Académique Documents
Professionnel Documents
Culture Documents
BUS-1
BUS-2
BUS-2
BUS-1
BUS-2
BUS-2
BUS-1
BUS-2
1-52 CB 2-52 CB
3-52 CB
2-52 CB
3-52 CB BUS-2
LINE-1
BUS-1
BUS-2
1-52 CB 2-52 CB
3-52 CB
LINE-2 2-52 CB
LINE-1
BUS-1
BUS-2
1-52 CB 2-52 CB
3-52 CB
LINE-2
2-52 CB
LINE-1
BUS-1
BUS-2
1-52 CB 2-52 CB
3-52 CB
LINE-2 2-52 CB
LINE-1
BUS-1
BUS-2
1-52 CB 2-52 CB
3-52 CB
LINE-2 2-52 CB
LINE-1
BUS-1
BUS-2
1-52 CB 2-52 CB
3-52 CB
LINE-2 2-52 CB
BUS-1 1-52 CB
14. THE BAY BETWEEN BUS-1 & LINE-1 IS CALLED MAIN BAY FOR FEEDER-1.
LINE-1
BUS-1
BUS-2
1-52 CB
3-52 CB
2-52 CB
LINE-2
2-52 CB
BUS-1 1-52 CB
15. THE BAY BETWEEN LINE-1 & LINE-2 IS CALLED TIE BAY FOR FEEDER-1 & 2.
LINE-1
BUS-1
BUS-2
1-52 CB
3-52 CB
2-52 CB
LINE-2
2-52 CB
BUS-1 1-52 CB
16. THE BAY BETWEEN BUS-2 & LINE-2 IS CALLED MAIN BAY FOR FEEDER-2.
LINE-1
BUS-1
BUS-2
1-52 CB
3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB BUS-2
LINE-1
LINE-2
BUS-1
17. IN THIS SYSTEM FULL DIA MEANS 2 FEEDERS CONTROLLED BY 3 CBs. 18. HALF DIA MEANS 1 FEEDER CONTROLLED BY 2 CBs. (Nothing but Double CB System)
LINE-1
BUS-1
BUS-2
1-52 CB
3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB BUS-2
LINE-1
LINE-2
BUS-1
GOPALA KRISHNA PALEPU ADE/MRT/ T&C/400KV SS/ O/O CE/400KV / L&SS/ VS APTRANSCO, HYDERABAD gk_aptransco@yahoo.co.in Mobile: 9440336984
LINE-1
BUS-1
BUS-2
1-52 CB
3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB BUS-2
LINE-1
LINE-2
SUBSTATION DESIGN/LAYOUT
(I (I-CONFIGUARATION)
FEEDER1 FEEDER3 FEEDER5 FEEDER7 FEEDER9 FEEDER11
BUSBUS -1 DIA1
BAY1
DIA2
BAY4
DIA3
BAY7
DIA4
BAY10
DIA5
BAY13
DIA6
BAY16
BAY14
BAY12
BUSBUS -2
FEEDER2
FEEDER4
FEEDER6
FEEDER8
FEEDER10
BAY15
FEEDER12
BAY18
BAY3
BAY6
BAY9
BAY17
BAY11
BAY2
BAY5
BAY8
SUBSTATION DESIGN/LAYOUT
(D(D-CONFIGUARATION)
FEEDER1
BAY2
FEEDER2
FEEDER5
BAY8
FEEDER6
FEEDER9
FEEDER10
BAY14
BAY13
BAY1
BAY7
BAY9
DIA1
DIA3
DIA5
BUSBUS -1
BUSBUS -2
BAY10 BAY12 BAY16 BAY4
BAY15
BAY3
DIA2
DIA4
DIA6
BAY5
BAY11
BAY17
FEEDER3
FEEDER4
FEEDER7
FEEDER8
FEEDER11
FEEDER12
BAY18
BAY6
1-CT 5 4 3 2 1 P1
1-89L 1-CVT
1 2 3
LATEST CONCEPT REDUNDANT LINE PROTECTION, REDUNDANT ICT PROTECTION, REDUNDANT BUSBAR PROTECTION, LBB IS IN BUILT FUNCTION OF BUSBAR
P2
P1 P2
1 2 5 4 3 HAIR PIN / U SHAPE DESIGN
CORES
CLASS
PS
1S1 1S3
PS
0.2 PS PS
