Vous êtes sur la page 1sur 115

PRESUPUESTO DE OBRA CASA INTERES SOCIAL

CASA UBICADA EN FRACC. SAN ISIDRO TERRENO 8 X 16 MTS (128 M2) SALA, COMEDOR BAO, PATIO DE SERVICIO COCHERA DOS CARROS (63 M2 DE CONSTRUCCION)

CONCEPTO
1 2 3 4 5 6 7 8
CIMENTACION OBRA NEGRA INSTALACIONES OBRA GRIS ACABADOS HERRERIA CARPINTERIA MUEBLES DE PLOMERIA Y ACCESORIOS

ERES SOCIAL

(128 M2) SALA, COMEDOR COCINA, 63 M2 DE CONSTRUCCION)

TOTAL
$ $ $ $ $ $ $ $ SIN IVA $ 54,366.15 158,430.61 16,000.00 35,224.85 23,000.00 9,600.00 7,200.00 5,562.00 309,383.60

CON IVA

$ 358,884.98

PRESUPUESTO

CASA UBICADA EN FRACC SAN ISIDRO TERRENO 8 X 16 MTS (128 M2) SAL COMEDOR COCINA, BAO, PATIO DE SERVICIO COCHERA DOS CARROS. 63 M CONSTRUCCION 1 1 1.1 1.2 1.3 1.4 1.5
CIMENTACION CONCEPTO
BODEGA PROVISIONAL EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO. ELABORACION DE 1M2 DE PLANTILA ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5 ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA. RELLENO

UNIDAD PZA M3 M2 M3 PZA M3

CANTIDAD 1 13 45 20 20 60

2 2.1 2.1.1 2.2 2.3 2.4 2.5 2.6

OBRA NEGRA CONCEPTO


DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. IMPERMEABILIZANTE DE DALA MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5. DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. CASTILLOS DE CONCRETO FC=150, ARMADOS CON ARMEX 15X15X4. COMPACTACION Y NIVELACION ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR. ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO MURO DE LADRILLO PARA PRETIL SENTADO CON MORTERO CEMENTO ARENA 1: 5.

UNIDAD ML ML M2 ML ML M3 M2

CANTIDAD 0 44.95 0.38 0 45 24 63

2.7

M2

65

2.8

M2

20.00

3 3.1 3.2 3.3 3.4 3.5

INSTALACIONES CONCEPTO
ELECTRICA HIDRAULICA SANITARIA GAS ESPECIALES

UNIDAD LOTE LOTE LOTE LOTE LOTE

CANTIDAD 1 1 1 1 1

4 4.1

OBRA GRIS CONCEPTO


IMPERBEABILIZANTE O MACETEADO

UNIDAD M2

CANTIDAD 65

4.2 4.3 4.4 4.5

BASE PARA TINACO REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

PZA M2 M2 M3

1 160 160 65

5 5.1 5.2 5.3 5.4

ACABADOS CONCEPTO
ELABORACION DE 1 M2 DE PISO CERAMICO 30 X 30 CMS O CEMENTO PULIDO POR DEFINIR ELABORACION DE 1 ML DE ZOCLO DE VITROPISO. ELABORACION DE 1 M2 DE VITROMURO O CEMENTO PULIDO AUN POR DEFINIR ELABORACION DE 1 M2 DE PINTURA DIVERSOS ACABADOS

UNIDAD M2 ML M2 M2

CANTIDAD 63 16 225

HERRERIA CONCEPTO

UNIDAD PZA

CANTIDAD 1

6.1

PUERTA PRINCIPAL METALICA DE 2 TABLEROS Y MARCO RIGIDO; MEDIDAS 1.10 DE ANCHO POR 2.10 DE ALTO. INLCUYE CHAPA Y PINTURA PUERTA TRASERA METALICA DE 1 TABLERO METALICO Y UN TABLERO DE CRISTAL MARCO RIGIDO; MEDIDAS 1 M DE ANCHO POR 2.10 M DE ALTO. INLCUYE CHAPA Y PINTURA VENTANA TIPO 1: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.20M X 1.20 M INCLUYE MOSQUITERO,PINTURA Y PROTECCION VENTANA TIPO 2: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.35 M DE ANCHO X 1.20 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION VENTANA TIPO 3: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS .60 M DE ANCHO X .50 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

6.2

PZA

6.3

PZA

6.4

PZA

6.5

PZA

CARPINTERIA CONCEPTO

UNIDAD PZA

CANTIDAD 2

7.1

PUERTA TIPO 1 PARA RECAMARAS. DE TAMBOR MADERA DE PINO; MEDIDAS 1.00 DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION PUERTA TIPO 2 PARA BAO. DE TAMBOR MADERA DE PINO; MEDIDAS .80 M DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

7.2

PZA

MUEBLES DE PLOMERIA Y ACCESORIOS CONCEPTO

UNIDAD

CANTIDAD

8.1 8.2 8.3 8.4 8.5

FREGADERO DE ACERO INOXIDABLE MARCA EB ESCURRIDOR DERECHO DE 52 X 80 KIT DE INSTALACION PARA FREGADERO LAVADERO BOYLER KIT DE LAVABO Y TASA INCLUYE ACCESORIOS

PZA PZA PZA PZA

1 1 1 1

CON IVA

O 8 X 16 MTS (128 M2) SALA, CHERA DOS CARROS. 63 M2 DE PRESU $ 28,356.85 TOTAL $ 4,000.00 $ $ 1,208.24 3,172.61 REAL $ 23,125.00 $ 4,000.00 $ 525.00 1.5 HORAS $ 1,500.00 $ 13,000.00 $ 2,000.00 $ 2,100.00 PRESU 1 $ 15,639.00 CEMENTO TRAZO Y BODEGA

P.U. $ 4,000.00 $ $ $ $ $ 92.94 70.50 752.84 95.96 100.00

$ 15,056.86 $ $ 1,919.15 3,000.00

P.U. $130.68 $8.00 $ 117.60 $130.68 $130.68 $31.77 $107.58

$ 41,414.29 TOTAL $ $ $ $ $ $ $ 359.60 44.90 5,880.66 762.50 6,777.55

$388.26

$ 25,237.03

117.60

2,352.06

P.U. $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00

$ 16,000.00 TOTAL $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00

P.U. 100.00

$ 28,365.09 TOTAL $ 6,500.00

$ 1,500.00 $ $ $ 53.65 52.03 53.16

$ $ $ $

1,500.00 8,584.80 8,324.79 3,455.51

P.U. $120.00 $50.00 $120.00 $29.00

$ 16,005.00 TOTAL $ $ $ 7,560.00 1,920.00 6,525.00

$ P.U. $1,500.00 $

9,600.00 TOTAL 1,500.00

$1,300.00

1,300.00

$1,500.00

4,500.00

$1,700.00

1,700.00

$600.00

600.00

$ P.U. $1,300.00 $

3,800.00 TOTAL 2,600.00

$1,200.00

1,200.00

$ P.U.

5,562.00 TOTAL

$769.00 $393.00 $1,400.00 $3,000.00

$ $ $ $ $

769.00 393.00 1,400.00 3,000.00

SIN IVA CON IVA

$ 149,103.24 $ 172,959.76

MORTERO

ARENA

GRAVA

PIEDRA

13

4130

PRESUPUESTO
CASA BURGOS AGUILAR

1 1 1.1 1.2 1.3

CIMENTACION CONCEPTO
BODEGA PROVISIONAL TRAZO Y IVELACION EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO. ELABORACION DE 1M2 DE PLANTILA ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5 ELABORACION DE ZAPATA ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA. RELLENO Y COMPACTACION

UNIDAD PZA M2 M3 M2 M3 PZA PZA M3

CANTIDAD 1 135 37.48

33 14 20 56

1.4 1.5

2 2.1 2.2 2.3 2.4 2.5 2.6

OBRA NEGRA CONCEPTO


DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5. DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. CASTILLOS DE CONCRETO FC=150, ARMADOS CON ARMEX 15X15X4. COMPACTACION Y NIVELACION ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR. ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO MURO DE LADRILLO PARA PRETIL SENTADO CON MORTERO CEMENTO ARENA 1: 5.

UNIDAD ML M2 ML ML M3 M2

CANTIDAD 100 280.00 100 50 108 108

2.7

M2

108

2.8

M2

3 3.1 3.2 3.3 3.4 3.5

INSTALACIONES CONCEPTO
ELECTRICA HIDRAULICA SANITARIA GAS ESPECIALES

UNIDAD LOTE LOTE LOTE LOTE LOTE

CANTIDAD 1 1 1 1 1

OBRA GRIS CONCEPTO

UNIDAD

CANTIDAD

4.1 4.2 4.3 4.4 4.5

IMPERBEABILIZANTE O MACETEADO BASE PARA TINACO REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

M2 PZA M2 M2 M3 380 280

5 5.1 5.2 5.3 5.4

ACABADOS CONCEPTO
ELABORACION DE 1 M2 DE PISO CERAMICO 30 X 30 CMS O CEMENTO PULIDO POR DEFINIR ELABORACION DE 1 ML DE ZOCLO DE VITROPISO. ELABORACION DE 1 M2 DE VITROMURO O CEMENTO PULIDO AUN POR DEFINIR ELABORACION DE 1 M2 DE PINTURA DIVERSOS ACABADOS

UNIDAD M2 ML M2 M2

CANTIDAD 108 16 280

HERRERIA CONCEPTO

UNIDAD PZA

CANTIDAD 1

6.1

PUERTA PRINCIPAL METALICA DE 2 TABLEROS Y MARCO RIGIDO; MEDIDAS 1.10 DE ANCHO POR 2.10 DE ALTO. INLCUYE CHAPA Y PINTURA PUERTA TRASERA METALICA DE 1 TABLERO METALICO Y UN TABLERO DE CRISTAL MARCO RIGIDO; MEDIDAS 1 M DE ANCHO POR 2.10 M DE ALTO. INLCUYE CHAPA Y PINTURA VENTANA TIPO 1: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.20M X 1.20 M INCLUYE MOSQUITERO,PINTURA Y PROTECCION VENTANA TIPO 2: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.35 M DE ANCHO X 1.20 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION VENTANA TIPO 3: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS .60 M DE ANCHO X .50 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

6.2

PZA

6.3

PZA

6.4

PZA

6.5

PZA

CARPINTERIA CONCEPTO

UNIDAD PZA

CANTIDAD 4

7.1

PUERTA TIPO 1 PARA RECAMARAS. DE TAMBOR MADERA DE PINO; MEDIDAS 1.00 DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

MUEBLES DE PLOMERIA Y ACCESORIOS CONCEPTO


FREGADERO DE ACERO INOXIDABLE MARCA EB ESCURRIDOR DERECHO DE 52 X 80

UNIDAD PZA

CANTIDAD 1

8.1

8.2 8.3 8.4 8.5

KIT DE INSTALACION PARA FREGADERO LAVADERO BOYLER KIT DE LAVABO Y TASA INCLUYE ACCESORIOS

PZA PZA PZA

1 1 1

SIN IVA CON IVA

AR

P.U. $ 2,202.00 $ 8.20 $ $ $ 123.00 70.50 543.00

$ 54,366.15 TOTAL $ 2,202.00 $ 1,107.00 $ $ 4,610.04 -

$ 17,919.00 $ 19,740.00 $ $ 1,919.15 6,868.96

$ 1,410.00 $ $ 95.96 122.66

P.U. $130.68 $ 117.60 $130.68 $130.68 $31.77 $107.58

$ 158,430.61 TOTAL $ 13,068.12 $ 32,928.80 $ 13,068.12 $ $ 6,534.06 3,431.24

$ 11,618.66

$720.20

$ 77,781.60

117.60

P.U. $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00

$ 16,000.00 TOTAL $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00

P.U.

