3 m.

Adjust railings before anchoring to ensure matching alignment at abutting joints. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction. RAILING CONNECTIONS

3.3 A.

Nonwelded Connections: Use mechanical or adhesive joints for permanently connecting railing components. Use wood blocks and padding to prevent damage to railing members and fittings. Seal recessed holes of exposed locking screws using plastic cement filler colored to match finish of railings. Welded Connections: Use fully welded joints for permanently connecting railing components. Comply with requirements for welded connections in Part 2 "Fabrication" Article whether welding is performed in the shop or in the field. Expansion Joints: Install expansion joints at locations indicated but not farther apart than required to accommodate thermal movement. Provide slip-joint internal sleeve extending 50 mm beyond joint on either side, fasten internal sleeve securely to 1 side, and locate joint within 150 mm of post. ANCHORING POSTS

B.

C.

3.4 A.

Use steel pipe sleeves preset and anchored into concrete for installing posts. After posts have been inserted into sleeves, fill annular space between post and sleeve with nonshrink, nonmetallic grout, mixed and placed to comply with anchoring material manufacturer's written instructions. Form or core-drill holes not less than 125 mm deep and 20 mm larger than OD of post for installing posts in concrete. Clean holes of loose material, insert posts, and fill annular space between post and concrete with nonshrink, nonmetallic grout, mixed and placed to comply with anchoring material manufacturer's written instructions. Cover anchorage joint with flange of same metal as post, welded to post after placing anchoring material. Leave anchorage joint exposed; wipe off surplus anchoring material; and leave 3-mm buildup, sloped away from post. ANCHORING RAILING ENDS

B.

C. D.

3.5 A.

Anchor railing ends to concrete and masonry with round flanges connected to railing ends and anchored to wall construction with anchors and bolts. ATTACHING HANDRAILS TO WALLS

3.6 A.

Attach handrails to wall with wall brackets. Provide brackets with 38-mm clearance from inside face of handrail and finished wall surface. 1. 2. Use type of bracket with flange tapped for concealed anchorage to threaded hanger bolt. Use type of bracket with predrilled hole for exposed bolt anchorage.

B. C.

Locate brackets as indicated or, if not indicated, at spacing required to support structural loads. Secure wall brackets to building construction as follows:
05521-6 11 March 2013

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2.

For concrete and solid masonry anchorage, use drilled-in expansion shields and hanger or lag bolts. For steel-framed gypsum board partitions, fasten brackets directly to steel framing or concealed steel reinforcements using self-tapping screws of size and type required to support structural loads.

3.7 A.

ADJUSTING AND CLEANING Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint are specified in Division 9 painting Sections. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780. PROTECTION A. B. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion. Restore finishes damaged during installation and construction period so no evidence remains of correction work. Return items that cannot be refinished in the field to the shop; make required alterations and refinish entire unit, or provide new units. END OF SECTION

B. C.

3.8

PIPE AND TUBE RAILINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05521-7 11 March 2013

SECTION 05530 GRATINGS PART 1 - GENERAL 1.01 SUMMARY A. B. Section includes formed floor gratings. Related Sections: 1. Section 03300 Cast-In-Place - Concrete Framed concrete opening. 2. Section 05500 Miscellaneous Metal Work. 3. Section 09900 - Paints and Coatings: Field paint finish.

. 1.02 PERFORMANCE REQUIREMENTS A. B. C. 1.03 Design Live Pedestrian Load: Uniform load of 4.7 kPa minimum; concentrated load of force 1330 N. Maximum Allowable Deflection Under Live Load: 1/240 of span; size components for single span. Maximum Spacing Between Bars: To restrict pedestrian shoe heels.

SUBMITTALS A. Shop Drawings: Indicate details of gratings, component supports, anchorage, openings, perimeter construction details, and tolerances. Indicate welded connections using standard AWS A2.0 welding symbols. Indicate net weld lengths. Product Data: Submit span and deflection tables. Samples: Submit two samples, 300 x 300 mm in size illustrating surface finish, colour, and texture. Manufacturer's Installation Instructions: Submit special requirements of opening, perimeter framing, and finishing. Welders' Certificates: Submit under provisions of Section 01300 Administrative requirements certifying welders employed on the Work, verifying AWS qualification within previous 12 months.

B. C. D. E. 1.04

QUALIFICATIONS A. Design gratings under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Kuwait.

1.05

FIELD MEASUREMENTS A. Verify field measurements prior to fabrication.

1.06

COORDINATION A. Co-ordinate Work with placement of frames, tolerances for openings.

PART 2 - PRODUCTS 2.01 GRATINGS AND FLOOR PLATES


05530-1 11 March 2013 GRATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2.

ACO Grating SAB Gratings Approved manufacture by engineer.

2.02

ACCESSORIES A. B. Fasteners and Saddle Clips: stainless steel. Perimeter Closure: Same material as grating.

2.03

FABRICATION A. B. C. D. E. Fabricate grates to sizes indicated in Contract drawing. AR-A-200. Weld joints of intersecting metal sections. Fabricate support framing for openings. Top Surface: Non-slip. Removable Panels: With recessed finger lift rings.

2.04

SHOP FINISHING A. B. Clean surfaces of rust, scale, grease, and foreign matter prior to finishing. Do not prime surfaces in direct contact with concrete or where field welding is required.

C. Prime paint items with two coats. PART 3 - EXECUTION 3.01 EXAMINATION A. B. 3.02 Verify opening sizes and dimensional tolerances are acceptable. Verify anchors are correctly positioned.

INSTALLATION A. B. C. D. E. Place frames in correct position, plumb and level. Mechanically cut primed finish surfaces. Do not flame cut. Set perimeter closure flush with top of grating and surrounding construction. Secure to prevent movement. Install Work in accordance with State of Kuwait Public Works standards.

3.03

ERECTION TOLERANCES A. B. Conform to NAAMM Metal Bar Grating Manual Maximum Space between Adjacent Sections: 10 mm.
05530-2 11 March 2013

GRATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.04

VARIATION A. B. Maximum Variation from Top Surface Plane of Adjacent Sections: 1.5 mm. Clean welds and damaged coatings and apply two coats of touch-up primer.

3.05

SCHEDULES A. As indicated on drawings.

END OF SECTION

GRATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

05530-3 11 March 2013

SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 SECTION INCLUDES A. B. Fire retardant treated plywood backer panels for mounting of electrical panel boards, and other equipment. Various wood blockings, edgings, nailers, curbs, cants, grounds, furring, sheathing, framing members including wood preservative, as required for receipt of various finishes and surfacing materials, not described herein above.

1.02

REFERENCES A. Comply with applicable requirements of the following standards and those others referenced in this Section, under the provisions of Section 01420 - REFERENCES. Where these standards conflict with other specified requirements, the most restrictive requirements shall govern. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. APA - applicable grades and specifications. APA PRB-108 Performance Standards and Policies for Structural-Use Panels.. AWPA Standards and references for preservative treated wood. ASTM D 3201 - Test Method for Hygroscopic Properties of Fire-Retardant Wood. AWPA C-20 - Structural Lumber Fire Retardant Treatment by Pressure Processes. AWPA C-27 - Plywood, Fire Retardant Treatment by Pressure Processes. SPIB Grading Rules, current edition. UL - Building Materials Directory US. Department of Commerce Voluntary Product Standard PS1 for Construction and Industrial US. Department of Commerce Voluntary Product Standard PS2 for Wood-Based Structural-Use Panels. US. Department of Commerce Voluntary Product Standard PS-20 - American Softwood Lumber Standard. U.S. Department of Commerce Simplified Practice Recommendation R-16, for sizes and use classifications of lumber American Lumber Standards Committee, National Lumber Grades Authority for Canadian Lumber, and applicable grading rules and standards of the various lumber associations whose species are being used for grades specified.

1.03

SUBMITTALS A. Submit the following under provisions of Division I GENERAL REQUIREMENTS: 1. Certifications: Written certification from the respective treatment plants indicating types of wood preservative treatment and fire-retardent treatment used, treatments method, applications instructions, and conformance to the requirements specified herein. a. Provide certification that fire retardent treatment materials do not contain ammonium phosphate. b. Provide report from National Evaluation Service Committee on fire retardent treated wood flame spreading, strength, corrosion and hygroscopic properties. c. Provide report from National Evaluation Service Committee on pressure preservative treated wood strength, corrosion, anti-fungi, and anti-insect properties.
06100-1 11 March 2013

ROUGH CARPENTRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.04

QUALITY ASSURANCE A. All lumber shall: 1. 2. 3. B. Be new, dressed four sides (S4S), clear and free from warping and other defects. Have a moisture content not exceeding 19 percent when delivered to the project. Be in accordance with the grading rules of the lumber manufacturer's association under whose jurisdiction the lumber is produced and bear the mark of grade and mill identification.

Plywood: Conform to the requirements of Product Standard PS-1, and bear applicable APA grade trademarks. 1. Plywood for electrical boards treated for retardance, meet Class I or a flame spread rating of 25 or less and bear U.L. label "Classified FRS".

1.05

DELIVERY, STORAGE AND HANDLING A. Store all materials in an elevated dry location, protected by waterproof coverings.

1.06

SEQUENCING AND SCHEDULING A. Coordinate work of this Section with the work of the various trades responsible for applying finish materials and other items to rough carpentry work, and ensure that the work performed hereunder is acceptable to such trades for the installation of their work.

PART 2 - PRODUCTS 2.01 MATERIALS A. Lumber for blocking, nailers and curbs as indicated or required: Hem-Fir, Douglas Fir, Eastern Spruce, Eastern Hemlock, or Southern Pine, surfaced dried stud or utility grade. Wood members shall be of sizes indicated on the Drawings or of the same size as the members being braced. Plywood and sheet products : 1. For electric panel board mountings and similar uses: APA graded B-D INT, Group 2 species, touch-sanded, fire-retardent treated, 20 mm (3/4 inch) thick, except as otherwise indicated on the Drawings. For unspecified interior concealed from view locations: APA graded C-D PLUGGED INT, Group 2 species, thickness as required or indicated on the Drawings.

B.

2. 2.02

WOOD TREATMENTS A. Treated wood products shall be produced by a single treatment plant, fully licensed by the chemical manufacturers, and conforming to the requirements specified herein. 1. 2. Dye wood or otherwise color code all treated wood at treatment plant to clearly distinguish the different treatments in the field. Kiln dry all treated lumber and plywood to the following maximum moisture content after treatment. a. Lumber: 19 percent. b. Plywood 15 percent. c. Discard pieces with defects which might impair quality of work. Quality marks: Each piece of lumber and plywood shall be permanently affixed with a quality mark, containing the following information: a. Identification of the inspection agency. b. Standard to which material was treated.
06100-2 11 March 2013

3.

ROUGH CARPENTRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Identification of the treating plant. Fire retardant treated wood shall include: stamp signifying a FR-S rating Preservative treated wood shall include: Retention and end use for which product is suitable. Fire retardant treated wood. Designated as FRTW 1. Chemical Manufacturer: Subject to compliance with the requirements specified herein, Products which may be incorporated in the work include: a. Hickson Corporation, Smyrna, GA, 001-770-801-6600, product, Dricon. b. Hoover Treated Wood Products, Inc., Thompson, GA, 001-706-595-5058, product PyroGuard. Fire retardant treated wood shall comply with the following requirements: a. All fire-retardant lumber and plywood must have an Underwriters Laboratories stamp signifying a FR-S rating certifying a 25 or less flame spread and smoke developed value, when tested in accordance to ASTM E-84, or UBC Standard No. 42-1. b. Fire retardant chemical: Free of halogens, sulfates, ammonium phosphate and formaldehyde. c. Corrosion rates: Less than one mil per year for carbon steel, galvanized steel, aluminum, copper and red brass in contact with the fire retardant treated wood when tested in accordance with Federal Specification MIL-L-19140E Paragraph 4.6.5.2. d. The fire retardant treated wood must have an equilibrium moisture content of not more than 25 percent when tested in accordance with ASTM D 3201 procedures at 95 percent relative humidity and 26 degrees C. (80 degrees F.) e. Fire retardant chemical: Registered for use as a wood preservative by the U.S. Environmental Protection Agency. f. Testing: Fire performance and strength properties for both lumber and plywood, of the fire retardant treated wood shall be recognized by issuance of a National Evaluation Services Report. Fire retardant chemical must not damage the middle lammella of the wood structure when exposed to 77 degrees C. (170 degrees F.) and 90 percent relative humidity for 23 days.

c. d. e.

2.

C.

Pressure preservative treated wood. Designated as PT 1. Chemical Manufacturer: Subject to compliance with the requirements specified herein, Products which may be incorporated in the work include: a. Hickson Corporation, Smyrna, GA, 001-770-801-6600, product, Wolmanized Pressure Treated Wood. b. Hoover Treated Wood Products, Inc., Thompson, GA, 001-706-595-5058 product CCA Outside Wood. Treatment: Chromated Copper Arsenate (CCA) Type C in accordance with AWPA Standard P5, free of sodium and sulphates. Registered by the United States Environmental Protection Agency as a pesticide containing inorganic arsenic. Minimum preservative retention: a. Above and below ground contact: All pressure preservative treated lumber and plywood must have an ALSC-recognized agency Quality Mark signifying a chemical retention level of 0.0065 kilograms/litre (0.40 pounds per cubic foot) of oxide chemical, rated for Ground Contact. b. Salt water contact: All pressure preservative treated lumber and plywood must have an ALSC-recognized agency Quality Mark signifying a chemical retention level of 0.04 kilograms/litre (2.50 pounds per cubic foot) of oxide chemical, rated for Salt Water Immersion. Fixation of Chemical: Treated wood shall not be shipped from treatment plant until fixation of the preservative has occurred in the wood.
06100-3 11 March 2013

2.

3.

4.

ROUGH CARPENTRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.03

ACCESSORIES A. B. Adhesive for lamination and fabrication of wood and plywood items: Exterior grade, phenolic resin glue. Adhesive for subfloors and underlayment: High strength, waterproof and non-freezing adhesive complying with AFG-01 Frozen Lumber Test and ASTM 3498, equal to W.W. Henry Company, Lancaster, PA, 001800-232-4832, product 217 - Subfloor & Construction Adhesive. Nails: Galvanized common nails, of size and type to suit application and as required by state and local building codes. Screws : 1. 2. E. Screws for interior applications: Flat head electroplated-galvanized wood screws of the appropriate sizes. Screws for exterior applications: Flat head hard aluminum, or stainless steel, wood screws, of the appropriate sizes.

C. D.

Anchor bolts, expansion bolts and lag screws: Hot-dipped galvanized steel, of the following types: 1. For lumber having actual thickness of 38 mm (1-1/2 inches) or greater to masonry and concrete: Anchor bolts or expansion bolts, as most applicable for the specific receiving surface material, 9 mm (3/8-inch) minimum diameter, spaced as shown on drawings, and staggered as far as practicable. Countersink all bolt heads, and provide head washers of matching material. For lumber having actual thickness of greater than 22 mm (7/8-inch) but less than 38 mm (1-1/2) inches to masonry and concrete: Anchor bolts or expansion bolts, as most applicable for the specific receiving surface material, at least 6 mm (1/4-inch) diameter of the most appropriate lengths for the specific application, spaced as shown, and staggered as far as practicable. Countersink all bolt heads, and provide head washers of matching material. For lumber having actual thickness of 22 mm (7/8-inch) and less: Anchor bolts or expansion bolts, at least 6 mm (1/4-inch) in diameter; or screws, of the most appropriate sizes; in lengths most suitable for the specific application, countersunk, spaced, and staggered.

2.

3.

F.

Protection paper: Canadian red-rosen paper or kraft paper.

PART 3 - EXECUTION 3.01 PREPARATION A. All materials shall be inspected before use, with all checked, split and otherwise deficient stock rejected, or used only for miscellaneous blocking, furring or other incidental use. The Contractor shall be responsible for replacing all lumber which, due to warpage, twist, splitting, or checking, results in unsatisfactory work. Such replacement shall be required at any time, whether before or after application of finish material under other Sections. Verify exact locations of toilet accessories, door stops and similar items with Engineer prior to installation of blocking for accessories.

B. 3.02

INSTALLATION - GENERAL A. B. Closely coordinate the installation of the rough carpentry work with the work of other trades responsible for the installation of interfacing or overlaying materials, so as not to delay the work of the related trades. Erect all rough carpentry work plumb, level, and true with tight, close fitting joints, securely attached and braced to surrounding construction, all in a first class workmanlike manner. Counterbore for bolt heads, nuts,
06100-4 11 March 2013

ROUGH CARPENTRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

and washers where required to avoid interference with other materials. Bear complete responsibility for structural integrity, connections, and anchorage of all rough carpentry work. C. D. E. Make provisions for erection loads, and for sufficient temporary bracing to maintain structure safe, plumb, and in true alignment until completion of erection and installation of permanent bracing. Use as long lengths as practicable for wood nailers, blockings, and curbs, to minimize number of joints, and attach the members with the types, and spacing, of fasteners specified herein. Install blocking, grounds and furring, as required for proper attachment of the work of other trades, in accordance with the requirements provided by the respective related trades. 1. Spacing for furring and strapping shall not exceed 400 mm (16 inches) on center. Field cuts of fire retardent treated lumber: Do not rip or mill fire retardent treated lumber. Only end cuts, drilling holes and joining cuts are permitted. Field cuts of inorganic arsenical pressure-treated lumber: Apply solution of copper naphthenate containing a minimum of 2 percent metallic copper in-solution, in accordance with AWPA standard M4. Brush liberally all cuts and holes. Install concealed from view plywood with specified fasteners spaced not more than 250 mm (10 inches) on centers. Install fire-treated plywood backer boards with counter-sunk galvanized fasteners, of specified sizes, spaced not more than 300 mm (12 inches) on centers.

F. G.

H. I. 3.03

INSTALLATION - ROOF NAILERS AND BLOCKING A. General: Provide anchorage for nailers as required for roof and edging to obtain FM Class A/I-90 rating, coordinate requirements with Section 07530 - Single Ply Membrane Roofing. 1. 2. Secure nailers and blocking to metal deck with electro-galvanized screws at not greater than 300 mm (12 inch) on center spacing, extending a minimum of 20 mm (3/4-inch) below deck. Secure nailers and blocking to wood substrates with electro-galvanized screws at not greater than 300 mm (12 inch) on center spacing, extending a minimum of 38 mm (1-1/2 inch) into board substrates and 20 mm (3/4 inches) into sheet materials.

B.

When building up layers of nailers and blocking, fully secure each layer to at least the one below, alternating location of fasteners, spacing at 300 mm (12 inches) on center. Provide fasteners in lengths to penetrate through more than one substrate layer of blocking. Stagger locations of butt ends of boards, such that no 2 joints are aligned. Ensure finished height of nailers is same as top surface of roof insulation within 6 mm (1/4-inch).

C. 3.04

CLEANING A. B. Daily clean work areas by sweeping and disposing of scraps and sawdust. Upon completion of the work of this Section in any given area, remove tools, equipment and all rubbish and debris from the work area; leave area in broom-clean condition.

3.05

SCHEDULES A. Wood treatment schedule: 1. Pressure preservative treat all concealed or exposed-to-view: a. Lumber and plywood which comes in contact with concrete, masonry, or earth.
06100-5 11 March 2013

ROUGH CARPENTRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. 2. B.

Lumber and plywood nailers, blocking and curbing directly related to roofing, flashing, skylights, roof hatches, and roof accessories.

Fire retardent treat all equipment backer boards, additionally provide fire retardent treated lumber and plywood where indicated or noted on Drawings.

Wood blocking schedule: The following schedule lists common items for which blocking is required in all drywalls although it may not be indicated on the Drawings. It is not the intention of this schedule to list all conditions requiring blocking or limit the extent of blocking required for completion of the Work; provide all wood blocking, edgings, nailers, required for receipt of various finishes and surfacing materials. Securely anchor wood blocking and run continuous between framing. Items Nominal size of blocking with fastener notes Mirror Soap dispensers Paper towel dispensers Toilet paper dispensers Towel bars Grab bars Lavatories Wall mounted door stops Window shades 50 mm by 100 mm (2 by 4 inch). 25 mm by 75 mm (1 by 3 inch). 50 mm by 100 mm (2 by 4 inch). 50 mm by 100 mm (2 by 4 inch). 50 mm by 150 mm (2 by 6 inch), with 6 mm (1/4 inch) dia. Toggle bolts. 50 mm by 150 mm (2 by 6 inch), with 6 mm (1/4 inch) dia. Toggle bolts. 50 mm by 200 mm (2 by 6 inch), with 6 mm (1/4 inch) dia. Toggle bolts. 25 mm by 75 mm (1 by 3 inch). 50 mm by 100 mm (2 by 4 inch).

END OF SECTION

ROUGH CARPENTRY Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

06100-6 11 March 2013

SECTION 06420 INTERIOR ARCHITECTURAL WOODWORK PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide interior architectural woodwork in accordance with the Contract Documents. Related Work Specified Elsewhere 1. Wood doors not in paneled walls. 2. Custom furniture. 3. Banquettes.

1.02

QUALITY ASSURANCE A. B. The Work of this Section shall be provided by a firm having a minimum of 5 years experience on projects of similar size and quality to that specified and shown. Single-Source Manufacturing and Installation Responsibility: Engage a qualified Manufacturer to assume undivided responsibility for architectural woodwork specified herein, including fabrication, finishing, and installation.

1.03

REQUIREMENTS OF REGULATORY AGENCIES A. Fire Retardant Treated Wood: Treat those items required by applicable codes to be treated and those items shown or specified as "Fire Retardant Treated Wood". Provide lumber, plywood, medium density fiberboard and particleboard with an Underwriters Laboratories (UL) stamp certifying values as specified herein for each type of product.

1.04

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. AWI "Quality Standards". 2. NAAMM "Metal Finishes Manual". 3. AWPA "Fire Retardant Pressure Treatment". 4. NBGQA "Specifications For Building Granite". 5. MIA "Design Manual". 6. CDA Publication No. 120/2 "Welding, Soldering, Brazing and Surfacing of Copper and Copper Alloys". Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

B. 1.05

SUBMITTALS A. Shop Drawings: Submit shop drawings of architectural woodwork for the fabrication and the installation of the Work. Include the following: 1. Large scale details, dimensioned plans, locations and elevations, attachment devices, and adjacent work of other trades. Locate and specify each piece of cabinet hardware and related accessories. Show locations and sizes of furring, blocking, and hanging strips, including concealed blocking and reinforcing specified elsewhere.
06420-1 11 March 2013

2.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3. 4.

Show locations and sizes of cutouts and holes for plumbing fixtures, faucets, soap dispensers, and other items installed in architectural woodwork. Show veneer leaves with dimensions, grain direction, exposed face, and an identification number indicated for each leaf. Identification number shall indicate the flitch and the sequence within the flitch for each leaf.

B.

Samples: Submit samples of each of the following items: 1. 2. 3. 4. Plastic laminate, 12 in. square, for each color, pattern and surface finish. Include sample on specified backer with balancing sheet. Post formed plastic laminate assembly: 24 in. sq. showing post formed edge. Stone, 12 in. x 12 in. of each species, finished as specified, and finish matching samples on file, and indicative of the entire range of materials. Transparent finish for each species of wood veneer laminated to MDF or particleboard, 12 in. x 12 in., for each finish specified or shown consisting of veneer pieces cut from selected flitch samples, laminated to panel product, for each species and cut. Include at least one face-veneer seam and finish one-half of face as specified.. Opaque finish for wood veneer laminated to MDF or particleboard, 12 in. x 12 in., for each color, gloss and finish specified or shown. Each finish type of panel, 24 in. wide x 36 in. high. Each type and finish of each type of metal trim, 8 in. long, finished as specified. Cabinet hardware exposed in the finished work and other type hardware as requested. Banquettes: a. Submit finished samples of all materials exposed to view after assembly and installation. Furnish samples of sufficient size and quantity to demonstrate the full range for the Project. b. Submit samples of fabric taken from delivered goods, of normal fabric width and 1 yd. in length, but not less than one complete repeat, for each color and/or pattern. c. Submit a fabricated segment of a unit as designated by the Engineer.

5. 6. 7. 8. 9.

C.

Product Data: Provide manufacturer's product data for each type of product and process specified in this section and incorporated into items of architectural woodwork during fabrication, finishing, and installation. In addition, submit the following: 1. Submit catalog cuts of hardware specified herein.

D.

Certifications 1. Certification of Fire Retardant Treatment of Wood: Submit certification, stating name of fire retardant materials used, and compliance with AWPA Specification C1 and C20 for lumber and C27 for plywood. Certify that fire retardant materials will not bleed through painted or natural finish surfaces. Certification of Fire Retardant Treatment of Fire Retardant Particleboard: Submit certification that particleboard specified as fire retardant complies with Underwriters' Laboratory Class 1 rating and these Specifications. Certification of Fire Retardant Treatment of Fire Retardant Medium Density Fiberboard: Submit certification that medium density fiberboard specified as fire retardant complies with Underwriters' Laboratory Class 1 rating and these Specifications. Certification of Fire Rated Plastic Laminate: Submit certification that plastic laminate assemblies specified as fire rated comply with Underwriters' Laboratory Class 1 rating and these Specifications.

2.

3.

4.

1.06

MOCK-UPS
06420-2 11 March 2013

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Provide mock-ups of the following items consisting of all the specified components: 1. Wood veneer panel assemblies, 2m x 2m minimum size. 2. Plastic laminate assemblies, 2m x 2m minimum size and 2m long for countertops. 3. Banquette assemblies, 2m long minimum. 4. Separate mock-up of wood paneling in Wedding Hall , minimum 2 bays for each condition. 5. Separate mock up of custom wood screens, minimum of 2 bays. Locate the mock-up where directed. Provide lighting of similar type and level as that of final installation for viewing. Demonstrate the proposed range of aesthetic effects and workmanship. Alter or revise mock-up, as directed, to obtain the acceptance of the Engineer. The accepted mock-up shall serve as a standard of quality for specified item(s) for the project and may remain as a permanent part of the Work if in same condition as new at time of final acceptance. The approval of the mock-up does not relieve the Contractor of its obligation to perform the work in accordance with the Contract Documents. Provide a full size mock-up of the proposed back-painted glass panel system utilizing the specified components.

C.

D. 1.07

PROJECT CONDITIONS A. Do not install architectural woodwork in any space until wet work in such space is dry to the satisfaction of the woodwork fabricator and installer, and only when the building's mechanical system can maintain the relative humidity and temperature at occupancy levels during the remainder of the construction period so that the woodwork will not be damaged by excessive changes. Maintain temperature and humidity levels in installation areas as required so as not to cause damage to installed items. Keep post forming grade plastic laminate for 48 hours at 75 degrees and a relative humidity of 45 to 55 percent prior to bonding.

B. C. 1.08

COORDINATION A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units of Work specified in other Sections to ensure that architectural woodwork can be supported and installed as indicated.

1.09

PROTECTION A. B. Protect architectural woodwork during transit, delivery, storage and handling to prevent damage. Cover and keep covered with non-staining protective wrapping. Store architectural woodwork in a dry, well ventilated space, matching the environmental conditions of the finished installation.

1.10

GUARANTEE A. Guarantees specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and are in addition to and run concurrent with other

PART 2 - PRODUCTS APPROVED MANUFACTURER / LOCAL SUPPLIER


INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 06420-3 11 March 2013

Al Baidaq, Kuwait (Local Supplier) Moso International B. V, The Netherlands Or approved equal 2.01 WOOD A. General 1. Standards: In addition to requirements shown and specified, comply with applicable provisions for grading and workmanship of AWI "Quality Standards". 2. Surfaces and Patterns: Provide lumber surfaced 4 sides (S4S) and worked to profiles shown or required. 3. Moisture Content: Kiln-dry lumber to the moisture content recommended by the AWI Section 100S-11 . Lumber: AWI Section 100 with the following requirements: 1. Hardwood for Transparent Finish: AWI Section 100-S-1, Grade 1, select White Oak unless otherwise shown or specified, and free from cats-eyes, birds-eyes, burls, splits, shakes, sap wood, wind checks, worm holes, resin deposits, mineral discolorations; hand selected to be uniform in color and grain characteristics and to match contiguous wood paneling. a. Where hardwood is used adjacent to veneered wood, use solid wood of the same species, graining and other characteristics, from the same flitch as the wood veneer selected.

B.

2. 3. 4.

Hardwood for Opaque Finish: Any hardwood which, when finished, will not show any grain, imperfection or other surface defects when used with the opaque finish specified. Hardwood for Concealed Framing and Blocking: AWI Section 100-S-1, Grade II or III, any species. Fire Performance Characteristics: Provide materials identical to those tested for the following fire performance characteristics per ASTM test methods indicated by UL or other testing and inspecting organizations acceptable to authorities having jurisdiction. Identify treated lumber with classification marking of inspecting and testing organization in the form of separable paper label or, where required by authorities having jurisdiction, of imprint on lumber surfaces that will be concealed from view after installation. a. Surface Burning Characteristics: Not exceeding values indicated below, tested per ASTM E84 for 30 minutes with no evidence of significant combustion. 1) Flame Spread: 25. 2) Smoke Developed: 50.

C.

Panel Products: AWI Section 200 with the following requirements: 1. Core Types a. Medium Density Fiberboard: ANSI A208.2 and AWI Section 200, either Medium Density or High Density Classification, and in compliance with NPA 9 for allowable formaldehyde emissions. 1) Grades a) Medium Density: Grade MD b) High Density: Grade HD c) Exterior Grade: Grade MDF-Exterior Glue (When used for countertops: Provide MD-Exterior Glue Grade for counter tops with sinks or other plumbing fixtures and countertops to receive stone surfaces). Subject to compliance with requirements, provide the following: a) Medium Density: "Medite II" ( Sierra-Pine Ltd.) or approved equal. b) High Density: "Medite HD" ( Sierra-Pine Ltd.) or approved equal.
06420-4 11 March 2013

2)

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

c) 3)

Exterior Grade "Medex" ( Sierra-Pine Ltd.) or approved equal.

Fire-Retardant Medium Density Fiberboard: Where shown or required, provide panels complying with ANSI A208.2, grade as appropriate for intended application and that have fire-retardant chemicals bonded to softwood particles at time of panel manufacture to achieve products identical to those tested for compliance with UL Class 1 surface spread of flame per UL 753 Flame rating Test or other testing and inspecting organization acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing and inspecting organization. Subject to compliance with requirements, provide "Medite FR" ( Sierra-Pine Ltd.) or approved equal.

4) b.

Particleboard: ANSI A208.1 and AWI Section 200, either medium or high density classification, and in compliance with NPA 8 for allowable formaldehyde emissions. 1) Grades a) Medium Density: Grade M-2 or M-3. b) High Density: Grade H-2 or H-3. c) When used for countertops: Comply with ANSI 161.2. Provide phenolic resin particleboard core for counter tops with sinks or other plumbing fixtures and countertops to receive stone surfaces. 2) Fire-Retardant Particleboard: Where shown or required, provide panels complying with ANSI A208.1, grade as appropriate for intended application and that have fire-retardant chemicals bonded to softwood particles at time of panel manufacture to achieve products identical to those tested for flame spread of 20 or less and for smoke developed of 25 or less per ASTM E84 by UL or other testing and inspecting organization acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing and inspecting organization. Subject to compliance with requirements, provide "Duraflake FR" (Duraflake Div.; Willamette Industries, Inc.) or approved equal.

3) c. 2.

Plywood: AWI Section 200-G-5 either veneer core plywood or particle core plywood; fire retardant treated where required or shown. Hardwood: AWI Section 200-S-5, Grade I and ANSI/HPVA-1, Grade AA; face veneers or overlays as shown or specified.

Surface Grades of Panels a.

3.

Edges: Band edges of plywood and particleboard core panels with face veneer banding in accordance with AWI Section 500A-S-3, Premium Grade, unless hardwood edge banding is shown. Provide special banding where shown. Only use edging where veneers are not wrapped around edges. Panel Balancing Veneer: Provide balancing veneer on concealed side of panels, using same species as the face veneer. Panel Fire Performance Characteristics: Provide paneling composed of panels of wood veneer density and fire-retardant plywood or particleboard that are identical in construction to units tested for the following surface burning characteristics per ASTM E84 by UL or other testing and inspecting organization acceptable to authorities having jurisdiction. Identify panels with appropriate markings of applicable testing and inspecting organization on surfaces that will be concealed from view after installation. a. Flame Spread: 75 or less. b. Smoke Developed: 450 or less. Core Formaldehyde Emission Levels: Comply with formaldehyde emission requirements of each voluntary standard referenced below: a. Medium Density Fiberboard: NPA 9.
06420-5 11 March 2013

4. 5.

6.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. c. D. E.

Particleboard: ANSI 208.1 and NPA 8. Hardwood Plywood: HPMA FE.

Furring, Blocking, Shims, and Hanging Strips: Fire-retardant-treated softwood lumber, kiln dried to less than 15 percent moisture content. Veneers 1. Face Veneers for Transparent Finish: AWI Section 200-S-8, Grade I of the following species: To be selected by the client. 2. Face Veneers for Opaque Finish: AWI Section 200-S-8, Grade I or II, any hardwood veneer that, when finished, will not show any grain, imperfection or other surface defects when used with the opaque finish specified or phenolic resin impregnated paper, equal to "Forbond Yorkite III" (NVF Co., Primary Products Div..).

F.

Finishing (Wood) 1. Transparent Finishes a. Transparent Finish: Clear nitrocellulose lacquer , to a cured film thickness of 1 mil. Prior to application of finish prepare wood surfaces with oil stains, water-based aniline stains or toners as required to match approved sample. Specular gloss as selected by the Engineer. Transparent Finish: Open pore rubbed lacquer finish consisting of bleaching, as may be required, aniline stains and toners, clear sealer coats, clear lacquer coats, rubbed and waxed. Between each coat sanding is required so that the final finish shall match the sample on file in the Engineer's office. Transparent Finish: Closed pore rubbed lacquer finish consisting of bleaching and paste wood fillers, as may be required, aniline stains and toners, clear sealer coats as required to achieve a closed pore finish, clear lacquer coats, rubbed and waxed. Between each coat sanding is required so that the final finish shall match the sample on file in the Engineer's office. Opaque Lacquer Finish 1) Polish finished substrates to eliminate marks and sander scratches and wipe clean prior to application of undercoater. 2) 1st Coat: Alkyd resin or nitrocellulose lacquer base, 65% solids, opaque undercoater, color best suited to achieve final color appearance of subsequent coats, with a cold check cycle of 16. 3) 2nd Coat: Opaque lacquer, nitrocellulose plasticizer base, 45% solids, color and specular gloss as selected by the Engineer, with a cold check of 20. 4) 3rd Coat: Clear catalyzed lacquer, alkyd urea base modified nitrocellulose resin, 26% solids, specular gloss as selected by Engineer, with a cold check of 15. 5) Total dry film thickness between 3 and 5 mils. 6) Final finish shall match sample on file in the Engineer's office.

b.

c.

2.

Opaque Finishes a.

3.

Unexposed Wood Finish: Alkyd type primer-sealer.


06420-6 11 March 2013

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.02

PLASTIC LAMINATE A. B. C. Face Sheets: NEMA Publication LD3, Grade General Purpose Grade HGS, 0.048 in. nominal thickness, satin finish unless otherwise shown. Color as selected. Backing Sheets: Intended for use as a balancing sheet in panel construction; NEMA Publication LD3, Grade BKH, 0.048 + 0.005 in. thick. Fire Rated Sheets: NEMA Publication LD3, Grade Fire-Rated General Purpose Grade, HGF 0.48 in. nominal thickness. Provide sheets with UL label, Class 1. Provide fire rated backing sheets of equal thickness in panel products. General Purpose Horizontal Post Forming Grade Face Sheets: NEMA Publication LD3, General Purpose Forming Grade, HGP 0.39 in. nominal thickness. Color and finish as selected. Integrally Colored Solid Plastic Laminate: NEMA Publication LD3, Type HCS 62, nominal thickness. Color as selected. Cabinet Liner Sheets: Intended for use in cabinet interiors where shown or specified; NEMA Publication LD3, Grade CL20, 0.020 in. nominal thickness. Edges: Finish edges with plastic laminate to match face sheets and apply before face sheets are applied, unless otherwise shown or specified. Plastic Laminate Schedule 1. Type PL-11: Mfr. No. 4269, Cherry Basketweave, (Formica); 3 foot x 8 foot sheets. 2. Type PL-12: Mfr. No. 7330-12, Greentea Weave, (Formica); 3 foot x 8 foot sheet s; Weave finish.

D. E. F. G. H.

2.03

METAL A. Steel 1. 2. 3. Structural Steel Shapes and Plates: ASTM A36. Cold-Rolled Carbon Steel Strips: ASTM A109. Cold-Rolled Carbon Steel Sheets: For concealed surfaces, commercial quality, ASTM A366; or structural quality, complying with ASTM A611, Grade A, unless another grade is required by design loads,. For all exposed parts, open-hearth, full pickled, annealed, stretcher-leveled furniture steel, free of scale, waves and defects. Hot-Rolled Carbon Steel Sheets: Commercial quality, complying with ASTM A 569; or structural quality, complying with ASTM A570, Grade 30, unless another grade is required by design loads, may be used for concealed parts only. Steel Bars: Cold-finished, carbon steel, ASTM A108, hot-rolled. Rolled Steel Formed Channels: AISI MT-1010, cold-rolled steel, best commercial grade. Steel Tubing: ASTM A500 cold-rolled steel seamless welded, best commercial grade, not less than 0.065 in. thick. Finishing (Steel) a. b. Chrome Plating: ASTM B456, Service Condition SC-4, highly polished matching US26 finish. Lacquer Finish 1) Prepare substrate in accordance with paint manufacturer's directions. 2) One (1) coat Sanding Undercoat "No. 30-237" for light colors and "No. 13903" for dark colors (FYN Paint & Lacquer Co., Inc.).
06420-7 11 March 2013

4.

5. 6. 7. 8.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3) 4) 5) 6) 7) 8) B. Stainless Steel 1.

Sand with 000 stearated paper sandpaper. One (1) coat Sanding Undercoat "No. 30-237" for light colors and "No. 13903" for dark colors. Sand with 000 stearated paper sandpaper. Two (2) coats gloss lacquer, color as selected. Rub with water and pumice. Two (2) coats water white clear lacquer.

AISI Type 302 or 304. a. Plate and Sheet: ASTM A666, Stretcher leveled sheets. b. Bar Stock: ASTM A276. c. Tubing: ASTM A269. Finishes: As shown for the respective units and matching the Engineer's samples. Remove scratches, abrasions, dents, die markings and other defects prior to finishing operations. Perform this work in addition to finish treatment specified. a. No. 4 (bright directional polish). b. No. 6 (satin directional polish). c. No. 7 (highly reflective directional polish). d. No. 8 (non-directional mirror polish).

2.

C.

Bronze 1. 2. 3. Extrusions: Architectural bronze, CDA alloy 385. Sheet and Roll-Formed: Muntz metal, CDA alloy 280, stretcher leveled panel quality composed of 60% copper and 40% zinc. Finishes: As shown for the respective units and matching the Engineer's samples. Remove scratches, abrasions, dents and other defects prior to finishing operations. Perform this work in addition to finish treatment specified. a. NAAMM M32-C55, medium statuary. Clear Organic Coating: Clear air-drying acrylic lacquer specially developed for coating copper alloy products, applied by air-spray in 2 coats per manufacturer's directions, with interim drying, to a total thickness of 1.0 mil. Provide "Incralac" (as developed by International Copper Research Corporation).

4.

D.

Brass 1. 2. Cartridge Brass, CDA alloy 260, composed of 70% copper and 30% zinc; free from scratches, porosity, nonconducting inclusions, roll and die marks, cold shuts, cracks or other defects. Finishes: As shown for the respective units and matching the Engineer's samples. Remove scratches, abrasions, dents and other defects prior to finishing operations. Perform this work in addition to finish treatment specified. a. NAAMM M32-C55, medium statuary. Clear Organic Coating: Clear air-drying acrylic lacquer specially developed for coating copper alloy products, applied by air-spray in 2 coats per manufacturer's directions, with interim drying, to a total thickness of 1.0 mil. Provide "Incralac" (as developed by International Copper Research Corporation).

3.

2.07

MISCELLANEOUS PRODUCTS
06420-8 11 March 2013

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Fasteners 1. Screws: Select material, type, size, and finish required for each use. Comply with ASME B18.6.1 for applicable requirements. For metal framing supports, provide screws as recommended by metal-framing manufacturer. Nails: FS FF-N-105, type, size, material and finish as required for the condition of use. Anchors: Type, size, material and finish as required for the condition of use capable of sustaining, without failure, the load imposed within a safety factor of 4 as determined by tested in accordance with ASTM E448.. Provide nonferrous metal or hot-dip galvanized anchors and inserts on inside face of exterior walls and elsewhere as required for corrosion resistance. Provide toothed steel or lead expansion bolt devices for drilled-in-place anchors. Furnish inserts and anchors, as required, to be set into concrete or masonry work for subsequent woodwork anchorage. Staples: Upholstery type staples of sufficient strength to hold fabric taut in place without sagging. Panel Clips: Aluminum interlocking offset panel fasteners; type, size and quantity for the condition of use. Provide one of the following or approved equal: a. b. c. 6. 7. "Panel Fastening Systems" (Panel Fastening Systems, Inc.). "Panel "Z" Clips" (Monarch Metal Fabrications Inc.). "ZC3 Clips" (Doug Mockett & Co., Inc.).

2. 3.

4. 5.

Blind Splines and Draw Downs: Specialty devices, as required for tight butt joining, types and size as recommended by woodwork fabricator. Where mortises of fastener heads, or draw downs are exposed (blind holes) in finished work, provide plastic covercaps, color as selected by Engineer.

B.

Adhesives 1. 2. For Laminating Plastic Laminate Surfaces: Melamine, phenol-resin, or resorcinol-resin complying with FS MMM-A-181; type, grade and class best suited for the purpose. For All Other Uses: Moisture resistant complying with FS MMM-A125, Type II, or MMM-A-188, Type I, II or III; type best suited for the purpose.

C.

Architectural Woodwork Hardware: Provide architectural woodwork cabinet hardware and accessory materials associated with architectural cabinets, except for items specified in Section "Finish Hardware. Obtain architectural woodwork cabinet hardware for each category from a single manufacturer. Specified manufacturers and their product catalog numbers establish the standard of quality and design required for the various categories, and equivalent products by other manufacturers may be acceptable, subject to Engineer's review of their equivalency. Comply with BHMA A156.9 except as otherwise specified; Provide the following items, or their approved equal, as required:

2.09

1. FABRICATION - GENERAL A. B. C. D. Provide Premium grade architectural woodwork complying with the referenced AWI quality standard unless otherwise specified. Provide steel framing and lumber framing for architectural woodwork, complete with all bracing and fastening devices as required for a rigid installation, and as required to sustain the imposed loads. Do all fabrication from field measurement with provision for scribing as required to meet built-in conditions. Coordinate the work of this Section with the work of other trades.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

06420-9 11 March 2013

E.

Fabricate units in largest practicable sections. Assemble in the shop for trial fit, disassemble for shipment and reassemble with concealed fasteners. Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting. Comply with requirements of referenced AWI quality standard for wood moisture content in relation to ambient relative humidity during fabrication and in installation areas. Maintain relative humidity and temperature during fabrication, storage and finishing operations matching that of the areas of installation. Details indicate the required type and quality of construction. Modifications to conform to manufacturer's standards will be considered providing they comply with the Contract Documents, maintain the profiles shown and subject to acceptance by the Engineer. Reinforcing shown is minimum. Provide additional reinforcing as required to ensure a rigid assembly. Exposed surfaces shall be free from dents, tool marks, warpage, buckle, glue and open joints, or other defects affecting serviceability or appearance. Accurately fit all joints, corners and miters. Conceal all fasteners. Make threaded connections up tight so that threads are entirely concealed. Welding and brazing shall be of adequate strength and durability with joints tight and flush, smooth and clean. All exposed surfaces shall be ground and finished flush, free of weld marks. Welds or brazes on finished surfaces shall be indistinguishable from parent metal. Factory finish all items where possible. Defer final touch-up, cleaning and polishing after delivery and installation. Comply with AWI Section 1500-S-5 and Section 1500-T-1, Premium Grade for sanding, filling countersunk fasteners and other preparations for the finishing of architectural woodwork, as applicable to each unit of work with the following additional requirements for final preparation of wood surfaces for all finishes: 1. 2. Sanding: Use 220 grit for exposed surfaces and 180 grit for semi-exposed surfaces. Sand fire-retardant-treated wood lightly to remove raised grain on exposed surfaces before fabrication. Countersinkages in finished surfaces will not be permitted in the finished work except as specifically directed by the Engineer. In such cases countersinkages shall be filled with wood putty tinted to blend with the adjacent wood veneer.

F.

G.

H.

I.

J. K.

L.

Fabricate woodwork to dimensions, profiles, and details indicated. Ease edges to radius indicated for the following: 1. 2. Corners of cabinets and edges of solid wood (lumber) members less than 1 inch in nominal thickness: 1/16 inch. Edges of rails and similar members more than 1 inch in nominal thickness: 1/8 inch.

M. N.

Provide finishes as shown or specified. Veneers for Transparent Finish 1. 2. 3. 4. The Engineer will assign specific flitches for specific elevations. Bond veneers to cores by the hot press method. All full width panels shall be center book matched and end matched. Full width panels 40 in. or less in width shall be: a. 4 piece matched for quarter sliced veneer species (narrow leaf veneers). b. 2 piece matched for plain sliced veneer species (wide leaf veneers). c. 1 piece matched for special, extra wide leaf veneer species. Full width veneers of width greater than 40 in. shall have number of leaves in panel assigned on an individual species and flitch basis. Panels shall be blueprint, balanced and sequence matched and full flitch matched, with all sapwood removed.
06420-10 11 March 2013

5. 6.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.10

FABRICATION - SPECIFIC ITEMS A. Architectural Cabinetwork 1. Provide cabinetwork in accordance with AWI Section 400A, Premium Grade, for wood cabinetwork and AWI Section 400B, Premium Grade, for plastic laminate cabinetwork. a. 2. Provide "Flush Overlay" AWI type cabinet construction unless otherwise noted. Include all preparations for mechanical, electrical, telephone, computer equipment and plumbing work required. Prepare cabinets, which contain computer equipment, to receive cooling fans, air slots for air circulation within the equipment area of sizes as shown or required and wireways for electrical, data and communication wires. Allow for cable conduits entering casework from different directions. In areas where shown or required, provide removable panels and access doors. Provide cabinet hardware as shown or specified. Provide dust panels of 3 in. plywood or tempered hardboard above compartments in body webs and drawers except where located directly under tops. Semi-Exposed Surfaces a. Semi-exposed surfaces of wood cabinetwork shall be provided with same finish and species as the face veneer, except they may be of quality, size and leaf width not acceptable for face use. Drawer sides and backs shall be solid hardwood lumber, stained to match species indicated for exposed surfaces, shop finished. Drawer bottoms shall be hardwood plywood, same species indicated for exposed surfaces, shop finished. Semi-exposed surfaces other than the drawer bodies of plastic laminate clad cabinetwork shall be surfaced with high pressure decorative laminate, Grade CL-20. Drawer sides and backs shall be solid hardwood lumber, shop finished. Drawer bottoms shall be hardwood plywood, shop finished.

3. 4. 5.

b.

6. 7. 8. 9. 10. B.

Provide wood veneers for exposed surfaces as specified hereinbefore. Hollow core doors will not be permitted. Provide matching veneers for edge treatments of case body members where transparent finishes are indicated or specified. Provide drawers with slides as specified. Drawers shall not rest on web body frames. Provide wood veneers for transparent finish, of matching and continuing grain, for drawer and door edges.

Countertops 1. 2. Fabricate countertops of sizes and profiles shown, not a part of integral casework, in accordance with AWI Section 400C, Premium Grade, and as specified herein. Provide countertops fabricated with either veneer core or particle core plywood cores for all locations, except provide either exterior veneer core or phenolic resin particleboard core plywood cores for counter tops with sinks or other plumbing fixtures and countertops to receive stone surfaces. In areas where shown, provide post formed edges to radius shown complying with NEMA "LD3" recommendations for fabrication and application of post forming plastic laminates. Provide countertops in longest length possible for each location shown. Provide wood blocking and framing, anchors, clips, splines, supporting and attaching devices.

3. 4. 5.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

06420-11 11 March 2013

6.

Provide cut-outs to receive attachments, supporting substructure, mechanical and electrical work from templates and drawings furnished by other trades. Provide grommets in locations where wiring enters or exits from countertop. Provide balancing face, on concealed side of countertops, of same thickness and material as specified for face, except concealed grade, to equalize pull and prevent warpage, twist or bow. Provide fascias, skirts or backsplashes of profiles and sizes shown, and fabricated the same as countertops. Finish edges of plastic laminate countertops before face sheets in accordance with AWI 400C, Premium Grade. Provide continuous clear anodized aluminum splines at countertop edges where shown. Countertops to receive stone surfaces shall be primed and sealed on all surfaces with materials compatible with the stone and stone setting materials.

7 8. 9.

10. C. Paneling 1.

General a. Panels shall be in accordance with AWI Section 500, Premium Grade construction. b. Panel joints shall be flush type unless otherwise shown or specified. c. Provide wood blocking and framing, anchors, clips, splines, supporting and attaching devices. d. Provide cut-outs to receive attachments, mechanical and electrical work as required. Shop-cut openings, to maximum extent possible, to receive hardware, appliances, plumbing fixtures, electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagrams to produce accurately sized and shaped openings. Smooth edges of cutouts. e. Provide balancing veneer on concealed side of panels, using same species as the face veneer, to equalize pull. f. Provide panel clips in quantity and spacing to sustain loading and prevent warping and bowing of panels. Wood Veneer Paneling a. Comply with AWI Section 500A, Premium Grade. b. Provide veneers as specified and as shown, including all matching requirements. Plastic Laminate Paneling: Comply with AWI Section 500B, Premium Grade. Metal Panels a. b. c. Provide panels of the metals and finishes shown or specified. Laminate metal sheets to plywood, particleboard or MDF panels. Provide balancing sheets of same thickness metal laminated to panel backs. Form panels of one piece seamless faces with corners formed square and true.

2.

3. 4.

D. E.

Wood Screens: Constructed of hardwood, grid size as shown, with surrounding hardwood frame, joined to form a rectangular lattice; opaque finish. Closet and Storage Shelving 1. 2. 3. 4. Provide closet and storage shelving in accordance with AWI Section 600, Custom Grade, unless otherwise shown or specified. Shelf Cleats: : in. x 3-1/2-in. boards with holes to receive clothes rods (if shown or required), of same species and grade indicated above for interior lumber trim for opaque finish. Exposed edges shall have hardwood edge bands. For sizing of shelves and spacing of supports, comply with AWI Section 400-G-5. Shelf deflection shall not be greater than 3 in. between supports.
06420-12 11 March 2013

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

F. G.

Standing and Running Trim: Provide standing and running trim of the sizes, profiles, species and finish as specified or shown and complying with AWI Section 300, Premium Grade. Wood Doors: Fabricate wood doors in accordance with the requirements of Section "Wood Doors" and AWI Section 1300, Premium Grade for flush type doors and AWI Section 1400, Premium Grade for stile and rail type doors. 1. Provide veneer species and finish as specified or shown.

PART 3 - EXECUTION 3.01 PRE-INSTALLATION MEETING A. Prior to the installation of architectural woodwork, and at the Contractor's direction, meet at the project site to review the material selections, substrate preparations, installation procedures, coordination with other trades, special details and conditions, standard of workmanship, and other pertinent topics related to the Work. The meeting shall include the Engineer, the Contractor, architectural woodwork fabricator, architectural woodwork installer, various manufacturer's representatives, and representatives of other trades or subcontractors affected by the installation.

3.02

CONDITION OF SURFACES A. B. C. Examination: Examine the substrates, adjoining construction and conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected. Verify locations of concealed framing, blocking, reinforcements, and furring that support woodwork by accurate field measurements before being enclosed. Record measurements on final shop drawings. Condition woodwork to average prevailing humidity conditions in installation areas before installing.

3.03

INSTALLATION A. Coordination: Coordinate architectural woodwork with the adjacent work of other sections. Provide items to be placed during the installation of other work at the proper time to avoid delays. Coordinate placement of such items, including inserts and anchors, accurately in relation to the final location of architectural woodwork. General: Install architectural woodwork in accordance with AWI Section 1700, Premium Grade. 1. Coordinate installation with the work of other trades to ensure exact fit and perfect alignment. Verify dimensions before proceeding and obtain measurements at job site for work required to be accurately fitted to other construction. Install work plumb, level, true and straight with no distortions. Provide shims as required. Cutting, trimming, fitting and matching of prefinished work will not be permitted. Where cutting is required, scribe to fit adjoining work so as not to damage finished surfaces. Securely fasten architectural woodwork items to blocking with concealed fasteners only. Where surface nailing is required, countersink and fill flush with the woodwork so that the finished heads are undetectable. Install materials utilizing materials and methods as recommended by manufacturer unless otherwise specified.

B.

2. 3. 4. 5.

6. C.

Casework: Install cabinets and casework in accordance with AWI Section 1700B. Install and adjust cabinetry and casework so that the doors and drawers are centered, operate smoothly and within the permissible tolerances. Field adjust plant hinged doors to meet plant tolerances.
06420-13 11 March 2013

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.

Provide cabinetry complete with blocking, framing, supports and bracing as required for a safe, rigid assembly. Install cabinets with no more than 1/8 in. in 96 in. sag, bow, or other variation from a straight line. Coordinate with the work of electrical and mechanical trades and other trades as required for a complete installation. Install shelving brackets, standards, and cabinet shelf supports as recommended by manufacturers of these products and as required for intended use.

2. D.

Countertops: Anchor securely by screwing through corner blocks of base cabinets or other supports into underside of countertop. Install countertops with no more than 1/8 in. in 96 in. sag, bow, or other variation from a straight line. If backsplashes are indicated, secure to tops with concealed metal brackets at 16 in. o.c. and to walls with adhesive. Seal space between backsplash and wall with sealant specified in Section "Sealants." Paneling: Install paneling in accordance with AWI Section 1700 and as follows: 1. 2. Provide a system of concealed panel hanger clips and corresponding wall clips to support the panel system. Face nailing shall not be permitted. Hang the panels in the designated locations. Scribe and cut panel-work to fit adjoining work, and refinish cut surfaces and repair damaged finish at cuts. Panels shall be straight, level, flat and flush with adjoining panels. Install to a tolerance of 1/8 in. in 96 in. for plumb and level. Install with no more than 1/16 in. in 96 in. vertical cup or bow and 1/8 in. in 96 in. horizontal variation from a true plane. Where reveals are indicated, keep panels spaced so that reveals are parallel and of widths shown.

E.

3. F. G.

Closet and Storage Shelving: Provide closet and storage shelving at the locations shown. Provide hang rods where shown. Set adjustable center hangers. Standing and Running Trim: Install standing and running trim in accordance with AWI Section 1700A. Install with minimum number of joints possible, using full-length pieces for each run. 1. Stagger joints in adjacent and related members. Cope at returns, miter at corners to produce tight fitting joints with full surface contact throughout length of joint. Use scarf joints for end to end joints. Plane backs of casings to provide uniform thickness across joints, if required. Miter cut all running joints, butt joints are prohibited. Cut running joints away from direction of major view. Install trim after gypsum board joint finishing operations are completed. Drill pilot holes in hardwood before fastening to prevent splitting. Fasten to prevent movement or warping. Countersink fastener heads on exposed carpentry work and fill holes.

2. 3. 4. H.

Banquettes: Provide mortises and tenons of size required to provide maximum strength in the assembled joint. The tenons shall fit the mortises completely and tightly; using blind tenons wherever through tenons would show in the finished work. Glue stains will not be permitted. 1. 2. Fabricate substructure of wood materials as recommended by fabricator and in accordance with the drawings. Provide all required reinforcing which result in a rigid frame. Install cushioning in accordance with shop drawings to provide a firm surface. Cover entire cushion assembly with cushion overlay prior to upholstering banquette. Lay upholstery material smooth and even. Cut evenly along intersecting surfaces. Provide buttoned upholstery where shown. For channeled upholstery, seams shall be inconspicuously concealed between the channels. All upholstery material shall be aligned so that lines of channels are straight and continuous and with channels parallel to each other, and with vertical lines perpendicular. Upholster material smooth with sufficient tension so that the finished installation is free of tacks, scraps, ripples, scallops or puckers. All seams shall be sewn in lieu of wrapped. Apply fabrics to surfaces shown using application methods and fastenings as recommended by the fabric manufacturer to achieve a smooth, undistorted finish to the satisfaction of the Engineer.
06420-14 11 March 2013

3.

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

I. 3.04

Install glass to comply with applicable requirements in Section "Glazing" and in GANA's "Glazing Manual." For glass in wood frames, secure glass with removable stops.

PROTECTION A. B. Damage Prevention: Protect architectural woodwork so that it will be without damage at the time of acceptance. Repairing of Damage: Touch-up marred finishes to match adjacent surfaces perfectly. 1. Architectural woodwork which, in the opinion of the Engineer, can not be satisfactorily refinished in the field shall be removed and replaced, with units to match contiguous architectural woodwork in all respects.

END OF SECTION

INTERIOR ARCHITECTURAL WOOD WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

06420-15 11 March 2013

SECTION 07100 UNDERSLAB WATERPROOFING BARRIER MEMBRANE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A 1.02 All of the Contract Documents, including General and Supplementary Conditions and Division I General Requirements apply to the work of this section.

SCOPE A The work of this section includes, but is not limited to, the following: 1 B Installation of waterproofing barrier membrane where indicated in the drawings.

Related Sections: Other specification sections which directly relate to the work of this section include, but are not limited to, the following: 1 2 Section 03300 - Cast-In-Place Concrete Section 07260 - Under Slab Vapor Retarders

1.03

REFERENCE STANDARDS A American Society for Testing and Materials (ASTM): D146 Sampling and Testing Bitumen Saturated Felts and Fabrics D412 Tests for Rubber Properties in Tension D570 Test Method for Water Absorption of Plastics E96(b) Tests for Water Vapor Transmission of Materials in Sheet Form E154 Test for Puncture Resistance F2130 Resistance to Penetration by Pesticides D4833 Test Method for Index Puncture Resistance of Geotextiles, Geomembranes and Related Products D4533 Test Method for Trapezoid Tearing Strength of Geotextiles D1434 Test Method for Determining Gas Permeability Characteristics of Plastic Film and Sheeting B C General Services Administration, Public Building Service: Elastomeric Waterproofing. Texas A & M Method - Resistance to penetration by termites.
U.S. Patent No. 7,488,523

GSA-PBS-07115 Guide Specification for

UNDER SLAB WATERPROOFING BARRIER MEMBRANE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07100-1 11 March 2013

Radon Reduction Technology Laboratory: 1 2 Resistance to Permeance by Radioactive Radon Gas Resistance to Diffusion by Radioactive Radon Gas

Qualifies under LEED: 1 2 3 IAQ Credit 5 - Indoor Chemical and Pollutant Source Control (below grade toxin barrier / reduced pesticide usage). SS 3 - Brownfield redevelopment (can be used for pesticide contaminated sites) Can be considered for ID 1 - Innovation in design.

1.04

SYSTEM DESCRIPTION Product provided by this section is a strong sheet membrane with a 20 mil thick high strength polyethylene geomembrane topped with a 55 mil thick layer of proprietary waterproofing sealant integrated into a high strength nonwoven geotextile fabric.

1.05

SUBMITTALS A B C General: Submit in accordance with Section 01330. Product Data: Submit manufacturers product literature and installation instructions. Samples: Submit representative samples of the following for approval: 1 2 D E F Sheet Membrane Fabric Tape and Accessories

Subcontractors approval by Manufacturer: Submit document stating manufacturers acceptance of subcontractor. Warranty: Submit a sample of manufacturers warranty identifying the terms and conditions stated in 1.09. Substitutions: To be accepted as an equal a product must have demonstrated in documented field trials over a minimum 5 year period the ability to reduce cracking and to maintain a seal even if the slab above it has cracked.

1.06

QUALITY ASSURANCE A Manufacturer Qualifications: Sheet Membrane Waterproofing Barrier System must be manufactured by a company with a minimum of 10 years experience in the production and sales of membrane waterproofing materials. Applicator Qualifications: A firm having at least 3 years experience in applying these types of specified materials and specifically accepted in writing by the membrane system manufacturer. Materials: For each type of material required to complete the work of this section, provide primary materials which are the products of a single manufacturer. Pre-Application Conference: A pre-application conference shall be held to establish procedures and to review conditions, installation procedures and coordination with other related work. Meeting agenda shall include review of special details and flashing. Manufacturers Representative: Arrange to have trained representative of the manufacturer on site periodically to review installation procedures.
07100-2 11 March 2013

B C D

UNDER SLAB WATERPROOFING BARRIER MEMBRANE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.07

DELIVERY, STORAGE, HANDLING A Materials should be delivered to site in manufacturers original, unopened containers with original labels attached and bearing the following information: 1 2 3 B Name of material. Manufacturers batch codes including date of manufacture. Materials Safety Data Sheets.

Membrane and accessories should be unloaded and stored carefully. Cartons and containers must be protected from weather, sparks, flames, excessive heat, cold and lack of ventilation. Do not stack membrane higher than 5 feet vertically, nor double stack cartons. Cartons should be stored on pallets and covered to protect from water damage. Any damaged material must be removed from the site and disposed of in accordance with applicable regulations.

1.08

PROJECT CONDITIONS A Work should be performed only when existing and forecasted weather conditions are within the limits established by the membrane manufacturer. Membrane should only be installed when temperature is 40F (4.44C) and rising. Consult manufacturer for information concerning cooler temperatures. Proceed with installation only when substrate construction and preparation work is complete. subsoil is approved by architect or geotechnical firm. Ensure that

B C D E

Warn personnel against breathing of vapors and contact with skin and eyes; wear appropriate protective clothing and respiratory equipment. Keep flammable products away from spark or flame. Post No Smoking signs. Do not allow spark producing equipment to be used during application and until all vapors have dissipated. Maintain work area in a neat and workmanlike condition. Remove empty cartons and rubbish from the site daily.

1.09

WARRANTY A Provide a written 5 year material warranty from the manufacturer upon completion and acceptance of the installation.

PART 2 - PRODUCTS 2.01 MANUFACTURERS A Approve by Engineer

UNDER SLAB WATERPROOFING BARRIER MEMBRANE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07100-3 11 March 2013

2.02

PRODUCTS A High Strength Waterproofing: Shall be Polyguard UndersealTM Underslab Waterproofing Barrier Membrane, a 95 mil rubberized asphalt membrane consisting of a strong sheet membrane with a facing of extremely high strength polyethylene backing laminated to a thick layer of proprietary stress absorbing / waterproofing formulation, with a top layer of nonwoven geotextile fabric:

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.

Resistance to Penetration by Termites Resistance to Penetration by Pesticides Resistance to Permeance by Methane Gas Resistance to Permeance by Radioactive Radon Gas Resistance to Diffusion by Radioactive Radon Gas Resistance to Fungi in Soil 16 Weeks Resistance to Permeance by Moisture US grains/sq.ft./in. HGF Resistance to Puncture - Membrane using 1" (24mm) Rod Lb. Resistance to Puncture - Membrane using .35" (8mm) Rod Lb. Resistance to Tearing - Membrane Lb. Membrane Thickness inch Elongation - Ultimate Failure of Polyethylene Backing - % Elongation at Failure Elongation - Ultimate Failure of Adhesive Compound - % Elongation at Failure Cycling Over Crack @ -15 Peel Adhesion - lb/in/ width Overlap Bond - lb/in. width Pliability - 180 bend over 1" mandrel at -25F (-32 C)

0.0% 0.0% 6.3 x 10 -7 2.1 x 10 -14 5.08 x 10 -8 No effect .01 >310 >54 78 .095 >850% >1000% No effect 10.0 8.0 No effect

TEXAS A & M TESTING ASTM F-2130 ASTM D1434 Radon Reduction Technology Laboratory Method Radon Reduction Technology Laboratory Method GSA-PBS 07115 ASTM E-96-B ASTM E-154 ASTM E-4833 ASTM D-4533 ASTM D-1000 ASTM D-412 ASTM D-412 ASTM C-836 ASTM D-1000 ASTM D-1000 ASTM D-146

Self Sealability - Water Vapor Transmission g/h .01* ASTM E-96* ft2 * Test method used: ASTM E-96. Sample preparation for nail puncture: ASTM D-1970. B Accessory Products 1 2 3 Fabric Tape: Shall be Polyguard UndersealTM Fabric Tape Surface Primer: Shall be Polyguard 650 LT Liquid Adhesive or California Sealant Liquid Membrane: Shall be Polyguard LM95

UNDER SLAB WATERPROOFING BARRIER MEMBRANE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07100-4 11 March 2013

PART 3 - EXECUTION 3.01 INSPECTION A Before starting any waterproofing work, the applicator shall thoroughly inspect all surfaces for any conditions detrimental to the proper completion of the work. Should any deficiencies exist, the General Contractor should be made aware of such in writing immediately. Do not proceed with application until all unsatisfactory conditions are corrected.

3.02

SURFACE PREPARATION: A Refer to manufacturers product literature for surface preparation requirements. Surfaces should be structurally sound. Remove debris or any other foreign materials which may damage the membrane system. Use repair materials that are acceptable by the sheet membrane manufacturer. Soil Condition 1 Level, tamp or roll aggregate, sand or earth base.