4S1 4S3 4S1 4S2 MAIN-2 4S1 4S4 PROTECTION 4S4 4S2 4S4 4S3 MAIN-1 5S1 5S4 PROTECTION 5S1 5S3 5S4 5S2 5S1 5S2 5S4 5S3
1-52CB
P2
3-52CB
P2
1-CT
P1
3-CT
P1
1-89A 2-CT
P1 P2
3-89A
2-89B 3-89T
LINE 1 T/F-1
1 CT
MAIN1 BUSBARBUSBAR-1 PROTECTION LBB IN BUILT (87BB1M1) MAIN2 BUSBARBUSBAR-1 PROTECTION LBB INBUILT (87BB1M2) SPARE BCU + ENERGY METER FOR FEEDER MAIN-2 LINE PROTECTION MAINFOR FEEDER (21 L2 / 87L2) MAIN-1 LINE PROTECTION MAINFOR FEEDER (21L1/87L1)
2 CT
MAIN1 DIFFFERENTIAL PROTECTION FOR TRANSFORMER (87T1) BACKUP PROTECTION FOR TRANSFORMER (67 HV) HV BCU + HV ENERGY METER FOR AT/F HV BCU + ENERGY METER FOR FEEDER MAIN-2 LINE PROTECTION MAINFOR FEEDER (21 L2 / 87L2) MAIN-1 LINE PROTECTION MAINFOR FEEDER (21L1/87L1)
3 CT
MAIN1 BUSBARBUSBAR-2 PROTECTION LBB IN BUILT (87BB2M1) MAIN2 BUSBARBUSBAR-2 PROTECTION LBB IN BUILT (87BB2M2) SPARE HV BCU + HV ENERGY METER FOR AT/F HV BACKUP PROTECTION FOR TRANSFORMER (67 HV) MAIN1 DIFFFERENTIAL PROTECTION FOR TRANSFORMER (87T1)
CORE 2
( PS)
CORE 3
( 0.2)
CORE 4
(0.2)
CORE 5
( PS)
CORE 6
( PS)
1 CT
MAIN1 BUSBARBUSBAR-1 PROTECTION LBB IN BUILT (87BB1M1) MAIN2 BUSBARBUSBAR-1 PROTECTION LBB INBUILT (87BB1M2) BCU + ENERGY METER FOR FEEDER MAIN-2 LINE PROTECTION MAINFOR FEEDER (21 L2 / 87L2) MAIN-1 LINE PROTECTION MAINFOR FEEDER (21L1/87L1)
2 CT
MAIN1 DIFFFERENTIAL PROTECTION FOR TRANSFORMER (87T1) BACKUP PROTECTION FOR TRANSFORMER (67 HV) BCU + ENERGY METER FOR FEEDER MAIN MAIN-2 LINE PROTECTION FOR FEEDER (21 L2 / 87L2) MAIN-1 LINE PROTECTION MAINFOR FEEDER (21L1/87L1)
3 CT
MAIN1 BUSBARBUSBAR-2 PROTECTION LBB IN BUILT (87BB2M1) MAIN2 BUSBARBUSBAR-2 PROTECTION LBB IN BUILT (87BB2M2) SPARE BACKUP PROTECTION FOR TRANSFORMER (67 HV) MAIN1 DIFFFERENTIAL PROTECTION FOR TRANSFORMER (87T1)
CORE 2
( PS)
CORE 3
(0.2)
CORE 4
( PS)
CORE 5
( PS)
NORMALLY THIS SYTEM ADOPTS, WHEN ONE SIDE LINE, OTHER SIDE AUTO TRANSFORMER OR BUS REACTOR IS PROVIDED IN A DIA OF ONE AND HALF BREAKER SYSTEM, IF BUSHING CT METERING CORE IS AVAILABLE, THEN IT IS USED FOR HV BCU + HV ENERGY METER FOR AT/F HV OR BUS REACTOR
BUS-2
79+25 (BCU) MAIN1:21L1 / 87L1 MAIN2: 21L2/87L2 BCU+EM (L) BU BU 87BB1M2 87BB1M1
79+25 (BCU) MAIN1:87T1 B/U: 67HV SPARE BU BU BCU+EM (HV) 87BB2M2 87BB2M1 MAIN1:87T1 B/U: 67LV
79+25 (BCU)
VBB1/VL1 VBB2/VL2
MAIN1:21L1 / 87L1
ICT
MAIN2:87T2
MAIN2: 21L2/87L2
LINE 1
