Job No. SC2252 Job Name OPaL DFCU & AU Project Client OPaL No. SC2252-WI-008 14,Jul,09 Rev. NO. 0 Issue Date PIPING ARRANGEMENTS FOR FLOWMETER INSTALLATIONS

1. PIPING ARRANGEMENTS FOR ORIFICE PLATES INSTALLATIONS 2. PIPING ARRANGEMENTS FOR VENTURI INSTALLATIONS

Reference Document Name


S.S.Kim

Made Date
2009-07-14

Sign

Name

Check Date

Sign

Name
C.S.Park

Approval Date

Sign

Distribution after issue Name Date Sign Remark

Name
C.S.Park B.R.Kim S.C.Pee S.Yoo B.Heo Rohit

Circulation before issue Date Sign W/Com.

Remark

SAMSUNG ENGINEERING CO., LTD. SEOUL, KOREA

MINIMUM FLOW METER RUN


0 REV
2009-07-14 For Information S.S.Kim

DATE

DESCRIPTION

BY

CHK

APP

Page 1 of 3

SC2252-WI-008

REV.0

Work Instruction
Subject :

Job No. SC2252 Job Name OPaL DFCU & AU Project Client OPaL No. SC2252-WI-008 14,Jul,09 Rev. NO. 0 Issue Date PIPING ARRANGEMENTS FOR FLOWMETER INSTALLATIONS

1. PIPING ARRANGEMENTS FOR ORIFICE PLATES INSTALLATIONS

ORIFICE/PIPEDIA. (d/D)RATIO

LENGTHOFSTRAIGHTRUN A F
12D

G
18D

UPSTREAM H K
18D 22D

M
35D

R
44D

DOWNSTREAM Z
5D

0.75
NOTES:

8D

1. TABULATED DIMENSIONS ARE GENERALLY BASED ON INFORMATION IN THE ISO 5167-2 AND ALSO ASME FLUID METERS - 6th EDITION AT A MAXIMUM ORIFICE DIAMETER RATIO (d/D) OF 0.75. 2. THE DIMENSIONS SHOWN ARE TO THE UPSTREAM FACE OF THE ORIFICE PLATE AND THE MINIMUM REQUIRED, WHEN POSSIBLE DIMENSIONS SHOULD BE INCREASED. 3. WHEN SEVERAL FITTINGS (OTHER THAN 90 BENDS) ARE UPSTREAM OF THE ORIFICE PLATE, THE FIRST FITTING CLOSEST TO THE ORIFICE PLATE SHALL BE PER THE TABLE. THE MINIMUM STRAIGHT LENGTH FROM THE SECOND FITTING (TO THE FIRST FITTING) SHALL BE 1/2 OF THE DIMENSION LISTED IN THE TABLE FOR THE SECOND FITTING. 4. WHEN BENDS ARE USED INSTEAD OF FITTINGS TO CHANGE DIRECTION, DIMENSION LINES SHALL BE TO TANGENT LINE OF BEND.

* THIS INSTRUCTION SHALL BE USED FOR ROUTING STUDY ONLY. * THE INSTRUCTION INCLUDING THE DETAILED DATA IS TO BE ISSUED AFTER RECEIVING INTRUMENTATION DATA.

SAMSUNG ENGINEERING CO., LTD. SEOUL, KOREA

MINIMUM FLOW METER RUN


0 REV
2009-07-14 For Information S.S.Kim

DATE

DESCRIPTION

BY

CHK

APP

Page 2 of 3

SC2252-WI-008

REV.0

2. PIPING ARRANGEMENTS FOR VENTURI INSTALLATIONS

H G F A Z
VALVE

TWO PLANE FLOW

CONCENTRIC REDUCER

CONCENTRIC EXPANDER

WIDEOPEN GATEOR BALLVALVE

CONCENTRIC REDUCEROR EXPANDER

TEE,CROSS,OR LATERAL

* WHEN DISTANCE BETWEEN ELBOWS IS IOD OR LESS

LENGTHOFSTRAIGHTRUN
VENTURI/PIPEDIA. (d/D)RATIO

UPSTREAM A F
3.5D

DOWNSTREAM G H
8D

Z
4d

0.75

8D

4.5D

NOTES:
1. TABULATED DIMENSIONS ARE BASED ON INFORMATION IN THE ISO 5167-4 AND ALSO ASME FLUID METERS - 6th EDITION, AT A MAXIMUM THROAT DIAMETER RATIO (d/D) OF 0.75. 2. DIMENSIONS SHOWN ARE MINIMUM REQUIRED. WHEN POSSIBLE THEY SHOULD BE INCREASED. 3. WHEN BENDS ARE USED INSTEAD OF FITTINGS TO CHANGE DIRECTION, DIMENSION LINES SHALL BE TO TANGENT LINE OF BEND. 4. D: INNER DIAMETER OF PIPE / d : THROAT DIAMETER OF VENTURI

SAMSUNG ENGINEERING CO., LTD. SEOUL, KOREA

MINIMUM FLOW METER RUN


0 REV
2009-07-14 For Information S.S.Kim

DATE

DESCRIPTION

BY

CHK

APP

Page 3 of 3

SC2252-WI-008

REV.0

Vous aimerez peut-être aussi