3.03

INSTALLATION: A B Installation shall be in accordance with manufacturers instructions and ASTM E 1634-98. Membrane Installation - Horizontal Surfaces: Unroll waterproofing barrier membrane with longest dimension parallel with direction of pour. Place extremely high strength backing to the soil and fabric to the concrete. Lap waterproofing barrier membrane over footings and seal to foundation walls. Overlap side seams using the 4" edge trim seal. Clean polyethylene backing of waterproofing barrier membrane prior to application on the 4" edge seal with 30% Isopropyl Alcohol. 5 End laps should be overlapped a minimum of 4" and addressed by applying a coat of liquid adhesive approximately 150-200 sq. ft. per gallon to fabric side of waterproofing barrier membrane and placing adjacent sheet on top. Roll to assure full adhesion. 6 After application of end lap use liquid adhesive to prime seam and apply a 12" piece of fabric tape centered over seam to seal extend out 6 past side laps roll with laminate roller. 7 If annular space of pipe through opening is " or less apply liquid adhesive to fabric side of membrane. Apply a 3/4" cant/fillet around pipe penetration extending onto fabric side of waterproofing barrier membrane and pipe a minimum of 3". 8 If annular space of pipe through opening exceeds " then a patch of fabric seal tape is required. Apply a heavy coat approximately 150 - 200 sq. ft. per gallon liquid adhesive onto the fabric side of the waterproofing barrier membrane extending 6" beyond pipe. Apply a patch 6" larger than pipe diameter. Press or roll patch firmly to obtain full adhesion to waterproofing barrier membrane. Apply another coat of liquid adhesive to the fabric side of the fabric tape patch and apply liquid membrane. 9 Steel reinforcements will be applied directly over the waterproofing barrier membrane. It is utmost important that reinforcement (rebar) chairs that are used are compatible with the system. Steel chairs and bolster be plastic dipped or have plastic caps. 10 Precaution should be taken to protect the waterproofing barrier membrane during placement of reinforcing or concrete. Visually inspect waterproofing barrier membrane prior to pouring of concrete for any punctures or damage to membrane which needs to be repaired. Patch any damaged areas by applying the liquid adhesive at a rate of 150-200 sq. ft. per gallon to fabric side of waterproofing barrier membrane and apply a patch of fabric tape. 11 Prior to slab pour all standing water must be removed from the membrane. 1 2 3 4 END OF SECTION

UNDER SLAB WATERPROOFING BARRIER MEMBRANE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07100-5 11 March 2013

SECTION 07105 BITUMINOUS MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 DESCRIPTION A. B. The work included in this Section comprises furnishing all plant, labour, equipment, appliances and materials and performing all operations in connection with Bituminious membrane Waterproofing. The principal work of this Section includes, but may not be limited to, the application of : 1. Bituminious membrane waterproofing to external faces of basements and other underground and water retaining structures. 2. Protection screed to horizontal surfaces. 3. Protection board to vertical waterproofing within the site. 4. Blockwork (SRC) to vertical waterproofing at site boundaries.

1.02

REFERENCE STANDARDS A. The work shall conform to the codes and standards of the following agencies as further cited herein: NRCA - National Roofing Contractors Association Roofing and Waterproofing Manual

1.03

QUALIFICATIONS A. Installer: Sheet membrane waterproofing shall be executed by an approved specialist Sub-Contractor having a minimum of Fifteen (15) years successful experience in the installation of the specified material. Employ only tradesmen experienced with the installation of the materials specified. The manufacturer shall provide evidence indicating that the specified materials to be used have been successfully utilised on work of similar scope to that shown and specified for this Project. The waterproofing system examples cited shall have been completed and in use for a minimum five (5) years without evidence of failure.

B.

1.04

WARRANTY A. Warranty specified in this Article shall not deprive the Employer of other rights he may have under other provisions of the Contract Documents and are in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. 1. Warranty: Provide a written warranty, for a Ten (10) years period, against leaks resulting from defects of materials or workmanship. Upon notification of such defects, within the warranty period, make the necessary repairs and replacements, to the satisfaction of the Engineer and at no additional cost to the Employer and at minimum disturbance to the Employers use of the Project.

1.05

SUBMITTALS A. B. Manufacturers' Data: Submit manufacturers' specifications, installation instructions and other data to show compliance with the Contract Documents. Samples: Submit samples of membrane waterproofing . Samples shall be 300 mm square.

BITUMINOUS MEMBRANE WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07105-1 11 March 2013

1.06

PRE-INSTALLATION CO-ORDINATION A. Pre-waterproofing Conference : 1. After approval of all materials and prior to installation, a Pre-Waterproofing conference shall be held at job site. In attendance shall be representatives of (1) the Engineer (2) the Contractor, (3) Sub-Contractor and (4) Manufacturer's representative. The parties shall review Drawings, specifications and approved materials. Correct conflicts, if any, between approvals and specification requirements. Examine job site conditions, including inspection of deck, material lables and methods of storing materials. Confirm that all curbs and edges are provided and correctly installed. Review installation procedures, scheduling and temperature requirements, and establish protection methods for finished roof from other trades.

2.

1.07

FINAL INSPECTION A. Upon completion of the installation, an inspection shall be made by a representative of the material manufacturer in order to ascertain that the system has been properly installed. Should there be any deviation from this specification without the prior written consent of the material manufacturer, the manufacturer shall have the option of refusing the guarantee.

1.08

DELIVERY, STORAGE AND HANDLING A. Materials shall be delivered in their original, tightly sealed containers or unopened packages, all clearly labelled with the manufacturer's name, brand name, and number and batch number of the material where appropriate. Materials and equipment shall be stored as directed in a neat and safe manner. Storage area shall be shaded, ventilated and maintained at a temperature between (10oC) and (40oC), and shall be located away from all sources of excess heat, sparks or open flame. Containers of liquid material shall not be left open at any time in the storage area. Materials not conforming to these requirements will be rejected by the Engineer and shall be removed from the site by the applicator and replaced with approved materials, at no additional cost to the Employer. Deliver materials to site in ample time to avoid delay in job progress and at such times as to permit proper co-ordination of the various parts.

B. C. 1.09

PROTECTION A. B. C. D. Protect waterproofing system installation from damage during construction period so that it will be without any indication of abuse or damage at the time of completion. Protect the building from damage resulting from spillage, dripping and dropping of materials. Repair and restore other work damaged during roofing membrane operations. Prevent materials from running into and clogging drains. Take all necessary precautions against fire and other hazards during delivery, storage and installation of flammable materials specified herein. Comply with local ordinances and fire regulations in the installation of hazardous materials specified or required under this section.

PART 2 - PRODUCTS 2.01 MATERIALS A. General: Provide the products and systems specified in the material manufacturer's latest published manual for the type of substrate shown.

BITUMINOUS MEMBRANE WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07105-2 11 March 2013

B. C.

Manufacturers: The products and manufacturers specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than those specified, will be considered acceptable. The decision of acceptability will rest with the Engineer. Bitumen Sheet Membrane: Flame bonded single-ply membrane, 4 (+/-0.2) mm thick, composed of asphalt or bitumen modified with thermoplastic resins and reinforced with non-woven polyester fabric. Provide the following : 1. "Paralon NT4"; Imper, Italy 2. Testudo Polyester Spunbond 16"; Index, Italy 3. "Marley Torch 400S"; Marley Waterproofing Ltd. 4. Dermabit elasphalt 250 series. 5. Awazel ht-250 Or equal approved. Provide no. of layers as shown in the drawings or provide two layers if none is shown.

D.

Primer for Bitumen Sheet Membrane: Provide the following: 1. 2. 3. 4. 5. 6. "Impertene Primer", Imper, Italy, or "Indemastic Primer", Index, Italy, or "Marley Bitumen Primer", Marley Waterproofing Ltd, or As recommended by the manufacturer of bitumen sheet membrane. Dermabit Awazel Or equal approved.
07105-3 11 March 2013

BITUMINOUS MEMBRANE WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Protection Screed 1:4 cement sand screed, using sulphate resisting cement type V. F. Protection Board: Provide one of the following or as recommended by the manufacturer of waterproofing membrane wherever mentioned or shown on the drawing. 1. 2. 3. 4. 5. 6. "Sealtight Protection Course PC-2"; W.R. Meadows Inc. "Elastoboard", The Celotex Corp. "Servi-Pak", Servicised Ltd. "Alphatect", Asphal Top SA Dermabit sonoproof PE 6mm thick. Awazel MS 60.

Thickness of the protection board to be as per the drawings or 6mm if none is mentioned therein. G. Blockwork : Provide 100mm thick blockwall as protection to vertical waterproofing membrane at site boundaries. The cement used for manufacturing the blocks as well as that for making the mortar shall be sulphate resisting, type V.

PART 3 - EXECUTION
BITUMINOUS MEMBRANE WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 07105-4 11 March 2013

3.01

Approved local applicators. 1. 2. 3. 4. Al Hamra Al Bahar and Bardawil Jasim Al Nisf Or equal approved.

3.02

CONDITIONS OF SURFACE A. Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected.

3.03

PREPARATION A. Clean and prepare the substrates in all areas and locations in accordance with each of the respective manufacturer's instructions. Grind and fill concrete surfaces as required to meet tolerances specified by the manufacturer. Provide levelling screed in the thickness shown on the drawing or minimum 3mm if none is shown as well as provide additional thickness so as to prepare a level surface for applying the waterproofing membrane. Co-ordinate the installation of waterproofing membrane with floor drains, equipment bases and other adjacent work. Mask adjacent work to prevent soil marks.

B. C. 3.04

INSTALLATION OF MEMBRANE A. B. C. Comply with the membrane manufacturer's directions for the installation. Install and complete the system to assure that no water leakage through the system occurs. At the start of the installation and periodically as work progresses provide the services of the manufacturer's technical representative at the job site as often as deemed necessary by the manufacturer and/or the Engineer to advise on all phases of this work. Install the system in accordance with the manufacturer's instructions, except where more stringent requirements are shown or specified. Install cant strips where shown or recommended by the waterproofing materials manufacturer.

D. E. 3.05

INSTALLATION OF PROTECTION BOARD TO VERTICAL SURFACES WITHIN THE SITE A. Areas where waterproofing is applied shall be protected from all traffic and backfilling. All damage to finished portions of the waterproofing membrane by other trades shall be either repaired or replaced, or both, in an acceptable manner and the cost of such corrective work shall be borne by the Contractor. Upon completion of waterproofing, immediately install a protective course over membrane surfaces. Protection course shall consist of protection board, or where indicated protection board shall be applied in "dry" method over horizontal sections of membrane waterproofing. At vertical sections of membrane waterproofing, protection board shall be adhered to membrane with membrane manufacturer's approved adhesive.

B.

3.06

INSTALLATION OF 100MM THICK BLOCKWORK AT SITE BOUNDARIES A. B. Refer and comply with 3.04A above. Install 100mm thick blockwork as protection to vertical waterproofing if it abuts the site boundary.
07105-5 11 March 2013

BITUMINOUS MEMBRANE WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C. 3.07

Block work as protection to the waterproofing membrane will be done in a manner as not to damage the membrane. The Contractor/Sub-contractor will be completely responsible.

INSTALLATION OF PROTECTION SCREED TO HORIZONTAL WATERPROOFING A. Install the above, all as protection screed as shown in the drawings or 50mm thick if none is shown.

3.08

TESTING A. On completion of membrane installation all areas shall be observed for leaks after removal of dewatering system wherever applicable, or under natural conditions likely to occur after the contract is substantially complete. Any area where leaks occur shall be drained, thoroughly dried, repaired, and then fully re-tested.

B. 3.08

CLEAN UP The applicator shall remove all masking, protection, equipment, materials and debris from the work and storage areas and leave those areas in clean, undamaged and acceptable condition.

END OF SECTION

BITUMINOUS MEMBRANE WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07105-6 11 March 2013

SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 - GENERAL 1.01 DESCRIPTION A. B. The work included in this Section comprises furnishing all plant, labour, equipment, appliances and materials and performing all operations in connection with Fluid Applied membrane Waterproofing. The principal work of this Section includes, but may not be limited to, the application of : 1. Fluid Applied Waterproofing (CIM1060) for potable and non-potable water tanks etc. 2. Fluid Applied Waterproofing for wet areas like kitchens, toilets, pools etc. One layer of Waterproofing membrane 4.5mm thick with minimum 250 polystyrene with water test and fluid applied water proofing below the floor finishing.

1.02

SUBMITTALS A. Submit the following under provisions of Division 1- GENERAL REQUIREMENTS: 1. 2. 3. Literature: Manufacturer's product data sheets, specifications, performance data, physical properties and installation instructions for each item furnished hereunder. Manufacturers instructions: Manufacturers installation instructions indicating special procedures, and perimeter conditions requiring special attention. Qualifications Statement: Evidence indicating that the proposed applicators are qualified to perform the work and are approved by the waterproofing manufacturer.

1.03

QUALITY ASSURANCE A. The work under this Section must be performed by an applicator approved by the membrane manufacturer. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. Prior to commencing work, the manufacturer of the fluid applied waterproofing membrane shall submit the following: 1. 2. C. D. Certification from an independent testing laboratory that their material meets the CGSB 37-GP50M standard for rubberized asphalt membranes. Certification showing full time quality control of their production facilities and that each batch of material is tested to insure conformance with the manufacturers published physical properties.

B.

Upon completion of the work the membrane manufacturer shall inspect the location where membrane have been carried out. Upon completion of the work, furnish the Employer with a single source, Five-Year watertightness Warranty from the manufacturer/supplier.

1.04

SPECIAL REQUIREMENTS A. All surfaces shall be clean, free of dampness, frost, dust, laitance or loose concrete, films of oil, grease, curing compounds, lacquers or other substances which would affect the application of membrane waterproofing.

FLUID APPLIED WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07120-1 11 March 2013

B. C. D. 1.05

Protect all adjacent work from damage by work performed under this section. Deliver materials In original unopened containers of packaging clearly labeled with manufacturer's name, brand name, Instruction for use, all Identifying numbers, and U.L. Labels. Store materials in a clean, dry area protected from water and direct sunlight.

JOB CONDITIONS A. B. C. D. E. Application of the membrane shall not commence nor proceed during inclement weather. All surfaces to receive the membrane shall be free of water, dew, frost, snow and ice. Application of membrane shall not commence nor proceed when the ambient temperature is below 32 degrees Fahrenheit. Preparation and application of waterproofing must be conducted in well ventilated areas. Over its service life, do not expose membrane or accessories to a constant temperature in excess of 180 degrees Fahrenheit. (i.e. hot pipes and vents or direct steam venting, etc..). Do not allow waste products (petroleum, grease, oil, solvents, vegetable or mineral oil, animal fat, etc.) to come in contact with the waterproofing membrane. Any exposure to foreign materials or chemical discharges must be presented to membrane manufacturer for evaluation to determine any impact on the membrane assembly performance.

1.06

WARRANTY A. Waterproofing membrane manufacturer shall provide the following warranties and bonds under the provisions of the General Conditions, Supplementary Conditions and Division 1 General Requirements. 1. Five Year - Watertightness Warranty a. The waterproofing shall remain watertight for five years from substantial .completion. b. In the event that the products fails to so perform, the manufacturer/supplier will make repairs to the waterproofing assembly to enable it to perform as warranted.

PART 2 - PRODUCTS 2.01 MATERIALS A. Description: 1. The Waterproofing System shall be a high solids, two component (for water tanks only), liquid, cold applied, chemical resistant asphalt extended urethane elastomer that cures to a durable abrasion resistant film. Forms a flexible impermeable barrier to water and most aqueous agents. Product shall be EPA approved and meet NSF-61 criteria for direct contact with potable water and shall meet the following performance data :

2. B.

Manufacture: To establish a standard of quality, design and function desired, Drawings and specifications have been based on the following: 1. 2. For Potable Water Tanks : Product: CIM 1000 - Commercial Industrial Membrane For Wet Areas and Fountain Pools : a. CIM 800:

FLUID APPLIED WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07120-2 11 March 2013

b. Approved Materials: 1. Zypax 2. Vandex 3. IDI

Or equal approved.

PART 3 EXECUTION APPROVED LOCAL APPLICATORS 1. 2. 3. 3.01 Al Hamra Al Bahar and Bardawil Jasim Al Nisf

EXAMINATION A. Examine the substrates adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until satisfactory conditions have been corrected.

3.02

PREPARATION A. B. C. Clean and prepare the substrate in accordance with the manufacturers instructions. Grind and fill concrete surfaces as required to meet tolerances specified by the manufacturer. Apply waterproofing to substrate in accordance with the manufacturers instructions. Co-ordinate the installation of waterproofing with adjacent work.

3.03

LOCATION A. B. C. D. All concrete water tanks on their floors, walls and soffits. All toilets and kitchens on their floors, plus 1000 mm height on their walls and water features fountains etc. wherever shown on drawings. All pool fountains on their floors and walls. Elsewhere to the extent shown in the drawings.

3.04

INSTALLATION A. B. C. Comply with waterproofing manufacturers directions for the installation. Install and complete the system to assure that no water leakage through the system occurs. At the start of the installation and periodically as work progresses provide the service of the manufacturers technical representative at the job site as often as deemed necessary by the manufacturer to advise on all phases of the Work. Install the system in accordance with the manufacturers instructions, except where more stringent requirements are shown or specified. Allow waterproofing to cure properly. During this period, block off all traffic and protect waterproofing from physical damage.

D. E.

FLUID APPLIED WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07120-3 11 March 2013

3.05

TESTING A. B. Test water tanks and all other areas receiving fluid applied waterproofing such as toilet and kitchen floors against leaks after 48 hours (or more if manufacturer so recommends) from the start of the test. Fill water tanks full. Fill with 10cm standing water in toilets and other wet areas. If leaks occur, drain and allow it to be thoroughly dry, repair waterproofing and re test. Repeat process as often as required until no leaks occur.

3.06

CLEAN-UP A. Applicator shall remove all masking, protection, equipment, materials and debris from the work and storage areas and leave those areas in clean, undamaged and in acceptable condition.

END OF SECTION

FLUID APPLIED WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07120-4 11 March 2013

SECTION 07140 CEMENTITIOUS WATERPROOFING 1 - GENERAL 1.01 GENERAL DESCRIPTION A. The penetrating cementitious waterproofing materials specified herein shall be of the surface applied, capillary action type, capable of providing the waterproofing qualities as stated under the Guarantee, for all vertical and horizontal applications, at locations shown on the drawings or on the finish schedules. All work of this Section shall comply with the Conditions of the Contract, the Drawings and any special conditions forming apart of the Contract.

B. 1.02

SCOPE OF WORK A. B. C. D. E. F. G. H. I. J. Provide all labor, materials, equipment and appliances as required for the proper installation cementitious type waterproofing as follows: Prepare all surfaces, as specified herein, to receive penetrating cementitious waterproofing. Provide waterproofing at all vertical and horizontal surfaces shown on the Drawings or Finish Schedule. Manufacturer to provide all certifications, test data, affidavits or samples requested by the Architect. Perform all installations to comply with local Rules and Regulations, OSHA Requirements for Health and Safety and EPA Statutes complying with environmental protection Perform all installations in accordance with the approved construction progress schedule or at such times necessary for the orderly and expeditious completion of the work of the project. Upon completion of waterproofing, remove all waste or rubbish resulting from waterproofing application and all equipment used for same. Pre-mixed factory formulation shall be guaranteed not to contain additives such as chlorides, sulphates, iron oxides, asbestos or similar deleterious substances. All materials used in the formulation shall comply with standards set forth herein, as follows: Penetrating cementitious waterproofing compound shall be composed of specially prepared Portland cement, fine oven-dried Quartz aggregates with a specific sand curve, and organic and inorganic chemicals produced by Contite International.

2 - PRODUCTS 2.01 MANUFACTURERS A. B. C. D. Contite International, Shelton, CT CIM Chemical Construction Material XYPEX Jassem Ahmad Yousef Al Nisf & Co. VANDEX Al Hamra Kuwait Co.
07140-1 11 March 2013

CEMENTATIOUS WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E. 2.02

IDE--

B&B

TYPES OF PRODUCTS A. B. C. D. E. Contite Slurry Contite waterproofing Mortar. Contite TA, broad cast powder application Contite PA added to shot-crete mix Contite Stop plugging material

3 - EXECUTION 3.01 PREPARATION A. B. C. D. E. F. G. Prior to commencing waterproofing operations inspect all containers for rips, tears or holes. Any damaged containers shall be rejected and replaced with new materials. Make sure that surfaces to be treated are free of laitance and foreign materials which will prevent the chemical penetration. Floor hardeners or curing agents should not be used prior to the application. Contite products CANNOT be applied if ambient temperature falls below freezing. Surfaces to be treated shall be frost-free. Surfaces to be treated shall have an open capillary system. joints and cracks exceeding 0.01 inch in size should be routed out 3/4 deep and as narrow as possible Remove all laitance, dirt, dust and rinse concrete slabs and cracks with water. The surfaces shall have a dark not shiny appearance when the coating is applied. Steam clean, acid-etch, or brush blast when necessary. Leavetie holes 1 back. Segregated areas and faulty construction joints shall be routed out to sound concrete. Construction joints and visible cracks in concrete surfaces exceeding hairline size (larger than 0.01) should be routed out3/4 deep. Construction joints can be formed initially by use of cant strip 1 x 3/4

3.02

MIXING PROCEDURES A. Slurry Mix 1. Mix contrite powder water. Proportions: 3 parts of powder to 1 part of water by volume. Should the mixture start to thicken, stir again. Prepare only as much as can be applied within a 30-minute period

B.

Mortar Mix 1. Mix contrite mortar with water. Trowel until medium stiff consistency is reached. Prepare only as much Contite as can be applied within a 35 minute period

3.03

SAFETY A. Protect hands with rubber gloves. During spray or overhead applications use goggles.

3.04

APPLICATION
07140-2 11 March 2013

CEMENTATIOUS WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B. C.

Apply Contite by masonry brush or broom with artificial fibers or spray equipment. Apply Contite TA by broadcast on the concrete while the concrete is still plastic. Float or trowel by hand or machine until desired finish is reached. Horizontal Concrete Surfaces 1. 2. 3. 4. 5. Dry shake and Power Trowel, Wood or Bull Float Broad cast Contite TA when horizontal concrete slab is still in the plastic state. Apply 1.0 lbs./sq.yd. Trowel or float surface is specified finish. Slurry Mix: Contite 2.5 0 3.0 lbs./sq.yd. in one coating. Construction joints and pour/cold joints should be treated with Contite Slurry 2.5 to 3.0 lbs./sq.yd. in slurry consistency immediately prior to placing of concrete Installation of reglets and cant strips at time of forming is recommended. 1 x cold joints are filled with Contite Mortar.

D.

Vertical Concrete Surfaces 1. 2. 3. Honeycombed areas, faulty construction joints, cracks, and tie holes, fill with Contite Mortar Coat interior/exterior surfaces of concrete walls 2.5 to 3.0 lbs/sq. yd with Contite by brush (two coatings) or spray gun. Fill reglets, construction joints, junction walls and slab and/or junction wall land footing with Contite Mortar.

3.05

PROTECTION ANDCURING A. B. Protect the freshly treated surfaces from rain for a minimum period of 24 hours. Maintain above freezing temperature for 24hours. Moisture cure all treated areas for a minimum period of two days in warm, dry and windy weather. Start with water fog spraying the day following the application.

3.06

CLEANING A. Clean all tools such as trowels, brushes, buckets and spray equipment IMMEDIATLY after use. Dried materials can be removed by soaking in muriatic acid (10% solution).

3.07

PAINTING A. B. C. Contite coated surfaces can be painted 14 days after coating. A wash with vinegar water is recommended prior to painting For application on cisterns and drinking water reservoirs, follow EPA requirements.

CEMENTATIOUS WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07140-3 11 March 2013

For special tanks, aquariums and industrial or processing installations, please contact: Contite International, 135 Dudley Road, Wayland, MA 01778 (888)266-8483.

END OF SECTION

CEMENTATIOUS WATERPROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07140-4 11 March 2013

SECTION 07160 BITUMINOUS DAMPPROOFING PART 1 - GENERAL 1.01 DESCRIPTION A. B. The work included in this Section comprises furnishing all plant, labor, equipment, appliances and materials and performing all operations in connection with Fluid Bituminous Damp proofing. The principal work of this Section includes, but may not be limited to, the following:1. 1.02 Protective painting to concrete foundations, and all other concrete surfaces, in contact with soil where waterproofing membrane is not shown to be applied/required.

REFERENCE STANDARDS A. The work shall conform to the Codes and Standards of the following agencies as further cited herein: BS 3416 Rubberized Bitumen Paint

1.04

QUALIFICATIONS A. The manufacturer shall provide evidence indicating that the specified materials have been successfully utilised on work of a similar scope to that shown and specified for this Project. The system examples cited shall have been completed and in use for a minimum two (2) years without any evidence of failure. Fluid applied bituminous dampproofing shall be executed by workers who are familiar with this type of work for a minimum of two years.

B. 1.05

SUBMITTALS A. Manufacturers' Data: Submit to the Engineer Manufacturers' specifications and installation instructions for the fluid applied dampproofing system and other data to show compliance with the Contract Documents.

1.06

DELIVERY, STORAGE AND HANDLING A. The Contractor shall deliver the approved products to the job site in their original unopened containers clearly labelled with the manufacturer's name, brand, designation, type and class as applicable, and the date of manufacture and expiration (if any). Products shall be stored in an approved dry area and protected from contact with soil and from exposure to the elements. Products shall be kept dry at all times. Products shall be handled in a manner that will prevent breakage of containers and/or damage to the products.

B. C. 1.07

ENVIRONMENTAL CONDITIONS A. Do not apply Bituminous Dampproofing during inclement weather or when air temperature is outside the range recommended by the manufacturer.

1.08

PROTECTION A. Protect Bituminous Dampproofing from damage during construction period so that it will be without any indication of abuse or damage at time of completion or covering with other materials.
07160-1 11 March 2013

BITUMINOUS DAMPPROFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C. D.

Protect the building from damage resulting from spillage, dripping and dropping of materials. Repair and restore other work damaged during Bituminous Dampproofing operations. Prevent materials from running into and clogging drains. Take all necessary precautions against fire and other hazards during delivery, storage and installation of flammable materials specified herein. Comply with local ordinances and fire regulations in the installation of hazardous materials specified or required under this Section.

PART 2 - PRODUCTS 2.01 MATERIALS A. Rubberised Bitumen Paint The rubber bitumen emulsion shall comply with BS 3416 Type I Class A or B and shall be a water bound emulsion with a minimum 60% total solids content by volume, comprising bitumen with fine particles of rubber. Not less than 10% nor more than 20% of the total solids shall be rubber. The consistency shall be such that it can be applied to the surface by brush at normal temperature comply with CP 231 for application of paint. 2.02 MANUFACTURERS A. The product and manufacturer specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than, those specified may be acceptable subject to the Engineer's approval. 1. Nito Proof 100 Fosroc International Ltd 2. Febit FEB Construction Products 3. Pasta Imper Imper Italia SPA

PART 3 - EXECUTION 3.01 EXAMINATION A. Inspect all surfaces and verify that they are in proper condition to receive the work of this Section. 1. 2. B. C. 3.02 Verify items which penetrate surfaces to receive dampproofing are rigidly installed. Verify surfaces are free of cracks, depressions, waves, or projections which may be detrimental to successful installation.

Do not apply dampproofing to damp, frozen, dirty, dusty or surfaces which require cleaning. Do not apply dampproofing unless curing of concrete is complete and approved by the Engineer.

PREPARATION A. B. Clean surfaces of debris and deleterious material and surfaces are clean, dry, free from oil, grease or loosely adhering particles such as mortar, laitance etc. Do not proceed with Bituminous Dampproofing until all drains, piping, conduit, vents, ducts and other projections through the substrate have been installed.

3.03

INSTALLATION
07160-2 11 March 2013

BITUMINOUS DAMPPROFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B. C. D. E.

Install Bituminous Dampproofing in accordance with manufacturer's printed instructions except as hereinafter specified. Apply a first coat of bituminous dampproofing and allow to dry coverage rate should be approximately 3m2 per litre. The second coat shall be applied as soon as the first coat is dry at right angles to the first coat, also at the same rate as the first coat. The emulsion shall be applied by brush, squeegee or spraying strictly in accordance with the manufacturer's instructions. It shall not be applied during, or when rain or dust storms are to be expected. Backfillings shall not be commenced until the second coat of emulsion is quite dry. END OF SECTION

BITUMINOUS DAMPPROFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07160-3 11 March 2013

SECTION 07210 BUILDING INSULATION PART 1 - GENERAL 1.01 REFERENCE STANDARDS A. American Society for Testing and Materials (ASTM): C 553-92 Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications. C 578-95 Rigid, Cellular Polystyrene Thermal Insulation. C 612-93 Mineral Fiber Block and Board Thermal Insulation. C 665-98 Mineral Fiber Blanket Thermal Housing. E 84-98 E 136-96a 1.02 Insulation for Light Frame Construction and Manufactured

Test Method for Surface Burning Characteristics of Building Materials. Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C.

E 119-98 Method for Fire Tests of Building Construction and Materials.

PERFORMANCE REQUIREMENTS A. B. Provide complete thermal separation between exterior and interior of air-conditioned spaces with R value of not less than 10. Exceptions: 1. Requirements for glazed areas, roofs, and other areas of construction not controllable under this Section are specified elsewhere. 2. Below Grade Spaces: Perimeter insulation not required to extend more than 150 mm below grade unless shown otherwise. Interior wall systems required full height. 3. Slab on Grade: Separation provided by perimeter insulation. Firestoppinng: Coordinate with Section 07270 - Firestopping to achieve required fire resistance at perimeter walls and edge of slabs.

C. 1.03

SUBMITTALS A. Product Data: Submit manufacturer's literature fully describing insulating products.

1.04

QUALITY ASSURANCE A. Provide only materials tested and certified to conform with specified requirements.

1.05

DELIVERY, STORAGE, AND HANDLING A. B. Delivery : Deliver products in original, unopened containers with contents, brand names, and manufacturer plainly marked. Storage: Store material in dry place. Protect from damage.

BUILDING INSULATION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07210-1 11 March 2013

PART 2 - PRODUCTS 2.01 MANUFACTURERS A. B. C. Isofoam Insulating Material Plants, Kuwait Gulf Materials & Trading Co., Kuwait Kuwait Insulating Material Co., (KIMMCO), Kuwait

2.02

MATERIALS A. Rigid Insulation: 1. Extruded polystyrene foam: One of the following conforming to ASTM C 578, Type IV, with compressive strength not less than 1.8 kg/cm2: a. "Styrofoam" ("Square Edge" or "Scoreboard") by Dow Chemical Company. b. "Foamular 250" by Owens Corning (previously UC Industries). c. "Amofoam RCY" by Tenneco Building Products (Previously Amoco) d. ISO board MD. By Isofoam Insulation Material Plants WLL or Masterboard. Thickness 50 mm for walls and 75mm for roof unless otherwise shown on drawings. Water Absorption: Not to exceed 0.1%. Fire characteristics per ASTM E 84: a. Flame spread: 75 maximum. b. Smoke developed: 450 maximum.

2. 3. 4.

B.

Batt/Blanket Insulation: 1. Glass fiber, mineral fiber, or mineral wool materials. Acceptable manufacturers: Manville, Owens Corning Fiberglass Corporation, U.S. Gypsum Company, Fibrex, Knauf, Rockwool Industries Inc., Azel and Kimco. Thickness as required to achieve the following thermal values: minimum R 12 typical for general use and min. 15 for metal roofs. Widths as required and as suitable for application. Facing: a. Unfaced: ASTM C 665, Type I.

2. 3. C.

Semi-Rigid Insulation Board: 1. Glass fiber material by Owens Corning Fiberglas Corporation or Kimco. 2. Minimum R = 12.0. 3. Unfaced: Flame spread 20 or less by ASTM E 84, smoke developed 20. a. Type 701, 24 kg/m~density, k = 0.24; ASTM C 553, Type III. Spandrel Insulation. 1. 2. Mineral insulation "Thermafiber Curtain Wall Insulation" by U.S. Gypsum Co. or equal by Fibrex or Partek or approved equal from specified manufacturers. Provide with foil facing. Minimum R = 12.0.

D.

2.03

VAPOR BARRIER A. Specified elsewhere.

2.04

FASTENING DEVICES
07210-2 11 March 2013

BUILDING INSULATION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B.

Adhesives: Provide mastics and adhesives made or recommended by the manufacturer for bonding materials to the indicated substrate. See insulation anchors and perimeter insulation. Fasteners: 1. Galvanized sheet metal screws and washers. 2. Rigid Wall Insulation System: Hand or pneumatic driven nails or self-threading screws as recommended by insulation manufacturer. Insulation Anchors: 1. Typical: Metal spindle on mounting plate and washer; "Insul-Anchor" by Midwest Fasteners Mfg., "Stic-Klip" by Eckel Industries of Canada, or approved equal. 2. Over Spray Fireproofing : Weld on type clips which permit attachment to steel substrate without removal of fireproofing similar to products manufactured by U.S. Gypsum Co. Insulation Tape : "FasTape" No. 0821 by Fasson or approved equal. Foil/ scrim/kraft facestock coated tape; coated one side with rubber based adhesive protected by a bleached kraft release liner. Reinforced scrim. Typical for foil-faced products. Supplemental Supports: Provide wire mesh, straps, flexible metal rods or similar devices where required for supplemental support of insulation in permanent location. Galvanized finish typical except where aluminum is required to prevent electrolysis.

C.

D.

E.

PART 3 - EXECUTION 3.01 EXAMINATION AND PREPARATION A. 3.02 Examine surfaces to receive insulation and verify that they are ready for the installation. Remove loose particles, dirt, and other foreign matter affecting bond of adhesives.

LOCATION 1. 2. Exterior Wall Window Framing Between stone and wall 50mm thick extruded polystyrene insulation Pack perimeters of window framing with glass fibre batt insulation where glazing system abuts wall construction; fill all voids. Spandrel insulation.

3. 4. 5. 3.03

Glazed Curtain Wall Spandrels

Underside of metal roofing for interior Glass fiber blanket insulation having aluminium foil facing and fixed with chicken wire mesh. Over R.C roof 75mm extruded polystyrene insulation

INSTALLATION A. Provide attachment/support as required and recommended by manufacturer to assure insulating materials maintain their proper location and perform their intended function, all subject to review by Engineer. 1. Provide wire or strapping retainers at stud walls without board covering to maintain insulation in place. Install retainers on open side of wall at 400 mm centers. Rigid Insulation: 1. Foundation: (exterior side.) a. Install on exterior side of foundation walls at slab-on-grade conditions; depth as shown on drawings. Wall: a. Install on interior surface of exterior concrete or masonry wall.
07210-3 11 March 2013

B.

2.

BUILDING INSULATION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. c.

Install insulation with tight joints with grooves oriented vertically. Install metal furring vertically at 600 mm center to center into grooved insulation and securely attach to wall with mechanical fasteners, all in accordance with manufacturer's recommendations.

C.

Semi-Rigid Insulation: 1. Install with insulation anchors at spacing recommended by insulation manufacturer. 2. Use weld-on type anchors at steel members with spray fireproof mg. Install in spaces between framing members. Cut and fit tightly around obstructions and fill voids. Spandrel Insulation : Install per manufacturer's recommendations to hold insulation firmly and permanently in place. No supports or fasteners shall be visible from exterior. END OF SECTION

D. E.

BUILDING INSULATION Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07210-4 11 March 2013

SECTION 07243 EXTERNAL RENDERING PART 1 - GENERAL 1.01 SUMAMRY A. Provide labor, material, equipment and services and perform operations required for complete installation of external rendering system including metal furring and lathing and related work as indicated on the drawings, specified herein, and approved by the engineer. 1.02 RELATED WORK A. B. C. D. E. 1.03 Concrete, CMU and ACMU. Flashing Sealants Doors, Windows and Curtain Walling Paints

SUBMITTALS FOR REVIEW A. Samples: samples of materials specified herein shall be submitted for approval and approval obtained before work and materials are installed. Samples shall be fully identified, labeled and shall show manufacturers complete standard line of colors and textures. Samples shall be minimum 300x500mm. B. Product Date: Submit manufactures latest published literature for materials specified herein for approval. Obtain approval before materials are delivered to the job site. Literature shall include data on each component of exterior rendering system.

1.04

JOB MOCK-UP A. Location and extend of the job Mock-up shall be as directed by the Engineer. B. Apply External Rendering mock-up to show color, texture and workmanship to be expected in completed work. Build mockup at site, as directed, using all accessories: insulation, anchors, stone, base coat, fiber glass mesh, metal furring, metal lathing, cover coat and finish coat, as specified and shown on drawings. C. Obtain engineers acceptance of visual qualities of mock-up before start of composite rendering. Replace unsatisfactory mockup work, as directed, until acceptable to Engineer. Mock-up shall serve as a standard for comparison and for judging completed rendering.

1.04

ENVIRONMENTAL REQUIREMENTS A. The contractor shall make adequate provision before normal application of External Rendering commences for the means of keeping within this temperature limit, taking into account the anticipated site temperatures during the period of External Rendering application. B. Do not apply External Rendering key coat or brown coats when substrate or ambient air temperature in more than 40C0 . Coating works in summer should be carried at night OR early in morning below temperatures of 40C0.

PART 2 - PRODUCTS 2.01 EXTERNAL RENDERING SYSTEM A. External Rendering shall comply with ASTM C387, BS 5262, BS 5492, BSEN 1015 and DIN 18550, consist of the following coats: a. Provide 200mm wide galvanized steel strip lath (1.11kg/m) to bridge two dissimilar wall strata, cover conduits and pipes and the joints between concrete and block walls.
EXTERNAL RENDERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 07243-1 11 March 2013

b.

Key coat (Dash Coat): premix ready to apply dash coat from National Industries to be applied a minimum thickness of 6mm overall. i. Approved manufacturer: National Industries Base Coat: Ready to apply base coat from National Industries i. Approved manufacturer: National Industries Primer: Primer sealer based on acrylic copolymer resins. i. Approved manufacturer: Jotun. Textured Coat: high quality fine textured finish based. texture shall be subject to the Engineers approval i. Approved manufacturer: Jotun Protection Coat High quality decorative coat paint based on pure acrylic copolymer emulsion with PU if necessary. Color and sheen shall be subject to the Engineers approval. i. Approved manufacturer: Jotun

c. d. e.

f.

2.02

PLASTER ACCESSORIES A. General a. b. c. d. e. f. g. Plaster accessories shall be made of galvanized steel in accordance with BSEN 10142 DX51D+Z257. Plaster accessories shall be manufactured by Catnic, UK. Strip lath: Strip lath shall be manufactured in accordance with BS 1369: Part 1: 1987 Corner Bead: corner bead shall be manufactured in accordance with BS 6425: Part 1: 1984. Depth governed by plaster thickness, maximum possible lengths, expanded metal flanges with Chisel nose. Plaster stop Bead: Plasters top bead shall be manufactured in accordance with BS 6425: Part 1: 1984 Depth governed by plaster thickness, maximum possible lengths. Control and Expansion Joint Accessories: Control and Expansion joints shall be formed of two plaster stop beads as shown in drawings and approval of the Engineer. Corner beads, plaster stop beads and metal supports (Anchorage) shall be pre-painted with the following coats: i. One coat, (35u) of two component polyamide cured epoxy primer as manufactured by Jotun. ii. Two coats (50u) of two components polyurethane, asocyanate cured acrylic finish as manufactured by Jotun; Finish Semi-Gloss or as decided by the Engineers sample approval. Anchorage: Tie wire, nails, and other metal supports of type and size to suit application; to rigidly secure materials in place. Fasteners: ASTM C1002, self-drilling, self-tapping screws.

h. i. 2.03

EXTERNAL RENDERING MATERIAL A. B. External rendering shall be applied on all concrete surfaces, CMU/ACMU walls and ceilings as indicated. Material Technical Date a. Key coat (Dash coat): Spray apply 6 mm thick pre-mixed key coat on concrete surfaces and CMU/ACMU wall strata using power spray gun leaving a rough texture to provide mechanical key for subsequent coat. i. Sand blast all concrete surfaces or apply special bounding material. ii. For concrete containing microsilica; application shall be as recommended by the key coat manufacturer. iii. Key coat surface shall be continuously went and cured for three (3) days. b. Base coat i. Apply base coat onto the prepared dash coat surface in one coat up to 20mm thick and finished by floating. ii. In the event additional base coat (s) are required due to tolerances in alignment and plumb that exceed the allowable limits based on international standards (not more than 3mm in 3m straight edge placed at any location), the contractor shall provide complete fiberglass mesh over the entire base coat.
07243-2 11 March 2013

EXTERNAL RENDERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

c. d. e. 2.04

iii. The additional base coat(s) shall be done by the contractor without any extra cost to the Employer. iv. Cellulose glass fibers shall have mesh size of 8mm x 8mm, weight 110gm/m minimum. v. Base coat surface shall be continuously wet and cured for three (3) days. Primer: High quality primer sealer based on acrylic copolymer resins. Primer shall be applied on dry substrate and free from laitance and any other contamination Textured Render: very high quality structure finish based on copolymer dispersion filled with ground natural stone aggregates. Render Protection: Two coats of height quality decorative paint based on pure acrylic copolymer emulsion.

RENDERING MIXES A. Mix and proportion External rendering in accordance with manufacturers recommendation.

PART 3 - EXECUTION 3.01 EXAMINATION A. Make a thorough examination of all surfaces receiving the work of this section and before starting the fabrication, notify the Engineer, in writing, of any defects which would affect the satisfactory completion of the work of this section. B. Start of work shall imply acceptance of conditions as satisfactory for the installation of the work of this section. 3.02 PREPARATION A. Examine the contract drawings and specifications in order to insure the completeness of the work required under this section. Supplementary parts, equipment, and work, necessary to complete fabrication and installation, though not specifically indicated on drawings or specified herein, shall be provided. B. Verify measurements and dimensions at the job site and cooperate in the coordination and scheduling of the work of this section with the work of related trades. C. Protect contiguous work from moisture, deterioration and soiling resulting from application of systems. Provide temporary covering and other protection needed to prevent spattering of exterior finish coating on other work. Protect system, substrates, and wall construction behind them from inclement weather during installation. Prevent infiltration of moisture behind system and deterioration of substrates. D. Prepare level and clean substrates to comply with stem manufacturers requirements to obtain optimum bond between substrates and adhesive for installation. 3.03 INSTALLTION ACCESSORIES A. Place corner bead at external wall corners. Fasten at outer edges of lath only. B. Place 200mm wide strips of metal lath centered over junctions of dissimilar materials over pipes/conduits. Secure rigidly in place and the joints between concrete and blocks.. C. Place plaster stop beads at terminations of plaster finish and at control joints. Secure rigidly in place 3.04 CONTROL AND EXPANSION JOINTS A. Locate exterior control and expansion joints as shown on drawings. B. Establish control and expansion joints with double plaster stop beads as shown on drawings. C. Coordinate joint placement with other related work. 3.05 APPLICATION OF RENDERING SYSTEM
07243-3 11 March 2013

EXTERNAL RENDERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. Apply external rendering system as per manufacturers recommendation and as per approved method statement submitted by the contractor. 3.06 CURING A. Key coat and base coat surfaces shall be continuously wet and cured for three (3) days. 3.07 FIELD QUALITY CONTROL A. Material and workmanship shall be at all times subject to inspection by the Engineer and ready access for such inspection shall be permitted to all work during application. B. Material and workmanship not in conformity with the provisions of the manufacturers instructions and these specifications may be rejected at any time if defects are found during progress of the work. 3.08 CLEANING AND PROTECTION A. Remove temporary covering and protection of other work. Promptly remove protective coatings from window and door frames, and any other surfaces outside areas indicated to receive protective coating. B. Provide final protection and maintain conditions, in a manner acceptable to installer and system manufacturer, which ensure system being without damage or deterioration until completion of the project. END OF SECTION

EXTERNAL RENDERING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07243-4 11 March 2013

SECTION 07500 PROTECTED MEMBRANE ROOFING PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 The work included in this Section comprises furnishing all plant, labour, equipment, appliances and materials and performing all operations in connection with Protected Membrane Roofing as shown in the drawings.

SUBMITTALS A. Manufacturers' Literature: Submit to the Engineer manufacturers' specifications and installation instructions for roofing membrane and accessory items and for each item of proprietary material used, showing compliance with these Specifications. Shop Drawings: Submit shop drawings showing details, dimensions, locations and installation methods of roofing system including membrane, insulation, tiles/pavers, flashings and all accessories; indicate the following:- profiles, slopes, low and high points, dimensions, joints and arrangement and connections to adjoining work or materials and anchoring. Indicate positions of service outlets including roof drains, vent pipes, exhaust fans, roof hatches, skylights, etc., and co-ordinate with all other trades Samples: Submit samples of membrane, light weight concrete, insulation, each metal flashing type, concrete pavers/tiles and all other items.

B.

C. 1.03

QUALIFICATIONS A. B. C. Roofing manufacturer to have 15 (Fifteen) years documented experience demonstrating previously successful work of the type specified herein. Roofing applicator to have ten (10) years documented experience demonstrating previously successful work of the type specified herein. Roofing applicators foreman with a minimum of fifteen (15) years documented experience of the type specified herein.

1.04

QUALITY ASSURANCE A. The manufacturers authorized representative shall provide a final inspection at the completion of the project to insure, that the project has been completed in accordance with the manufacturers requirements. Upon approval and acceptance of the project, then a manufacturer's warranty certification shall be written, executed and furnished to the Employer. All roofing shall be as described in this Section and shall be provided and approved by the roof system manufacturer. Any materials not manufactured or provided by manufacturer, shall have written approval from the manufacturer stating the materials are acceptable and are compatible with the other materials and systems required. All roofing and flashing work shall be applied in strict accordance with the roofing manufacturer's written requirements and specifications applicable to roof conditions. Where a conflict exists between the manufacturers written specifications and those procedures specified in this section, the more stringent requirements shall apply.

B.

C.

1.05

DELIVERY, STORAGE AND HANDLING

PROTECTED MEMBRANE ROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07500-1 11 March 2013

A. B. C. D. E.

Deliver materials in manufacturers original, unopened containers or packages with labels and package seals intact and legible. Store all materials in accordance with the manufacturers recommendations. Store rolled goods on clean, raised platforms. Store other materials in dry areas, protected from water and direct sunlight. Provide continuous protection of stored materials against deterioration for duration of project. Store insulation on dunnage and completely cover with a water-resistant breathable material. Provide weights to prevent wind damage to insulation. Distribute any materials stored on roof levels for immediate use to prevent concentrated loads that would impose excessive strain on deck or structural members. Protect roof stored materials to prevent displacement by the wind and protect from exposure to inclement weather and sun. Damaged material: Remove any damaged or contaminated materials from job site immediately, including materials in broken packages, or show other evidence of damage, unless the Engineers Representative specifically authorizes correction thereof and usage on project.

F.

1.06

ENVIRONMENTAL REQUIREMENTS A. B. C. Apply roofing in dry weather; do not install roofing in inclement weather or when precipitation is predicted in the media. Do not apply roofing membrane to damp or frozen deck surface. Apply roofing when ambient temperature is above 4 degrees C. (40 degrees Fahrenheit).

1.07

SEQUENCING AND SCHEDULING A. B. Coordinate the work of this Section with the respective trades responsible for installing interfacing work, and ensure that the work performed hereunder is acceptable to such trades for the installation of their work. Notify manufacturer's representative 48 hours in advance for deck acceptance. Avoid situations where excessive drainage could pass into completed roofing.

1.08

WARRANTY A. Deliver to the Employer upon completion of the work of this Section, an unconditional warranty, on the work of this Section agreeing to promptly repair the roofing as necessary to prevent penetration of water through it. 1. 2. 3. 4. Warranty shall cover product quality, performance, and workmanship for a period of 10(ten) years. Warranty shall cover total roofing system including membrane, insulation, adhesives, sealant, fasteners, membrane flashings, and other materials furnished and installed under this Section. Warranty shall provide coverage for uplift created by maximum wind speed of 128 kilometers per hour (80 miles per hour). Warranty shall provide coverage for maximum peak gust wind speed of 128 kilometers per hour (80 miles per hour).

1.09

PROTECTION A. B. Protect Waterproofing system installation from damage during construction period so that it will be without any indication of abuse or damage at the time of substantial completion of the project. Protect the building from damage resulting from spillage, dripping and dropping of materials. Repair and restore other work damaged during roofing membrane operations.
07500-2 11 March 2013

PROTECTED MEMBRANE ROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C. D.

Prevent materials from running into and clogging drains. Take all necessary precautions against fire and other hazards during delivery, storage and installation of flammable materials specified herein. Comply with local ordinances and fire regulations in the installation of hazardous materials specified or required under this Section.

PART 2 - PRODUCTS 2.01 MATERIALS A. Manufacturers: The products and manufacturers specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than those specified, will be considered acceptable. The decision of acceptability will rest with the Engineer.

2.02

LIGHT WEIGHT CONCRETE A. System based on products by Esastizell of America, Ann Arbor, MI (734-761-6900) or approved equal.

2.03

WATERPROOFING MEMBRANE A. B. General: Provide the products and systems specified in the material manufacturer's latest published manual for the and type of substrate shown. Bitumen Sheet Membrane: Flame bonded single-ply membrane, 4 (+/-0.2) mm thick, composed of asphalt or bitumen modified with thermoplastic resins and reinforced with non-woven polyester fabric. Provide the following or other equal and approved: 1. "Paralon NT4"; Imper, Italy 2. Testudo Polyester Spunbond 16"; Index, Italy 3. "Marley Torch 400S"; Marley Waterproofing Ltd. 4. Dermabit elasphalt 250 series. 5. Awazel ht-250 Or equal approved.

C.

Primer for Bitumen Sheet Membrane: 1. 2. 3. 4. "Impertene Primer", Imper, Italy. "Indomastic Primer", Index, Italy. "Marley Bitumen Primer", Marley Waterproofing Ltd. Or as recommended by the manufacturer of bitumen sheet membrane.

D. 2.04

Cant Strips: Cement and sand mortar, in the proportion of 1:3 by volume.

ROOF INSULATION A. Roof Insulation: Shall be lap edged rigid extruded closed cell polystyrene foam insulation board, in thickness as indicated on the Drawings, as approved by the Engineer. Expanded polystyerene will not be accepted as a substitute. Insulation shall have the following characteristics: 1. Thermal Conductivity: Five year aged average "K" factor of .20 when tested at 24oC mean temperature in accordance with ASTM C-518. 2. Compressive strength: of 2.8kg/cm2 average, 1.75kg/cm2 minimum, when tested in accordance with ASTM D-1621. 3. Water Absorption: of 1% average when tested in accordance with ASTM D-2842 or 0.1% when tested in accordance with ASTM C-272.
07500-3 11 March 2013

PROTECTED MEMBRANE ROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

4. B.

Water Vapor Permeability: of 0.6 perm-inch average when tested in accordance with ASTM C355.

Cover roof insulation with 250 micron (10 mil) polythene sheet/filter fabric. (Note : 1 mil = 1 inch and 1 micron = 1 mm) 1000 1000 FILTER FABRIC Norm. *) *) *) *) CBR-test CBR-test Elongation Strip-test (200mm) Elongation Grab-test Elongation at break Plane strain test Elongation at break Tear Strength Cone Drop Test (hole size) Puncture resistance Water-permeability kDarcy **) Flow at 10cm WC Pore Size Thickness Weight Fibre Bonding Raw Material Resistances d50% d90% at 2,0 kPA DIN 53 855 DIN 53 854 Needled/thermic bonded Polypropylene (PP) n x (CH2-CH-CH3) Wet or dry, the properties shall remain un-changed be resistant to attacks of dry, rot or fungi and to acids and alkalis. Not vibrated ASTM D-1117 BS 6906 Part 6 Dorn : 6mm/110o VSS Prfvorschriften DIN 53 858 ISO/DIS 10319 X X-s DIN 54 307 Unit N N % kN/m % N/2, 5 cm % kN/m % N mm N cm/sec. 1/sec/m2 micron micron mm g/m2 Value Length/Cross 780 700 30 3/3 35/45 225/260 60/60 4/4/4 35/45/45 100/70 50 150 9,0 x 10-2 140 80 80 0,7 110

2.05

PLAIN CONCRETE TILES A. Plain Concrete Tiles shall be 400 x 400 x 40 mm thick, all as shown on the drawings.

PART 3 - EXECUTION 3.01 PRE-INSTALLATION CO-ORDINATION A. Pre-Roofing Conference: 1. After approval of all materials and prior to installation, a pre-roofing conference shall be held at the job site. In attendance shall be (1) Engineers Representative (2) Contractor, (3) Roofing SubContractor and (4) Manufacturer's representative.
07500-4 11 March 2013

PROTECTED MEMBRANE ROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.

The parties shall review Drawings, specifications and approved materials. Correct conflicts, if any, between approvals and specification requirements. Examine job site conditions, including inspection of deck, material labels and methods of storing materials. Confirm that all curbs and edges are provided and correctly installed. Review installation procedures, scheduling and temperature requirements, and establish protection methods for finished roof from other trades and co-ordination of work by other trades.

3.02

INSPECTION A. Surfaces to receive membrane roofing shall be free of projections, voids, depressions, scale efflorescence, loose material, laitence, oil grease and other foreign contaminants. Before starting work, inspect all surfaces to receive membrane and report in writing to the Engineer, any surfaces that are not suitable for correct application of the membrane. If any surfaces are unsuitable to receive membrane, the Contractor shall see that same are corrected by the respective trade prior to application of his work.

B. 3.03

PREPARATION A. All preparation of surfaces, including construction joints shall be completed before membrane waterproofing is installed. Commencement of application of membrane waterproofing to any surface will be construed as acceptance of that surface as proper to receive the waterproofing and any defects in the work thereafter shall be the responsibility of the Contractor without additional cost to the Employer.

3.04

INSTALLATION OF MEMBRANE ROOFING. A. B. On completion of screed over the light weight concrete, laid to required slopes and falls, the membrane roofing will proceed. At the start of the installation, and periodically as work progresses, provide the services of the manufacturer's technical representative at the job site as often as deemed necessary by the manufacturer to advise on all phases of this work. The waterproofing membrane shall be in two layers. Install roofing system alongwith all fixing accessories, in strict accordance with manufacturer's direction for conditions of each application. Prime all surfaces receiving roofing membrane. Use products and methods recommended by the roofing membrane materials manufacturers. Apply cant strips at all edges and around any penetrations in the roofing, as shown on Drawings. Apply roofing membrane in accordance with manufacturer's instructions and recommendations. Overlap joints a minimum of 100 mm. Flash all roof outlets, pipes, sleeves, and other projections through roof deck and provide tight construction throughout. Provide one additional reinforcing layer of the waterproofing membrane at all perimeters, junctions fulboras, at the edges, at upstands etc. and as directed.

C. D. E. F. G. H. 3.05

FLOOD TESTING A. B. The horizontal areas of waterproofing shall be tested prior to the installation of protection board or insulation as applicable. Such testing shall be by flooding sections of the waterproofed area with a minimum 10 cm head of water for 72 (Seventy-two) hours. Flooding shall include proper damming of areas as required. This applicator shall
07500-5 11 March 2013

PROTECTED MEMBRANE ROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

provide his own hoses. Mark any leaks and repair when the membrane is dry. Before flood testing, ascertain from the structural engineer that the structure will withstand the dead load of the water. C. D. E. 3.06 Any area where leaks occur shall be drained, thoroughly dried, repaired, and then re-tested. At completion of flood testing, remove all dams and traces of water to the satisfaction of the Engineer. Installation of mortar beds, fill materials or concrete which are applied over the waterproofing shall not start until such time as the membrane is leak free and has been accepted by the Engineer.

INSULATION INSTALLATION A. Set polystyrene insulation in thickness indicated, using "dry method" (without the use of adhesive or bitumen) as shown on drawings, with long joints continuous and short joints staggered, butting each panel tightly to adjoining panel. Discard all damaged insulation boards. Neatly cut and shape insulation at all projections through roof and at all other vertical projections allowing at least 12mm clearance. Apply no more insulation than can be covered with ballast on the same day. Under no circumstances allow insulation to remain uncovered in damp, wet weather, overnight or exposed to sunlight for prolonged periods of time. Immediately after insulation is applied, apply polyester filter fabric directly on top of insulation.

B. C.

D. 3.07

INSTALLATION OF PLAIN CONCRETE TILES A. B. C. D. Lay plain concrete tiles of size 400 x 400 x 40mm thick to slope, as shown on the drawings. Tiles are to be loose laid. Lay tiles firmly on the filter fabric, without mortar bed. Laying of tiles shall be uniformly straight, in line and level.

3.08

GRAVEL A. Install and lay gravel around the deck as shown in the drawings

3.09

PROTECTION AND CLEANING A. Make good, all damage to the building resulting from this work or operations. Particular care shall be taken to avoid staining any part of the exposed structural or finished work. Hoisting of materials shall be done with extreme care. Use approved means to protect exposed surfaces. At completion of work under this Section, remove from the site and legally dispose of packaging, containers and other accumulated materials, and leave the work in a clean and satisfactory condition. END OF SECTION

B.

PROTECTED MEMBRANE ROOFING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07500-6 11 March 2013

SECTION 07600 METAL FLASHING AND SHEET METAL WORK PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 Drawings and general provisions of the Contract, including Contract General Conditions and Special Conditions apply to the Work of this Section.

REFERENCES A. B. C. D. E. F. G. H. Comply with applicable requirements of the following standards and those others referenced in this Section, under the provisions of Section 01421 - Reference Standards and Definitions. ASTM B 209 - Specification for Aluminum Alloy, Sheet and Plate. ASTM B 221 - Specification for Aluminum Extrusions. ASTM D 226 - Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing. ASTM D 4586 - Asphalt Roof Cement, Asbestos-Free. FS QQ-A-250d - Aluminum and Aluminum Alloy, Plate and Sheet. SMACNA - Architectural Sheet Metal Manual, referred to herein as Sheet Metal Manual. NRCA - Roofing and Waterproofing Manual.

1.03

SUBMITTALS A. Submit the following under provisions of Division 1 - General Requirements: 1. 2. 3. Literature: Manufacturer's data sheets for each metal type and accessories furnished hereunder, include material specifications, performance data, physical properties and finishes. Certification: Provide certifications that materials and systems comply with the specified requirements for the use indicated. Shop drawings: a. Fully dimensioned large scale design details showing material profiles, splices, flashing terminations and other jointing details, fastening methods and installation details. Indicate material type, sizes, and weights or gages. Indicate extent of adjacent work specified under other Sections of the Specifications. b. Fully detail methods of relieving stresses due to thermal movement, including sealing of expansion seams. c. All details bearing dimensions of actual measurements taken at the project. Selection Samples: a. Metal sample chips, indicating Manufacturer's full range of finish colors for factory finishes available for selection by Engineer. b. Manufacturer's sample boards for sealant colors. Verification Samples: a. 300 mm long samples of formed fascia and trim components.

4.

5. 1.04

QUALITY ASSURANCE A. Company specializing in fabrication and installation of sheet metal flashing work with minimum 5 years documented experience.
07600-1 11 March 2013

METAL FLASHING AND SHEET METAL WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. 1.05

Flashing and sheet metal applicator, with a minimum of five (5) years documented experience demonstrating previously successful work of the type specified herein, and approved by product manufacturer.

DELIVERY, STORAGE AND HANDLING A. B. C. General: Deliver, store, and protect and handle products to site under provisions of Section 01600 Materials and Equipment. Store preformed and prefinished material to prevent twisting, bending, or abrasion, and to provide ventilation. Slope metal sheets to ensure drainage. Prevent contact with materials during storage which may cause discoloration, staining, or damage.

1.06

SEQUENCING AND SCHEDULING A. Coordinate the installation of flashings and sheet metal work with the various trades responsible for installing interfacing materials, and install the work at appropriate times so as not to delay the progress of related work.

1.07

WARRANTY A. Provide five (5) year warranty under provisions of Section 01700. Warranty shall include replacement of materials due to the finish failing, chipping, scaling, or fading beyond industry standards.

1.08

EXTRA MATERIALS A. B. Provide sufficient quantity of each color finish coat material, for field touch-up work after erection, and pack the additional coating materials with the components to be furnished hereunder. Clearly label and package extra materials securely to prevent damage.

PART 2 - PRODUCTS 2.01 SHEET METAL FLASHING AND TRIM MATERIALS A. B. C. D. E. F. G. H. J. Aluminum 2mm thick sheet .unless otherwise shown, finish No. 2D. Solder: ASTM B32; for use with stainless steel, provide 60 - 40 tin/lead solder, with acid-chloride type flux, except use rosin flux over tinned surfaces. Fasteners: Screws and rivets shall be of same material as sheet metal or of compatible material. Match finish of exposed heads with material being fastened. No nailing permitted for the fixation of the flashing. Sealant: As specified in Section 07900 - Sealants. Epoxy Seam Sealer: 2 part non-corrosive metal seam cementing compound, recommended by metal manufacturer for exterior/interior non-moving joints including riveted joints. Mastic Sealant: Polyisobutylene; non-hardening, non-skinning, non-drying, non-migrating sealant. Paper Slip Sheet: rosin-sized building paper. Polyethylene Underlayment: Minimum 6 mil carbonated polyethylene film resistant to decay. Dielectric Separator:
07600-2 11 March 2013

METAL FLASHING AND SHEET METAL WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.02

ACCESSORIES A. B. Underlayment: ASTM D226 No 15 asphalt saturated roofing felt, non-perforated. Flashing cement: Trowel grade, composed of selected asphalts, solvents, and non-asbestos fillers, conforming to FS SS-C-153 Type 1, ASTM D 2822, Type 1 and ASTM D 4586, Type 1 (Non-asbestoes) as manufactured by Karnak Chemical Corporation, product N. 19 Flashing Cement, Koch Materials Company, J & P Petroleum Products Company or other approved manufacturer. Screws: Stainless steel flat head screws, of sizes most appropriate for the specific application, and equipped with soft neoprene washers. Sealant in conjunction with metal work: Sealant Type RP as specified under Section 07900 - Sealants. Plastic cement as recommended by roofing manufacturer and eave protection manufacturer.

C. D. E. 2.03

FABRICATED UNITS A. General Metal Fabrication: Shop-fabricate work to greatest extent possible. Fabricate for waterproof and weather-resistant performance, with expansion provisions for running work, sufficient to permanently prevent leakage, damage, or deterioration of the work. Form work to fit substrates. Form exposed sheet metal work without excessive oil-canning, buckling, and tool marks, true to line and levels indicated, with exposed edges folded back to form hems. Seams: Fabricate nonmoving seams in sheet metal with flat-lock seams. Form seams, and solder. Rivet joints for additional strength where required. Expansion Provisions: Where lapped or bayonet-type expansion provisions in work cannot be used or would not be sufficiently water/weatherproof, form expansion joints of intermeshing hooked flanges, filled with mastic sealant (concealed within joints). Sealant Joints: Where movable, nonexpansion type joints are indicated or required for proper performance of work, form metal to provide for proper installation of elastomeric sealant. Separations: Provide for separation of metal from noncompatible metal or corrosive substrates by coating concealed surfaces at locations of contact, with bituminous coating or other permanent separation as recommended by manufacturer/fabricator.

B. C.

D. E.

PART 3 - EXECUTION 3.01 EXAMINATION A. B. 3.02 Verify roof openings, curbs, pipes, sleeves, ducts, or vents through roof are solidly set, cant strips and reglets in place and nailing strips located. Beginning of work shall constitute acceptance of the conditions of the surfaces to which this work is to be applied.

PREPARATION A. B. C. Field measure site conditions prior to fabrication. Install starter and edge strips, and cleats before starting installation. Install surface mounted reglets true to lines and levels. Seal top of reglets with sealant.
07600-3 11 March 2013

METAL FLASHING AND SHEET METAL WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D. E. F. G. H. I.

Insert flashings into reglets to form tight fit. Secure in place with plastic wedges at maximum of 200 mm on center. Seal flashings into reglets with sealant. Secure flashings in place using concealed fasteners. Cleat and seam all joints. Apply plastic cement compound between metal flashings and felt flashings, asphalt shingle roofing or asphalt roll roofing. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles. Solder metal joints at gutters and rain leaders watertight for full metal surface contact. After soldering, wash metal clean with neutralizing solution and rinse with water. Seal metal joints watertight. During the installation of work of this Section, protect the work of other trades against undue soilage and damage by the exercise of reasonable care and precautions. Repair or replace any work so damaged and soiled.

3.03

FLASHING INSTALLATION - GENERAL A. Except as otherwise shown on the reviewed shop drawings or specified herein, the workmanship of sheet metal work, method for forming joints anchoring, cleating, provisions for thermal movement, etc., shall conform to the standard details and recommendations of the sheet metal producer and those of producer organizations and research institutions and associations concerning the sheet metal used, in addition to the standards and details set forth in the referenced materials specified in this Section. Face nailing will not be permitted, concealed cleating or other concealed method must be used to attach sheet metal work to structure. Ensure that fastenings do not exceed 200 mm on centers. Use flat head fasteners throughout, and seal all fastener heads after installation thereof. Fill all slip joints and overlapping surfaces in the assembly with specified sealant material, removing all excess sealant material from the prefinished surfaces immediately, to prevent staining the finish.

B. C. D. 3.04

CLEANING A. B. Daily clean work areas by sweeping and disposing of debris. Upon completion of the work of this Section in any given area, remove tools, equipment and all rubbish and debris from the work area; leave area in broom-clean condition.

END OF SECTION

METAL FLASHING AND SHEET METAL WORK Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07600-4 11 March 2013

SECTION 07841 THROUGH-PENETRATION FIRESTOP SYSTEMS PART 1 - GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. B. This Section includes through-penetration firestop systems for penetrations through fire-resistance-rated constructions, including both empty openings and openings containing penetrating items. Related Sections include the following: 1. 2. 3. 4. 1.3 A. Division 7 Section "Fire-Resistive Joint Systems." Division 13 Sections specifying fire-suppression piping penetrations. Division 15 Sections specifying duct and piping penetrations. Division 16 Sections specifying cable and conduit penetrations.

1.2

PERFORMANCE REQUIREMENTS General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. 1. 2. B. Fire-resistance-rated walls including fire walls, fire partitions, fire barriers and smoke barriers. Fire-resistance-rated horizontal assemblies including floors, floor/ceiling assemblies and ceiling membranes of roof/ceiling assemblies.

Rated Systems: Provide through-penetration firestop systems with the following ratings determined per ASTM E 814 or UL 1479: 1. 2. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated. T-Rated Systems: For the following conditions, provide through-penetration firestop systems with T-ratings indicated, as well as F-ratings, where systems protect penetrating items exposed to potential contact with adjacent materials in occupiable floor areas: a. b. 3. Penetrations located outside wall cavities. Penetrations located outside fire-resistance-rated shaft enclosures.

