Vous êtes sur la page 1sur 12

PLANILLA DE METRADOS

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA
DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
ITEM

DESCRIPCIN

N DE
VECES

LARGO

MEDIDAS
ANCHO

PARCIAL

TOTAL

UND.

ALTURA

03. ARQUITECTURA
3.01 REVOQUES Y ENLUCIDOS
03.01.01 TARRAJEOS
03.01.01.01 TARRAJEO PRIMARIO
En Jardineras

12.75 m2
1.00

4.20

2.00

8.40

1.00

2.90

1.50

4.35

03.01.01.02 TARRAJEO EN MUROS INTERIORES Y EXTERIORES (C:A 1:5 e=1,5cm)

183.87 m2

En Muros de contencion
Eje a

1.00

Area=

14.20

14.20

Eje b

1.00

Area=

39.00

39.00

1.00

Area=

27.37

27.37

1.00

Area=

27.00

27.00

2.00

Area=

38.15

76.30

5.00

24.20

1.15

139.15

3.00

1.30

3.50

13.65

2.00

4.75

0.30

2.85

1.00

5.75

1.30

Acceso

2.00

3.00

0.15

0.30

0.27

Circulacion Principal

2.00

16.00

0.15

0.30

1.44

Galeria de circulacion

2.00

28.10

0.15

0.30

2.53

1.00

10.87

0.15

0.30

0.49

Acceso posterior

2.00

10.85

0.15

0.30

0.98

Vereda

1.00

22.90

0.15

0.40

1.37

Acceso

1.00

3.00

4.20

12.60

Circulacion Principal

1.00

16.00

2.70

43.20

Galeria de circulacion

1.00

28.10

2.20

61.82

1.00

rea=

39.90

39.90

Acceso posterior

1.00

10.85

2.70

29.30

Vereda

1.00

22.90

1.35

30.92

en entrada principal

1.00

16.20

5.00

81.00

en gradas

1.00

4.30

3.00

12.90

1.00

1.20

19.40

23.28

1.00

1.20

11.10

13.32

4.00

3.00

0.30

1.00

4.00

0.20

0.80

4.00

16.00

0.30

19.20

03.01.01.03 REVESTIMIENTO DE GRADERIAS MEZCLA 1:2


En graderias

139.15 m2

03.01.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO ARENA


En columnas de acceso principal

13.65 m2

03.01.01.05 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO ARENA


Acceso Principal

2.85 m2

3.02 CIELO RASOS


03.02.01 CIELO RASO CON MEZCLA DE C:A 1:5
Acceso Principal

7.48 m2
7.48

3.03 PISOS Y PAVIMENTOS


03.03.01 CIRCULACIONES
03.03.01.01 CIRCULACIONES: SARDINEL DE C F'c=175kg/cm2

7.08 m2

03.03.01.02 CIRCULACIONES: CONCRETO F'C=140 KG/CM2, E=4" ACAB. 1:2

348.23 m2

36.60

03.03.01.03 CIRCULACIONES: ENCOFRADO Y DESENCOFRADO


Acceso
Circulacion Principal

164.36 m2
3.60

PLANILLA DE METRADOS
PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA
DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
ITEM

DESCRIPCIN

Galeria de circulacion

Acceso posterior
Vereda

N DE
VECES
16.00

LARGO
4.00

4.00

MEDIDAS
ANCHO

PARCIAL
ALTURA
0.20

12.80

28.10

0.30

33.72

2.00

10.87

0.30

6.52

15.00

2.50

0.10

3.75

5.00

1.90

0.10

0.95

8.00

3.00

0.10

2.40

2.00

8.00

0.10

1.60

2.00

10.85

0.30

6.51

8.00

3.00

0.15

3.60

2.00

22.90

0.40

18.32

12.00

2.00

0.12

2.90

1.00

36.95

0.40

14.78

TOTAL

UND.

