CEMENTO a 9,35 BS/SACO TOTAL=1.795,58 BLOQUES a 1,91 BS/BLOQUE TOTAL= 4.251,44 CABILLAS a 23,35 BS/cab. TOTAL=1.447,49 Bs CABILLAS 3/8 a 13,52 BS/cab. TOTAL=1.190,05 Bs KIT METALICO DE HERRERIA Y TECHO TOTAL=12.500Bs PIEDRA PICADA a 62,99 BS/M3. TOTAL=1007,84 Bs.
Bs. 15.137,54
O
KIT ESTRUCTURA METALICA TOTAL=16.824,71 Bs MALLA TRUCKSON a 745, 11BS/ROLLO. TOTAL=745,11Bs
ESTOS CALCULOS REPRESENTAN EL VALOR EN EL MERCADO Y LAS EMPRESAS DEL ESTADO CON PRECIOS REGULADOS, EL MONTO TRANSFERIDO POR VIVIENDA SERA DE 72.330,00 BS. SIN INCLUIR EL 2% DE LOS GASTOS ADMINISTRATIVOS Y EL 6% DE LOS PROYECTOS SOCIOPRODUCTIVOS