L-Rated Systems: Where through-penetration firestop systems are indicated in smoke barriers, provide through-penetration firestop systems with L-ratings of not more than 0.01524cu. m/s x sq. m at both ambient temperatures and 204 deg C.

C.

For through-penetration firestop systems exposed to view, traffic, moisture, and physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. 1. For piping penetrations for plumbing and wet-pipe sprinkler systems, provide moisture-resistant throughpenetration firestop systems.

THROUGH-PENETRATION FIRESTOP SYSTEMS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07841-1 11 March 2013

2. 3. D.

For floor penetrations with annular spaces exceeding 100 mm in width and exposed to possible loading and traffic, provide firestop systems capable of supporting floor loads involved, either by installing floor plates or by other means. For penetrations involving insulated piping, provide through-penetration firestop systems not requiring removal of insulation.

For through-penetration firestop systems exposed to view, provide products with flame-spread and smokedeveloped indexes of less than 25 and 450, respectively, as determined per ASTM E 84. SUBMITTALS

1.4 A. B.

Product Data: For each type of product indicated. Shop Drawings: For each through-penetration firestop system, show each type of construction condition penetrated, relationships to adjoining construction, and type of penetrating item. Include firestop design designation of qualified testing and inspecting agency that evidences compliance with requirements for each condition indicated. 1. 2. Submit documentation, including illustrations, from a qualified testing and inspecting agency that is applicable to each through-penetration firestop system configuration for construction and penetrating items. Where Project conditions require modification to a qualified testing and inspecting agency's illustration for a particular through-penetration firestop condition, submit illustration, with modifications marked, approved by through-penetration firestop system manufacturer's fire-protection engineer as an engineering judgment or equivalent fire-resistance-rated assembly.

C.

Through-Penetration Firestop System Schedule: Indicate locations of each through-penetration firestop system, along with the following information: 1. 2. 3. Types of penetrating items. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency.

D. E. F.

Qualification Data: For Installer. Product Certificates: For through-penetration firestop system products, signed by product manufacturer. Product Test Reports: From a qualified testing agency indicating through-penetration firestop system complies with requirements, based on comprehensive testing of current products. QUALITY ASSURANCE

1.5 A. B.

Installer Qualifications: A firm that has been approved by FMG according to FMG 4991, "Approval of Firestop Contractors." Installer Qualifications: A firm experienced in installing through-penetration firestop systems similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful performance. Qualifications include having the necessary experience, staff, and training to install manufacturer's products per specified requirements. Manufacturer's willingness to sell its through-penetration firestop system products to Contractor or to Installer engaged by Contractor does not in itself confer qualification on buyer. Installation Responsibility: Assign installation of through-penetration firestop systems and fire-resistive joint systems in Project to a single qualified installer. Source Limitations: Obtain through-penetration firestop systems, for each kind of penetration and construction condition indicated, through one source from a single manufacturer.
07841-2 11 March 2013

C. D.

THROUGH-PENETRATION FIRESTOP SYSTEMS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Fire-Test-Response Characteristics: Provide through-penetration firestop systems that comply with the following requirements and those specified in Part 1 "Performance Requirements" Article: 1. 2. Firestopping tests are performed by a qualified testing and inspecting agency. A qualified testing and inspecting agency is UL, or another agency performing testing and follow-up inspection services for firestop systems acceptable to authorities having jurisdiction. Through-penetration firestop systems are identical to those tested per testing standard referenced in "Part 1 Performance Requirements" Article. Provide rated systems complying with the following requirements: a. b. Through-penetration firestop system products bear classification marking of qualified testing and inspecting agency. Through-penetration firestop systems correspond to those indicated by reference to throughpenetration firestop system designations listed by the following: 1) UL in its "Fire Resistance Directory."

F.

Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." DELIVERY, STORAGE, AND HANDLING

1.6 A.

Deliver through-penetration firestop system products to Project site in original, unopened containers or packages with intact and legible manufacturers' labels identifying product and manufacturer, date of manufacture, lot number, shelf life if applicable, qualified testing and inspecting agency's classification marking applicable to Project, curing time, and mixing instructions for multicomponent materials. Store and handle materials for through-penetration firestop systems to prevent their deterioration or damage due to moisture, temperature changes, contaminants, or other causes. PROJECT CONDITIONS

B.

1.7 A.

Environmental Limitations: Do not install through-penetration firestop systems when ambient or substrate temperatures are outside limits permitted by through-penetration firestop system manufacturers or when substrates are wet due to rain, frost, condensation, or other causes. Ventilate through-penetration firestop systems per manufacturer's written instructions by natural means or, where this is inadequate, forced-air circulation. COORDINATION

B.

1.8 A. B. C. D.

Coordinate construction of openings and penetrating items to ensure that through-penetration firestop systems are installed according to specified requirements. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate through-penetration firestop systems. Notify Owner's inspecting agency at least seven days in advance of through-penetration firestop system installations; confirm dates and times on days preceding each series of installations. Do not cover up through-penetration firestop system installations that will become concealed behind other construction until each installation has been examined by Owner's inspecting agency and building inspector, if required by authorities having jurisdiction.

PART 2 - PRODUCTS 2.1 MANUFACTURERS

THROUGH-PENETRATION FIRESTOP SYSTEMS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07841-3 11 March 2013

A.

Available Products: Subject to compliance with requirements, through-penetration firestop systems that may be incorporated into the Work include, but are not limited to, those systems indicated in the Through-Penetration Firestop System Schedule on Drawings. FIRESTOPPING, GENERAL

2.2 A.

Compatibility: Provide through-penetration firestop systems that are compatible with one another; with the substrates forming openings; and with the items, if any, penetrating through-penetration firestop systems, under conditions of service and application, as demonstrated by through-penetration firestop system manufacturer based on testing and field experience. Accessories: Provide components for each through-penetration firestop system that are needed to install fill materials and to comply with Part 1 "Performance Requirements" Article. Use only components specified by through-penetration firestop system manufacturer and approved by qualified testing and inspecting agency for firestop systems indicated. Accessories include, but are not limited to, the following items: 1. Permanent forming/damming/backing materials, including the following: a. b. c. d. 2. 3. 4. Slag-/rock-wool-fiber insulation. Sealants used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state. Fire-rated form board. Fillers for sealants.

B.

Substrate primers. Collars. Steel sleeves.

2.3 A.

FILL MATERIALS General: Provide through-penetration firestop systems containing the types of fill materials indicated in the Through-Penetration Firestop System Schedule at the end of Part 3 by referencing the types of materials described in this Article. Fill materials are those referred to in directories of referenced testing and inspecting agencies as "fill," "void," or "cavity" materials. Cast-in-Place Firestop Devices: Factory-assembled devices for use in cast-in-place concrete floors and consisting of an outer metallic sleeve lined with an intumescent strip, a radial extended flange attached to one end of the sleeve for fastening to concrete formwork, and a neoprene gasket. Latex Sealants: Single-component latex formulations that after cure do not re-emulsify during exposure to moisture. Firestop Devices: Factory-assembled collars formed from galvanized steel and lined with intumescent material sized to fit specific diameter of penetrant. Intumescent Composite Sheets: Rigid panels consisting of aluminum-foil-faced elastomeric sheet bonded to galvanized steel sheet. Intumescent Putties: Nonhardening dielectric, water-resistant putties containing no solvents, inorganic fibers, or silicone compounds. Intumescent Wrap Strips: Single-component intumescent elastomeric sheets with aluminum foil on one side. Mortars: Prepackaged dry mixes consisting of a blend of inorganic binders, hydraulic cement, fillers, and lightweight aggregate formulated for mixing with water at Project site to form a nonshrinking, homogeneous mortar. Pillows/Bags: Reusable heat-expanding pillows/bags consisting of glass-fiber cloth cases filled with a combination of mineral-fiber, water-insoluble expansion agents, and fire-retardant additives.
07841-4 11 March 2013

B.

C. D. E. F. G. H.

I.

THROUGH-PENETRATION FIRESTOP SYSTEMS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

J. K.

Silicone Foams: Multicomponent, silicone-based liquid elastomers that, when mixed, expand and cure in place to produce a flexible, nonshrinking foam. Silicone Sealants: Single-component, silicone-based, neutral-curing elastomeric sealants of grade indicated below: 1. 2. 3. Grade: Pourable (self-leveling) formulation for openings in floors and other horizontal surfaces, and nonsag formulation for openings in vertical and other surfaces requiring a nonslumping, gunnable sealant, unless indicated firestop system limits use to nonsag grade for both opening conditions. Grade for Horizontal Surfaces: Pourable (self-leveling) formulation for openings in floors and other horizontal surfaces. Grade for Vertical Surfaces: Nonsag formulation for openings in vertical and other surfaces.

2.4 A.

MIXING For those products requiring mixing before application, comply with through-penetration firestop system manufacturer's written instructions for accurate proportioning of materials, water (if required), type of mixing equipment, selection of mixer speeds, mixing containers, mixing time, and other items or procedures needed to produce products of uniform quality with optimum performance characteristics for application indicated.

PART 3 - EXECUTION 3.1 A. EXAMINATION Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of work. 1. 3.2 A. Proceed with installation only after unsatisfactory conditions have been corrected.

PREPARATION Surface Cleaning: Clean out openings immediately before installing through-penetration firestop systems to comply with firestop system manufacturer's written instructions and with the following requirements: 1. 2. 3. B. Remove from surfaces of opening substrates and from penetrating items foreign materials that could interfere with adhesion of through-penetration firestop systems. Clean opening substrates and penetrating items to produce clean, sound surfaces capable of developing optimum bond with through-penetration firestop systems. Remove loose particles remaining from cleaning operation. Remove laitance and form-release agents from concrete.

Priming: Prime substrates where recommended in writing by through-penetration firestop system manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces. Masking Tape: Use masking tape to prevent through-penetration firestop systems from contacting adjoining surfaces that will remain exposed on completion of Work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove smears from firestop system materials. Remove tape as soon as possible without disturbing firestop system's seal with substrates. THROUGH-PENETRATION FIRESTOP SYSTEM INSTALLATION

C.

3.3 A.

General: Install through-penetration firestop systems to comply with Part 1 "Performance Requirements" Article and with firestop system manufacturer's written installation instructions and published drawings for products and applications indicated.

THROUGH-PENETRATION FIRESTOP SYSTEMS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07841-5 11 March 2013

B.

Install forming/damming/backing materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated. 1. After installing fill materials and allowing them to fully cure, remove combustible forming materials and other accessories not indicated as permanent components of firestop systems.

C.

Install fill materials for firestop systems by proven techniques to produce the following results: 1. 2. 3. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating items as required to achieve fire-resistance ratings indicated. Apply materials so they contact and adhere to substrates formed by openings and penetrating items. For fill materials that will remain exposed after completing Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.

3.4 A.

IDENTIFICATION Identify through-penetration firestop systems with preprinted metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 150 mm of edge of the firestop systems so that labels will be visible to anyone seeking to remove penetrating items or firestop systems. Use mechanical fasteners for metal labels. For plastic labels, use self-adhering type with adhesives capable of permanently bonding labels to surfaces on which labels are placed and, in combination with label material, will result in partial destruction of label if removal is attempted. Include the following information on labels: 1. 2. 3. 4. 5. 6. The words "Warning - Through-Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage." Contractor's name, address, and phone number. Through-penetration firestop system designation of applicable testing and inspecting agency. Date of installation. Through-penetration firestop system manufacturer's name. Installer's name.

3.5 A.

FIELD QUALITY CONTROL Inspecting Agency: Owner will engage a qualified, independent inspecting agency to inspect through-penetration firestops. Independent inspecting agency shall comply with ASTM E 2174 requirements including those related to qualifications, conducting inspections, and preparing test reports. Where deficiencies are found, repair or replace through-penetration firestop systems so they comply with requirements. Proceed with enclosing through-penetration firestop systems with other construction only after inspection reports are issued and firestop installations comply with requirements. CLEANING AND PROTECTING A. Clean off excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not damage materials in which openings occur. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems aithout damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. END OF SECTION

B. C.

3.6

B.

THROUGH-PENETRATION FIRESTOP SYSTEMS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07841-6 11 March 2013

SECTION 07900 EXTERIOR SEALANTS PART 1 - GENERAL 1.01 SUMMARY A. B. 1.02 Drawings and general provisions of the Contract, including Contract General Conditions and Special Conditions apply to the Work of this Section. The work included in this section comprises furnishing all plant, labour, equipment, appliances and materials and performing all operations in connection with joint sealants, glazing sealants etc. and the accessories.

QUALIFICATIONS A. Applicator: The sealant work shall be performed by a firm having 5 years experience in the installation of specified materials on projects comparable to this Project. The firm shall have the approval of the sealant materials manufacturer.

1.03

MOCK UPS AND TESTING A. Visual Mock-Up 1. B. Provide specified sealants, at Project site, where directed, in coordination with exterior wall work, glass and glazing for the visual mock-up review by the Engineer.

Testing Mock-Up: Provide specified sealants and related accessories for testing mock-up in composite configurations designed to fulfill the performance criteria, and representing the elements which will be used in the final work. Sealant Adhesion Evaluation 1. 2. Perform sealant adhesion evaluation at the earliest possible time after award of the Contract. The sealant manufacturer shall perform adhesion evaluation tests in accordance with ASTM C794 using the sealant and production run samples of the finished substrates which are to be used in the test mock-up and in the final Work. Furnish to the sealant manufacturer the finished substrate samples of such size and quantity as he requires for the adhesion evaluation. a. The substrate samples shall be of the alloy and with the temper, surface treatment and preparation, primer and finish in each specified color, all as are to be used in the test mock-ups and in the final Work. If the materials used fail to meet the sealant manufacturer's requirements for structural glazing, furnish additional samples with such modifications as may be necessary to meet the sealant manufacturer's requirements and the requirements of the Contract documents.

C.

3.

4.

D.

Preconstruction Compatibility and Adhesion Testing: Prior to testing of mock-ups, submit samples of all materials that will contact or affect sealants to sealant manufacturers for compatibility and adhesion testing, as indicated below: 1. 2. 3. Schedule sufficient time for testing and analysis of results to prevent delay in the progress of the Work. Investigate materials failing compatibility or adhesion tests and obtain sealant manufacturer's written recommendations for corrective measures, including use of specially formulated primers. Testing will not be required when sealant manufacturer is able to submit joint preparation data required above which is acceptable to Engineer and is based on previous testing of current sealant
07900-1 11 March 2013

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

products for adhesion to, and compatibility with, joint substrates and other materials matching those submitted. E. Preconstruction Stain Resistance Testing: Prior to testing of mock-ups, submit samples of all materials that will contact or affect sealants to sealant manufacturers, in sizes as required, for stain testing, as indicated below: 1. Use test methods standard with manufacturer to determine resistance to staining. Submit quantities of each type of contiguous joint substrate material, in sizes a s required by the sealant manufacturer for testing. Schedule sufficient time for testing and analysis of results to prevent delay in the progress of the Work.

2. 1.04 WARRANTIES A.

Warranty: Provide a written warranty, agreeing to repair or replace silicone sealant compounds which have failed to provide airtight and watertight joints for any reason, or which appear to have failed in adhesion, cohesion, abrasion-resistance, migration-resistance, stain-resistance, general durability or any other form of apparent deterioration (excluding inherent qualities and limitations clearly specified in the manufacturer's data which was submitted). Period of warranty shall be twenty (20) years, and warranty shall be signed by the Manufacturer, the installer and the Contractor.

1.05

SUBMITTALS A. Manufacturers Literature: Submit to the Engineer the following information from the manufacturer. 1. Published data or manufacturer's letter, clearly indicating that each product to be furnished complies with these Specifications, is recommended for the application shown and is compatible with each other material in the joint system. Complete instructions for handling, storage, mixing, priming, installation, curing and protection of each type of sealant.

2. B.

Samples: Submit to the Engineer (following the submittal of manufacturer's data), samples of each type of exposed sealant. Provide samples 300 mm long installed between two samples of the materials to be sealed, fully cured. Samples will be reviewed by the Engineer for colour and texture only. Compliance with all other requirements is the exclusive responsibility of the Contractor. Compliance with Performance Requirements: Not-withstanding the types of sealant specified herein, the Contractor shall in all cases be responsible for providing sealant materials the best of their respective kinds, compatible with adjoining materials and suitable for the purpose intended, all at no additional expense to the Employer.

C.

1.06

ENVIRONMENTAL CONDITIONS A. Do not proceed with installation of sealants during inclement weather unless all requirements and manufacturer's instructions can be complied with, and unless the work can proceed in accordance with the agreements of the pre-installation meeting. Do not proceed with the installation of sealants under extreme temperature conditions which would cause joint openings to be at either maximum or minimum width, nor when such extreme temperatures or heavy wind loads are forecast during the period required for initial or nominal cure of elastomeric sealants. Whenever possible, schedule the installation and cure of elastomeric sealants during period of relatively low temperatures (but well within manufacturer's recommended range) so that subsequent tensile stresses upon the cured sealants will be minimised.

1.07

PRE-INSTALLATION MEETING A. Prior to the installation of caulking or sealants, and at the Engineer's direction, meet at the project site to review the material selections, installation procedures and co-ordination with other trades. Meeting shall include the contractor, manufacturer's representative, the Engineer and representatives of other trades or
07900-2 11 March 2013

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

Sub-Contractors affected by the sealant installation. Examine sample applications to determine and record whether all parties agree that the proposed installations are likely to perform as required. 1.08 SAMPLE APPLICATION A. Provide sample applications of caulking or sealants at locations designated by the Engineer. Samples shall represent the primary types of materials, substrate surfaces, joint size, exposure, and other conditions to be encountered in the work. Preparation, priming, application, and curing, shall comply with manufacturer's recommendations and actual proposed methods. Schedule the applications, with allowance for sufficient curing time, so that samples may be examined and any necessary adjustments made at least one (1) week prior to date scheduled for commencing installation of the work. The samples shall be visually examined for staining, dirt pickup, shrinkage, colour, general workmanship and appearance. Cut and pull the caulking or sealant from each sample joint to examine for internal bubbles or voids, adhesion, and general compatibility with substrate.

B.

1.09

DELIVERY, STORAGE AND HANDLING A. B. Deliver materials in manufacturers' unopened containers, fully identified with brand, type, grade, class and all other qualifying information. Store materials in a dry location, in such a manner as to prevent damage or intrusion of foreign matter. Conspicuously mark "Rejected" on materials which have once been wet or damaged an remove from the job site.

PART 2 - PRODUCTS 2.01 MATERIALS - GENERAL A. Product Variations: If more than one of the manufacturer's products comply with the requirements for any item specified herein, provide the specific product recommended by the manufacturer for the particular condition of use in each case. Manufacturers: The products and manufacturers specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than those specified, may be acceptable subject to the Engineer's approval. Compatibility: Provide only sealants, caulking compounds and joint primers which are compatible with the joint surfaces and backing or filler materials, as stated in the manufacturer's published data, or as certified by the manufacturer for each application. Confirm compatibility of sealants that may be in contact with each other. Determine the proper hardness or consistency of elastomeric sealants in consultation with the manufacturer, considering joint movement and exposure for the size of joint shown. Ranges of Hardness: In general, provide sealants with the following ranges of hardness (fully cured sealant at 24 Deg.C): 1. 2. 3. For joints subject to maximum movement and nominal exposure to weather and abrasion: 15 to 25 Shore A durometer hardness. For joints subject to moderate movements and severe weather exposure or moderate abrasion: 25 to 40 Shore A durometer hardness. For joints subject to minimum movement and severe abrasion: 35 to 60 Shore A durometer hardness.

B.

C.

D. E.

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07900-3 11 March 2013

F.

Modulus of Elasticity: In general, for elastomeric sealants, provide sealants having the lowest modulus of elasticity which is consistent with the degree of exposure to wear and abrasion. Any sealant exposed to traffic must have strength and modulus sufficiently high to resist damage by traffic. Colour: For fully concealed joints, provide the manufacturer's standards colour of sealant which has the best overall performance characteristics for the application shown. For exposed joints provide the colour shown, or if the colour is not shown provide colours as follows: 1. The colour, in each case, will be selected by the Engineer from manufacturer's standards colours, to match or blend with adjoining materials in a manner to be determined by the Engineer.

G.

H.

Manufacturer's Representative: Do not use elastomeric sealants produced by any manufacturer who will not agree to send a qualified technical representative to the project site when requested, for the purpose of rendering advice concerning the proper installation of his materials.

2.02

SEALANTS A. One-Part Silicone Rubber Sealant (1SRS): Exterior Glazing: One-component elastomeric sealant, FS-TTS-001543, Class A, Type II non-sag: 1. Silpruf; General Electric Co., Waterford, New York, USA. 2. 790 Building Sealant; Dow Corning Corp., Midland, Michigan, USA. Two-Part Polyurethane Modified Sealant (2-PUMS): Exterior-general application: FS TT-S-00227, Class A, Type II non-sag, elastomeric sealant: 1. Dymeric; Tremco Mfg. Co., Cleveland, Ohio, USA. 2. Iso-Flex 2000; Harry S. Peterson Co., Elmhurst, Illinois, USA. 3. Dynatrol II; Pecora Corp; Harleysville, Pennsylvania, USA.

B.

2.03

ELASTOMERIC JOINT SEALANTS A. B. Elastomeric Sealant Standard: Provide manufacturer's standard chemically curing, elastomeric sealant of base polymer indicated. Silicone Rubber Weather Seal (Sealant Type 1): ASTM C920, class and use as best suited for the intended purpose; Provide one of the following: 1. "Silpruf 2000 " (General Electric Co.). 2. "795 Building Sealant" or "790 Silicone Building Sealant"(Dow Corning Corp.). Silicone Rubber Structural Sealant (Sealant Type 2): Complies with ASTM C920 and ASTM C1184 requirements, is compatible with system components with which it comes in contact, and is specifically formulated and tested for use as a structural sealant; class and use as best suited for the intended purpose; Provide one of the following: 1. "Ultraglaze 4000 Silicone Structural Glazing Sealant" (General Electric Co.); "Ultraglaze 4200 Silicone Structural Glazing Sealant" (General Electric Co.) for use with insulating glass units and "Ultraglaze 4400 Silicone Structural Glazing Sealant" (General Electric Co.) for use in the shop. 2. "795 Silicone Building Sealant" or "995 Silicone Building Sealant" (Dow Corning Corp.) for field use and "983 Silicone Building Sealant"(Dow Corning Corp.) for use in the shop.

C.

2.04

SOLVENT-RELEASE-CURING JOINT SEALANTS A. Non-Skinning Mastic Compounds 1. Mastic Compound: A non-drying, non-skinning, non-hardening compound for sealing small concealed joints; 2. Polyisobutylene Mastic Compound: A non-drying, non-skinning, non-oxidizing, non-bleeding heavy mastic sealing compound of polyisobutylene for sealing large concealed joints.
07900-4 11 March 2013

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.05

LATEX JOINT SEALANTS A. Acrylic-Emulsion Sealant: ASTM C834, Manufacturer's standard, one part, nonsag, mildew-resistant, acrylic-emulsion sealant formulated to be paintable and recommended for exposed applications on interior and on protected exterior locations involving joint movement of not more than plus or minus 5 percent.

2.06

JOINT SEALANT BACKING A. General: Provide sealant backings of material and type which are nonstaining; are compatible with joint substrates, sealants, primers and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing. Plastic Foam Joint Fillers: Preformed, compressible, resilient, nonwaxing, nonextruding strips of flexible, nongassing plastic foam of material indicated below; nonabsorbent to water and gas; and of size, shape and density to control sealant depth and otherwise contribute to producing optimum sealant performance. 1. 2. Closed Cell Polyethylene: Not less than 3 psi for 25% compression resistance, highly resistant to petroleum oils and solvents Compressible Closed Cell Polyethylene Foam Rod: Types as shown, or as required for proper performance of the sealant in the specific joint, which is compatible with sealant, as recommended by sealant manufacturer.

B.

C. 2.07

Compressible Filler: Continuous closed cell neoprene with pressure sensitive temporary positioning adhesive on one side; thickness and width as shown.

MISCELLANEOUS MATERIALS A. B. Primer: Provide type recommended by joint sealer manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint sealer-substrate tests and field tests. Cleaners for Nonporous Surfaces: Provide nonstaining, chemical cleaners of type which are acceptable to manufacturers of sealants and sealant backing materials, which are not harmful to substrates and adjacent nonporous materials, and which do not leave oily residues or otherwise have a detrimental effect on sealant adhesion or in-service performance. Bond-Breaker Tape: Polyethylene tape as recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where applicable.

C.

PART 3 - EXECUTION 3.01 ACCEPTABLE CONDITIONS: A. Examine the component surfaces and fillers of the joints to be sealed, and the conditions under which the work is to be done. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the Engineer.

3.02

PREPARATION A. Clean bonding joint surfaces to remove deleterious substances which might interfere with bond or otherwise impair the work. Do not apply elastomeric sealants to joint surfaces previously painted or treated with sealer, curing compound, water repellent or other coatings, unless a laboratory durability test of bond-cohesion has been performed and successfully demonstrated that bond will be durable. Test method shall comply with procedures of the Federal Specification, or other referenced standard, as applicable to the particular sealant.

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07900-5 11 March 2013

B. C.

Do not apply paint and other coatings or substances to surfaces adjoining joint surfaces until sealants have been installed and are nominally cured, so that adhesion will not be impaired by migration of such substances onto the joint surfaces. Concrete and Masonry Joint Surfaces: Etch bonding surfaces with a 5% solution of muriatic acid to remove excess alkalinity. Rinse thoroughly with a diluted ammonia solution, and then with clear water, and dry before installation of elastomeric sealants.

3.03

INSTALLATION A. B. C. Comply with the manufacturer's instructions for the use and installation of each type of sealant, unless otherwise shown or specified. Prime or seal the bonding joint surfaces in accordance with the sealant manufacturer's recommendations. Avoid migration of primer or sealer onto adjoining surfaces and remove any spillage promptly. Install bond breaker in joints as shown and wherever recommended by the sealant manufacturer to prevent bond of the sealant to surfaces where such bond might impair the performance of the sealant. Do not puncture surface or skin of compressible rod type bond breaker. Have the manufacturer's technical representative present when beginning the installation of each major type of sealant. Comply with manufacturer's printed instructions and recommendations, except as may be otherwise shown, or except as may be otherwise directed (and recorded) by the manufacturer's representative. Employ only tradesmen who are experienced in the use of the materials specified. Use only the types of equipment recommended by the sealant manufacturer. Apply compounds in continuous beads or rivers, filling joint from the bottom without openings, voids or air pockets. Force compound to sides of joint so as to carefully and thoroughly "wet" opposite joint bond surfaces, forming equal areas of contact with sealant. Confine compounds to joint areas shown by use of masking tapes or other precautions to prevent spilling and migration onto adjoining surfaces. Apply compounds in concealed compression joints accurately so that excess compound will not exude from the joint. Apply sealants in the depth shown or, if none is shown, apply in accordance with the manufacturers recommendations and the following general proportions and limitations: 1. 2. K. Apply elastomeric sealants, in joints subject to traffic or other abrasion, to a depth equal to 75% of the joint width, but not less than 10 mm and not more than 19 mm. Apply elastomeric sealants, in joints not subject to traffic or other abrasion, to a depth equal to 50% of the joint width, but not less than 6 mm and not more than 13 mm.

D. E. F. G.

H.

J.

Tool exposed surfaces so as to compress sealants to the profile shown or, if none is shown, tool surface slightly concave except provide a slight wash on horizontal joints where horizontal and vertical surfaces meet. Against rough surfaces or in joints of uneven widths avoid the appearance of excess sealant by locating the sealant well back into joint wherever possible. Remove excess sealant promptly as the work progresses and clean the adjoining surfaces as may be necessary to eliminate any evidence of spillage. If job progress or any other condition requires the installation of sealants at temperatures below those recommended by the manufacturer, consult the manufacturer's representative and establish the minimum provisions required to ensure satisfactory work. Record in writing the conditions under which such installations must proceed and the provisions made to ensure satisfactory work.
07900-6 11 March 2013

L. M. N.

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.04

CURING AND PROTECTION A. B. Cure the sealants in accordance with the manufacturer's instructions, to obtain maximum bond to surfaces, cohesive strength and durability at the earliest possible date. Protect the sealants during the remainder of the construction period, so that they will be without any indication of deterioration or damage at the time of completion of the Works.

3.05

PERFORMANCE TEST A. After curing exterior joints exposed to the weather, test for leaks by applying a stream of water perpendicularly from a 19 mm hose at normal city water pressure or at a pressure determined by the Engineer. Test approximately 5% of the exposed joint system where leakage could be observed. Conduct tests in the presence of the Engineer who will determine the actual percentage of joints to be tested, and the period of water flow exposure, based on any observed leakage. Repair leaks and re-test as directed.

END OF SECTION

EXTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07900-7 11 March 2013

SECTION 07905 INTERIOR SEALANTS PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide interior sealants in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 2. 1.02 SUBMITTALS A. Manufacturer's Data: Submit the following information from the manufacturer: 1. B. Complete instructions for handling, storage, mixing, priming, installation, curing and protection of each type of sealant. Acoustical sealant. Fire stopping sealants.

Samples: Submit samples of specified products, 12 in. long and installed between samples of the materials to be sealed for the Project. Architect's acceptance will be for color only. Compliance with other requirements is the Contractor's responsibility.

1.03

PRODUCT HANDLING A. Deliver materials to Project site in manufacturer's unopened containers, with manufacturer's name, brand, hardness, type, class, grade, and color fully indicated thereon. In addition, provide manufacturers expiration date on all sealant containers and/or include with shipping and installation packaging. Store in accordance with manufacturer's instructions. Material Safety Data Sheets: Submit Material Safety Data Sheets with products delivered to job site.

B.

PART 2 - PRODUCTS 2.01 BULK COMPOUNDS A. General: Provide sealants, joint fillers and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by sealant manufacturer based on testing and field experience. Use non-sag compounds for all other areas except as shown or specified. Elastomeric Compounds 1. Silicone Rubber (Sealant Type 1): ASTM C920, class and use as best suited for the intended purpose; Provide one of the following: a. b. C. "Silpruf 2000 " (General Electric Co.). "795 Building Sealant" or "790 Silicone Building Sealant"(Dow Corning Corp.).

B.

Non-Elastomeric Mildew Resistant Compounds 1. Silicone Sanitary Rubber (Sealant Type 9): ASTM C920, Provide white color unless otherwise shown or specified. Provide one of the following: a. "Silicone Sanitary 1700 Sealant" (General Electric Co.).
07905-1 11 March 2013

INTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. c. D.

"786 Mildew Resistant Silicone Sealant" (Dow Corning Corp.). "898 Sanitary Silicone Sealant" (Pecora Corp.).

d. "Rhodorsil 6B Silicone Sealant" (Tremco-Rhone-Poulenc, Inc.). Non-Elastomeric Compounds 1. Acrylic Latex (Sealant Type 11): ASTM C834; Provide one of the following: a. b. c. "AC-20" (Pecora Corp.). "Acrylic Latex 834" (Tremco). "Sonolac" (Sonneborn Building Products).

E.

Color of Sealant: For concealed joints provide manufacturer's standard color which has the best overall performance qualities for the application shown. For exposed joints the Architect will select colors from the manufacturer's standard colors unless special colors are shown or specified.

2.02

JOINT FILLER MATERIALS A. Compressible Rod: Use non-gassing rod fillers, types as shown, or as required for proper performance of the sealant in the specific joint, which is compatible with sealant, as recommended by sealant manufacturer. One of the following: 1. Closed Cell Polyethylene or Polyolefin Foam Rod: One of the following: a. b. c. 2. a. b. B. "Sof-Rod" (Applied Extrusion Technology). "Green-Rod Polyethylene Backer Rod" (Nomaco, Inc.) "HBR Backer Rod" (Hercules, Inc.). "Denver Foam" as distributed by Pecora Chemical Corp. or Woodmont Products Inc. "Sof-Rod" (Applied Extrusion Technology).

Backer Rod for Silicone Sealants: One of the following:

Select shape and size of joint filler in consultation with the manufacturer for proper performance in the specific condition of use in each case.

2.03

MISCELLANEOUS MATERIALS A. Joint Cleaner: Provide nonstaining, chemical cleaners of type which are recommended by and acceptable to manufacturers of sealants and sealant backing materials, which are not harmful to substrates and adjacent nonporous materials, and which do not leave oily residues or otherwise have a detrimental effect on sealant adhesion or in-service performance. Joint Primer and Sealer: Provide non-staining compounds recommended by the manufacturer of the sealant for the specific joint surface and condition. Bond-Breaker Tape: Polyethylene tape as recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where applicable. Masking Tape: Provide nonstaining, nonabsorbent type compatible with joint sealants and to surfaces adjacent to joints.

B. C.

D.

PART 3 - EXECUTION 3.01 CONDITION OF SURFACES

INTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07905-2 11 March 2013

A. B. 3.02

Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected. Examine the substrates to determine if they are strong enough to withstand the forces which will be induced by the sealants. Repair or strengthen substrates as required before proceeding with the work.

PREPARATION A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealers to comply with recommendations of joint sealer manufacturers and the following requirements: 1. Remove all foreign material from joint substrates which could interfere with adhesion of joint sealer, including dust; paints, except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer; old joint sealers; oil; grease; waterproofing; water repellants; water; surface dirt; and frost. Clean concrete, masonry, unglazed surfaces of ceramic tile and similar porous joint substrate surfaces, by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealers. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil-free compressed air. Remove laitance and form release agents from concrete. Clean metal, glass, porcelain enamel, glazed surfaces of ceramic tile; and other nonporous surfaces by chemical cleaners or other means which are not harmful to substrates or leave residues capable of interfering with adhesion of joint sealers.

2.

3. 4.

B.

Joint Priming: Prime joint substrates where indicated or where recommended by joint sealer manufacturer based on preconstruction joint sealer-substrate tests or prior experience. Apply primer to comply with joint sealer manufacturer's recommendations. Confine primers to areas of joint sealer bond, do not allow spillage or migration onto adjoining surfaces. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces which otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing sealant.

C.

3.04

INSTALLATION A. B. Install materials in accordance with the manufacturer's printed instructions, unless otherwise shown or specified. Installation of Sealant Backings: Install sealant backings to comply with the following requirements: 1. Where joint filler is used as backup for bulk compounds, install filler continuously to depth and shape specified by compound manufacturer for proper application and performance of products. Install joint fillers to provide support of sealants during application and at position required to produce the cross-sectional shapes and depths of installed sealants relative to joint widths which allow optimum sealant movement capability. Provide watertight and airtight corners and joints in a manner recommended by the manufacturer. Do not leave gaps between ends of joint fillers and do not stretch, twist, puncture, or tear joint fillers. Remove absorbent joint fillers which have become wet prior to sealant application and replace with dry material. Install bond breaker tape between sealants and joint fillers, compression seals, or back of joints where adhesion of sealant to surfaces at back of joints would result in sealant failure.

2. C.

Prime or seal substrates, except where manufacturer provides written reports of tests conducted by an independent testing agency which demonstrates that primer or sealer is not required for the conditions of use and the substrates involved. When priming, comply with the application instructions of the bulk compound manufacturer. Apply compounds in continuous beads without open joints, voids or air pockets so as to provide a watertight and airtight seal for the entire joint length and to allow optimum sealant movement
07905-3 11 March 2013

INTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

capability. Apply compounds to the depth and width ratio recommended by the bulk compound manufacturer. D. Immediately after sealant application and prior to time skinning or curing begins, tool sealants to form smooth, uniform beads of configuration indicated, to eliminate air pockets, and to ensure contact and adhesion of sealant with sides of joint. Remove excess sealants from surfaces adjacent to joint. Do not use tooling agents which discolor sealants or adjacent surfaces or are not approved by sealant manufacturer. Tool exposed surfaces of compounds to the profile shown or if none is shown, tool slightly concave to match configuration per Figure 5A in ASTM C962, unless otherwise indicated.

3.05

PROTECTION AND CLEANING A. Protect sealants and related accessories during and after curing period from contact with contaminating substances or from damage resulting from construction operations or other causes so that they are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealers immediately and reseal joints with new materials to produce joint sealer installations with repaired areas indistinguishable from original work. Clean off excess sealants or sealant smears adjacent to joints as work progresses by methods and with cleaning materials approved by manufacturers of joint sealers and of products in which joints occur. END OF SECTION

B.

INTERIOR SEALANTS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

07905-4 11 March 2013

SECTION 08110 INTERIOR HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide hollow metal doors and frames in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 1.02 Furnishing of finish hardware as specified in Section Finish Hardware.

QUALITY ASSURANCE A. B. Provide doors and frames manufactured by a single firm specializing in the production of hollow metal work for not less than 5 years. Hollow metal doors and frames for fire rated openings shall be manufactured by a firm whose units are inspected, tested and listed by UL for single point hardware.

1.03

REQUIREMENTS OF REGULATORY AGENCIES A. Comply with the label requirements of NFPA and UL. Fabricate units in accordance with requirements of NFPA Standard No. 80, 10B and UL Standard for Safety No. 63 "Outline for Proposed Investigation for Fire Doors and Frames" and for the class of door opening corresponding to the hourly rating shown. 1. 2. B. C. Provide required labels permanently fastened on each door and frame assembly which is within the size limitations established by the labeling authority having jurisdiction. Provide anchors for labeled frames as required by authority having jurisdiction.

Temperature Rise Rating: At stairwell enclosures, provide doors which have a Temperature Rise Rating of 450oF maximum in 30 minutes of fire exposure. Safety Glazing Materials: Comply with the requirements of 16 CFR 1201 of the Consumer Products Safety Act with respect to glass and glazing provided in conjunction with hollow metal doors and frames. Refer to Section 08800 GLAZING.

1.04

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. 3. 4. 5. 6. 7. B. ANSI 250.8 Recommended Specifications for Standard Steel Doors and Frames". DHI "Recommended Locations for Finish Hardware". NAAMM/HMMA 840" Installation and Storage of Hollow Metal Doors and Frames". NAAMM/HMMA 850 "Fire Rated Hollow Metal Doors and Frames". "Guide Specifications for Commercial Hollow Metal Doors and Frames (NAAMM). "Metal Finishes Manual" (NAAMM). AWS "Structural Welding Code".

Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.
08110-1 11 March 2013

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.05

SUBMITTALS A. Shop Drawings 1. Submit shop drawings for hollow metal doors and frames. Include for each opening details of frame, elevation of door design type, conditions at opening, details of construction, details of joints and connections, description of anchorage and accessory items and location of reinforcement and installation requirements for finish hardware. a. 2. 3. 4. B. Samples 1. Submit an 18 in. x 24 in. cut-away sample door with provisions for lockset and a pair of hinges and corner section of door frame. Include samples of anchorage. In addition, submit a 12 in. long sample of the stainless steel cladding mounted on the steel frame. Submit an 18 in. x 24 in. cut-away sample frame complete with specified glass and glazing. Indicate coordination of glazing frames and stops with glass and glazing requirements. Submit schedule of doors and frames utilizing reference numbers for details and openings as shown. Describe primer and method of application proposed. Electric Hardware Devices:: Indicate routing of electrical metal raceway or electrical conduit for electric hardware devices.

2. C.

Certificates: Submit manufacturer's certification for each hollow metal unit which is shown for a labeled opening but is larger than the size limitations established by the labeling authority having jurisdiction. State that the unit has been constructed in accordance with applicable requirements for labeled construction. Certification: Provide certification that the prime finish on the hollow metal doors and frames has been tested and complies with ANSI A250.10.

D. 1.06

MOCK-UPS A. B. Provide minimum of one visual mock-up of each standard door and frame assembly and custom door and frame assembly, in type of finish required, subject to review and acceptance of Engineer. The accepted mock-up shall serve as a standard of quality for the assembly represented.

1.06

PRODUCT HANDLING A. Protect hollow metal units from damage during transit, storage and installation. Tool marks, rust, blemishes and any other damage on exposed surfaces will not be acceptable. Store material in a dry location, off the ground and in such a manner as to prevent deterioration. Avoid using nonvented plastic or canvas shelters that could create a humidity chamber. If door packaging becomes wet, remove cartons immediately. Provide spaces between stacked doors to permit air circulation. Deliver hollow metal door frames packaged with one (1) frame per bundle, marked with frame type, size, swing and wall thickness. Inspect doors and frames on delivery for damage, and notify shipper and supplier if damage is found.

B.

1.07

PROTECTION AND CLEANING A. Protect units during construction period so that units will be without any indication of deterioration, use or damage at time of substantial completion.

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08110-2 11 March 2013

B.

Upon completion of installation, clean exposed metal surfaces as recommended by manufacturer and leave ready for final painting.

PART 2 - PRODUCTS 2.01 MANUFACTURERS A. MANUFACTURERS / VENDORS subject to conformance with the requirements herein, shall be selected from one of the below. 1. Steelcraft 2. Curries Doors and CECO Doors 3. Windsor Republic Doors 4. Amweld Building Products 5. Ceco Door Products, USA 6. Dorma Group

2.02

MATERIALS A. B. Cold Rolled Sheet Steel: ASTM A366 and A568, free from scale, pitting or other defects; stretcher leveled standard of flatness for doors. Reinforcing Steel, Supports and Anchoring Devices: Structural steel, ASTM A36; or sheet steel, ASTM A366 cold-rolled or ASTM A569 hot-rolled and ASTM A568; as shown but not less than 16 gauge where shown to be built into exterior walls; hot-dip galvanize after fabrication; comply with ASTM A153, Class B. Filler: Sound deadening and heat-retarding mineral fiber insulating material. At doors required to have temperature rise rating, provide mineral fiberboard core. Fasteners: Galvanized or cadmium plated steel. 1. 2. Bolts and Nuts: ASTM A307, Grade A; with ASTM A 563 hex nuts and, where indicated or required, flat washers. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to six times the load imposed when installed in unit masonry and equal to four times the load imposed when installed in concrete: a. 3. E. F. Interior Material: Carbon-steel components zinc-plated to comply with ASTM B633, Class Fe/Zn 5.

C. D.

Machine Screws: FS FF-S-92, carbon steel, Type III cross-recessed, design I or II recess, style 2C flat head.

Shop Primer: A baked-on primer compatible with the respective specified finish paint and complying with the test procedure and acceptance criteria of ANSI A250.10. Dielectric Separator: Cold applied type, non-sagging, resistant to severe corrosion conditions; applied in two coats for an overall minimum dry film thickness of 25 mils. One of the following: 1. 2. 3. "Carbomastic 90" (Carboline Co.). "Bitumastic 50" (Kop-Coat, Inc.) "Jennite J-16" (Maintenance Inc.).

2.03

FABRICATION A. Fabricate doors and frames to the design and dimensions shown in accordance with best shop practices and in compliance with SDI 117 "Manufacturing Tolerances Standard Steel Door and Frames". Unless
08110-3 11 March 2013

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

otherwise shown, fabricate doors and panels to a thickness of 1-: in. Take field measurements where coordination with adjoining work is necessary. B. C. Make hollow metal work strong, rigid, neat in appearance and free from defects. Reinforce corners of doors as required to prevent twisting or sagging. Form exposed surfaces free from warp, wave and buckle, with all corners square, unless otherwise shown. Form molded members straight and true, with welded joints coped or mitered, well formed, and in true alignment. Dress welded joints on exposed surfaces smooth so they are invisible after finishing. Provide clearances for doors, not otherwise specified or shown, as follows: 1/8 in. at jambs and heads, 1/8 in. at meeting stiles of pairs of doors and 3/8 in. at bottom where no threshold or carpet is required. Where a threshold is shown provide 1/8 in. clearance above the threshold. Where carpet is shown provide 3 in. clearance above the carpet. Prepare doors to receive weather-stripping where required. Provide clearances for labeled doors and panels within the limitations established by the authority having jurisdiction. Mortise, reinforce, drill and tap doors and frames at factory to receive mortise type hardware including installation of 2 in. dia. galvanized steel conduit for routing of low voltage wire from electrical hinges to electro-mechanical locks, in accordance with reviewed hardware schedule and templates. Provide steel reinforcing, drill and tap for doors and frames to receive surface applied hardware, except at push plates and kickplates provide reinforcing only. Use steel secured by spot welding as reinforcement. Prepare doors and frames in accordance with ANSI A250.6 and ANSI A115, except with the following modifications: 1. 2. 3. 4. 5. 6. 7. 8. 9. G. Butt and Intermediate Pivot Hinge Reinforcements: 10 gauge or equivalent number of threads on doors and 7 gauge on frames. Top and Bottom Pivot Reinforcements: 7 gauge steel by size as required by hardware manufacturer. Lock Fronts: 12 gauge by size as required by approved hardware manufacturer. Flush Bolts: 12 gauge by size as required by approved hardware manufacturer. Lock reinforcement units, 14 gauge by size as required by hardware manufacturer. Closers and Hold Open Arms: 12 gauge one-piece channel, size as required by approved hardware manufacturer. Panic Device Reinforcement: 1/8 in. thick by 10 in. high by 4 in. wide centered on panic device case body, unless otherwise recommended by panic device manufacturer. Other hardware reinforcements as required for adequate strength and anchorage. In lieu of reinforcement specified, hardware manufacturers' recommended reinforcing units may be used.

D.

E. F.

Electrical Requirements 1. 2. General: Make provisions for installation of electrical items; arrange in manner so wiring can be readily removed and replaced. Doors and Frames with Electric Hinges a. b. c. General: Provide metal conduit raceway to permit wiring from electric hinge to other electric door hardware. Hinge and Pivot Location: Center or intermediate as applicable; top or bottom not permitted. Back Box for Electric Hardware Items: Weld back boxes for electric hardware items. Weld Dust cover boxes or mortar guards for electrical hinges.
08110-4 11 March 2013

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3. H. I. J. K. 2.04

Future Work: Where marked /F, provide cutouts in doors and door frames to receive electronic door hardware at a future date.

Provide a full miter continuously welded on back side at frame corners with edges straight and true. Grind welds smooth and flush on exposed surfaces. Accurately machine, file and fit exposed connections with hairline joints unless otherwise shown. Conceal fastenings wherever possible. Countersink exposed screws using flat, Phillips head screws. Provide welds of adequate strength and durability.

FLUSH DOORS A. Standards and Door Construction: Fabricate doors with minimum gage face sheets below, with edges welded and finished flush. Do not expose seams or joints on door faces or edges. Comply with the following: 1. Provide metal doors complying with the following ANSI 250.8 levels and models: a. b. 2. Interior Flush Doors below 7 ft. height: ANSI 250.8, Level II, heavy-duty, Model 2, Seamless Design, minimum 18 gage cold-rolled sheet steel faces. Interior Flush Doors above 7 ft. height: ANSI 250.8, Level III, extra heavy-duty, Model 2, Seamless Design, minimum 16 gage cold-rolled sheet steel faces.

Reinforce face sheets of flush doors with 20 gage interlocking vertical C or Z shaped reinforcing members spaced not over 6 in. apart and spot welded to face sheets not more than 6 in. o.c. Provide flush inverted 16 gage steel channels welded to face sheets at top and bottom of door. Place filler between reinforcing members for full height of door. Provide removable moldings of 18 gage steel for glazed openings in doors applied with countersunk screws spaced not more than 12 in. on center. Framing for Temperature Rise Rated Doors: A continuous mineral fireboard core, permanently bonded to the inside face of the outer sheets. Fabricate exposed faces of doors and panels, including stiles and rails of non-flush units, from only cold-rolled steel.

3. 4. 2.05

FIRE RATED DOORS A. Comply with the specifications herein for flush doors and to the requirements of Paragraph 1.02.

2.06

HOLLOW METAL DOOR FRAMES A. Provide combination type, fully welded, hollow metal door frames to be used as both door buck and trim, formed to profiles shown and, unless otherwise shown, of the following minimum gages: 1. 2. 3. 4. B. C. Interior frames: 16 gage steel for doors 7 ft. and under; 14 gage steel for doors above 7 ft. In addition, frames scheduled to receive electrical locking devices shall be minimum 14 gage steel. Glazed light frames: 16 gage steel, unless otherwise shown. Cased Opening Frames: 14 gage steel. Code requirements: As required.

Corner joints of frames shall have all contact edges closed tight, with trim faces mitered and continuously welded and stops mitered. The use of gussets shall not be permitted. Where partitions are set into door frames, fabricate frames with throat opening 1/16 in. larger than partition thickness unless otherwise shown or specified.
08110-5 11 March 2013

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D.

Provide tee shaped corrugated or perforated metal anchors into adjoining masonry or concrete construction. Use adjustable anchors with friction fit for frames set in masonry. Weld to frames set in concrete. Fabricate anchors of steel no lighter than the gage used for the frame, 2-2 in. wide by 10 in. long, three (3) per jamb up to 7 ft. high and four (4) per jamb up to 8 ft. high, and for openings over 8 ft. high, provide 1 anchor for each 2 ft. of height or fraction thereof. 1. At fire rated frames in masonry construction, provide UL rated adjustable anchors consisting of spot welded straps and adjustable corrugated or perforated anchors. Gauge of strap and anchor; same as frame. Minimum size anchors; 2 in. wide by 10 in. long. Number of anchors shall be two (2) per jamb to 5 ft. jamb height, with one additional anchor for each additional 30 in. or fraction thereof.

E.

Anchor frame jambs to concrete or masonry which has been placed prior to setting of frames with 3/8 in. countersunk concealed flat head bolts into expansion type shields or inserts, provide one not more than 6 in. from the top and bottom of each jamb with intermediate anchors spaced a maximum of 26 in. o.c. with a minimum of 4 per jamb. Apply removable stops to cover anchor bolts. Where frames are set into standard drywall or shaft wall (steel studs) weld 16 gauge anchor clips to each jamb as follows: 1. Hinge Side: a. b. 2. 3. One anchor above and below top hinge. One anchor above each remaining hinge.

F.

Strike Side: Match hinge side. Clip Width: Match stud width.

G.

Provide 16 gage steel channel temporary spreaders at the bottom of all 3 sided frames to prevent distortion during shipment and storage and to hold frames in proper position until anchorage and adjacent construction has been completed. Terminate bottom of frames at the indicated finished floor level. Where floor fill or setting beds occur support frame by adjustable clip angles anchored to the structural substrate. Angle floor clips shall be 12 gage, welded to frame and punched for two (2) 3/8 in. fasteners. Provide mullions and transom bars of closed or tubular construction, or as otherwise shown. Attach members to heads and jambs of frame with butt-welded joints unless shown to be removable. Reinforce the joints with concealed clip angles of the same thickness as the frame. Reinforce head of frames over 3 ft. wide with 12 gage steel channel unless a structural lintel is provided to support the wall construction above the frame or unless there is no wall construction above the frame. Provide full enclosing electrical junction boxes or mortar shields over all mortises. Provide removable access plates in the heads of frames to receive concealed door closers. Offset reinforcement so that faces of hinges or keepers are flush with face of the frame rebate. Provide holes for rubber door silencers: 3 for single doors and 4 for pairs of doors. Install plastic plugs in silencer holes to keep holes clear during installation. Where frames are to be fully grouted, coat the back of the frame with bituminous paint.

H.

I.

J. K.

L. M. 2.07

FIRE RATED DOOR FRAMES A. Comply with specifications for hollow metal door frames and with requirements of Paragraph 1.02.

2.08

GLAZED LIGHT FRAMES


08110-6 11 March 2013

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Form glazed light frames to the profiles shown. Provide anchors at jambs same as for door frames. Provide closed mullion sections same as for door frames. Fabricate from 16 gage steel for interior work and 14 gage galvanized steel for exterior work, unless otherwise shown or required. Miter, fit and weld corners of panel moldings for glass panels in sidelights and borrowed lights to form continuous frame around panels. Provide non-removable panel moldings on the exterior. Secure removable moldings with not less than No. 6 x 32 Phillips oval-head countersunk machine screws at 12 in. on center. Provide continuous felt strips cemented in place, on all bed and stop surfaces for interior light frames to be glazed so that at no time does metal touch glass.

B.

C. 2.09

SHOP PAINTING A. B. Clean, treat and paint surfaces of fabricated hollow metal work, inside and out, whether exposed or concealed in the construction. Thoroughly clean all metal surfaces of loose scale, shavings, filings, dirt and other deleterious materials by use of wire brushes or other effective means. Remove grease and oil by one of the methods specified in SSPC-SP-1-63 "Solvent Cleaning". Fill as required to fill seams in edges. Apply 2 coats of metal primer to all reinforcement and attachment steel and framing which will be in contact with masonry or concrete. Chemically treat surfaces with phosphate compound to assure maximum paint adhesion. Apply a sufficient number of coats of an approved enamel filler, baked on, to obtain uniformly smooth exposed surfaces. In addition, apply one coat of light-colored primer, baked on, to both inside and outside surfaces. Touch-up surfaces having runs, smears or bare spots. Provide minimum mil thicknesses of coatings as recommended by the paint manufacturer.

C. D.

E.

PART 3 - EXECUTION 3.01 CONDITION OF SURFACES A. 3.02 Examination: Examine the substrates, adjoining construction and conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected.

INSTALLATION A. Hollow Metal Frames: Set hollow metal frames to the pre installed metal sub frame at locations, in perfect alignment and elevation, plumb, level, straight, true and free from rack. Brace frames to prevent displacement. Comply with provisions in SDI 105, unless otherwise indicated. Install fire-rated frames according to NFPA 80. 1. 2. Except for frames located in existing walls or partitions, place frames before construction of enclosing walls and ceilings Extend frame anchorages below fills and finishes, except over membrane waterproofed areas. Anchor bottom of frames to floors with anchor bolts or with power driven fasteners. Coordinate the installation of built-in anchors for wall and partition construction as required with other work. For openings 90 in. or more in height, install an additional anchor at hinge and strike jambs. In masonry construction, provide at least three wall anchors per jamb; install adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Acceptable anchors include masonry wire anchors and masonry T-shaped anchors. In metal-stud partitions, provide at least three wall anchors per jamb; install adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Attach wall anchors to studs with screws
08110-7 11 March 2013

3.

4.

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

5. B.

After wall construction has been completed, remove temporary braces. Leave surfaces smooth and undamaged.

Hollow Metal Door Installation: Comply with ANSI A250.8. Fit hollow-metal doors accurately in frames, within clearances specified in ANSI A250.8. Shim as necessary to comply with SDI 122 and ANSI/DHI A115.1G. 1. Install labeled fire doors and frames to meet requirements of the Insurance Inspection and Rating Bureaus having jurisdiction at the Project site so as to avoid any rate penalty. Correct any installation that would subject the Owner to a rate penalty. Install fire-rated doors with clearances as specified in NFPA Standard No. 80.

C.

Apply hardware in accordance with hardware manufacturer's instructions and Section "Finish Hardware" of these Specifications. Drill and tap for machine screws as required. Do not use self-tapping sheet metal screws. Anchor panels in place with concealed fasteners. Adjust door installation to provide uniform clearance at head and jambs, and to contact stops uniformly. Remove and replace doors which are found to be warped, bowed or otherwise damaged and cannot be properly fitted in frames. Provide scheduled glass and glazing in accordance with Section 08805, Interior Glazing.

D. 3.03

PROTECTION AND CLEANING A. Prime-Coat Touchup: Immediately after installation, sand smooth any rusted or damaged areas of prime coat and apply touch up of compatible air-drying primer. Upon completion of installation, clean exposed metal surfaces as recommended by manufacturer and leave ready for final painting. Protect units during construction period so that they will be without any indication of deterioration, use or damage at time of substantial completion. Clean glass in accordance with Section 08805, Interior Glazing. END OF SECTION

B. C.

INTERIOR HOLLOW METAL DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08110-8 11 March 2013

SECTION 08210 WOOD DOORS AND FRAMES PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide wood doors in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 2. 1.02 Furnishing of finish hardware. Wood panels and trim adhered to wood doors as shown.

REQUIREMENTS OF REGULATORY AGENCIES A. Comply with the label requirements of NFPA and UL. Fabricate doors in accordance with requirements of NFPA No. 80 and 10B for the class of door opening corresponding to the hourly rating shown, and which have been tested and rated for single point hardware by UL. 1. 2. B. Provide UL label on each listed labeled door. Provide required labels permanently fastened on each door which is within the size limitations established by the labeling authority having jurisdiction.

Temperature Rise Rating: Provide doors which have a Temperature Rise Rating of 450oF maximum in 30 minutes of fire exposure if it required as fire rated.

1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. 3. B. "Quality Standards, Section 1300, Architectural Flush Doors, Premium Grade" (Architectural Woodwork Institute). "Commercial Standard 171, Hardwood Veneered Doors" (U.S. Department of Commerce). "Wood Flush Doors Standard NWWDA I.S.1" (National Wood Window & Door Association).

Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

1.04

SUBMITTALS A. Shop Drawings: Submit shop drawings for all wood doors showing location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; location and extent of hardware blocking; and other pertinent data. Indicate the dimensions and locations of mortises and holes for scheduled hardware, dimensions and locations of cutouts, fire ratings for fire doors, requirements for veneer matching and finish requirements and other pertinent data.. Samples: Submit samples of each type of door specified showing construction, finish, color and specular gloss selected. Samples shall be 12 in. x 12 in. corner section. Submit samples of acoustical hardware accessories. Product Data: Submit manufacturers product data for each type of door. Include details of core and edge construction, trim for openings, and louvers.

B.

C.

WOOD DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08210-1 11 March 2013

D.

Test Reports 1. Submit copies of the following laboratory test results: a. Cycle/slam tests, stile edge screw withdrawals tests and stile edge split resistance tests for fire rated doors.

E.

Certifications 1. Submit manufacturer's certification that all wood doors are manufactured to requirements of NWWDA I.S.1 Industry Standard for Wood Flush Doors and that they bear the NWWDA Wood Flush Door Certification Hallmark.

1.05

MOCK-UPS A. B. Provide minimum of one visual mock-up for each wood door and frame assembly, in type of finish required, subject to review and acceptance of Engineer. Provide visual mock-up for oversized Wedding Hall Lobby doors and second floor Meeting Room Lobby doors, including the specific door hardware, trim and decorative items specific to each door. The accepted mock-up shall serve as a standard of quality for the assembly represented. The accepted mock-up shall serve as a standard of quality for the assembly represented.

C. 1.06

PRODUCT HANDLING A. Package prefinished doors and panels in heavy duty cardboard cartons at the factory prior to shipment. Identify each door with individual opening numbers which correlate with designation system used on shop drawings for door, frames, and hardware, using temporary, removable or concealed markings. Protect doors against damage during handling, transit and storage. Store in a dry place, protected from the weather. Stack in accordance with manufacturer's directions.

B. 1.06

PROJECT CONDITIONS A. Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized and will be maintained in storage and installation areas during remainder of construction period to comply with the referenced AWI quality standard including Section 100-S-3 "Moisture Content".

1.07

WARRANTY A. Warranty: Submit manufacturer's standard door warranty for the life of the original installation. Warranty shall provide for removal of defective door and replacement and finishing of new door, including installation as originally specified. A representative of the door manufacturer shall inspect the installed doors and shall note on the warranty that no provisions of the warranty have been nullified in the manufacture and/or installation.

PART 2 - PRODUCTS 2.01 MATERIALS A. Particle Board Core: Single thickness slab of 3 ply particle board complying with ANSI A208.1, Grade 1-L-1, average density not less than between 28 to 32 pcf, hot pressed with synthetic resin glue. Linear expansion shall not exceed 0.03% in either direction when tested in accordance with ASTM D1037, Sections 76 through 79. Faces of core slab shall be of 0.010 in. thick flakes, with resin content a minimum of 50% higher than core resin content. Face layer density shall be a minimum of 25% higher than core density. Lumber Core: Low density thoroughly kilns dried wood blocks not more than 2-1/2 in. wide, random lengths. Mineral Core: Incombustible mineral composition free of asbestos fiber.
08210-2 11 March 2013

B. C.

WOOD DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D. E. F. G. H.

Top and Bottom Edge Bands: Thoroughly kiln dried hardwood. Blocking: Manufacturer's standard designed for purpose intended. Side Edge Bands: Thoroughly kiln dried hardwood, matching face veneers for natural finish. Crossbands: Minimum 1/16 in. thick after sanding, properly dried hardwood. Face Veneer (For Natural Finish): Standard thickness thoroughly dried conforming to CS35, Premium Grade. Match faces of doors in pairs and end match transoms. Where indicated, provide doors with faces produced from the same flitches as the adjacent wood paneling and arranged to provide the same matching as required for the wood paneling. Face veneer shall be tapeless spliced with grain running vertically, balanced and center matched, belt and polish sanded, of the following species: Type I Adhesive: CS35, Type I (fully waterproof bond). Type II Adhesive: CS35, Type II (water-resistant bond).

I. J. 2.02

MANUFACTURER A. Provide wood doors for the entire project from one of the following manufacturers:

2.03

GCC Manufacturers 1. Hasan Abul Establishment, 2. Al Dimnah Kuwait 3. Al-Ahlia Carpentry 4. Kuwait Carpentry Works 5. Dalia Wood Works - Door Service Centre Co, Kuwait FABRICATION A. B. General: All doors and panels shall be 1-3/4 in. thick unless otherwise shown. Type I Construction: AWI 1300 G-4 Premium Grade, PC-5 or PC-HPDL. 1. 2. Core: Solid particleboard. Vertical Stiles: Minimum 1-3/8 in. wide after trimming, 2 ply construction without fingerjoints, consisting of 5/8 in. thick outerband (specie matching or compatible with face veneer) and : in. thick mill option hardwood innerband. Top and Bottom Rails: Minimum 1-3/8 in. wide after trimming, 2 ply construction without fingerjoints. At Doors to receive surface mounted overhead closers, utilize 5 in. solid wood rails so that doors are not through-bolted. Crossbands: Full width of door with grain running horizontally, tapeless spliced without voids. Face Veneer: Standard thickness thoroughly dried conforming to CS35, Premium Grade. Match faces of doors in pairs and end match transoms. Face veneer shall be tapeless spliced with grain running vertically, balanced and center matched, belt and polish sanded, of the following species: a. Wood Type: Teak, as selected by Engineer to match sample on file in Engineers office. All teak utilized in fabrication of wood doors shall certified to be harvested from sustainable yield forests or farms. Core to stiles, rails and blocking: Type II adhesive. Face veneers and crossbands to core and edges: Type I adhesive by hot plate process.

3.

4. 5.

6.

Bonding a. b.

C.

Type III Construction: AWI 1300 Premium Grade, G-4 FD-5. Construct in accordance with requirements of NFPA Standard No. 80 and UL Standard for Safety No. 10B for class of door shown. Doors shall be listed
08210-3 11 March 2013

WOOD DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

by Underwriters' Laboratories, Inc. Provide UL label on each door. Comply with requirements of Paragraph 1.02 and the following minimum requirements: 1. 2. Core: Incombustible, asbestos-free mineral composition, engineered to meet labeling requirements. Vertical Stiles: Provide balanced construction by furnishing stile edge screw holding reinforcement to both vertical stiles as standard with the manufacturer and complying with the following: a. b. c. 3. Stile edge screw withdrawals when tested in accordance with ASTM D1037 shall exceed 740 lbs. Stile edge split resistance when tested in accordance with ASTM D143 (modified) shall exceed 750 lbs. Cycle/Slam: Not less than 500,000 cycles with no loosening of hinge screws or other visible signs of failure when tested in accordance with the requirements of ANSI A151.1.

Top and Bottom Rails: Top rails minimum 2 in. wide after trimming, bottom rails minimum 2 in. wide after trimming with finger joints. Provide additional reinforcing as required by specified hardware. At Doors to receive surface mounted overhead closers, utilize 5 in. solid wood rails so that doors are not through-bolted. Crossbands: Full width of door with grain running horizontally, tapeless spliced without voids. Face Veneer: Standard thickness, thoroughly dried conforming to CS35, Premium Grade. Match faces of doors in pairs and end match transoms. Face veneer shall be tapeless spliced with grain running vertically, balanced and center matched, belt and polish sanded, of the following species: a. Wood Type: Teak, as selected by Engineer to match sample on file in Engineers office. All teak utilized in fabrication of wood doors shall certified to be harvested from sustainable yield forests or farms.

4. 5.

6. 7.

Bonding: Manufacturer's standard to achieve specified rating. Blocking a. b. c. Provide 5 in. blocking at top rail for surface door closers. Provide 5 in. x 18 in. blocking for locksets and exit devices. Provide blocking for flushbolts and vertical rod exit device latches.

8. D.

Carved Wood Panels: Where shown, provide carved wood panels applied to specified wood doors of patterns, sizes and thicknesses indicated.

Fabrication Tolerances: Comply with NWWDA Industry Standard I.S.1, AWI 1300 and the following. 1. 2. 3. 4. Jambs: 1/8 in. each jamb. Lock edge beveled 1/8 in. in 2 in. Head: 1/8 in. Sill: Cut at time of installation. Cut at time of installation except for any label door that must be machined under label service. Do not exceed clearance as required to meet labeling requirements. Toilet Room Door Sills: Provide inch undercut at Toilet Room doors, unless otherwise indicated.

2.04

DOOR TYPES A. B. C. Doors to receive hardwood face veneers for natural finish (conversion varnish or thermoplastic film) or to receive high density overlay face veneers for polyvinyl fluoride film finish shall be Type I construction. Doors of the hourly ratings shown shall be Type III construction. Face veneers and finishes shall match adjacent non-rated doors. Transom and side panels shall match door construction in every respect.
08210-4 11 March 2013

WOOD DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.05

REINFORCEMENT A. Provide additional hardwood reinforcement (fire retardant treated if required) blocking for all mortise lock and latchset applications, surface mounted closers, panic hardware and as required by hardware manufacturers and authorities having jurisdiction.

2.06

PREFITTING AND PREMACHINING A. Prefit doors and panels in accordance with tolerance requirements of Commercial Standard CS 171 and AWI 1300-S-6, at the place of manufacture. Provide standard bevel or radius to edges of doors as required by the installation. Machine doors and panels for hardware requiring cutting of the doors at the place of manufacture. Machining shall be in accordance with hardware templates, final hardware schedules and door frame shop drawings.

B.