$ 35,224.85 TOTAL

$ 100.00 $ 1,500.00 $ $ $ 53.65 52.03 53.16

$ $

$ 15,023.39 $ -

$ 20,201.45

P.U. $120.00 $50.00 $120.00 $29.00

$ 23,000.00 TOTAL $ 12,960.00 $ $ 1,920.00 8,120.00

$ P.U. $1,500.00 $

9,600.00 TOTAL 1,500.00

$1,300.00

1,300.00

$1,500.00

4,500.00

$1,700.00

1,700.00

$600.00

600.00

$ P.U. $1,800.00 $

7,200.00 TOTAL 7,200.00

$ P.U. $769.00 $

5,562.00 TOTAL 769.00

$393.00 $1,400.00 $3,000.00

$ $ $ $

393.00 1,400.00 3,000.00

SIN IVA CON IVA

$ 309,383.60 $ 358,884.98

INSUMO
FERRETERO MATERIALES HERRERIA CARPINTERIA INSTALACIONES

PROVEEDOR
FERRETERA RODO PEDRO CALDERA PANCHO HERRERIA CESAR GAMBOA CRISO

DIRECCION
ZACATECAS 312 , MORGA , C.P 34010 , DURANGO , DGO SAN CARLOS

TELEFONO
1305350 6188390895 6181279931

CIMENTACION

CONCEPTO

UNIDAD M3 M2 M3 PZA

CANTIDAD 37.48 128.41 12.04 32 $ 25,869.50

1.1 1.2 1.3 1.4

EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO. ELABORACION DE 1M2 DE PLANTILA ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5 ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

OBRA NEGRA

CONCEPTO

UNIDAD ML M2 ML ML M3 M2

CANTIDAD 89.17 156.38 89.17 98 24 102.29

2.1 2.2 2.3 2.4 2.5 2.6

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X15X4. MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5. DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. CASTILLOS DE CONCRETO FC=150, ARMADOS CON ARMEX 15X15X4. COMPACTACION Y NIVELACION ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR. ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO MURO DE LADRILLO PARA PRETIL SENTADO CON MORTERO CEMENTO ARENA 1: 5.

2.7

M2

154.73

2.8

M2

20.00

3 3.1 3.2 3.3 3.4 3.5

INSTALACIONES CONCEPTO
ELECTRICA HIDRAULICA SANITARIA GAS ESPECIALES

UNIDAD LOTE LOTE LOTE LOTE LOTE

CANTIDAD 1 1 1 1 1

4 4.1 4.2 4.3 4.4 4.5

OBRA GRIS CONCEPTO


IMPERBEABILIZANTE O MACETEADO BASE PARA TINACO ELABORACION DE 1 M2 DE APLANADO HECHO CON MORTERO CEMENTO-ARENA A 2 CM DE ESPESOR ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

UNIDAD M2 PZA M2 M2 M3

CANTIDAD 154.73 1 99.042 160 7.2

5 5.1 5.2 5.3 5.4

ACABADOS CONCEPTO
ELABORACION DE 1 M2 DE PISO CERAMICO 30 X 30 CMS O CEMENTO PULIDO POR DEFINIR ELABORACION DE 1 ML DE ZOCLO DE VITROPISO. ELABORACION DE 1 M2 DE VITROMURO O CEMENTO PULIDO AUN POR DEFINIR ELABORACION DE 1 M2 DE PINTURA DIVERSOS ACABADOS

UNIDAD M2 ML M2 M2

CANTIDAD 63 16 225

HERRERIA CONCEPTO

UNIDAD PZA

CANTIDAD 1

6.1

PUERTA PRINCIPAL METALICA DE 2 TABLEROS Y MARCO RIGIDO; MEDIDAS 1.10 DE ANCHO POR 2.10 DE ALTO. INLCUYE CHAPA Y PINTURA PUERTA TRASERA METALICA DE 1 TABLERO METALICO Y UN TABLERO DE CRISTAL MARCO RIGIDO; MEDIDAS 1 M DE ANCHO POR 2.10 M DE ALTO. INLCUYE CHAPA Y PINTURA VENTANA TIPO 1: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.20M X 1.20 M INCLUYE MOSQUITERO,PINTURA Y PROTECCION VENTANA TIPO 2: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.35 M DE ANCHO X 1.20 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION VENTANA TIPO 3: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS .60 M DE ANCHO X .50 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

6.2

PZA

6.3

PZA

6.4

PZA

6.5

PZA

CARPINTERIA CONCEPTO

UNIDAD

CANTIDAD

7.1

PUERTA TIPO 1 PARA RECAMARAS. DE TAMBOR MADERA DE PINO; MEDIDAS 1.00 DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION PUERTA TIPO 2 PARA BAO. DE TAMBOR MADERA DE PINO; MEDIDAS .80 M DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

PZA

7.2

PZA

MUEBLES DE PLOMERIA Y ACCESORIOS CONCEPTO


FREGADERO DE ACERO INOXIDABLE MARCA EB ESCURRIDOR DERECHO DE 52 X 80 KIT DE INSTALACION PARA FREGADERO LAVADERO BOYLER KIT DE LAVABO Y TASA INCLUYE ACCESORIOS

UNIDAD PZA PZA PZA PZA

CANTIDAD 1 1 1 1

8.1 8.2 8.3 8.4 8.5

$ 10,779.37

P.U.

TOTAL

MANO DE OBRA PU TOTAL $92.94 $3,482.64

$ $ $

32.99 402.16 53.16

$ 4,236.25 $ 4,842.01 $ 1,701.12 $ 619.58

37.52 $ 4,817.36 16.01

3.08 4.49 2.30 9.87 $ 1,095.79 $

4.19

1.60

$ 350.70 $ 4,222.43 $ 42.79 $ 1,369.37

3.22 7.41 822.21

1.55 3.15 $ 5,707.94

16.01 $ 13,891.81 $ 1,937.60

$ 67,031.43

P.U. $80.51 $65.00 $80.51 $80.51 $31.77 $54.98

TOTAL $ 7,179.08 $ 10,164.70 $ 7,179.08 $ 7,889.98 $ 762.50 $ 5,623.90 $ $ $ $ $ $

MANO DE OBRA 50.17 $ 4,474.03 52.60 $ 8,225.86 52.60 $ 4,690.34 50.17 $ 4,917.07 31.77 $ 762.50 52.60 $ 5,380.63

1.28 11.46 1.28 1.28 4.09

1.79

0.86

1.79 1.79 5.56

0.86 0.86 2.13

$167.26

$ 25,880.14

$ 221.00 $ 34,195.82

8.73

12.07

6.59

$117.60

$ 2,352.06

52.60 $ 1,052.03 $63,698.29

1.47 29.60 $ 3,285.08 23.01 $ 2,554.16 11.31 #########

CEMENTO

PIEDRA

GRAVA

ARENA

CEMENTO

PIEDRA

GRAVA

ARENA

P.U

TOTAL

MANO DE OBRA

$16.02

$1,586.65

$35.57

$3,522.92

$2.46

ARMEX ML15 15

MORTERO TON

1.12 53.12 53.12 $ 778.48

1.12 $ 1,635.68

AGUA

$ 11,977.69

LADRILLO (MILAR)

VARILLA 3/8" KG

ARMEX ML15 15

MORTERO TON

ALAMBRE

CLAVO

0.20 2.85 0.20 0.20 6.09882

959.326

30.946

15.473

0.36 3.22 $ 4,712.49 $ 0.61 8.88

0.78 6.87882 $ 7,635.49 959.326 $ 7,443.05 $ 30.946 453.52 $ 15.473 206.75 $ 38,673.46

AGUA

$0.06

Numeros Generadores
Fecha concepto: plantilla de cimentacion armada con varilla 3/8
Largo 13.13 Ancho 9.78 Altura 0.1 subtotal 12.84114

Unidad: M3
Total 12.84114

FIRME DE CONCRETO DE 8 CM 13.13 9.78 0.08 10.27

Fecha Concepto: ANCLAJE DE CASTILLOS Y CASTILLOS


Eje 1 2 3 4 5 5 5 6 6 7 Entre Ejes A-K H-I A-B E-K C-D G I A I-K C Largo Ancho Altura 2.95 2.95 3.25 2.95 3.25 3.25 2.95 3.25 2.95 3.25 subtotal 5 2 2 5 2 1 1 1 3 1

Unidad: M2
hueco ventana puerta Total 14.75 5.9 6.5 14.75 6.5 3.25 2.95 3.25 8.85 3.25

7 7 8 8

F I A-C I-K

COLUMNAS CILINDRICAS

3.35 2.95 3.25 2.95 3 3.35 ANCLAJES

1 1 2 2 2 1 32 CONCRETO

3.35 2.95 6.5 5.9 6 3.35 98

ML CASTILLO

M3

0.3818

0.3818

Concepto: MUROS

Fecha
Entre Ejes A-B B-E E-H H-K H-I A-B E-H H-I I-K Largo 3.07 2.53 2.74 4.41 0.85 2.96 2.74 0.85 2.43 Ancho Altura 2.25 2.25 2.25 2.25 2.25 2.55 2.25 2.4 2.25 subtotal 6.9075 5.6925 6.165 9.9225 1.9125 7.548 6.165 2.04 5.4675

Unidad: M2
hueco ventana puerta 1.05 0 2.1 0 1.155 0 1.68 0 0 0 0 0 0 1.572 0 1.73 0 1.73 Total 5.8575 3.5925 5.01 8.2425 1.9125 7.548 4.593 0.31 4.047

Eje 1

2 3 4

6 7 8 A

C E H I

J K

C-D D-G G-I I-K C-F F-I I-K 1,3 3,6 6,8 5,7 7,8 1,4 1,4 2,4 5,6 6,7 7,8 4,6 1,4 4,6 6,8

1.66 2.4 1.27 2.43 2.72 2.76 3.42 3.54 2.86 3.1 3.85 1.27 3.4 3.26 1.03 1.37 1.69 1.27 3 3.4 3 3.1

2.54 2.9 2.48 2.25 2.88 2.88 2.25 2.25 2.55 2.55 2.55 2.55 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25

3.9757 6.96 3 5.4675 7.8336 7.9488 7.695 7.965 7.293 7.9 9.81 3.238 7.65 7.32 2.31 3.08 3.8 2.85 6.75 7.65 6.75 6.97

0 0 0 0 2.07 0.345 1.365 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6 0 m2 de ladrillo

0 6 0 1.73 1.85 0 0 1.665 0 0 0 0 0 0 0 0 0 1.57 0 0 0

3.9757 0.96 3 4.047 4.8116 4.66 6.33 7.965 5.628 7.9 9.81 3.238 7.65 7.32 2.31 3.08 3.8 2.85 5.17 7.65 6.15 6.97 156.3883

1 m2 = 40 ladrillos de .13*.07*.26 sentados a 2 cm de mortero cemento-arena menos .85 % de desperdicio cantidad de ladrillos millar 6.26

Numeros Generadores
Concepto: EXCAVACION

Unidad: M3
Largo 14 1.3 4 1.3 3.75 4 6.3 4 6.3 14 10.4 5.8 4 4 1.5 3.6 10.4 Ancho 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Profundidad 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 m3 Sub total 5.32 0.494 1.52 0.494 1.425 1.52 2.394 1.52 2.394 5.32 3.952 2.204 1.52 1.52 0.57 1.368 3.952 37.487

Eje 1 2 3 4

5 6 7 8 A C E H I J K

Entre Ejes A-K H-I A-B H-I E-H I-K C-I I-K C-I A-K 1,8 5,7 1,4 1,4 2,4 4,6 1,8

CONCEPTO: CIMENTACION DE MAMPOSTERA DE PIEDRA, ANCHO .35, ALTURA .40, SENTADA CON MORTERO CEM-ARENA 1:5

CIMENTACION DE MAMPOSTERA DE PIEDRA, ANCHO .35, ALTURA .40, SENTADA CON MORTERO CEM-ARENA 1:5

Eje 1

Entre Ejes A-B B-E E-H H-K H-I A-B E-H H-I I-J J-K C-D D-G G-I I-J J-K C-F F-I I-K C-F F-I 1,3 3,6 6,8 5,7 7,8 1,4 1,2 2,4 2,4 5,6

Largo 3.07 2.53 2.74 4.41 0.85 3.05 2.74 0.85 2.43 0.85 1.66 2.4 1.27 2.43 0.85 2.72 2.76 3.42 2.44 2.43 3.54 2.86 3.1 3.85 1.27 3.4 3.26 1.03 1.03 1.37

Ancho 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35

Altura 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4

total 0.4298 0.3542 0.3836 0.6174 0.119 0.427 0.3836 0.119 0.3402 0.119 0.2324 0.336 0.1778 0.3402 0.119 0.3808 0.3864 0.4788 0.3416 0.3402 0.4956 0.4004 0.434 0.539 0.1778 0.476 0.4564 0.1442 0.1442 0.1918

2 3 4

6 7 8

C E H I

J K

6,7 7,8 4,6 1,4 4,6 6,8

1.69 1.27 3 3.4 3 3.1

0.35 0.35 0.35 0.35 0.35 0.35

0.4 0.4 0.4 0.4 0.4 0.4 M3 DE PIEDRA

0.2366 0.1778 0.42 0.476 0.42 0.434 12.0409

dala de cimentacion de .15 * .15 Eje 1 Entre Ejes A-B B-E E-H H-K H-I A-B E-H H-I I-J J-K C-D D-G G-I I-J J-K C-F F-I I-K C-F F-I 1,3 3,6 Largo 3.17 2.63 2.74 4.51 0.95 3.15 2.84 0.95 2.53 0.95 1.76 2.5 1.37 2.53 0.95 2.82 2.76 3.42 2.44 2.53 3.64 2.96 total 3.17 2.63 2.74 4.51 0.95 3.15 2.84 0.95 2.53 0.95 1.76 2.5 1.37 2.53 0.95 2.82 2.76 3.42 2.44 2.53 3.64 2.96

