Académique Documents
Professionnel Documents
Culture Documents
- 2
ITEM 1 2 3 4 5 6 7
DESCRIPTION
UNIT
UNIT PR ICE TOTAL ( S.R) PRICE (S.R) 198.17 42.51 96.48 520.00 303.75 438.75 32.00 93,932.58 20,149.74 17,752.32 20,800.00 6,075.00 8,775.00 640.00
supply and installation field fabricated galvannized sheet duct M2 supply and installationthermal duct insulation 25 x 24kg/m3M2
supply and installation of flexible duct connector ( durodyneLM ) best quality 184 supply and installation of supply air grilles (1100 x 500mm )nos supply andi installation of return air grilles (1100 x 350mm) nos supply and installation of weather louver w / screen (500 x 500mm nos ) installation of washable filter installation of copper pipe . Vacuuming and freon charge . nos 40 20 20 20
LM LM
832 832
25.65 25.65
21,340.80 21,340.80
832 832 40 40 40
10 11 12 13
installation of filter drier installation of singhtglass. installation of thermostatic expansin valve Final positioning. Levling. Duct and electrical a) AHU / ACCU G1 to G8 (6.0TR ) b) AHU /ACCU F1 to F8 (6.0TR ) c) AHU /ACCU S1 to S8 (6.0TR ) d ) AHU /ACCU T1 to FT8 (6.0TR ) e) AHU /ACCU FO1 to FO8 ( 6.0) TR
8 8 8 8 8 40
14 15
installation of thermostatic expansin valve supply and installation of valume damper 500 x 500 - SU - 600 series
nos
20
615.00
12,300.00
16
Final positioning. Levling and electrical Termination a) Exhaust Fan . Wall mid @ 750 CFM includes weather louver nos b) Exhoust Fan wall mid @ 100 CFM includes weather louver nos 30 15 17 1
TOTAL PRICE
17 18
Final positioning. Leveling and Electrical Termination of window nos Engineering, supervision , Testing and Comissioning Lat
8/29/2013
Page 1