2.07

PREFINISHING A. B. General: Comply with applicable provisions and requirements of AWI Section 1500, Factory Finishing, Premium Grade. Natural veneer doors shall be finished with a conversion varnish to a cured film thickness of 1 mil and complying with MIL-V-12954 and AWI 1500 Finish System #3, Premium Grade, at the place of manufacture. Prior to application of finish prepare door faces with oil stains or toners as required to match Engineer's sample. Apply a compatible finish to stile and rail edges and cutouts. Transparent Polyurethane Finish for Wood Toilet Room Entrance Doors and Wood Toilet Stall Doors: Provide transparent polyurethane finish complying with AWI Section 1500, Finish System #5, except noncatalyzed polyurethane utilizing "Varathane, #90 Gloss" (Flecto Co. Inc.) clear liquid plastic.

C.

2.08

FRAME FABRICATION A. Lumber: AWI Section 100 with the following requirements: 1. Hardwood for Transparent Finish: AWI Section 100-S-1, Grade 1as follows; a. Wood Type: Solid Teak Hardwood as selected by Engineer to match sample on file in Engineers office; All teak utilized in fabrication of wood doors shall certified to be harvested from sustainable yield forests or farms.

PART 3 - EXECUTION 3.01 INSPECTION A. Examine doors and door frames, adjoining construction and the conditions which the Work is to be installed. Do not proceed with the work until unsatisfactory conditions have been corrected. Do not hang doors with an apparent defect.

3.02

INSTALLATION A. B. C. Do not install doors until concrete, masonry, plaster and tile work are completed and dried in the areas to receive doors. All doors and windows should be fixed to the sub frame as shown in the drawing. Doors shall be conditioned to the average prevailing moisture (humidity) of the locality before hanging. Doors shall not be subjected to abnormal heat, dryness, or humidity. Avoid sudden changes such as forced heat (used to dry out the building). Clearances
08210-5 11 March 2013

D.

WOOD DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.

Clearances for Non-Rated Doors: Provide 1/8 in. at jambs and heads; 1/16 in. per leaf at meeting stiles for pairs of doors; and 1/8 in. from bottom of door to top of decorative floor finish or covering. Where threshold is shown or scheduled, provide 3 in. clearance from bottom of door to top of threshold. Bevel non-rated doors 1/8 in. in 2 in. at lock and hinge edges. Clearances for Fire-Rated Doors: Complying with NFPA 80. Bevel fire-rated doors 1/8 in. in 2 in. at lock edge; trim stiles and rails only to extent permitted by labeling agency.

2. E. F.

Cutting, trimming, fitting and machining of prefinished doors will not be permitted. Install doors in required openings as shown. Install flush panels with concealed fasteners. Provide pilot holes of proper size for screws into particle board core doors. Use stainless steel sheet metal screws into particle board. Install fire-rated doors in corresponding fire-rated frames in accordance with requirements of NFPA No. 80 and local authorities having jurisdiction. Apply hardware in accordance with hardware manufacturer's instructions and Section "Finish Hardware". Adjust door installation to provide uniform clearance at head and jambs, and to contact stops uniformly. Remove and replace doors which are found to be warped, bowed or otherwise damaged and cannot be properly fitted in frames.

G. H.

3.03

PROTECTION A. Protect doors and hardware during construction. Marred finishes shall be touched-up to perfectly match adjacent surfaces to the satisfaction of the Engineer or unit shall be replaced.

END OF SECTION

WOOD DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08210-6 11 March 2013

SECTION 08211 FLUSH WOOD DOORS PART 1 - GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. SUMMARY A. Section Includes: 1. Solid-core doors with wood-veneer faces. 2. Hollow-core doors with wood-veneer faces. 3. Factory fitting flush wood doors to frames and factory machining for hardware. Related Sections: 1. Division 06 Section " Interior Architectural Woodwork" for wood door frames including fire-rated wood door frames. 2. Division 09 Sections "Painting" for field finishing doors. SUBMITTALS A. B. Product Data: For each type of door indicated. Include details of core and edge construction. Include factoryfinishing specifications. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; location and extent of hardware blocking; and other pertinent data. 1. Indicate dimensions and locations of mortises and holes for hardware. 2. Indicate dimensions and locations of cutouts. 3. Indicate requirements for veneer matching. 4. Indicate doors to be factory finished and finish requirements. 5. Indicate fire-protection ratings for fire-rated doors. Samples for Initial Selection: For factory-finished doors. Samples for Verification: 1. Factory finishes applied to actual door face materials, approximately 200 by 250 mm, for each material and finish. 2. Corner sections of doors, approximately 200 by 250 mm, with door faces and edges representing actual materials to be used. a. Provide samples for each species of veneer and solid lumber required. b. Finish veneer-faced door samples with same materials proposed for factory-finished doors. Warranty: Sample of special warranty. QUALITY ASSURANCE A. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.
08211-1 11 March 2013

1.2

B.

1.3

C. D.

E. 1.4

FLUSH WOOD DOORS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. C.

Source Limitations: Obtain flush wood doors from single manufacturer. Quality Standard: In addition to requirements specified, comply with AWI's "Architectural Woodwork Quality Standards Illustrated." 1. Provide AWI Quality Certification Labels or an AWI letter of licensing for Project indicating that doors comply with requirements of grades specified.. Fire-Rated Wood Doors: Doors complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252. 1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a qualified testing agency that doors comply with standard construction requirements for tested and labeled fire-rated door assemblies except for size. 2. Temperature-Rise Limit: At vertical exit enclosures and exit passageways, provide doors that have a maximum transmitted temperature end point of not more than 250 deg C above ambient after 30 minutes of standard fire-test exposure. Pre installation Conference: Conduct conference at Project site. DELIVERY, STORAGE, AND HANDLING

D.

E. 1.5 A. B. C. 1.6 A.

Comply with requirements of referenced standard and manufacturer's written instructions. Package doors individually in cardboard cartons and wrap bundles of doors in plastic sheeting. Mark each door on top and bottom rail with opening number used on Shop Drawings. PROJECT CONDITIONS Environmental Limitations: Do not deliver or install doors until spaces are enclosed and weather tight, wet work in spaces is complete and dry, and HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period. Environmental Limitations: Do not deliver or install doors until spaces are enclosed and weather tight, wet work in spaces is complete and dry, and HVAC system is operating and maintaining temperature between 16 and 32 deg C and relative humidity between 25 and 55 percent during the remainder of the construction period. WARRANTY

B.

1.7 A.

Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace doors that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Warping (bow, cup, or twist) more than 6.4 mm in a 1067-by-2134-mm section. b. Telegraphing of core construction in face veneers exceeding 0.25 mm in a 76.2-mm span. 2. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors. 3. Warranty Period for Solid-Core Exterior Doors: Five years from date of Substantial Completion. 4. Warranty Period for Solid-Core Interior Doors: Life of installation. 5. Warranty Period for Hollow-Core Interior Doors: Two year(s) from date of Substantial Completion.

FLUSH WOOD DOORS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08211-2 11 March 2013

PART 2 - PRODUCTS 2.1 A. B. C. DOOR CONSTRUCTION, GENERAL Low-Emitting Materials: Provide doors made with adhesives and composite wood products that do not contain urea formaldehyde. WDMA I.S.1-A Performance Grade: As indicated. WDMA I.S.1-A Performance Grade: 1. Heavy Duty unless otherwise indicated. 2. Extra Heavy Duty: public toilets, janitor's closets, assembly spaces, and exits. 3. Standard Duty: Closets (not including janitor's closets) private toilets, and where indicated. Particleboard-Core Doors: 1. Particleboard: ANSI A208.1, Grade LD-1 or Grade LD-2. 2. Particleboard: Straw-based particleboard complying with ANSI A208.1, Grade LD-2 or M-2, except for density. 3. Blocking: Provide wood blocking in particleboard-core doors as follows: a. 125-mm top-rail blocking, in doors indicated to have closers. b. 125-mm bottom-rail blocking, in exterior doors and doors indicated to have kick, mop, or armor plates. c. 125-mm midrail blocking, in doors indicated to have exit devices. 4. Provide doors with glued-wood-stave cores instead of particleboard cores for doors indicated to receive exit devices. Structural-Composite-Lumber-Core Doors: 1. Structural Composite Lumber: WDMA I.S.10. a. Screw Withdrawal, Face: 3100 N. b. Screw Withdrawal, Edge: 1780 N. Fire-Protection-Rated Doors: Provide core specified or mineral core as needed to provide fire-protection rating indicated. 1. Edge Construction: Provide edge construction with intumescent seals concealed by outer stile. Comply with specified requirements for exposed edges. 2. Pairs: Provide fire-retardant stiles that are listed and labeled for applications indicated without formedsteel edges and astragals. Provide stiles with concealed intumescent seals. Comply with specified requirements for exposed edges. 3. Pairs: Provide formed-steel edges and astragals with intumescent seals. a. Finish steel edges and astragals with baked enamel same color as doors. b. Finish steel edges and astragals to match door hardware (locksets or exit devices). Mineral-Core Doors: 1. Core: Noncombustible mineral product complying with requirements of referenced quality standard and testing and inspecting agency for fire-protection rating indicated. 2. Blocking: Provide composite blocking with improved screw-holding capability approved for use in doors of fire-protection ratings indicated as follows: a. 125-mm top-rail blocking. b. 125-mm bottom-rail blocking, in doors indicated to have protection plates. c. 125-mm midrail blocking, in doors indicated to have armor plates. d. 114-by-250-mm lock blocks, in doors indicated to have exit devices. 3. Edge Construction: At hinge stiles, provide laminated-edge construction with improved screw-holding capability and split resistance. Comply with specified requirements for exposed edges.

D.

E.

F.

G.

FLUSH WOOD DOORS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08211-3 11 March 2013

H.

Hollow-Core Doors: 1. Construction: Standard hollow core. 2. Blocking: Provide wood blocking with minimum dimensions as follows: a. 125-by-460-mm lock blocks at both stiles. b. 125-mm top- and bottom-rail blocking. c. 64-mm midrail blocking. DOORS FOR OPAQUE FINISH

2.2 A.

Exterior Solid-Core Doors: 1. Grade: Premium. 2. Faces: a. Apply medium-density overlay to standard-thickness, closed-grain, hardwood face veneers or directly to high-density hardboard crossbands. 3. Exposed Vertical and Top Edges: Any closed-grain hardwood. 4. Core: Particleboard . 5. Construction: Five or seven plies. Stiles and rails are bonded to core, then entire unit abrasive planed before veneering. Faces are bonded to core using a hot press. 6. Adhesives: Type I per WDMA TM-6. 7. WDMA I.S.1-A Performance Grade: Heavy Duty. Interior Solid-Core Doors: 1. Grade: Premium. 2. Faces: Any closed-grain hardwood of mill option. a. Apply medium-density overlay to standard-thickness, closed-grain, hardwood face veneers or directly to high-density hardboard crossbands. b. Hardboard Faces: AHA A135.4, Class 1 (tempered) or Class 2 (standard). c. MDF Faces: ANSI A208.2, Grade 150 or 160. 3. Exposed Vertical and Top Edges: Any closed-grain hardwood. 4. Core: Particleboard . 5. Construction: Five plies. Stiles and rails are bonded to core, then entire unit abrasive planed before veneering. Faces are bonded to core using a hot press. 6. WDMA I.S.1-A Performance Grade: As indicated. Interior Hollow-Core Doors: 1. Grade: Premium . 2. Faces: Any closed-grain hardwood of mill option. a. Hardboard Faces: AHA A135.4, Class 1 (tempered) or Class 2 (standard). b. MDF Faces: ANSI A208.2, Grade 150 or 160. 3. Exposed Vertical and Top Edges: Any closed-grain hardwood. 4. Construction: Three plies. 5. WDMA I.S.1-A Performance Grade: As indicated. FABRICATION

B.

C.

2.3 A.

Factory fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated. 1. Comply with requirements in NFPA 80 for fire-rated doors. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, DHI A115-W series standards, and hardware templates. 1. Coordinate with hardware mortises in metal frames to verify dimensions and alignment before factory machining. 2. Metal Astragals: Factory machine astragals and formed-steel edges for hardware for pairs of fire-rated doors.
08211-4 11 March 2013

B.

FLUSH WOOD DOORS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.4 A.

SHOP PRIMING Doors for Opaque Finish: Shop prime doors with one coat of wood primer specified in Division 09 Section "Painting". Seal all four edges, edges of cutouts, and mortises with primer. FACTORY FINISHING A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing. 1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be omitted on top and bottom edges, edges of cutouts, and mortises. Finish doors at factory that are indicated to receive opaque finish. Opaque Finish: 1. Grade: Premium. 2. Finish: AWI conversion varnish or catalyzed polyurethane system. 3. Color: As selected by Architect from manufacturer's full range. 4. Sheen: Satin.

2.5

B. C.

PART 3 - EXECUTION 3.1 A. EXAMINATION Examine doors and installed door frames before hanging doors. 1. Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with level heads and plumb jambs. 2. Reject doors with defects. Proceed with installation only after unsatisfactory conditions have been corrected. INSTALLATION A. B. Hardware: For installation, see Division 08 Section "Door Hardware." Installation Instructions: Install doors to comply with manufacturer's written instructions and the referenced quality standard, and as indicated. 1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80. Job-Fitted Doors: Align and fit doors in frames with uniform clearances and bevels as indicated below; do not trim stiles and rails in excess of limits set by manufacturer or permitted for fire-rated doors. Machine doors for hardware. Seal edges of doors, edges of cutouts, and mortises after fitting and machining. 1. Clearances: Provide 3.2 mm at heads, jambs, and between pairs of doors. Provide 3.2 mm from bottom of door to top of decorative floor finish or covering unless otherwise indicated. Where threshold is shown or scheduled, provide 6.4 mm from bottom of door to top of threshold unless otherwise indicated. a. Comply with NFPA 80 for fire-rated doors. 2. Bevel non-fire-rated doors 3-1/2 degrees at lock and hinge edges. 3. Bevel fire-rated doors 3-1/2 degrees at lock edge; trim stiles and rails only to extent permitted by labeling agency. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.
08211-5 11 March 2013

B. 3.2

C.

D.

FLUSH WOOD DOORS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E. 3.3 A. B.

Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site. ADJUSTING Operation: Rehang or replace doors that do not swing or operate freely. Finished Doors: Replace doors that are damaged or that do not comply with requirements. Doors may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing. END OF SECTION

FLUSH WOOD DOORS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08211-6 11 March 2013

SECTION 08311 ACCESS DOORS AND FRAMES

PART 1 - GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. This Section includes the following: 1. B. Access doors and frames for walls and ceilings.

1.2

Related Sections include the following: 1. 2. 3. 4. 5. Division 3 Section "Cast-in-Place Concrete" for blocking out openings for access doors and frames in concrete. Division 4 Section "Unit Masonry Assemblies" for anchoring and grouting access door frames set in masonry construction. Division 7 Section "Roof Accessories" for roof hatches. Division 8 Section "Door Hardware" for mortise or rim cylinder locks and master keying. Division 9 Section "Acoustical Tile Ceilings" for suspended acoustical tile ceilings.

1.3 A. B. C. D. E.

SUBMITTALS Product Data: For each type of access door and frame indicated. Include construction details, fire ratings, materials, individual components and profiles, and finishes. Shop Drawings: Show fabrication and installation details of access doors and frames for each type of substrate. Include plans, elevations, sections, details, and attachments to other work. Samples: For each door face material, at least 75 by 125 mm in size, in specified finish. Access Door and Frame Schedule: Provide complete access door and frame schedule, including types, locations, sizes, latching or locking provisions, and other data pertinent to installation. Ceiling Coordination Drawings: Reflected ceiling plans, drawn to scale, on which ceiling-mounted items including access doors and frames, lighting fixtures, diffusers, grilles, speakers, sprinklers, and special trim are shown and coordinated with each other. QUALITY ASSURANCE A. Source Limitations: Obtain each type of access door(s) and frame(s) through one source from a single manufacturer.

1.4

ACCESS DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08311-1 11 March 2013

B.

Fire-Rated Access Doors and Frames: Units complying with NFPA 80 that are identical to access door and frame assemblies tested for fire-test-response characteristics per the following test method and that are listed and labeled by UL or another testing and inspecting agency acceptable to authorities having jurisdiction: 1. 2. NFPA 252 or UL 10B for vertical access doors and frames. ASTM E 119 or UL 263 for horizontal access doors and frames.

C.

Size Variations: Obtain Architect's acceptance of manufacturer's standard-size units, which may vary slightly from sizes indicated. COORDINATION

1.5 A.

Verification: Determine specific locations and sizes for access doors needed to gain access to concealed plumbing, mechanical, or other concealed work, and indicate in the schedule specified in "Submittals" Article.

PART 2 - PRODUCTS 2.1 A. STEEL MATERIALS Steel Plates, Shapes, and Bars: ASTM A 36/A 36M. 1. 2. B. ASTM A 123/A 123M, for galvanizing steel and iron products. ASTM A 153/A 153M, for galvanizing steel and iron hardware.

Rolled-Steel Floor Plate: ASTM A 786/A 786M, rolled from plate complying with ASTM A 36/A 36M or ASTM A 283/A 283M, Grade C or D. 1. 2. ASTM A 123/A 123M, for galvanizing steel and iron products ASTM A 153/A 153M, for galvanizing steel and iron hardware.

C. D.

Steel Sheet: Uncoated or electrolytic zinc-coated, ASTM A 591/A 591M with cold-rolled steel sheet substrate complying with ASTM A 1008/A 1008M, Commercial Steel (CS), exposed. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS) with ZF180 zinc-iron-alloy (galvannealed) coating or Z180 mill-phosphatized zinc coating; stretcher-leveled standard of flatness; with minimum thickness indicated representing specified thickness according to ASTM A 924/A 924M. Steel Finishes: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. 1. Surface Preparation for Steel Sheet: Clean surfaces to comply with SSPC-SP 1, "Solvent Cleaning," to remove dirt, oil, grease, or other contaminants that could impair paint bond. Remove mill scale and rust, if present, from uncoated steel, complying with SSPC-SP 5/NACE No. 1, "White Metal Blast Cleaning," or SSPC-SP 8, "Pickling." Surface Preparation for Metallic-Coated Steel Sheet: Clean surfaces with nonpetroleum solvent so surfaces are free of oil and other contaminants. After cleaning, apply a conversion coating suited to the organic coating to be applied over it. Clean welds, mechanical connections, and abraded areas, and apply galvanizing repair paint specified below to comply with ASTM A 780. a. Galvanizing Repair Paint: High-zinc-dust-content paint for regalvanizing welds in steel, complying with SSPC-Paint 20.

E.

2.

ACCESS DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08311-2 11 March 2013

3. F.

Factory-Primed Finish: Apply shop primer immediately after cleaning and pretreating.

Drywall Beads: Edge trim formed from 0.76-mm zinc-coated steel sheet formed to receive joint compound and in size to suit thickness of gypsum board. STAINLESS-STEEL MATERIALS

2.2 A. B.

Rolled-Stainless-Steel Floor Plate: ASTM A 793, manufacturer's standard finish. Stainless-Steel Sheet, Strip, Plate, and Flat Bars: ASTM A 666, Type 304. Remove tool and die marks and stretch lines or blend into finish. 1. Finish: Directional Satin Finish, No. 4.

2.3 A.

ACCESS DOORS AND FRAMES FOR WALLS AND CEILINGS Flush Access Doors and Trim less Frames: Fabricated from steel sheet. 1. 2. 3. 4. 5. 6. Locations: Wall and ceiling surfaces. Door: Minimum 1.5-mm- thick sheet metal, set flush with surrounding finish surfaces. Frame: Minimum 1.5-mm- thick sheet metal with drywall bead flange. Hinges: Spring-loaded, concealed-pin type. Latch: Cam latch operated by with interior release. Lock: Cylinder. a. B. Lock Preparation: Prepare door panel to accept cylinder specified in Division 8 Section "Door Hardware."

Fire-Rated, Insulated, Flush Access Doors and Trimless Frames: Fabricated from steel metallic-coated steel sheet. 1. 2. 3. 4. 5. 6. 7. 8. 9. Locations: Wall and ceiling surfaces. Fire-Resistance Rating: Not less than that indicated. Temperature Rise Rating: 139 deg C at the end of 30 minutes. Door: Flush panel with a core of mineral-fiber insulation enclosed in sheet metal with a minimum thickness of 0.9 mm. Frame: Minimum 1.5-mm- thick sheet metal with drywall bead. Hinges: Concealed-pin type. Automatic Closer: Spring type. Latch: Self-latching device operated by knurled knob with interior release. Lock: Self-latching device with cylinder lock. a. Lock Preparation: Prepare door panel to accept cylinder specified in Division 8 Section "Door Hardware."\

2.4 A. B.

FABRICATION General: Provide access door and frame assemblies manufactured as integral units ready for installation. Metal Surfaces: For metal surfaces exposed to view in the completed Work, provide materials with smooth, flat surfaces without blemishes. Do not use materials with exposed pitting, seam marks, roller marks, rolled trade names, or roughness.
08311-3 11 March 2013

ACCESS DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C.

Doors and Frames: Grind exposed welds smooth and flush with adjacent surfaces. Furnish attachment devices and fasteners of type required to secure access panels to types of supports indicated. 1. 2. 3. 4. 5. Exposed Flanges: As indicated. For trimless frames with drywall bead, provide edge trim for gypsum board and gypsum base securely attached to perimeter of frames. For trimless frames with plaster bead for full-bed plaster applications, provide zinc-coated expanded metal lath and exposed casing bead welded to perimeter of frames. Provide mounting holes in frames for attachment of units to metal or wood framing. Provide mounting holes in frame for attachment of masonry anchors. Furnish adjustable metal masonry anchors.

D.

Latching Mechanisms: Furnish number required to hold doors in flush, smooth plane when closed. 1. 2. For cylinder lock, furnish two keys per lock and key all locks alike. For recessed panel doors, provide access sleeves for each locking device. Furnish plastic grommets and install in holes cut through finish.

PART 3 - EXECUTION 3.1 A. B. C. 3.2 A. B. INSTALLATION Comply with manufacturer's written instructions for installing access doors and frames. Set frames accurately in position and attach securely to supports with plane of face panels aligned with adjacent finish surfaces. Install doors flush with adjacent finish surfaces or recessed to receive finish material. ADJUSTING AND CLEANING Adjust doors and hardware after installation for proper operation. Remove and replace doors and frames that are warped, bowed, or otherwise damaged. END

ACCESS DOORS AND FRAMES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08311-4 11 March 2013

SECTION 08520 ALUMINUM DOORS, WINDOWS AND LOUVRES PART 1 - GENERAL 1.01 DESCRIPTION A. B. Drawings and general provisions of the Contract, including Contract General Conditions and Special Conditions apply to the Work of this Section. Work Included: The systems shown are a awning type zero sightline structural silicone glass and aluminum assembly with all required operating hardware and fixed windows and doors with all required glass and concealed aluminum supports as shown and includes the following: 1. Supper durable Powder coated extruded aluminum framing members without Thermal Break. 2. All glass and glazing. 3. Operating hardware. 4. Structural and weather sealants and all required accessories

1.02

QUALITY ASSURANCE A. B. Provide aluminum doors, windows & louvers units produced by a single firm, which has been producing such units successfully for not less than five (5) years. The installation of the aluminium doors, windows & louvers shall be performed by a firm which has been installing such units successfully for not less than five (5) years and has received the prior approval of the manufacturer. Fabricator of insulating glass units shall have a minimum of five (5) years experience in fabricating units similar to those specified herein on Projects comparable to this project. Producer of Low 'E' type coating shall have a minimum of five (5) years experience in the production of Low 'E' type coating in quantities similar to quantities required for this project.

C. D. 1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. ANSI/AAMA 101 "Voluntary Specifications for Aluminum Prime Windows and Sliding Glass Doors". 2. NAAMM "Metal Finishes Manual". 3. GANA "Sealant Manual" and "Glazing Manual". 4. GTA "Engineering Standards Manual". 5. AWS D1.1 "Structural Welding Code - Steel". 6. AWS D1.2 "Structural Welding Code - Aluminum". 7. AAMA 611 American Architectural Manufacturers Association Standards for Anodised Architectural Aluminium. 8. Air Movement And Control Association Inc. AMCA Standard 500. 9. AAMA 2605 Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Architectural Extrusions and Panels. 10. AAMA 2603 Voluntary Specification, Performance Requirements and Test Procedures for Pigmented Organic Coatings on Extruded Aluminium and Panels.

1.04

QUALITY ASSURANCE A. Award the window and door work to a single firm specializing in this type of work so that there will be undivided responsibility for such work.
08520-1 11 March 2013

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Single Source Responsibility for Glass: To ensure consistent quality of appearance and performance, provide materials produced by a single manufacturer or fabricator for each kind and condition of glass indicated and composed of primary glass obtained from a single source for each type and class required. Qualify welding process and welders in accordance with D1.2 Structural Welding Code Aluminium and D1.3 Structural Welding Code Sheet Steel.

C. 1.05

PERFORMANCE CRITERIA A. Except as otherwise indicated, comply with all applicable requirements including structural loading, air infiltration, water resistance and condensation resistance and fabrication specifications specified in ANSI/AAMA 101 classification C-HC40. Design Loads: Design, fabricate, and install component parts so that the completed windows and doors including glass will withstand a wind speed of 80 miles/hour for exposure D condition as per UBC 97. Design, fabricate and install component parts so that the completed exterior metal louvers will withstand the inward and outward pressures normal to the plane of the enclosure as noted on the drawings without evidencing permanent deformation of louver components including blades, frames, and supports; noise or metal fatigue caused by louver blade rattle or flutter; or permanent damage to fasteners and anchors. Maximum allowable deflection L/180. Deflections: Base calculations for the following deflections upon the combination of maximum direct loadings, building deflections and erection tolerances. Do not permit any permanent deflections in the finished work. Long term deflection shall not exceed 1/1000 of the clear span of the component part. 1. Normal to Plane Deflections: Design, fabricate and install each component part (other than glass) so that deflections normal to any plane at full loading will not exceed 1/450 or 19 mm whichever is less, of the clear span of the component part including glass-supporting members, except limit deflection of centerpoint of glass to 13 mm and deflection of the entire assembly including glass to 25 mm.

B. C.

D.

E.

Design, fabricate and install component parts to provide for expansion and contraction of the system over an ambient temperature range of 120 deg. F. and a surface temperature range of 180 deg. F. without buckling, sealed joint failure, glass breakage, undue stress on members or anchors, and other detrimental effects. Design Factor of Safety: Failure of any structural component shall not occur at less than 1.5 times the maximum "Design Loads" when tested in accordance with ASTM E330. Failure is defined as breakage, component disengagement, or permanent deformation. 1. Structural components of the windows, doors and louvres, include members, glazing stops, gaskets, weldments, connections, adhesives, and sealants used as adhesives. Note that individual structural components will require different design factors of safety to resist failure at 1.5 times the maximum "Design Loads."

F.

G.

Leakage of Water and Air: Design, fabricate, and install the windows and doors, including joints and flashings between this and other work, to effectively prevent leakage of either water or air into the building, under any combination of the foregoing performance requirements when any type or amount of precipitation occurs. 1. The window and door systems shall be designed to prevent the appearance of uncontrolled water, other than condensation, on any underside part of the window or door when subjected to a uniform static pressure of 0.564 kPa for a minimum of 15 minutes when tested in accordance with ASTM E331. The window and door systems shall be designed to limit air infiltration (air leakage) to a rate not exceeding 0.30 L/s on a complete module or bay when subjected to a uniform pressure of 0.30 kPa in accordance with ASTM E283.

2.

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-2 11 March 2013

H.

Thermal Movement: Design, fabricate and install window, door and louvre work to provide for expansion and contraction of the exterior wall over an ambient temperature range of 50 deg. C. and a surface temperature range of 82 deg. C. without buckling, sealed joint failure, glass breakage, undue stress on members or anchors, and other detrimental effects. 1. Dimensions shown on Drawings are based on an assumed design temperature of 21oC. Fabrication and erection procedures shall take into account the ambient temperature range at the time of the respective operations.

I. J.

Make provisions at sill to drain water and condensation to exterior face of the frames. Design louvers so that objectionable noises are not created when installed louvers are subjected to wind loads within the range from 0.0 kPa to the design load specified as demonstrated by testing manufacturers stock units according to ASTM E90. Design, fabricate and install louvers so that they are easily removable and replaceable ( in the event that equipment or materials need to be moved through). All exterior metal louvers utilized in the final Work shall provide the percentage of free air shown on the Drawings for the respective locations. Permanent deformation, weld or fastener failure, component disengagement or breakage shall not occur under loading equal to 1.5 times the design load pressures (positive and negative) specified herein. Permanent deformation is defined as deflection without recovery exceeding length/1000.

K. L. M.

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-3 11 March 2013

1.06

SUBMITTALS A. Submit the following under provisions of Division 1 - General Requirements: 1. Shop drawings: a. 1:50 scale elevations and plans of each entrance and storefront system condition, indicate all hardware mounting heights. b. Large scale design details of entrance and storefront systems; indicating sizes, types, and gauges of all metal components; expansion provisions, glazing details, indicating types and thicknesses of glass; bracing and stabilizing members; attachment clips and brackets; and complete installation details. c. Provide all shop drawings bearing dimensions of actual measurements taken at the project. d. Design engineering shall be the responsibility of the framing systems manufacturer, and may vary from those indicated on the Contract Drawings, but basic sight lines shall be retained. Selection Samples: a. Provide physical samples as requested by Engineer for initial selection of finish and colour. b. Manufacturer's sample boards for sealant colors, for selections by the Engineer. Verification Samples: a. Provide operating hardware components in specified finishes as requested by Engineer. b. After receipt of selected standard samples from the Engineer, submit at least two 300 mm long pieces of major metal extruded components of the systems, and 300 by 300 mm samples of finished aluminum sheet used for brake metal components, prefinished in the specified finish system in selected color.

2.

3.

1.07

DELIVERY, STORAGE AND HANDLING A. B. C. Deliver hardware scheduled for field installation packaged individually. Label and identify each package with door opening code to match hardware schedule. Protect pre-finished aluminum surfaces with wrapping. Do not use adhesive papers or sprayed coatings which bond when exposed to sunlight or weather. Store framing and glazing materials in manner to keep them dry, protected from weather, direct sunlight, surface contamination, corrosion and damage from construction traffic and other causes.

1.08

FIELD MEASUREMENTS A. Verify that field measurements are as indicated on shop drawings.

1.09

SEQUENCING AND SCHEDULING A. Coordinate the work of this Section with the respective trades responsible for installing interfacing work, and ensure that the work performed hereunder is acceptable to such trades for the installation of their work.

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-4 11 March 2013

B. C. 1.10

Do not order or deliver any materials until all submittals, required hereunder, have been received and approved by the Engineer. Arrange keying, and schedule delivery of keys, with Engineer.

WARRANTY A. Submit the following warranties under provisions of Division 1 - General Requirements: 1. Manufacturer's written warranty for entrance and storefront systems, covering repair or replacement of any system which leaks, or exhibits defects in materials, finish, design, within two (2) years from date of substantial completion of the General Contract. Failure due to defective materials or workmanship is deemed to include, but not to be limited to: a. Failures in operation of operating component or components. b. Leakage or air infiltration in excess of the specified standard. c. Deterioration of finish to an extent visible to the unaided eye. d. Defects which contribute to unsightly appearance, potential safety hazard, or potential untimely failure of the work of this Section or the Work as a whole. Glass manufacturer's standard ten (10) years guarantee covering insulating glass against defects in materials and workmanship, including failure of seals commencing at date of substantial completion of the whole Contract.

2.

PART 2 - PRODUCTS 2.01 MANUFACTURERS A. Doors and Windows 1. Kuwait aluminum. 2. Alico Kuwait 3. Schuco International 4. Technal, France 5. SEAGULL - General Trading Company 6. SAFCO Kuwait 7. Serie EKU 8. Technal, France Louvers 1. Dasco Aluminium Company 2. SAFCO Kuwait 3. Seagull General Trading Company

B.

2.02

FRAMING MATERIALS A. Aluminum Members: Extrusions, formed members, sheet and plate, of the alloy, temper and thickness recommended by the manufacturer. 1. 2. 3. Principal Framing Members: Extruded aluminum, alloy and temper 6063-T5 or T52, 6063-T6 or 6061-T6, with minimum thickness of 3 mm Miscellaneous Non-Supporting Trim: Extruded aluminum, alloy 6063-T5 or T52 or 6063-T6, with minimum thickness of 1.6 mm. Principal Formed Metal Members: Sheet aluminum, alloy 5052, 5005, or 6061-T6, with minimum thickness of 3 mm for structural items and minimum thickness of 1.6mm for closures and trim.

B.

Louvers

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-5 11 March 2013

1.

Aluminum Extrusions: Shapes as shown and as required to fulfill performance requirements, but not less than 3mm thick, unless otherwise shown. Suitable alloy and proper temper for extruding and fabricating with adequate structural characteristics, and suitable for finishing as specified. Aluminum Sheets and Plates: Sizes as shown and minimum thickness of 2mm and as required to fulfill performance requirements. Suitable alloy and proper temper for forming and fabricating with adequate structural characteristics and suitable for finishing as specified.

2.

C.

Aluminum Finishes: 1. Organic Coating (supper durable Powder Coating) : Electrolytic ally applied baked-on acrylic or polyester enamel coating in colors and gloss selected by the Architect, of minimum 1.5 mils dry film thickness complying with AAMA 2603 and AA-C12C42R1x applied over manufacturers standard substrate preparation including a acid chromate fluoride phosphate conversion coating. Steel Sections, Angles, Plates, Anchors, Clips, Bars, Rods and other Steel Accessories Required to Join or Reinforce Assembly of Aluminum Components: ASTM A36 and ASTM A283, galvanized or, if galvanized is not compatible with alloy of component parts, shop painted with primer specified herein after cutting to size. Galvanize all ferrous metals embedded in concrete or masonry unless otherwise shown or specified. Aluminum Angles, Plates, Bars, and other Aluminum Members Required to Join or Reinforce Assembly of Aluminum Components: Alloys recommended by manufacturer or fabricator to develop required strength of assembly. Framing System Gaskets and Joint Fillers: Window and door permanent type framing system gaskets and joint fillers, depending on joint movement and sealing requirements, such as sliding joints, compression joint translation, or non-moving joints. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum items, where feasible; otherwise provide non-magnetic stainless steel. At the fabricator's option, brackets for anchorage to structure and not exposed to weather or abrasion may be hot-dipped galvanized steel. Provide non-staining, non-ferrous shims for installation and alignment of work. Fasteners and Accessories: Manufacturer's standard non-corrosive fasteners and accessories that are compatible with materials used in the framing system and with exposed portions that match finish of the windows and doors. Where movement should be expected, provide slip-joint linings of sheets, pads, shims, or washers of fluorocarbon resin or a similar material recommended by the manufacturer. 1. Items for bolting aluminum extrusions and connecting members: Stainless steel. 2. Items for anchoring windows and doors to supporting structure: Zinc- coated steel fasteners. 3. Where fasteners anchor into aluminum less than 3 mm thick, provide non-corrosive pressed-in splined grommet nuts or other type reinforcement to receive fastener threads. All screwed connections shall be drilled and taped. Do not use self-tapping screws. Sliding Bearing Pads: As required.

D.

E.

F.

G.

H.

I. 2.04

ACCESSORIES A. B. C. D. Aluminum Sheets for Apron, Skirt and Trim Panels: 3 mm thick plate. Suitable alloy and proper temper for forming and fabricating with adequate structural characteristics and suitable for finishing as specified. Concealed Flashing: Dead-soft stainless steel flashing, complying with ASTM A 67, Series 304; minimum 0.4 mm thick. Exposed Flashing and Closures: Aluminum sheet. Slip Gaskets (at bolted slip-joints): high impact polystyrene or nylatron.

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-6 11 March 2013

E. F. G.

Separator Gaskets: (except at bolted slip-joints): Tape impregnated separators; thickness and width as required. Weep Baffles: PVC coated open cell reticulated urethane foam Weather stripping: Provide compressible and removable type weather stripping formed from neoprene or EPDM complying with ASTM D2000 or molded expanded EPDM or neoprene complying with ASTM C509, grade as selected by the manufacturer. Silicone Rubber (Sealant Type SE01): ASTM C920, class and use as best suited for the intended purpose; Provide one of the following: 1. 2. "Silpruf 2000 " (General Electric Co.). "795 Building Sealant" or "790 Silicone Building Sealant"(Dow Corning Corp.).

H.

I.

Glass-Fiber-Mesh Insect Screen: 1.4 by 1.6 mm mesh of plastic-coated glass-fiber threads, woven and fused to form a fabric mesh resistant to corrosion, shrinkage, stretch, impact damage, and weather deterioration. Comply with requirements of ASTM D 3656. Paint 1. Rust Inhibitive Primer for Ferrous Metals Not Galvanized: One of the following: a. "4-55 Versare" (Tnemec Co. Inc.); 2.0 - 3.5 mils d.f.t. b. "GP-818" (Carboline Co.); 2.0 mils d.f.t. c. "Amercoat 5105" (Ameron Protective Coatings); 2.0 - 3.0 mils d.f.t. Dielectric Separator: Cold applied type, non-sagging, resistant to severe corrosion conditions; applied in two coats for an overall minimum dry film thickness of 25 mils. Provide one of the following: a. "Carbomastic 90" (Carboline Co.). b. "Bitumastic 50" (Kop-Coat, Inc.) c. "Jennite J-16" (Maintenance Inc.).

J.

2.

K.

Sound Damping Compound: Visco-elastic sound damping material in emulsion form, non-toxic, nonflammable; spray, brush or trowel applied; air-dried after application to form a non-tacky, non-marring film of medium hardness, with a flame spread rating of less than 25 and a smoke development rating of less than 50 when tested in accordance with ASTM E84. Provide one of the following: 1. 2. 3. "Antivibe DL-10" (H.L. Bachford Ltd.; Distributed by AVNEC, Inc.). "GP-1, Damping Compound" (Sound Coat; Distributed by Controlled Acoustics Corp.) "Vibrasorb Damping Compound" (E.N. Murray Co., Inc.)

2.05

OPERATING HARDWARE A. General: Provide as per Hardware Schedule.

2.06

LOUVER TYPES A. Removable stormproof units designed to collect and drain water to exterior sill by means of gutters in front edge of blades, and channels with blades and frames of profiles indicated.

2.07

GLASS A. General: As specified in Section 08810 : Glass and Glazing.

2.08

FABRICATION A. General: Fabricate metal-framed windows, doors and louvers to conform to design details and to meet and performance criteria specified. Fit and assemble components in the manufacturer's shop to the fullest extent
08520-7 11 March 2013

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

practicable and prior to application of finishes. Shop assemble, mark and disassemble before shipment the components which cannot be permanently shop assembled. B. Construct windows and doors using extruded aluminum components similar to sections shown on Drawings, except where formed aluminum members are indicated. Provide units that are reglazable without dismantling sash or ventilator framing. Prepare units for glazing, except where preglazing at the factory is indicated. Fabricate components to allow for expansion and contraction, field adjustment, and minimum clearance and shimming at perimeter. Rigidly fit and secure corners and joints with screw and spline, internal reinforcement or welding. Make exposed framing and trim joints and connections flush, hairline and weatherproof. Subframes: Provide subframes with anchors for units as shown, of profile and dimensions indicated but not less than 1.6-mm thick extruded aluminum. Miter or cope corners, and weld and dress smooth with concealed mechanical joint fasteners. Finish to match units. Design and assemble components to drain water passing joints, condensation occurring in glazing channels, condensation occurring within framing members and moisture migrating within the system to the exterior of the units. If shown or required, provide continuous aluminum panel perimeter apron finishing flush with glass, with expansion joints and with locked and sealed or fully welded corners, and fascia on all sides. Provide matching interior fascia where required. Prepare components to receive anchor and connection devices and fasteners. Provide concealed connectors, attachments and fasteners, unless otherwise indicated. Where fasteners exposed to view from interior are permissible, provide bolts and screws with countersunk heads. Provide acceptable exposed fasteners with finish matching the framing members or trim. Complete the welding, cutting, drilling and fitting of joints prior to finishing. Weld with electrodes and by methods recommended by the aluminum manufacturer. Use only methods which will avoid distortion or discoloration of exposed faces. Grind weld areas smooth and restore mechanical finish condition before proceeding with other treatment. Install concealed steel items and fastenings required within the assemblies. Apply bituminous coating to concealed steel surfaces and other dissimilar metals to come in contact with aluminum or use another approved method for separation. Fabricate frames, including integral sills, to fit in openings of size indicated with allowances made for fabrication and installation tolerances of louvers, adjoining construction, and perimeter sealant joints. Reinforce members and joints for rigidity and strength as needed to fulfill performance requirements. Use concealed stainless steel fasteners for jointing which cannot be welded. Provide interior splash pans at the sill of all active louvers which catches water infilitration through the louver blades and conducts it to the exterior via drainage weeps. Provide removable, rewireable bird screens fabricated of same metal and finish as louvers set in a folded extruded frame. Screen shall be 19mm x 19mm mesh of 1.6mm aluminum wire. Locate screens on inside face louvers, unless otherwise shown. Secure screens to louver frames with screws spaced at each corner and at 25mm on centres minimum. Provide insulated blank-off plates in areas as shown and where ducts do not attach to louver, fabricated of 1.6mm thick aluminum. Finish shall match finish of louvers and frames.

C.

D.

E.

F.

G.

H.

I.

J. K.

L.

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-8 11 March 2013

PART 3 - EXECUTION 3.01 EXAMINATION A. B. C. D. Inspect all surfaces and verify that they are in proper condition to receive the work of this Section. Beginning of installation means acceptance of existing project conditions. Verify wall openings and adjoining air and vapor seal materials are ready to receive work of this Section Before proceeding with installation work, inspect all project conditions and all work of other trades to assure that all such conditions and work are suitable to satisfactorily receive the work of this Section and notify the Engineer in writing of any which are not. Do not proceed further until corrective work has been completed or waived.

3.02

ERECTION A. Coordinate the installation of the entrance and storefronts systems, and related items to be furnished hereunder with the work of the other trades responsible for providing receiving and interfacing materials, and ensure that all receiving and supporting surfaces have been completed and ready to receive the work of this Section. Perform the installation work in strict accordance with the approved shop drawings, and the manufacturers' installation instructions, and the herein-referenced standards. Erect the various systems and items plumb and true, in proper alignment and relation to established lines and grades. All shims shall be aluminum. Wood shims will not be acceptable. Provide sheet aluminum closures as indicated or required to complete the Work. Install flashings and set thresholds in bed of mastic and secure. Perform all glazing work in accordance with FGMA Glazing Manual SIGMA and LSGA standards, and with the entrance and storefronts framing system manufacturers' recommended glazing procedures. 1. All glass at entrance and storefront frames shall be set by use of resilient glazing gaskets between both interior and exterior stops and glass, weathertight, in strict accordance with the printed glazing instructions of the manufacturers of aluminum work and glazing materials. All glass at aluminum doors shall be set by the use of resilient glazing gaskets provided on the glazing stops, in weathertight, in strict accordance with the printed glazing instructions of the manufacturer.

B.

C. D. E. F.

2.

G. H. 3.03

Ensure that all metal-to-metal and metal-to-glass joints are completely weathertight, and that adequate provisions have been made to permit expansion and contraction in the metal. No permanent exposed to view labels of any kind will be permitted to remain on the doors, frames or glass.

TOLERANCES A. Attach to structure to permit sufficient adjustmSent to accommodate construction tolerances and other irregularities. Erect the aluminum entrance and storefront systems plumb and level, free of warp or twist. 1. 2. Install 2 mm per 3 metre, non-cumulative, maximum variation from plumb. Install 2 mm maximum misalignment of two adjoining members abutting in plane.

3.04

ADJUSTING A. B. Adjust doors and hardware for smooth operation and tight fit. Lubricate hardware and other moving parts. Touch-up all scratches, abrasions, and other defects in the pre-finished metal surfaces with shop-coat finish material, supplied with the various items to be furnished hereunder.
08520-9 11 March 2013

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.05

PROTECTION AND CLEANING OF ENTRANCE SYSTEM A. Clean all entrance system promptly after installation, exercising care to avoid damage. Thoroughly clean all metal and glass surfaces free from dirt, handling marks, packing tapes, and foreign matter; remove excess sealant. Remove labels from glass surfaces, and clean and polish same. Touch-up all scratches, abrasions, and other defects in the prefinished metal surfaces with shop-coat finish material, supplied with the various items to be furnished hereunder. Lubricate hardware and other moving parts. The manufacturer shall advise the Contractor of protective treatment and other precautions required by him through the remainder of construction to ensure that the work of this Section will be without damage or deterioration at the time of Substantial Completion of the Contract.

B. C. D.

3.06

CLEANING OF GLASS A. B. Clean glass surfaces promptly after installation, exercising care to avoid damage to the same. Remove excess sealing compounds, mortar, paint, dirt, and other contaminants. All exposed edges of sealant and gaskets shall be left smooth, uniform in line, and with edges neatly struck.

3.07

GLASS BREAKAGE A. B. Replace in kind and thickness all glass breakage caused by the work performed under this Section, and bear all costs therefor. Replace in kind and thickness all glass breakage, caused by other trades, because of negligence or any other reasons, with the costs being borne by the trade at fault, or the Contractor as applicable.

3.08

PROTECTION A. Protect finished metal surfaces from damage during fabrication, shipping, storage, and erection; advise the Contractor of protective treatment and other precautions required through the remainder of construction.

END OF SECTION

ALUMINUM DOORS, WINDOWS AND LOUVERS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08520-10 11 March 2013

SECTION 008710 DOOR HARDWARE PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Finish hardware in accordance with the requirements of the Contract Documents. Work includes architectural hardware for all interior and exterior doors unless otherwise specified elsewhere. Works includes but are not limited to: 1. 2. 3. 4. 5. 6. 7. 8. 9. Hinges Pivots Lock sets and Cylinders Master keying system Lever Handles Door closers - Floor Springs Flush bolts - Dust proof socket Panic exit devices Pull handles Mop plates Kick plates Door stops Coordinators

10. Silencers 11. 12. 13. Automatic door bottom smoke seals Sliding door hardware Security Locks

B. Related Sections: 1. 2. 3. 4. 5. 6. 7. 1.02 Section 08100 Metal Doors and Frames Section 08210 Wood Doors Section 08305 Access Panels Section 08711 Hardware Set Schedule Section 08800 Glazing Section 08920 Glazed Curtain Wall Section 09900 Painting

REFERENCES A. British Standard Institution (BSI)

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08710-1 11 March 2013

November 15, 1994 (R)

BSI BS 476-31.1, Fire Tests on building Materials and structures part 31: Methods of penetration through door sets and shutters assemblies section 31.1: Method of measurement under Ambient Temperature Conditions (AMD 8366). : : : : : : : : : : : : : : : : Building and Facilities Providing Accessibility and Usability for Handicapped People Building Hardware Single Axis Hinges Mechanically Operated Locks & Latches Panic Exit Devices Operated by a Horizontal Bar Emergency Exit Devices Operated by a Lever handle or Push Pad Controlled Door Closing Devices Cylinders for Locks Requirements and Test Methods Lever handles & Knob Furniture Graphic symbol and Sign Safety signs, Inc. Fire Safety signs. Safety of Power operated Doors for Pedestrian Use. Sliding & Folding Door Hardware Electrically Powered Hold Open Devices Requirements & Tests Methods Pull Handles Requirements & Test Methods Door Coordinating Devices Door and Window Bolts Padlocks & Padlock fittings

B.

British Standards (BS) 1. BS 8300:2001 2. BS EN 1935:2002 3. BS EN 12209:2003 4. BS EN 1125:1997 5. BS EN 179:1998 6. BS EN 1154:1997 7. BS EN 1303:2005 8. BS EN 1906:2002 9. BS 5499-5:2002

10. 11. 12. 13. 14. 15. 16. C.

BS 7036-1/5:1996 BS EN 1527:1998 BS EN 1155:1997 BS 8424:2004 BS EN 1158:1997 BS EN 12051:2000 BS EN 12320:2001

Door and Hardware Federation (DHF) / Guild of Architectural Ironmongers (GAI), Standards and regulations for Ironmongery 1. June 2006 : Published a new code of practice relating to hardware for fire and escape doors.

D.

British Wood working Federation (BWF): 1. 2. 1990 Edition 1976 Edition : : Recommended locations for Builders Hardware for Standard Steel Doors and Frames Recommended location for Builders Hardware for Custom Steel Doors and Frames

E. BS 5588 / Fire Precautions & National Fire Protection Association (NFPA): F. CE Marked, BS EN1155, BS EN1634, BS476, BS EN 1125, BS EN179, BS EN 1935 1.03 A. SUBMITTALS Manufacturers Literature Catalogue Cuts: Submit to the Engineer, for information only, copies of manufacturers Specifications, maintenance and keying manuals, and installation instructions (templates to suit each particular
08710-2 11 March 2013

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

installation), for each item of finish hardware. Include photographs, catalogue cuts, marked templates and other data as may be required to show compliance with these Specifications. Only original manufacturers catalogue will be acceptable. B. Samples : Submit to the Engineer, in accordance with the requirements of the Contract Documents each of the samples: Ball bearing hinge 4-1/2x4x3mm / 3.5mm Ball bearing hinge 4x3-1/2x3mm Panic exit device Mortise lockset Lever handles Pull handle 25mm / 30mm x 300mm Male or Female toilet sign Extensions flush bolts as required for wood / Metal doors Dust proof socket Automatic flush bolt as required for Wood / Metal doors Overhead door closer with / without stainless steel arm as specified & required Floor door stop Wall door stop C. Finish Hardware Schedule: Submit to the Engineer for review, in accordance with the requirements of the Contract Documents, copies of finish hardware schedule covering complete identification of all items required for the project. Include manufacturers names and identification of finishes. Include a separate schedule of key and master key system with final submittal of schedule. Engineers review of schedules shall neither be construed as a complete check not shall it relieve the Contractor of responsibility for errors, deviations or omissions from requirement to provide complete hardware for the project. 1. 2. D. Co-ordinate hardware schedule with door manufacturers Door Schedule. Submit required templates to door manufacturers to enable proper and accurate sizing and location of hardware. Keying Schedule: Separate detailed schedule indicating clearly how the Employers final instructions on keying of locks has been fulfilled.

Statement of Application : Submit to the Engineer, in accordance with the requirements of the Contract Documents, one copy of a statement confirming that the finish hardware work complies with these specifications and, that the methods of installation is proper and adequate for the condition of installation and use. The Statement of Application shall be signed by the Contractor. All door frames shall be furnished with door silencers of plug in type except frames having weather stripping or smoke seal. Furnish each single door frame with 3 silencers and each double door frame with 2 silencers.

E. 1.04

QUALITY ASSURANCE A. Manufacturers: Try to obtain each type of hardware from single manufacturers although several may be indicated as offering products complying with requirements. Companies specializing in manufacturing door hardware with minimum ten (10) years experience. Installer Qualifications: 1. 2. The hardware installer shall have extensive experience of not less than five (5) years in the installation of similar hardware to large projects and must produce evidence in the form of reference from previous jobs. The hardware supplier must provide an experienced qualified staff that has been with the hardware supplier for a minimum of five (5) years. He must be available during the delivery and installation period and must be able to attend the building site at other times as required by Engineer.
08710-3 11 March 2013

B.

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.

The hardware supplier should depute the technical staff with AHC (Architectural Hardware Consultant) OR dipGAI (Guild of Architectural ironmongers), certificate holders, to supervise and help in the technical clarifications required then & there.

C.

Requirements of Regulatory Agencies: 1. Hardware at Rated Openings: Furnish hardware in accordance with BS / NFPA Standard for openings specified, shown or scheduled for a fire rated opening. In case of conflict between type of hardware specified and type required for fire protection, furnish type required by British Standard. Furnish hardware according to British Standard for usage with the types and size of fire doors and frames required. Unless otherwise shown or specified, arrange doors at fire rated openings to remain in the normally closed position by furnishing each unit with an automatic closing device. Furnish active latch bolts, of approved throw, that cannot be hold in the retracted position.

2.

D.

Pre-Installation Meetings: After delivery of hardware and prior to its installation, meet with the Engineer and manufacturers representatives. Compare final samples with actual hardware delivered to assure acceptability. Review catalogues, brochures, templates, installation instructions and the final hardware schedule. Rehearse installation procedures and workmanship with special emphasis on unusual conditions, so as to ensure correct technique of installation, and co-ordination with other work. a. Finish and colour of each hardware item is to match sample furnished to, reviewed and selected by the Engineer as herein before specified.

1.05

DELIVERY, STORAGE AND HARDLING A. Package and label each item of hardware separately. Tag each item in accordance with the final hardware schedule. Each package shall contain appropriate fastenings, instructions and installation templates. Protect all items from loss or damage in shipment. All hardware shall be stored in a dry, secure area and in a manner to facilitate sorting, checking and unpacking.

B. 1.06

PROJECT CONDITIONS A. Co-ordination: Co-ordinate work of this section with other directly affected sections involving manufacturer of any internal reinforcement, or cutting for door hardware.

1.07

WARRANTY A. Special Project Warranty: Submit a written warranty, executed by the Contractor, Installer, and Manufacturer agreeing to repair or replace components or entire units which fail in materials or workmanship within specified warranty period. Failures include, but are not necessarily limited to deterioration of metals, metal finishes and other materials beyond normal weathering and defects in hardware. Warranty Period for door hardware shall be five (5) years after the date of Substantial Completion.

B.

1.08 MAINTENANCE A. B. Provide special wrenches and tools applicable to each different or special hardware component. Provide maintenance tools and accessories supplied by hardware component manufacturer.

PART 2 PRODUCTS 2.1 MANUFACTURERS / SUPPLIERS


08710-4 11 March 2013

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. The products and manufacturers specified hereinafter are specified for the purpose of establishing minimum quality standards. Products equal in quality to, or better than those specified, will be considered acceptable. The decision of acceptability shall rest with the Engineer. B. Manufacturers: 1. 2. 3. 4. 2. 2 Hafele- Germany CES-Germany Geze- Germany others as specified against each. Dorma Germany

FINISH PRODUCTS A. a. Fasteners: Provide concealed fastenings where ever possible. The use of self-tapping or sheet metal screws is prohibited except for the application of flush mounted push and kick plates. Concealed Fasteners: Furnish hardware items with appropriate type and length of screws or other fastenings suitable to ensure permanent anchorage. Exposed fasteners: Furnish hardware with countersunk Philips oval head type screws where concealed fastening is not possible. The finish or colour of these screws is to match that of the hardware item being fastened.

B. 1.

Hinges: General: Pack all hinges with machine or wood screws as required by door and frame construction. Where door jamb or trim projects to such an extent that the width of leaf specified will not allow the door to clear such frame or trim; furnish hinges with leaves of sufficient width to clear. Furnish template hinges in accordance with door and frame material required. All hinges to be stainless steel minimum grade 304. Hinge pins, except as otherwise indicated, shall be as follows: a. b. c. d. Stainless steel pins. Exterior door: Non-removable pins (NRP). Interior doors: Non-rising pins. Tips: Flat button.

2. 3.

4. 5. 6.

Provide sufficient hinge width to allow door to clear the trim, if the projection of door trim prevents desired degree of opening. Furnish hinges complying to BS EN Standards, equipped with two ball bearing units and five knuckles, with CE markings. The supplier should provide the grade certificate for the hinges.
08710-5 11 March 2013

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

a.

Hinge Size: (i) 114 x 102 x 3.4/3.5 mm CE, BS EN1935 (ii) 100 x 89 x 3 mm CE, BS EN1935

BS EN 1935: 2002, the standard classifies hinges using the eight digit coding system. Each digit relates to a particular feature of the product measured against the standard performance requirements. Digit 1 Category of use, Grade 3 or 4: Heavy duty & severe duty, hinges for use on doors as per the location which are subject to frequent moderate & violent use. Digit 2 Number of cycles, Grade 7: 200 000 test cycles. Digit 3 Classification, Eight test door mass grades are identified according to Table 1 of this standard. Hinge grade of 10 to 14 should be used as per the usage and location of the doors. Digit 4 Fire behaviour, Grade 0 or 1: suitable for use on fire/smoke resistant door assemblies. Non fire rated hinges grade 0, could be used on non fire rated doors. Digit 5 Safety, all hinges are required to satisfy the essential Therefore only grade 1 is identified. Digit 6 Corrosion resistance, Grade 0 4 mild resistance. Minimum grade of 3 0r 4 should used, which is high or very high resistance. Digit 7 Security Burglar resistance, Grade 0-1: Suitable for use on burglar-resistant door assemblies, subject to satisfactory assessment. Grade 0 could be used if it is not a must to use on doors. Digit 8 Hinge Grade 10 -14 for use on doors with a mass to 60 kg- 160 kg, but a minimum of grade 13 to be used as the hinge grade. Manufacturers: Hafele World wide Royde & Tucker Ltd UK BSW - Germany C. Mortise Locksets: requirement of safety in use.

1. All locks and latches shall be mortise locksets with 55 mm standardized backset unless otherwise noted. Cases shall be steel and standardized to one size to allow interchange of function. Lock cases shall be closed on all sides to protect inner mechanism from corrosion and foreign matter and provided with heavy gauge steel armored front. Extra heavy long throw latch bolt, with auxiliary deadlocking latch to be provided for positive, secure latching. Where dead bolts are required they shall be full 21 mm throw and above. Locksets including lever handle functions, to be easily reversible in field. 2. The supplier should provide the grade certificate for the Locks. 3. BS EN 12209:2003 The standard classifies hinges using the 7 digit coding system. Each digit relates to a particular feature of the product measured against the standard performance requirements. Digit 1 Category of use-Grade 2 or 3: office doors or doors in public use Digit 2 Duration-Number of cycles, Grade X: 200 000 test cycles.
DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 08710-6 11 March 2013

Digit 3 Door mass & closing force-Grade 7, 8 or 9, with 100/200 kg door mass & 25 N / 15 N maximum closing force. Digit 4 Fire behaviour, Grade 0 or 1: suitable for use on fire/smoke resistant door assemblies. None fire rated grade 0, could be used on non fire rated doors. Digit 5 Safety, No safety identified & grade specified, hence grade 0 is accepted. Digit 6 Corrosion resistance & temperature, Grade C to G is specified with high resistance and temperature and as per the site requirements. Digit 7 Security & drill resistance-grade 4 to 7 with high security and variant drill resistances. Digit 8 Field of application with 15 grades. Digit 9 Type of key operation & locking with grades 0 to grade H.

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08710-7 11 March 2013

Manufacturers: Hafele Worldwide CES - Germany KABA Germany BASSI Germany GU-BKS-Germany BMH-Germany D. 1. Lever handles: All Lever trim shall be thru-bolted for greater strength and security and more accurate installation and comply with BS EN 1906:2002-Class 4, fire approved. The attachment of the handle to be concealed with 8mm spindle. All lever trim shall be Grade 304 with Alasept Antibacterial coating. BS EN 1906:2002, European standard specifies the performance requirements and test methods (i.e. durability, static strength, operating torque, corrosion, safety, etc) for sprung and unsprung lever handles and knobs for doors on back plates and roses. The standard has additional graded safety requirements where a high risk of failing exists. The standard classifies door furniture by using an 8 digit coding system. Each digit refers to a particular feature of the product measured against the standard performance requirements. Digit 1 Category of use, Grade 3 or 4: High use on public office doors, stadiums, public toilets & as per the site requirements. Digit 2 Durability, Grade 7: High use 200 000 cycles Digit 3 Test door mass, No requirement. Digit 4 Fire resistance, Grade 0 or 1: suitable for use on fire/smoke doors assemblies, grade 0 should be recommended for use on non fire rated doors. Digit 5 Safety, Grade 0 or 1: Safety application to qualify for this grade, handles must have high strength and knobs that have handle to plate and plate-to-door fixing and/or handle to spindle fixing, such that they would withstand a person grabbing in order to prevent falling. Digit 6 Corrosion resistance, Grade 3 or 4: high resistance or very high resistance, recommended for use in exposed marine atmospheres or much polluted industrial environments. Digit 7 Security, Grade 0 - 4: against burglary resistance. The main requirements include resistance to drilling, close fitting plates or escutcheons to help protect the lock and support the cylinder. Digit 8 Type of operation: Type A-U: The following marking denotes a lever handle for high frequency use on a door that is also subject to frequent violent usage. Manufacturers: Hafele worldwide HAF-UK E. Cylinders For Locks BS EN 1303: 2005, The standard classifies cylinders using a 8 digit coding system. Each digit refers to a particular feature of the product measured against the Standards performance requirements.
DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 08710-8 11 March 2013

2.

Digit 1 Category of use, Grade 1: keys shall resist a torque of 2.5Nm and still be useful. Digit 2 Durability, Grade 6: 100 000 cycles Digit 3 Door mass, No requirement. Digit 4 Fire resistance, Grade 0 or 1: Cylinders shall be fire tested in accordance with current fire test requirements of EN 1634-1 & grade 0 to be specified on non fire rated doors. Digit 5 safety, No requirement. Digit 6 Corrosion and temperature resistance, Grade 0 to C as per the site requirements and engineers approval. Digit 7 Key Security, Cylinders are classified in grades 1 to 6, where 6 is the highest. The grade of security can differ from one side of the double cylinder to the other and as per the engineers approval. Digit 8 Attack resistance grade 0, 1 & 2, where 2 is the highest and as per the engineers approval. Manufacturers: Hafele worldwide BASI Germany CES-Germany F. Panic Devices: Furnish exit devices as indicated in the Hardware Set Schedule with utilized Installation feature to suit various door widths. All models shall be comply with British Standard for fire rated doors to BS 1125, Figure 02 or Figure 3. Furnish Panic device complying to British Standard as follows: Panic Device: Type 1 or Type 2: BS EN 1125, figure 02 or figure 03 BS 476: Part 22: 1997. EN 1125. CE mark 1007 and CE 1008, ANSI BS EN 1125: 2008, the standard provides details on product types, classification by use, test cycles, door mass, corrosion resistance, as well as definitions, product performance requirements, test apparatus, test methods and marking of products. The emphasis for products covered by this standard is on safe exit rather than security. The main purpose of the performance requirements of this standard is to give safe and effective escape through a doorway with minimum effort and without prior knowledge of the device, i.e. for locked doors on escape routes where panic situations can be foreseen. The standard classifies panic exit devices by using a 10 digit coding system. Each digit refers to a particular feature of the product measured against the standards performance requirements. Digit 1 Category of use Grade 3: High frequency of use by public and others with little incentive to exercise care. Digit 2 Number of test cycles Grade 7: 200 000 cycles
DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 08710-9 11 March 2013

Digit 3 Test door mass Grade 5 -7 from 100 kgs to above 200 Kg Digit 4 Fire resistance Grade 0, A & B: suitable for use on fire/smoke door assemblies, and as per the door requirements. Digit 5 Safety, Grade 1: All panic devices have a critical safety function. Digit 6 Corrosion resistance, Grade 3 or 4: high or very high resistance. Digit 7 Security, Grade 2: Safety considerations will always be given priority over security. Digit 8 Projection of device, Grade 1 or 2: projection up to 100mm (standard projection) or 150 mm (large projection). Digit 9 Type of device, Type A or Type B: Panic device with push bar Operation or touch bar operation. Manufacturers: Hafele - worldwide Leon Speciality Inc - Taiwan G. Door Closers And Floor Springs:

Provide door closers and floor springs as indicated in the Hardware Set schedule. Hold open arms / parallel arms to be provided as per the requirement. The spring power of the closer shall permit adjustment to suit any width of door. Door closers shall be listed for fire rated doors, EN 1634-1 and carry a five year guarantee. Furnish floor door springs with statically controlled closing speed with back check. Spindles of floor springs should be interchangeable with extensions to meet the required tolerances on bottom of doors. 1. 2. 3. Floor springs shall be listed for fire rated door and conform to BS standard. Provide stainless steel cover to the body of door closers and floor springs as shown to the Hardware Schedule. Furnish Door Closers and floor springs complying to BS as follows:

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08710-10 11 March 2013

BS EN 1154: 1997, the standard includes a wide range of products than BS 6459 and covers all controlled surface mounted, concealed, transom mounted closers as well as both single and double action floor springs. The standard classifies door closers using the 6 digit coding system. Each digit relates to a particular feature of the product measured against the standards performance requirements. Digit 1 Category of use, Grade 3 or 4: For closing doors from 105 degree 180 degree open. Digit 2 Number of test cycles, Grade 8: 500 000 test cycles. Only one test duration is identified for door closing devices manufactured to this standard. Digit 3 Test door mass/size, seven test door mass grades 1-7 with maximum mass of hinged leaf 160kg. Digit 4 Fire behaviour, Grade 0 or 1: Suitable for use on fire/smoke door assemblies, subject to satisfactory assessment. Grade 0 for non fire rated doors are also applicable, as per the door location and door. Digit 5 Safety, Grade 1: All door closers are required to satisfy the essential requirement of safety in use contained in the Construction products directive issued by the EU. Therefore only grade 1 is identified. Digit 6 Corrosion resistance, grade 0-4 are approved and as per the site conditions and as approved by the engineer. Manufacturers: Hafele worldwide Geze Germany H. Flush Bolts: BS EN-12051 1. All flush bolts are to be furnished in pairs. Furnish extension flush bolts with minimum length of 300mm for all rods except where any door is higher than 2100, furnish the top bolt to a length sufficient to locate the flush bolt operator no more than 1800mm above the finished floor. Furnish dust-proof sockets for bottom bolts. 2. Furnish flush bolts as indicated in the Hardware sets schedule and complying to British Standard as follows: a. b. I. Door Stop: Furnish door stops as indicated in the Hardware set schedule and complying with British Standard. Flush Bolt: BS EN 12051:2000 Dust Proof Strike: BS EN 12051:2000

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08710-11 11 March 2013

J.

Pull Handles: BS EN 8424: Furnish door pull bars as indicated in the hardware set schedule and complying with BS 8424:2003 and material to be of anti corrosive high grade stainless steel Grade 304 with Alasept Antibacterial coating. K. Kick Plates and Mop Plates: Kick plates and Mop plates as indicated in the hardware set schedule and complying to British Standard. The thickness will be 1.5mm L. Toilet Sign:

Furnish stainless steel finish sex indicator male/female/handicap, size 150 x 100mm or 76 mm dia Or 100 MM dia, in material and finish as indicated in the hardware set schedule and complying with British Standard. M. Automatic Drop Seals, Smoke Seals, Weather strips, Silencer:

Furnish concealed automatic drop seals to bottom edge of doors equal approved for fire, sound proof and external doors, complying with British standard. 1. 2. Furnish Smoke Seals to Perimeter and Meeting Stiles complying to BS 476 Part 20, 22 or BS EN 1634-1.