32.90
1.00
7.00

19.40

11.10

11.10

1.20

1.00
4.00

19.40

1.20

1.20

1.20

03.03.01.04 CIRCULACIONES: JUNTAS DE DILATACION E=1"

249.68 m

Junta transversal
Acceso

1.00

3.00

3.00

Circulacion Principal

16.00

3.00

48.00

Galeria de circulacion

15.00

2.50

37.50

5.00

1.90

9.50

8.00

3.00

24.00

2.00

8.00

16.00

8.00

3.00

24.00

12.00

1.50

18.00

6.00

1.20

1.20

4.00

1.20

1.20

4.80

14.00

4.12

4.12

57.68

Circulacion Principal

1.00

10.00

3.00

30.00

Acceso a aulas

2.00

16.40

1.20

39.36

1.00

6.00

1.20

7.20

1.00

12.50

1.20

15.00

4.00

3.00

0.10

1.20

16.00

1.20

0.10

1.92

5.00

1.32

0.10

0.66

4.00

3.00

12.00

16.00

1.20

19.20

5.00

1.20

6.00

1.00

Area=

Acceso posterior
Vereda

69.68
7.20

03.03.02 RAMPAS
03.03.02.01 RAMPAS: CONCRETO F'C=140 KG/CM2, E=4" ACAB. BRUADO

Acceso campo deportivo

91.56 m2

03.03.02.02 RAMPAS: ENCOFRADO Y DESENCOFRADO


Circulacion Principal
Acceso a aulas
Acceso campo deportivo

3.78 m2

03.03.02.03 RAMPAS: JUNTA DE DILATACION


Circulacion Principal
Acceso a aulas
Acceso campo deportivo

37.20 M

3.04 ZOCALOS Y CONTRAZOCALOS


03.04.01 ZOCALO DE PIEDRA GRIS E=3/8"
Del Metrado de tarrajeo primario

12.75 M2
12.75

12.75

3.05 CARPINTERIA METALICA


03.05.01 BARANDA D/TUBO DE F'NEGRO

202.75 m

PLANILLA DE METRADOS
PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA
DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
ITEM

DESCRIPCIN
En circulacion principal

N DE
VECES
1.00

LARGO
50.00

4.00

30.00

En rampas de aceso a aulas


Acceso campo deportivo

MEDIDAS
ANCHO

PARCIAL
50.00

1.00

5.00

5.00

2.00

13.88

27.75
1.00 Und

1.00

1.00

1.00

1.00

03.05.03 PUERTA METALICA (1.20 X 2.80M) INCL PINTURA


En acceso principal

UND.

120.00

03.05.02 PUERTA METALICA (3.00 X 2.80M) INCL PINTURA


En acceso principal

TOTAL

ALTURA

1.00 Und

3.06 PINTURA
03.06.01 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNAS

251.29 m2

En columnas

1.00

Area=

13.65

13.65

En Muros

1.00

Area=

183.87

183.87

En graderias

1.00

Area=

53.77

53.77

1.00

Area=

2.85

2.85

1.00

Area=

7.48

7.48

1.00

Long=

197.92

03.06.02 PINTURA LATEX 2 MANOS EN VIGAS


Del Metrado de Tarrajeo en Vigas

2.85 m2

03.06.03 PINTURA LATEX 2 MANOS EN CIELO RASO


Del Metrado de Tarrajeo en Cielo raso

7.48 m2

03.06.04 PINTURA ANTICORROSIVA Y ESMALTE (2 MANOS) EN ELEMENTOS METALICOS


Del metrado de pasamanos metalico

47.50 m2
0.24

47.50

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
Cdigo

JULIO DEL 2,008


ELEMENTO Y/O DESCRIPCION

CONCRETO (m3)
Largo
Alto

Base

Parcial

ENCOFRADO (m2)
Largo
Alto
Parcial

FIERRO (Kg)

Cant

Long.