2 3 4

6 7 8

C E H I

J K

6,8 5,7 7,8 1,4 1,2 2,4 2,4 5,6 6,7 7,8 4,6 1,4 4,6 6,8

3.2 3.85 1.37 3.5 3.36 1.13 1.13 1.47 1.79 1.37 3.1 3.5 3.1 3.2

3.2 3.85 1.37 3.5 3.36 1.13 1.13 1.47 1.79 1.37 3.1 3.5 3.1 3.2

armex de 15*20 armex de 15*15

ml de dala de cimentacion ml de dala de cerramiento ml de varilla de 3/8

89.17 89.17 713.13

loza de concreto + marquesina de 40 cm.

unidad: m2 12 cm de espesor

total 154,73 18.5676

m3 de concreto mas varilla de 3 / 8

aplanado de mortero cemento-arena de espesor de 2 cm en muros exteriores UNIDAD M2

eje 1 A 7 8 K I C

entre eje A-K 1,8 C-I I-K 1,8 7,8 7,8

subtotal 26.199 24.393 10.627 7.515 23.54 3.384 3.384 M2 DE APLANADO

total 26.199 24.393 10.627 7.515 23.54 3.384 3.384 99.042

aplanado de pasta de yeso de 2 cm de espesor para muros interiores


Concepto: MUROS

Fecha
Largo 3.07 2.63 2.74 4.41 0.99 3.17 3.02 0.99 3.42 5.62 3.42 5.62 3.7 3.54 3 3.24 6.44 3.4 3.4 1.03 muros 1 1 1 1 2 2 2 2 1 2 1 1 1 1 1 1 2 2 2 2 Altura 2.4 2.4 2.4 2.4 2.4 2.7 2.4 2.4 2.4 2.9 2.4 2.9 2.4 2.4 2.7 2.7 2.7 2.4 2.4 2.4 subtotal 7.368 6.312 6.576 10.584 4.752 17.118 14.496 4.752 8.208 32.596 8.208 16.298 8.88 8.496 8.1 8.748 34.776 16.32 16.32 4.944 ventana 1.05 2.1 1.155 1.68 0 0 0 0 0 0 0 2.41 1.365 0 0 0 0 0 0 0

Unidad: M2
total hueco puerta 0 0 0 0 0 0 3.144 3.46 3.46 13.6 3.46 1.85 0 0 1.665 0 3.33 0 0 0 6.318 4.212 5.421 8.904 4.752 17.118 11.352 1.292 4.748 18.996 4.748 12.038 7.515 8.496 6.435 8.748 27.642 16.32 16.32 4.944

Eje 1

Entre Ejes A-B B-E E-H H-K H-I A-B E-H H-I I-K C-I I-K C-I I-K 1,3 3,6 6,8 5,8 1,4 1,4 2,4

2 3 4

5 6 7 8 A

C E H I

J K

5,8 4,6 1,4 4,6 6,8

4.57 3 3.4 3 3.1

2 1 1 1 1

2.4 2.4 2.4 2.4 2.4

21.936 7.2 8.16 7.2 7.44

0 0 0 0.6 0

0 1.57 0 0 0

18.55 5.63 8.16 6.6 7.44

APLANADO DE YESO EN LOZA M2 DE APLANADO DE YESO

116.92 360

PINTURA VINILICA PISO CERAMICO

M2 M2

317.9 95

AZULEJO

M2

31.3

E
DESGLOSADO $1,810.34 $1,465.52 $1,099.14 $111.00 $111.00 $121.00 $1,110.00 $8.62 $7.76 $14.66 $13.79 $32.76 $14.66 $14.66 $19.83 $21.55 $172.41 $172.41 $6.90 $5.17 $38.79 $13.36 $99.14 $38.79 #VALUE! $431.03 DESGLOSADO $22.61 $22.61 $56.52 $113.04 $105.00 $102.54 $195.65 $200.00 $300.00 $300.00 $6.09 $4.00 $178.26 $0.25 $0.26 $8.70 $0.35 DESGLOSADO $1,520.87 $2,325.00 $2,550.13 $4.61 DESGLOSADO $1,000.00 $137.80 $172.00 $80.00 $9.50 $11.45 $1.22 DESGLOSADO $550.43 $527.00 $55.04 $52.70 DESGLOSADO $23.74 $46.96 $125.00 $27.00 $50.00 $45.56 UNIDAD SACO SACO SACO M3 M3 M3 PZA TRAMO KG KG ML TRAMO TRAMO P.U $105.00 $85.00 $63.75 $128.76 $128.76 $140.36 $1.29 $95.00 $96.50 $17.00 $16.00 $95.00 $100.00 $98.00 $102.00 $103.00 $104.00 $105.00 $106.00 $107.00 $108.00 $109.00 $110.00 $111.00 $112.00 $113.00 DESGLOSADO $90.52 $73.28 $54.96 $111.00 $111.00 $121.00 $1.11 $81.90 $83.19 $14.66 $13.79 $81.90 $86.21 $84.48 $87.93 $88.79 $89.66 $90.52 $91.38 $92.24 $93.10 $93.97 $94.83 $95.69 $96.55 $97.41 CANTIDAD COSTO 14.4642587 $26,185.30 4.33 $ 6,348.17 $ 39.47 $ 4,380.86 30.42 $ 3,376.37 16.01 $ 1,937.60 6.87882 $ 7,635.49 $ $ 30.946 $ 453.52 $ $ 53.73 $ 787.36 NETO $30,374.94 $ 7,363.88 $ $ 5,081.80 $ 3,916.59 $ 2,247.61 $ 8,857.17 $ $ $ 526.08 $ $ $ 913.34 MARCA MTY OBSERVACION EL MOCTEZUMA ES MAS BARA COTIZACION 30 DE MARZO

300

4 5 6 7 8 9 # # # # # # # # # # # # # # # # # # #

# # # # # # # # # # # # # # # # #

# # # # # # # # # #

# # # # # # # # # # #

MATERIALES TRADICIONALES CONCEPTO UNIDAD P.U. CEMENTO GRIS CPC 30R CEMEX TONELADA $2,100.00 MORTERO CEMEX TONELADA $1,700.00 YESO POLAR TONELADA $1,275.00 ARENA M3 $128.76 GRAVA M3 $128.76 PIEDRA M3 $140.36 LADRILLO MILLAR $1,287.60 HULE PARA SILO M2 $10.00 VARILLA CUALQUIER DIAMETRO KG $9.00 ALAMBRE RECOCIDO KG $17.00 ALAMBRON KG $16.00 MALLA ALECT. 6-6 10-10 M2 $38.00 ARMEX 15X20X4 ML $17.00 ARMEX 15X15X4 ML $17.00 ARMEX 15X30X4 ML $23.00 TELA DE GALLINERO M2 $25.00 REVOLVEDORA JNAL $200.00 VIBRADOR JNAL $200.00 ANDAMIOS JNAL $8.00 AGUA M3 $6.00 RENTA DE CIMBRA M2 $45.00 CLAVO DE 2 1/2" KG $15.50 ESTAMPADO DE CONCRETO M2 $115.00 CIMBRA APARENTE M2 $45.00 RENTA DE GRUA DE 10 TON HR y EQUIPO NEUMATICO JORNAL $500.00 MATERIALES ALTERNOS TABLAROCA Y FIBROCEMENTO CONCEPTO UNIDAD P.U. CANAL METALICO PIEZA $26.00 POSTE METALICO PIEZA $26.00 PANEL DE YESO STD. PIEZA $65.00 PANEL DE YESO WR. PIEZA $130.00 PANEL DE YESO FR. PIEZA $120.75 PANEL DE YESO EXT. PIEZA $117.92 PANEL TEC-3000 MURO PIEZA $225.00 PANEL TEC-3000 LOSA PIEZA $230.00 TABLERO CEMPANEL LOSA PIEZA $345.00 TABLERO CEMPANEL MURO PIEZA $345.00 COMPUESTO PARA JUNTEO MC MILLAN KG $7.00 COMPUESTO PARA JUNTEO EUREKA KG $4.60 COMPUESTO PARA JUNTEO KG. $205.00 CINTA DE PAPEL ML $0.29 TORNILLO PARA PAPEL PIEZA $0.30 TORNILLO FRAMER PIEZA $10.00 TORNILLO CON TAQUETE PIEZA $0.40 MATERIALES ALTERNOS CONCRETO CELULAR CONCEPTO UNIDAD P.U. BLOCK CONTEC DE 12.5 X 40X60 M3 $1,749.00 DINTEL ARMADO M3 $2,673.75 PANEL PARA LOSA CONTEC M3 $2,932.65 ADHESIVO CONTEC KG $5.30 MATERIALES ALTERNOS BETOSTYRENE Y PANEL MONOLITE CONCEPTO UNIDAD P.U. BETOSTYRENE M3 $1,150.00 PANEL MONOLITE 10.8 CMS. M2 $158.47 PANEL MONOLITE VOBEDILLA M2 $197.80 FIBRA DE POLIPROPILENO KG $92.00 MALLA UNION PIEZA $10.93 MALLA ESCUADRA PIEZA $13.17 GRAPA STANLEY PIEZA $1.40 MATERIALES ALTERNOS MULTYPANEL CONCEPTO UNIDAD P.U. MULTYMURO 3" M2 $633.00 MULTYTECHO 3" M2 $606.05 CONEXIONES 10% PANEL MURO $63.30 CONEXIONES 10% PANEL LOSA $60.61 MATERIALES ALTERNOS FOAMBLOCK, culiacan CONCEPTO UNIDAD P.U. BLOCK FOAMBLOCK PIEZA $27.30 VIGUETA Y BOVEDILLA m2 $54.00 VIGUETA PRE-COLADA ML $143.75 foamblock torreon BLOCK FOAMBLOCK PIEZA $31.05 VIGUETA Y BOVEDILLA m2 $57.50 VIGUETA PRE-COLADA ML $52.39

$59,281.41

FOLKLORICOS

CONCEPTO CAL ARCILLA

UNIDAD TONELADA M3

P.U. $1,700.00 $110.00

DESGLOSADO $1,478.26 BULTO $95.65

40

$34.48

ALAMBRE RECOCIDO ALAMBRON MALLA ALECT. 6-6 10-10 ARMEX 15X20X4 ARMEX 15X15X4 TELA DE GALLINERO REVOLVEDORA VIBRADOR ANDAMIOS AGUA RENTA DE CIMBRA CLAVO DE 2 1/2" ESTAMPADO DE CONCRETO CIMBRA APARENTE RENTA DE GRUA DE 10 TON EQUIPO NEUMATICO

KG KG M2 ML ML M2 JNAL JNAL JNAL M3 M2 KG M2 M2 HR JORNAL

$0.00 $0.00 $0.00 $0.00 $0.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

A 3 4 5 6 7 8 9 10 11

B concepto peon ayudante of. Albail of. Fierrero of. Carpintero, plomero, electricista mando intermedio

D f.s.r. 1.28 1.28 1.28 1.28 1.28 1.28

E s.r. $186.18 $175.56 $279.68 $335.62 $335.62 $351.13

analisis de costo de mano de obra


p.u. $145.45 $137.16 $218.50 $262.20 $262.20 $274.32

14 15 16 17 18 19 20 21 22 23

cuadrilla

analisis de cuadrillas para mano de obra peones oficial


$186.18 $186.18 $744.70 $351.13 $351.13 $351.13 $351.13 0 $279.68 $0.00 $335.62 $335.62 $351.13 $351.13

cuadrilla # 1 (1peon + 0.10 de m.i.) cuadrilla # 2 (1peon + 1ofic. De albail + 0.10 de m.i.) cuadrilla # 3 (4peones + 0.15 de m.i.) cuadrilla # 4 (2ayudantes +1ofi. Fierr + 0.10 de m.i) cuadrilla # 5 (2ayudantes +1ofi. Carpint. + 0.10 de m.i) cuadrilla # 6 (2ayudantes +1ofi. plomero + 0.10 de m.i) cuadrilla # 7 (2ayudantes +1ofi. yesero + 0.10 de m.i)

mando intermedio $35.11 $35.11 $52.67 $52.67 $52.67 $52.67 $52.67

total
$221.29 $500.97 $797.37 $739.42 $739.42 $754.93 $754.93 1 2 3 4 5 7 8

1023.968

799.975

3199.9 600 IMSS

4100

1025

TARJETA DE ANALISIS DE PRECIOS UNITARIOS


CONCEPTO: LABORACION DE 1 M3 DE CONCRETO FC = 100 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