FIBER OPTIC
REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
FIBER OPTIC
C E
LINE
C E
MAIN2: 87T2
ABB Network Partner AG ABB Network Partner AG REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
MAIN1: 87T1
B/U: 67LV
ICT
VL1
CVT
BF
FEEDER2 / LINE2 MAIN-1 MAIN-2 VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 BF BUSBARBUSBAR -2 87BB2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED . CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)
BUS-I BUS
2-52CB
DISTURBANCE RECORDER, EVENT RECORDER, FAULT LOCATOR ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIST PROT RELAYS 21L1 & 21L2
DISTURBANCE RECORDER, EVENT RECORDER, ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIFF PROT RELAYS 87T1 & 87T2
LATEST CONCEPT REDUNDANT LINE PROTECTION REDUNDANT ICT PROTECTION REDUNDANT DISTRIBUTED BUSBAR PROTECTION LBB IS IN BUILT FUNCTION OF BUSBAR
87T2- ICT DIFF PROT2 FOR ICT CVT IS NOT AVAILABLE. ACCORDING TO CONDITION IT IS SELECTED BUS-1 CVT OR BUS-2 CVT OR LINE CVT HV & LV OVER FLUX PROT ARE IN BUILT. ICT HV METERING IS BUSHING CT
3-52CB
1-52CB
BUS-II BUS
MET+SYN
MAIN-1 MAIN-2
1-52CB
P2
3-52CB
P2
1-CT
P1
3-CT
P1
1-89A 2-ACT
P2 P1
3-89A 2-BCT
P1 P2
2-89A 1-89L
2-52CB
2-89B 3-89T
LINE 1 T/F-1
1- CT
MAIN1 BUSBARBUSBAR-1 PROTECTION LBB IN BUILT (87BB1M1) MAIN2 BUSBARBUSBAR-1 PROTECTION LBB INBUILT (87BB1M2) BCU + ENERGY METER FOR FEEDER MAIN-2 LINE MAINPROTECTION FOR FEEDER (21 L2 / 87L2) MAIN-1 LINE MAINPROTECTION FOR FEEDER (21L1/87L1)
2-BCT
SPARE
2-ACT
SPARE
3-CT
MAIN1 BUSBARBUSBAR-2 PROTECTION LBB IN BUILT (87BB2M1) MAIN2 BUSBARBUSBAR-2 PROTECTION LBB INBUILT (87BB2M2) HV BCU + HV ENERGY METER FOR ICT HV BACKUP PROTECTION FOR TRANSFORMER (67 HV) MAIN1 ICT DIFFFERENTIAL PROTECTION FOR TRANSFORMER (87T1)
CORECORE -2
(PS)
TIE LBB
SPARE
CORECORE -3
(0.2)
BCU + ENERGY METER FOR FEEDER MAIN-2 LINE MAINPROTECTION FOR FEEDER (21 L2 / 87L2) MAIN-1 LINE MAINPROTECTION FOR FEEDER (21L1/87L1)
HV BCU + HV ENERGY METER FOR ICT HV BACKUP PROTECTION FOR TRANSFORMER (67 HV) MAIN1-ICT MAIN1DIFFFERENTIAL PROTECTION FOR TRANSFORMER (87T1)
CORECORE -4
(PS)
CORECORE -5
(PS)
BUS-2
79+25 (BCU) MAIN1:21L1 / 87L1 MAIN2: 21L2/87L2 BCU+EM (L) BU BU 87BB1M2 87BB1M1
79+25 (BCU) MAIN1:87T1 B/U: 67HV BCU+EM (HV) BU 87BB2M2 87BB2M1 MAIN1:87T1 B/U: 67LV MAIN1:21L1 / 87L1