Furnish door hinges locks and door closers with intumescent fire protection kits for the smoke stop & fire rated doors. The installation must comply with specifications and must be independently tested by recognized test laboratories and comply with EN 1634-1, BS 476 part 22-1987 and smoke element seals comply with the requirement of BS 476 part 31. 3. 4. 5. Concealed and Surface mounted door bottoms to be used for the Fire rated doors and as required by the engineer as a variation. Weather Strips, Smoke seals, Astragals etc has to be provided as per the requirement, by the door manufacturer. Door Silencers to be fixed on all metal frames, to be supplied by the door manufacturer.

N. Door Coordinator-BS-EN 1158:1997, to be added on the doors upon requested by the site engineer as a variation. 2.3 HARDWARE FINISHES A. B. C. Hardware shall be of the best grade satin stainless steel grade 304 where possible, unless indicated otherwise. All sizes of material given in the hardware sets are only for guidance. It is the responsibility of the Contractor to furnish the exact size and weight of hardware items to ensure proper function in each case. Produce finishes to exactly matching with Engineers selected sample(s). Reduce variance in hue in the colour of each finish, as much as possible, whether the base material is cast, forged or stamped, or when plating is applied over steel, brass or bronze. Finishes of the same designation that comes from 2 or more sources shall match when the items are viewed at arm length and approximately 600 mm apart. Unless otherwise specified, match the finish of each item of hardware with the finish selected for lock sets & latches.

2.4

HARDWARE MOUNTING HEIGHTS


08710-12 11 March 2013

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A. B.

Mounting heights shall generally be in accordance with the Recommended Locations for Builders Hardware published by the Doors and Hardware Institute (DHI) and to the approval of the Engineer. The following mounting heights shall apply throughout the work, unless otherwise shown. The same could be accepted as per the site requirements. 1. 2. 3. 4. 5. 6. 7. 8. Lock Sets and Latches: 950mm to centre of handle from floor. Butt Hinges: 305mm to center of lowest hinge from floor, 184mm to center of upper hinge from top of door, space other hinges equally between lower and upper hinges. Door Pulls: 1120mm finished floor to centre of pull, centre line in 125mm from edge of flush doors, and centered on stile of narrow stile glass doors. Deadlocks: Centre line of cylinder to align with centre line of cylinder for lock sets, unless indicated otherwise. Cross-Bar of Exit Device: 950mm finished floor to centre of cross bar. Push Bar: 1050mm finished floor to centre of push bar. Push Plate: 1120mm finished floor to centre of plate through mounted to pulls. Flush Bolt Operating Mechanisms: Top bolt 1650 to 1800mm above finished floor, bottom bolt 250 to 300mm above finished floor.

2.5

SOURCE QUALITY CONTROL A. B. C. Coordinate the application of hardware items with door and frame details and with methods of fastening as hereinafter specified. Adaptation of Hardware Items: Where the type of hardware specified is not adaptable to the finished size of members requiring hardware; submit an item having a similar operation and quality to the Engineer for review. Templates: Make finish hardware to templates, with wood and/or machine screws as applicable to door and frame details. Furnish templates and schedules to door and frame manufacturers and other trades requiring same, so that doors and frames can be cut, reinforced and prepared in the shop to receive hardware. Use template hinges conforming to BS standards to establish location of holes for each size of hinge. Try to avoid the names of the manufacturers on exposed parts of the hardware, as a part of publicity. Single Source: Try to use only the products of one manufacturer for each type of hardware specified. The Contractor should be responsible for the accuracy of the quantities, sizes, finish and proper hardware to be furnished whether specifically mentioned or not and shall be responsible for determining all details such as hand of doors, type of locks, standards required etc.

D. E. F.

2.6

LOCK CYLINDERS AND KEYING SYSTEM A. B. C. D. Provide 3 change keys per cylinder. A master key system has to cover all door types such as wood, hollow metal, glass doors and aluminium doors. The system has to be designed by the manufacturer in accordance with the Employers and Engineers requirement. Master keyed lock cylinders shall be under the same source euro profile type or equal and approved quality. Provide keys of nickel silver or other equal and approved material.
08710-13 11 March 2013

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E. F. G. H.

Provide 3 keys for each master key level. Finish of cylinders shall match with the finish of other hardware in accordance with British Standard. Provide temporary cylinders or construction keys as necessary for use during construction period only. After completion of installation and prior to handing over to the Employers representative, call the manufacturers' local authorized representative who shall organize the installation of the approved master key system. The master keys must be handed over direct to the Employers representative by the manufacturer's local authorized representative and a receipt obtained. Furnish the receipt to the Contractor as evidence of completing the obligation. Provide steel key cabinet with cabinet lock having a capacity of 25 percent in excess of the total quantity of master keyed cylinders.

I. J.

On handing over, each key shall be fitted to a coloured nylon key tag with clear labeling of cylinder/key marking. On handing over, all individual keys shall be placed on the hooks inside the key cabinet except the master keys, which shall be handed over in a sealed envelope. PART 3 EXECUTION 3.1 EXAMINATION Verify that doors and frames are ready to receive work and dimensions are as indicated on the prepared and reviewed hardware schedule and as instructed by the manufacturer. 3.2 PREPARATION Install each hardware item in compliance with the manufacturers instructions and recommendations. Wherever cutting and fitting is required to install hardware onto or into surface which are later to be painted or finished in another way, coordinate removal, storage and reinstallation or application of surface protection with finishing work specified in the Division 9 Sections. Do not install surface-mounted items until finishes have been completed on the substrate.

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08710-14 11 March 2013

3.3

INSTALLATION Receive hardware for doors as shown and scheduled, and as specified In the applicable hardware portions of these specifications. Store the hardware items in a locked space to prevent loss. Apply to doors as recommended by hardware manufacturer and as required. Fit locks and latch in their respective doors and remove before painting. Reinstall after painting of doors in completed. Upon completion, adjust and lubricate hardware for proper operation. Instruct Employers personnel in the proper adjustment and maintenance of hardware as per the manufacturer's instructions and recommendations. Set units level, plumb and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper installation and operation.

3.4

FINAL ADJUSTMENTS AND CHECKING The hardware supplier shall assist the Contractor in adjusting and checking the installation of finish hardware. Check, test and adjust moving parts to ensure free and smooth operation. Furnish to the Employer the special tools required to adjust and maintain hardware including instruction sheets and operation manuals. 1. 2. After the building is completed and in use, adjust hardware to compensate for air movement and other conditions, so that all items will operate properly. The manufacturer local authorized representative of the lock and latch manufacturer shall examine all hardware furnished with the Engineer (6) months after the handing over to the Employer. Adjust the hardware for proper operation.

Clean and polish all exposed hardware at the time of handing over to the Employer. END OF SECTION

DOOR HARDWARE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08710-15 11 March 2013

SECTION 08800 GLAZING PART 1 - GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. Work Included: Provide glass and glazing in accordance with the Contract DocumentsThe Work of this Section shall include but not be limited to the following: 1. 2. 3. 4. 5. B. Windows; Heat strengthened, low E. Aluminum Windows and Doors: Insulating glass units heat strengthened and low E Glazed entrances; Tempered. Interior door lites. Decorative glass for interior applications.

1.2

Related Sections include the following: 1. 2. 3. Section 08411 Aluminum-framed Entrances Section 08450 "All-Glass Entrances" Section 08520 Aluminum Windows and Doors.

1.3 A. B. C. D.

DEFINITIONS Manufacturers of Glass Products: Firms that produce primary glass, fabricated glass, or both, as defined in referenced glazing publications. Glass Thicknesses: Indicated by thickness designations in millimeters according to ASTM C 1036. Interspace: Space between lites of an insulating-glass unit that contains dehydrated air or a specified gas. Deterioration of Insulating Glass: Evidence of failure is the obstruction of vision by dust, moisture, or film on interior surfaces of glass under normal use that is attributed to the manufacturing process. Failure excludes glass breakage and maintenance and cleaning of insulating glass contrary to manufacturers written instructions. PERFORMANCE REQUIREMENTS A. General: Provide glazing systems capable of withstanding normal thermal movement and wind and impact loads (where applicable) without failure, including loss or glass breakage attributable to the following: defective manufacture, fabrication, and installation; failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials; or other defects in construction.

1.4

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08800-1 11 March 2013

B.

Glass Design: Glass thickness designations indicated are minimums and are for detailing only. Confirm glass thicknesses by analyzing Project loads and in-service conditions. Provide glass lites in the thickness designations indicated for various size openings, but not less than thicknesses and in strengths (annealed or heat treated) required to meet or exceed the following criteria: 1. Glass Thicknesses: Select minimum glass thicknesses to comply with ASTM E 1300, according to the following requirements: a. b. Specified Design Wind Loads: As per values specified in Division 08920 Maximum Lateral Deflection: For the following types of glass supported on all 4 edges, provide thickness required that limits center deflection at design wind pressure to 1/50 times the short side length or, whichever is less. 1) For monolithic-glass lites heat treated to resist wind loads. 2) For insulating glass. Thickness of Glass: Provide the same thickness for each type indicated throughout Project.

c. C.

Thermal Movements: Provide glazing that allows for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures acting on glass framing members and glazing components. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. 1. Temperature Change (Range): , ambient;, material surfaces.

D.

Thermal and Optical Performance Properties: Provide glass with performance properties specified based on manufacturer's published test data, as determined according to procedures indicated below: 1. 2. For insulating-glass units, properties are based on units of thickness indicated for overall unit and for each lite. Center-of-Glass Values: Based on using LBL-44789 WINDOW 5.0 computer program for the following methodologies: a. b. c. U-Factors: NFRC 100 expressed as. Solar Heat Gain Coefficient: NFRC 200. Solar Optical Properties: NFRC 300.

E.

Heat Strengthened Glass: Heat strengthened glass shall have a residual surface compression less than 50Mpa. The glass shall be installed with any roller wave marks orientated horizontal (parallel to sill) where possible. 1. Roller wave distortion to be minimized by controlling the furnace temperatures and cooling beds during manufacture. In general the roller wave should not give a disturbing, distorted image when viewed in reflection or when viewing through the glass. Localized Bow or Roller Wave Distortion should be less than 0.15mm over 300mm measured peak to trough Permanent Identification marking shall be in the bottom right hand corner of each glass lite.

2. 1.5 A. B.

SUBMITTALS Product Data: For each glass product and glazing material indicated. Samples:

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08800-2 11 March 2013

1. 2. 3.

For the following products, in the form of square Samples for glass and of long Samples for sealants. Install sealant Samples between two strips of material representative in color of the adjoining framing system. For visual and test mockups, full-size units as required. For decorative glass: a. b. c. d. Each type of decorative glass. Each edge treatment on type of decorative glass. Each decorative film overlay on type of decorative glass. Each applied coating on type of decorative glass.

C. D. E. F.

Glazing Schedule: Use same designations indicated on Drawings for glazed openings in preparing a schedule listing glass types and thicknesses for each size opening and location. Product Certificates: Signed by manufacturers of glass and glazing products certifying that products furnished comply with requirements. Qualification Data: For installers. Preconstruction Adhesion and Compatibility Test Report: From glazing sealant manufacturer indicating glazing sealants were tested for adhesion to glass and glazing channel substrates and for compatibility with glass and other glazing materials. Product Test Reports: For each of the following types of glazing products: 1. 2. Insulating glass. Glazing sealants.

G.

H. 1.6 A.

Warranties: Special warranties specified in this Section. QUALITY ASSURANCE Installer Qualifications: An experienced installer who has completed glazing similar in material, design, and extent to that indicated for this Project; whose work has resulted in glass installations with a record of successful in-service performance; and who employs glass installers for this Project who are certified under the National Glass Association's Certified Glass Installer Program. Source Limitations for Glazing Accessories: Obtain glazing accessories through one source from a single manufacturer for each product and installation method indicated. Glass Product Testing: Obtain glass test results for product test reports in "Submittals" Article from a qualified testing agency based on testing glass products. 1. Glass Testing Agency Qualifications: An independent testing agency with the experience and capability to conduct the testing indicated, as documented according to ASTM E 548.

B. C.

D.

Elastomeric Glazing Sealant Product Testing: Obtain sealant test results for product test reports in "Submittals" Article from a qualified testing agency based on testing current sealant formulations within a 36-month period. 1. 2. Sealant Testing Agency Qualifications: An independent testing agency qualified according to ASTM C 1021 to conduct the testing indicated, as documented according to ASTM E 548. Test elastomeric glazing sealants for compliance with requirements specified by reference to ASTM C 920, and where applicable, to other standard test methods.
08800-3 11 March 2013

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Preconstruction Adhesion and Compatibility Testing: Submit to elastomeric glazing sealant manufacturers, for testing indicated below, samples of each glazing material type, tape sealant, gasket, glazing accessory, and glass-framing member that will contact or affect elastomeric glazing sealants: 1. 2. 3. 4. 5. Use ASTM C 1087 to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of glazing sealants to glass, tape sealants, gaskets, and glazing channel substrates. Submit not fewer than eight pieces of each type of material, including joint substrates, shims, jointsealant backings, secondary seals, and miscellaneous materials. Schedule sufficient time for testing and analyzing results to prevent delaying the Work. For materials failing tests, obtain sealant manufacturer's written instructions for corrective measures, including the use of specially formulated primers. Testing will not be required if elastomeric glazing sealant manufacturers submit data based on previous testing of current sealant products for adhesion to, and compatibility with, glazing materials matching those submitted.

F.

Safety Glazing Products: Comply with testing requirements in 16 CFR 1201. 1. Where glazing units, including Kind FT glass and laminated glass, are specified in Part 2 articles for glazing lites : a. b. More than in exposed surface area of one side, provide glazing products that comply with Category II materials, for lites Less in exposed surface area of one side, provide glazing products that comply with Category I or II materials, except for hazardous locations where Category II materials are required by 16 CFR 1201 and regulations of authorities having jurisdiction.

G.

Glazing Publications: Comply with published recommendations of glass product manufacturers and organizations below, unless more stringent requirements are indicated. Refer to these publications for glazing terms not otherwise defined in this Section or in referenced standards. 1. 2. GANA Publications: GANA's "Glazing Manual." IGMA Publication for Insulating Glass: SIGMA TM-3000, "Glazing Guidelines for Sealed Insulating Glass Units."

H.

Insulating-Glass Certification Program: Permanently marked either on spacers or on at least one component lite of units with appropriate certification label of the following testing and inspecting agency: 1. 2. Insulating Glass Certification Council. Associated Laboratories, Inc.

I.

Mockups: Build mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. 1. 2. Build mockups in the location as directed by Architect. Build glass mockups by installing the following kinds of glass in mockups specified in Section 08450 "All Glass Entrances to match glazing systems required for Project, including glazing methods: a. 3. Fully tempered glass.

Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

J.

Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination."
08800-4 11 March 2013

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.7 A.

DELIVERY, STORAGE, AND HANDLING Protect glazing materials according to manufacturer's written instructions and as needed to prevent damage to glass and glazing materials from condensation, temperature changes, direct exposure to sun, or other causes. PROJECT CONDITIONS A. Environmental Limitations: Do not proceed with glazing when ambient and substrate temperature conditions are outside limits permitted by glazing material manufacturers and when glazing channel substrates are wet from rain, frost, condensation, or other causes. 1. Do not install glazing sealants when ambient and substrate temperature conditions are outside limits permitted by glazing sealant manufacturer or below.

1.8

1.9 A. B.

WARRANTY General: Submit warranties to repair or replace defective glass and glazing materials or workmanship for a period of not less than 5 years after date of Substantial Completion, or longer where specified. Insulating Glass: Manufacturer's standard form, made out to Owner and signed by insulating-glass manufacturer agreeing to replace insulating-glass units that deteriorate as defined in "Definitions" Article. Submit a written warranty agreeing to replace defective insulating glass for a period of 10 years after date of Substantial Completion. Defects include, but are not limited to the following: 1. 2. 3. C. Failure of insulating glass edge seal as shown by frost, moisture, dust or corrosion within sealed air space Insulating glass spacer migration. Failure to meet specified performance requirements.

Manufacturer's Warranty on Laminated Glass: Submit written warranty signed by insulating glass manufacturer agreeing to furnish replacements for those laminated glass units that deteriorate as defined in the "Definitions" article, f.o.b. point of manufacture, freight allowed Project site, within specified warranty period indicated below. Warranty covers only deterioration due to normal conditions of use and not to handling, installing, and cleaning practices contrary to glass manufacturer's published instructions. 1. Warranty Period: Completion. Manufacturer's standard but not less than 5 years after date of Substantial

D.

Coated Glass Products: Submit written warranty signed by coated glass manufacturer agreeing to furnish replacements for those coated glass units that deteriorate as defined in "Definitions" article, f.o.b. point of manufacture, freight allowed Project site, within specified warranty period indicated below. Warranty covers only deterioration due to normal conditions of use and not to handling, installing, and cleaning practices contrary to glass manufacturer's published instructions. 1. Warranty Period: Completion. Manufacturer's standard but not less than 5 years after date of Substantial

PART 2 - PRODUCTS 2.1 MANUFACTURERS


08800-5 11 March 2013

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: 1. Basis-of-Design Product: The design for each glazing product is based on the product named. Subject to compliance with requirements, provide either the named product or a comparable product by one of the other manufacturers specified.

2.2 A. B.

GLASS PRODUCTS Glass, General: All glass of the same type shall be the manufactured product of one company. Provide glass types for each application according to the glazing schedule found in part three of this section. Fabrication Process: By horizontal (roller-hearth) process. Glass heat treatment should run in one direction as installed in the building. Direction is subject to Architects approval. 1. 2. C. Resulting heat treated glass shall minimize the roller distortion or ripples resulting from fabrication. Where noticeable distortions exist, and are acceptable to the Architect, install glass with such distortions running horizontally. Glass within one type of opening shall be produced by the same heat treating process.

GLASS TYPES Glass Type 1: External Curtain Walls, Windows and Doors: Vertical Glazing: The Glass to be 28 MM Hermetically Sealed STRUCTURAL Silicone Double Glazed Unit of thefollowing Make Up: Outer Lite : 6 MM SOLARSTOP Smart vision 20. Space : 16 MM Air Filling. Inner Lite : 6 MM super low e 75 fully Tempered glass. The optical and thermal data for the above makeup should be as follows: Visible light transmittance : 17% Visible light Reflectance Out : 27% Visible light Reflectance IN : 13% Solar Heat Gain Co-Efficient : 0.25 Glass Type 1A: Spandrel Glass: The unit to be of the following make up: Outer Lite : 6 MM SOLARSTOP Smart Vision 20. Space : 16 MM Air Filling. Inner Lite : 6 MM super low e 75 fully Tempered glass. Back pane: 1.5 mm Powder coated aluminum sheet as approved by the architect . Insulation : 50 mm thick rigid rock wool of density 50 kg/m3 Glass Type 2 : External Curtain Walls: Sloped Glazing Inwards and sky lights:

U-Value Summer : 1.65 w/m/K Shading Co-efficient : 0.29

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08800-6 11 March 2013

The Glass to be 33.14 MM Hermetically Sealed Structural Silicone Double Glazed Unit of the following Make up: Outer lite Space : 6 MM SOLARSTOP Smart Vision 20. : 16 MM Laminated Glass consisting of: 6 MM super low e 75 fully tempered Glass. 1.14 clear PVB Interlayer 6 MM Clear fully Tempered Glass. The optical and thermal data for the above makeup should be as follows: Visible light transmittance : 16% : 27% : 13% : 0.25 U-Value Summer : 1.65 Shading Co- efficient : 0.29

Visible light Reflectance-Out Visible light Reflectance In Solar heat Gain Co.-Efficient

Glass Type 2A : Spandrel Glass: The unit to be of the following make up: Outer Lite : 6 MM SOLARSTOP Smart Vision 20 . Space : 16 MM Air Filling. Inner Lite : 6 MM clear fully Tempered glass. Back Pane: 1.5 mm Powder coated aluminum sheet as approved by the architect . Insulation: 50 mm Thick rigid rock wool of density 50kg/m3 Glasss Type 3: X-Ray Shield Radiation Shielding Glass is a high quality optical grade lead barium glass with more than 60% heavy metal oxide including at least 55% lead oxide with sizes up to 96x48. All Radiation Shield Glasses should cover MOH Regulations. Reference as mentioned in A7.950. D. Insulating-Glass Units, General: Factory-assembled units consisting of sealed lites of glass separated by a dehydrated interspace, and complying with ASTM E 774 for Class CBA units and with requirements specified in this Article and in Part 2 "Insulating-Glass Units" Article. 1. 2. 3. 4. Provide Kind HS (heat-strengthened) float glass in place of annealed glass where needed to resist thermal stresses induced by differential shading of individual glass lites and to comply with glass design requirements specified in Part 1 "Performance Requirements" Article. Provide Kind FT (fully tempered) glass lites where safety glass is indicated. Overall Unit Thickness and Thickness of Each Lite: Dimensions indicated for insulating-glass units are nominal and the overall thicknesses of units are measured perpendicularly from outer surfaces of glass lites at unit's edge. Sealing System: Dual seal, with primary and secondary sealants as follows: a. 5. 6. Grey Silicone

Spacer Specifications: Manufacturer's standard spacer material and construction. Spacer Specifications: Manufacturer's standard spacer material and construction complying with the following requirements: a. b. c. Spacer Material: Mill finish Desiccant: Molecular sieve or silica gel, or blend of both. Corner Construction: Manufacturer's standard corner construction.
08800-7 11 March 2013

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Heat-Treated Glass: ASTM C 1048, Quality q3 (glazing select); Condition A (uncoated surfaces), Type I (transparent glass, flat), and Class specified in Glazing Schedule at end of Section. 1. Kind HS - Heat Strengthened. (Heat strengthened glass shall be achieved by heat treating glass resulting in a glass product capable of a surface compressive stress of not less than 3500 psi, nor more than 7000 psi.)

F.

Laminated Glass: 1. Two lites of glass bonded to plastic, puncture resistant, polyvinyl butyral (PVB) interlayer conforming to the requirements of ANSI Z97.1, ASTM C 1172, and CPSC standard 16 CFR 1201 Category II, as follows: Clear Laminated Glass: One 1.5-mm or two (2) .7-mm thick layers of clear PVB. Interlayer shall be compatible with all glazing sealants. Approved Interlayer Products: a. b. Saflex Clear as manufactured by Solutia, Inc. Butacite as manufactured by E. I. Dupont de Nemours & Co., Inc.

2. 3. 4.

G.

Low-E Coated Glass Products: Clear monolithic glass with a high performance low-emissivity (low-E) coating for use in an insulating unit: a. b. Low-E coating(s) shall be neutral in transmitted and otherwise exhibit the visual and performance characteristics of the products specified herein. Visual quality control acceptance criteria of the coating shall be consistent with industry guidelines, subject to approval by the Contractor.

H. I.

Wired Glass: Monolithic Wired-Glass Units, ASTM C 1036, of form and mesh pattern specified in the schedule. Decorative Glass: 1. 2. Basis for design product: Bendheim, Product GRZS 327. Fully tempered.

2.3

GLAZING ACCESSORIES: c. Not in Direct Contact with Silicone: 1) 2) 3) 4) d. Closed Cell Sponge Gaskets (Interior): Polychloroprene (neoprene) or EPDM gaskets complying with ASTM C 509-84 (60 plus Shore A durometer). Non-Cellular Gaskets (Exterior): Non-cellular polychloroprene (neoprene), or EPDM, or silicone gaskets complying with ASTM C 864-84 (70 plus Shore A durometer). Setting Blocks: Non-cellular(dense) extruded polychloroprene (neoprene) or EPDM: ASTM C 864-84 (90 plus Shore A durometer). Spacers and Edge Blocks: Non-cellular(dense) extruded poly-chloroprene (neoprene) or EPDM: ASTM C 864-84.

In Direct Contact with Silicone:

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08800-8 11 March 2013

1) 2) 3)

Glazing Gaskets: Heat-cured, extruded silicone rubber: ASTM C 1115 (70 plus 5 Shore A durometer. Setting Blocks: Non-cellular (dense) extruded silicone: ASTM C 1115 Type C (90 plus or minus 5 Shore A durometer hardness). Spacers and Edge Blocks: Non-cellular (dense) extruded silicone: ASTM C 1115 (60 plus or minus 5 Shore A durometer hardness).

2.4 A.

GLAZING SEALANTS: General: Provide products of type indicated, complying with the following requirements: 1. Compatibility: Select glazing sealants that are compatible with one another and with other materials they will contact, including glass products, seals of insulating-glass units, and glazing channel substrates, under conditions of service and application, as demonstrated by sealant manufacturer based on testing and field experience. Suitability: Comply with sealant and glass manufacturers' written instructions for selecting glazing sealants suitable for applications indicated and for conditions existing at time of installation. Colors of Exposed Glazing Sealants: Grey.

2. 3. 2.5 A. B.

SEALANT AND SEALANT BACKING MATERIAL: Cellular Glazing Tapes: Open-cell, semi-rigid, adhesive-backed foam tape; provide Thermalbond V2100 or Thermalbond V2200 as manufactured by Norton Industries. Silicone Compounds, General: Where indicated provide silicone sealants which are specifically designed and tested for use as structural silicone sealant. Secondary seal or weatherseal silicone sealants shall be compatible with the neutral cure structural silicone sealant. Weatherseal shall accommodate a 50 percent increase or decrease of joint width as measured at time of application in accordance with ASTM C 719. 1. 2. 3. C. Single-Component: ASTM C 1193, Type S, Grade NS. Multi-Component: ASTM C 1193, Type M, Grade NS. Color: Gray.

Sealant Backing Materials: Preformed foam plastics and synthetic rubbers, compressible, non-gassing, non staining, and compatible with sealants and as recommended by sealant manufacturers. Backing shall be of the sizes and shapes to suit the various conditions and shall be a color different than the sealant color. Backer rods shall be 25 percent wider than the joint width. 1. 2. Open/ Closed Cell Extruded Polyolefin Backer Rod: Provide Sof-Rod as manufactured by AET, Inc., or approved equal. Bond Breaker Tape: Provide Lithographer Tape as manufactured by 3M Company, Inc., or approved equal.

D. E.

Weep Hole Filter: PVC-coated reticulated open cell urethane foam, 20 to 45 pores/ inch. Elastomeric Glazing Sealants: Comply with ASTM C 920 and other requirements indicated for each liquidapplied chemically curing sealant specified, including those referencing ASTM C 920 classifications for type, grade, class, and uses related to exposure and joint substrates. 1. Single-Component Neutral- and Basic-Curing Silicone Glazing Sealants: a. Type and Grade: S (single component) and NS (nonsag).
08800-9 11 March 2013

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

b. c. d.

Class: Use Related to Exposure: NT (nontraffic). Uses Related to Glazing Substrates: M, G, A, and, as applicable to glazing substrates indicated, O. 1) Use O Glazing Substrates:

2.6 A.

MISCELLANEOUS GLAZING MATERIALS General: Provide products of material, size, and shape complying with referenced glazing standard, requirements of manufacturers of glass and other glazing materials for application indicated, and with a proven record of compatibility with surfaces contacted in installation. Cleaners, Primers, and Sealers: Types recommended by sealant or gasket manufacturer. Setting Blocks: Elastomeric material with a Shore, Type A durometer hardness of 85, plus or minus 5. Spacers: Elastomeric blocks or continuous extrusions with a Shore, Type A durometer hardness required by glass manufacturer to maintain glass lites in place for installation indicated. Edge Blocks: Elastomeric material of hardness needed to limit glass lateral movement (side walking). Cylindrical Glazing Sealant Backing: ASTM C 1330, Type O (open-cell material), of size and density to control glazing sealant depth and otherwise produce optimum glazing sealant performance. 1. 2. Cellular Glazing Tapes: Open-cell, semi-rigid, adhesive-backed foam tape; provide Thermalbond V2100 or Thermalbond V2200 as manufactured by Norton Industries. Silicone Compounds, General: Where indicated provide silicone sealants which are specifically designed and tested for use as structural silicone sealant. Secondary seal or weatherseal silicone sealants shall be compatible with the neutral cure structural silicone sealant. Weatherseal shall accommodate a 50 percent increase or decrease of joint width as measured at time of application in accordance with ASTM C 719. a. b. c. 3. Single-Component: ASTM C 1193, Type S, Grade NS. Multi-Component: ASTM C 1193, Type M, Grade NS. Color: Gray.

B. C. D. E. F.

Sealant Backing Materials: Preformed foam plastics and synthetic rubbers, compressible, non-gassing, non staining, and compatible with sealants and as recommended by sealant manufacturers. Backing shall be of the sizes and shapes to suit the various conditions and shall be a color different than the sealant color. Backer rods shall be 25 percent wider than the joint width. a. Open/ Closed Cell Extruded Polyolefin Backer Rod: Provide Sof-Rod as manufactured by AET, Inc., or approved equal.

4. G. 2.7

Bond Breaker Tape: Provide Lithographer Tape as manufactured by 3M Company, Inc., or approved equal.

Weep Hole Filter: PVC-coated reticulated open cell urethane foam, 20 to 45 pores/ inch. FABRICATION OF GLAZING UNITS

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08800-10 11 March 2013

A.

Fabricate glazing units in sizes required to glaze openings indicated for Project, with edge and face clearances, edge and surface conditions, and bite complying with written instructions of product manufacturer and referenced glazing publications, to comply with system performance requirements. Clean-cut or flat-grind vertical edges of butt-glazed monolithic lites in a manner that produces square edges with slight kerfs at junctions with outdoor and indoor faces. Grind smooth and polish exposed glass edges and corners. APPROVED MANUFACTURERS

B. C. 2.8 A.

Listed Manufacturers, including but not limited to following: a. Saint Gobain b. Guardian c. Pilkington d. Viracon USA e. Interpane Germany f. PPG USA g. A&L Sheilding, Rome

PART 3 - EXECUTION 3.1 A. EXAMINATION Examine framing glazing, with Installer present, for compliance with the following: 1. 2. 3. 4. B. 3.2 A. Manufacturing and installation tolerances, including those for size, squareness, and offsets at corners. Presence and functioning of weep system. Minimum required face or edge clearances. Effective sealing between joints of glass-framing members.

Proceed with installation only after unsatisfactory conditions have been corrected. PREPARATION Clean glazing channels and other framing members receiving glass immediately before glazing. Remove coatings not firmly bonded to substrates. GLAZING, GENERAL

3.3 A. B. C.

Comply with combined written instructions of manufacturers of glass, sealants, gaskets, and other glazing materials, unless more stringent requirements are indicated, including those in referenced glazing publications. Provide glazing channel dimensions, to provide necessary bite on glass, minimum edge and face clearances, and adequate sealant thicknesses, with reasonable tolerances. Protect glass edges from damage during handling and installation. Remove damaged glass from Project site and legally dispose of off Project site. Damaged glass is glass with edge damage or other imperfections that, when installed, could weaken glass and impair performance and appearance.
08800-11 11 March 2013

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D. E.

Apply primers to joint surfaces where required for adhesion of sealants, as determined by preconstruction sealant-substrate testing. Install setting blocks in sill rabbets, sized and located to comply with referenced glazing publications, unless otherwise required by glass manufacturer. Set blocks in thin course of compatible sealant suitable for heel bead. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites. Provide spacers for glass lites where length plus width is larger than as follows: 1. Locate spacers directly opposite each other on both inside and outside faces of glass. Install correct size and spacing to preserve required face clearances, unless gaskets and glazing tapes are used that have demonstrated ability to maintain required face clearances and to comply with system performance requirements. Provide minimum bite of spacers on glass and use thickness equal to sealant width. With glazing tape, use thickness slightly less than final compressed thickness of tape.

F. G.

2. H.

Provide edge blocking where indicated or needed to prevent glass lites from moving sideways in glazing channel, as recommended in writing by glass manufacturer and according to requirements in referenced glazing publications. Set glass lites in each series with uniform pattern, draw, bow, and similar characteristics. Where wedge-shaped gaskets are driven into one side of channel to pressurize sealant or gasket on opposite side, provide adequate anchorage so gasket cannot walk out when installation is subjected to movement. Square cut wedge-shaped gaskets at corners and install gaskets in a manner recommended by gasket manufacturer to prevent corners from pulling away; seal corner joints and butt joints with sealant recommended by gasket manufacturer. SEALANT GLAZING (WET)

I. J. K.

3.4 A.

Install continuous spacers, or spacers combined with cylindrical sealant backing, between glass lites and glazing stops to maintain glass face clearances and to prevent sealant from extruding into glass channel and blocking weep systems until sealants cure. Secure spacers or spacers and backings in place and in position to control depth of installed sealant relative to edge clearance for optimum sealant performance. Force sealants into glazing channels to eliminate voids and to ensure complete wetting or bond of sealant to glass and channel surfaces. Tool exposed surfaces of sealants to provide a substantial wash away from glass. CLEANING AND PROTECTION

B. C. 3.5 A.

Protect exterior glass from damage immediately after installation by attaching crossed streamers to framing held away from glass. Do not apply markers to glass surface unless required for certification purposes. Remove nonpermanent labels, and clean surfaces. Protect glass from contact with contaminating substances resulting from construction operations, including weld splatter. If, despite such protection, contaminating substances do come into contact with glass, remove substances immediately as recommended by glass manufacturer.
08800-12 11 March 2013

B.

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C.

Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at frequent intervals during construction, but not less than once a month, for buildup of dirt, scum, alkaline deposits, or stains; remove as recommended in writing by glass manufacturer. Remove and replace glass that is broken, chipped, cracked, or abraded or that is damaged from natural causes, accidents, and vandalism, during construction period. Wash glass on both exposed surfaces in each area of Project not more than four days before date scheduled for inspections that establish date of Substantial Completion. Wash glass as recommended in writing by glass manufacturer. GLAZING SCHEDULE

D. E.

3.6 A.

Refer to Drawings for glazing schedule. END OF SECTION

GLAZING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08800-13 11 March 2013

SECTION 08805 GLASS AND GLAZING - INTERNAL PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide glazing in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 2. 1.02 Section "Architectural Metal Entrances". Section "Rough Carpentry" for plywood backerboard for mirror installation.

QUALITY ASSURANCE A. Single Source Responsibility for Glass: To ensure consistent quality of appearance and performance, and to comply with warranty requirements, provide materials produced by a single manufacturer or fabricator for each kind and condition of glass indicated and composed of primary glass obtained from a single source for each type and class required. All glass processes of fabrication including tempering, application of thermal coatings, ceramic enameled coatings and any process of lamination shall be manufactured by and fabricated into insulating units by a single source with the ability to comply with and assume all specified warranty provisions. Glazier Qualifications: Engage an experienced glazier who has completed glazing similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance. Fabricator of insulating glass units shall have a minimum of 10 (ten) years experience in fabricating units similar to those specified herein on Projects comparable to this project and shall be required to comply with and assume warranty provisions specified herein. Producer of decorative type coatings for glass shall have a minimum of 10 (ten) years experience in the production of decorative type coatings in quantities similar to quantities required for this project.

B. C.

D. 1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. 3. 4. 5. GANA "Sealant Manual" and "Glazing Manual". GTA "Engineering Standards Manual". NAMM "National Association of Mirror Manufacturers "Mirrors, Handle with Extreme Care, Tips for the Professional on the Care and Handling of Mirrors." GANA "Laminated Glass Design Guide." Safety Glazing Standard: Where safety glass is indicated or required by authorities having jurisdiction, provide type of products indicated which comply with ANSI Z97.1 and testing requirements of CPSC 16 CFR Part 1201 for category II materials. Subject to compliance with requirements and local authorities having jurisdiction, provide safety glass with a removable certification label of Safety Glazing Certification Council (SGCC) or other certification agency acceptable to authorities having jurisdiction.

B. 1.04

Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.
08805-1 11 March 2013

SUBMITTALS

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

A.

Samples: Submit samples of each type of glass, setting block, face shim, edge block, glazing sealant and gasket. Provide sealant samples 12 in. long installed between samples of the materials to be glazed, fully cured. Samples will be reviewed for color and texture only. Glazing Schedule: Provide a glazing schedule utilizing the same designations shown on Drawings for glazed openings listing glass types and thicknesses for each size opening and location. Product Data: Submit the following information from the manufacturer: 1. 2. Statement that each product to be furnished is recommended for the application shown. Product Test Reports: Provide product test reports from a qualified testing agency indicating the following products comply with requirements, based on comprehensive testing of current products: a. Coated float glass. b. Ceramic patterned frit glass c. Glazing sealants. d. Glazing gaskets. Complete instructions for handling, storing, mixing, priming, installing, curing and protecting each glazing material. Sealant adhesion test reports. Mirror Product Data a. Submit product data for mirrors including description of materials and process used to produce mirrored glass, including source of glass, glass coating components, edge sealer, and quality control provisions. Mirror mastic glass coating compatibility test reports from organic protective coating manufacturer indicating that mirror mastic has been tested for compatibility and adhesion with organic protective coating. Include organic coating manufacturers' interpretation of test results relative to performance and recommendations for use of mastics with organic protective coating.

B. C.

3. 4. 5.

b.

E.

Statement of Application: Submit copy of statement signed by the Subcontractor and Contractor, stating that the glazing materials complied with these Specifications and that the installation methods complied with the manufacturer's printed instructions for each condition of use on this Project. Maintenance Instructions: Furnish maintenance instructions for each type of glass for use during construction and for use by the Owner after acceptance of the Work.

F. 1.05

SAMPLE INSTALLATION A. Prepare sample installation before proceeding with the work. Glaze sample in the presence of the glazing materials manufacturer and glass manufacturer, not less than one (1) week in advance of the scheduled glazing work.

1.06

MOCK UPS AND TESTING A. Visual Mock-Up 1. Provide, at Project site, where directed, in coordination with glass and glazing for the visual mockup review by the Engineer, extent as shown, and representative of the finished Work in all respects. Provide all features as will be used in the final Work. Clean glass installed in mock-up with materials and techniques intended for use on the Project. Replace unsatisfactory Work as required to obtain approval of the Engineer. The approved visual mock-up will become the standard of workmanship for the project.
08805-2 11 March 2013

2. 3.

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

4. B.

The approval of the visual mock-up does not relieve the Contractor of its obligation to perform the work in accordance with the Contract Documents.

Testing Mock-Up: Provide glass and glazing and related accessories for testing mock-up in composite configurations designed to fulfill the performance criteria, and representing the elements which will be used in the final work. Extent of mock-up as directed by Engineer. Provide personnel to install glass and glazing in mock-up as directed by the Engineer. Preconstruction Compatibility and Adhesion Testing: Submit samples of all materials that will contact or affect sealants to sealant manufacturers for compatibility and adhesion testing, as indicated below: 1. Use test methods standard with manufacturer to determine if priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of sealants to joint substrates. Perform tests under conditions of 72 deg. F. temperature and 50% relative humidity. Manufacturer(s) of sealant(s) shall submit written recommendations when installations involve adverse temperature or humidity conditions. Submit not less than 9 pieces of each type of material, including joint substrates, shims, joint sealant backings, secondary seals, and miscellaneous materials. Schedule sufficient time for testing and analysis of results to prevent delay in the progress of the Work. Investigate materials failing compatibility or adhesion tests and obtain sealant manufacturer's written recommendations for corrective measures, including use of specially formulated primers. Testing will not be required when sealant manufacturer is able to submit joint preparation data required above which is acceptable to Engineer and is based on previous testing of current sealant products for adhesion to, and compatibility with, joint substrates and other materials matching those submitted.

C.

2. 3. 4. 5.

D.

Preconstruction Mirror Mastic Glass Coating Compatibility Test: Submit mirror mastic products to manufacturer of protective organic coating for testing by coating manufacturer's standard test method to determine compatibility of adhesive with mirrored glass coating.

1.07

PRODUCT HANDLING A. Deliver glazing materials to Project site in manufacturers' unopened containers, fully identified with trade name, color, size, hardness, type, class, and grade. Store each item in accordance with manufacturer's instructions. Deliver, store and handle glass in accordance with manufacturer's recommendations; protected from weather, staining and damage. During storage and handling of glass provide cushions at edges to prevent impact damage. Protect glass from scratches and abrasion.

B.

1.08

PROJECT CONDITIONS A. Do not perform glazing when temperature is below 40 deg. F., unless the manufacturer of the glazing materials specifically recommends application of his materials at lower temperatures. If job progress or other conditions require glazing work when temperatures are below 40 deg. F. (or below the minimum temperature recommended by the manufacturer), consult the manufacturer and establish the minimum provisions required to ensure satisfactory work. Record in writing to the manufacturer, with copy to the Engineer, the conditions under which such glazing work was performed and the provisions made to ensure satisfactory work.

1.09

WARRANTIES A. Warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and are in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents.
08805-3 11 March 2013

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Warranty, Laminated Glass: Provide a (5) five year written warranty, directly to the Owner, warranting against deterioration of laminated glass. Deterioration of laminated glass is defined as the development of manufacturing defects including edge separation or delamination which materially obstructs vision through glass and blemishes exceeding those allowed by referenced laminated-glass standard. Upon notification of such defect, within the warranty period, make the necessary replacements at the convenience of the Owner. Warranty, Coated Glass: Provide a ten (10) year written warranty, directly to the Owner, for the coated glass against peeling, uneven color, fading cracking, and other indications of deterioration in coating. Upon notification of such defect, within the warranty period, make the necessary replacements at the convenience of the Owner. Warranty, Decorative Patterned Ceramic Fritted Glass: Provide a (10) ten year written warranty, directly to the Owner, for the ceramic enameled patterned glass against peeling, uneven color, fading cracking, and other indications of deterioration in coating. Upon notification of such defect, within the warranty period, make the necessary replacements at the convenience of the Owner. Warranty, Mirror: Provide a 5 year written warranty, directly to the Owner, warranting against any evidence of silver spoilage. Upon notification of such defects, within the warranty period, make the necessary replacements at the convenience of the Owner. Warranty of Backpainted Glass Panels: Provide a written warranty, directly to the Owner, stating that the backpainted glass panels will not discolor, peel, craze, alligator or delaminate for a period of five (5) years from date of final acceptance. If discoloration, peeling, crazing, alligatoring or delamination occurs, correct or replace panels at the Owner's convenience.

C.

D.

E.

F.

PART 2 - PRODUCTS 2.01 GLASS MANUFACTURERS/SUPPLIERS 1 2 3 4 5 6 2.02 GLASS A. B. C. General: Comply with ASTM C1036 unless otherwise specified. Type and thickness as shown or specified. Float Glass: Type I, Class 1, Quality q3. Heat Treated Glass: Comply with ASTM C1048, unless otherwise specified. Type and thickness as shown or specified. 1. Glass for Heat Treating a. b. 2. Float, Type I, Class 1, Quality q3. Heat Absorbing, Type I, Class 2, Quality q3, Style B, color as shown. Saint Gobain Guardian Pilkington Viracon USA Interpane Germany PPG USA A

Sizes and Cutting: Prior to heat treating, cut glass to required sizes as determined by accurate measurement of openings to be glazed, making allowance for required edge clearances. Cut and process edges in accordance with glass manufacturer's recommendations. Do not cut or treat edges in the field. General: For glass which has been heat-treated horizontally, maintain roller marks running horizontally in the final installation, wherever possible. For glass which has been heat treated vertically, locate tong marks along an edge which will be concealed in the glazing system.
08805-4 11 March 2013

3.

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

a.

Overall Bow and Warp Tolerances: Heat treated glass shall be examined by the glass manufacturer to detect and discard any lights which exceed one half (50%) the maximum bow and warp tolerances in any direction as listed in ASTM C1048 Table 2. Roll Ripple Tolerances: Where the heat treatment process results in essentially parallel ripples or waves, the deviation from flatness at any peak (peak to valley deviation) shall not exceed 0.005 in. or the average rollerwave distortion shall be certified not to exceed 0.05 mm, with a maximum sag at the leading and trailing edge of 0.25 mm. (The more stringent requirement) A site inspection if required for roller wave and bow tolerances should be from a minimum distance of 3 meters.

b.

4. 5.

Fully Tempered Glass: Comply with ASTM C1048, Kind FT, and meeting the requirements of ANSI Z97.1. Surface compression shall be 10,000 psi minimum. Heat-Strengthened Glass: Comply with ASTM C1048, Kind HS. Strengthen by manufacturer's standard heat-treatment process to increase the flexural strength to not less than 2 times the strength before treatment and having a surface compression stress of 5000 psi +/- 1500 psi.

D.

Laminated Glass: ASTM C1172, two sheets of g1ass permanently factory laminated under heat and pressure with an interlayer of 0.060 in. thick clear, translucent, photographically patterned or colored, plasticized polyvinyl butyl made specifically for laminating glass. 1. Provide type and thickness of glass sheets as shown or specified. Fabricate laminated glass to produce glass free of foreign substances and air or glass pockets in a autoclave utilizing heat plus pressure. Prior to laminating, cut glass to required sizes and profiles as determined by accurate measurement of openings to be glazed, making allowance for required edge clearances. Cut and process edges in accordance with glass manufacturer's recommendations. Do not cut or treat edges in the field.

2.

E.

Coated Glass: Provide coated glass coating complying with ASTM C1376 and as follows: 1. Sputter-Coated Float Glass: Float glass with metallic-oxide or metallic-nitride coating deposited by vacuum deposition process after manufacture and heat treatment (if any), complying with requirements specified in glass type schedules. Pyrolytic-Coated Float Glass: Float glass with solar-reflective metallic-oxide coating applied by pyrolytic deposition process during initial manufacture, complying with requirements specified in glass type schedules.

2.

F.

Patterned Ceramic Enameled Glass: Apply fused opaque ceramic enamel coating in pattern shown by heat treatment process that heat strengthens the glass to not less than 2 times its flexural strength. 1. 2. 3. Provide type and thickness of glass as shown or specified. Do not cut, nip or treat edges after heat treatment process. Provide patterned ceramic enameled glass from one of the following manufacturer's: a. Guardian Industries. b. Viracon.

G.

Mirror Glass 1. 2. 3. ASTM C1036, Type 1, Class 1, Quality q1. Provide silvering, copper backing and protective heat catalyzed paint coating on entire back surface of mirror. Exposed edges of all mirrors shall have a flat polished (eased) profile. Perform edge treatment and sealing in factory immediately after cutting to final sizes. Do not cut or treat edges in the field.

H.

Backpainted Glass Panel Assembly: Perform work in a "clean room" environment to ensure suitable application conditions. Provide backpainted glass panel assemblies comprised of the following components:
08805-5 11 March 2013

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2.

Glass: As specified herein. Provide separation between glass and metal in all locations. Paint for Backpainting: Apply paint after glass has been thoroughly cleaned and dust free; utilizing materials and methods recommended by the paint manufacturer. Apply two (2) coats evenly to all surfaces. Particleboard Panel Core: AWI Section 200-G-2, either medium or high density classification, thickness as shown. a. If fire-retardant treated particleboard is required or shown, provide "Duraflake FR" (Williamette Industries Inc.) or approved equal Seal surfaces of particleboard as required to accept glass adhesive and in accordance with the recommendations of the panel manufacturer. Provide one piece seamless panel core behind each individual backpainted glass panel.

3.

b. 4. 5. 6. 7. 8. 2.02

Edge Banding: Provide hardwood edge banding for particleboard on all edges whether exposed or not unless otherwise shown. Glass Adhesive: Provide adhesive setting compounds specially formulated for adhering painted glass; and compatible with specified paint and sealed particleboard substrates. Perimeter Supports and Edge Trim: Provide perimeter metal edge trims and panel supports for each backpainted glass panel. Setting Blocks: Provide neoprene or cured silicone setting blocks; hardness and locations as recommended by glass manufacturer. Panel Clips: Provide heavy duty panel clips in quantity and spacing to sustain loading and prevent warping and bowing of panels.

GLAZING MATERIALS A. Silicone Rubber (Sealant Type SE01): ASTM C920, class and use as best suited for the intended purpose; Provide one of the following: 1. 2. B. "Silpruf 2000 " (General Electric Co.). "795 Building Sealant" or "790 Silicone Building Sealant"(Dow Corning Corp.).

Butyl Glazing Tape Reinforced: A pre-formed, non-sagging, non-oxidizing, non-staining butyl rubber tape with core reinforcement, one of the following: 1. 2. 3. "Extru-Seal Butyl Rubber Tape" (Pecora Corp.). "No. 166.6 Elastic Butyl Tape" (Presstite Div.). "Pre-Shimmed Tremco 440 Tape" (Tremco).

C.

Butyl Glazing Tape: A vulcanized butyl, self-adhesive, non-staining tape, one of the following: 1. 2. "Duribbon 1082" (National Adhesives; National Starch & Chemical Corp.). "606 Architectural Sealant Tape" (Protective Treatments, Inc.).

D. E.

Glazing Gaskets: Continuous neoprene or polyvinyl chloride extrusions, of 50 Shore A durometer hardness plus or minus 5 Glazing Gaskets 1. Solid Gaskets: Black, continuous extruded neoprene with a Shore A durometer hardness and profile as required to provide pressure adequate to fulfill the overall performance requirements specified and complying with the applicable provisions of ASTM C864. Fully vulcanize gasket corners where compatible with installation procedures.
08805-6 11 March 2013

2.

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

H. I. J. K. L.

Lock-Strip Gaskets: ASTM C542, neoprene extrusions. Frames fabricated with injection molded corners. Provide with separate lock (zipper) strips, Shore A durometer: 10 points harder than gasket body. Setting Blocks: ASTM C864; neoprene blocks, 80 to 90 Shore A durometer hardness. Face Shims: ASTM C864; neoprene blocks, 40 to 50 Shore A durometer hardness, self-adhesive on one face only. Edge Blocks: ASTM C864; neoprene blocks, 60 to 70 Shore A durometer hardness. Mirror Mastic: An adhesive setting compound, manufactured specifically for setting mirrors by spot application, certified as compatible with back of mirror coating by organic protective coating manufacturer, scheduled mirror substrate and approved by mirror manufacturer. Comply with mirror mastic manufacturer's written instructions for size, number and pattern of mastic spots required for installation. Subject to compliance with requirements, provide products by one of the following: 1. 2. 3. Gunther Mirror Mastics. Palmer Products Corporation. Glazers Choice, Inc.

M.

Mirror Edge Sealer: A mirror edge sealer manufactured specifically for sealing mirror edges and that has proven to be compatible with mirror coating and approved by mirrored glass manufacturer for use in protecting against silver deterioration at mirror edges; Provide one of the following: 1. 2. "Seal-Kwik" (C. Gunther Co.). "No. 209 Mirror Edge Sealant" (Sprayway, Inc.).

N. O. 2.03

Stainless Steel Angle Mirror Support and Frame: AISI Type 302 or 304; hot or cold rolled angle; 1 in. x 1 in. x 1/8 in. thick; polish edge of exposed portion of angle to bright finish. Joint Cleaner, Primer and Sealer: The products recommended by the manufacturer. Never apply or allow primers to come into contact with glass surfaces.

FABRICATION A. Sizes: Fabricate glass to sizes required for glazing openings indicated, with edge clearances and tolerances complying with recommendations of glass manufacturer. Provide thicknesses indicated or, if not otherwise indicated, as recommended by glass manufacturer for application indicated. Cutting: Obtain sizes from shop drawings or by field measurement. Cut glass to fit each opening with edge clearances and bite on glass as recommended by glass manufacturer. Do not nip glass edges. Factory cut heavy heat absorbing glass and heavy float glass. Edges may be wheel cut or sawed and seamed at manufacturer's option. For glass to be cut at site, provide glass larger than required so as to obtain, cleancut edges without seaming or nipping. Do not cut, seam, nip or abrade glass after heat-tempering. Edgework for Butt Glazing: Where glass is to be butt joined with silicone sealant, provide flat ground butting glass edges having a satin finished flat edge with eased arrise corners.

B.

C. D.

Edgework for Exposed Edges: Where edges of glass are to be exposed in the finish work, provide ground and polished edges and slightly eased arrises and eased corners. PART 3 - EXECUTION 3.01 PRE-INSTALLATION MEETING A. Prior to the start of the Work, and at the Contractor's direction, meet at the Project site to review material selections, methods and sequence of installation, glazing procedures standard of workmanship, quality control requirements, evaluation of suitability of specified compounds and sealants for anticipated weather
08805-7 11 March 2013

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

conditions, coordination with other trades, and other pertinent topics related to the Work. The meeting shall include the Engineer, the Contractor, the Contractor's project superintendent, subcontractor's superintendent, primary component materials suppliers, and any other subcontractors whose work requires coordination with this Work. 3.02 CONDITION OF SURFACE A. 3.03 Examine substrates, adjoining construction and conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected.

PREPARATION A. Clean glazing channels, stops and rabbets to receive glazing materials of obstructions and deleterious substances which might impair the work. Remove protective coatings which might interfere with bond of sealants. Comply with manufacturer's instructions for final wiping of surfaces immediately before application of primer and glazing compounds or tapes. Prime surfaces to receive glazing compounds, except where manufacturer provides written reports of tests conducted by an independent testing agency which demonstrates that primer or sealer is not required for the conditions of use and the substrates involved. When priming, comply with manufacturer's recommendations.

B.

3.04

INSTALLATION A. Standards: Unless otherwise shown or specified, comply with recommendations and requirements of the GANA "Glazing Sealing Systems Manual" and "Glazing Manual". For the installation of tinted or spandrel glass comply with glass manufacturer's recommendations. Inspect each piece of glass immediately before installation. Do not install any pieces which are improperly sized or have damaged edges, scratches or abrasion or other evidence of damage. Remove labels from glass immediately after installation. Locate setting blocks at sill one-quarter of the width in from each end of the glass, unless otherwise recommended by the glass manufacturer. Use blocks of sized 1/8 in. wider than the glass thickness and 1/16 in. to 1/8 in. less than the width of the glazing channel to support the glass and in accordance with manufacturer's recommendations. Provide face shims for all large glass sizes to separate glass from stops, except where continuous glazing gaskets or felts are provided. Locate face shims opposite each other and no farther than 24 in. apart and no closer than 12 in. to a corner. Make bite of spacer on glass a nominal 3 in. or greater. Provide edge blocks, located in glazing rebate as recommended by the glass manufacturer, to insure against displacement of the glass and against metal to glass contact within the rebate and to ensure permanently adequate bite of the glass within the glazing system. Set glass in a manner which produces greatest possible degree of uniformity in appearance. Where safety glazing is scheduled or required, install glass after detaching removable safety glazing label unless otherwise required by authorities having jurisdiction. If local authorities require permanent labeling, install glass with permanent safety glazing label in concealed or inconspicuous locations subject to selection by the Engineer. Do not use 2 different glazing materials in the same joint system unless the manufacturer of each material has stated in writing that his material is fully compatible with the other material. Use suitable protection to limit coverage of glazing materials to the surfaces intended for sealants. Miter-cut and seal joints of glazing gaskets in accordance with manufacturer's instructions to provide a continuous watertight and airtight seal at corners and other locations where joints are required. Vulcanize
08805-8 11 March 2013

B.

C.

D.

E.

F.

G. H. I.

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

corner joints where compatible with installation procedure. Where wedge-shaped gaskets are driven into one side of channel to pressurize gasket on opposite side, provide adequate anchorage so gasket cannot walk out when installation is subjected to movement. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lights. J. K. L. Butt or lap ends of tapes in accordance with manufacturer's recommendations. Tool exposed surfaces of glazing materials to provide a slight wash away from the glass. Install exposed tapes and gaskets with a slight protrusion above stops in the final compressed condition. Lock Strip Gaskets: Comply with ASTM C716 and gasket manufacturer's instructions and recommendations. Miter-cut corners of loose lock-strips. Cut lock-strips slightly longer to provide permanent compression at joints. Use special tool to install and remove filler strips; lubricate in accordance with manufacturer's instructions. Mirror Glazing 1. Adhesive Mounting of Mirrors a. Identify and examine surfaces over which mirror is to be mounted. Comply with manufacturer's printed installation directions for preparation of mounting surfaces including coating surfaces with mastic manufacturer's special bond coating where applicable or priming and sealing substrate as recommended. Paint back of mirror with an additional coat of moisture-resistant paint of the type recommended by the mirror manufacturer and compatible with mirror mastic and substrate. Apply mirror edge sealer to all edges of mirror in accordance with manufacturers instructions and recommendations. Provide 2 in. thick fire-retardant treated plywood mirror backerboards as specified in Section "Rough Carpentry". Provide 1 in. x 1 in. x 1/8 in. thick stainless steel angle frame with mitered corners and bright polished finished exposed edges. Secure angle frame to wall construction with fastening devices appropriate for substrates encountered spaced 16 in. o.c. maximum. Secure plywood backerboard to wall using fastening devices appropriate for substrates encountered spaced 12 in. o.c. maximum at perimeter 2 in. from corners and three rows of 3 fasteners each in the backerboard field. Countersink fasteners flush with plywood surface. Butt adjacent panels without lapping. Prepare panels for priming as required by manufacturer of mirror mastic. Support mirror with stainless steel satin finished angle frame with bottom support designed to withstand mirror weight. Provide 1/8 in. thick by 4 in. long x 3 in wide setting blocks at quarter points. Apply mirror mastic in accordance with mastic manufacturer's instructions utilizing mastic manufacturer's special tool to assure complete and accurate coverage. Do not cover more than 25% of mirror back unless otherwise recommended by the mastic manufacture. Provide neoprene shims, double face tape or other type compatible material to allow for minimum clearances for mastic. Apply mirror to substrate so that areas not covered with mastic will remain open for ventilation, with minimum clearance from substrate as recommended by mastic manufacturer. Provide temporary rigid support until adhesive has set. Fill 1/8 in. wide joint between stainless steel angle and face of mirror with continuous backer rod and clear silicone sealant (Sealant Type 1).

M.

b.

c.

d.

e. 2.

Channel Glazing of Mirrors: Use interior glazing system specified herein and comply with mirror manufacturer's instructions and recommendations.

N.

Glass To Glass Glazing: Apply silicone rubber sealant (Type 2) to abutting surfaces of glass in accordance with manufacturer's recommendations.

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08805-9 11 March 2013

O.

Entrance Glass/Visual Distraction Marks: Paint window and door distraction markings on glass surfaces, in colors, uniform patterns and spacings shown and as required to comply with the requirements specified in Paragraph "Standards". Provide one of the following methods: 1. Field paint glass utilizing glass preparation methods and paints as recommended by paint manufacturer, to provide uniform characters with sharp edges and tightly registered patterns, free from blemishes or other defects which, in the Engineer's opinion, will impair the finished work. Provide decals (specifically manufactured for application to glass) applied to the glass to provide uniform characters with sharp edges and tightly registered patterns, free from blemishes or other defects which, in the Engineer's opinion, will impair the finished work.

2.

3.05

CLEANING AND PROTECTION A. B. Clean excess sealant or compound from glass and framing members immediately after application using solvents or cleaners recommended by manufacturers. Protect glass from breakage immediately upon installation. Use streamers or ribbons suitably attached to framing and held free of the glass. Do not apply warning markings directly to the glass. Do not permit edges of glass to be exposed to standing water. Protect glass and glazing materials during the construction period so that they will be without any indication of damage or deterioration at the time of acceptance by the Owner. Cover glass to protect it from activities that might abrade the surfaces. Replace glass during the construction period which is broken, cracked, chipped or damaged in any way and from any source, including weather, vandalism or accidents. Maintain glass in a reasonably clean condition during construction so that it will not become stained and will not contribute to the deterioration of glazing materials. Conduct a systematic inspection program not less than once a month for glass. Clean to meet above requirements. Wash glass on both faces not more than 4 days prior to acceptance by the Owner. Comply with instructions and recommendations of the glass manufacturer and glazing materials manufacturer for cleaning in each case.

C.

D. E.

F.

3.06

FIELD QUALITY CONTROL A. After completion of exterior glazing and nominal curing of sealants and glazing compounds, test for water leaks. Conduct tests in accordance with "Specifications for Field Check of Metal Curtain Walls for Water Leakage", AAMA Standard 501.2, except perform tests on not less than 5% of all exterior lights. Correct any deficiencies observed as a result of test. END OF SECTION

GLASS AND GLAZZING INTERNAL Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

08805-10 11 March 2013

SECTION 09200 LATH AND PLASTER PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide lath and Gypsum plaster in accordance with the Contract Documents. Related Work Specified Elsewhere 1. Finish painting. 2 Veneer plasters systems.

1.02

QUALIFICATIONS A. B. The machine applied plaster work shall be performed by a firm having 3 years experience in the machine application of plaster on projects similar in size and scope to this Project. Obtain plaster ingredients, furring and lathing from a single source or manufacturer.

1.03

REQUIREMENTS OF REGULATORY AGENCIES A. Wherever a fire resistance classification is shown involving lath and plaster (3-hr., 2-hr. and similar designations), provide materials, accessories and application procedures which have been listed by UL or tested according to ASTM E119 to achieve the rating required.

1.04

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. 3. 4. 5. B. ML/SFA "Specifications for Metal Lathing and Furring". ASTM C841 "Standard Specification for the Installation of Interior Lathing and Furring". PCA "Portland Cement Plaster (Stucco) Manual". ASTM C1063 "Standard Specification for the Installation of Lathing and Furring for Portland Cement-Based Plaster". ASTM C926 "Standard Specification for the Application of Portland Cement Based Plaster".

Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

1.05

SUBMITTALS A. Shop Drawings: Submit detailed shop drawings at full scale of all unusual conditions involving lath and plaster Work, including expansion and control joints, special hangers, special runners, and details at light fixtures and ceiling diffusers. Show locations of access panels occurring in plaster Work and details of rated assemblies, with copies of their respective approvals. Coordinate all components which are specified elsewhere, which are a part of, or are contiguous, with the system. Setting Drawings: Provide setting drawings and templates for the location of lath and stucco items that are to be embedded in or anchored to concrete and masonry. Samples

B. C.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-1 11 March 2013

1.

Furnish sample panels for preliminary review of each color and finish not less than 2 ft. square, on movable frames. Include typical control joint and expansion joint. Sample panels shall be representative of materials, colors, textures and workmanship for the entire Work. Acceptance will be for color and texture only. Submit samples of the following: a. Expansion joint and control joint: 12 in. long. b. Each type plaster accessory: 12 in. long.

2.

D.

Product Data: Submit, for information only, manufacturer's specifications and installation instructions for each type of lath, mesh, channel, hanger, stud, joist, clip, bracket, bead, stop, expansion joint, control joint, screed and special shape required, including other data as may be required to show compliance with the Contract Documents. Certification: Submit producer's certification for each type of aggregate and cement specified, evidencing compliance with requirements.

E. 1.06

PERFORMANCE CRITERIA A. The installed lath and stucco wall system, shall be withstand an inward and outward wind pressure of 10 psf normal to the plane of the wall, without structural failure, cracking, crazing, permanent distortion or displacement or other damage. Permanent distortion or displacement is defined as values exceeding 50% of specified installation tolerances. Deflection of support framing for lath and cement plaster (stucco) system shall be limited to 1/360 of the span , except as otherwise shown or specified. Design, fabricate and install component parts to provide for expansion and contraction over an ambient temperature range of 120 deg. F. and a surface temperature range of 180 deg. F. without buckling, sealed joint failure, undue stress on members or anchors, and other detrimental effects. Design, fabricate and install lath and plaster Work to withstand building movements due to loading deflections, shrinkage and creep whose values are shown or specified elsewhere. Design Modifications: Make design modifications only as may be necessary to meet performance requirements and coordinate the Work. Variations in details and materials which do not adversely affect appearance, durability or strength shall be submitted to the Engineer for review.

B. C.

D. E.

1.07

VISUAL MOCK-UP A. After approval of samples and sample panel(s), provide a visual mock-up of not less than 100 sq. ft. of each texture and finish, including at least one expansion joint and one control joint, in a location on the building where directed. Mock-up shall be representative of the finished Work in all respects.

1.08

PRODUCT HANDLING A. B. Deliver in manufacturer's unopened containers or bundles, fully identified with name, brand, type and grade. Handle and protect lath and plaster materials from damage. Store in a dry, ventilated space, off the ground. Protect materials from contamination and dampness until used. Protect lime putty from sun exposure, and prevent excessive evaporation when stored.

l.09

PROJECT CONDITIONS A. General: Comply with the requirements of Paragraph "Standards" and recommendations of the component manufacturers for environmental conditions before, during and after performing the Work and as follows: 1. Interior Plaster: Do not start lath and plaster Work until the building is enclosed and interior spaces are ventilated and continuously maintained at a uniform temperature not less than 40 deg.
09200-2 11 March 2013

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.10

GUARANTEE A.

F nor more than 80 deg. F for not less than one week prior to application. Continuously maintain temperature one week after the plaster Work is complete. Provide ventilation to remove the water in excess of that required for hydration of the plaster, immediately subsequent to its application and set.

Guarantee specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and are in addition to and run concurrent with other guarantees made by the Contractor under requirements of the Contract Documents. Guarantee: Provide a written guarantee, directly to the Owner, for a period of five years, guarantee signed by the Contractor, subcontractor and manufacturer, stating that the bonding agent will not fail to provide a complete bond between the plaster and the substrate. Upon notification of such defect, within the guarantee period, make the necessary repairs at the convenience of the Owner with out any extra cost.

B.