CONCEPTO

MATERIALES CONCEPTO
CEMENTO CPC 30-R

UNIDAD TON M3 M3 M3

CANTIDAD 0.26 0.5 0.68 0.195

ARENA GRAVA DE 3/4" AGUA

PRECIO UNITARIO $1,810.34 $111.00 $111.00 $5.17

TOTAL $470.69 $55.50 $75.48 $1.01

TOTAL MANO DE OBRA CONCEPTO CUADRILLA No 3

$602.68

UNIDAD JORNAL

CANTIDAD 1/15

PRECIO UNITARIO $797.37

TOTAL $53.16 $0.00 $0.00 $0.00 $53.16

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO $53.16 $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.66 $28.74 $31.39 $687.23

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO FC = 150 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

HOJA No. FECHA UNIDAD OBRA

2 de 45 Feb-08 M3 BARDA

MATERIALES CONCEPTO
CEMENTO CPC 30-R

UNIDAD TON M3 M3 M3

CANTIDAD 0.323 0.48 0.67 0.21

ARENA GRAVA DE 3/4" AGUA

PRECIO UNITARIO $1,810.34 $111.00 $111.00 $5.17

TOTAL $584.74 $53.28 $74.37 $1.09 $0.00 $0.00 $0.00 $0.00 $713.48

TOTAL MANO DE OBRA CONCEPTO CUADRILLA III

UNIDAD JORNAL

CANTIDAD 1/5

PRECIO UNITARIO $797.37

TOTAL $159.47 $0.00 $0.00 $0.00 $159.47

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO $23.80 $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.19 $28.74 $29.93 $902.88

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.
CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO

3 de 45

CONCEPTO DESPLANTE

CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO FC = 200 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

FECHA UNIDAD OBRA

Feb-08 M3 BARDA

CONCEPTO DESPLANTE HECHO 15 CIMBRADO

MATERIALES CONCEPTO
CEMENTO CPC 30-R

UNIDAD TON M3 M3 M3

CANTIDAD 0.355 0.47 0.65 0.195

ARENA GRAVA DE 3/4" AGUA

PRECIO UNITARIO $1,810.34 $111.00 $111.00 $5.17

TOTAL $642.67 $52.17 $72.15 $1.01 $0.00 $0.00 $0.00 $0.00 $768.00

TOTAL MANO DE OBRA CONCEPTO CUADRILLA III

UNIDAD JORNAL

CANTIDAD 1/5

PRECIO UNITARIO $797.37

TOTAL $159.47 $0.00 $0.00 $0.00 $159.47

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO $23.80 $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.19 $28.74 $29.93 $957.40

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE MORTEROARENA 1:4 PARA RECUBRIMIENTO, JUNTEO DE LADRILLO Y DE PIEDRA DE CIMENTACION.

HOJA No. FECHA UNIDAD OBRA

4 de 45 Feb-08 M3 BARDA

CONCEPTO

MATERIALES CONCEPTO
MORTERO CEMEX

UNIDAD TON M3 M3

CANTIDAD 0.309 1.242 0.377

ARENA AGUA

PRECIO UNITARIO $1,465.52 $128.76 $5.17

TOTAL $452.84 $159.92 $1.95 $0.00 $0.00 $0.00 $0.00 $0.00 $614.71

TOTAL MANO DE OBRA CONCEPTO CUADRILLA III

UNIDAD JORNAL

CANTIDAD 1/5

PRECIO UNITARIO $797.37

TOTAL $159.47 $0.00 $0.00 $0.00 $159.47

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO $23.80 $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.19 $28.74 $29.93 $804.12

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE MEZCLA CEMENTOARENA 1:4, CON FIBRA DE POLIPROPILENO RECUBRIMIENTO DE PANEL ESTRUCTURAL MONOLITE. PARA

HOJA No. FECHA UNIDAD OBRA

5 de 45 Mar-04 M3 TESIS

CONCEPTO PANEL ESPESOR, MORTERO APLICADO

MATERIALES

CONCEPTO
CEMENTO CPC 30-R

UNIDAD TON M3 M3 KG

CANTIDAD 0.26 0.5 0.195 0.6

ARENA AGUA FIBRA DE POLIPROPILENO

PRECIO UNITARIO $1,810.34 $111.00 $5.17 $80.00

TOTAL $470.69 $55.50 $1.01 $15.60 $0.00 $0.00 $0.00 $0.00 $542.80

TOTAL MANO DE OBRA CONCEPTO CUADRILLA III

UNIDAD JORNAL

CANTIDAD 2/15

PRECIO UNITARIO $797.37

TOTAL $106.32 $0.00 $0.00 $0.00 $106.32

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO $23.80 $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.19 $28.74 $29.93 $679.04

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELARACION DE 1M3 DE YESO PARA APLANADO

HOJA No. FECHA UNIDAD OBRA

6 de 45 Mar-04 M3 TESIS

CONCEPTO

MATERIALES CONCEPTO YESO

UNIDAD TONELADA

CANTIDAD 0.8345

PRECIO UNITARIO $1,099.14

TOTAL $917.23

AGUA

M3

1.17

$5.17

$6.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $923.28

TOTAL MANO DE OBRA CONCEPTO CUADRILLA I

UNIDAD JORNAL

CANTIDAD 67/100

PRECIO UNITARIO $221.29

TOTAL $148.26 $0.00 $0.00 $0.00 $148.26

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $23.80 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.19 $1.19 $1,072.74

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.

HOJA No. FECHA UNIDAD OBRA

7 DE 45 Feb-08 M3 BARDA

CONCEPTO: 3000 ELABORADO CON GALVANIZADO Y PANE INCLUYE MATERIAL Y

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO CUADRILLA I

$0.00

UNIDAD JORNAL

CANTIDAD 2/5

PRECIO UNITARIO $221.29

TOTAL $88.52 $0.00 $0.00 $0.00 $88.52

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HTA. MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $88.52 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $4.43 $4.43 $92.94 $13.94 $106.88

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION 1M2


DE PLANTILLA DE CIMENTACION DE CONCRETO F'C=100 HECHO EN OBRA DE 10 CMS DE ESPESOR .

HOJA No. FECHA UNIDAD OBRA

8 DE 45 Mar-04 M2 TESIS

CONCEPTO

MATERIALES CONCEPTO CONCRETO F'C = 100 KG/CM2

UNIDAD M3

CANTIDAD 0.048

PRECIO UNITARIO $687.23

TOTAL $32.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 TOTAL MANO DE OBRA CONCEPTO CUADRILLA II $32.99

UNIDAD JORNAL

CANTIDAD 1/14

PRECIO UNITARIO $500.97

TOTAL $35.78 $0.00 $0.00 $0.00 $35.78

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HTA. MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $35.78 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.73 $1.73 $70.50 $10.58 $81.08

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:ELABORACION DE 1M3 DE CIMENTACION MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5.

DE

HOJA No. FECHA UNIDAD OBRA

9 DE 45 Feb-08 M3 BARDA

CONCEPTO

MATERIALES CONCEPTO MORTERO CEM-ARENA 1:5 PIEDRA

UNIDAD M3 M3

CANTIDAD 0.3 1.33

PRECIO UNITARIO $804.12 $121.00

TOTAL $241.23 $160.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $402.16

TOTAL

MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 2/3

PRECIO UNITARIO $500.97

TOTAL $333.98 $0.00 $0.00 $0.00 $333.98

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HTA. MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $333.98 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $16.70 $0.00 $16.70 $752.84 $112.93 $865.77

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

HOJA No. FECHA UNIDAD OBRA

10 DE 45 Feb-08 PIEZA BARDA

CONCEPTO

MATERIALES CONCEPTO CONCRETO F?C=150 KG/CM2 ARMEX 15X15X4

UNIDAD M3 ML

CANTIDAD 0.011 2.95

PRECIO UNITARIO $902.88 $14.66

TOTAL $9.93 $43.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $53.16

TOTAL MANO DE OBRA CONCEPTO

UNIDAD

CANTIDAD

PRECIO

TOTAL

CUADRILLA III CUADRILLA IV CUADRILLA IV

JORNAL JORNAL JORNAL

1/50 1/50 1/50

UNITARIO $500.97 $797.37 $739.42 TOTAL

$10.02 $15.95 $14.79 $0.00 $40.76

HTA. Y EQUIPO MENOR CONCEPTO HTA. MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $40.76 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.04 $0.00 $2.04 $95.96 $14.39 $110.35

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: RELLENO Y COMPACTACION CON MATERIAL


PRODUCTO DE LA EXCAVACION, ENCAPAS DE 12 CMS.

HOJA No. FECHA UNIDAD OBRA

11 DE 45 Feb-08 M3 BARDA

CONCEPTO

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO CUADRILLA I

$0.00

UNIDAD JORNAL

CANTIDAD 1/7

PRECIO UNITARIO $221.29

TOTAL $31.61 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

$0.00 $0.00 $31.61

UNIDAD %

CANTIDAD 0.005

PRECIO UNITARIO $31.61 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $0.16 $0.16 $31.77 $4.77 $36.54

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 ML DE DALA DE DESPLANTE


Y CERRAMINENTOO DE CONCRETO F'C=150 KG7CM2, HECHO EN OBRA

HOJA No. FECHA UNIDAD OBRA

12 DE 45 Feb-08 ML BARDA

CONCEPTO
CON ESTANDAR

MATERIALES CONCEPTO CONCRETO FC= 150 KG/CM2 ACERO #3 ALAMBRON DE 1/4 " CIMBRA DIESEL CLAVO DE 2 1/2 "

UNIDAD M3 TN KG M2 LT KG

CANTIDAD 0.03 0.002264 0.5208 0.3 0.15 0.09

PRECIO UNITARIO $902.88 $13,463.30 $16.00 $38.79 $10.50 $15.50

TOTAL $27.09 $30.48 $8.33 $11.64 $1.58 $1.40 $0.00 $0.00 $80.51

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA V CUADRILLA IV

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/60 1/50 1/30

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $8.35 $14.79 $24.65 $0.00 $47.78

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $47.78 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.39 $2.39 $130.68 $19.60 $150.28

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR.

HOJA No. FECHA UNIDAD OBRA

13 DE 45 Mar-04 M2 TESIS

CONCEPTO: MURO DIV ELABORADO CON PERF GALVANIZADO Y PANE INCLUYE MATERIAL Y

MATERIALES CONCEPTO CONCRETO F'C=100 KG/CM2

UNIDAD M3

CANTIDAD 0.08

PRECIO UNITARIO $687.23

TOTAL $54.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $54.98

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 1/10

PRECIO UNITARIO $500.97

TOTAL $50.10 $0.00 $0.00 $0.00 $50.10

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO

TOTAL

HERRAMIENTA MENOR

0.05

UNITARIO $50.10 TOTAL SUB-TOTAL I.VA TOTAL

$2.50 $2.50 $107.58 $16.14 $123.72

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE LADRILLO


DE DIMENSIONES REGULARES, JUNTEADO CON MORTEROARENA 1:5.

HOJA No. FECHA UNIDAD OBRA

14 DE 45 Feb-08 M2 BARDA

CONCEPTO: MURO DIV ELABORADO CON PERF GALVANIZADO Y PANE SENCILLO, INCLUYE M

MATERIALES CONCEPTO MORTERO CEM ARENA 1:5 LADRILLO DE LA REGION

UNIDAD M3 MILLAR

CANTIDAD 0.027 0.039

PRECIO UNITARIO $804.12 $1,110.00

TOTAL $21.71 $43.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $65.00

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 1/10

PRECIO UNITARIO $500.97

TOTAL $50.10 $0.00 $0.00 $0.00 $50.10

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $50.10

TOTAL $2.50 $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$2.50 $117.60 $17.64 $135.24

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO.