1.00
1/4"
-

2.00
3/8"
-

3.00
1/2"
-

4.00
5/8"
-

5.00
3/4"
-

6.00
1"
-

4.00.00

OBRAS DE CONCRETO ARMADO

4.01.00

ZAPATAS

4.01.01

ZAPATAS : CONCRETO F'C=210 KG/CM2

4.01.02

ZAPATAS : ACERO FY=4200 KG/CM2

Eje a-a y B-B Acero Longitudinal

0.35

6.20

0.40

3.47

Acero Transversal
Eje c-c Acero Longitudinal

0.35

4.45

0.40

1.25

Acero Transversal
Eje 6-6 Acero Longitudinal

0.35

7.70

0.40

1.08

Acero Transversal
Eje 7'-7' Acero Longitudinal

0.35

2.94

0.40

0.82

Acero Transversal
Eje 8-8 Acero Longitudinal

0.35

2.25

0.40

0.63

Acero Transversal

CONCRETO

Cdigo

Base

Largo

6.2

49.6

5.95

1.3

15.47

4.45

17.8

17.8

1.3

23.14

7.7

30.8

30.8

1.3

40.04

2.94

11.76

11.76

1.3

15.288

2.25

1.3

11.7

118.96

105.638

0.56

0.99

1.55

2.24

3.97

ML

KG/ML

0.25

KG

7.25

Alto

ENCOFRADO

CONCRETO (m3)

ELEMENTO Y/O DESCRIPCION

Largo

Alto

5.9

0.4

1.00

2.00

3.00

4.00

5.00

6.00

FIERRO (Kg)
Cant

Long.

1/4"

3/8"

1/2"

5/8"

3/4"

1"

9.44

5.9

47.2

5.9

23.6

3.75

4.69

18.76

4.69

9.38

5.40

4.69

18.76

4.69

9.38

2.78

4.69

18.76

4.69

9.38

2.80

4.69

18.76

Parcial

04.02 VIGAS DE CIMENTACION


04.02.01 VIGAS DE CIMENTACION: CONCRETO F'C=210 KG/CM2
04.02.02 VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO
04.02.03 VIGAS DE CIMENTACION: ACERO FY=4200 KG/CM2
Acero longitudinal
Eje a-a y b-b
Eje c-c

2
1

0.30
0.30

5.90
4.69

0.80
0.80

2.83
1.13

4.69

0.4

Eje 6-6
Eje 7'-7'
Eje 8-8

1
1
1

0.30
0.30
0.30

6.75
3.48
3.50

0.80
0.80
0.80

1.62
0.84
0.84

2
2
2

6.75
3.48
3.50

0.4
0.4
0.4

171.20

ENCOFRADO (m2)
Parcial

66.6176 104.5816

TOTAL (KG)

TOTAL (KG)

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:

JULIO DEL 2,008

Cdigo

ELEMENTO Y/O DESCRIPCION

CONCRETO (m3)
Largo
Alto

Base

ENCOFRADO (m2)
Largo
Alto
Parcial

FIERRO (Kg)

Cant

Long.

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

4.69

9.38

Estribos

Eje a-a

28

2.05

57.4

Eje b-b

29

2.05

59.45

Eje c-c

29

2.05

59.45

Eje 6-6

34

2.05

69.7

Eje 7'-7'

17

2.05

34.85

Eje 8-8

16

2.05

32.8

ML

177.97

122.24

KG/ML

0.25

0.56

0.99

1.55

2.24

3.97

KG

99.6632

189.472

CONCRETO

Cdigo

Parcial

7.25

ENCOFRADO

CONCRETO (m3)

ELEMENTO Y/O DESCRIPCION


#

Base

Largo

Alto

Largo

Alto

5.85

0.6

289.14

24.18

ENCOFRADO (m2)
Parcial

TOTAL (KG)

FIERRO (Kg)
Parcial

1.00

2.00

3.00

4.00

5.00

6.00

Cant

Long.

