Vous êtes sur la page 1sur 1

Record No.

Inspection and Test Record


for Painting
Client:

Subcontractor:

Project No.:

Subcontract P.O. No.:

Project Name:

Item painted (Tag No./Line No.):

Reference Document:

Subcontractor

Items to inspect

inspected
initials/date
1.0

Company
Hold
Point

Remarks

inspected*
initials/date

Ambient conditions

2.0

Time of measurement

............................hrs

Relative humidity

..............................%

Dew point

............................. oC

Surface temperature

............................. oC

Surface preparation

3.0

Cleanliness level SA

.................................

Profile/anchor pattern

.....................microns

Undercoat
Make/type/batch No.

.................................

Application/workmanship
4.0

Second coat
Make/type/batch No.

.................................

Application/workmanship
5.0

Top coat
Make/type/batch No.

.................................

Application/workmanship
6.0

Testing
Wet film thickness
Dry film thickness
Specified

.....................microns

Measured:No. of points .................................


Maximum .....................microns
Minimum .....................microns
Average .....................microns
Adhesion test

H - Companys presence is mandatory for all activities in section.

Attachments, No. of pages:

h - Companys presence is mandatory.

Accepted for Subcontractor


Name:

Signature:
Date:

Accepted for Company


Name:

Signature:

Date:

Accepted for Client


Name:

Signature:

Date:

*Company only initials for holdpoint

C:\RB_Forms\RB26N01.DOT\

www.red-bag.com

Vous aimerez peut-être aussi