PART 2 - PRODUCTS 2.01 METAL MATERIALS A. Non-Load Bearing Studs and Runners: ASTM C645 roll formed steel, hot-dip galvanized in accordance with ASTM A525 Designation G60; type and size as shown. Minimum 25 ga. unless heavier gauge is shown or recommended by the manufacturer for the wall system indicated. Load Bearing (Transverse and Axial) Steel Studs, Joists, Runners, Bracing and/or Bridging: ASTM C955; hot dipped galvanized steel sheet complying with ASTM A446, Grade A for 20 ga. and below (33,000 psi yield point), Grade B for 18 ga. to 20 ga. (37,000 psi yield point) and Grade D for 16 ga. and greater (50,000 psi yield point), Coating Designation G60. Joists Hangers, Clip Angles, Flat Straps, Web Stiffeners, Hole Reinforcement Plates, and Joist End Clips: ASTM C955; hot dipped galvanized steel sheet complying with ASTM A446, Grade A for 20 ga. and below (33,000 psi yield point), Grade B for 18 ga. to 20 ga. (37,000 psi yield point) and Grade D for 16 ga. and greater (50,000 psi yield point), Coating Designation G60. Furring and Runner Channels: Either hot-rolled or cold-rolled steel, of the sizes shown or required by Code or, if none are shown, of the following minimum weights per thousand lineal ft.: SIZE, IN. 1 1-2 2 E. HOT-ROLLED, LB. 300 410 1120 1260 COLD-ROLLED, LB 300 --475 590

B.

C.

D.

Hangers for Support of Runner Channels: Galvanized soft steel wire not less than 8 ga., or 3 in. round steel pencil rods, or flat iron or soft steel straps, 3/16 in. x 1 in. Use wire hangers of monel metal not less than 0.125 in. diameter in high humidity spaces. Hat Furring Channels: ASTM C645, roll-formed galvanized steel, flanged channel type, 7/8 in. deep; for wall furring and ceiling attachment. Primary Suspension Members for Ceilings 1. 2. General: Size and provide ceiling support components to comply with ASTM C1063 for portland cement installation and ASTM C841 for gypsum plaster installation. Wire Hanger Inserts: No. 6 galvanized wire loop and 26 ga. galvanized shell or 14 ga. galvanized steel strap with 5/16 in. hole.

F. G.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-3 11 March 2013

3. 4.

Strap Iron Hanger Inserts: Mild steel flats, 1 in. x 3/16 in. with 7/16 in. holes punched on center line and lower ends, designed to develop the full strength of hangers. Hanger Anchorage Devices: Screws, clips, bolts or other devices applicable to the indicated method of structural anchorage for ceiling hangers. Provide anchorage devices sized for three (3) times the calculated load supported. Hangers: Galvanized, one of the following: a. 3/16 in. x 1 in. steel straps. b. 3 in. diameter steel rods. c. ASTM A641, Class 1 zinc coating, soft temper 9 ga. soft steel wire. Carrying Channels: ASTM C754, cold rolled steel channels, 1-2 in., 475 lbs. per 1000 linear ft. Clips: Provide support clips, clamps, fasteners, and other attachment devices as required to connect components and transfer imposed loads of primary suspension system.

5.

6. 7. H. I.

Pencil Rods: Hot-rolled of circular cross-section 3 in. or 3/8 in. diameter as required for the respective conditions of use. Accessories 1. Interior Use: Provide accessories complying with ASTM C841 and fabricated from zinc coated (galvanized) steel for interior use. Comply with ASTM C841, Paragraph 6.6 for thickness of accessories for interior use. General: Accessories shall have perforated or expanded flanges or clips shaped so as to permit complete embedment in the plaster, to provide means for accurate alignment and secure attachment to the substrate. Coordinate depth of accessory with thickness of plaster. a. Corner Beads: Formed with a bead not exceeding 3/16 in. with expanded metal flanges at least 2-2 in. wide; ground thickness appropriate to installation. b. Casing and Stop Beads: Formed with 3 in. min. expanded metal wing; ground thickness appropriate to installation. c. Expansion and Control Joint: Double "V" type, formed with expanded metal flanges at least 1-3 in. wide; ground thickness appropriate to installation. d. Special Stops: Formed as detailed. Tack weld a continuous 20 ga. sheet metal closure on backside of stop where plaster abuts other surfaces. At expansion joints, where shown, tack weld a continuous 20 ga. backplate to one casing bead, leaving opposite bead free to slide on backplate; ground thickness appropriate to installation. e. Corner Reinforcement: Smooth edge strips of expanded metal lath; Cornerite, 6 in. wide, bent to form 3 in. wings for internal plaster angles. f. Striplath: Smooth edge flat strips of expanded metal lath not less than 4 in. wide for reinforcing joints. g. Screeds: Formed with expanded metal wings not less than 2 in. wide. h. Sheet Metal Grounds: 20 ga. galvanized sheet metal; where shown or required for attachment of other work; size as required for each individual item.

2.

J.

Fastenings 1. Tie Wire: ASTM A641, Class 1, soft tempered galvanized steel wire, not less than 16 ga. for tying furring channels to runner channels or other supports and not less than 18 ga. for tying lathing to furring channels. Furring Brackets: 20 ga. galvanized steel with serrated edges, adjustable from 3 in. to 2-3 in. Attachment Clips: Galvanized sheet metal devices complying with Paragraph "Standards" and as recommended by lath manufacturer specially designed for attachment of lath to framing members and lath to lath.

2. 3.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-4 11 March 2013

4.

Steel Screws: Corrosion resistant, self-drilling and self-tapping; ASTM C1002, Type G, Type S, or Type W screws suitable for fastening into steel not greater than 20 ga. and ASTM C954 for fastening into steel of 20 ga. to 14 ga. thickness. Lathing Nails: Hardened, zinc-coated masonry nails, barbed roofing nails, offset-head or hookhead lath nails; lengths as required for proper anchorage.

5. 2.02

LATHING MATERIALS A. B. Recommended brand for all metal accessories related to plastering works should be CATNIC U.K. or equivalent approved by Engineer. Expanded Metal Lath: ASTM C847, expanded metal lath fabricated from galvanized steel sheet. Spray paint end bundles in different colors to denote various weight and types. 1. 2. Diamond Mesh: Flat expanded metal lath weighing not less than 3.4 lbs. per sq. yd. Self-Furring Diamond Mesh: Flat expanded metal lath with indentations to hold lath 3 in. from wall surface or from face of steel, weighing not less than 3.4 lbs. per sq. yd. a. 1/8 in. Flat Rib Lath: weighing not less than 3.4 lbs. per sq. yd. b. 3/8 in. Rib Lath: weighing not less than 4.0 lbs. per sq. yd. c. : in. Rib Lath: weighing not less than 5.4 lbs. per sq. yd.

2.03

PLASTER MATERIALS AND MIXES A. Cement Plaster and Stucco 1. 2. 3. 4. 5. Aggregates: ASTM C897; natural sand, except use graded silica sand passing a 0 mesh screen. Hydrated Lime: ASTM C206, Type S. Fiber: Alkaline resistant glass fibers, 2 in. long, free from grease, oil, dirt and other impurities or contaminates. White Portland Cement: ASTM C150 Type I, II or Type III where shown or specified or equal approved. Bonding Agent (for Portland Cement Plaster and Portland Cement Stucco): ASTM C932; One of the following: a. "Weldcrete" (Larsen Products Corp.) b. "Daraweld-C" (W.R. Grace & Co.) c. Or equal approved.

2.04

MISCELLANEOUS MATERIALS A. B. C. D. Water: Potable and free from deleterious materials which would impair the Work. Acoustical Sealant: "USG Acoustical Sealant" (United States Gypsum Co.). Acoustical Insulation (Partitions): "Thermafiber Sound Attenuation Blanket" (United States Gypsum Co.), 12 in. thick unless otherwise shown. Acoustical Insulation (Ceilings): "Thermafiber Regular Blanket" (United States Gypsum Co.), 2-5/8 in. thick unless otherwise shown.

2.05

METAL FABRICATION A. B. Galvanize all hangers, furring channels and metal lath. Form accessories of white metal (zinc alloy). Metal lath and lathing accessories which are specified to be galvanized, shall be galvanized after fabrication. Galvanize inserts, hangers and channels by the hot-dip process in accordance with ASTM A123.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-5 11 March 2013

C. D. 2.06 MIXES A. B. C.

All items not galvanized shall be given 1 coat of rust-inhibitive primer after fabrication. All weights listed or shown are weights of the material before it is galvanized or painted.

Proportions: All mixes are by volume unless otherwise specified. Lime Putty: Make from hydrated lime; machine-mix with water to putty form; allow to stand at least 15 minutes before using. Weight not less than 83 pcf. Cement Plaster (Stucco) Basecoats and Finish Coats: ASTM C926. Mix proportions may be varied to meet local conditions and achieve the desired finish within the limits specified in cited standards and subject to acceptance by the Engineer.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-6 11 March 2013

2.07

PLASTER TYPES A. B. Plaster Type PLA-10: Cementitious Plaster painted as selected by Engineer. Plaster Type PLA-11 : Gypsum plaster painted as selected by Engineer.

PART 3 - EXECUTION 3.01 PRE-INSTALLATION MEETING A. Prior to the start of the Work, and at the Contractor's direction, meet at the Project site to review material selections, methods and sequence of installation, special details and conditions, standard of workmanship, quality control requirements, job organization, coordination with other trades, and other pertinent topics related to the Work. The meeting shall include the Engineer, the Contractor's project superintendent, subcontractor's superintendent, manufacturer's representative, primary component materials suppliers, and any other subcontractors whose work requires coordination with this Work.

3.02

CONDITION OF SURFACES A. Examine the substrates, adjoining construction and conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected.

3.03

PLASTER SUBSTRATE INSTALLATION, GENERAL A. Verify dimensions of supporting structure by field measurements so that the Work will be accurately designed, fabricated and fitted to the structure. Tolerances for supporting structure are specified in other Sections. Coordinate Work with the work of other Sections and provide items to be placed during the installation of other work at the proper time to avoid delays. Place such items, including inserts and anchors, accurately in relation to the final location of components. Coordinate access hatches, plaster rings and other items occurring in lathed surfaces and specified in other Sections with the work of this Section. Erect all components in accordance with the manufacturer's written instructions and recommendations and referenced standards. Provide the following construction tolerances: 1. 2. D. Variation from plumb or level in any exposed line or surface: Variation between planes of Abutting edges or ends: +/- 1/8 in. in 10 ft. or 3mm in 3 meters +/- 1/16 in. or 1.5mm in 3 meters.

B.

C.

Where lathing and metal support system abuts building structure, isolate the Work from structural movement sufficiently to prevent transfer of loading into the Work from the building structure. Install slip type joints to absorb deflections but maintain lateral support. Provide slip gaskets to ensure freedom of movement. Do not over tighten fasteners; where movement is required, strike threads to prevent backing off of nuts. Frame both sides of control and expansion joints independently, and do not bridge joints with furring and lathing or other accessories. Provide supplementary framing, blocking and bracing at terminations in the Work and for support of fixtures, equipment, heavy trim and similar work. Dimensions shown on Drawings are based on an assumed design temperature of 70 deg. F. Fabrication and erection procedures shall take into account the ambient temperature at the time of the respective operations.

E. F.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-7 11 March 2013

G. 3.04

Paint cut and abraded surfaces of rust-inhibitive treated and galvanized metal materials with a coat of an approved rust-inhibitive primer at the project site, before use.

STEEL STUD INSTALLATION A. General: Install components for steel stud partition support system to comply with the written instructions and recommendations of the steel stud manufacturer and applications indicated and with the following reference standards: 1. 2. B. For installation of steel studs, furring and accessories for cement plaster and/or stucco application, use roll formed type steel studs and comply with ASTM C1063. For installation of steel studs and related accessories (including erection tolerances) for loadbearing (axial and transverse) system application comply with ASTM C1007.

Space metal studs a maximum of 16 in. o.c. unless otherwise shown, noted or required by referenced standard. Align runner tracks accurately to the partition layout at both floor and ceiling. Secure runner channels to the floor with anchors 24 in. o.c., unless otherwise shown. When construction above is concrete, fasten ceiling track same as floor track. Where partition extends to a suspended ceiling, wire-tie stud track to runner channels or furring channels, unless otherwise shown. Place a stud 2 in. from abutting partitions, internal corners, partition terminals, studs inserted into metal frames and other similar locations. Install two studs on each side of metal door frames, accurately centered, and attached to the anchor clips securely with double strand 18 ga. tie wire. Provide runner tracks continuously at the head and sill of all framed openings in partitions. Provide all stud shoes, wire clips and anchorage assemblies recommended by the manufacturer of steel studs for a complete stud installation. Coordinate work with ceiling work. Stiffen partitions over 10 ft. high with 1-2 in. channel stiffeners, permanently wired on the inside of the partition running continuously, not to exceed 6 ft. o.c. spacing. Where door frames do not extend to ceiling, place one : in. channel brace no more than 6 in. above frame, extended at least two full stud spaces behind each side of the frame and securely wire-tied or welded to the flange of each stud. Provide load bearing steel joists in the metal stud framed walls as necessary to frame the openings indicated. Secure joists to studs using pre-manufactured steel brackets or joist hangers of sufficient size and strength or utilize custom engineered connections as required to sustain the imposed loads.

C.

D.

E.

3.05

FURRING INSTALLATION A. Provide metal furring where shown and as specified and complying with referenced standards, to provide a suitable base for plastering. Include all steel shapes, clips, wire and other attachments necessary to bring finished surface to lines shown. Secure furring to supporting construction with furring brackets. Install furring devices as required providing clearance for forming plaster keys. Stagger end laps.

B. 3.06

SUSPENDED CEILINGS SUPPORTS INSTALLATION A. B. Provide ceiling support components complying with referenced standards and manufacturer's written instructions and recommendations. Provide hangers and inserts necessary to support suspended ceilings below concrete slab before concrete is poured and in time to avoid delay in work. Give particular attention to the correct location and alignment of hangers and inserts. Provide hangers of ample length. Secure hangers without inserts to steel reinforcement or embed hangers in the concrete so as to develop full strength. Inserts shall develop full the strength of hangers attached to them. Locate hangers not less than 6 mm. from each end and spaced 60cm maximum along each runner channel. Coordinate placement of hangers, runner channels, and furring channels with the location of electrical fixtures, ceiling diffusers, grilles, access panels, sprinkler heads, and other items occurring in or on the

C.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-8 11 March 2013

ceiling. Provide a trapeze framework or splay hangers only where required to miss obstructions and offset horizontal force by bracing or other approved methods.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-9 11 March 2013

D.

Where ceilings are suspended below ductwork, piping or other building elements which are not suitable for ceiling attachment due to strength limitations, or restrictions of authorities having jurisdiction, provide additional supplemental framing, supports and related work as required to span beneath these elements from suitable support locations. Provide brass wedges and other materials as required to make metal lathing and furring installation rigid. Frame openings in lathed surfaces with furring strips so that recessed items finish flush, unless otherwise shown. Approved supplier for all hangers is Hiliti or equal approved by the engineer.

E. F. 3.07

LATHING A. Install lath in accordance with the following referenced standards: 1. For installation of metal lath, furring and accessories for cement plaster and/or stucco application comply with ASTM C1063. Install continuous strip lath at junction of dissimilar surfaces to be plastered. At corners of openings exceeding 2 sq. ft. in area, install strips of metal lath 12 in. wide x 24 in. long at a 45 deg. angle. Attach stucco mesh to solid surfaces with nails spaced 6 in. apart. Frame both sides of control and expansion joints independently and do not bridge joints with furring, lathing or accessories. Shim metal lath away from metal studs to provide for proper bonding of the plaster to the lath.

B.

C.

3.08

ACCESSORY INSTALLATION A. Provide corner beads on all external corners and in single lengths where the length of a corner or jamb does not exceed the manufacturer's standard lengths. Miter or cope at corners, and fasten securely with tie wire, or lathing nails spaced not more than 8 in. staggered. Provide corner reinforcement at all internal corners. Provide strip lath at changes in plaster base material. Provide casing beads where shown and where plastering terminates and is not covered by other finish. Provide sheet metal closures at reveals. Set the beads level, plumb and true to line. Align joints with concealed splice or tie plates. Where the structural backing is concrete or masonry, secure the beads with hardened galvanized nails or drive screws driven into fiber plugs set in masonry or by other approved methods. Space fastenings not more than 8 in. apart. Expansion and Control Joints: Install expansion and control joints at positions shown and as required by referenced standards. Where joints are not shown but are required, submit locations for Engineer's review. In general locate expansion and control joints as follows: 1. 2. 3. D. Where expansion or control joints occur in floor, ceiling or wall construction supporting the lath and plaster system. Where lath and plaster abuts a structural element other than the floor, or abuts dissimilar construction or the construction changes within the plane of the system. In Portland cement based plaster systems, install control/expansion joints so that no area exceeds 100 sq. ft. The distance between control joints shall not exceed 10 ft. in either direction.

B.

C.

Do not locate expansion or control joints within 8 in. from corners or openings except where joints are shown at jamb lines or where openings occur adjacent to exterior or interior angles of an area. At door frames, extend control joints upward from both jamb corners. Terminate channels and metal lath on each side of joint. Secure to metal lath with tie wire.

3.09

FIRE RATED CONSTRUCTION A. Where Drawings show fireproofing of steel columns or steel beams, apply lath secured to columns or beams as required by the manufacturer to achieve fire ratings specified.

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-10 11 March 2013

B.

Provide metal furring and lathing and necessary spacers, corner beads, metal lath and other materials to achieve final plaster thickness over structural members requiring fireproofing, complying with the appropriate class and hourly rated designs detailed and listed in the Building Materials List by UL. Where fire rated partitions are secured directly to the underside of fluted metal decking, provide galvanized sheet metal closures to prevent displacement of fire stopping material.

C. 3.10

PREPARATION FOR APPLICATION OF PLASTER A. B. C. Protect all fixtures, frames, access panels, inserts and other contiguous work from rusting, soiling, clogging or any type damage due to plastering operations. For surface preparation and conditioning of surfaces for application of cement plaster and stucco, comply with ASTM C926 and recommendations of the PCA. Prepare monolithic surfaces for bonded base coats for application of cement plaster and stucco in compliance with the referenced standards.

3.11

PLASTER APPLICATION, GENERAL A. B. The term "gypsum plaster" on the Drawings means gypsum based plaster with a float finish unless otherwise noted. Apply 2-coats work on all bases and thickness as required. Where casing beads or plaster stops do not occur at juncture of plaster and hollow metal frames or other built in metal items, finish with a vee groove. Where a finish coat is not required, as behind built-in cabinets, furnishings and fixed equipment, finish brown coat to a true, even surface, with angles plumb and square. Prior to lathing, grout hollow metal frames, bases and similar work occurring in plastered areas, with base coat material. Except where full grouting is indicated or required for fire resistance ratings, grout 6 in. lengths at each anchorage. Mixing 1. Use mechanical mixers for mixing plaster except where hand mixing of small batches is acceptable. Do not use frozen, caked, or lumped material. Clean mechanical mixers, mixing boxes and tools after mixing each batch; keep free of plaster from previous mixes. Thoroughly mix plaster with proper amount of water until uniform in color and consistency. Re-tempering not permitted; discard plaster which has begun to stiffen. Provide waterproof protection under mixer. Machine Applied Plaster: Determine proper consistency by slump test as follows: Take slump test samples from nozzle of plastering machine hose using a 2 in. x 4 in. x 6 in. slump cone. Samples will be taken at random as often as may be required and without prior notice. a. Gypsum plaster or Stucco: Maximum 2-2 in. slump.

C.

D.

2.

E. F.

Method of Application: By hand or machine application. Limit machine application to base-coats, except where machine texture finish is specified. Thickness of Plaster 1. Gypsum plaster and Portland Cement Stucco: Total thickness 1 in. minimum; and maximum as required by layers maximum in thick and additional mesh, Comply with ASTM C926 Table 4 for all applications not otherwise shown or specified.

G.

Application of Gypsum plaster and Stucco Plaster 1. Apply gypsum plaster and stucco plaster base-coats and finish coats complying with ASTM C926 with the following type finish coat: a. Smooth Trowel Finish

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-11 11 March 2013

H. 3.12

Application of Bonding Agent: Apply bonding agent in accordance with manufacturer's written instructions and recommendations and the referenced standards.

FIELD QUALITY CONTROL A. Plaster Sampling: Samples may be taken from work in place at any time. Areas represented by samples which show over-sanding or wrong aggregate proportion will be rejected.

3.13

PATCHING A. B. Work containing cracks, blisters, pits, checks, or discoloration will not be accepted. Remove such work, including rejected work, and replace with new. Patching of defective work permitted only when approved. Perform cutting, patching, repairing and pointing-up operations neatly and thoroughly. Repair the cracks and indented surfaces by moistening the plaster and filling with new material, troweled or tamped flush with adjoining surfaces. Point-up and finish surfaces around fixtures, outlet boxes, piping, fittings, tile and other work flush with adjacent plaster. Where new plaster adjoins plaster which has been installed more than 48 hours, cut existing plaster at an angle of approximately 45 deg. with the surface before installing new plaster.

3.14

CLEANING AND PROTECTION A. B. Make provisions to minimize the spattering of plaster on other work. Promptly clean windows and other surfaces which have been soiled by the Work of this Section. Protect plaster from the weather, freezing, premature drying, marking, dirt, dust, marring or other damage throughout the construction period so that it will be without any indication of damage at the time of acceptance by the Owner.

END OF SECTION

LATH AND PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09200-12 11 March 2013

SECTION 09210 ARTISAN PLASTER PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide artisan plaster in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 2. 1.02 Section "Access Doors". Section "Veneer Plaster" for gypsum veneer plaster, plaster base, veneer plaster, and metal framing systems.

QUALITY ASSURANCE A. Fire Resistance Ratings: Where artisan plaster systems with fire resistance ratings are indicated, provide materials and installations identical to those of applicable assemblies tested per ASTM E119 by fire testing laboratories acceptable to authorities having jurisdiction. 1. Provide artisan plaster for fire resistance rated systems that has same aggregate as specified for similar non-rated work, unless specified aggregate has not been tested by accepted fire testing laboratories.

B. C. D. E.

Coordination of Work: Coordinate layout and installation of system components for artisan plaster work with other work supported by or penetrating through assemblies. The artisan plaster work shall be performed by a firm having a minimum of 10 years experience in the application of artisan plaster on projects similar in size and scope to this Project. Obtain artisan plaster ingredients, furring and lathing from a single source or manufacturer. Field-Constructed Mock-Up: Prior to installation of artisan plaster work, fabricate panels for each type of finish and application required to verify selections made under sample submittals and to demonstrate aesthetic effects of application as well as qualities of materials and erection. Build mock-ups to comply with the following requirements, using materials indicated for final unit of Work. 1. 2. 3. 4. 5. Locate mock-ups on site in location indicated or, if not indicated, as directed. Erect 4 ft. square by full thickness mock-up using materials, including lath and support system, indicated for final work. Demonstrate the proposed range of aesthetic effects including color, texture, and workmanship to be expected in completed work. Obtain acceptance of mock-ups before start of plaster work. Retain and maintain mock-ups during construction in undisturbed condition as a standard for judging completed plaster work.

1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. 3. ML/SFA "Specifications for Metal Lathing and Furring". ASTM C841 "Standard Specification for the Installation of Interior Lathing and Furring". ASTM C842 "Standard Specification for the Application of Interior Gypsum Plaster".
09210-1 11 March 2013

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.04

SUBMITTALS A. Shop Drawings: Submit detailed shop drawings at full scale of all unusual conditions involving artisan plaster Work, including expansion and control joints, special hangers, and other work. Show details of rated assemblies, with copies of their respective approvals. Coordinate all components which are specified elsewhere, which are a part of, or are contiguous, with the system. Submit the following: 1. 2. 3. B. Details of all unusual conditions in connection with veneer plaster systems construction. Proposed locations of control joints that are required but not shown. Locations of access doors occurring in veneer plaster systems construction.

Product Data: Submit, for information only, manufacturer's specifications and installation instructions for each type of lath, mesh, channel, hanger, stud, joist, clip, bracket, bead, stop, expansion joint, control joint, screed and special shape required, including other data as may be required to show compliance with the Contract Documents. Samples 1. Furnish sample panels for preliminary review of each color and finish not less than 2 ft. square, on movable frames. Include typical control joint. Sample panels shall be representative of materials, colors, textures and workmanship for the entire Work. Acceptance will be for color and texture only. Submit samples of the following: a. b. Control joint: 12 in. long. Each type plaster accessory: 12 in. long.

C.

2.

D. E. F. 1.05

Setting Drawings: Provide setting drawings and templates for the location of plaster items that are to be embedded in or anchored to concrete and masonry. Product Data: Submit manufacturer's technical data for each component of artisan plaster system, including all related accessories. Material Certificates: Submit producer's certificate for each kind of plaster aggregate indicated evidencing that materials comply with requirements.

PERFORMANCE CRITERIA A. Design and install veneer plaster components so that the completed partition will withstand a minimum inward and outward pressure of 5 psf normal to the plane of the wall.

1.06

DELIVERY, STORAGE, AND HANDLING A. B. Deliver materials in original packages, containers, or bundles bearing brand name and identification of manufacturer. Store materials inside, under cover, and in manner to keep them dry, protected from weather, direct sunlight, surface contamination, aging, corrosion, and damage from construction traffic and other causes. Neatly stack gypsum lath flat to prevent deformation.

1.07

PROJECT CONDITIONS A. General: Comply with the requirements of Paragraph "Standards" and recommendations of the component manufacturers for environmental conditions before, during and after performing the Work and as follows: 1. Do not start artisan plaster Work until the interior spaces are ventilated and continuously maintained at a uniform temperature not less than 40 deg. F nor more than 80 deg. F for not less
09210-2 11 March 2013

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

PART 2 - PRODUCTS 2.01

than one week prior to application. Continuously maintain temperature one week after the artisan plaster Work is complete. Provide ventilation to remove the water in excess of that required for hydration of the artisan plaster, immediately subsequent to its application and set.

METAL MATERIALS A. Structural Accessories 1. 2. Runners: ASTM C645, roll formed galvanized steel, channel or angle shape, type, size and gage as recommended by the manufacturer for the wall system indicated. Metal Studs: ASTM C645 roll-formed galvanized steel, size and gage as recommended by the manufacturer for the wall system and height indicated; "ST" and "CWS" (Unimast Inc.), for interior partitions, and ceilings. Furring Channels: "Rigid Furring Channel" (Unimast Inc.); ASTM C645, roll-formed galvanized steel, flanged channel type, 7/8 in. deep; for wall furring and ceiling attachment. Sheet Metal Grounds: 20 gage galvanized sheet metal; where shown or required for attachment of other work; size as required for each individual item.

3. 4.

B.

Fasteners 1. 2. For Plaster Base: Self-drilling cadmium plated bugle head screws. For Studs to Runners: Self-drilling, 3/8 in. pan head screws.

C.

Metal Accessories: Products specified herein by proprietary designation are as manufactured by Unimast Inc. and establish the quality standards required. Equivalent products of other manufacturers will be considered provided they meet those established standards. 1. 2. 3. 4. Corner Beads: "No. 900" (Unimast Inc.)(for 2 coat applications); galvanized steel. Install in one piece when manufactured in length required. Metal Trim, Channel Type: " No. 701A" (Unimast Inc.)(for 2 coat applications); galvanized steel. Install in one piece when manufactured in length required. Metal Trim, Angle Type: "No. 701B" (Unimast Inc.)(for 2 coat applications), galvanized steel. Install in one piece when manufactured in length required. Control Joints: "No. 093"(Unimast Inc.); roll formed zinc alloy. Install in one piece when manufactured in length required.

2.02

ARTISAN PLASTER MATERIALS A. B. General: Provide artisan plaster consisting of three (3) distinct colors, textures and finishes to match specimen samples available for inspection at the Engineer's office. Plaster Base: ASTM C588, specifically engineered for use with basecoat and finish plasters of the following type as required: 1. Non-Fire Rated Plaster Base: 5/8 in. thick, unless otherwise shown, 4 ft. wide. Provide one of the following: a. "Dens-Cote Plaster Base" (Georgia-Pacific Corp.) b. "Kal-Kore Regular" (Gold Bond Building Products Div., National Gypsum Co.) c. "IMPERIAL Gypsum Base" (United States Gypsum Co.) Fire Rated Plaster Base: Type X, as required for specific fire-resistance-rated assembly, 5/8 in. thick, unless otherwise shown, 4 ft. wide. Provide one of the following: a. "Firestop Dens-Cote Plaster Base" (Georgia-Pacific Corp.) b. "Kal-Kore Fire-Shield" (Gold Bond Building Products Div., National Gypsum Co.)
09210-3 11 March 2013

2.

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

c. C.

"IMPERIAL Gypsum Base FIRECODE" (United States Gypsum Co.)

Gypsum Artisan Plaster 1. 2. 3. 4. Aggregate for Base Coat Artisan plaster: ASTM C35, natural sand Aggregates for Finish Coat Artisan plaster: ASTM C35, natural sand, except gradation as specified in ASTM C842, Table 1. Hydrated Lime: ASTM C206, Type S. Gypsum Artisan plaster: ASTM C28 as follows: a. All Basecoats Not Otherwise Specified: Neat unfibered. b. Lime Putty Gypsum Trowel Finish: Manufacturer's standard mill mixed gauged interior finish artisan plaster. Pigments: Mineral pigments of high purity, nonfading and limeproof; colors as selected. Use only pigments with record of satisfactory performance in gypsum plaster.

5. D.

Artisan Veneer Plaster (Two Coat High-Strength System): Separate ready-mixed veneer plaster formulations complying with ASTM C587: one for base coat and the other for finish coat, each containing mill-mixed fine silica sand and having a compressive strength of 3000 psi per ASTM C472. Products specified herein by proprietary designation are as manufactured by Art-In Construction Ltd. and establish the quality standards required. Equivalent products of other manufacturers will be considered provided they meet those established standards. 1. 2. Base Coat: Special Formula AA.I.C. Arriccio IA-107" (Art-In Construction Ltd.) Finish Coat: Special Formula AA.I.C. Intonaco II-16" (Art-In Construction Ltd.)

E. F. G. H. I. J.

Water: Potable and free from deleterious materials which would impair the Work. Reinforcing Tape: Paper reinforcing tape standard with the manufacturer. Embedding Material for Gypsum Base Joint Tape: As recommended by veneer plaster manufacturer for use with joint tape material indicated. Sound Attenuation Fire Blankets: "Thermafiber Sound Attenuation Fire Blankets" (Thermafiber Inc.), 1-2 in, thick unless otherwise shown, specified or required. Plaster Grout: ASTM C28, wood fiber. Acoustical Sealant: One of the following: 1. 2. 3. "SHEETROCK Acoustical Sealant" ( United States Gypsum Co.). "AC-20 FTR Acoustical and Insulation Sealant" ( Pecora Corp.). Or equal approved.

2.05

ARTISAN PLASTER MIXES A. B. C. Proportions: All mixes are by volume unless otherwise specified. Lime Putty: Make from hydrated lime; machine-mix with water to putty form; allow to stand at least 15 minutes before using. Weight not less than 83 pcf. Gypsum Artisan Plaster Basecoats and Finish Coats: ASTM C842. Mix proportions may be varied to meet local conditions and achieve the desired finish and color within the limits specified in cited standards and subject to acceptance by the Engineer. Provide the following: 1. PLA-11: Mfr. No. 3-3450, Off White ; (Art In Construction); Artisan Plaster.
09210-4 11 March 2013

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2. 3. 4. 5.

PLA-13: MFR. No. WM-325 Moatuaro White /Gold ; (Amiatite America); Encaustic Plaster PLA-13A: MFR No. WM-325 Moatuaro White / Gold: ; (Amiatite America); Encaustic Plaster Moulding. PLA-14: Mfr. No. 947, Light Blue: (Timeless Plaster); Artisan Plaster. PLA-15: Mfr. No. 6066, Beige ; (Fresco); Smooth White Armourcoat Artisan Plaster.

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09210-5 11 March 2013

PART 3 - EXECUTION 3.01 CONDITION OF SURFACES A. 3.02 Examine the substrates, adjoining construction and conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected.

SUBSTRATE INSTALLATION, GENERAL A. B. Verify dimensions of supporting structure by field measurements so that the Work will be accurately designed, fabricated and fitted to the structure. Coordinate Work with the work of other Sections and provide items to be placed during the installation of other work at the proper time to avoid delays. Place such items, including inserts and anchors, accurately in relation to the final location of components. Coordinate access hatches, plaster rings and other items occurring in lathed surfaces and specified in other Sections with the work of this Section. Erect all components in accordance with the manufacturer's written instructions and recommendations and referenced standards. Provide the following construction tolerances: 1. 2. D. Variation from plumb or level in any exposed line or surface: Variation between planes of abutting edges or ends: +/- 1/8 in. in 8 ft. +/- 1/16 in.

C.

Where metal support system abuts building structure, isolate the Work from structural movement sufficiently to prevent transfer of loading into the Work from the building structure. Install slip type joints to absorb deflections but maintain lateral support. Provide slip gaskets to ensure freedom of movement. Do not overtighten fasteners; where movement is required, strike threads to prevent backing off of nuts. Frame both sides of control joints independently, and do not bridge joints with furring and lathing or other accessories. Provide supplementary framing, blocking and bracing at terminations in the Work and for support of fixtures, equipment, heavy trim and similar work. Dimensions shown on Drawings are based on an assumed design temperature of 70 deg. F. Fabrication and erection procedures shall take into account the ambient temperature at the time of the respective operations. Paint cut and abraded surfaces of rust-inhibitive treated and galvanized metal materials with a coat of an approved rust-inhibitive primer at the project site, before use.

E. F.

G. 3.03

STEEL STUD INSTALLATION A. General: Install components for steel stud partition support system to comply with the written instructions and recommendations of the steel stud manufacturer and applications indicated, Division 9 Section "Lath and Plaster" and with the following reference standards: 1. B. For installation of steel studs, furring and accessories for gypsum artisan plaster application, use roll formed type steel studs and comply with ASTM C841.

Space metal studs a maximum of 16 in. o.c. unless otherwise shown, noted or required by referenced standard. Align runner tracks accurately to the partition layout at both floor and ceiling. Secure runner channels to the floor with anchors 24 in. o.c., unless otherwise shown. When construction above is concrete, fasten ceiling track same as floor track. Where partition extends to a suspended ceiling, wire-tie stud track to runner channels or furring channels, unless otherwise shown. Place a stud 2 in. from abutting partitions, internal corners, partition terminals, studs inserted into metal frames and other similar locations. Install two studs on each side of metal door frames, accurately centered, and attached to the anchor clips securely with double strand 18 ga. tie wire.

C.

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09210-6 11 March 2013

D.

Provide runner tracks continuously at the head and sill of all framed openings in partitions. Provide all stud shoes, wire clips and anchorage assemblies recommended by the manufacturer of steel studs for a complete stud installation. Coordinate work with ceiling work. Stiffen partitions over 10 ft. high with 1-1/2 in. channel stiffeners, permanently wired on the inside of the partition running continuously, not to exceed 6 ft. o.c. spacing. Where door frames do not extend to ceiling, place one 3/4 in. channel brace no more than 6 in. above frame, extended at least two full stud spaces behind each side of the frame and securely wire-tied or welded to the flange of each stud.

3.04

FURRING INSTALLATION A. Provide metal furring where shown and as specified and complying with referenced standards, to provide a suitable base for artisan plastering. Include all steel shapes, clips, wire and other attachments necessary to bring finished surface to lines shown. Secure furring to supporting construction with furring brackets. Install furring devices as required to provide clearance for forming plaster keys. Stagger end laps.

B. 3.05

ACCESSORY INSTALLATION A. Provide corner beads on all external corners and in single lengths where the length of a corner or jamb does not exceed the manufacturer's standard lengths. Miter or cope at corners, and fasten securely with tie wire, or lathing nails spaced not more than 8 in. staggered. Provide corner reinforcement at all internal corners. Provide strip lath at changes in artisan plaster base material. Provide casing beads where shown and where plastering terminates and is not covered by other finish. Provide sheet metal closures at reveals. Set the beads level, plumb and true to line. Align joints with concealed splice or tie plates. Space fastenings not more than 8 in. apart. Control Joints: Install expansion and control joints at positions shown and as required by referenced standards. Where joints are not shown but are required, submit locations for Engineer's review. Do not locate control joints within 8 in. from corners or openings except where joints are shown at jamb lines or where openings occur adjacent to exterior or interior angles of an area. At door-frames, extend control joints upward from both jamb corners. Terminate channels and metal lath on each side of joint. Secure to metal lath with tie wire.

B.

C. D.

3.06

PREPARATION FOR APPLICATION OF ARTISAN PLASTER A. B. Protect all fixtures, frames, access panels, inserts and other contiguous work from rusting, soiling, clogging or any type damage due to plastering operations. For surface preparation and conditioning of surfaces for application of gypsum artisan plaster, comply with ASTM C842.

3.07

ARTISAN PLASTER APPLICATION, GENERAL A. B. The term "artisan plaster" on the Drawings means gypsum artisan plaster base coats and integrally colored lime putty trowel finish unless otherwise noted. Where casing beads or plaster stops do not occur at juncture of plaster and hollow metal frames or other built in metal items, finish with a vee groove. Where a finish coat is not required, as behind built-in cabinets, furnishings and fixed equipment, finish brown coat to a true, even surface, with angles plumb and square. Prior to lathing, grout hollow metal frames, bases and similar work occurring in plastered areas, with base coat material. Grout 6 in. lengths at each anchorage. Mixing 1. Use mechanical mixers for mixing artisan plaster except where hand mixing of small batches is acceptable. Do not use frozen, caked, or lumped material. Clean mechanical mixers, mixing
09210-7 11 March 2013

C. D.

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E. F. G.

boxes and tools after mixing each batch; keep free of artisan plaster from previous mixes. Thoroughly mix artisan plaster with proper amount of water until uniform in color and consistency. Retempering not permitted; discard artisan plaster which has begun to stiffen. Provide waterproof protection under mixer. Method of Application: By hand or machine application. Limit machine application to basecoats. Thickness of Artisan Plaster: Standard with the manufacturer. Application of Gypsum Artisan Plaster: Apply gypsum artisan plaster basecoats and finish coats complying with ASTM C842 and with the manufacturers written instructions and recommendations to achieve match with Engineers sample.

3.08

PATCHING A. B. Work containing cracks, blisters, pits, checks, or discoloration will not be accepted. Remove such work, including rejected work, and replace with new. Patching of defective work permitted only when approved. Perform cutting, patching, repairing and pointing-up operations neatly and thoroughly. Repair the cracks and indented surfaces by moistening the artisan plaster and filling with new material, troweled or tamped flush with adjoining surfaces. Point-up and finish surfaces around fixtures, outlet boxes, piping, fittings, tile and other work flush with adjacent artisan plaster. Where new artisan plaster adjoins artisan plaster which has been installed more than 48 hours, cut existing artisan plaster at an angle of approximately 45 deg. with the surface before installing new artisan plaster.

3.09

CLEANING AND PROTECTION A. B. Make provisions to minimize the spattering of artisan plaster on other work. Promptly clean windows and other surfaces that have been soiled by the Work of this Section. Protect artisan plaster from the premature drying, marking, dirt, dust, marring or other damage throughout the construction period so that it will be without any indication of damage at the time of acceptance by the Owner. END OF SECTION

ARTISAN PLASTER Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09210-8 11 March 2013

SECTION 09225 GLASS FIBER REINFORCED GYPSUM

PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide glass fiber reinforced gypsum (GFRG) in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 2. 1.02 Painting Gypsum drywall.

QUALITY ASSURANCE A. B. Fabricator: Provide glass fiber reinforced gypsum work complete with all required accessories as produced by a single manufacturer for the entire project. Installer: The glass fiber reinforced gypsum work shall be performed by a firm having 5 years experience in the installation of similar materials to those specified herein on projects comparable to this Project. This firm shall have the approval of the glass fiber reinforced gypsum manufacturer.

1.03

SUBMITTALS A. Shop Drawings: Submit shop drawings for GFRG units. Show typical details of all conditions at large scale including profiles, thicknesses, finishes, ornamentation, anchorage details, cutouts for sprinklers, diffusers, grilles, speakers, and lighting fixtures and interface with contiguous construction. Indicate attachment methods, embedded supports, reinforcement, fabrication methods, installation tolerances, joint treatments, clearances, and supports. Include final engineering calculations with shop drawings. Samples 1. 2. C. Submit 2 sets of 24 in. long x full width samples of finished glass fiber reinforced gypsum showing full profile, curvature and finish shown or specified showing quality, variation, profiles and texture. Submit samples of integral reinforcing and anchor devices proposed for use.

B.

Product Data: Submit, for information only, manufacturer's specifications and installation instructions for glass fiber reinforced gypsum including other data as may be required to show compliance with the Contract Documents. Product Test Reports: submit product test reports based on evaluation of comprehensive tests performed by glass fiber reinforced gypsum fabrication manufacturer and witnessed by a qualified independent testing agency, indicating that it=s current glass-reinforced gypsum fabrications comply with ASTM C1355 requirements. Certification 1. Submit manufacturer's certification stating that units comply with the flame spread rating specified. Submit certified test reports of an independent laboratory indicating compliance with specified criteria.

D.

E.

F.

Calculations: Prepare and submit complete design calculations for ceiling suspension system, including loads imposed on structure, prepared, signed and sealed by a Professional Engineer registered in Kuwait. Submittals of calculations for permanent parts of the structure will be reviewed by the Engineer only for compliance with stipulated design criteria.
09225-1 11 March 2013

GLASS FIBER REINFORCED GYPSUM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. G. 1.04 A.

Submit structural calculations for connections. Submit engineering calculations to show that maximum deflections do not exceed specified performance requirements under full design loading.

Maintenance: Submit the manufacturer's instructions for maintenance of the GFRG units. PERFORMANCE CRITERIA The GFRG system, when installed, shall not develop structural failure, joint failure, cracking, crazing, permanent distortion or displacement or other damage. Permanent distortion and displacement are defined as values exceeding 50% of erection tolerances. The maximum temporary deflection due to all loads shall not exceed 1/360 of the distance between supports. Design, fabricate and install component parts so that no movement will occur which might abrade abutting members, loosen fastenings or anchorage or cause other detrimental effects. PHYSICAL PROPERTIES 1. 2. 3. 4. 5. 6. 7. 8. Shell Thickness: Weight: Density: Ultimate Tensile Strength: Impact Strength: Compressive Strength: Yield Strength: 3/16 in. minimum 2 lbs/sq. ft. 12 lbs/cu. ft. 1400 psi. 8 ft. lb./sq. in. 4200 psi min. 1060 psi

B. C. D.

Fire Resistance: The GFRG units shall have ratings not exceeding the following when tested in accordance with ASTM E84: a. b. c. Flame Spread Fuel Contributed Smoke Developed 0 0 0

1.05

MOCK-UP A. Provide mock-up of each type of ceiling system and adjacent materials, minimum 2m x 2m in size, including lighting fixtures and perimeter mouldings, in a space within the building to be designated by the Engineer. Mock-up shall be representative of the finished work in all respects. Provide mock-up of Dome in Wedding Hall, including all hangers and attachments and relationship to adjacent materials. Mock-ups may be installed in final locations and if accepted, may be utilized in the finished work.

B. C. 1.06

PRODUCT HANDLING A. B. Protect GFRG units from damage during transit, storage and installation. Store in accordance with the manufacturer's instructions, above grade on dunnage, so as to avoid damage of any kind. Acclimatize glass-reinforced gypsum fabrications to ambient temperature and humidity of spaces in which they will be installed. Remove packaging and move units into installation spaces not less than 48 hours before installing them.

1.07

PROJECT CONDITIONS

GLASS FIBER REINFORCED GYPSUM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09225-2 11 March 2013

A.

B.

Do not install glass fiber reinforced gypsum materials and accessories unless temperature and humidity conditions closely approximate the interior conditions which will exist when the building is occupied. Maintain temperature/humidity conditions before, during and after installation in accordance with manufacturer's recommendations. Coordinate layout and installation of glass reinforced gypsum fabrications and suspension system components with other construction, including ceilings, light fixtures, HVAC equipment, fire-suppression-system components, and partition assemblies.

1.08

WARRANTY A. Warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and are in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. Warranty: Provide a written warranty, directly to the Owner, for a period of 2 years, warrantying that the GFRG units will meet the specified Structural Criteria, and will not craze, crack or split. Upon notification of such defect, within the guarantee period, make the necessary repairs at the convenience of the Owner.

B.

PART 2 - PRODUCTS 2.01 MATERIALS A. Glass Reinforced Gypsum: Glass fiber reinforced and polymer modified high density gypsum, factory prefabricated and complying with ASTM C1355; Provide components and fabrications from one of the following: 1. 2. 3. 4. B. C. D. E. F. G. H. "Formglas" (Formglas, Inc.). "Custom-Cast" (Custom Castings Inc.). "Plastrglas" (Plastrglas Corp.). "PlasterForm G.R.G." (PlasterForm Inc..).

Adhesive: Casein, conforming to FS MMM-A-125C, Type 2. Joint Prefill: "Durabond 90 Joint Compound" (U.S. Gypsum) or approved equal. Joint Treatment Materials: Joint compound and finishing compound; ASTM C475, asbestos free (U.S. Gypsum). Joint Tape: Open mesh fiberglass tape, 2-2 in. width minimum. Fasteners, Inserts and Attachment Devices: Stainless steel as specified, best suited for intended use. Integral Reinforcement: Roll-formed galvanized steel complying with ASTM A653, G60 and exterior grade plywood. Primary Suspension Members 1. Strap Iron Hanger Inserts: Mild steel flats, 1 in. x 3/16 in. x 3 in. with 7/16 in. holes punched on center line and both ends, designed to develop the full strength of hangers and bent at 90 deg. to permit anchor bolt attachment to existing slab. Hangers: Galvanized 3 in. dia. steel pencil rods. Hanger Anchorage Devices: Screws, clips, bolts or other devices applicable to the indicated method of structural anchorage for ceiling hangers. Provide anchorage devices sized for three (3) times the calculated load supported. Carrying Channels: Cold rolled steel channels, 1-2 in., 475 lbs./1000 lin. ft.

2. 3.

4.

GLASS FIBER REINFORCED GYPSUM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09225-3 11 March 2013

2.02

FABRICATION A. Fabricate units to the shapes shown in the largest sizes possible in accordance with ASTM C1355 "Specification for Glass Fiber Reinforced Gypsum Composites". Fabricate glass fiber reinforced gypsum units from molds constructed of rigid materials that will result in smooth-finished surfaces conforming to profiles, dimensions, and tolerances indicated. Provide units as large as practical to minimize joints. Provide integral rib and edge reinforcing for units as necessary for loads and handling stresses, and for anchorage reinforcing where shown and where required. Remove units from molds and repair hollows, voids, scratches, and other surface imperfections. Material Compatibility: Fabricate glass-reinforced gypsum fabrications with surface characteristics required for a high-gloss paint finish. Incorporate embedments so they develop the full strength of glass-reinforced gypsum fabrications. Cover embedments with glass-reinforced gypsum composite not less than 3/16 in. thick. Fabricate units to the shapes shown with all penetrations as required for mechanical and electrical work completed. Prefabricate corners, radii, reveals, etc. to minimize field cutting. Molding tolerances shall be as follows: 1. 2. 3. 4. E. Length, corner to corner of +/- 1/16 in. any straight or curved edge Twist, bow or warp, corner to +/- 1/16 in. diagonally opposite corner measured along straight line across back of unit Radius of curved surfaces Thickness, minimum +/- 1/16 in. measured with rigid template of full cross section +/- 1/8 in.

B.

C. D.

The finished product shall be free of visual defects, such as foreign matter, dry spots, cracks, air bubbles, pin holes and pimples. Identifying markings shall not appear on any exposed surface.

F.

Fabricators (Local) 1. Sadeer Trading and Contracting Co. 2. Fibrex Co., W.L.L. 2. Index, Kuwait
3. 4. 5. Hassan Habeeb Co., Kuwait Italian Gypsum, Kuwait Kuwait Gypsum, Kuwait

2.03

GLASS FIBER REINFORCED GYPSUM TYPES A. B. Type GFRG-10: (Formglass). Type GFRG-11: (Formglass). Custom shapes; custom pattern; in PC-11 color with accent colors as indicated, Custom shapes; custom pattern; in PC-11 color with accent colors as indicated,

PART 3 - EXECUTION 3.01 CONDITION OF SURFACES A. B. Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected. Condition system(s) to average prevailing humidity conditions in installation areas before installing.

GLASS FIBER REINFORCED GYPSUM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09225-4 11 March 2013

3.02

INSTALLATION A. Coordination: Coordinate glass fiber reinforced gypsum with the adjacent work of other sections. Provide items to be placed during the installation of other work at the proper time to avoid delays. Coordinate placement of such items, accurately in relation to the final location of glass fiber reinforced gypsum. General: Install glass fiber reinforced gypsum in accordance with manufacturer's written instructions and recommendations. Coordinate installation with the work of other trades to ensure exact fit and perfect alignment. Verify dimensions before proceeding and obtain measurements at job site for work required to be accurately fitted to other construction. Install all materials and systems as shown on the Drawings and final shop drawings and in accordance with the GFRG manufacturer's instructions. Comply with manufacturer's printed instructions for installation of system using type of mounting accessories indicated or, if none indicated, as recommended by manufacturer. Make all exposed abutting surfaces of units level, plumb, true to curve, and flush, with all joints straight and true, scribed to fit adjoining work accurately at borders and at penetrations. Provide neat cutouts for items protruding through GFRG units. Cope units at the juncture of construction as required and without exposing cut edges or voids. Adhere abutting flanges of wall panel and ceiling panel joints. Provide temporary ties and braces as may be required. Fill, tape and spackle joints unless otherwise shown. Use procedures that will minimize damage or soiling of the units during installation. Do not erect units which are damaged or defaced to such extent as to impair strength or appearance. Replace units which are damaged, or cannot be adequately repaired or cleaned to the satisfaction of the Engineer. Install supporting members to support required loads and to prevent distortion in excess of that specified. Provide accessible ceiling and wall panels where shown or required for access to contiguous work. Set units level, plumb and true to line, with uniform joints. Comply with the following erection tolerances: 1. 2. 3. 4. J. Variation from plumb: Joint alignment: Joint width: Surface alignment across joints: 1/8 in. in 20 ft. +/- 1/32 in. + 1/32 in. - 0.0 in. +/- 1/32 in.

B.

C.

D.

E. F. G.

H. I.

Provide joint finishing in accordance with joint compound manufacturer's printed instructions, modified as required by GFRG manufacturer. Provide smooth joints and seams which, when finished, are undistinguishable from contiguous work. Provide temporary ties and braces as may be required.

K. 3.03

CLEANING A. Upon completion of the work, thoroughly clean all exposed surfaces using materials and methods recommended by the manufacturer. All surface stains shall be removed by means compatible with paint finish as recommended by the manufacturer. Protect exposed surfaces during the construction period so that they will be without any indication of deterioration or damage. END OF SECTION

B.

GLASS FIBER REINFORCED GYPSUM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09225-5 11 March 2013

SECTION 09260 GYPSUM BOARD SYSTEM PART 1 - GENERAL 1.01 A. B. 1. 2. 3. 4. 5. 1.02 A. DESCRIPTION Provide labor, materials, equipment and services, and perform operations required for installation of gypsum board and related work as indicated on the drawings and specified herein. Work Included: The work of this section shall include, but not be limited to, the following: Gypsum board ceilings including framing members. Ceiling and soffit suspension systems. Installation of access panels and other items furnished under other sections of the specifications and requiring installation in gypsum board, except as otherwise specified. Hanging members include ceiling runners, furring, channels, hangers and bracing. Accessories including fasteners, anchors, acoustical sealant, insulation, joint compound and fiber tape, and other accessories as required for installation. QUALITY ASSURANCE Industry Standards: Except as otherwise indicated on the drawings or specified herein, the current edition industry standards, referred to below, shall apply to work under this section. Where requirements indicated on the drawings, or specified herein, differ from the industry standards, the more stringent requirements shall govern. The following latest edition standard specifications for gypsum board construction by the Gypsum Association. GA-201; Using Gypsum Board for Walls and Ceilings. GA-216; Recommended Specifications for the Application and Finishing of Gypsum Board. GA-505; Gypsum Board Construction Terminology and Definitions. Fire Resistance Design Manual. The following standards for the American Society for Testing and Materials: ASTM C11; Gypsum Board Construction Terminology. ASTM C754; Specification for steel framing members to receive screw-attached gypsum board, backing board or water-resistant board. ASTM C840; Specification for Application and Finishing of Gypsum Board. ASTM C1002; Specification for steel drill screws for the application of gypsum board. Fire-Resistant Ratings: Where indicated, provide materials and construction which are identical to those of assemblies whose fire resistance rating has been determined per ASTM E119 by a testing and inspection organization acceptable to authorities having jurisdiction. Provide fire-resistance-rated assemblies identical to those indicated by reference to design designations in UL "Fire
09260-1 11 March 2013

1. a. b. c. d. 2. a. b. c. d. B.

1.

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

Resistance Directory" or in listing of other testing and agencies acceptable to authorities having jurisdiction. 1.03 A. B. C. SUBMITTALS Product Data: Submit copies of manufacturer's latest published literature for materials specified herein for approval. Certificates: Submit applicable test certificate conforming to requirements of authorities having jurisdiction on fire rated assemblies as required. Shop Drawings: Shop drawings for work specified herein shall be submitted for approval. Shop drawings shall include construction and system details for partitions including fire, sound rated and shaftwall partitions in large scale detail, including details of control joints. DELIVERY, STORAGE AND HANDLING Deliver materials in original packages, containers or bundles bearing brand name and identification of manufacturer or supplier. Store materials under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic and other causes. Neatly stack gypsum boards flat to prevent sagging. Handle gypsum boards to prevent damage to edges, ends and surfaces. Do not bend or otherwise damage metal corner beads and trim.

1.04 A. B.

C.

1.05 A. B.

PROJECT CONDITIONS Establish and maintain environmental conditions for application and finishing gypsum board to comply with ASTM C840 and with gypsum board manufacturer's recommendations. For non-adhesive attachment of gypsum board to framing, maintain temperature no less than 5 degrees C (40 degrees F). For adhesive attachment and finishing of gypsum board, maintain temperature no less than 10 degrees C (50 degrees F) for 48 hours prior to application and continuously thereafter until adhesive is dry. Ventilate building spaces to remove water not required for drying joint treatment materials. Avoid drafts during dry, hot weather to prevent materials from drying too rapidly.

C.

PART 2 PRODUCTS 2.01 APPROVED MANUFACTURER A. B. C. D. Danogips Kuwait Gypsum Manufacturing Co. National Gypsum Company Knauf Or equally approved

2.02 MATERIALS/MANUFACTURER A. Manufacturer: Obtain gypsum boards, trim accessories, adhesives and joint treatment products from a single manufacturer or from manufacturer's recommended by the prime manufacturer of gypsum boards.
09260-2 11 March 2013

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B.

Gypsum Board: Shall be tapered edge type, conforming to ASTM C36 Type Regular, and shall be "Sheetrock Regular" by United States Gypsum Co., National Gypsum Co., Georgia-Pacific Corp., Genstar Gypsum Products Co. or approved equal. Fire Retardant Gypsum Board: Shall be tapered edge type conforming to ASTM C36 Type X, and shall be "Sheetrock Firecode C" by United States Gypsum Co., National Gypsum Co., Georgia-Pacific Corp., Genstar Gypsum Products Co. or approved equal. Water-Resistant Gypsum Board: Shall be tapered edge type conforming to ASTM C630 and be "Sheetrock W/R" by United States Gypsum Co., National Gypsum Co., Georgia-Pacific Corp., Genstar Gypsum Products Co. or approved equal. Sound Attenuation Blankets: Shall conform to Federal Specifications HH-I-521f, Type I, Class A and ASTM C665. Blankets shall be "Thermafiber" Sound Attenuation Fire Blankets by United States Gypsum Co. or approved equal. X-ray Shielding Gypsum Board Wall and Ceiling: Shall be in accordance with the recommendation of the specialist manufacturer in respect to MOH regulations (Ref: A7.950). Suspension System for Gypsum Board Ceilings: Shall be in accordance with the recommendations of the approved gypsum board manufacturer and shall conform to building code requirements. Ceiling hangers shall be 4mm galvanized threaded rad attached to building construction above as required by building code. Runner Channels shall be cold-rolled, 38 mm or 19 mm (1 or inch), 16 gauge, prime painted or galvanized, and shall be "USG Cold-Rolled Channels" by United States Gypsum Co., National Gypsum Co., Inc., Marino Ind., Corp. or approved equal. Furring Channels shall be roll-formed, 22.2 mm (7/8 inch), 25 gauge galvanized steel designed for screw attachment and shall be "USG Metal Furring Channels" by United States Gypsum Co., National Gypsum Co., Incor Inc., Marino Ind., Corp. or approved equal. Furring Brackets: Shall be "USG Adjustable Wall Furring Brackets" by United States Gypsum Co., National Gypsum Co., Incor Inc., Marino Ind., Corp. or approved equal. Water-Resistant Compound (Sealant): Type recommended by gypsum board manufacturer for sealing raw cut edges, holes, joints and nailheads in water-resistant gypsum board. Acoustical Purpose Sealant: Shall be nonstaining, modified curing, "USG Acoustical Sealant" by United States Gypsum Co., "Acoustical Sealant" by Tremco Co. or approved equal. Joint Reinforcing Fiber Tape, Adhesive and Laminating Materials: Shall conform to the "Standard Methods of Testing Joint Treatment Materials for Gypsum Board Construction", ASTM C474, and "Standard Specification for Joint Materials for Gypsum Board Construction", ASTM C475, and shall be of type recommended and manufactured by approved gypsum board manufacturer. Adhesive for laminating gypsum board to concrete or masonry shall be "USG Durabond Joint Compound" by United States Gypsum Co., National Gypsum Co. or Georgia-Pacific Corp. or approved equal. Reinforcement Plates for support of items furnished under other sections shall be minimum 20 gauge, 150 mm (6 inches) wide by full length of supported item composed of galvanized steel complying with ASTM 366. Neoprene Pad: Moisture resistant insulating material, 6.4 mm (1/4 inch) thick sponge type, closed cell neoprene, durometer A of 40. Accessories: Clips, splices and other accessories required to complete the work, including 14 gauge anchor
09260-3 11 March 2013

B.

D.

E.

F. F. 1. 2.

3.

G. H. I. J.

K. L. M. N.

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

plates, angles or channels to secure partition head to structural members. PART 3 EXECUTION 3.01 3.02 A. B. A. EXAMINATION Examine conditions at the job site where work of this section is to be performed to insure proper arrangement and fit of the work. Start of work implies acceptance of job site conditions. PREPARATION Examine the Contract Drawings and Specifications in order to ensure the completeness of the work required under this Section. Verify measurements and dimensions at the job site and cooperate in the coordination and scheduling of the work of this Section with the work of related trades, with particular attention given to the installation of items installed in gypsum board, so as not to delay job progress. INSTALLATION/APPLICATION/ERECTION A. Install gypsum board, ceilings and other items as indicated on drawings and specified herein, and in accordance with applicable provisions of Codes, regulations and Industry Standards, referred to herein including Gypsum Association GA-201 and 216. Provide fire retardant gypsum board in locations where gypsum board is indicated on the drawings, which require fire resistive or fireproof construction. Fire retardant gypsum board shall be installed in accordance with the requirements of the National Fire Protective Association and in accordance with the testing procedures and listing of the Underwriters' Laboratories, Inc. Do not apply gypsum board construction over mechanical or electrical work which requires inspection and approval, until such inspection has been made and the work approved by the proper authority and the Engineer. Insure that insulation, if required, has been completed to walls, pipes and other items. Neglect of this instruction will nullify any claims for extra payment for removal and replacement of construction to determine if such work, when intended to pass through and finish flush with finished face of board, has been properly aligned to receive the board. Allowable Tolerances: 1.6 mm (1/16 inch) offsets between planes of board faces, and 6.4 mm in 2400 mm (1/4 inch in 8 feet) for plumb, level and bow. Finished work shall be rigid, secure, square, level and plumb with allowance for thermal movement. Permissible Deflections: Provide bracing in wall construction, reduce stud spacing or increase metal thickness as necessary to avoid exceeding the following: Paint, Wall-covering or Unfinished L/240 Partitions, walls and ceilings shall be erected in such a manner as to avoid damage due to racking deformation, including the separation of face and base layers, liner panels, peeling, blistering, other effects and the binding of doors in frames. Install back to back trim beads or control joints as required to allow building movements due to live and dead load or winds, to prevent cracking of gypsum board. Maintain necessary clearances of board from edge channels. Construct gypsum board fire separations and enclosures according to the requirements of the Building Code. Provide accessories and hardware so that the necessary resistances are achieved. Continue gypsum board construction in fire and sound rated separations through the ceiling to the underside of the structure above, except where otherwise indicated on the drawings. Furred Ceilings, and Suspended Ceilings

3.03

B.

C.

D. E. 1. a. F.

G. H. I.

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09260-4 11 March 2013

1. 2.

Hangers: Use the adjustable rod hangers, It Shall be spaced a maximum of 1200 mm (4 feet) on center. Attach to channels spaced on maximum 1200 mm (4 feet) centers. Attach furring channels to channel runners at 400 mm (16 inches) on center at right angles to runners and securely wire tied to place. Provide end splices by nesting channels no less than 200 mm (8 inches) and securely wire tied to each other. Furring at concrete ceiling shall be done with furring channels placed at maximum 600 mm (24 inch) centers or as detailed and securely fastened. Gypsum Board : Carefully cut gypsum boards to the required sizes with cut edges and ends of the board sandpapered to obtain neat jointing. Apply gypsum board with the reverse side against the framing members. Separate boards shall be in moderate contact. In no cases shall the boards be forced into place. At interior and exterior corners, the cut edges of the boards shall be concealed by overlapping them with the abutting boards. Stagger gypsum board so that the corners of any four boards will not meet at the same point. Vertical joints shall not occur on the same stud on both sides of a partition. Apply gypsum board with the long dimension at right angles to the steel stud framing members. Use horizontal application unless vertical application results in fewer joints. Apply to full height of wall. Terminate gypsum board 75 mm (3 inches) above finish ceiling except where partition framing terminates at finish ceiling or where gypsum board is required to underside of slab. Screw boards to furring members as recommended by manufacturers. Seal joints with joint fiber tape and cover with joint compound as specified herein. Drive in screws slightly below the surface of the board, taking care not to crush the core of the board or the surface of the paper, with screw heads forming a slight depression below the surface of the gypsum board. Gypsum board adjacent to the point of fastening will be held tightly against the framing members while driving screws. Use of screws to draw the gypsum board against the framing members will not be acceptable. Shaftwall gypsum board enclosures shall be installed where indicated on drawings, and in strict conformance with manufacturer's printed instructions, to provide required fire rating and air resistance requirements. Provide accessories as required for installation. Multiple Layers: Where multiple layers are indicated on drawings, apply laminating adhesive to back of face layers and laminate in place using moderate pressure to insure adequate bond. Offset joints of each layer and secure with Type "G" screws spaced along vertical third points and at horizontal center of face layer. Lamination of Gypsum Board to Concrete and Masonry : Where indicated on drawings, gypsum board may be laminated to concrete or masonry where no insulation and furring is required. Concrete and masonry surfaces shall be clean, smooth, dry and free of foreign matter. Fill pockets or holes greater than 100 mm (4 inches) in diameter and 3.2 mm (1/8 inch) deep with laminating material (joint compound) and allow to dry prior to laminating. Grind smooth rough surfaces or protrusions before beginning laminating work. Cut gypsum board face panels to the proper size for the full floor-to-ceiling dimension, allowing a continuous clearance 3.2 mm to 6.4 mm (1/8 inch to 1/4 inch) at the floor. Smooth monolithic concrete walls and columns - beads of joint compound 9.6 mm (3/8 inch) high by 8 mm (5/16 inch) wide 75 mm to 100 mm (3 to 4 inches) on center, running parallel to long dimension of board with
09260-5 11 March 2013

3. J. 1. 2.

3. 4. 5. 6.

7. 8.

9. a. b. c.

d. e.

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

the two outside beads 50 mm (2 inches) from the edge. f. Position face panels vertically to provide a tight fit at abutting long edges. If panel is in contact with floor at any point, cut back panel to provide 3.2 mm (1/8 inch) minimum clearance. Use moderate pressure to develop full adhesive contact with concrete or masonry surfaces. Care should be taken to avoid unnecessary impact on board after placement. Provide bracing of face panels until the joint compound dries industry standards. (minimum 48 hours) in accordance with

g. K.

Install accessories, including access doors and frames furnished under other Contracts, where required and indicated on the drawings. Control Joints: Install control joints where indicated in accordance with manufacturer's and industry's standards. Sound Isolation : Apply acoustical sealant specified herein where partitions maintain sound attenuation blankets and where indicated on the drawings. Apply minimum 6.4 mm (1/4 inch) bead of sealant to floor against runners, ceiling tracks against dissimilar construction and vertical contact surfaces. Butter the backs of electrical boxes and seal perimeter with acoustical sealant. Use and apply sealant in strict conformance with manufacturer's instructions. Install sound attenuation blankets in stud cavities of partitions indicated on drawings, butting ends of blankets closely together and filling voids. Allow air space between backs of blankets and back of opposite face layer. Attach insulation to ceiling track and in accordance with manufacturer's and industry's standards. Joints, Corners, Screw Depressions : Comply with applicable requirements of GA-201 and GA-216 by the Gypsum Association, except where more detailed or more stringent requirements are indicated including the recommendations of the manufacturer. Joints: First Step: Joint cement, mixed as directed by the manufacturer's printed instructions shall be forced into the joints of the boards with a scraping knife. The channels shall be filled evenly, using moderate pressure on the knife. Reinforcing fiber tape shall be applied over the full length of the joint. The fiber tape shall be embedded in the cement, using moderate pressure on the knife. Excess cement shall be removed, after which the fiber tape shall be given a thin coating of cement. Vertical end joints shall be filled with the cement and fiber tape in a similar manner. The cement shall be sanded only as may be necessary. Second Step: A second coating of joint cement shall be applied to the joints. The coating shall be feathered out as far as may be necessary to obtain a smooth surface. Third Step: After the second coating has dried, a very thin coating shall be applied and again feathered on the left as smooth as possible. If necessary, the joints shall be sanded lightly with 2/0 sandpaper to leave a smooth, flush surface. Care shall be taken not to scuff the paper surface of the gypsum board when sandpapering the cement. Screws: Boards shall fit tightly against the supporting framework screw depressions shall be concealed. The depressions shall be filled with 3 coats of joint cement and each coat shall be allowed to dry before the suc09260-6 11 March 2013

L. M. 1. a. b. c. 2.

N. 1. 2. a.

b. c.