1/4"

3/8"

1/2"

5/8"

3/4"

1"

5.85

35.1

23.4

1.07

50.076

4.35

13.05

17.4

1.07

18.618

5.86

17.58

23.44

1.07

25.0808

2.98

8.94

11.92

1.07

12.7544

12

1.07

12.84

ML

203.0392

KG/ML

0.25

0.56

0.99

1.55

2.24

3.97

KG

113.702

2
2

TOTAL (KG)

4.03 SOBRECIMIENTO REFORZADO


4,03,01 SOBRECIMIENTO REFORZADO: CONCRETO F'C=175 KG/CM2
4,03,02 SOBRECIMIENTO REFORZADO: ENCOFRADO Y DESENCOFRADO
4,03,03 SOBRECIMIENTO REFORZADO: ACERO FY=4200 KG/CM2
Eje a-a y b-b
Eje c-c
Eje 6-6
Eje 7'-7'
Eje 8-8

2
1
1
1
1

0.15
0.15
0.15
0.15
0.15

5.85
4.35
5.86
2.98
3.00

CONCRETO
4.04 COLUMNAS

0.60
0.60
0.60
0.60
0.60

1.05
0.39
0.53
0.27
0.27

2.51

2
2
2
2

4.35
5.86
2.98
3

0.6
0.6
0.6
0.6

ENCOFRADO

14.04
5.22
7.03
3.58
3.60

33.47

113.70

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:

JULIO DEL 2,008

Cdigo

ELEMENTO Y/O DESCRIPCION

Base

CONCRETO (m3)
Largo
Alto

Parcial

ENCOFRADO (m2)
Largo
Alto
Parcial

FIERRO (Kg)

Cant

Long.

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

TOTAL (KG)

4,04,01 COLUMNAS: CONCRETO F'C=210 KG/CM2


4,04,02 COLUMNAS: ENCOFRADO Y DESENCOFRADO
4,04,03 COLUMNAS: ACERO FY=4200 KG/CM2

1 Piso
C-3 Eje a-a, eje 6-6

0.25

0.40

3.60

1.44

1.3

C-3 Eje a-a, eje 6-6 (Estribos)


C-7 (Circular)

3.6

18.72

7.69

123.04

7.69

61.52

41

1.33

218.12

7.69

46.14

41

0.87

35.67

7.69

46.14

41

0.93

38.13

7.69

61.52

3.6

14.4

41

0.83

34.03

7.69

30.76

7.69

15.38

41

1.2

49.2

16.90

Perim.
1

Area=

0.07

3.60

0.25

3.6

0.94

3.38

C-7 (Circular) Estribos


C-5

0.25

0.30

3.60

0.27

3.6

1.1

3.96

C-5 Estribos
C-6 Eje 7-7

0.25

0.25

3.60

0.45

3.6

7.20

C-6, Eje 7 Estribos


C-8

0.25

0.45

3.60

0.41

3.6

1.41

5.08

Estribos C-8

2 Piso
C-3 Eje a-a, eje 6-6

0.25

0.40

3.25

1.30

1.3

C-3 Eje a-a, eje 6-6 (Estribos)


C-7 (Circular)

3.25
Perim.

Area=

0.07

3.25

0.23

3.25

0.94

3.06

0.25

0.30

3.25

0.24

3.25

1.1

3.58

0.25

0.25

3.25

0.20

3.25

3.25

0.25

0.45

3.25

0.37

3.25

1.41

4.58

C-7 (Circular) Estribos


C-5
C-5 Estribos
C-6 Eje 7-7
C-6, Eje 7 Estribos
C-8

CONCRETO

4.05 COLUMNETAS

5.16

ENCOFRADO

69.70

ML

375.15

245.1

153.8

KG/ML

0.25

0.56

0.99

1.55

2.24

3.97

KG

210.084

242.649

238.39

691.12

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:

JULIO DEL 2,008

Cdigo

ELEMENTO Y/O DESCRIPCION

Base

CONCRETO (m3)
Largo
Alto

Parcial

ENCOFRADO (m2)
Largo
Alto
Parcial

FIERRO (Kg)

Cant

Long.

