Vous êtes sur la page 1sur 8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Search

Listen to music

Home Disclaimer Construction Method Statements Plumbing Piping Electrical HVAC Duct Works HVAC Piping Testing & Commissioning Pump Installation Method Statement Template Inspection Checklists Request A Method Statement Health & Safety Sample Forms & Formats

Flushing Procedure For Chilled Water System Chemical Treatment

Tw eet

Like

0
Email Share
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 1/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Tw eet Like 0

Email

Share

HVAC Air Conditioning


www.siemens.com/climate-control Climate Control by Siemens - Save up to 60 percent of consumed energy

This method statement describes the methodology and procedure for flushing of chilled water system and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and Project Documents and Specification. Scope of Works

This method statement is intended to outline the activities and the methods used in cleaning and flushing of chilled water system and its chemical treatment. All activities will be carried out in accordance with the contract details and in full compliance to the project specifications. All work within the rights-of-way of the standards and specifications will be done in compliance with requirements issued by authorities. Required Tools/Equipment Tool box Tool kit Meters/gauges Power Tools Temporary pump

methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html

2/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Chilled Water Flushing Procedure


Preparation: The following preparation checks / works shall be carried out prior to commencement of flushing and cleaning of chilled water system. Check and ensure the system is hydro-statically pressure tested and verify test certificate. Check the provision of air vents at location as per approved drawings. Check and ensure sufficient quantities of chemicals are available as per requirement. Place warning signs and warning tape as required. Arrangements for draining the flushed water to be made before starting the flushing process. Drain should be connected to main drainage line or as directed by authorities.

Flushing & Cleaning Steps


Cleaning With Fresh Water Fill the system with clean water and drain the water after 30 minutes of circulation. The water quality will be as per approved parameters. Refill the system with clean water and run the chilled water pump for 2 hours. Take samples to check the quality
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 3/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

of water as per applicable requirements in the contract. Open the drain valves in the main lines and drain the water completely. Clean the strainers During the above flushing process the drain valves shall be kept open while the pump is running, until the water appears clean. Close all the drain valves Cleaning With Cleaning Chemical Desired water quality should be achieved before adding the chemical. Refill the system with clean water and add cleaning chemical in required quantities as per Specialist suppliers instructions i.e. 1Kg per cubic meter of system volume. Once the cleaning process is started, samples of solution shall be collected from various parts of the system to ensure the chemical solution has reached all parts of the system. Run the pump and circulate the water (with chemicals added) for a minimum period of 24 hours as per specialist suppliers recommendations. Samples to be taken and tested in 3rd party laboratory. The water quality must be achieved as per the requirements agreed in the contract or as applicable Specialist contractor shall collect samples and conduct tests until satisfactory results are obtained as required which is a condition when no increase in iron level is observed and a level of iron less than 1ppm is achieved and the water is clear, colourless and odourless. After the cleaning process is completed as described above the cleaning solution shall be flushed out. Addition of Corrosion & Scale Inhibitors The entire system is re-filled with fresh and clean water and treated with corrosion and scale inhibiting treatment chemical at the rate of 3Kg per cubic meter of the system volume or as applicable depending upon the chemical concentration. After 24 hours of circulation samples are taken to ensure the concentration levels i.e. 800-100 ppm as NaNo2 Biological Control Biological control chemical, shall be dosed at the agreed rate per cubic meter using the manual dosing pot. This is a shock dosing which shall be done after every three months. Inspection The inspection request shall be raised for consultant to witness the flushing and cleaning process at different stages and results shall be noted on checklists.

methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html

4/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Tags: Chemical Treatment of chw piping, chw piping cleaning, Flushing Procedure For Chilled Water System METHOD STATEMENT FOR CONCRETE SAMPLING AND TESTING Sample Forms & Checklists For HVAC Installation Testing & Commissioning
Search Search

Electrical Installation
www.siemens.ae/green-buildings Siemens Green Buildings - Save up to 60 percent of consumed energy!

Like Us To Support Us

methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html

5/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Methodstatementhq
Like One person likes Methodstatementhq.

F acebook social plugin

Other Method Statements


Testing & Commissioning Of Fire Suppression System August 20th, 2013 The scope of method statements covers the planning, preparation, and conduct of fire suppression sys[...]

Welding Method Statement August 13th, 2013 There are many different welding processes, but the most commonly used in the construction industry [...]

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing August 13th, 2013 The purpose of this method statement is to lay down the systematic procedures for the various activi[...]

Method Statement For Installation Testing & Commissioning Of BMS Building Management System August 1st, 2013 Scope of Work This method statement is applicable for Installation, Testing & Commissioning of [...]
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 6/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Chilled Water Balancing For HVAC System Method Statement July 31st, 2013 The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow r[...]

Method Statement For Air Balancing Of HVAC System FCU AHU Exhaust Fans & Pressurization Unit July 31st, 2013 Air Balancing Method Statement Air Balancing For Fan Coil Units Check that all automatic contro[...]

Inspection Checklists / Forms For Electrical Works Installation Testing & Commissioning July 31st, 2013 Below are the links for downloading the sample inspection and testing check sheets and forms which y[...]

Sample Forms & Checklists For HVAC Installation Testing & Commissioning July 31st, 2013 You can download the sample forms and checklists for different activities which you can then customi[...]

METHOD STATEMENT FOR CONCRETE SAMPLING AND TESTING July 29th, 2013 This method statement is applicable for collecting samples for concrete before and during concrete p[...]

METHOD STATEMENT FOR TESTING & COMMISSIONING OF PRESSURIZATION UNIT July 29th, 2013 The purpose of this procedure is to define the step by step method to implement the correct practice[...]
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 7/8

8/25/13

Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ

Most Visited Tags


AC Ducting Method Statement

blank performa blank proforma BMS Testing Procedure Building Management System BMS

Construction Method Statements Drainage Piping Installation Electrical Method Statements

for GI Box Installation GI Conduit In T he Wall


Method Statement

hvac

HVAC Duct Work Installation Method Statement HVAC System Procedure

installation Installation of GI Conduits &

Accessories

method Method Of Statement Method Statement

method statement for Installation Method Statement For PVC Conduit Installation In Concrete Slab Method Statement Template MST MST For
For Drainage Piping method statement for drainage works Method Statement For GI Box & Conduit Installation

BMS

MST For Conduiting Work

of Piping Installation Procedure pressure pumps PVC uPVC Underground Above Ground Piping Risk

Assessment

sample check list sample checksheet Sample Format Electrical SOP

statement swms template test

Testing & Commissioning Testing & Commissioning Method Statement water

Home Privacy Policy Disclaimer Copyright 2011 - 2012 MethodStatementHQ.Com. All Rights Reserved.

methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html

8/8

Vous aimerez peut-être aussi