3.

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

ceeding coat or treatment is applied. Where necessary, the last coat shall be sanded with 2/0 sandpaper so as to leave a smooth finish flush with the paper face of the gypsum board. 4. a. b. Corner and Edge Treatment Internal corners shall be treated in the manner specified for joints, except that the reinforcing fiber tape shall be folded lengthwise through the middle and fitted neatly into the corner. External corners shall be one-piece sheet metal treated after application with a joint cement as specified for joints. The corners shall receive a metal corner reinforcement of not lighter than 26 gauge rolled sheet steel channel-shaped molding, engaged over the ends or edges of the gypsum board, true to line. CLEANING, PROTECTION AND PATCHING A. Be responsible for cutting and patching of defects appearing in the gypsum board work, after the work of other trades has been completed, regardless of how, or by whom, the damage was caused. Patching shall be neatly and properly made to match the original work. Portions of the work damaged beyond repair shall be removed and replaced with new material at no additional cost to the Engineer. Clean and repair surfaces soiled or damaged in connection with the work of this Section to the approval of the Engineer. Pay the cost of replacing finishes or materials that cannot be satisfactorily cleaned. Upon completion of the work, remove debris, equipment and excess material resulting from the work of this Section from the site. Protect completed work from damage through construction period. EXTRA MATERIAL : Provide 2% extra material.

3.04

B. C. D. 3.05

END OF SECTION

GYPSUM BOARD SYSTEM Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09260-7 11 March 2013

SECTION 09271 GLASS-REINFORCED GYPSUM FABRICATIONS PART 1 - GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. B. This Section includes factory-molded, glass-reinforced gypsum (GRG) fabrications for interior applications. Related Sections include the following: 1. 2. Division 6 Section "Rough Carpentry" for blocking, nailers, shims, and carpentry supporting GRG fabrications. Division 9 Section " Gypsum Board Assemblies" for steel framing, blocking, and bracing supporting GRG fabrications.

1.2

1.3 A. B. C.

SUBMITTALS Product Data: For each type of product indicated. Include construction details, material descriptions, weights, dimensions of individual components and profiles, and finishes. Shop Drawings: Show profiles, thicknesses, embedded supports, and anchorage details for fabrications. Indicate requirements for joint treatment, clearances, and attachment to supports. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved: 1. 2. 3. D. Ceiling suspension assembly members. Method of attaching hangers to GRG fabrications and to building structure. Ceiling-mounted items including lighting fixtures, diffusers, grilles, speakers, sprinklers, access panels, and moldings.

Samples: For each exposed product in each profile and size required, and as follows: 1. Linear Moldings: 610-mm- long section with finished joint. Show complete pattern.

1.4 A.

QUALITY ASSURANCE Mockups: Build mockups to set quality standard for fabrication and installation. 1. 2. 3. Build mockups of each type of GRG fabrication. Paint mockups to match final decoration scheduled or indicated and to comply with requirements specified in other Division 9 Sections. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
09271-1 11 March 2013

GLASS-REINFORCED GYPSUM FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.5 A. 1.6 A.

DELIVERY, STORAGE, AND HANDLING Comply with ASTM C 1467/C 1467M. PROJECT CONDITIONS Environmental Conditions: 1. 2. Comply with requirements in ASTM C 1467/C 1467M. Do not deliver or install GRG fabrications until building is enclosed, wet work is complete, and HVAC system is operating and continuously maintaining temperature and relative humidity at levels intended for building occupants.

B.

Conditioning: Acclimatize GRG fabrications to ambient temperature and humidity of spaces in which they will be installed. Remove packaging and move units into installation spaces not less than 48 hours before installing them. Field Measurements: Where GRG fabrications are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work. COORDINATION

C.

1.7 A.

Coordinate layout and installation of GRG fabrications with support components specified in other Sections.

PART 2 - PRODUCTS 2.1 A. B. GRG FABRICATIONS Fabrications: Molded 25mm thick, glass-fiber-reinforced gypsum units complying with ASTM C 1381. Embedments: As standard with GRG fabrication manufacturer and as required for reinforcement and for anchorage to substrates and framing. AUXILIARY MATERIALS A. Steel Drill Screws: Of sufficient length and size to securely fasten GRG fabrications to framing members, and as follows: 1. 2. B. 2.3 Screws complying with ASTM C 1002 for fastening GRG fabrications to steel members less than 0.84 mm thick. Screws complying with ASTM C 954 for fastening GRG fabrications to steel members from 0.84 to 2.84 mm thick.

2.2

Joint-Treatment Materials: ASTM C 475/C 475M. FABRICATION

GLASS-REINFORCED GYPSUM FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09271-2 11 March 2013

A.

Fabricate GRG units to comply with ASTM C 1381, with smooth-finished surfaces; repair hollows, voids, scratches, and other surface imperfections. Fabricate units in lengths and sizes that will minimize number of joints between abutting units. Embedments: Incorporate embedments into units to develop the full strength of GRG fabrications. Cover embedments with not less than 5-mm thickness of GRG composite. Connection Hardware: Designed and fabricated to support and connect GRG fabrications to hangers, support framing, and substrates.

B. C.

PART 3 - EXECUTION 3.1 A. EXAMINATION Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work. 1. 3.2 A. B. C. Proceed with installation only after unsatisfactory conditions have been corrected.

GRG INSTALLATION Comply with requirements in ASTM C 1467/C 1467M. Install GRG fabrications level, plumb, true, and aligned with adjacent materials. Use concealed shims where required for alignment. Attach GRG fabrications to framing and substrates with steel drill screws, unless otherwise indicated. Do not use pneumatic staple guns. Countersink screw heads below adjoining finished surface. 1. 2. D. Predrill fastener holes in units. Clean fastener holes to remove dirt and oil. Locate fasteners not less than 7.9 mm from edges or ends of units.

Use joint-treatment materials to finish GRG fabrications to produce surfaces ready to receive primers and paint finishes specified in other Division 9 Sections. 1. 2. Finish joints between units, other than control joints, and countersunk fastener heads to comply with ASTM C 840 for Level 4 and to match surface texture of units. Repair hollows, voids, scratches, and other surface imperfections on units. END OF SECTION

GLASS-REINFORCED GYPSUM FABRICATIONS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09271-3 11 March 2013

SECTION 09310 CERAMIC TILE PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide ceramic tile in accordance with the Contract Documents. Related Work Specified Elsewhere 1. 1.02 Scratch coat for wall tile.

QUALITY ASSURANCE A. Single-Source Responsibility for Tile: Obtain each color, grade, finish, type, composition, and variety of tile from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. Single-Source Responsibility for Setting and Grouting Materials: Obtain ingredients of a uniform quality from one manufacturer for each cementitious and admixture component and from one source or producer for each aggregate. Single-Source Responsibility for Waterproofing Materials: Obtain waterproofing materials and associated accessories from one manufacturer for each type waterproofing system. Installer Qualifications: Engage an experienced Installer who has successfully completed tile installations similar in material, design, and extent to that indicated for Project.

B.

C. D. 1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. 3. B. TCA "Handbook for Ceramic Tile Installation". ANSI A137.1 "Standard Specifications for Ceramic Tile." ANSI A108/A118/A136 "Standard Specifications for the Installation of Ceramic Tile."

Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

1.04

SUBMITTALS A. Shop Drawings: Provide shop drawings for the following: 1. 2. B. Tile patterns and locations. Widths, details, and locations of expansion, contraction, control, and isolation joints in tile substrates and finished tile surfaces.

Samples: Submit samples of each type, class, color and tile patten, not less than I meter square on plywood backing, and grouted as required. Sample submittal and Engineer's acceptance shall be for color, pattern and texture only. Compliance with all other requirements is the responsibility of the Contractor. Product Data: Submit manufacturer's technical information, specifications and installation instructions for each material required. Certification 1. Submit a Certificate of Compliance to ANSI A137.1 prior to submission of samples for review.
09310-1 11 March 2013

C. D.

CERAMIC TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.

Furnish a "Master Grade Certificate" in the form approved in ANSI 137.1 for each type of tile, signed by the manufacturer, certifying to the grade, type and quantity of tile, together with satisfactory information for identification of the containers to which they apply. These certificates shall be supplied promptly after material has been shipped from the factory. Submit certification from the manufacturers of dry-set mortar and grouts that their products conform to the appropriate ANSI "Materials" specifications.

3. E.

Substrate Acceptability: Submit a certified statement issued by the manufacturers of tile setting materials and countersigned by the tile installer, attesting that all areas and surfaces designated to receive ceramic tiles have been inspected and found satisfactory for the reception of the tile, and are not in conflict with the referenced standards requirements. Application of tile will be construed as acceptance of surfaces.

1.05

MOCK-UP(S) A. Following approval of each tile, tile type ( including custom made tile mosaics) and colored grout sample(s), construct a visual mock-up of each tile system in minimum 3m x 3m panels unless otherwise indicated, consisting of specified tile placed on setting bed to simulate final condition, tile pattern, corner conditions and grouting. Alter or revise mock-up(s) as directed, to the complete satisfaction of the Engineer, at which time they shall remain as the standard of workmanship for the Project. Mock-up(s), if approved, may be utilized in the final work.

1.06

PRODUCT HANDLING A. Deliver materials, other than bulk materials, in manufacturer's unopened containers fully identified with grade labels as specified in TCA 137.1, and with name, brand, type, class, size, color and pattern. Store all materials above grade and protect from weather and damage from any source. Store in accordance with manufacturer's instructions. Prevent damage or contamination to materials by water, freezing, foreign matter, and other causes. Handle tile with temporary protective coating on exposed surfaces to prevent coated surfaces from contacting backs or edges of other units. If despite these precautions coating does contact bonding surfaces of tile, remove coating from bonding surfaces before setting tile. Material Safety Data Sheets: Submit Material Safety Data Sheets with products delivered to job-site.

B. C.

D. 1.07

PROJECT CONDITIONS A. B. C. Maintain project conditions and protect the Work during and after installation as required to comply with referenced standards, manufacturer's written recommendations and instructions. Vent temporary heaters to exterior to prevent damage to tile work from carbon dioxide buildup. Maintain temperatures at 50 deg. F. or more in tiled areas during installation and for 7 days after completion, unless higher temperatures and/or longer cure times are required by referenced installation standard or manufacturer's instructions.

1.08

EXTRA STOCK A. Furnish to the Owner, at the job-site, a quantity of tile, grout and trim units equal to 2 percent of amount installed, but not less than one unopened box, for each type, composition, color, pattern and size properly packaged and identified with labels clearly describing contents.

CERAMIC TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09310-2 11 March 2013

PART 2 - PRODUCTS 2.01 MATERIALS A. Tile Products 1. RAK Ceramics, UAE (Local Supplier: Asian Building Material Group) 2. CINCA, USA 3. Or equal approved by the consultant

2.02

MORTARS AND GROUTS A. Basic Setting Materials 1. Portland Cement: ASTM C150, Type I; white where required to match Engineer's sample. 2. Hydrated Lime: ASTM C206, Type S, or ASTM C207, Type S. 3. Sand: ASTM C144. LatexBPortland Cement ThinBSet Mortar: ANSI A118.4, liquid acrylic or SBR resin type latexBmodified cement mortar for thinBset application. Factory proportioned cement, sand and polymer additives in dry blend to be mixed with water. Provide one of the following: 1. 2. 3. 4. C. "PremiumPlus Thin Set Mortar" with "CustomFlex Ultra Strength Thin Set Additive" (Custom Building Products). "Laticrete 211 Crete Filler Powder" with "Laticrete 4237 ThinBSet Mortar Additive" (Laticrete International, Inc. ). "Kerabond Mortar" with "Keralastic Additive" with (Mapei). "TAB380/381 Flu Set Plus Premium" with "TA-867 Full Bond Additive"(TEC Incorporated).

B.

Organic Tile Adhesive: ANSI A136.1, Type 1, waterBresistant latex emulsion. Provide one of the following: 1. "Hydroment 7001 Tile Mastic" (Bostik). 2. "AcrylPro Ceramic Tile Mastic" (Custom Building Products). 3. "Laticrete 15 MultiBMastic Adhesive" (Laticrete International, Inc. ). 4. "Ultra Mastic 1" (Mapei). 5. "TAB122 Double Duty Adhesive" (TEC Incorporated). 6. Kara bound. Italy LatexBPortland Cement Sanded Grout for Unglazed Tile: ANSI A118.6,polymerBmodified cement grout suitable for nonBabsorptive tile. Factory proportioned cement, sand, liquid polymer additives and alkali resistant nonBfading mineral pigments in dry blend to be mixed with water. Grout color as selected by Engineer. Provide one of the following: 1. 2. 3. 4. "Hydroment Ceramic Tile Grout (sanded)" with "Acrylic Latex Admixture 425" (Bostik). "Classic Blend Colored Grout (sanded) with "Acrylic Mortar Admixture" (Custom Building Products). "Laticrete 500 Series Sanded Grout" with "Laticrete 1776 Admixture" (Laticrete International, Inc. ). "TAB650 AccuColor Premium Sanded Grout" with "TA-869 Acrylic Grout Additive"(TEC Incorporated).

D.

E.

LatexBPortland Cement Unsanded Grout for Glazed Tile: ANSI A118.6, polymerBmodified cement grout for use with non-absorptive ans vitreous type tile. Factory proportioned cement, liquid polymer additives and alkali resistant nonBfading mineral pigments in dry blend to be mixed with water. Grout color as selected by Engineer. Provide one of the following: 1. 2. 3. 4. "Hydroment Ceramic Tile Grout (unsanded)" with "Acrylic Latex Admixture 425" (Bostik). "Laticrete 600 Series Unsanded Grout" with "Laticrete 1776 Admixture" (Laticrete International, Inc. ). "Keracolor Wall" with Plastijoints Admixture" (Mapei). "TAB620 AccuColor Unsanded Grout" with "TA-869 Acrylic Grout Additive"(TEC Incorporated).
09310-3 11 March 2013

CERAMIC TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.03

AUXILIARY MATERIALS A. Stone Thresholds 1. Marble Saddles: Fabricate from highest grade Madre Cream Alabama or Georgia White marble, having an minimum abrasion hardness (Ha) of 10.0 when tested in accordance with ASTM C241, thickness as shown with chamfered corners and eased edges, cut from sound stock, uniform in color, free from cracks, and spalled edges. Honed finish on exposed surfaces.

B.

Miscellaneous Materials 1. 2. Water: Clear, potable, and without deleterious substances which would impair the work. Pigments: Pure mineral pigments, resistant to alkalies, non-fading and weatherproof, colors as required to match Engineer's sample.

C.

Waterproofing Materials 1. Polyethylene Sheet Membrane Waterproofing: Manufacturer's standard proprietary product complying with ANSI A118.10 and consisting of composite sheets, 60 inches wide by a nominal thickness of 0.030 in. minimum, composed of an inner layer of chlorinated polyethylene (CPE) sheet faced on both sides with laminated high-strength nonwoven polyester material. Provide preformed outside and inside corners, pipe protrusion collars, cap strips, seaming adhesive and other accessories as required for a complete waterproof installation. Provide one of the following: a. "NobleSeal TS" (The Noble Co.). b. "NobleSeal TS" (American Olean). c. "Dal-Seal TS" (Dal-Tile).

2.04

TILE SCHEDULE Type of tiles, as indicated in the finishes drawings/schedule.

2.05

MANUFACTURER AND LOCAL SUPPLIER All ceramic brands, manufacturer and local distributor to be proposed by contractor and accepted by client and consultants representative A. B. C. D. RAK Ceramics Asian Building Material Group Hassan Abul, Kuwait Al Shaya, Kuwait

PART 3 - EXECUTION 3.01 PRE-INSTALLATION MEETING A. Prior to the installation of tile, and at the Contractor's direction, meet at the project site to review the material selections, substrate preparations, installation procedures, coordination with other trades, special details and conditions, standard of workmanship, and other pertinent topics related to the Work. The meeting shall include the Engineer, the Contractor, ceramic tile installer, ceramic tile and setting material manufacturer's representatives, and representatives of other trades or subcontractors affected by the installation. Examine sample installations which have been prepared and determine and record whether everyone present is in agreement that the proposed installations are likely to perform as required.

3.02

CONDITION OF SURFACES A. Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected. Verify that substrates for setting tile are firm, dry, clean, and free from oil laitance, waxy films and curing compounds. Confirm that

CERAMIC TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09310-4 11 March 2013

installation of grounds, anchors, recessed frames, electrical, plumbing and mechanical elements, and similar items located in or behind tile has been completed prior to beginning the Work. B. Allowable Variations in Substrate Levels 1. C. 3.03 Thin-Set Work: Same as allowable variations in finished work.

Grind or fill concrete, masonry and plaster substrates as required to comply with allowable variations.

PREPARATION A. Mechanically scarify concrete substrate by sandblasting, grinding or a portable shot blast cleaning system as may be required to provide a proper surface or to remove curing compounds or other surface contaminants that would interfere with proper bond of mortar, waterproofing membrane, or adhesive for tile. Seal substrate with sealer if and as recommended by manufacturer of mortar or adhesive. Blending: For tile exhibiting color variations within the ranges selected during sample submittals, verify that tile has been blended in factory and packaged accordingly so that tile units taken from one package show the same range in colors as those taken from other packages and match approved samples. If not factory blended, either return to manufacturer or blend tiles at Project site before installing.

B. C.

3.04

INSTALLATION A. B. Unless otherwise shown or specified comply with the referenced standards and the manufacturer's instructions. Mix mortars and grouts to comply with requirements of referenced standards and manufacturers including those for accurate proportioning of materials, water, or additive content; type of mixing equipment, selection of mixer speeds, mixing containers, mixing time, and other procedures needed to produce mortars and grouts of uniform quality with optimum performance characteristics for application indicated. Allowable Variations in Finished Work: Do not exceed the following deviations from level and plumb, and from elevations, locations, slopes and alignments shown: 1. 2. 3. D. Floors: 1/8 in. in 10 ft. run, any direction; +/- 1/8 in. at any location; 1/32 in. offset at any location. Walls: 1/8 in. in 8 ft. run, any direction; +/- 1/8 in. at any location; 1/32 in. offset at any location. Joints: +/- 1/32 in. joint width variation at any location; 1/16 in. in 3 ft. run for deviation from plumb and true, and for other variations in alignment of joints.

C.

Lay out tile work in pattern shown using field tile and trim shapes as shown or required. Center tile fields both directions in each space or on each wall area and adjust to minimize tile cutting. Use uniform joint widths of 1/16 in. for ceramic tile and 3 in. for quarry tile unless otherwise shown. Align joints when adjoining tiles on floor, base, walls, and trim are same size. Adjust to minimize tile cutting. Cut field tile, not trim shapes, unless otherwise shown. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures and other penetrations so that plates, collars or covers overlap tile. For tile mounted in sheets, make joints between tile sheets same width as joints within tile sheets so that extent of each sheet is not apparent in finished work. Extend tile work into recesses and under equipment and fixtures in the spaces shown or scheduled to receive tile. Form a complete covering without interruptions except for control and expansion joints as shown and as required to comply with requirements. Terminate work neatly at obstructions, edges and corners without disruption of pattern or joint alignments. Sheet Membrane Waterproofing Installation: In areas shown, install sheet membrane waterproofing as per recommendations and written instructions of the manufacturer. Bond to substrates with full bed of adhesive. Position seams so that water would flow over and not against laps in direction toward drains. Turn up sheet membrane waterproofing onto vertical surfaces so that top edge of membrane is not less than 6 in. above the completed tile floor surface and neatly fasten. Seal all corners and seams, penetrations of pipes,
09310-5 11 March 2013

E.

F.

CERAMIC TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

conduits, fixtures and drains watertight in accordance with manufacturers written instruction using recommended materials. G. H. Install reinforcement in all horizontal mortar setting beds over membrane waterproofing. Dry-Set Installation: Except for installations directly on wood or metal substrate, use factory pre-mixed dryset mortar with latex additive for dry-set tile work, unless otherwise shown. Install dry-set system over waterproofing membrane in accordance with membrane manufacturer's written instructions and recommendations. Comply with TCA Method F122 and ANSI A108.5 for installation of tile. Adhesive Installation: Use organic tile adhesive for setting tile on gypsum wallboard and elsewhere as shown. Comply with TCA Methods W223 or W242 and ANSI A108.4 for installation of tile. Grout: Unless otherwise shown use factory pre-mixed grout with latex additive specified for non-vitreous body tile, porcelain body tile and for quarry tile. Comply with the following for grouting: ANSI 108.10. Slip-Resistant Tile Installation: Use slip- resistant tile in areas shown as "Slip-Resistant". Install as specified for normal ceramic tile or quarry tile of the same type and class. Control and Expansion Joints: TCA Method EJ171. Where shown as "Control Joint" or "Expansion Joint", and also where required by ANSI Standard for proper workmanship, install removable divider strips of the width shown or of the proper width. Provide strips of same depth as the work, including setting bed. Remove strips after grouting tile and properly curing the work. Install joint fillers and sealants, in control and expansion joints of type as recommended by manufacturer of tile. Marble Saddles: Install in one piece, fit neatly to door jambs and set in same type of setting bed as abutting field tile unless otherwise indicated. Set thresholds in latex-Portland cement mortar for locations where mortar bed would otherwise be exposed above adjacent non-tile floor finish. Comply with TCA Method TH611.

I. J. K. L.

M.

3.05

CLEANING A. In addition to the initial cleaning procedure required, and not more than 2 days before occupancy or preliminary acceptance by the Owner, clean ceramic tile work as recommended by the tile manufacturer and TCA. Protect tile-work during the construction period so that it will be without any indication of use or damage at the time of acceptance.

B.

END OF SECTION

CERAMIC TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09310-6 11 March 2013

SECTION 09410 PRECAST TERRAZZO TILES PART 1 - GENERAL 1.01 SUMMARY A. B. Section includes Precast terrazzo floor; Precast terrazzo skirting tiles at roof etc. Related Sections: 1. Section 03300 - Cast-In-Place Concrete: Concrete subfloor with finish. 2. Section 07905 Interior Sealants: Joint between terrazzo base and wall surface. 3. Section 05810 - Expansion Joint Assemblies: Product requirements for building control and expansion joint devices installed under this section.

1.02

REFERENCES A. B. C. D. E. F. G. H. ASTM A185 - Steel Welded Wire Fabric, Plain, for Concrete Reinforcement. ASTM C33 - Concrete Aggregates. ASTM C144 Sand Cement Mortar. ASTM C150 - Portland Cement. ASTM C309 - Liquid Membrane-Forming Compounds for Curing Concrete. ASTM D2103 - Polyethylene Film and Sheeting. NTMA TIG (The National Terrazzo and Mosaic Association, Inc.) - Terrazzo Information Guide. TCA (Tile Council of American)- Handbook for Tile Installation.

1.03

SUBMITTALS A. B. C. D. Section 01330 - Submittal Procedures: Submittal procedures. Shop Drawings: Indicate divider strip layout, control joint and expansion joint layout,flooring material transitions, color patterns, and details of adjacent components. Product Data: Submit data for reinforcing, divider strips, control joint strips, non-slip inserts sealer and terrazzo precast tile. Samples: Submit two samples of each terrazzo tile, Precast base, tread and riser and skirting 150 x 150 mm in size illustrating color, chip size and variation, chip gradation, mortar color, and typical divider strip.

1.04

CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: Submit procedures for stain removal, stripping, and sealing.

1.05

QUALITY ASSURANCE A. B. Perform Work in accordance with NTMA recommendations contained in "Terrazzo Information Guide." Maintain one copy of document on site.

1.06

QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum ten years documented experience.
09410-1 11 March 2013

PRECAST TERRAZZO TILES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

B. 1.07

Installer: Company specializing in performing Work of this section with minimum five years documented experience.

MOCKUP A. B. C. Construct mockup, 1 x 1 m, including terrazzo flooring and base illustrating appearance of finished work. Locate where directed by Engineer. Remove mockup when directed by Engineer.

1.08

PRE-INSTALLATION MEETING A. Convene minimum one week prior to commencing Work of this section.

1.09

ENVIRONMENTAL REQUIREMENTS A. B. Do not install terrazzo when temperature is below 10 degrees C or above 32 degrees C. Maintain temperature within specified range 24 hours before, during, and 72 hours after installation of terrazzo.

1.10

COORDINATION A. Coordinate placement of terrazzo divider strips with location of mechanical and electrical access covers and other items built in to terrazzo.

1.11

EXTRA MATERIALS A. Supply 2% of each type, color, pattern and size of precast terrazzo product installed properly packaged and labelled

PART 2 - PRODUCTS 2.01 MATERIALS A. Manufacturers: 1. Al-Duaij. 2. Dashti Sons Group. 3. Emirates Industries. 4. Quiligotti & Co. Ltd. 5. National industries.

2.02

COMPONENTS A. B. C. D. E. F. Portland Cement: ASTM C150, Type 1 Normal; white color for topping mix; gray color for underbed; modified to NTMA higher compressive strength requirements; obtained from single source. Color Pigments For Topping: Non-fading mineral type, alkali-resistant. Terrazzo Sand: ASTM C33, fine aggregates Sharp, coarse, clean, screened, and free of deleterious material. Cushion Sand: ASTM C33 Clean and free of deleterious material. Water: Potable. Surface Aggregate: Crushed marble, chips size in accordance with NTMA chip size for standard gradation and uniform coloration.
09410-2 11 March 2013

PRECAST TERRAZZO TILES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.03

ACCESSORIES A. B. C. D. E. F. G. H. I. J. K. Underbed Reinforcing Mesh: Galvanized weld wire fabric to comply with ASTM A185; Divider Strips: 3 mm thick brass exposed top strip, zinc coated steel concealed bottom strip, with anchoring features. Control Joint Strips: 3 mm nominal width brass exposed top strips, zinc coated steel concealed bottom strip, 3 mm wide neoprene filler strip between vertical strips, with anchoring features. Strip Height: To suit thickness of terrazzo topping, with allowance for grinding. Base Cap, Base Divider Strip, and Separator Strip: Match divider strips. Foam Filler: Closed cell urethane foam capable of compression to 50 percent of its thickness with full recovery. Slip Sheet: ASTM D2103; 0.15 mm polyethylene sheet. Non-slip Strips: Rough textured surface finish. Curing Compound: Comply with ASTM C309. Cleaniquid type, pH of 7 10. Sealer: Colorless, non-yellowing, penetrating liquid type, pH of 7 -10; not detrimental to terrazzo components.

2.04

MIXES A. B. C. Underbed: One part Portland cement to 4 parts sand by volume. Add water to produce low slump mix. Floor: Comply with mix requirements of NTMA gray Portland cement, with exposed divider and accessory strips. Base and Border: Comply with mix requirements of NTMA white Portland cement, with exposed divider and accessory strips.

PART 3 - EXECUTION 3.01 EXAMINATION A. B. 3.02 Verify substrate surfaces are ready to receive Work. Do not begin terrazzo tile work until concrete substrate has cured 28 days, minimum, and has dried to maximum moisture content of 12 percent.

PREPARATION A. B. C. D. E. Clean substrate of foreign matter. Remove loose or flaking concrete and repair to form sound, solid substrate. Remove surface water and thoroughly brush in neat cement slurry bond coat. Set out so that cut tiles are kept to a minimum Concrete floor irregularities to be corrected.
09410-3 11 March 2013

PRECAST TERRAZZO TILES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.03

F. Tiles to be immersed in clean, potable water before laying. INSTALLATION A. Precast terrazzo tiles. 1. Inspect areas to receive under bed. a. Defects in existing concrete work that affect proper execution of precast terrazzo work. b. Variances beyond allowable tolerances (cracks, deflection, voilds, etc.) Under bed; a. Area to be covered with dry sand not to exceed the required thickness. b. Install cleavage membrane 4mm polyethylene film in accordance with ASTM D 2103 over-lapping all ends and edges minimum of 3 inches. c. Install 50mm x 50mm x 16 gauge welded wire mesh. Overlap at ends and edges a minimum of 2 squares. d. Place under bed in a uniform thickness of 30 mm. e. Underbed elevation to 22mm below finished floor elevation to receive 20mm terrazzo tile. Grouting a. Prepare, mix and apply latex Portland cement grout mix to clean and sound surfaces in accordance with material manufacturers instruction. 1. Tinted grout to utilize an alkali-resistant colour stable pigment. b. Ensure full penetration of entire joint depth and allow surplus on face of all joints. c. Allow grout to cure, normally 24 hours. Initial grind a. Grind floor with 24-40 grit stone or with comparable diamond plates to remove all surplus grout and any unit lippage. b. Inspect floor for pinholes and voids. Machine grout floor before final grind. Finish Grind a. Grind floor with 80-120 grit stone to smooth finish.

2.

3.

4.

5. B. Curing: 1. 2. 3. C.

Begin curing procedures as soon as curing materials can be applied without damaging formed surfaces. Use curing method in accordance with NTMA instructions. Close area to construction traffic, allowing undisturbed curing.

Surface Finishing: 1. 2. 3. 4. 5. 6. 7. Brush apply terrazzo topping mix slurry to topping surface. Finish terrazzo in accordance with NTMA instructions. Produce terrazzo finish surface to match approved mock-up with minimum 70 percent chip exposed. Grind terrazzo surface with power disc machine; successively sequence using coarse to fine grit abrasive, using wet or dry method. Apply grout mix matching matrix color to fill honeycomb exposed during grinding. After grout has sufficiently cured, grind repaired areas using fine grit abrasive. Hand grind base cove, and curb.

3.04

ERECTION TOLERANCES A. B. Maximum Variation from Flat Surface: 3 mm in one m. Maximum Variation from Level (Except Surfaces Sloping to Drain): 3 mm.
09410-4 11 March 2013

PRECAST TERRAZZO TILES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3.05

CLEANING A. B. C. Scrub and clean terrazzo surfaces with cleaner in accordance with NTMA instructions. Let dry. Immediately after terrazzo has dried, apply sealer in accordance with NTMA instructions and let dry. Seal and polish surfaces in accordance with NTMA instructions.

3.06

PROTECTION OF INSTALLED CONSTRUCTION A. B. Protecting installed construction. Do not permit traffic over finished terrazzo surfaces. END OF SECTION

PRECAST TERRAZZO TILES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09410-5 11 March 2013

SECTION 09638 STONE FLOORING PART 1 - GENERAL 1.1 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. Section includes the following applications of dimension stone: 1. B. Interior flooring.

1.2

Related Sections: 1. 2. 3. Division 7 Section "Hot Fluid-Applied Waterproofing" for waterproofing, protection board under stone paving. Division 7 Section "Joint Sealants" for sealing control and expansion joints in stonework with elastomeric sealants. Division 9 Section "Interior Stone Facing" for stone base.

1.3 A.

SUBMITTALS Product Data: 1. 2. B. C. For each variety of stone. Include data on physical properties required by referenced ASTM standards. For stone accessories and other manufactured products.

Shop Drawings: Include plans, sections, details, and attachments to other work. Samples for Verification: 1. 2. For each stone type indicated, in sets of Samples not less than 300 mm square. Include four or more Samples in each set and show the full range of variations in appearance characteristics expected in completed Work. Samples will establish the standard by which stone will be judged. For each color of pointing mortar required.

D. E.

Qualification Data: For qualified fabricator. Maintenance Data: For stone flooring to include in maintenance manuals. Include Product Data for stone-care products used or recommended by Installer and names, addresses, and telephone numbers of local sources for products. QUALITY ASSURANCE

1.4 A. B. C.

Fabricator Qualifications: A qualified fabricator that custom fabricates stone. Installer Qualifications: Stone fabricator. Source Limitations for Stone: Obtain each variety of stone, regardless of finish, from a single quarry, whether specified in this Section or in other Sections of the Specifications, with resources to provide materials of consistent quality in appearance and physical properties.

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09638-1 11 March 2013

1. 2. 3.

For stone types that include same list of varieties and sources, provide same variety from same source for each. Make quarried blocks available for examination by Architect for appearance characteristics. Make stone slabs available for Architect to examine for appearance characteristics. a. b. c. Architect will select aesthetically acceptable slabs and will indicate aesthetically unacceptable portions of slabs. Segregate slabs selected for use on Project and mark backs indicating approval. Mark and photograph aesthetically unacceptable portions of slabs as directed by Architect.

D. E.

Source Limitations for Other Materials: Obtain each type of cementitious material, grout, admixture, stone accessory, and other material from single source. Mockups: Build mockups to demonstrate aesthetic effects and set quality standards for materials and execution. 1. 2. 3. Build mockup of typical interior floor area as shown on Drawings. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.5 A. B. C.

DELIVERY, STORAGE, AND HANDLING Lift stone with wide-belt slings; do not use wire rope or ropes that might cause staining. Move stone, if required, using dollies with cushioned wood supports. Store stone on pallets with nonstaining separators and nonstaining, waterproof covers. Ventilate under covers to prevent condensation. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp. PROJECT CONDITIONS A. Cold-Weather Requirements for Interior Stone Flooring: 1. 2. Do not set stone when air or material temperature is below 10 deg C. Maintain temperature at 10 deg C or above in installation areas during installation and for 7 days after completion unless higher temperatures are required by fabricator's or supplier's instructions.

1.6

PART 2 - PRODUCTS 2.1 A. B. C. 2.2 A. B. C. APPROVED SUPPLIER Salam Al Kuwait Al Jehad International Co. AKL Marble Co. External Stone Flooring Type: As shown in the schedule Ref. A7.950 Finish: As shown in the schedule Ref. A7.950 Color: As shown in the schedule Ref. A7.950
09638-2 11 March 2013

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

D. 2.3 A.

Size: Not less than 2cm thick unless otherwise indicated. MORTAR MATERIALS Portland Cement: ASTM C 150, Type I or II. Provide natural color or white cement as required to produce mortar color indicated. 1. Low-Alkali Cement: Not more than 0.60 percent total alkali when tested according to ASTM C 114.

B. C. D. E.

Hydrated Lime: ASTM C 207, Type S. Portland Cement-Lime Mix: Packaged blend of portland cement complying with ASTM C 150, Type I or III, and hydrated lime complying with ASTM C 207, Type S. Aggregate: ASTM C 144; except for joints narrower than 6 mm and pointing mortar, use aggregate graded with 100 percent passing 1.18-mm sieve. Mortar Pigments: Natural and synthetic iron oxides, compounded for use in mortar mixes. Use pigments with a record of satisfactory performance in mortar and containing no carbon black. 1. Products: Subject to compliance with requirements, provide the following: a. b. c. Bayer, Industrial Chemicals Div.; Bayferrox Iron Oxide Pigments. Davis Colors; True Tone Mortar Colors. Solomon Colors; SGS Mortar Colors.

F.

Latex Additive: Manufacturer's standard acrylic-resin or styrene-butadiene-rubber water emulsion, serving as replacement for part or all of gaging water, of type specifically recommended by latex-additive manufacturer for use with field-mixed portland cement mortar bed, and not containing a retarder. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Carabond or equal approved.

G. 2.4 A. B. C. D.

Water: Potable. ACCESSORIES Temporary Spacers: Resilient plastic, nonstaining to stone, sized to suit joint thickness. Cleavage Membrane: Polyethylene sheeting, ASTM D 4397, 0.1 mm thick; or unperforated asphalt felt, ASTM D 226, Type I (No. 15). Reinforcing Wire: Galvanized, welded, 1.57-mm- diameter wire; 50-by-50-mm mesh; comply with ASTM A 185 and ASTM A 82 except for minimum wire size. Cleaner: Stone cleaner specifically formulated for stone types, finishes, and applications indicated, as recommended by stone producer and, if a sealer is specified, by sealer manufacturer. Do not use cleaning compounds containing acids, caustics, harsh fillers, or abrasives. Floor Sealer: Colorless, slip- and stain-resistant sealer that does not affect color or physical properties of stone surfaces, as recommended by stone producer for application indicated. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: . a. Sealer recommended by the stone supplier.
09638-3 11 March 2013

E.

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2.5 A.

MORTARMIXES Mortar: Comply with referenced standards and with manufacturers' written instructions for mix proportions, mixing equipment, mixer speeds, mixing containers, mixing time, and other procedures needed to produce mortar of uniform quality and with optimum performance characteristics. 1. 2. 3. Do not use admixtures, including pigments, air-entraining agents, accelerators, retarders, water-repellent agents, antifreeze compounds, or other admixtures, unless otherwise indicated. Do not use calcium chloride. Combine mortar materials and thoroughly mix in a mechanical batch mixer unless otherwise indicated. Discard mortar when it has reached initial set. Mixing Pointing Mortar: Thoroughly mix cementitious and aggregate materials together before adding any water. Add only enough water to produce a damp, unworkable mix that will retain its form when pressed into a ball. Maintain mortar in this dampened condition for one to two hours. Add remaining water in small portions until mortar reaches desired consistency. Use mortar within 30 minutes of final mixing; do not retemper or use partially hardened material.

B. C. D.

Portland Cement-Lime Setting Mortar: ASTM C 270, Proportion Specification, Type N. Use amount of water to produce a stiff mixture with a moist surface when bed is ready to receive stone. Mortar-Bed Bond Coat: Mix neat cement and latex additive to a creamy consistency. Pointing Mortar: Comply with requirements indicated above for setting mortar, including type and the following: 1. Pigmented Pointing Mortar: Select and proportion pigments with other ingredients to produce color required. Do not exceed pigment-to-cement ratio of 1:10, by weight.

2.6 A.

STONE FABRICATION Select stone for intended use to prevent fabricated units from containing cracks, seams, and starts that could impair structural integrity or function. 1. B. Repairs that are characteristic of the varieties specified are acceptable provided they do not impair structural integrity or function and are not aesthetically unpleasing, as judged by Architect.

Fabricate stone to comply with requirements indicated and with the following references: 1. 2. For limestone, comply with recommendations in ILI's "Indiana Limestone Handbook." For stone not otherwise indicated, comply with recommendations in MIA's "Dimension Stone - Design Manual."

C.

Cut stone to produce pieces of thickness, size, and shape indicated, including details on Drawings and Shop Drawings. 1. 2. 3. Pattern: As indicated. Stone Edges: As indicated. Joint Width: As indicated.

D.

Pattern Arrangement: Fabricate and arrange stone units with veining and other natural markings to comply with the following requirements: 1. 2. 3. 4. 5. 6. 7. Cut stone from one block or contiguous, matched blocks in which natural markings occur. Arrange units with veining as indicated on Drawings. Arrange units in blend pattern. Book match adjacent units in each row and between adjacent rows. Book match adjacent units in each row and arrange units in end-slip pattern between adjacent rows. Arrange four units adjoining center point of room in two-way book match, and arrange surrounding units in side-slip and end-slip pattern. Number stone units and note numbers on Shop Drawings to designate installed location of each unit.
09638-4 11 March 2013

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Carefully inspect finished stone units at fabrication plant for compliance with requirements for appearance, material, and fabrication. Replace defective units. Clean sawed backs of stones to remove rust stains and iron particles. 1. 2. Grade and select stone for overall uniform appearance when assembled in place. Natural variations in appearance are acceptable if installed stone units match range of colors and other appearance characteristics represented in approved Samples and mockups.

PART 3 - EXECUTION 3.1 A. B. C. 3.2 A. B. C. EXAMINATION Examine surfaces indicated to receive stone, with Installer present, for compliance with requirements and other conditions affecting performance. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of stone flooring. Proceed with installation only after unsatisfactory conditions have been corrected. PREPARATION Vacuum clean concrete substrates to remove dirt, dust, debris, and loose particles. Remove substances from concrete substrates that could impair mortar bond, including curing and sealing compounds, form oil, and laitance. Clean dirty or stained stone surfaces by removing soil, stains, and foreign materials before setting. Clean stone by thoroughly scrubbing with fiber brushes and then drenching with clear water. Use only mild cleaning compounds that contain no caustic or harsh materials or abrasives. INSTALLATION, GENERAL A. Do necessary field cutting as stone is set. Cut lines straight and true and finish field-cut edges to match shop-cut edges. 1. B. C. D. 3.4 A. B. C. Use power saws with diamond blades to cut stone except for stone that is specified to have rough-split edges.

3.3

Set stone to comply with Drawings and Shop Drawings. Match stone for color and pattern by using units numbered in sequence as indicated on Shop Drawings. Scribe and field-cut stone as necessary to fit at obstructions. Produce neat joints of size specified or indicated. Expansion- and Control-Joint Installation: Locate and install according to Drawings and Shop Drawings. INSTALLATION TOLERANCES Variation in Line: For positions shown in plan for edges of paving, flooring, ramps, steps, changes in color or finish, and continuous joint lines, do not exceed 3 mm in 2400 mm, 6 mm in 6 m, or 10 mm maximum. Variation in Joint Width: Do not vary joint thickness more than 1.5 mm or 1/4 of nominal joint width, whichever is less. Variation in Surface Plane: Do not exceed 3 mm in 3 m, 6 mm in 6 m, or 10 mm maximum from level or slope indicated.

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09638-5 11 March 2013

D.

Variation in Plane between Adjacent Units (Lipping): Do not exceed 0.8-mm difference between planes of adjacent units. INSTALLATION OF STONE DIRECTLY OVER CONCRETE

3.5 A. B.

Saturate concrete with clean water several hours before placing setting bed. Remove surface water about one hour before placing setting bed. Apply mortar-bed bond coat to damp concrete and broom to provide an even coating that completely covers the concrete. Do not exceed 1.5-mm thickness. Limit area of mortar-bed bond coat to avoid its drying out before placing setting bed. 1. Place reinforcing wire mesh over concrete, lapped at joints by at least one full mesh and supported so mesh becomes embedded in middle of setting bed. Hold edges back from vertical surfaces about 13 mm.

C. D. E. F.

Apply mortar bed immediately after applying mortar-bed bond coat. Spread, tamp, and screed to uniform thickness at elevations required for setting stone to finished elevations indicated. Mix and place only that amount of mortar bed that can be covered with stone before initial set. Cut back, bevel edge, and discard material that has reached initial set before stone can be placed. Place stone before initial set of mortar occurs. Immediately before placing stone on setting bed, apply uniform 1.5-mm- thick bond coat to bed or to back of each stone unit. Tamp and beat stone with a wooden block or rubber mallet to obtain full contact with setting bed and to bring finished surfaces within indicated tolerances. Set each unit in a single operation before initial set of mortar; do not return to areas already set and disturb stone for purposes of realigning finished surfaces or adjusting joints. Rake out joints to depth required to receive pointing mortar as units are set. Point joints after setting. Fill full with mortar type and color indicated. Tool joints flat, uniform, and smooth, without visible voids. INSTALLATION OF STONE OVER CLEAVAGE MEMBRANE

G. H.

3.6 A. B. C.

Place cleavage membrane over substrates indicated to receive stone, lapped at least 100 mm at joints. Place reinforcing wire fabric over cleavage membrane, lapped at least one full mesh at joints and supported so mesh becomes embedded in middle of setting bed. Hold edges back from vertical surfaces about 13 mm. Place mortar bed over cleavage membrane with reinforcing wire fabric fully embedded in middle of mortar bed. Spread, tamp, and screed to uniform thickness at elevations required for setting stone to finished elevations indicated. Mix and place only that amount of mortar bed that can be covered with stone before initial set. Cut back, bevel edge, and discard material that has reached initial set before stone can be placed. Place stone before initial set of mortar occurs. Immediately before placing stone on setting bed, apply uniform 1.5-mm- thick bond coat to bed or to back of each stone unit. Tamp and beat stone with a wooden block or rubber mallet to obtain full contact with setting bed and to bring finished surfaces within indicated tolerances. Set each unit in a single operation before initial set of mortar; do not return to areas already set and disturb stone for purposes of realigning finished surfaces or adjusting joints. Rake out joints to depth required to receive pointing mortar as units are set. ADJUSTING AND CLEANING

D. E. F.

G. 3.7 A.

Remove and replace stonework of the following description:


09638-6 11 March 2013

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1. 2. 3. 4. B. C. D. E. 3.8 A. B.

Broken, chipped, stained, or otherwise damaged stone. Stone may be repaired if methods and results are approved by Architect. Defective joints. Stone paving, flooring, and joints not matching approved Samples and mockups. Stonework not complying with other requirements indicated.

Replace in a manner that result in stonework matching approved Samples and mockups, complying with other requirements, and showing no evidence of replacement. In-Progress Cleaning: Clean stonework as work progresses. Remove mortar fins and smears before tooling joints. Clean stonework after setting and grouting are complete. Use procedures recommended by stone fabricator for types of application. Apply sealer to cleaned stonework according to sealer manufacturer's written instructions. PROTECTION Prohibit traffic from installed stone for a minimum of 72 hours. Protect installed stonework during construction with nonstaining kraft paper. Where adjoining areas require construction work access, cover stonework with a minimum of 20 mm untreated plywood over nonstaining kraft paper. Repellent coating to be added on final handover as recommended by the supplier.

C.

END OF SECTION

STONE FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09638-7 11 March 2013

SECTION 09650 RESILIENT FLOORING PART 1 - GENERAL 1.01 DESCRIPTION A. 1.02 General: Provide resilient flooring in accordance with the Contract Documents.

QUALITY ASSURANCE A. B. Manufacturer: Provide each type of resilient flooring and accessories as produced by a single manufacturer, including recommended primers, adhesives, sealants, and leveling compounds. Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in installing resilient products similar to those required for this Project and with a record of successful inservice performance. Fire Resistance Ratings: Provide materials that have been tested and comply with the following fire test performance criteria as determined by an independent testing laboratory acceptable to the authorities having jurisdiction. Tests shall include backing materials. 1. Resilient Flooring: Comply with the following performance criteria: a. 2. A minimum radiant flux of 0.22 watts/sq. cm for the full duration of the test when tested in accordance with ASTM E648, based on the average of three replicate tests.

C.

Resilient Base: A flame spread rating of 75 or less and a smoke developed rating of 450 or less when tested in accordance with ASTM E84.

1.03

SUBMITTALS A. Samples: Submit following listed samples: 1. 2. B. C. D. Resilient Flooring: Each type, color and size. Resilient Base: Each type and color, 24 in. long.

Product Data: Submit manufacturer's technical data, including specifications and installation instructions for each type of resilient flooring and accessory. Certifications: Submit certification from an independent testing laboratory acceptable to authorities having jurisdiction that resilient flooring complies with fire test performance requirements. Substrate Acceptability: Submit a certified statement issued by the manufacturers of each type resilient flooring system and countersigned by the installer, attesting that all areas and surfaces designated to receive resilient flooring have been inspected and found satisfactory for the reception of their system, and are not in conflict with their substrate acceptability requirements. Application of systems will be construed as acceptance of surfaces Maintenance Instructions: Submit manufacturer's written maintenance instructions for resilient flooring.

E. 1.04

PRODUCT HANDLING A. Delivery and Storage: Deliver materials to job site in manufacturer's unopened containers clearly marked with manufacturer's name, brand, size, thickness, grade, color and design. Store materials per manufacturer's recommendations.
09650-1 11 March 2013

RESILIENT FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

1.05

PROJECT CONDITIONS A. B. C. General: Maintain temperature in spaces receiving resilient flooring at 70 deg. F. minimum at least 48 hours before, during, and after installation; thereafter, maintain a 55 deg. F. minimum. Store materials on flat surfaces in the areas scheduled to receive resilient flooring at least 48 hrs. prior to installation. Install resilient flooring and accessories after other finishing operations, including painting, have been completed. Do not install resilient flooring over concrete slabs until the latter have been cured and are sufficiently dry to achieve bond with adhesive as determined by resilient flooring manufacturer's recommended bond and moisture test.

1.06

EXTRA STOCK A. Furnish and deliver the following extra stock to Owner, at job site from same manufactured lot as materials installed, enclosed in protective packaging and labeled as to contents: 1. 2. Flooring: One unopened roll for each 100 rolls (or fraction thereof) of each type, color, pattern and size installed. Resilient Bases and Accessories: Not less than 10 linear feet for each 500 linear feet or fraction thereof, of each type, color, pattern, and size of resilient accessory installed.

PART 2 - PRODUCTS 2.01 APROVED MANUFACTURER 1. 2. 3. 2.02


Forbo Flooring Middle East, Phone: +971 50 450 7948

Berkvens, UK Or equal approved

MATERIALS A. Vinyl-Composition: ASTM F1066 Composition 1, Class 1 or 2, with color and pattern extending throughout the roll thickness; 2.6mm thick, unless otherwise shown; manufacturer's standard color as selected. All vinyl flooring to be antibacterial and antistatic. 1. B. C. D. E. F. G. H. Sarlon Tech U3P3: 33236, Brown (Farbo Flooring System).

Resilient Bases: Recommended by resilient flooring manufacturer and best suited for the purpose. Resilient Reducer Strip: Recommended by resilient flooring manufacturer and best suited for the purpose. Leveling and Patching Compounds: Type as recommended by flooring manufacturer. Do not use gypsum based leveling or patching compounds. Adhesive for Resilient Flooring: Type recommended by resilient flooring manufacturer and best suited for the purpose. Cement for Resilient Bases: Waterproof type as recommended by base manufacturer. Primer: Non-staining type as recommended by resilient flooring manufacturer. Wax: FS P-W-155, 16% concentration; slip-resistant, water emulsion base.

RESILIENT FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09650-2 11 March 2013

PART 3 - EXECUTION 3.01 CONDITION OF SURFACES A. Examine the substrates, adjoining construction and conditions under which the work is to be installed to determine if existing conditions are satisfactory for installation of resilient flooring. Do not proceed with the work until unsatisfactory conditions have been corrected.

3.02

PREPARATION A. Clean substrate to remove deleterious substances which would impair the work. Remove coatings from subfloor surfaces that would prevent adhesive bond, including curing compounds incompatible with resilient flooring adhesives, paint, oils, waxes and sealers. Prepare concrete floors in accordance with ASTM F710. Use leveling and patching compounds recommended by the resilient flooring manufacturer for filling cracks, holes and depressions in the substrate. Do not use gypsum based leveling or patching compounds. Surface shall be smooth, level and at proper elevation. Surface shall not vary more than 3mm in 3m in any direction from level, plumb or slopes shown. Remove roughness and protrusions from concrete surfaces by grinding. Prime, seal or cover substrate if it is of a kind or in a condition that the manufacturer of the resilient flooring recommends being primed, sealed or covered. Use materials complying with manufacturer's recommendations. Broom clean or vacuum surfaces to be covered, and inspect subfloor. Test concrete floors to ensure that they are fully cured and dry before installation of resilient flooring, in accordance with applicable provisions of RTI and RMA.

B.

C.

D. 3.03

INSTALLATION A. B. Standards: Install resilient flooring in accordance with the manufacturer's instructions and the applicable recommendations of RTI, unless otherwise shown or specified. Prime Coat: Apply primer to concrete surfaces; work well into surface; use minimum quantity that will assure complete surface coverage with a non-absorptive base. Allow primer to dry before applying adhesive. Prime coat may be omitted if recommended by resilient flooring manufacturer. Adhesive: Apply to substrate with properly notched steel trowels; allow adhesive to become tacky before applying resilient flooring. Extend resilient flooring into closets, offsets and under movable equipment of the rooms and spaces scheduled to receive resilient flooring, including recessed covers within those spaces. Extend unexposed edges of flooring under set-on bases and similar trim work. Scribe, cut and fit exposed edges of flooring and base adjoining other work accurately and neatly with a tight joint. Tightly cement resilient flooring to substrate without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, or other surface imperfections. Hand roll resilient flooring at perimeter of each covered area to assure adhesion. Install resilient flooring on covers for telephone and electrical ducts, and other such items occurring within finished floor areas. Maintain overall continuity of color and pattern with pieces of flooring installed in these covers. Tightly cement edges to perimeter of floor around covers and to covers. Sheet Units 1. 2. Layout: Lay rolls symmetrically about center line of major room or space in a square pattern, unless otherwise shown; adjust so edge not less than 60cm width. Installation: Lay rolls with bottom surface securely bonded to substrate and top surface left smooth, clean and free from imperfections. Fit rolls tightly so each unit is in contact with contiguous rolls and joints are in proper alignment. Make neat tight joints where exposed edges
09650-3 11 March 2013

C. D.

E.

F.

RESILIENT FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

abut other surfaces. Lay rolls with graining running in one direction as directed, unless otherwise shown. 3. G. Welding: All joints of the rolls to be thermo welded with proper color and type as recommended by the manufacturer.

Resilient Bases 1. If required by manufacturer, acclimate resilient base to room temperature for a minimum of 24 hours prior to installation. Apply resilient base to walls, columns, pilasters, casework and other permanent fixtures in rooms or areas where base is required. Install base in lengths as long as practicable, with preformed corner units, or fabricated from base materials with mitered or coped inside corners. On masonry surfaces, or other similar irregular substrates, fill voids along top edge of resilient wall base with manufacturer's recommended adhesive filler material. Secure bases to surfaces with waterproof cement; make joints tight; keep top and bottom edges in firm contact with adjacent surfaces. Install in single lengths for each location where possible without gaps at seams and with tops of adjacent pieces aligned. Do not stretch base during installation. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient wall base with manufacturer's recommended adhesive filler material.

2.

3. H.

Reducer Strips: Install resilient reducer strips in continuous lengths at exposed edges of resilient flooring, tightly butted to flooring and secure with adhesive. Install strips at edges of flooring which would otherwise be exposed.

3.04

CLEANING A. Cleaning: Do not wash floor until time period recommended by resilient flooring manufacturer has elapsed to allow resilient flooring to become well-sealed in adhesive. Clean floor thoroughly utilizing cleaner and methods recommended by the flooring manufacturer, not more than 4 days before acceptance or occupancy by the Owner, clean the resilient flooring and base. Waxing: In accordance with manufacturer's instructions and as soon as the resilient flooring is completely dry after cleaning, apply a heavy coat of floor wax. Buff thoroughly with mechanical buffers in accordance with the wax manufacturer's instructions. Protection: Protect work from damage and from normal wear and tear throughout construction period so that it will be without any indication of use or damage at the time of acceptance by the Owner. 1. 2. Utilize plywood or hardboard covering to protect flooring from rolling load damage by carts or dollies used to move stationary equipment or furnishings across floors. Cover resilient flooring with undyed, untreated building paper until inspection for substantial completion.

B.

C.

END OF SECTION

RESILIENT FLOORING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09650-4 11 March 2013

SECTION 09656 RESILIENT TERRAZZO TILE

PART 1 - GENERAL SCHEDULE 0 SECTION INCLUDES

PRODUCT DATA SHEET 0 - Marble terrazzo tile and accessories. PRODUCT DATA SHEET 1 - Granite terrazzo tile and accessories. SCHEDULE 1 RELATED SECTIONS

PRODUCT DATA SHEET 0 - Section 03300 - Cast-in-Place Concrete. PRODUCT DATA SHEET 1 - Section 06100 - Rough Carpentry: Wood subfloor. PRODUCT DATA SHEET 2 - Section 07900 - Joint Sealers. PRODUCT DATA SHEET 3 - Section 09650 - Resilient Flooring. SCHEDULE 2 REFERENCES

PRODUCT DATA SHEET 0 - ASTM C 109/C 109M - Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or 50-mm Cube Specimens). PRODUCT DATA SHEET 1 - ASTM D 695 - Standard Test Method for Compressive Properties of Rigid Plastics. PRODUCT DATA SHEET 2 - ASTM D 2047 - Standard Test Method for Static Coefficient of Polish-Coated Floor Surfaces as Measured by the James Machine. PRODUCT DATA SHEET 3 - ASTM D 2240 - Standard Test Method for Rubber Property--Durometer Hardness. PRODUCT DATA SHEET 4 - ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials. PRODUCT DATA SHEET 5 - ASTM E 648 - Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source. PRODUCT DATA SHEET 6 - ASTM E 662 - Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials. PRODUCT DATA SHEET 7 - ASTM F 510 - Standard Test Method for Resistance to Abrasion of Resilient Floor Coverings Using an Abrader with a Grit Feed Method. PRODUCT DATA SHEET 8 - ASTM F 540 - Standard Test Method for Squareness of Resilient Floor Tile by Dial Gage Method. PRODUCT DATA SHEET 9 - ASTM F 925 - Standard Test Method for Resistance to Chemicals of Resilient Sheet Flooring. PRODUCT DATA SHEET 10 - ASTM F 970 - Standard Test Method for Static Load Limit. PRODUCT DATA SHEET 11 - ASTM F 1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate
RESILIENT TERRAAZZO TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 09656-1 11 March 2013

of Concrete Subfloor Using Anhydrous Calcium Chloride. PRODUCT DATA SHEET 12 - MIL D-3134 - Deck Covering Materials; Revision J, Addendum 1. SCHEDULE 3 SYSTEM DESCRIPTION

PRODUCT DATA SHEET 0 - Performance Requirements of Terrazzo Tiles: 1.1 Abrasion Resistance: Maximum 0.0196 cubic centimeters volume loss, when tested in accordance with ASTM F 510, Taber abrader, S-39 wheels, at 500 cycles with 1000 gram load. 1.2 Compressive Strength: Between 2900 and 5000 psi (20 and 34.5 MPa), when tested in accordance with ASTM C 109/C 109M or ASTM D 695. 1.3 Static Load Limit: 0.0007 inch (0.012 mm) maximum indentation, when tested in accordance with ASTM F 970 at 125 pounds (57 kg). 1.4 Hardness: When tested in accordance with ASTM D 2240: A. Matrix: Shore D 78, minimum. B. Aggregate: Between Barcol 55 and 100. 1.5 Coefficient of Friction: Greater than 0.7, average 0.74, when tested in accordance with ASTM D 2047. 1.6 Flame Spread Index: 15, maximum, when tested in accordance with ASTM E 84. 1.7 Smoke Density: Specific optical density, when tested in accordance with ASTM E 662, of 231.76 (smoldering) and 292.05 (flaming). 1.8 Critical Radiant Flux: Minimum of 0.93 watt/cubic centimeter (Class 1) when tested in accordance with ASTM E 648. 1.9 Chemical Resistance: No change or surface attack, color change, or swelling, when tested in accordance with ASTM F 925. 1.10 Oil Resistance: Complying with MIL D-3134. 1.11 Corrosion Resistance: Complying with MIL D-3134. 1.12 Electrical Conductance: Nonconductive. 1.13 Squareness: 0.003 inch (0.076 mm) out of square, maximum, when measured in accordance with ASTM F 540. SCHEDULE 4 SUBMITTALS

PRODUCT DATA SHEET 0 - Submit in accordance with Section 01300. PRODUCT DATA SHEET 1 - Submit manufacturer's specifications and technical data for precast terrazzo tile and accessories; including manufacturer's printed installation instructions and maintenance manuals for each material specified. PRODUCT DATA SHEET 2 - Samples for Selection: Submit manufacturer's samples of actual sections of tile and accessories; include manufacturer's full range of color and patterns available. PRODUCT DATA SHEET 3 - Samples for Verification Prior to Installation: Submit full size samples of all types, colors, and patterns selected, indicating full range of patterning and color variations. PRODUCT DATA SHEET 4 - Test Reports: Submit test reports for bond and moisture tests of substrates. PRODUCT DATA SHEET 5 - Certificates: Submit certificates from manufacturer stating compliance with applicable requirements for materials specified. SCHEDULE 5 QUALITY ASSURANCE

PRODUCT DATA SHEET 0 - Installer Qualifications: A firm that has at least three years of experience with the installation of precast terrazzo tile and has successfully completed installations of a similar size and scope. PRODUCT DATA SHEET 1 - Regulatory Requirements: Comply with requirements of local building codes and applicable regulations of other government authorities. PRODUCT DATA SHEET 2 - Pre-Installation Meeting: Meet with tile manufacturer's representative and Owner
RESILIENT TERRAAZZO TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 09656-2 11 March 2013

prior to preparation of substrate and installation of tile, to review manufacturer's instructions and requirements to ensure the tile is installed properly. SCHEDULE 6 DELIVERY, STORAGE, AND HANDLING

PRODUCT DATA SHEET 0 - Deliver materials in original, unopened packages, containers or bundles bearing brand name and identification of manufacturer. PRODUCT DATA SHEET 1 - Store materials inside, under cover in a manner to keep them dry, protected from the weather, direct sunlight, surface contamination, corrosion, and damage from construction traffic and other causes. SCHEDULE 7 PROJECT CONDITIONS

PRODUCT DATA SHEET 0 - Maintain minimum temperature of 70 degrees F (21 degrees C) in spaces to receive terrazzo tile, for at least 48 hours before, during and after installation. Store materials in space where they will be installed for at least 48 hours or as required ensuring that the materials have reached 70 degrees F (21 degrees C) before staring installation. PRODUCT DATA SHEET 1 - Install terrazzo tile and accessories after other finishing operations, including painting, have been completed. PRODUCT DATA SHEET 2 - Do not install terrazzo tile on concrete slabs until they have been cured and are sufficiently dry to achieve bond with adhesives, as determined by the tile manufacturer's recommended bond and moisture test. Allow sufficient time for the slab to dry out before installation is started. PRODUCT DATA SHEET 3 - Provide adequate lighting to allow for proper installation. PRODUCT DATA SHEET 4 - Do not use portable or temporary heat. SCHEDULE 8 WARRANTY

PRODUCT DATA SHEET 0 - Submit 20 year wear warranty written material warranty from tile manufacturer warranting that tile is free from defects in workmanship and material. 1.1 Products must be installed so as not to void the manufacturer's warranty for wear. 1.2 Warranty shall be in form acceptable to Owner. SCHEDULE 9 MAINTENANCE

PRODUCT DATA SHEET 0 - Extra Materials: Furnish one box of tile for each fifty boxes or fraction thereof, for each type, color, pattern and size of the tile installed, from same manufactured lot as materials installed. 1.1 Deliver extra tile to Owner after completion of work. 1.2 Furnish tiles in protective packaging with identifying labels. PART 2 - PRODUCTS SCHEDULE 0 MANUFACTURERS

PRODUCT DATA SHEET 0 - Acceptable Manufacturers: National Industries Kuwait or equal approved by the consultant. PRODUCT DATA SHEET 1 - Substitutions: Not permitted. PRODUCT DATA SHEET 2 - Requests for substitutions will be considered in accordance with provisions of Section 01600. PRODUCT DATA SHEET 3 - Obtain all materials including terrazzo tile and recommended adhesives and leveling compounds from a single manufacturer. SCHEDULE 1 MATERIALS
09656-3 11 March 2013

RESILIENT TERRAAZZO TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

PRODUCT DATA SHEET 0 - Terrazzo Tile: Marble or granite chips embedded in flexible thermoset polyester resin matrix, with random distribution of chips and smooth factory applied urethane coating cured by ultra violet exposure process. 2.1 Color/Pattern/Thickness: As indicated on drawings. 2.2 Color/Pattern/Thickness: As selected by Architect from manufacturer's full range. 2.3 Color/Pattern/Thickness: Marble CL-200/1, 1/8 inch (3.2 mm) thick. 2.4 Color/Pattern/Thickness: Marble VP-5500/1, 1/8 inch (3.2 mm) thick. 2.5 Color/Pattern/Thickness: Marble CL-600/3, 3/16 inch (4.8 mm) thick. 2.6 Color/Pattern/Thickness: Marble RB-2200/1, 1/8 inch (3.2 mm) thick. 2.7 Color/Pattern/Thickness: Granite GT-3000/1, 1/8 inch (3.2 mm) thick. 2.8 Color/Pattern/Thickness: Granite GD-7700/3, 3/16 inch (4.8 mm) thick. 2.9 Color/Pattern/Thickness: Marble GRN-800/1, 1/8 inch (3.2 mm) thick. 2.10 Color/Pattern/Thickness: Marble CTN500/1, 1/8 inch (3.2 mm) thick. 2.11 Color/Pattern/Thickness: Marble CT300/3, 3/16 inch (4.8 mm) thick. 2.12 Color/Pattern/Thickness: Glass GL6500/3, 3/16 inch (4.8 mm) thick. 2.13 Size: 12 by 12 inches (305 by 305 mm), nominal. 2.14 Color Match: Obtain all tile materials from same production run. PRODUCT DATA SHEET 1 - Floor Adhesive: 2.1 Fritz FA-88 Powdered Multipurpose Adhesive mixed with water, for installation using 1/8 by 1/8 by 1/8 inch (3 by 3 by 3 mm) U-notched trowel. 2.2 Fritz FA-1100MP Pre-Mixed Wet Set Adhesive for installation using 3/32 by 3/32 by 3/32 (3 by 3 by 3 mm) U-notched trowel. 2.3 Fritz Premium #1 Pre-Mixed Wet Set Adhesive for installation using 3/32 by 3/32 by 3/32 (3 by 3 by 3 mm) U-notched trowel. PRODUCT DATA SHEET 2 - Sealer and Finish: Two coats of Fritz FCP-102 protective sealer and two coats of Fritz Duro-Gloss Finish FCP-300, applied as recommended by manufacturer. PRODUCT DATA SHEET 3 - Sealant: Silicone, as specified in Section 07900, and of type approved by tile manufacturer. PART 3 - EXECUTION SCHEDULE 0 EXAMINATION

PRODUCT DATA SHEET 0 - Concrete Subfloor: 3.1 Inspect subfloor to verify that it is clean, flat, smooth, level and free from cracks, holes, ridges, coatings preventing adhesion, and other defects impairing performance or appearance. 3.2 Notify Architect of conditions that would adversely affect flooring installation; do not proceed until defective conditions have been corrected. 3.3 Perform bond and moisture tests on concrete subfloors to determine if surfaces are sufficiently cured and dry as well as to ascertain presence of curing, sealing, hardening or any other compounds. A. Perform bond test in accordance with tile manufacturer's warranty requirements. B. Perform moisture test in accordance with ASTM F 1869. C. Do not install tile if moisture vapor transmission exceeds 7 pounds (3 kg) per 1000 square feet (93 sq m) in 24 hours using FA88 Adhesive. D. Submit test results and obtain Architect's acceptance prior to beginning installation. 3.4 Do not proceed until substrate preparation is complete and satisfactory, bond and moisture tests are completed and test reports submitted which indicate that bond and moisture values meet specified requirements. PRODUCT DATA SHEET 1 - Wood Subfloor: 3.1 Verify that wood subflooring complies with requirements specified in Section 06100. 3.2 Verify that underlayment surface is free of irregularities and substances that may interfere with adhesive bond or show through surface or stain flooring. PRODUCT DATA SHEET 2 - Coordinate work with that of other installers prior to installation so that tile work fits
RESILIENT TERRAAZZO TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 09656-4 11 March 2013

properly with doors, frames, saddles, floor drains, and other adjacent work. PRODUCT DATA SHEET 3 - Start of work constitutes acceptance that conditions are satisfactory. PRODUCT DATA SHEET 4 - Close the space and areas where flooring is being installed to traffic and other installers until flooring has set and sealing and finish of tiles are complete. SCHEDULE 1 PREPARATION

PRODUCT DATA SHEET 0 - Fill small cracks, holes and depressions in subfloors using leveling and patching compounds recommended by tile manufacturer. PRODUCT DATA SHEET 1 - Remove deleterious coatings from subfloor surfaces that would prevent a positive adhesive bond; such as curing compounds incompatible with adhesives, paints, oils, adhesives, waxes and sealers. PRODUCT DATA SHEET 2 - Completely remove existing solvent-based adhesives to prevent bleed through and staining. PRODUCT DATA SHEET 3 - Remove existing floor covering and condition subfloor to provide smooth, clean continuous surface; level subfloor with self-leveling compound in compliance with tile manufacturer's specifications and installation instructions. SCHEDULE 2 INSTALLATION

PRODUCT DATA SHEET 0 - Comply with manufacturer's instructions for terrazzo tile installation. PRODUCT DATA SHEET 1 - Scribe, cut and fit tile to permanent fixtures, built-in furniture, cabinets, pipes, outlets and permanent columns, wall, and partitions using tile cutting procedures recommended by tile manufacturer. PRODUCT DATA SHEET 2 - Maintain reference markers indicated on subfloor for future cutting, by repeating on finished terrazzo tile floor. PRODUCT DATA SHEET 3 - Lay tile from center marks established with principal walls discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid use of cut widths less than one half tile at perimeters. Lay tile square to room axis, unless otherwise indicated. PRODUCT DATA SHEET 4 - Adhere tile flooring to substrate using full spread of adhesive. PRODUCT DATA SHEET 5 - Lay tile using conventional procedures for laying resilient tile, placing tile carefully and firmly in position and as level as possible. Butt tile cleanly, evenly and snugly against adjacent tile. PRODUCT DATA SHEET 6 - Match tiles for color and pattern by using tile from cartons in same sequence as manufactured and packaged, if cartons are so numbered. Do not install broken, cracked or chipped tiles. PRODUCT DATA SHEET 7 - Roll and cross roll floor with 150 pound sectional roller continuously while tile is being laid. Use hand roller in areas that cannot be reached with large roller. Cease rolling when rolling has no more effect. PRODUCT DATA SHEET 8 - Do not subject floors to traffic until adhesive is dry and hard and sealers and finishes are applied. PRODUCT DATA SHEET 9 - Remove and replace tiles that are not flat, including lipped, cupped, curved, or poorly adhered tile. Remove rejected tile from site. SCHEDULE 3 FIELD QUALITY CONTROL

PRODUCT DATA SHEET 0 - Manufacturer's Field Services: Provide on-site services of tile manufacturer or authorized distributor for technical assistance during preparation and installation.
RESILIENT TERRAAZZO TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center 09656-5 11 March 2013

SCHEDULE 4 -

CLEANING AND PROTECTION

PRODUCT DATA SHEET 0 - Upon completion of installation and curing of adhesive, apply sealant to entire perimeter and around columns, door frames, and other joints and penetrations to prevent water penetration into the adhesive layer due to accidental or maintenance (mopping) water accumulation. PRODUCT DATA SHEET 1 - Remove excess adhesives, dirt, stain and other foreign material. Clean floors in accordance with tile manufacturer's instructions. PRODUCT DATA SHEET 2 - Protect finished installation at all times. Repair or replace flooring damaged prior to final acceptance of installation by Owner. END OF SECTION

RESILIENT TERRAAZZO TILE Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09656-6 11 March 2013

SECTION 09680 CARPETING PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide carpeting in accordance with the Contract Documents.

