Vous êtes sur la page 1sur 17

PROPOSED DESIGN, CONSTRUCTION AND COMPLETION OF 548 UNITS GOVERNMENT APARTMENTS AT PARCEL 17 RM4 PRECINCT 17, PUTRAJAYA

PROGRESS REPORT ON 28 JUNE 2009 31.26 Actual / 31.34 Target

IBS: PROJECT COMPONENTS


PERSPECTIVE
BLOCK E BLOCK D BLOCK C BLOCK B
Others: Car Parks 3 nos.(660 parking bays) Substations 3 nos. Landscape Infrastructures

BLOCK A

LAYOUT PLAN

Car Park 3

Car Park 2
DEWAN Dewan 2 Storey Surau 1 Storey Car Park 1 Block D Block C Block B N A B C D E TOTAL SURAU BLOCKS STOREYS UNITS 18 19 19 18 16 115 122 122 115 74 548
Page 4

Block A

IBS: CONSTRUCTION ELEMENTS


PRECAST APARTMENTS 2nd Floor to 17th Floor Structural precast walls Precast hollowcore slab Non-structural precast wall panels Precast staircases Blockwork infill wall

Precast
CAST-IN-SITU AMENITIES AND M&E ROOMS Ground and first floor Cast-in situ 250mm thk rc shear wall Blockwork infill 2nd Floor Cast-in situ slab
Page 5

Cast-in Situ

IBS: TYPICAL FLOOR LAYOUT

Page 6

IBS: TYPICAL UNIT

(Contd)

Unit Size -9.0m X 14.4m (1,200 sqf)


3 Bedrooms Master Bedroom (4.2m x 5.4m) 1 Living room (4.2m x 9.0m) 1 Kitchen (4.2m X 3.5m) 1 Store (1.3m x 1.5m) 2 Bathrooms Dry Yard

Page 7

IBS: CASTING SECTION (Hollow Core Panel)

Page 8

IBS: CASTING SECTION (Other Precast Panel)

Page 9

IBS: CASTING SECTION (Quality Assurance and Control)

(Contd)

Page 10

IBS: DELIVERY SECTION

(Contd)

Page 11

IBS: INSTALLATION SECTION

(Contd)

Page 12

IBS: Construction of Joints and Support

(Contd)

Page 13

IBS: Progress Photos

(Contd)

Overall progress on 28 June 2009

Block E on 28 June 2009

IBS: Progress Photos

(Contd)

Block D on 28 June 2009

Block C on 28 June 2009

IBS: Progress Photos

(Contd)

Block B on 28 June 2009

Block A on 28 June 2009

IBS: Progress Photos

(Contd)

IBS: MOCK-UP UNIT

(Contd)

Page 18

Vous aimerez peut-être aussi