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

4,05,01

COLUMNETAS: CONCRETO F'C=175 KG/CM2

4,05,02

COLUMNETAS: ENCOFRADO Y DESENCOFRADO

4,05,03

COLUMNETAS: ACERO FY=4200 KG/CM2

TOTAL (KG)

1 Piso
C-4 SSHH

14

0.13

0.15

2.00

0.55

14

0.3

8.40

14

3.33

93.24

14

20

0.18

50.4

3.33

53.28

18

0.18

25.92

2.93

11.72

18

0.18

6.48

0.72

1.27

15.24

0.5

ML

88.8

173.48

KG/ML

0.25

0.56

0.99

1.55

2.24

3.97

KG

22.2

97.1488

Estribos

2 Piso
8
2

Columnatas en parapeto

0.13
0.13
0.15

0.15
0.15
0.15

1.60
2.00
0.80

CONCRETO

Cdigo

0.25
0.08
0.05

8
2
3

0.93

Base

Largo

Alto

4.06 VIGAS

1.6

0.3
0.8

2
0.3

ENCOFRADO

CONCRETO (m3)

ELEMENTO Y/O DESCRIPCION

0.3

3.84
1.20

ENCOFRADO (m2)
Parcial

Largo

Alto

FIERRO (Kg)
Parcial

4.06.01

VIGAS: CONCRETO F'C=210 KG/CM2

4.06.02

VIGAS: ENCOFRADO Y DESENCOFRADO

4.06.03

VIGAS: ACERO FY=4200 KG/CM2

1.00

2.00

3.00

4.00

5.00

6.00

Cant

Long.

1/4"

3/8"

1/2"

5/8"

3/4"

1"

1 Piso
VP 105 Eje a-a; As. Superior

0.25

7.30

0.35

0.64

7.3

0.55

9.75

19.5

As refuerzo superior int. volado 8

6.22

6.22

As refuerzo eje intersec eje 6

1.12

1.12

9.77

19.54

1.1

1.1

2.26

2.26

4.02

63

1.14

71.82

7.29

29.16

Estribos Eje a-a


VP 107 Eje b-b As Superior, inf

0.25

6.30

0.35

0.55

6.32

0.55

119.35

14.16

3.48

TOTAL (KG)

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
Cdigo

JULIO DEL 2,008


ELEMENTO Y/O DESCRIPCION

Base

CONCRETO (m3)
Largo
Alto

Parcial

ENCOFRADO (m2)
Largo
Alto
Parcial

As refuerzo superior
Estribos Eje b-b
VP 106 Eje c-c

0.25

4.63

0.35

0.41

4.63

0.75

3.47

As refuerzo inferior
Estribos Eje c-c
VB voladro Eje c-c

0.15

4.01

0.20

0.12

4.01

0.35

1.40

Estribos Eje c-c


VB voladro Eje a-a

0.15

3.55

0.20

0.11

3.55

0.35

1.24

Estribos Eje a-a

FIERRO (Kg)

Cant

Long.

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

5.47

5.47

2.82

46

1.14

52.44

2.82

5.32

21.28

4.01

4.01

2.18

2.18

2.18

2.18

35

1.14

39.9

5.15

10.3

35

0.27

9.45

4.3

8.6

33

0.27

8.91

VA 103 Eje 6-6

0.25

5.86

0.20

0.29

5.86

0.45

2.64

10.52

63.12

Volado 103 Eje 6-6

0.25

1.00

0.40

0.10

0.65

0.65

4.24

25.44

Volado VP 103 Eje 6-6

0.25

1.80

0.40

0.18

1.8

0.65

1.17

4.74

14.22

Volado VE 103 Entre 7 y 7'

0.25

1.80

0.40

0.18

1.8

0.65

1.17

4.38

26.28

VA 105 Eje 7'-7'