HOJA No. FECHA UNIDAD OBRA

15 DE 45 Mar-04 M2 TESIS

CONCEPTO: ELABORAC HECHO CON BLOCK FO CMS, SENTADO CON M 1:5 Y RELLENO DE CON

MATERIALES CONCEPTO CONCRETO 200 KG/CM2 ACERO DE 3/8" ALAMBRE RECOCIDO CALVO DE 21/2"

UNIDAD M3 KG KG KG

CANTIDAD 0.12 6.2 0.2 0.1

PRECIO UNITARIO $957.40 $7.76 $14.66 $13.36

TOTAL $114.89 $48.10 $2.93 $1.34 $0.00 $0.00 $0.00 $0.00 $167.26

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/8 1/20 1/10

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $62.62 $36.97 $73.94 $0.00 $173.53

HTA. Y EQUIPO MENOR CONCEPTO HTA. MENOR RENTA DE CIMBRA

UNIDAD % M2

CANTIDAD 0.05 1

PRECIO UNITARIO $173.53 $38.79 TOTAL SUB-TOTAL

TOTAL $8.68 $38.79 $47.47 $388.26

I.VA TOTAL

$58.24 $446.50

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORCION DE 1 M2 DE APLANADO HECHO CON MORTERO-ARENA PROP. 1:5, DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO

HOJA No. FECHA UNIDAD OBRA

16 DE 45 Feb-08 M2 BARDA

CONCEPTO: ELABORAC HECHA CON VIGUETA FANOSA, DE 12 CMS DE F'C=200 KG/CM2.

MATERIALES CONCEPTO MEZCLA

UNIDAD M3

CANTIDAD 0.02

PRECIO UNITARIO $804.12

TOTAL $16.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $16.08

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 1/14

PRECIO UNITARIO $500.97

TOTAL $35.78 $0.00 $0.00 $0.00 $35.78

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $35.78 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.79 $0.00 $1.79 $53.65 $8.05 $61.70

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

HOJA No. FECHA UNIDAD OBRA

17 DE 45 Mar-04 M2 TESIS

CONCEPTO: ELABORAC ACUSTOM, HECHO CON GALVANIZADO Y PANE SENCILLO, INCLUYE M

MATERIALES CONCEPTO PASTA DE YESO

UNIDAD M3

CANTIDAD 0.02

PRECIO UNITARIO $1,072.74

TOTAL $21.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $21.45

TOTAL MANO DE OBRA CONCEPTO CUADRILLA VIIi

UNIDAD JORNAL

CANTIDAD 1/25

PRECIO UNITARIO $754.93

TOTAL $30.20 $0.00 $0.00 $0.00 $30.20

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $30.20 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.51 $0.00 $1.51 $53.16 $7.97 $61.14

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.
CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20

18 DE 45

CONCEPTO: ELABORCI CONCRETO LIGERO F'C

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20


CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION.

FECHA UNIDAD OBRA

Mar-04 M2 TESIS

CONCEPTO: ELABORCI CONCRETO LIGERO F'C AGREGADO DE BETOST MALLA ELECTROSOLD

MATERIALES CONCEPTO CONCRETO F'C=200 ARMEX 20 X 15 X 4 HULE NEGRO VR DE 3/8" ALAMBRE RECOCIDO

UNIDAD M3 ML M2 KG KG

CANTIDAD 3/50 1 0.8 0.5 0.025

PRECIO UNITARIO $957.40 $14.66 $8.62 $7.76 $14.66

TOTAL $57.44 $14.66 $6.90 $3.88 $0.37 $0.00 $0.00 $0.00 $83.24

TOTAL MANO DE OBRA CONCEPTO CUADRILLA IV CUADRILLA V CUADRILLA II

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/60 1/50 1/30

PRECIO UNITARIO $739.42 $739.42 $500.97 TOTAL

TOTAL $12.32 $14.79 $16.70 $0.00 $43.81

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $43.81 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.19 $2.19 $129.24 $19.39 $148.63

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20


CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION Y ESTRIBOS DE VR DE 3/8" @ 30 MCS. PARA MUROS DE MONOLITE.

HOJA No. FECHA UNIDAD OBRA

18 DE 45 Mar-04 M2 TESIS

CONCEPTO CONCRETO LIGERO F'C AGREGADO DE BETOST MALLA ELECTROSOLD

MATERIALES CONCEPTO CONCRETO F'C=200 ARMEX 20 X 15 X 4 HULE PARA SILO VR DE 3/8" ALAMBRE RECOCIDO

UNIDAD M3 ML M2 KG KG

CANTIDAD 3/50 1 0.8 1.74 0.025

PRECIO UNITARIO $543.13

TOTAL $32.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $32.59

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA V CUADRILLA IV

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/60 1/50 1/30

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $8.35 $14.79 $24.65 $0.00 $47.78

HTA. Y EQUIPO MENOR CONCEPTO HERREMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $47.78 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.39 $2.39 $82.76 $12.41 $95.18

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

ELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO ESTAMPADO. INCLUYE HULE CONTRA TRANSMINACION.

HOJA No. FECHA UNIDAD OBRA

20 DE 45 Mar-04 M2 TESIS

CONCEPTO CHO CON MULTY 3" DE ESPESOR, INCLUY

MATERIALES

CONCEPTO CONCRETO F'C=200 MALLA ELECT. 6-6-10-10 HULE PARA SILO ALAMBRE RECOCIDO

UNIDAD M3 M2 M2 KG

CANTIDAD 3/25 1 1 0.025

PRECIO UNITARIO $957.40 $32.76 $8.62 $14.66

TOTAL $114.89 $32.76 $8.62 $0.37 $0.00 $0.00 $0.00 $0.00 $156.63

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA V CUADRILLA IV

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/20 1/20 1/40

PRECIO UNITARIO $500.97 $221.29 $739.42 TOTAL

TOTAL $25.05 $11.06 $18.49 $0.00 $54.60

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR ESTAMPADO

UNIDAD % M2

CANTIDAD 0.05 1

PRECIO UNITARIO $54.60 99.13793103 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.73 $99.14 $101.87 $313.10 $46.96 $360.06

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1M3 DE CONCRETO LIGERO


F'C=175 KG/CM2 HECHO CON BETOSTYRENE, HECHO EN OBRA.

HOJA No. FECHA UNIDAD OBRA

21 DE 45 Mar-04 M3 TESIS

CONCEPTO HECHA CON MULTY DE

MATERIALES CONCEPTO
CEMENTO CPC 30-R

UNIDAD TON

CANTIDAD 0.6

PRECIO UNITARIO $1,810.34

TOTAL $1,086.21

ARENA BETOSTYRENE AGUA

M3 M3 M3

0.56 0.4 0.3

$111.00 $1,000.00 $5.17

$62.16 $400.00 $1.55 $0.00 $0.00 $0.00 $0.00 $1,549.92

TOTAL MANO DE OBRA CONCEPTO CUADRILLA III

UNIDAD JORNAL

CANTIDAD 1/16

PRECIO UNITARIO $797.37

TOTAL $49.84 $0.00 $0.00 $0.00 $49.84

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR. RENTA REVOLVEDORA

UNIDAD % JORNAL

CANTIDAD 0.05 1/6

PRECIO UNITARIO $49.84 $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.49 $28.74 $31.23 $1,630.98

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO


LIGERO F'C=175 KG/CM2 DE 12 CMS. DE ESPESOR CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

HOJA No. FECHA UNIDAD OBRA

22 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CONCRETO LIGERO F'c=175 MALLA ELECTROSOLDADA

UNIDAD M3 M2

CANTIDAD 0.12 2

PRECIO UNITARIO $1,630.98 $32.76

TOTAL $195.72 $65.52 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V $261.24

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/30 1/50 1/60

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $16.70 $14.79 $12.32 $0.00 $43.81

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA APARENTE

UNIDAD % M2

CANTIDAD 0.05 2

PRECIO UNITARIO $43.81 $38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.19 $77.59 $79.78 $384.82 $57.72 $442.55

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO


LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

HOJA No. FECHA UNIDAD OBRA

23 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CONCRETO LIGERO F'c=175 MALLA ELECTROSOLDADA ALAMBRE RECOCIDO

UNIDAD M3 M2 KG

CANTIDAD 0.12 1 0.12

PRECIO UNITARIO $1,630.98 $32.76 $14.66

TOTAL $195.72 $32.76 $1.76 $0.00 $0.00 $0.00 $0.00

$0.00 TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V $230.24

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/20 1/20 1/20

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $25.05 $36.97 $36.97 $0.00 $98.99

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA

UNIDAD % M2

CANTIDAD 0.05 1

PRECIO UNITARIO $98.99 $38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $4.95 $38.79 $43.74 $372.97 $55.95 $428.91

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON


BLOCK CONTEC, DE 12 CMS, DE ESPESOR SENTADO CON ADHESIVO DE LA MISMA MARCA.

HOJA No. FECHA UNIDAD OBRA

24 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO BLOCK CONTEC 12.5X40X60 ADHESIVO CONTEC AGUA

UNIDAD M3 KG M3

CANTIDAD 0.15 3.3 0.001

PRECIO UNITARIO $1,520.87 $4.61 $5.17

TOTAL $228.13 $15.21 $0.01 $0.00 $0.00 $0.00 $0.00 $0.00 $243.34

TOTAL

MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 1/18

PRECIO UNITARIO $500.97

TOTAL $27.83 $0.00 $0.00 $0.00 $27.83

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD 5

CANTIDAD 0.05

PRECIO UNITARIO $27.83 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.39 $1.39 $272.57 $40.89 $313.45

ELABORACION DE ARMEX PARA DALA DE DESPLANTE CONCEPTO UNIDAD CANTIDAD VARILLA DE 3/8 ALAMBRE RECOCIDO ALAMBRON DE 1/4 KG KG KG

PRECIO UNITARIO

TOTAL

CONCEPTO: ELABORACION DE 1 ML DE CASTILLO DE CONCRETO DE FC= 150 KG/CM2 DE 10 *10*4

CONCEPTO CONCRETO FC= 150 KG/CM2 CASTILLO DE 10*10*4 CIMBRA DIESEL CLAVO DE 2 1/2 "

UNIDAD M3 ML M2 LT KG

CANTIDAD 0.03 1 0.26 0.13 0.07

PRECIO UNITARIO $902.88 $45.00 $38.79 $10.50 $15.50

TOTAL $27.09 $45.00 $10.09 $1.37 $1.09 $0.00

$0.00 TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV $84.62

UNIDAD JORNAL JORNAL

CANTIDAD 1/60 1/30

PRECIO UNITARIO $500.97 $739.42

TOTAL $8.35 $24.65 $0.00 $33.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $33.00 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.65 $1.65 $119.27 $17.89 $137.16

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 ML DE DINTEL CONTEC DE


12.5X12.5 CMS. SENTADO CON MADHESIVO DE LA MISMA MARCA.

HOJA No. FECHA UNIDAD OBRA

25 DE 45 Mar-04 M2 TESIS

CONCEPTO: CONCEPTO

MATERIALES CONCEPTO DINTEL ARMADO ADHESIVO CONTEC

UNIDAD M3 KG

CANTIDAD 0.0225 0.1

PRECIO UNITARIO $2,325.00 $4.61

TOTAL $52.31 $0.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $52.77

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 1/18

PRECIO UNITARIO $500.97

TOTAL $27.83 $0.00 $0.00 $0.00 $27.83

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $27.83 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.39 $1.39 $82.00 $12.30 $94.30

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE PANEL LOSA CONTEC


DE 15 CMS. DE ESPESOR.

HOJA No. FECHA UNIDAD OBRA

26 DE 45 Mar-04 M2 TESIS

CONCEPTO: CONCEPTO

MATERIALES CONCEPTO
PANEL PARA LOSA CONTEC

UNIDAD M3 M3 KG

CANTIDAD 0.125 0.015 1.5

CONCRETO F'C=200 VARILLA DE 3/8"

PRECIO UNITARIO $2,550.13 $957.40 $21.55

TOTAL $318.77 $14.36 $32.33 $0.00 $0.00 $0.00 $0.00 $0.00 $365.45

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/20 1/20 1/20

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $25.05 $36.97 $36.97 $0.00 $98.99

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR RENTA DE GRUA

UNIDAD % HR

CANTIDAD 0.05 0.1

PRECIO UNITARIO $98.99 #VALUE! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $4.95 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M DE DALA DE DESPLANTE HECHO CON CONCRETO F'C=200

HOJA No.

27 DE 45

CONCEPTO:

CONCEPTO: ELABORACION DE 1 M DE DALA DE DESPLANTE HECHO CON CONCRETO F'C=200 HECHO EN OBRA, ARMADA CON ARMEX 15X20X4,INCLUYE,VR 3/8 PARA FIJACION, CIMBRADO , COLADO Y CURADO.