1.02 QUALITY ASSURANCE A. B. Installer: Carpeting shall be installed by a firm having not less than 5 years experience in the installation of commercial carpeting in projects of similar size and scope specified herein. Fire Resistance Ratings: Carpet when used without cushion, and carpet and carpet cushion tested as an assembly shall comply with all of the following performance criteria: 1. 2. 3. 1.03 STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. B. The Carpet and Rug Institute (CRI) "The Carpet Specifier's Handbook". The Carpet and Rug Institute CRI 104 "Standard Installation of Commercial Textile Floor Covering Materials" excluding references not specified herein. CPSC 16 CFR, Part 1630 with a passing rating (DOC FF 1-70 or ASTM D2859, Methenamine Pill Test). A minimum radiant flux of 0.22 watts/sq. cm for the full duration of the test when tested in accordance with ASTM E648, based on the average of three replicate tests. A specific optical density in either the flaming or non-flaming mode not exceeding 300 within the first 4 minutes of the test when tested in accordance with ASTM E662.

Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

1.04 SUBMITTALS A. Shop Drawings: Submit shop drawings showing carpet layout, start points, seam locations, cushion type and edge strip types and locations. Include on shop drawings dimensions which verify field conditions and information as to type of subfloor. Indicate direction of pattern and lay of pile. Show details of cutouts. Indicate columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required in carpet. Indicate transition details to other flooring materials and type, color, and location of edge, transition, and other accessory strips. Samples: Submit the following samples showing full range of color, texture, and pattern variations expected. Where piece dyed, submit sample from actual dye lot for approval prior to shipping finish carpeting to the site. Prepare samples from same material to be used for the Work : 1. 2. Roll Carpeting: 18 in. x 27 in. samples of each type, color and pattern. Carpet Cushion: 18 in. x 27 in. samples of each type.
09680-1 11 March 2013

B.

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

3. C.

Carpet Edge Strip: 6 in. long sample of each type and color.

Product Data: Submit manufacturer's printed literature, specifications and installation instructions for materials specified herein and other data as may be required to show compliance with the Contract Documents including written data on physical characteristics, durability, sistance to fading, and flame resistance characteristics. Certification: Submit certified laboratory test reports for fire hazard classification of carpet and carpet cushion, from an independent testing laboratory. Maintenance Instructions: Submit 2 copies of instructions for care, cleaning, maintenance and repair of carpeting. Include the following: 1. 2. Manufacturer's recommended frequency for maintaining carpet. Precautions for cleaning materials and methods that could be detrimental to finishes and performance. Include cleaning and stain-removal products and procedures.

D. E.

1.05 MOCK-UPS A. Before installing carpet, install mockups for each type of carpet installation required to demonstrate aesthetic effects and qualities of materials and execution. Install mockups to comply with the specified requirements, using materials indicated for the completed Work. Install mockups in the location and of the size indicated or, if not indicated, as directed by Engineer. Notify Engineer seven days in advance of dates and times when mockups will be installed. Demonstrate the proposed range of aesthetic effects and workmanship. Obtain approval of mockups before starting work. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

B. C.

1.06 PRODUCT HANDLING A. B. C. 1.07 Deliver carpet in original mill protective wrapping with mill register numbers and tags attached. Comply with CRI 104 Section 5.2 for handling requirements. Deliver other materials in manufacturer's unopened containers identified with name, brand type, grade, class and all other qualifying information. Store materials in a dry location, in such a manner as to prevent damage. Comply with CRI 104 Section 5.1 for storage requirements.

PROJECT CONDITIONS A. Comply with CRI 104, Section 6.1, "Site Conditions; Temperature and Humidity." Do not install carpet until wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use. Where demountable partitions or other items are indicated for installation on top of carpet, install carpet before installing these items.

C. 1.08

EXTRA STOCK

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09680-2 11 March 2013

A. 1.09

Deliver all unused carpet and large scraps (over 2 sq. ft. in area and over 12 in. wide) to the Owner. Store where directed on the Site.

ATTIC STOCK A. Provide attic stock equal to 5 percent of each carpet type specified packaged in manufacturers original packaging, labeled as to contents. Store where directed by Owner.

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09680-3 11 March 2013

PART 2 - PRODUCTS 2.01 MATERIALS A. B. Carpet Fibers: Types as scheduled and as recommended by the carpet manufacturer for the conditions of installation and use. Pile Yarn: Provide yarn spun in the manner recommended by the yarn manufacturer and the carpet manufacturer, in number of plies and denier indicated or required, to achieve the pile yarn weight, texture and pattern indicated. Dye: Use dyes and dyeing methods recognized by the industry as successful for the type of fiber being dyed and to achieve the required colors and fade resistance. Achieve the fade resistance established by the Association of Textile Chemists and Colorists for carpet when tested on the Atlas Fadeometer for 40 hours. Carpet Cushion 1. Type CP-1: One of the following: a. b. E. "Stri-Lock" (Chris-Craft Industries, distributed by Strianese Assoc., Inc.); 56 oz./sq. yd., mothproof. For Double Glue Down Installation: "Tread-MOR Quality 2580" (Sponge Cushion Inc.); 3 in. thick, 26 Lb. density, 100% SBR Synthetic Rubber carpet padding.

C.

D.

Tackless Strip: Water-resistant 3-ply beveled edged plywood in strips, thickness to match cushion thickness, suitable for commercial installations and in compliance with CRI 104, 11.3, with 2 rows or 3 rows of angular pins protruding from the top designed to grip and hold stretched carpet at backing. Provide "Smoothedge Tackless Strip" (Roberts Consolidated Industries ) or equal, type as required for installation shown. Carpet Adhesive: Water resistant and nonstaining, release-type as recommended by the carpet manufacturer to comply with flammability requirements for installed carpet. Cushion Adhesive: Release-type, mildew resistant as recommended by the cushion manufacturer to comply with flammability requirements for installed carpet and cushion and expressly produced for use with specified carpet cushion on substrate. Edge Strip: Anodized aluminum strip with fold down edge and concealed carpet gripper teeth, minimum 1-2 in. wide punched anchorage flange and minimum 5/8 in. wide fold flange: color as selected from manufacturer's standard color range. Edge Strip: Extruded or molded heavy duty vinyl or rubber, of sizes, shapes and colors as shown and best suited for the respective purposes intended; one of the following manufacturers: 1. Burke Mercer Floor Products 2. Roppe Rubber Corp. 3. Johnsonite. 4. Flexco. Anti-Static Fiber: Metallic carpet fiber; of non-corrosive metal; of sufficient flexibility and low denier as to be unnoticeable when blended with carpet fiber; effective in controlling static build-up to 3000 volts with ambient conditions of 15% relative humidity and 72 deg. F. in persons with oak-tanned leather soled shoes. Anti-Static Spray: "Anti-Stat" (Certified Chemical and Equipment Co.) or equal.
09680-4 11 March 2013

F. G.

H.

I.

J.

K.

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

L. M.

Primary Backing, Secondary Backing and Back Coating: As recommended by the carpet manufacturer for the conditions of installation and use. Seaming Tape: Hot-Melt adhesive tape specifically manufactured for taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams. Provide "Super GT No. 50-330 Heat Bond Tape or Premium GT Heat Bond Tape No. 50-360" (Roberts Consolidated Industries, Inc.) or equal. Leveling and Patching Compounds: Type recommended by carpet and/or cushion manufacturer. Do not use gypsum based compounds. All Other Materials: Manufacturer's standard for the product specified.

N. O. 2.02

CARPET CONSTRUCTION A. Fabricate the carpet by construction methods indicated in the schedule by manufacturer's standard process which is recognized by the carpet industry for that method. MANUFACTURERS/ VENDORS 1. 2. 3. 4. 5.
egetpper a/s, Denmark 3M, U.S.A.

The Shaw Group Inc., USA Milliken, USA Sommer, France

PART 3 - EXECUTION 3.01 PRE-INSTALLATION MEETING A. Prior to the installation, and at the Contractor's direction, meet at the project site to review the material selections, substrate preparations, installation procedures, coordination with other trades, special details and conditions, standard of workmanship, and other pertinent topics related to the Work. The meeting shall include the Engineer, the Contractor, the installer, material manufacturer's representatives, and representatives of other trades or subcontractors affected by the installation. Examine sample installations which have been prepared and determine and record whether everyone present is in agreement that the proposed installations are likely to perform as required.

3.02 PREPARATION A. B. Coordinate the installation of carpet so as not to delay the occupancy of the building or interfere with the completion of construction. Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Verify recommended limits for moisture content and alkalinity of concrete substrate with carpet and cushion manufacturer(s). Do not proceed with the Work until unsatisfactory conditions have been corrected. Verify that concrete slabs comply with ASTM F710, that slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond substrate are free of cracks, ridges, depressions, scale, and foreign deposits. Comply with CRI 104 Section 6.1.1 and 6.2 for preparation requirements as related to concrete substrates. Clear away debris, broom clean or vacuum surfaces to be covered, and inspect subfloor.
09680-5 11 March 2013

C.

D.

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

E.

Use leveling and patching compounds recommended by flooring manufacturer for filling cracks, holes and depressions in the substrate. Surface shall be smooth, level and at proper elevation. Remove roughness and protrusions from concrete surfaces by grinding.

3.03 INSTALLATION A. B. Comply with the manufacturer's instructions and recommendations. Place seams at locations indicated on accepted shop drawings. Maintain direction of pattern, texture and lay of pile. Extend carpet into closets, alcoves and offsets, and under movable equipment movable flanges and furnishings of the rooms and spaces shown or scheduled to receive carpet, including recessed covers within those spaces. Provide cutouts as required for removable access covers in substrates except do not cutout for floor closer cover plates. Bind edges neatly where not concealed by protective edge guards or overlapping flanges, secure to substrate and maintain close tolerances so that edges of carpet will be covered by plates and escutcheons. Cut only 3 sides wherever it is feasible to provide carpet flap in lieu of fully removable cutout. At doorways, center seams under door in closed position; do not place seams perpendicular to door frame in direction of traffic through doorway. Do not bridge building expansion joints with continuous carpet. Cut openings in carpet for electrical outlets, piping and other penetrations. Maintain close tolerances so that edges of carpet will be covered by plates and escutcheons. Install edge strip at every location where edge of carpet is exposed to traffic, unless otherwise indicated. Install in single lengths wherever possible, secured in accordance with manufacturer's directions. Tackless Installation: Comply with CRI 104, Section 11 "Stretch-in Utilizing Tackless Strip" and as follows: 1. Install tackless strip at perimeter of carpeting, at obstructions and cutouts in accordance with manufacturer's directions. Maintain uniform spacing from stripping to wall so that cut carpet edge will turn down to substrate in a tight slot. Install carpet cushion in the largest possible size over the entire area to be carpeted. Place cushion with face in direction recommended by the manufacturer. Butt cushion tight against tackless strip. Lay out cushion seams at 90-degree angle with carpet seams and so as not to occur under carpet seams. Butt edges of cushion and adhere cushion to substrate with daubs of adhesive approximately 4 in. in diameter, spaced approximately 2 ft. apart at all edges. In ramped areas, adhere cushion to substrate with adhesive applied with a notched trowel. Stretch, adjust and trim carpet in accordance with recognized industry practice. Use power stretcher of a type recommended by the carpet manufacturer. Secure edges to tackless strip. Make seams so that pile of adjoining pieces has the same directional run and so as to be practically invisible. Install carpet with seams sewn or heat bond taped using permanent type construction which is of sufficient strength for stretching and wear without failure during the life of the carpet. Utilize equipment and methods for seaming as recommended by the tape manufacturer. Maintain straight seams running true with the lines of the building.

C.

D. E. F. G.

2.

3. 4. 5.

H.

Double Glue Down Installation: Comply with CRI 104, Section 9 "Double Glue-Down" and as follows: 1. Measure and lay out padding. Install padding in longest lengths possible. Cut and fit padding prior to gluing. Padding seams shall be at right angles to carpet seams, or shall offset carpet seams by a minimum of 6 in.
09680-6 11 March 2013

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

2. 3.

Apply premium grade releasable adhesive to entire surface of substrate to receive carpet padding in accordance with adhesive manufacturer's written instructions. Install padding to have a full positive contact with adhesive; to have no gaps, bubbles, wrinkles, or defects which telegraph through the carpeting. Butt cushion edges. Seams shall be finished tight, even, smooth, and with no gaps. Install carpeting on padding, as specified herein, in accordance with instructions for Glue Down Installation for Broadloom. Apply multi-purpose, premium quality adhesive to entire surface of padding in accordance with adhesive manufacturer's written instructions. Do not double cut carpet seams where cutting tool may penetrate padding. Utilize the appropriate weight roller as recommended by the padding manufacturer for the intended use.

4.

I.

Elevator Installation 1. 2. 3. Install tackless strip at elevator door opening only. Install carpet cushion in one piece with edges adhered to substrate with daubs of adhesive approximately 4 in. in diameter, spaced approximately 1 ft. apart. Finish raw edges of carpet by attaching matching tape not less than 1-3 in. wide. Tape shall not be visible when carpet is installed. Attach carpet to tackless strip at door and fit neatly at all other edges.

3.04

Furnish one replacement carpet, completely fabricated and marked for location, for each elevator cab requiring carpet. Wrap and store in location directed by the Owner. CLEANING AND PROTECTION A. B. C. Vacuum carpet with a commercial vacuum, with rotating agitator or beater in the nozzle. Remove soil spots in accordance with the carpet manufacturer's recommendations. Protect carpet from damage and soiling. Use non-staining cover material for protection. Tape joints in protective covering. Comply with CRI 104, Section 15 "Protection of Indoor Installation." Remove and dispose of debris and unusable scraps.

4.

3.05

SCHEDULE To be selected by the client. END OF SECTION

CARPETING Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09680-7 11 March 2013

SECTION 09900 PAINTS AND COATINGS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide painting in accordance with the Contract Documents. 1. Examine the requirements of the other technical Sections as to the location, extent and nature of painting work specified therein and include such items to be painted under this Section as are not included in the other Sections. In general, paint all exposed surfaces except surfaces noted as pre-finished or not to be painted. Where items or surfaces are not specifically mentioned, paint the same as adjacent materials or areas. Specifically, "Paint" includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate, or finish coats.

2.

B.

Related Work Specified Elsewhere 1. 2. 3. Factory finished items. Priming of miscellaneous metals and structural steel. Pavement marking.

1.02

QUALITY ASSURANCE A. Provide painting Work from a experienced firm that has specialized in such Work for at least 5 years, who is experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance, and who shall have undivided responsibility for the Work. Single-Source Responsibility: Provide primers, fillers and undercoat paint produced by the same manufacturer as the finish coats. Material Quality: Provide the manufacturer's best quality trade sale paint material of the various coating types specified. Paint material containers not displaying manufacturer's product identification will not be acceptable. Proprietary names used to designate colors or materials are not intended to imply that products named are required or to exclude equal products of other manufacturers.

B. C.

1.03

STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. 2. SSPC Volume 1 "Good Painting Practice". SSPC Volume 2 "Systems and Specifications".

1.04

SUBMITTALS A. B. Color Samples: Submit two (2) labeled 12 in. x 12 in. samples on hardboard substrate, for each color, sheen and texture duplicated to simulate final conditions. Show various stages of finish on displays. Detailed Painting Schedule: Submit a "Detailed Painting Schedule" for review by the Engineer. Prepare this schedule on the basis of the surfaces, types of paint materials, number of coats required, and list the brand name of the product of the manufacturer proposed for each use. Indicate each material and cross-reference specific coating, finish system, and application with identification related by manufacturer's catalog number and general classification.
09900-1 11 March 2013

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

C.

Product Data: Submit product data for each paint system specified, including block fillers and primers. Provide the manufacturer's technical information including label analysis and instructions for handling, storage, and application of each material proposed for use. List each material and cross-reference the specific coating, finish system, and application. Identify each material by either by the actual formula or the manufacturer's catalog and/or code number and general classification as suitable for duplication and replacement purposes.

1.05

MOCK-UP A. Prepare sample panels, after approval of paint displays, totaling approximately 100 sq. ft. in spaces designated by the Engineer for his final review.

1.06

PRODUCT HANDLING A. Deliver paint materials to the job site in original containers and packages, bearing the manufacturer's labels, indicating name, type, brand, color name and number, application instructions, contents by volume, for pigment, vehicle and volatile constituents. Unless otherwise directed by the Engineer, deliver paints readymixed. Order in advance in large enough quantities and in ample time to facilitate the Work. Store materials and equipment in a designated storage space on the site. Protect paint and associated materials from freezing. Keep storage space neat, clean and accessible at all times. Protect floors from paint spillage. Remove oily rags and waste daily. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application.

B.

1.07

PROJECT CONDITIONS A. B. Do not paint when the air is dust-laden nor when weather and temperature conditions are unsuitable. Maintain temperatures within the building at a minimum of 60 deg. F. during the painting and drying periods. Apply paint only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 deg. F. and 90 deg. F. Comply with manufacturer's recommendation when they are more stringent with respect to application temperatures. Do not apply paint in snow, rain, fog, or mist; or when the relative humidity exceeds 85%; or at temperatures less than 5 deg. above the dew point; or to damp or wet surfaces. Comply with manufacturer's recommendation when they are more stringent with respect to application temperatures. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by the manufacturer during application and drying periods.

C.

D. 1.08

PROTECTION A. Place paint or solvent soaked rags, waste or other materials which might constitute a fire hazard in metal containers and remove from premises at the close of each day's work. Take every precaution to avoid damage by fire. Provide suitable coverings to protect surfaces not requiring painting. Protect work of other trades, whether to be painted or not, against damage by painting operations. Correct damage by cleaning, repairing or replacing, and repainting, as required and acceptable to Owner. Comply with paint manufacturer's recommendations regarding materials and methods to be utilized. Remove or protect items such as hardware, hardware accessories, plates, lighting fixtures and similar items placed prior to painting. Reposition or remove protection upon completion of each space. Disconnect equipment adjacent to walls by workmen skilled in these trades to permit painting of wall surfaces; replace and reconnect after completion of painting.

B.

C.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-2 11 March 2013

D.

Maintain wrappings or other factory applied protection furnished with finish hardware (or other items provided by other trades) installed in areas where painting is required. If such protection is displaced or removed, replace before painting work continues and maintain for the duration of painting work. Provide "wet paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others for protection of their work after completion of painting operations. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

E.

PART 2 - PRODUCTS 2.01 MATERIALS A. Material Compatibility: Provide block fillers, primers, finish coat materials, and related materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by the manufacturer based on testing and field experience. Paint Materials: Subject to compliance with requirements, provide materials of the following manufacturers: Interior A. B. C. D. Exterior A. B. C. Jotun Paints (Jotashield). Or equal approved. Berger Paints Hempel Paints Sigma Paints Jotun Paints

B.

Use products of the same manufacturer for succeeding coats. Where primer is shop applied to steel, subsequent coats may be the product of another manufacturer provided the coatings are mutually compatible. Review other sections in which primers are provided to ensure compatibility of the total systems for various substrates. Colors, textures and degree of luster will be as shown the schedule (Ref: A7.950) or as selected by the Engineer. Tint prime and undercoats approximately to the shade of the final coat but with sufficient variation to distinguish them from the preceding coat. Proprietary names used to designate colors or materials are not intended to imply that products named are required or to exclude equal products of other manufacturers. Standard Coating Terms and Specular Gloss Range : Standard coating terms and gloss ranges as defined in ASTM D16 apply to this Section. 1. 2. 3. 4. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85-degree meter. Eggshell refers to low-sheen finish with a gloss range between 20 and 35 when measured at a 60-degree meter. Semigloss refers to medium-sheen finish with a gloss range between 35 and 70 when measured at a 60-degree meter. Full gloss refers to high-sheen finish with a gloss range more than 70 when measured at a 60-degree meter.

D.

E.

F.

In locations where ambient temperature-humidity conditions encourage the ready formation of mildew, use paints with additional mildew inhibitive agent incorporated during the manufacturing process, of type and in concentration recommended by the paint manufacturer to withstand such mildew formation.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-3 11 March 2013

PART 3 - EXECUTION 3.01 PRE-INSTALLATION MEETING A. Prior to the start of the Work, and at the Contractor's direction, meet at the Project site to review methods and sequence of Work, special details and conditions, standard of workmanship, and other pertinent topics related to the Work. The meeting shall include the Engineer, the Contractor, Contractor's project superintendent, painting subcontractor's superintendent, painting manufacturer's representative, and any other subcontractors whose work requires coordination with this work. Review other areas of the Work in which primers are provided to ensure compatibility of the total systems for various substrates.

B. 3.02

CONDITION OF SURFACES A. Examine the substrates, adjoining construction and the conditions under which the Work is to be installed. Do not proceed with the Work until unsatisfactory conditions have been corrected. Start of painting Work will be construed as the Applicator's acceptance of surfaces and conditions within a particular area.

3.03

PREPARATION A. Surface Preparation, General 1. Prepare surfaces to receive paint; thoroughly clean of grime, grease, dirt, loose material and other substances that may interfere with proper adhesion of paint. Provide barrier coats over incompatible primers or remove and re-prime. Paint dry surfaces only. Remove or protect hardware, hardware accessories, plates, signs, trim for mechanical work, machined surfaces, lighting fixtures and similar items in place and not to be finish painted. Disconnect and move equipment adjacent to areas scheduled to be painted. Reposition and reconnect items and remove protection upon completion of each space. Cleaning: Before applying paint or other surface treatments, clean the substrates of substances that could impair the bond of the various coatings. Remove oil and grease prior to cleaning. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. Fill dents, cracks, hollow places, open joints and other irregularities with a filler suitable for the purpose and, after setting, sand to a smooth finish. Prime surfaces not more than 8 hours after cleaning except as otherwise specified by the prime paint manufacturer.

2.

3.

4. 5. B. Metals 1.

General: Clean bare metal surfaces thoroughly of foreign matter such as mortar, plaster, grease, rust, scale and dirt before priming coat is applied. Remove oil, grease and similar contaminants in accordance with SSPC SP-1 "Solvent Cleaning", prior to any additional surface preparation specified. Remove rust and mill scale in accordance with SSPC SP-3 "Power Tool Cleaning". Where solder flux has been used, clean surface with solvent, or use mechanical tools to remove. Immediately after surface preparation, apply primer in accordance with manufacturer's instructions. Use painting methods which will result in full coverage and dry film thickness specified. After erection is completed, touch-up heads of bolts, welded surfaces and other field connections with specified primer. Shop Primed Ferrous Metal Surfaces: Remove grease and oil with a cleaner recommended for the purpose. Exercise care to prevent damage to shop coat. Touch-up abraded or marred shop coats with paint used for priming or "universal primer" compatible with primer, topcoat, and field surface preparation. Zinc Coated (Galvanized), Aluminum and Stainless Steel Surfaces: Remove grease and oil with a cleaner recommended for the purpose. Treat and roughen surfaces using either mechanical or

2.

3.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-4 11 March 2013

chemical means in accordance with recommendations of prime paint manufacturer. When chemical compound is used rinse the chemical compound completely with clean, fresh water. C. Concrete and Masonry Surfaces: Delay painting on concrete or masonry surfaces as long as practicable within the limits of the Contract. Test surfaces for presence of alkali and neutralize as required. Test surfaces for moisture content and do not paint surfaces which exceed manufacture's printed instructions. Remove grease, oil, form release agents and efflorescence. Patch cracks and other blemishes to be covered by paint. Neutralize concrete surfaces which have received capillary waterproofing, utilizing materials and methods as recommended by the manufacturer and applicator of the capillary waterproofing. 1. 2. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage with pores filled in accordance with manufacturer's instructions. Clean concrete floors to be painted with a 5 percent solution of muriatic acid or other etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow to dry, and vacuum before painting.

D.

Plaster Work 1. 2. Test plaster surfaces with a moisture meter and do not proceed with painting until the moisture content satisfies the recommendation of the respective paint manufacturer. Remove grit and loose particles and repair surface irregularities before paint is applied. Repair cracks and holes with patching plaster, properly keyed to the existing plaster, and sandpaper smooth. Patching plaster must be compatible with finish paint system. Prime plaster surfaces with approved fiber mesh and an approved alkali-resistant primer. Spackle imperfections in the plaster that becomes visible after the prime coat is applied. Make flush with adjoining surface, and spot prime with the prime coat material. If the prime coat does not dry to a uniform sheen over the entire surface, the areas that indicate suction shall also be spot primed before applying succeeding coats.

3.

E.

Woodwork 1. 2. Sandpaper woodwork to remove roughness, loose edges, slivers or splinters and then brush to remove dust. Wash off grease or dirt with an approved cleaner. Clean knots, pitch streaks or visible sap spots of residue and treat with two coats of "Formula WP578 Knot Sealer" (Western Pine Association). Allow at least two hours between the application of the first and second coats. Prime millwork on all sides before installation. Treat surfaces of opengrained woods with paste filler. Thin paste filler to brushing consistency with turpentine and apply in two coats, with stiff, short-bristled brushes. Allow filler to dry for one hour, then rub surfaces across the grain with coarse burlap or pads of excelsior until the surplus filler is removed. After the primer or paste filler has dried, fill nail holes and other indentations with putty, flush with the adjacent surfaces. Sand wood surfaces smooth with No. 00 sandpaper and remove dust.

F. 3.04

Pipe Covering and Insulation: Clean surfaces of pipe, duct and equipment insulation (such as canvas jackets and troweled-on insulation), of loose, foreign and objectionable material prior to priming or sealing.

WORKMANSHIP A. General: Apply paint in accordance with manufacturer's written instructions. Use applicator and techniques best suited for substrates and type of material being applied. Apply materials at not less than manufacturer's recommended spreading rate to establish a total dry film thickness as indicated or, if not indicated, as recommended by the manufacturer. Mix materials thoroughly before application to produce a mixture of uniform density; strain if necessary, before using. Do not mix surface film into material. If necessary, remove surface film and re-strain material before using. Do not adulterate ready-mixed materials except in accordance with the manufacturer's printed instructions. If no printed instructions appear on the container, obtain this information in writing from the manufacturer. Use only thinners approved by the paint manufacturer and only within recommended limits.

B.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-5 11 March 2013

C.

Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. Apply materials with care to a uniform and proper film thickness, showing no runs, holidays, sags, crawls or other defects. Apply with a minimum of brush marks. Finish surfaces shall be uniform in sheen, color and texture. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to the manufacturer's directions. 1. 2. 3. Brushes: Use brushes best suited for the material applied. Rollers: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by the manufacturer for the material and texture required. Spray Equipment: Use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required.

D.

E.

F.

The number of coats and the film thickness required are the same regardless of the application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. Sand between applications where sanding is required to produce a smooth even surface according to the manufacturer's directions. Apply additional coats if undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces. Apply two thin coats of paint to bare wood surfaces in sliding contact so as not to interfere with proper operation. Do not paint other materials in sliding contact. Remove paint applied to such surfaces. Paint access doors, plates, panel boxes, steel grilles, louvers, convector covers, registers, exposed prime painted hardware and the like in colors as selected. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. Paint interior surfaces of ducts or piping where visible through registers or grilles with a flat, non-specular paint type appropriate to surface to be painted. Finish paint doors on tops, bottoms, and side edges the same as exterior faces. Do not paint nameplates on equipment or over Underwriter's Laboratories, Factory Mutual or other code-required labels or equipment name, identification, performance rating, or nomenclature plates. Do not paint heating elements and pipes while they contain heat. Keep them cold until after the final coat has thoroughly dried. Mechanical and Electrical Work: Painting of mechanical and electrical work is limited to items exposed in equipment rooms and occupied spaces. 1. Mechanical items to be painted include, but are not limited to uninsulated metal piping, uninsulated plastic piping, pipe hangers and supports, tanks that do not have factory-applied final finishes, visible portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets, duct, equipment, and pipe insulation having "all-service jacket" or other paintable jacket material, and mechanical equipment that is indicated to have a factory-primed finish for field painting. Electrical items to be painted include, but are not limited to, switchgear, panelboards and electrical equipment that is indicated to have a factory-primed finish for field painting.

G. H.

I. J.

2. K. L.

Allow coats to dry and cure thoroughly before succeeding coats are applied; allow a minimum of 24 hours between applications on any one surface unless otherwise specified by the manufacturer. Sandpaper undercoats on interior metal thoroughly and uniformly to provide a smooth, even surface for finish coats.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-6 11 March 2013

M.

Surfaces given a prime or body coat of paint under other Sections of these Specifications will not require such coats of paint under this Section. Repair existing prime coatings with same primer or undercoat unless otherwise specified. Furnish competent technical assistance by the paint manufacturer on the job to ensure proper application of his material. When using paint with additional mildew inhibitive formulation, observe the procedures and precautions in the paint manufacturer's printed instructions for the use of this product.

N. O. 3.05

SCHEDULE OF EXTERIOR PAINTING A. B. General: Paint exterior surfaces exposed to view in accordance with this Schedule of Exterior Painting, except as specifically shown or specified. Ferrous Metal 1. Shop-Primed: Compatible with the primer. Provide the manufacturer recommended dry film thickness for each coat; semi-gloss finish coats; 1st coat - Alkyd Semi Gloss 2nd coat - Alkyd Semi Gloss 2. Galvanized: Compatible with the surface preparer. Provide the manufacturer recommended dry film thickness for each coat; semi-gloss finish coats; 1st coat - Epoxy Primer 2rd coat - Alkyd Semi Gloss C. Aluminum: Compatible with the surface preparer. Provide the manufacturer recommended dry film thickness for each coat; semi-gloss finish coats; 1st coat - Epoxy Primer 2nd coat - Alkyd Semi Gloss D. Portland Cement Stucco 1st coat - Acrylic Latex Flat 2nd coat - Acrylic Latex Flat E. Concrete, Concrete Masonry Units 1st coat - Latex Block Filler 2nd coat - Elastomeric Acrylic Latex 3rd coat - Elastomeric Acrylic Latex F. Wood 1. Stain Finish 1st coat - Stain Penetrating Wood Preservative 2nd coat - Clear Penetrating Wood Preservative 2. Gloss, Semi-Gloss or Eggshell Finish 1st coat - Wood Primer 2nd coat - Alkyd Paint 3rd coat - Alkyd Paint

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-7 11 March 2013

3.

Flat Finish

3.06

1st coat - Wood Primer 2nd coat - Acrylic Latex 3rd coat - Acrylic Latex SCHEDULE OF INTERIOR PAINTING A. B. General: Paint interior surfaces exposed to view in accordance with this Schedule of Interior Painting, except as specifically shown or specified. Ferrous Metal 1. Shop-Primed 1st coat - Enamel Undercoater 2nd coat - Alkyd Eggshell Enamel 2. Galvanized 1st coat - Water Based Acrylic Primer 2rd coat - Alkyd Eggshell Enamel 3. Semi-Gloss Epoxy Finish: One of the following systems: a. Pittsburgh Paints 1st coat - "Speedhide Primer 6-712"; 2.0 mils d.f.t. 2nd coat - "Pitt-Glaze Acrylic Epoxy"; 3.0 - 4.0 mils d.f.t.(PPG) 3rd coat - "Pitt-Glaze Acrylic Epoxy"; 3.0 - 4.0 mils d.f.t.(PPG) b. DuPont Company 1st coat - "Tufcote 72P"; 2.0 - 3.0 mils d.f.t. 2nd coat - "Corlar 76P"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Corlar 76P"; 2.0 - 3.0 mils d.f.t. c. Devoe Paints 1st coat - "Mirrulac No. 13101 "; 2.0 - 2.5 mils d.f.t. 2nd coat - "Gardcote-WB No. 25U8xx "; 2.0 - 3.0 mils d.f.t. 3rd coat - "Gardcote-WB No. 25U8xx "; 2.0 - 3.0 mils d.f.t. d. Carboline 1st coat - "Multibond 120"; 1.2 - 1.5 mils d.f.t. 2nd coat - "Sanitile 250 WB"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Sanitile 250 WB"; 2.0 - 3.0 mils d.f.t. C. Plaster and Fiberglass Reinforced Gypsum 1. Flat Finish 1st coat - Latex Primer 2nd coat - Latex Flat 3rd coat - Latex Flat 2. Eggshell Finish 1st coat - Latex Primer

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-8 11 March 2013

2nd coat - Latex Eggshell 3rd coat - Latex Eggshell 3. Satin Finish 1st coat - Latex Primer 2nd coat - Enamel Undercoater 3rd coat - Alkyd Satin Enamel

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-9 11 March 2013

4.

Semi-Gloss Epoxy Finish: One of the following: a. Pittsburgh Paints 1st coat - "Latex Primer Sealer, 6-2"; 1.0 - 1.5 mils d.f.t. 2nd coat - "Pitt-Glaze Acrylic Epoxy"; 3.0 - 4.0 mils d.f.t. 3rd coat - "Pitt-Glaze Acrylic Epoxy"; 3.0 - 4.0 mils d.f.t. b. DuPont Company 1st coat - "310 Acrylic"; 2.0 - 3.0 mils d.f.t. 2nd coat - "Corlar 76P"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Corlar 76P"; 2.0 - 3.0 mils d.f.t. c. Devoe Paint 1st coat - "Wonde-Prime No. 51701"; 1.5 mils d.f.t. 2nd coat - "Gardcote-WB No. 25U8xx Tru-Glaze-WB No. 128"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Gardcote-WB No. 25U8xx Tru-Glaze-WB No. 128"; 2.0 - 3.0 mils d.f.t. d. Carboline 1st coat - "Multibond 120"; 1.2 - 1.5 mils d.f.t. 2nd coat - "Sanitile 250 WB"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Sanitile 250 WB"; 2.0 - 3.0 mils d.f.t.

D.

Concrete, Concrete Masonry Units 1. Enamel Finish 1st coat - Latex Block Filler 2nd coat - Enamel Undercoater 3rd coat - Alkyd Eggshell Enamel 2. Epoxy Finish a. Pittsburgh Paints 1st coat - "Pitt-Glaze Latex Block Filler 16-90"; 12.5 mils d.f.t. 2nd coat - "Pitt-Glaze Acrylic Epoxy"; 3.0 - 4.0 mils d.f.t. 3rd coat - "Pitt-Glaze Acrylic Epoxy"; 3.0 - 4.0 mils d.f.t. b. DuPont Company 1st coat - "300P Acrylic Block Filler"; Apply to fill 2nd coat - "Corlar 76P"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Corlar 76P"; 2.0 - 3.0 mils d.f.t. c. Carboline 1st coat - "Flexxide Masonry Block Filler"; Apply to fill 2nd coat - "Sanitile 250 WB"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Sanitile 250 WB"; 2.0 - 3.0 mils d.f.t. d. Devoe Paints 1st coat - "No. 52903 Block Filler"; Apply to fill 2nd coat - "Gardcote-WB No. 25U8xx"; 2.0 - 3.0 mils d.f.t. 3rd coat - "Gardcote-WB No. 25U8xx"; 2.0 - 3.0 mils d.f.t.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-10 11 March 2013

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-11 11 March 2013

3.

Semi-Gloss Epoxy Finish Utilized as Access Floor Concrete Slab Sealer: a. Devoe Paints 1st coat - "Gardcote-WB No. 25U8xx" ; 2.0 - 3.0 mils d.f.t. 2nd coat - "Gardcote-WB No. 25U8xx" ; 2.0 - 3.0 mils d.f.t.

E.

Wood, Except Shop Finished 1st coat - Alkyd Primer Sealer 2nd coat - Enamel Undercoat 3rd coat - Alkyd Eggshell Enamel

F.

Piping and Mechanical Equipment: Paint piping, pipe hangers and supports, heat exchangers, tanks, ductwork, insulation, motors, electrical conduits, switchgear and other mechanical and electrical equipment except equipment which is non-ferrous metal, plated, finished by manufacturers, permanently concealed or noted to be painted under other Sections. Properly clean, prepare and finish as specified. Paint materials shall be heat-resisting type when applied to heating lines and equipment. 1. Uninsulated Piping Ductwork, Fittings and Equipment 1st coat - Enamel Undercoater 2nd coat - Alkyd Eggshell Enamel 2. Insulated Piping, Ductwork, Fittings and Equipment 1st coat - Latex Flat 2nd coat - Alkyd Semi Gloss 3. Machinery and Equipment 1st coat - Epoxy Type Machinery Enamel 2nd coat - Epoxy Type Machinery Enamel

H.

Pipe Identification 1. 2. Comply with ANSI A13.1 "Scheme for the Identification of Piping Systems". Provide plastic coated fabric pipe markers, "All-Temperature" labels (W.H. Brady), or approved equal. Indicate the pipe contents in printed, block letters. Provide labels of such length as to completely circumscribe the pipe and overlap not less than 1 in. upon one edge. Provide flow markers consisting of labels similar to the pipe markers with a large black arrow printed on the same background color to indicate the direction of flow of material in the pipe. On each side of walls or floors through which pipes pass, place a pipe marker and a flow marker on each pipe Place markers adjacent to valves and fittings. For exposed piping locate markers to be clearly visible to a person standing on the floor. On pipes or covering 1 in. and smaller in diameter requiring identifying markings, attach metal tag of not less than 1 in. in diameter, with lettering etched and filled with enamel, in lieu of stencils.

3. 4.

5. 3.07

PAINT COLOR TYPES A. Reference to a particular manufacturer's number or color name is used only as a convenience for the Engineer in order to establish the Project color requirements. These references are not intended to describe the required generic paint systems. For generic paint systems requirements, refer to the "Schedule of Exterior Painting" and the "Schedule of Interior Painting" as applicable to the respective conditions of use.

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-12 11 March 2013

B.

The Engineer's selection of paint colors are indicated by color type; designated "P- ". If suffixes "A" through "E" are utilized on the Finish Schedule, they denote the paint type's specular gloss range (adjust specified paint system as per manufacturers recommendations to achieve desired sheen) as follows: A - Flat Finish B - Eggshell Finish C - Satin Finish D - Semi-Gloss Finish E - Gloss Finish F - Fine Textured Finish G - Medium Textured Finish Except as otherwise noted, use flat finish on ceilings and soffits, eggshell finish on walls and fascias, satin or semi-gloss finish on doors and frames, semi-gloss finish on convector covers and metal trim, and epoxy finish on ceilings and walls in wet spaces where shown or specified. Samples showing color and sheen selected by the Engineer for specific items or areas specified to receive paint finishes are available for examination in the Engineer's office. Color Schedule: The following schedule shall be considered as a guide only to color requirements, subject to the Engineer's modification or approval: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Paint Type (PT01): Mfr. Name: Jotun; Color: RAL 9010; Eggshell finish. Paint Type (PT02): Mfr. Name: Jotun; Color : RAL 9011; Eggshell finish. Paint Type (PT03): Mfr. Name: Jotun; Color: RAL 6018; Eggshell finish. Paint Type (PT04): Mfr. Name: Jotun; Color: RAL 9010. Paint Type (PT05): Mfr. Name: Jotun; Color: RAL 7023. Paint Type (PT06): Mfr. Name: Jotun; Color: RAL 9011 (Black); Satin finish. Paint Type (PT07): Mfr. Name: Jotun; Color: RAL 9010; Satin finish. Paint Type (PT08): Mfr. Name: Jotun; Color: RAL 9010; Eggshell Matt. Paint Type (PT09): Mfr. Name. Jotun,; Color: RAL 9007; Semi-Matt Finish. Paint Type (PT10): Mfr. Name. Jotun,; Color: RAL 6018; Satin Finish. Paint Type (PT11): Mfr. Name. Jotun,; Color: RAL 6018. Paint Type (PT12): Mfr. Name. Jotun,; Color: RAL 6018; Eggshell Finish.

C.

D. E.

3.08

CLEANING A. B. C. At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site. Remove paint spots, oil or stains upon adjacent surfaces not requiring painting and leave entire job clean. Upon completion of painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces.

3.09

FIELD QUALITY CONTROL

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-13 11 March 2013

A.

The Owner reserves the right to invoke the following test procedure at any time and as often as the Owner deems necessary during the period when paint is being applied: 1. The Owner will engage the services of an independent testing agency to sample the paint material being used. Samples of material delivered to the Project will be taken, identified, sealed, and certified in the presence of the Contractor. The testing agency will perform appropriate tests for the following characteristics as required by the Owner: a. Quantitative materials analysis. b. Abrasion resistance. c. Apparent reflectivity. d. Flexibility. e. Washability. f. Absorption. g. Accelerated weathering. h. Dry opacity. I. Accelerated yellowness. j. Recoating. k. Skinning. l. Color retention. m. Alkali and mildew resistance. If test results show material being used does not comply with specified requirements, the Contractor may be directed to stop painting, remove noncomplying paint, pay for testing, repaint surfaces coated with rejected paint, and remove rejected paint from previously painted surfaces if, upon repainting with specified paint, the two coatings are incompatible.

2.

3.

END OF SECTION

PAINTS AND COATINGS Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

09900-14 11 March 2013

SECTION 10430 EXTERIOR SIGNS PART 1 - GENERAL - This section includes specifications for post mounted exterior signs. - Refer to Drawing Set A7.500 for Signage types and details.

1.01

SUMMARY A. Section includes: Non-illuminated post mounted (flag pole) sign complete with components by single manufacturer at locations indicated. Related sections: 1. Section 01630: 2. Section 03300: 3. Section 04220: 4. Section 07240: 5. Section 07900:

B.

Product Options and Substitutions. Cast-in-Place Concrete. Concrete Unit Masonry. Exterior Insulation and Finish System. Joint Sealers.

1.02

REFERENCES A. Standards of the following as referenced: 1. Aluminum Association (AA). 2. American National Standards Institute (ANSI). 3. American Society for Testing and Materials (ASTM).

1.03

SYSTEM DESCRIPTION A. Design criteria: Design to resist wind loads to 125 MPH when installed in accord with reviewed shop drawings and installation instructions.

1.04

SUBMITTALS A. Product data: 1. Manufacturer's signed statement regarding compliance with QUALITY ASSURANCE Article. 2. Manufacturer's product literature indicating units and designs selected. 3. Maintenance data and cleaning requirements for exterior surfaces. Shop drawings: 1. Indicate materials, sizes, configurations, applicable substrate mountings, and location of connections provided in other sections and co-ordinate with contractor. Specifically indicate tolerances required from other sections for base mounted modules. 2. Typography sample for copy. 3. Artwork for special graphics. 4. Furnish templates for locations of anchors installed by others. 5. Submit data of flagpole, including accessories and configurations.

B.

EXTERIOR SIGNS Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10430-1 11 March 2013

C. Samples: 1. Manufacturer to submit two 300x300mm sample illustrating pole material, color and finish to be approved by the Architect prior to fabrication and installation. 1.05 QUALITY ASSURANCE A. Qualifications: 1. Manufacturer qualifications: Work under this section from manufacturers regularly engaged in work of this magnitude and scope for minimum of seven years. Pre-installation conference: Closely coordinate tolerances required in this section for installation to bases supplied in other sections.

B. 1.06

DELIVERY, STORAGE, AND HANDLING A. B. Acceptance at site: Coordinate delivery of work to Project site under this section for immediate installation. Handling materials and equipment: Handle signage in careful manner in order not to damage or mar surfaces of signs or adjacent finish surfaces as applicable.

1.07

SEQUENCING AND SCHEDULING A. Coordinate: 1. Installation with adjacent finish materials in manner not to destroy adjacent surfaces. 2. with other sections for cast-in or built-in anchors and mounting hardware in work accomplished in other sections.

1.08

WARRANTY A. Special warranty: Manufacturer's standard seven year limited warranty covering coating degradation, chalking, fading, and fiberglass delaminating.

PART 2 - PRODUCTS 2.01 MANUFACTURER A. B.


3M, USA

Poles: Annin & Co. Flagpoles Ltd.

C. Fabric: Bulldog Cottton D. 2.02 As approved by the engineer.

MANUFACTURED UNITS PRODUCTS: A. Supporting Structure: 1. Material: Structural extruded aluminum alloy 6063-T6, 0.09". 2. Post profile: 3. Finish: as shown in the schedule.
10430-2 11 March 2013

EXTERIOR SIGNS Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

4. B.

Design post for panel size; individual lengths required by manufacturer for in ground mount.

Flag Fabric: 1. Bulldog material made with a special open weave that allows for less friction between threads as the material moves about in the breeze, increasing the lifetime of the fabric.

C. Graphics: 1. Special note: Use of clear overcoat on completed graphics regardless of colors or types selected is strictly prohibited. 3. Pressure sensitive graphics (PSG) colors: Selected by Architect from manufacturers, non-reflective colors. Indicated in SCHEDULES. 4. 2.03 Type: 1. Size: As indicated in drawings and schedule.

ACCESSORIES A. Sealant for base mounted modules: 1. Acceptable products: a. ChemRex Inc.; Sonneborn NP-I. b. Pecora Corp.; Dynatrol I. c. Tremco, Inc.; Dymonic. 2. ASTM C920-86, Type S, Grade NS, Class 25. 3. Colors: Selected by Architect from manufacturer's standard selection. Miscellaneous hardware and items for installation of in-ground and base mounted sign modules.

B. 2.04

FABRICATION A. Shop assembly: 1. Fabricate units to configurations indicated on reviewed shop drawings. Internally reinforce units in accord with reviewed shop drawings. 2. Provide copy required on reviewed shop drawings in accord with manufacturer's standard procedures. 3. Fabricate posts to lengths required for in-ground mounting.

PART 3 - EXECUTION 3.01 EXAMINATION A. Verification of conditions: Indicated in Coordination Section. 1. Examine areas to receive sign modules; verify for correct location of cast-in anchors installed under other sections. 2. Notify Architect in writing of unacceptable substrate or improper location of anchors. 3. Beginning work indicates acceptance of substrate. Subsequent modifications to substrate or modules becomes this section's complete responsibility.

3.02

INSTALLATION A. B. Install sign modules in locations indicated in accord with reviewed shop drawings. Square, plumb, and level units. Bore holes for post mounted sign modules; set and align posts; fill and compact space around post with concrete.

EXTERIOR SIGNS Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10430-3 11 March 2013

C. Install base mounted modules on prepared base; secure to base; caulk joint between module and base with polyurethane sealant specified above and in accord with Joint Sealers section. 3.03 CLEANING A. 3.04 Clean exposed surfaces not more than 48 hours prior to Date of Substantial Completion in accord with manufacturer's written cleaning instructions.

SCHEDULES A. See attached Schedule. END OF SECTION 10430

EXTERIOR SIGNS Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10430-4 11 March 2013

SECTION 10440 INTERIOR SIGNAGE PART 1 GENERAL 1.1 SECTION INCLUDES A. B. C. D. E. F. G. H. I. Identification Signage. Cubicle Signage. Directional Signage. Regulatory Signage. Informational Signage. Activity / Calendar Signage. Donor Boards. Directory Signs. Dimensional Characters.

1.2

RELATED SECTIONS A. B. C. D. E. F. Section 09200 - Plaster and Gypsum Board. Section 09700 - Wall Finishes. Section 10410 - Directories. Section 10420 - Plaques. Section 10430 - Exterior Signage. Section 12700 - Systems Furniture.

1.3

REFERENCES A. B. C. Americans with Disabilities Act (ADA). 1. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines. American National Standards Institute (ANSI): 1. ANSI A117.1 - Accessible and Usable Buildings and Facilities ASTM International (ASTM): 1. ASTM D 635 - Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position. 2. ASTM D 1929 - Standard Test Method for Determining Ignition Temperature of Plastics. 3. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials. 4. ASTM E 2073 - Standard Test Method for Photopic Luminance of Photoluminescent (Phosphorescent) Markings.

INTERIOR SIGNAGE Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10440-1 11 March 2013

D.

Underwriters Laboratory (UL): 1. UL 94 - Tests for Flammability of Plastic Materials for Parts in Devices and Appliances. 2. UL 723 - Surface Burning Characteristics of Interior Finish Materials and Systems.

1.4

PERFORMANCE REQUIREMENTS A. B. C. Provide photopolymer signage that conforms to the requirements of all regulatory agencies holding jurisdiction and the quality control of InPro SignScape. Provide Glow in the Dark, photoluminescent material that complies with applicable provisions of ASTM E 2073-02 and DIN 67510. Photoluminescent material must have up to 8 hours of luminance. Requirements: 1. Comply with all applicable provisions of the ADA and ANSI A117.1-1998. 2. Character Proportion: Letters and numbers on signs must have a width-to-height ratio between 3:5 and 1:1 and a stroke width-to-height ratio between 1:5 and 1:10. 3. Color Contrast: Characters and symbols must contrast with their background - either light characters on a dark background or dark characters on a light background. 4. Raised Characters or Symbols: Letters and numbers on signs must be raised 1/32 in (0.8 mm) minimum and be sans serif characters. Raised characters or symbols must be at least 5/8 in (16 mm) high, but no higher than 2 in (50 mm). Symbols or pictograms on signs must be raised 1/32 in (0.8 mm) minimum. 5. Symbols of Accessibility: Accessible facilities required to be identified, must use the international symbol of accessibility. 6. Braille: Grade II with accompanying text. Fire Performance Characteristics: 1. Provide photopolymer signage with surface burning characteristics that consist of a flame spread of 75 and a smoke development of 120 when tested in accordance to UL 723 (ASTM E 84). 2. Self Extinguishing: Provide photopolymer signage with a CC1 classification for .060 inch thick material, when tested in accordance with the procedures in ASTM D 635, Standard Test Method for Rate of Burning and/or Extent and Time of Burning Plastics in a Horizontal Position. 3. Vertical Burn: Provide photopolymer material that is classi-fied as 94V-2 for material .118 inches thick or greater and 94HB for material .118 inches thick or less when tested in accordance with UL 94, Tests for flammability pf Plastic Materials for Parts in Devices and Appliances. 4. Self Ignition Temperature: Provide photopolymer material that has a self ignition temperature of 800 F (427C) when tested in accordance with ASTM D 1929.

D.

1.5

SUBMITTALS A. B. Submit under provisions of Section 01300. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods. Shop Drawings: Detail drawings showing sizes, lettering, and graphics, construction details of each type of sign, and mounting details with appropriate fasteners for specific project substrates. Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns. Verification Samples: For each sign type and color specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns. Manufacturer's Installation Instructions: Printed Installation Instructions for each signage system.

C. D. E. F.

INTERIOR SIGNAGE Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10440-2 11 March 2013

G. 1.6

Signage Report: Signage report indicating signage sizes, lettering and construction.

DELIVERY, STORAGE, AND HANDLING A. B. C. D. Deliver materials in unopened factory packaging. Inspect materials at delivery to verify. Store products in manufacturer's original packaging until ready for installation, in climate controlled location away from direct sunlight. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.

1.7

PROJECT CONDITIONS A. B. Install products in an interior climate-controlled environment. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

1.8

WARRANTY A. At project closeout, provide to the owner or owners representative a copy of the manufacturer's standard limited warranty against manufacturing defect outlining the terms, conditions and exclusions from coverage. 1. Duration: One (1) year.

INTERIOR SIGNAGE Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10440-3 11 March 2013

PART 2 PRODUCTS 2.1 MANUFACTURERS 3M, USA Or equal approved.

- Requests for substitutions will be considered in accordance with provisions of Section 01600.

2.2 A.

SIGNAGE STICKERS Overlaminate Film: 1. Type: Scotchal Changeable Translucent Graphic film. IJ630-20. 2. Finish: Matte, Translucent 3. Application: Fiberglas, reinforced plastic, glass,plastic. 4. Adhesive: Clear, Changeable. 5. Thickness: 0.102mm Building/Glass: 1. Type: Scotchal Opaque Graphics Film Series 100 2. Finish: Glossy, Opaque 3. Application: Glass, polycarbonate, Buildings, Exterior, heat sensitive, on flat surfaces. 4. Adhesive: Clear. 5. Thickness: 0.05 mm Walls: 1. 2. 3. 4. 5. Type: Scotchal Graphics Film 3670LF Finish: Glossy, Opaque Application: Wall covering, screen printing for indoor vinyl signage Adhesive: Black pigmented adhesive, pressure sensitive. Thickness: 0.08-0.10mm

B.

C.

D.

Polycarbonate Panels: 1. Type: Scotlite Reflective Graphics Film Series 68085 2. Finish: Reflective, in black color permanent. 3. Application: for electrostatic or screen printing, indoor and outdoor use. 4. Adhesive: Clear with silver underneath, pressure activated - slideable 5. Thickness: 0.18-0.20mm Illuminated Signage: 1. Fluorescent: Cool White Fluorescent Tubes Description: Internally illuminated via cool white fluorescent tubes with electronic ballasts with power feed run within 2 off 15mm suspended ceiling tubes, mechanically attached to load spreader within ceiling void with ceiling rose at finished ceiling level. 2. Litepad (ROSCO) Illumination: - LItepad HO+LED Description: Edge-lit LED Light, Thickness: 1/3", Color: Daylight.

E.

INTERIOR SIGNAGE Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10440-4 11 March 2013

2.3

SIGNAGE GENERAL A. Refer to drawing set A7.500 and Signage Schedule.

B. Comply with all applicable provisions of the ADAAG, ANSI A117.1, and State and local authorities having jurisdiction. C. D. E. F. If required text and graphics are not indicated in specification or on drawings, obtain Owner's instructions as to text and graphics prior to preparation of shop drawings. Use manufacturer's standard pictograms wherever applicable. Graphic Design: 1. As shown in the drawings and schedule Braille: Grade 2 Braille produced with the Raster Method, patented process for placing Braille on signage. Raster Braille is computer engineered using a carbide-engraving bit, press-fit tool with vacuum pump and UV stable acrylic rasters.

PART 3 EXECUTION 3.2 A. B. C. D. E. 3.3 EXAMINATION Verify that wall surface is dry and free from dirt, grease, and loose paint. Complete all finishing operations, including painting, before beginning installation of signage systems. Do not begin installation until substrates have been properly prepared. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. Examine signage for defects prior to installation. Do not install damaged signage.

PREPARATION A. B. C. Verify mounting heights and locations comply with referenced standards. Clean surfaces thoroughly prior to installation to remove dust, debris and loose particles. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.4

INSTALLATION A. B. Locate the signage system as indicated on drawings for the appropriate substrate and in accordance with manufacturer's installation instructions. Install signage systems level and plumb at the height indicated on the drawings.

3.5

CLEANING A. At completion of installation, clean surfaces in accordance with manufacturer's instructions.

3.6

PROTECTION A. Protect installed products until completion of project.

INTERIOR SIGNAGE Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10440-5 11 March 2013

B.

Touch-up, repair or replace damaged products before Substantial Completion.

END OF SECTION

INTERIOR SIGNAGE Project No: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10440-6 11 March 2013

SECTION 10810 TOILET ACCESSORIES PART 1 - GENERAL 1.01 DESCRIPTION A. B. General: Provide toilet accessories in accordance with the Contract Documents. Related Work Specified Elsewhere 1. Mirrors not designated as Toilet Accessories. 2. Electrical connections to power source for electrical toilet accessories.

1.02

QUALITY ASSURANCE A. For each type of accessory specified, provide products produced by a single firm which has been manufacturing toilet accessories for not less than 5 years.

1.03

STANDARDS A. Except as modified by governing codes and the Contract Documents, comply with the applicable provisions and recommendations of the following: 1. Wiring Between Motors and Controls: Comply with the National Electrical Code. 2. Motors and Controls: Comply with the National Electrical Manufacturers Association (NEMA). 3. NAAMM "Metal Finishes Manual". 4. Industrial Fasteners Institute "Fastener Standards Book". Where the language in any of the documents referred to herein is in the form of a recommendation or suggestion, such recommendations or suggestions shall be deemed to be mandatory under this Contract.

B. 1.04

SUBMITTALS A. Setting Drawings: Provide setting drawings for toilet accessory cutouts required in other work; include templates, substrate preparation instructions, and directions for preparing cutouts and installing anchoring devices. Samples: Submit full size samples of each toilet accessory specified, as requested. Accepted samples may be used in the final installation. Schedule: Submit a schedule indicating types, quantities, sizes and installation locations by room for each toilet accessory item specified. Use designations indicated in the Schedule of Accessories specified herein and room designations indicated on Drawings in product schedule. Product Data: Submit manufacturer's specifications and installation instructions for each type toilet accessory specified, including details of construction relative to materials, dimensions, gages of metals, profiles, method of mounting, specified options and finishes. Operation and Maintenance Manuals: Submit three (3) copies of the manufacturer's operating and maintenance manuals, including parts lists for the electrical toilet accessories.

B. C.

D.

E. 1.05

PRODUCT DELIVERY, STORAGE AND HANDLING A. Delivery of Materials: Deliver materials in manufacturer's unopened protective containers fully identified with manufacturer's name, trade name, type of items, size, color finish and other information required for full identification.

TOILET ACCESSORIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10810-1 11 March 2013

B. 1.06

Storage of Materials: Store materials in unopened containers. Store off the ground and under cover, protected from damage by the elements.

COORDINATION A. B. Coordinate toilet accessory locations, installation, and sequencing with other work to avoid interference with and ensure proper installation, operation, adjustment, cleaning, and servicing of toilet accessory items. Deliver inserts and anchoring devices set into concrete or masonry as required to prevent delaying the Work.

1.07

WARRANTIES A. Warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and are in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. Warranty: Provide a written warranty , directly to the Owner, for a period of five years, for mirrors against visible silver spoilage defects. Upon notification of such defects, make necessary replacements at the convenience of the Owner. Warranty , Electric Hand Dryers: Provide a written warranty directly to the Owner, for a period of ten (10) years for the electric hand dryers against defects. Upon notification of such defects, make necessary replacements at the convenience of the Owner.

B.

C.

PART 2 - PRODUCTS 2.01 ACCESSORIES MATERIALS A. B. Stainless Steel: ASTM A666, AISI Type 302 or 304 with No. 4 finish, for all toilet accessories unless otherwise specified. Brass 1. 2. 3. Leaded and Unleaded Flat Products: ASTM B19. Rods, Shapes, Forgings and Flat Products with Finished Edges: ASTM B16. Castings: ASTM B30.

C. D. E.

Sheet Steel: ASTM A366, cold rolled, commercial quality, surface preparation and metal pretreatment as required for applied finish. Galvanized Sheet Steel: ASTM A\, Grade G60. Chrome Plating: ASTM B456, Service Condition No. SC2; US26D finish. On brass, nickel coating applied either directly to the base metal or over a coating of copper. On steel, nickel coating applied over a coating of copper. Mirrors: ASTM C1036, Type 1, Class 1, Quality q1, 3 in. thick unless otherwise specified. Mirrors shall have a uniform coating of silver, protected by a film of electrolytically deposited copper and a protective organic coating. Galvanized Steel Mounting Devices: ASTM A153, hot dip galvanized after fabrication. Fastening Devices: Stainless steel or cadmium plated steel, concealed in the finished work wherever possible. Exposed screws shall be theft-proof, flat head, countersunk, finished to match the accessory where exposed. Furnish two (2) special tools per floor. All Other Materials: Manufacturer's standard for the items required or type best suited for the intended use.

F.

G. H.

I.

TOILET ACCESSORIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10810-2 11 March 2013

2.02

FABRICATION A. Recessed Units: Except where otherwise shown, fabricate units of all welded construction, without mitered corners. Hang doors or access panels with full-length stainless steel piano hinge. Provide fasteners and anchorage that are fully concealed when unit is in the closed position. Surface Mounted Units: Except where otherwise shown, fabricate units with tight seams and joints and all edges rolled. Hang doors or access panels with full-length stainless steel piano hinge. Provide fasteners and anchorage that are fully concealed when unit is in the closed position. Manufacturer's nameplates on exposed faces of units will not be permitted. Provide identification of each accessory item indicating manufacturer's name and product model number either on the back of the accessory or on a surface not exposed to view utilizing printed, waterproof label or stamped nameplate indicating manufacturer's name and product model number. Keys: Unless otherwise indicated, provide universal keys for access to toilet accessory units requiring internal access for servicing, resupply, etc. Provide minimum of six (6) keys to Owner's representative and obtain receipt.

B.

C.

D.

2.03

MANUFACTURER A. Specified proprietary designations are from the current catalogs of the indicated product manufacturers and suppliers and establish the minimum standards of design, dimension and quality. Alternate products for each application manufactured by others will be considered, provided they satisfy the established requirements. Bobrick Bradley Corporation A & J Washroom Accessories Toto Grohe Bossini American Specialties Co. USA

A. B. C. D. E. F. G.

2.04

SCHEDULE OF ACCESSORIES Refer Sanitary Schedule

3.03

ADJUSTMENT AND CLEANING A. B. After review of the installation by the Owner, remove protection, labels, smears and stains. Clean and polish each accessory in accordance with manufacturer's written recommendations and instructions. Adjust accessories for proper operation and verify that mechanisms function smoothly. Replace damaged or defective items. END OF SECTION

TOILET ACCESSORIES Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

10810-3 11 March 2013

SECTION 12482 ENTRANCE MATS PART 1 - GENERAL 1.01 WORK INCLUDED A. B. 1.02 Vinyl finish entry mats. Aluminum alloy framing.

SAMPLES A. Submit samples in accordance with Section 01300.

1.03

SHOP DRAWINGS A. Submit shop drawings in accordance with Section 01340.

PART 2 - PRODUCTS 2.01 APPROVED MANUFACTURERS AND TYPE 1. Construction Specialities Group, UK, Canada and USA 2. Geggus E-M-S GmbH, Germay 3. EMCO Building Group 4. 3M Mats, USA 5. Balco, Inc. 6. Nuway Matting Systems, Inc. B. Type: Vinyl finish floor mat with aluminum alloy frame; Recessed type 44mm thick Model: as selected by the Engineers Representative. Color: as selected by the Engineers Representative.

C.

Grid Structure

Recess mounted for flush installation. Mill finish aluminium T-section rails at 38mm centers Vinyl support cushions Transverse aluminium locking bars at 300mm cetnres Removable Sections for cleaning.

D.

Well Details

46mm frame depth, 44mm finished well depth. Aluminium frames with snap-in corner locks Base of well can be drained.

E.

Tread Finishes

Vinyl - Ribbed for effect drainage and grip

ENTRANCE MAT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

12482-1 11 March 2013

PART 3 - EXECUTION 3.01 INSTALLATION A. B. Verify size of floor recess before fabricating mats. Place mats in floor recess after final cleaning of finish flooring. END OF SECTION

ENTRANCE MAT Project No.: KW.11.0209 Project Name: Hisham Abdullah Hamed Al-Sager Cardiac Center

12482-2 11 March 2013