0.25

3.03

0.30

0.23

3.03

0.45

1.36

6.73

40.38

VA 105 Eje 8-8

0.25

3.00

0.30

0.23

0.45

1.35

Volado VA 106 Eje 8-8

0.25

3.21

0.40

0.32

3.21

0.45

1.44

7.75

31

Estribos vigas

49

0.81

119.07

Estribos volados

11

0.81

44.55

Estribos volado 8-8

25

0.81

20.25

1.65

6.6

17

0.81

13.77

VE 106 Eje entre 7 y 7'

0.25

1.52

0.40

0.15

1.52

0.25

0.38

2 Piso
VP 203 Eje a-a

0.25

8.93

0.35

0.78

8.93

0.55

4.91

4.31

51.72

VP 204 Eje b-b

0.25

6.64

0.35

0.58

6.64

0.55

3.65

1.99

23.88

VP 205 Eje c-c

0.25

4.91

0.35

0.43

4.91

0.55

2.70

6.03

72.36

VB Total

0.15

24.58

0.17

0.63

16.85

0.42

7.08

VA 201 Eje 6-6

0.25

5.86

0.20

0.29

5.86

0.2

2.34

VI 201 Eje 6-6

0.25

10.38

0.17

0.44

10.38

0.25

2.60

VI 202 Eje 6-6

0.25

10.38

0.17

0.88

10.38

0.25

5.19

32

0.87

167.04

6.87

27.48

TOTAL (KG)

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:

JULIO DEL 2,008

Cdigo

ELEMENTO Y/O DESCRIPCION


VP-204 Eje 1,3 y 5

Base

CONCRETO (m3)
Largo
Alto

0.25

6.74

0.35

CONCRETO

Parcial
0.59

ENCOFRADO (m2)
Largo
Alto
Parcial

FIERRO (Kg)

Cant

Long.

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

6.74

6.81

27.24

40

0.87

69.6

3.7

44.4

ML

18.36

769.92

386.72

31.66

KG/ML

0.25

0.56

0.99

KG

4.59

8.13

0.48

ENCOFRADO

3.24

431.1552 382.8528

1.55

2.24

3.97

49.073

TOTAL (KG)

867.67

55.48

4.07 VIGAS DE CONFINAMIENTO


4.07.01

VIGAS DE CONFINAMIENTO: CONCRETO F'C=175 KG/CM2

4.07.02

VIGAS DE CONFINAMIENTO: ENCOFRADO Y DESENCOFRADO

4.07.03

VIGAS DE CONFINAMIENTO: ACERO FY=4200 KG/CM2

1 Piso SS.HH.

5.2

0.9

Eje c-c

0.15

0.52

0.10

0.03

0.52

0.1

0.42

Eje 7'-7'

0.15

0.52

0.10

0.02

0.52

0.1

0.21

Eje 8-8

0.15

0.52

0.10

0.01

0.52

0.1

0.10

2 Piso Administracin

5
1

0.52
0.18

Eje a-a

0.15

0.97

0.10

0.01

0.97

0.1

0.19

1.23

2.46

Eje c-c

0.15

2.24

0.10

0.03

2.24

0.1

0.45

12

0.18

2.16

Eje 7'-7'

0.15

1.21

0.10

0.02

0.52

0.1

0.10

1.47

2.94

Eje 7'-7'

0.15

0.52

0.10

0.01

0.52

0.1

0.10

14.7

0.18

2.646

Eje 8-8

0.15

2.24

0.10

0.03

0.52

0.1

0.10

2.5

10

25

0.18

14.706

20.6

ML

CONCRETO

4.08 LOSAS ALIGERADAS

0.16

ENCOFRADO

KG/ML

0.25

0.56

0.99

1.55

2.24

3.97

KG

3.6765

11.536

1.68

15.21

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
Cdigo

JULIO DEL 2,008


ELEMENTO Y/O DESCRIPCION

Base

CONCRETO (m3)
Largo
Alto

Parcial

ENCOFRADO (m2)
Largo
Alto
Parcial

FIERRO (Kg)

Cant

Long.