CONCEPTO:

FECHA UNIDAD OBRA

Mar-04 M2 TESIS

MATERIALES CONCEPTO
CONCRETO FC=200

UNIDAD M3 ML KG KG

CANTIDAD 0.03 1 1.5 1

ARMEX 15X20X4 VARILLA DE 3/8" ALAMBRE RECOCIDO

PRECIO UNITARIO $1,072.74 $14.66 $7.76 $14.66

TOTAL $32.18 $14.66 $11.64 $14.66 $0.00 $0.00 $0.00 $0.00 $73.13

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/45 1/45 1/45

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $11.13 $16.43 $16.43 $0.00 $44.00

HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA CIMBRA

UNIDAD % m2

CANTIDAD 0.05 0.40

PRECIO UNITARIO $44.00 $38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.20 $15.52 $17.72 $134.84 $20.23 $155.07

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE PANEL


ESTRUCTURAL MONOLITE DE 4" CMS. DE ESPESOR, CON ACABADO APLANADO A BASE DE MORTERO CEM-ARENA 1:5 DE 2 CMS. DE ESPESOR, APLICADO CON EQUIPO NEUMATICO.

HOJA No. FECHA UNIDAD OBRA

28 DE 45 Mar-04 M2 TESIS

CONCEPTO: ARCILLA 1:2:6 PARA RECUB DE PIEDRA DE CIMENTACI

MATERIALES CONCEPTO

UNIDAD

CANTIDAD 1 0.17 0.3

PANEL ESTRUCTURAL MONOLITE DE 12 CMS M2

MORTERO CEM-ARENA 1:5 ACCESORIOS

M3 %

PRECIO UNITARIO $137.80 $679.04 $137.80

TOTAL $137.80 $115.44 $41.34 $0.00 $0.00 $0.00 $0.00 $0.00 $294.58

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV

UNIDAD JORNAL JORNAL

CANTIDAD 1/20 1/20

PRECIO UNITARIO $500.97 $739.42

TOTAL $25.05 $36.97 $0.00 $0.00 $62.02

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA EQUIPO NEUMATICO

UNIDAD % JNAL

CANTIDAD 0.05 0.02

PRECIO UNITARIO $62.02 $431.03 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $3.10 $8.62 $11.72 $368.32 $55.25 $423.57

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE PANEL ESTRUCTURAL MONOLITE DE 4" CMS. DE ESPESOR, CON ACABADO APLANADO A BASE DE MORTERO CEM-ARENA 1:5 DE 2 CMS. DE ESPESOR, APLICADO A MANO.

HOJA No. FECHA UNIDAD OBRA

29 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES

CONCEPTO

UNIDAD

CANTIDAD 1 0.17 0.3

PANEL ESTRUCTURAL MONOLITE DE 12 CMS M2

MORTERO CEM-ARENA 1:5 ACCESORIOS

M3 %

PRECIO UNITARIO $137.80 $679.04 $137.80

TOTAL $137.80 $115.44 $41.34 $0.00 $0.00 $0.00 $0.00 $0.00 $294.58

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV

UNIDAD JORNAL JORNAL

CANTIDAD 1/10 1/10

PRECIO UNITARIO $500.97 $739.42

TOTAL $50.10 $73.94 $0.00 $0.00 $124.04

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $124.04 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $6.20 $6.20 $424.82 $63.72 $488.54

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

ELABORACION DE 1 M2 DE LOSA HECHA CON PANEL ESTRUCTURAL MONOLITE BOVEDILLA DE 10CMS. DE ESPESOR CON CONCRETO FC = 200 KG / CM2 T. M. A. 3/4", DE 5 CMS DE ESPESOR, HECHO EN OBRA CON REVOLVEDORA. Y ACABADO INTERIOR DE APLANADO DE MORTERO CEM-ARENA 1:5 DE 2 CMS DE ESPESOR.

HOJA No. FECHA UNIDAD OBRA

30 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO
P E M BOVEDILLA

UNIDAD M2

CANTIDAD 1

PRECIO UNITARIO $172.00

TOTAL $172.00

CONCRETO FC=200 MORTERO CEM-ARENA 1:5 VARILLA DE 3/8" ALAMBRE RECOCIDO EQUIPO NEUMATICO

M3 M3 KG KG JNAL

0.09 0.06 2.5 0.15 0.09

$957.40 $29.93 $7.76 $14.66 $431.03

$86.17 $1.80 $19.40 $2.20 $36.64 $0.00 $0.00 $318.19

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/20 1/20 1/20

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $25.05 $36.97 $36.97 $0.00 $98.99

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA

UNIDAD % M2

CANTIDAD 0.05 1

PRECIO UNITARIO $98.99 38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $4.95 38.79 $43.74 $460.93 $69.14 $530.07

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLERO TEC3000 ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

31 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL TEC-3000 TORNILLO PARA PAPEL

UNIDAD PIEZA PIEZA PIEZA PIEZA

CANTIDAD 0.3 0.77 0.71 22.16

PRECIO UNITARIO $22.61 $22.61 $195.65 $0.26

TOTAL $6.78 $17.41 $138.91 $5.78

COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

KG. ML PIEZA PIEZA

1.53 2.45 9 4.5

$6.09 $0.25 $8.70 $0.35 TOTAL

$9.31 $0.62 $78.26 $1.57 $258.64

MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/10

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CUBIERTA DE TABLERO TEC-3000, ELABORADA


CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

32 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE FIBROCEMENTO TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA

CANTIDAD 0.15 0.385 0.355 11.08 0.75 1.25 4.5

PRECIO UNITARIO $22.61 $22.61 $200.00 $0.26 $6.09 $0.25 $8.70

TOTAL $3.39 $8.70 $71.00 $2.89 $4.57 $0.32 $39.13

TORNILLO CON TAQUETE

PIEZA

2.2

$0.35 TOTAL

$0.77 $130.76

MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/10

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR RENTA DE GRUA

UNIDAD $ HR

CANTIDAD 0.05 0.1

PRECIO UNITARIO #REF! $850.00 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! $85.00 #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO


CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

33 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE YESO TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA PIEZA

CANTIDAD 0.3 0.77 0.71 22.16 1.53 2.45 8 3.3

PRECIO UNITARIO $22.61 $22.61 $56.52 $0.26 $4.00 $0.25 $8.70 $0.35 TOTAL

TOTAL $6.78 $17.41 $40.13 $5.78 $6.12 $0.62 $69.57 $1.15 $147.55

MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/15

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO


CON PERFILES DE ACERO GALVANIZADO Y PANELES DETABLA ROCA RW EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

34 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE TABLAROCA RW TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA PIEZA

CANTIDAD 0.3 0.77 0.71 22.16 1.53 2.45 8 3.3

PRECIO UNITARIO $22.61 $22.61 $172.00 $0.26 $4.00 $0.25 $8.70 $0.35 TOTAL

TOTAL $6.78 $17.41 $122.12 $5.78 $6.12 $0.62 $69.57 $1.15 $229.54

MANO DE OBRA CONCEPTO

UNIDAD

CANTIDAD

PRECIO

TOTAL

CUADRILLA VI

JORNAL

1/15

UNITARIO #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

#REF! $0.00 $0.00 $0.00 #REF!

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO


CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO RW SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

35 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE TABLAROCA TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA PIEZA

CANTIDAD 0.15 0.385 0.355 11.08 0.75 1.25 4 1.65

PRECIO UNITARIO $22.61 $22.61 $113.04 $0.26 $4.00 $0.25 $8.70 $0.35 TOTAL

TOTAL $3.39 $8.70 $40.13 $2.89 $3.00 $0.32 $34.78 $0.57 $93.79

MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/25

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

$0.00 $0.00 #REF!

UNIDAD %

CANTIDAD 0.05

PRECIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO


CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

36 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE YESO TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA PIEZA

CANTIDAD 0.15 0.385 0.355 11.08 0.75 1.25 4 1.65

PRECIO UNITARIO $22.61 $22.61 $56.52 $0.26 $4.00 $0.25 $8.70 $0.35 TOTAL

TOTAL $3.39 $8.70 $20.07 $2.89 $3.00 $0.32 $34.78 $0.57 $73.72

MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/25

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO RF. SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

37 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE TABLAROCA RF TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA PIEZA

CANTIDAD 0.15 0.385 0.355 11.08 0.75 1.25 4 1.65

PRECIO UNITARIO $22.61 $22.61 $105.00 $0.26 $4.00 $0.25 $8.70 $0.35 TOTAL

TOTAL $3.39 $8.70 $37.28 $2.89 $3.00 $0.32 $34.78 $0.57 $90.93

MANO DE OBRA CONCEPTO CUADRILLA TABLAROCA

UNIDAD JORNAL

CANTIDAD 1/15

PRECIO UNITARIO $738.46

TOTAL $49.23 $0.00 $0.00 $0.00 $49.23

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO

TOTAL

5% DE MANO DE OBRA

0.05

UNITARIO $49.23 TOTAL SUB-TOTAL I.VA TOTAL

$2.46 $2.46 $142.63 $21.39 $164.02

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO EXT. SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

38 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE TABLAROCA TORNILLO PARA PAPEL COMPUESTO PARA JUNTEO CINTA DE PAPEL TORNILLO FRAMER TORNILLO CON TAQUETE

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML PIEZA PIEZA

CANTIDAD 0.15 0.385 0.355 11.08 0.75 1.25 4 1.65

PRECIO UNITARIO $22.61 $22.61 $102.54 $0.26 $4.00 $0.25 $0.26 $8.70 TOTAL

TOTAL $3.39 $8.70 $36.40 $2.89 $3.00 $0.32 $1.04 $14.35 $70.10

MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/25

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF!

TOTAL #REF!

TOTAL SUB-TOTAL I.VA TOTAL

#REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON BLOCK FOAMBLOCK, DE 12.5X25X112 CMS, SENTADO CON MORTERO CEMENTO ARENA 1:5 Y RELLENO DE CONCRETO FC=200KG/CM2 Y

HOJA No. FECHA UNIDAD OBRA

39 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO BLOC FOAMBLOCK CONCRETO FC=200 MORTERO CEM-ARENA 1:5 VR DE 3/8" TELA DE GALLINERO APLANADO DE YESO

UNIDAD PIEZA M3 M3 KG M2 M3

CANTIDAD 3.47 0.135 0.02 1.5 2 0.02

PRECIO UNITARIO $23.74 $957.40 $804.12 $7.76 $21.55 $1,072.74

TOTAL $82.37 $129.25 $16.08 $11.64 $43.10 $21.45 $0.00 $0.00 $303.90

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA II

UNIDAD JORNAL JORNAL

CANTIDAD 1/15 1/40

PRECIO UNITARIO $500.97 $754.93

TOTAL $33.40 $18.87 $0.00 $0.00 $52.27

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HTA. MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $52.27 TOTAL SUB-TOTAL

TOTAL $2.61 $0.00 $2.61 $358.79

I.VA TOTAL

$53.82 $412.61

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON VIGUETA Y BOVEDILLA MARCA FANOSA, DE 12 CMS DE ESPESOR, CON CONCRETO F'C=200 KG/CM2.

HOJA No. FECHA UNIDAD OBRA

40 DE 45 Mar-04 M2 TESIS

CONCEPTO: CON ESPESOR, PLOMEADO Y NI

MATERIALES CONCEPTO BOVEDILLA CONCRETO FC=200KG MALLA ELECTROSOLDAD ALAMBRE RECOCIDO VIGUETA PRE-COLADA

UNIDAD M2 M3 M2 KG ML

CANTIDAD 1 0.065 1 0.025 1.6

PRECIO UNITARIO $46.96 $957.40 $32.76 $14.66 $125.00

TOTAL $46.96 $62.23 $32.76 $0.37 $200.00 $0.00 $0.00 $0.00 $342.31

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA I V CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/40 1/25 1/20

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $12.52 $29.58 $36.97 $0.00 $79.07

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA

UNIDAD % M2

CANTIDAD 0.05 1

PRECIO UNITARIO $79.07 38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $3.95 $38.79 $42.75 $464.13 $69.62 $533.75

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE PLAFON ACUSTOM, HECHO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO STANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

HOJA No. FECHA UNIDAD OBRA

41 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CANAL AMARRE POSTE METALICO PANEL DE YESO TORNILLO PARA PAPEL 1 1/8 COMPUESTO PARA JUNTEO CINTA DE PAPEL

UNIDAD PIEZA PIEZA PIEZA PIEZA KG. ML

CANTIDAD 0.22 0.44 1 11 0.76 1.25

PRECIO UNITARIO $22.61 $22.61 $56.52 $0.26 $4.00 $0.25

TOTAL $4.97 $9.95 $56.52 $2.87 $3.04 $0.32 $0.00 $0.00 $77.67

TOTAL MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/25

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO #REF! $172.41 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! $29.31 #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 CON

HOJA No.

42 DE 45

CONCEPTO:

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO:

FECHA UNIDAD OBRA

Mar-04 M2 TESIS

MATERIALES CONCEPTO CONCRETO LIGERO F'c=175 MALLA ELECTROSOLDADA

UNIDAD M3 M2

CANTIDAD 0.15 2

PRECIO UNITARIO #REF! $32.76

TOTAL #REF! $65.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 #REF!

