Vous êtes sur la page 1sur 1

EXPERIENCE OF FIRE WATER TANK (24 M )(API-650) Annular Plates, Bottom Plates, Roof plates lying and fit

t up inspection. Inspection of Shell Plates vertical fit up & Horizontal fit up. Modification of tanks with shell patch plates fit up inspection. Inspection of nozzle orientation and fit up inspection with RF pads. Carry out RF pad pneumatic test, Bottom & Roof plates vacuum box testing. Carry out inspection of Oil Penetrant test or MPI for shell plates with bottom plates fillet weld. PT of shell plates Vertical seam & circumference seam back chipping inspection. Review of RT film for shell plates vertical seam and circumference seam. Carry out inspection of Peaking and Banding of shell plates. Checks verity the plumpness and ovality of the Vertical storage tanks with application codes. Carry out Hydro test with full of water as per client requirements.
Job &Responsibilities as QCI- Mechanical:
Witness of foundation of Equipments. Witness Diesel test. Inspection of Peaking and banding deviation. Hydro test inspection at different stages of storage Tank. Inspection pickling and Passivation of SS storage tanks. Witness 1-Foot measurement for tank roundness.

Vous aimerez peut-être aussi