4.08.01 LOSA ALIGERADA: CONCRETO F'C=210 KG/CM2


4.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

4.08.03 ACERO GRADO 60 EN LOSAS ALIGERADAS


MDULO DE PLASTOFORMO (0.30 X 1.20 X 0.12)

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

1 Piso
Losa 01 y 02

2.30

3.00

0.05

0.69

Losa 03 Trapecio

2.70

3.00

0.05

0.41

Losa 04

3.35

3.00

0.05

0.50

Losa 05

1.06

3.00

0.05

0.16

Losa 06 volado posterior

1.90

0.75

0.05

0.07

Losa 07 volado posterior

2.30

0.75

0.05

0.09

Losa 08 volado delantero

1.25

1.65

0.05

0.10

Losa 09 volado delantero

2.30

1.65

0.05

0.19

Viguetas

24

0.10

3.00

0.15

1.08

24

3.00

0.40

28.80

Viguetas de Longitud variable

10

7.59

75.9

24.5

24.5

medida total
Bastones de refuerzo

10

5.93

59.3

Bastones de refuerzo de Long. Variable

24.5

24.5

Viguetas de long. Variable

0.10

8.03

0.15

0.12

8.03

0.40

3.21

Viguetas en volado posterior

0.10

0.75

0.15

0.10

0.75

0.40

2.70

Viguetas en volado delantero

0.10

3.55

0.15

0.21

3.55

0.40

5.68

100.98

4.11

16.44

3.51

14.04

Acero de temperatura
Pao 6,9,a,b

16.25

7.69

124.9625

Pao 6,8,b,c

16.3

5.7

92.91

Volado eje c-c

4.92

24.6

Volado eje a-a

2.16

19.44

2 Piso
Losa ejes 6,7,a,b

2.30

3.24

0.05

0.75

14

12.12

169.68

Losa ejes 7,7',b,c

2.70

3.24

0.05

0.44

14

2.13

29.82

Losa eje 7,8,a,b

3.35

3.24

0.05

0.54

14

6.8

95.2

Losa 05

1.06

3.24

0.05

0.17

TOTAL (KG)

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
Cdigo

JULIO DEL 2,008


ELEMENTO Y/O DESCRIPCION

Base

CONCRETO (m3)
Largo
Alto

Parcial

Losa eje c volado posterior

1.90

1.78

0.05

0.17

Losa eje c volado posterior

2.30

1.78

0.05

0.20

Losa eje a volado delantero

1.25

1.78

0.05

0.11

Losa eje a volado delantero


Viguetas
Viguetas de long. Variable
Viguetas en volado posterior
Viguetas en volado delantero

1
24
1
10
19

2.30
0.10
0.10
0.10
0.10

1.78
3.24
8.03
0.75
1.78
127.11

0.05
0.12
0.12
0.12
0.12

0.20
0.93
0.10
0.09
0.41

Acero de temperatura
MDULO DE PLASTOFORMO (0.30 X 1.20 X 0.12)
1
-

24
1
9
4

ENCOFRADO (m2)
Largo
Alto
Parcial

3.24
8.03
0.75
1.78

0.40
0.40
0.40
0.40

100.98
M/UND

1.20

127.11
M/UND

100.98

FIERRO (Kg)

Cant

Long.

1.00
1/4"

2.00
3/8"

3.00
1/2"

4.00
5/8"

5.00
3/4"

6.00
1"

7.71

428.2905

179
0.99
177.21

0
1.55
0

0
2.24
0

0
3.97
0

100.98 M
84.15 UND
85.00 UND
1.20

127.11

127.11 M
105.93 UND
106.00 UND

CALCULADO
ASUMIDO

ML
KG/ML
KG
CONCRETO

Cdigo

ELEMENTO Y/O DESCRIPCION

Base

7.83

CONCRETO (m3)
Largo
Alto

Parcial

ENCOFRADO

690.203 330.38
0.25
0.56
172.5508 185.0128

FIERRO (Kg)

Cant

Long.