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/30 1/20 1/40

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $16.70 $36.97 $18.49 $0.00 $72.16

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA APARENTE

UNIDAD % M2

CANTIDAD 0.05 2

PRECIO UNITARIO $72.16 38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $3.61 $77.59 $81.19 #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

HOJA No. FECHA UNIDAD OBRA

43 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO CONCRETO LIGERO F'c=175 MALLA ELECTROSOLDADA

UNIDAD M3 M2

CANTIDAD 0.12 2

PRECIO UNITARIO #REF! $32.76

TOTAL #REF! $65.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 #REF!

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA IV CUADRILLA V

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/30 1/20 1/40

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $16.70 $36.97 $18.49 $0.00 $72.16

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA APARENTE

UNIDAD % M2

CANTIDAD 0.05 1

PRECIO UNITARIO $72.16 $38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $3.61 $38.79 $42.40 #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO HE CHO CON MULTY-MURO, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

HOJA No. FECHA UNIDAD OBRA

44 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES

CONCEPTO MULTYMURO CONEXIONES

UNIDAD M2 %

CANTIDAD 1 0.1

PRECIO UNITARIO $550.43 $550.43

TOTAL $550.43 $55.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $605.48

TOTAL MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/15

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON MULTY-LOSA, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

HOJA No. FECHA UNIDAD OBRA

45 DE 45 Mar-04 M2 TESIS

CONCEPTO:

MATERIALES CONCEPTO MULTYTECHO

UNIDAD M2

CANTIDAD 1

PRECIO UNITARIO $527.00

TOTAL $527.00

CONEXIONES

0.1

$527.00

$52.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $579.70

TOTAL MANO DE OBRA CONCEPTO CUADRILLA VI

UNIDAD JORNAL

CANTIDAD 1/15

PRECIO UNITARIO #REF!

TOTAL #REF! $0.00 $0.00 $0.00 #REF!

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO #REF! TOTAL SUB-TOTAL I.VA TOTAL

TOTAL #REF! #REF! #REF! #REF! #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

CONCEPTO:

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO $0.00 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

CONCEPTO: Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO $0.00 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

CONCEPTO:

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL

$0.00

MANO DE OBRA CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO $0.00 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CONCEPTO: ELABORACION DE 1 ML DE CASTILLO,

DE CONCRETO F'C=150 KG7CM2, HECHO EN OBRA ARMADO CON ARMEX 15 X 30 X 4, REFORZADO CON VARILLA DE 3/8" INCLUYE ARMADO, CIMBRADO Y COLADO.

HOJA No. FECHA UNIDAD OBRA

12 DE 45 Feb-08 ML BARDA

MATERIALES CONCEPTO CONCRETO FC= 150 KG/CM2 ARMEX 15 X 30 X 4 VARILLA DE 3/8"

UNIDAD M3 ML ML

CANTIDAD 0.045 1 1

PRECIO UNITARIO $902.88 $14.66 $10.50

TOTAL $40.63 $14.66 $10.50 $0.00 $0.00 $0.00 $0.00 $0.00 $65.78

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA V CUADRILLA IV

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/60 1/50 1/30

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $8.35 $14.79 $24.65 $0.00 $47.78

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA

UNIDAD % M2

CANTIDAD 0.05 0.3

PRECIO UNITARIO $47.78 $38.79 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.39 $11.64 $14.03 $127.60 $19.14 $146.74

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CONCEPTO: ELABORACION DE 1 ML DE COLUMNA FC 200


KGS/CMS2 ARMADA CON VS DE 1/2 Y ESTRIBOS A CADA 25 CMS FY 4200 KG/CMS2

HOJA No. FECHA UNIDAD OBRA

12 DE 45 Feb-08 ML BARDA

MATERIALES CONCEPTO CONCRETO FC= 200 KG/CM2 VARILLA DE 1/2" ESTRIBOS VS 1/4"

UNIDAD M3 ML KG

CANTIDAD 0.1 4 2

PRECIO UNITARIO $957.40 $10.50 $11.50

TOTAL $95.74 $42.00 $23.00 $0.00 $0.00 $0.00 $0.00 $160.74

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II CUADRILLA V CUADRILLA IV

UNIDAD JORNAL JORNAL JORNAL

CANTIDAD 1/60 1/50 1/30

PRECIO UNITARIO $500.97 $739.42 $739.42 TOTAL

TOTAL $8.35 $14.79 $24.65 $0.00 $47.78

HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR CIMBRA

UNIDAD % M2

CANTIDAD 0.05 1.2

PRECIO UNITARIO $47.78 $55.04 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $2.39 $66.05 $68.44 $276.97 $41.54 $318.51

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No.

CONCEPTO:

FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE CEMENTO-CALARCILLA 1:2:6 PARA RECUBRIMIENTO, JUNTEO DE LADRILLO Y DE PIEDRA DE CIMENTACION.

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO
CEMENTO

UNIDAD TON M3 M3 M3

CANTIDAD 0.15 0.15 0.7 0.377

CAL ARCILLA AGUA

PRECIO UNITARIO $1,810.34 $1,478.26 $95.65 $5.17

TOTAL $271.55 $221.74 $66.96 $1.95 $0.00 $0.00 $0.00 $0.00 $562.20

TOTAL MANO DE OBRA CONCEPTO CUADRILLA III

UNIDAD JORNAL

CANTIDAD 1/5

PRECIO UNITARIO $797.37

TOTAL $159.47 $0.00 $0.00 $0.00 $159.47

TOTAL HTA. Y EQUIPO MENOR CONCEPTO 5% DE MANO DE OBRA REVOLVEDORA

UNIDAD % JNAL

CANTIDAD 0.05 0.17

PRECIO UNITARIO $23.80 $0.00 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.19 $0.00 $1.19 $722.86

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES

CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL

$0.00

MANO DE OBRA CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO

TOTAL

UNITARIO $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

$0.00 $0.00 $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL

HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO

TOTAL

UNITARIO $0.00 TOTAL SUB-TOTAL I.VA TOTAL $0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL

$0.00 $0.00

I.VA TOTAL

$0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO MEZCLA

UNIDAD M3

CANTIDAD 0.02

PRECIO UNITARIO $722.86

TOTAL $14.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14.46

TOTAL MANO DE OBRA CONCEPTO CUADRILLA II

UNIDAD JORNAL

CANTIDAD 1/14

PRECIO UNITARIO $500.97

TOTAL $35.78 $0.00 $0.00 $0.00 $35.78

TOTAL HTA. Y EQUIPO MENOR CONCEPTO HERRAMIENTA MENOR

UNIDAD %

CANTIDAD 0.05

PRECIO UNITARIO $35.78 TOTAL SUB-TOTAL I.VA TOTAL

TOTAL $1.79 $1.79 $52.03 $7.80 $59.83

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No.

CONCEPTO:

FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES

CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MANO DE OBRA CONCEPTO

$0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 TOTAL MANO DE OBRA CONCEPTO $0.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO:

HOJA No. FECHA UNIDAD OBRA

Sep-01 M2 TESIS

MATERIALES CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL

$0.00

MANO DE OBRA CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL HTA. Y EQUIPO MENOR CONCEPTO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL $0.00

TOTAL SUB-TOTAL I.VA TOTAL

$0.00 $0.00 $0.00 $0.00

PRESUPUESTO BARDA 2 MTS DE ALTURA CON REPELLADO


CONCEPTO
EXCAVACIN CON MAQUINARIA AFINE DE CEPAS POR MEDIO MANUAL EN T ERRENO T IPO B CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA 80, SENT ADA CON MORT ERO CEMARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2 RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN. DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8". CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. REPELLADO DE MORT ERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA PORT ON DE 2 HOJAS ABAT IBLE C/ PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y COLOCACION.

UNIDAD M3 M3

CANTIDAD 63.00 12.00

PRECIO UNITARIO $50.00 $106.88

TOTAL $3,150.00 $1,282.59

M3

51.00

$865.77

$44,154.23

PIEZA M3 ML

24.00 6.48 96.00

$110.35 $31.77 $150.28

$2,648.42 $205.87 $14,427.21

M2

152.00

$135.24

$20,556.98

ML

36.00

$146.74

$5,282.51

ML

10.00

$124.30

$1,243.00

ML

96.00

$130.53

$12,530.88

ML

6.00

$318.51

$1,911.07

M2

432.00

$61.70

$26,655.79

PZA

1.00

$10,000.00

$10,000.00

TOTAL

$134,048.55

PRESUPUESTO BARDA 2 MTS DE ALTURA SIN REPELLADO


CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONST RUCCIN EXCAVACIN CON MAQUINARIA AFINE DE CEPAS POR MEDIO MANUAL EN T ERRENO T IPO B CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2 RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN. DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8". CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. ON DE 2 HOJAS ABAT IBLE C/ PORT PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2

115.00

$7.67

$882.05

M3 M3 M3

63.00 12.00 131.00

$50.00 $106.88 $865.77

$3,150.00 $1,282.59 $113,415.77

PIEZA M3 ML

24.00 6.48 96.00

$110.35 $31.77 $150.28

$2,648.42 $205.87 $14,427.21

M2

152.00

$135.24

$20,556.98

ML

61.20

$146.74

$8,980.26

ML

14.00

$124.30

$1,740.20

ML

96.00

$130.53

$12,530.88

ML

6.00

$318.06

$1,908.36

PZA

1.00

$10,000.00

$10,000.00

TOTAL

$178,938.19

PRESUPUESTO BARDA 3.35 MTS DE ALTURA CON REPELLADO PRESUPUESTO BARDA 3.35 MTS DE ALTURA CON REPELLADO
CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONST RUCCIN EXCAVACIN CON MAQUINARIA

PRESUPUESTO BARDA 2 MTS DE ALTURA CON REPELLADO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONST RUCCIN EXCAVACIN CON MAQUINARIA

UNIDAD

TOTAL

CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONST RUCCIN EXCAVACIN CON MAQUINARIA

UNIDAD

TOTAL

M2

115.00

$7.67

$882.05

M2

$882.05

M2

$882.05

M3
AFINE DE CEPAS POR MEDIO MANUAL EN T ERRENO T IPO B

63.00

$50.00

$3,150.00
AFINE DE CEPAS POR MEDIO MANUAL T ERRENO T IPO B EN

M3

$3,150.00
AFINE DE CEPAS POR MEDIO MANUAL EN T ERRENO T IPO B

M3

$3,150.00

M3

12.00

$106.88

$1,282.59

M3

$1,282.59

M3

$1,282.59

CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2 RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN. MAT ERIAL INHERT E PARA RELLENO A VOLT EO PARA NIVELACION DE T ERRENO DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8". CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. REPELLADO DE MORT ERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA PORT ON DE 2 HOJAS ABAT IBLE C/ PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y

M3

131.00

$865.77

$113,415.77

CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2

M3

$113,415.77

CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2

M3

$113,415.77

PIEZA

24.00

$110.35

$2,648.42

PIEZA

$2,648.42

PIEZA

$2,648.42

M3

6.48

$31.77

$205.87

RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN. MAT ERIAL INHERT E PARA RELLENO A VOLT EO PARA NIVELACION DE T ERRENO DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8". CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. REPELLADO DE MORT ERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA PORT ON DE 2 HOJAS ABAT IBLE C/ PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y COLOCACION.

M3

$205.87

RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN. MAT ERIAL INHERT E PARA RELLENO VOLT EO PARA NIVELACION DE T ERRENO A

M3

$205.87

M3

849.00

$55.00

$46,695.00

M3

$46,695.00

$46,695.00

ML

96.00

$150.28

$14,427.21

ML

$14,427.21

M2

288.00

$135.24

$38,950.06

M2

$38,950.06

DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8". CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. REPELLADO DE MORT ERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA PORT ON DE 2 HOJAS ABAT IBLE C/ PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y COLOCACION.