79+25 (BCU)
VBB1/VL1 VBB2/VL2
BU
ICT
MAIN2:87T2
MAIN2: 21L2/87L2
BCU+EM (HV)
BCU+EM (L)
MAIN1:87T1
B/U: 67HV
TIE LBB
LINE 1
TIE LBB
FIBER OPTIC
REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
FIBER OPTIC
C E
LINE
C E
MAIN2: 87T2
ABB Network Partner AG ABB Network Partner AG REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
MAIN1: 87T1
B/U: 67LV
ICT
VL1
CVT
FEEDER2 / LINE2 MAIN-1 MAIN-2 VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 BF BUSBARBUSBAR -2 87BB2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED . CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)
BUS-I BUS
2-52CB
DISTURBANCE RECORDER, EVENT RECORDER, FAULT LOCATOR ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIST PROT RELAYS 21L1 & 21L2
DISTURBANCE RECORDER, EVENT RECORDER, ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIFF PROT RELAYS 87T1 & 87T2
LATEST CONCEPT REDUNDANT LINE PROTECTION REDUNDANT ICT PROTECTION REDUNDANT DISTRIBUTED BUSBAR PROTECTION LBB IS IN BUILT FUNCTION OF BUSBAR
FOR ICT CVT IS NOT AVAILABLE. ACCORDING TO CONDITION IT IS SELECTED BUS-1 CVT OR BUS-2 CVT OR LINE CVT HV & LV OVER FLUX PROT ARE IN BUILT
3-52CB
1-52CB
BUS-II BUS
MET+SYN
MAIN-1 MAIN-2
BUS-2 3-89
P1
1A-CT
P2
3A-CT
P2
1-52CB
P2
3-52CB
P2
1B-CT
P1
3B-CT
P1
1-89A
P1
2-89A 1-89L
2-52CB
2-89B 3-89T
T/F-1 LINE 1
1A1A-CT
2B2B-CT
2A 2A-CT
3A 3A-CT
3B3B-CT
MAIN1 BUSBARBUSBAR -2 PROTN LBB IN BUILT (87BB2M1)
2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAINMAIN -1 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAINMAIN -2 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO
2CTs SECONDARIES ARE CONNECTED CONNECTED TO MAINMAIN -1 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO
CORE-3 CORE(0.2)
SPARE
SPARE
79+25 (BCU)
ICT
MAIN2:87T2
MAIN2: 21L2/87L2
BCU+EM (HV)
BCU+EM (L)
MAIN1:87T1
B/U: 67HV
TIE LBB
LINE 1
TIE LBB
FIBER OPTIC
REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
FIBER OPTIC
C E
LINE
C E
MAIN2: 87T2
ABB Network Partner AG ABB Network Partner AG REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
MAIN1: 87T1
B/U: 67LV
ICT
FEEDER2 / LINE2 MAIN-1 VL2 / VL1 OR VBB1 VBB2 79 25 BF BUSBARBUSBAR -2 87BB2 MAIN-2 CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)
VBB2 CVT
FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .
