PRELIMINARY MASTER PROJECT SCHEDULE

2012
3RD QTR 4TH QTR 1ST QTR

2013
2ND QTR 3RD QTR 4TH QTR 1ST QTR

2014
2ND QTR 3RD QTR 4TH QTR 1ST QTR

2015
2ND QTR 3RD QTR 4TH QTR 1ST QTR

2016
2ND QTR 3RD QTR 4TH QTR

2017
1ST QTR

DEVELOPMENT PHASE
DESIGN MASTER PLANNING and CONCEPT DESIGN

FINAL DESIGN & CONSTRUCTION PHASE

OPERATIONS

D E S I G N

SD DD CDs Construc<on Start UTILITIES / EAST SITE PREP

STRUCTURAL FRAME ROOF STRUCTURE C O N S T R U C T I O N ENCLOSURE FINISHES SITEWORK SCOREBOARDS / SOUND SIGNAGE / FF&E Substan<al Comple<on

2012 NFL SEASON

2013 NFL SEASON

2014 NFL SEASON

2015 NFL SEASON

2016 NFL SEASON

*The determination of the timing regarding the demolition of the Metrodome (after the 2013 or 2014 season) has not been made yet and should be a consideration in the design and construction alternatives. Firms may propose design schedule alternatives that include overlap between design phases to accommodate an earlier construction start