MBS Lahore is still in the phase of execution and hence most of the presentation is either Planning or future Please criticize & Advise as well
9/7/2012
MBS
UU
City Lahore
The capital of Punjab, a city of around 9m, with a growth rate of around 3%
9/7/2012
MBS
UU
Vision
The Vision is to provide the city of Lahore with a high quality Public Transport System, with a road based mass transit system, in the medium term.
9/7/2012
MBS
UU
Basics
Estimated Project Cost ~ Rs. 30 Billion Total Length 32 km (Elevated portion 8.5 km) Median Side BRT with one each lane each direction Level Boarding for Passenger from Station Commercial Speed of 25 Km/h & reliability of service
Length
The Route (Green Corridor) is 32km long, running south to north across the city, on one of the four primary arteries of the city
9/7/2012
MBS
UU
9/7/2012
MBS
UU
Elevated Portion Around 7 km is elevated, which is because of the constraints on widening the Road
9/7/2012 MBS UU
Stations
These are on the sides of the Route 3 platforms on each side
Sliding Doors
9/7/2012 MBS UU
9/7/2012
MBS
UU
STOP BAR
PLATFORM AREA
9/7/2012
MBS
UU
Capacity
9/7/2012
MBS
UU
E Ticketing
We are introducing e ticketing , but only limited to the MBS for the time being
9/7/2012
MBS
UU
ITS
There are 11 traffic signals on the route that is at grade These signals are being upgraded to make these Intelligent, providing Bus priority and managing allied traffic as well. Control Center is being set up
9/7/2012 MBS UU
9/7/2012
MBS
UU
Main Road/Trunk/BRT
Feeder Bus
Transfer facilities
Communication Strategy
9/7/2012
MBS
UU
9/7/2012
MBS
UU
Thank you
9/7/2012 MBS UU
9/7/2012
MBS
UU