ML

$14,427.21

M2

$28,086.00

ML

61.20

$146.74

$8,980.26

ML

$8,980.26

ML

$8,980.26

ML

14.00

$124.30

$1,740.20

ML

$1,740.20

ML

$1,740.20

ML

96.00

$130.53

$12,530.88

ML

$12,530.88

ML

$12,530.88

ML

8.50

$318.06

$2,703.51

ML

$2,703.51

ML

$2,703.51

M2

590.00

$61.70

$36,404.90

M2

$36,404.90

M2

$22,077.00

PZA

1.00

$10,000.00

$10,000.00

PZA

$10,000.00

PZA

$10,000.00

SUBTOTAL

$283,134.68

SUBTOTAL

$283,134.68

SUBTOTAL

$257,942.72

U. Y G.I.

$56,626.94

U. Y G.I.

$56,626.94

U. Y G.I.

$51,588.54

TOTAL

$339,761.62

TOTAL

$339,761.62

TOTAL

$309,531.26

PRESUPUESTO BARDA 3.35 MTS DE ALTURA SIN REPELLADO PRESUPUESTO BARDA 3.35 MTS DE ALTURA SIN REPELLADO
PRECIO UNITARIO

PRESUPUESTO BARDA 2 MTS DE ALTURA SIN REPELLADO

CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE EXCAVACIN CON MAQUINARIA AFINE DE CEPAS POR MEDIO MANUAL EN T ERRENO T IPO B CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2 RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN. MAT ERIAL INHERT E PARA RELLENO A VOLT EO PARA NIVELACION DE T ERRENO DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. ON DE 2 HOJAS ABAT IBLE C/ PORT PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y COLOCACION.

UNIDAD

CANTIDAD

TOTAL

CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONST RUCCIN EXCAVACIN CON MAQUINARIA AFINE DE CEPAS POR MEDIO MANUAL T ERRENO T IPO B EN

UNIDAD

TOTAL

CONCEPTO
T RAZO Y NIVELACION DEL T ERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANT E DE EST RUCT URAS, EST ABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONST RUCCIN EXCAVACIN CON MAQUINARIA AFINE DE CEPAS POR MEDIO MANUAL EN T ERRENO T IPO B CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2 RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN.

UNIDAD

TOTAL

M2

115.00

$7.67

$882.05

M2

$882.05

M2

$882.05

M3 M3 M3 PIEZA

63.00 12.00 131.00 24.00

$50.00 $106.88 $865.77 $110.35

$3,150.00 $1,282.59 $113,415.77 $2,648.42

M3 M3 M3 PIEZA

$3,150.00 $1,282.59 $113,415.77 $2,648.42

M3 M3 M3 PIEZA

$3,150.00 $1,282.59 $113,415.77 $2,648.42

CIMENT ACION DE MAMPOST ERA DE PIEDRA, BASE 80, C0R0NA 30, ALT URA VARIABLE, SENT ADA CON MORT ERO CEM-ARENA 1:5 ANCLAJE DE CAST ILLOS ARMEX 15X30X4, INCLUYE CONCRET O F'C=150 KG/CM2 RELLENO PARA T APAR CEPAS CON MAT ERIAL PRODUCT O DE LA EXCAVACIN.

M3

6.48

$31.77

$205.87

M3

$205.87

M3

$205.87

M3

849.00

$55.00

$46,695.00

MAT ERIAL INHERT E PARA RELLENO A VOLT EO PARA NIVELACION DE T ERRENO

$46,695.00

MAT ERIAL INHERT E PARA RELLENO VOLT EO PARA NIVELACION DE T ERRENO

$46,695.00

ML

96.00

$150.28

$14,427.21

DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

ML

$14,427.21

DALA DE DESPLANT E DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. MURO DE LADRILLO SENT ADO MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O ARMADOS CON ARMEX 15X15X4. CON

ML

$14,427.21

M2

288.00

$135.24

$38,950.06

MURO DE LADRILLO SENT ADO CON MORT ERO CEMENT O ARENA 1: 5. CAST ILLOS DE CONCRET O FC=150, ARMADOS CON ARMEX 15X15X4. DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. PORT ON DE 2 HOJAS ABAT IBLE C/ PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y COLOCACION.

M2

$38,950.06

M2

$28,086.00

FC=150,

ML

61.20

$163.34

$9,996.41

ML

$9,996.41

ML

$9,996.41

ML

96.00

$130.53

$12,530.88

ML

$12,530.88

DALA DE CERRAMIENT O DE CONCRET O F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4. COLUMNAS DE CONCRET O F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y EST RIBOS DE 1/4" A CADA 25 CMS. PORT ON DE 2 HOJAS ABAT IBLE C/ PUERT A DE SERVICIO 2.85 MT S DE ALT URA X 5 MT S DE LARGO MARCO DE T UBO DE 2" CON T ABLERO DE LAMINA INCLUYE: PINT URA, CHAPAS Y COLOCACION.

ML

$12,530.88

ML

8.50

$318.06

$2,703.51

ML

$2,703.51

ML

$2,703.51

PZA

1.00

$10,000.00

$10,000.00

PZA

$10,000.00

PZA

$10,000.00

SUBTOTAL

$252,170.28

$252,170.28

$241,306.22

U. Y G.I.

$50,434.06

$50,434.06

$48,261.24

TOTAL

$302,604.34

$302,604.34

$289,567.46

CATALOGO DE PRECIOS UNITARIOS SISTEMA PANEL MONOLITE

CONCEPTO
ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, CONE UN MURO DE PANEL MONOLIT DE 12 CMS. DE ESPESOR, CUBIERT O CON MORT ERO CEMENT O ARENA 1 : 5. LOSA DE PANEL EST RUCT URAL MONOLIT E BOVEDILLA, CUBIERT O CON MORT ERO CEMENT O 1: 5, Y COLADO CON CONCRET O F'C= 200 KG/CM2.

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2 M2

56.27 101.30

$442.37 $423.57

$24,892.04 $42,907.17

M2

57.00

$530.07

$30,213.76

TOTAL

$98,012.98

COSTO POR M2 CONSTRUCCION $

DE

$1,719.53

CATALOGO DE PRECIOS UNITARIOS SISTEMA CEM-PANEL (FIBROCEMENTO)


PRECIO UNITARIO

CONCEPTO

UNIDAD

CANTIDAD

TOTAL

ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE MURO DE T ABLERO DE FIBROCEMENT O MARCA CEM-PANEL INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA. LOSA DE T ABLERO DE FIBROCEMENT O MARCA CEM-PANEL, INCLUYE CONEXIONES Y ACABADO DE LA MISMA

M2

56.27

$50.00

$2,813.50

M2 M2

101.30 57.00 TOTAL

$201.34 $121.60 =

$20,395.74 $6,931.20 $34,605.82

COSTO POR M2 CONSTRUCCION $

DE

$607.12

CATALOGO DE PRECIOS UNITARIOS SISTEMA TEC-3000 (FIBROCEMENTO)


CONCEPTO
ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE EXCAVACIN, Y T RABES DE MURO DE T ABLERO DE FIBROCEMENT O MARCA T EC-3000, INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2

56.27

$50.00

$2,813.50

M2

101.30

#REF!

#REF!

LOSA DE T ABLERO DE FIBROCEMENT O MARCA T EC-3000, INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA. FALSO PLAFOND DE T ABLA ROCA, INCLUYE ACCESORIOS Y CONEXIONES AS COMO ACABADO DE LA MISMA MARCA.

M2

57.00

#REF!

#REF!

M2

57.00

#REF!

#REF!

TOTAL

#REF!

COSTO POR M2 CONSTRUCCION $

DE

#REF!

CATALOGO DE PRECIOS UNITARIOS SISTEMA TABLA-ROCA


CONCEPTO
ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE EXCAVACIN, Y T RABES DE CIMENT ACIN DEL MISMO CONCRET O, ARMADAS ARMEX DE 15 X X 4, MURO DE CON T ABLERO T20 ABLA-ROCA EST NDAR AMBAS CARAS MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO LA MISMA MARCA. MURO DE DE T ABLERO DE T ABLA-ROCA EST NDAR SENCILLO MARCA PANELREY INCLUYE CONEXIONES Y ACABADO LA MISMA MARCA. MURO DE DE T ABLERO DE T ABLA-ROCA EXT ERIOR SENCILLO MARCA PANELREY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2

56.27

$50.00

$2,813.50

M2 M2

75.77 27.31

#REF! #REF!

#REF! #REF!

M2 M2 M2

70.05 8.00 10.18

#REF! $125.75 #REF!

#REF! $1,006.00 #REF!

MURO DE T ABLERO DE T ABLA-ROCA RESIT WAT ER MARCA PANEL-REY MURO DE T ABLERO DE T ABLA-ROCA DOBLE, RESIST ENT WAT ER MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

MURO DE T ABLERO DE T ABLA-ROCA SENCILLO, RESIST ENT FIRE MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA. FALSO PLAFOND DE T ABLA ROCA, INCLUYE ACCESORIOS Y CONEXIONES AS COMO ACABADO DE LA MISMA MARCA.

M2

7.63

$112.69

$859.26

M2

57.00 TOTAL

#REF! =

#REF! #REF!

COSTO POR M2 CONSTRUCCION $

DE

#REF!

CATALOGO DE PRECIOS UNITARIOS SISTEMA FORMAS AISLANTES (FOAMBLOCk)


CONCEPTO
ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, CON UN ELABORACIN DE MURO HECHO CON FOAM-BLOCK DE 12.5X112X25 CMS. SENT ADO CON MORT ERO CEMENT OARENA 1:5 Y RELLENO DE CONCRET O ELABORACIN DE LOSA HECHA CON BOVEDILLA FANOSA DE 61.5X1.60X15 CMS. DE CONCRET O F'C=200 Y ARMADO CON MALLA ELECT RO SOLDADA 6-6-10-

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2 M2 M2

56.27 101.30 57.00 TOTAL

$50.00 $412.61 $533.75 =

$2,813.50 $41,796.90 $30,423.78 $75,034.18

COSTO POR M2 CONSTRUCCION $

DE $1,316.39

CATALOGO DE PRECIOS UNITARIOS SISTEMA CONCRETO LIGERO (BETOSTYRENE)


CONCEPTO
ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE ELABORACIN DE MURO HECHO CON CONCRET O LIGERO F'C=175, CON AGREGADO DE BET OST YRENE, DE 15 CMS. DE ESPESOR, ARMADO CON MALLA ELECT ROSOLDADA CALIBRE 6X6 10-10. ELABORACIN DE LOSA HECHA CON CONCRET O LIGERO F'C=175, CON AGREGADO DE BET OST YRENE, DE 12 CMS. DE ESPESOR, ARMADO CON

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2

56.27

$50.00

$2,813.50

M2

101.30

$442.55

$44,829.92

M2

57.00 TOTAL

$428.91 =

$24,448.03 $72,091.44

COSTO POR M2 CONSTRUCCION $

DE

$1,264.76

CATALOGO DE PRECIOS UNITARIOS SISTEMA MULTY-PANEL (INTEGRAL)


CONCEPTO
ELABORACIN DE LOSA DE CIMENT ACIN HECHA CON CONCRET O F'C=200, ARMADA CON MALLA ELECT RO SOLDADA 6X6 10X10, ELABORACIN DE 1CON M2UN DE MURO HECHO CON MULT Y PANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M2 M2

56.27 101.30

$50.00 #REF!

$2,813.50 #REF!

ELABORACIN DE 1 M2 DE LOSA HECHA CON MULT Y PANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

M2

57.00 TOTAL

#REF! =

#REF!
#REF!

COSTO POR M2 CONSTRUCCION $

DE

#REF!

CATALOGO DE PRECIOS UNITARIOS LOSA DE CIMENTACION


CONCEPTO
EXCAVACION MANUAL T ERRENO COMPACT ADO. SOBRE

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M3 ML M2

2.58 43.00 57.00 TOTAL

$106.88 $148.63 $360.06 =

$275.76 $6,391.06 $20,523.70


$27,190.52

ELABORACION DE 1 ML DE T RABE DE 30 X 20 CMS. DE CONCRET O F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE RA ELABORACION DE HULE 1 M2CONT DE LOSA DE CIMENT ACION DE CONCRET O F'C=200KG/CM2, ARMADO CON MALLA ELECT ORSOLDADA Y ACABADO

COSTO POR M2 CONSTRUCCION $

DE

$483.22

CATALOGO DE PRECIOS UNITARIOS LOSA DE CIMENTACION SISTEMA PANEL MONOLITE


CONCEPTO
EXCAVACION MANUAL SOBRE T ERRENO COMPACT ADO, CEPA DE 20 X 30 CMS. ELABORACION DE 1 ML DE T RABE DE 30 X 20 CMS. DE CONCRET O F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE RA ELABORACION DE HULE 1 M2CONT DE LOSA DE CIMENT ACION DE CONCRET O F'C=200KG/CM2, ARMADO CON MALLA ELECT ORSOLDADA Y ACABADO

UNIDAD

CANTIDAD

PRECIO UNITARIO

TOTAL

M3 ML M2

2.58 43.00 57.00 TOTAL

$106.88 $95.18 $360.06 =

$275.76 $4,092.58 $20,523.70


$24,892.04

COSTO POR M2 CONSTRUCCION $

DE

$442.37

Vous aimerez peut-être aussi