0.85

1.00
1/4"
-

2.00
3/8"
-

3.00
1/2"
-

4.00
5/8"
-

5.00
3/4"
-

6.00
1"
-

17

Cimentaciones
1
2

0.40
1.00

1.50
1.00

0.70
0.40

0.42
0.80

2
1

0.25
0.25

0.25
2.70

2.30
0.30

0.29
0.20

2
1

1.5

3.29

4.94
10

Columna y Viga
Columnas
Viga

1 Tramo

2.3
2.7

1
0.55

534.77

80.26

ENCOFRADO (m2)
Largo
Alto
Parcial

4.09 ESCALERAS
4.09.01
ESCALERA: CONCRETO F'C=210 KG/CM2
4.09.02
ESCALERA: ENCOFRADO Y DESENCOFRADO
4.09.03
ESCALERA: ACERO GRADO 60
Cimiento corrido
Zapatas en columnas z-1

TOTAL (KG)

31.10
3.21
2.70
2.85
55.55

CALCULADO
ASUMIDO
MDULO DE PLASTOFORMO (0.30 X 1.20 X 0.15)
1
-

4.60
1.49

TOTAL (KG)

PLANILLA

D E

M E T R A D O S

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA INSTITUCION EDUCATIVA SECUNDARIA SAN FRANCISCO DE ASIS VILLA DEL LAGO DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO PUNO
COMPONENTE:
OBRAS EXTERIORES
FECHA:
Cdigo

JULIO DEL 2,008


ELEMENTO Y/O DESCRIPCION
Losa inclinada
Pasos y Contrapasos
Acero longitudinal inferior
Acero longitudinal inferior
Acero longitudinal Superior
Acero transversal

#
1
12

Base
1.53
0.14

CONCRETO (m3)
Largo
Alto
3.29
0.15
1.50
0.15

Parcial
0.76
0.36

#
1
12

ENCOFRADO (m2)
Largo
Alto
Parcial
1.5
3.29
4.94
1.5
0.15
2.70

Descanso
Losa Maciza Fondo
Losa Maciza Laterales
Acero longitudinal superior
Acero longitudinal inferior
Acero transversal

2.81

3.20

0.15

1.35

1
1

2.81
5.30

3.20
0.15

FIERRO (Kg)

Cant

Long.

1
1
1
1

3
3
3
2

7
7
7
12

4.37
1.59
1.82
1.5

1.00
1/4"
-

2.00
3/8"
18

3.00
1/2"
30.59
11.13
12.74
-

4.00
5/8"
-

5.00
3/4"
-

6.00
1"
-

45

28.63
24.43
-

8.99
0.80

Acero Longitudinal Superior


Acero Longitudinal Inferior
Acero Transversal

1
1
2

3
3
2

7
7
15

4.09
3.49
1.5

1
1
2

3
3
2

7
7
10

2.7
4.87
1.5

30

18.9
34.09
-

0
0.25
0

39
149
0.56
83.44

19.53
8.19
22.33
210.56
0.99
208.4544

0
1.55
0

0
2.24
0

0
3.97
0

TOTAL (KG)

2 Tramo
Losa inclinada
Pasos y Contrapasos
Acero longitudinal inferior
Acero longitudinal inferior
Acero longitudinal Superior
Acero transversal

1
10

1.53
0.14

3.29
1.50

0.15
0.15

0.76
0.30

1
10

1.5
1.5

2.74
0.15

4.11
2.25
1
1
1
2

3
3
3
2

7
7
7
13
ML
KG/ML
KG

CONCRETO

5.24

ENCOFRADO

34.80

2.79
1.17
3.19
1.5

291.89

Vous aimerez peut-être aussi