CT DS CB
CT DS DS
CT CB
CT DS DS
CT CB
CT DS
1-52CB
P2
3-52CB
P2
1-CT
P1
3-CT
P1
1-89A 2-CT
P1 P2
3-89A
2-89A 1-89L
P2
2-52CB
1L-CT
P1
LINE 1 T/F-1
1-LCT
TEED PROTPROT-1 (BAY 1&2) TEED PROTPROT-2 (BAY 1&2)
2-CT
TEED PROTPROT-1 (BAY 2&3) TEED PROTPROT-2 (BAY 2&3)
3-TCT
TEED PROTPROT-1 (BAY 2&3) TEED PROTPROT-2 (BAY 2&3)
3-CT
MAIN1 BUSBARBUSBAR-2 PROTECTION LBB IN BUILT (87BB2M1) MAIN2 BUSBARBUSBAR-2 PROTECTION LBB INBUILT (87BB2M2)
BCU (L)
ENERGY METER (L) MAIN-2 MAINPROTECTION (21 L2 / 87L2) MAIN-1 MAINPROTECTION (21L1/87L1)
BCU (L)
TEED PROTPROT-2 (BAY 1&2) + TIE LBB TEED PROTPROT-1 (BAY 1&2)
Paralleling of 2Nos CTs to the Main-1/Main-2/Backup line protection is not required. This gives better transient response. Separate STUB protection can be connected (Nothing BUT TEED Protection).
BUS-2
B/U: 67LV MAIN1:87T1 B/U: 67HV 87 TEED-1 TEED (2&3) SPARE BU BU 87BB2M1 BCU (HV) 87BB2M2 87 TEED-2 (3&2) EM (HV) 87 TEED-2 TEED (2&3) 87 TEED-1 (3&2)
(5CT METHOD)
87 TEED-2 TEED (1&2) BCU (L) 87 TEED-2 TEED (2&3) 87 TEED-1 TEED (2&3)
MAIN1:21L1 / 87L1
87 TEED-2 (1&2)
BU
BUS-1
87 TEED-1 (1&2)
BU
87BB1M1
MAIN2: 21L2/87L2
EM (L)
ICT
MAIN2:87T2
MAIN1:87T1
BCU
ABB Network Partner AG REL 316*4
4 5 6 7 8
C E
MAIN2: 21L2
REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
LINE
C E
EM
EM
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
B/U: 67HV
REL 316*4
ICT
MAIN1: 87T1
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
B/U: 67LV
MAIN2: 87T2
BCU((HV)
MAIN2: 87T2
.
79 25
87 TD2 LZ
CVT
BF
FEEDER2 / LINE2
.
87 TD2 LZ VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 BF 87 TD1 HZ BUSBARBUSBAR -2 87BB2
CVT VL2 MAIN-1 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .
1-52CB
P2
3-52CB
P2
1-CT
P1
3-CT
P1
1-89A 2A-CT
P2 P1
3-89A 2B-CT
P1 P2
2-89A 1-89L
P2
2-52CB
1L-CT
P1
T/F-1 LINE 1
1L1L-CT
TEED PROTPROT -1 (BAY 1&2)
2A 2A-CT
SPARE
2B 2B-CT
SPARE
3T3T-CT
TEED PROTPROT -1 (BAY 2&3)
3-CT
MAIN1 BUSBARBUSBAR -2 PROTECTION LBB IN BUILT (87BB2M1) MAIN2 BUSBARBUSBAR -2 PROTECTION LBB INBUILT (87BB2M2)
TIE LBB
SPARE
BCU (L)
TEED PROTPROT -2 (BAY 1&2) TEED PROTPROT -1 (BAY 1&2)
BCU (HV)
TEED PROTPROT -2 (BAY 2&3) TEED PROTPROT -1 (BAY 2&3)
BCU (L)
BCU (HV)
TEED PROTPROT -2 (BAY 2&3) TEED PROTPROT -1 (BAY 2&3)
PROTECTION
(87T1)
BUS-2
B/U: 67LV MAIN1:87T1 B/U: 67HV 87 TEED-1 TEED (2&3) BCU(HV) BU BU 87BB2M1 87BB2M2 87 TEED-2 (3&2) EM (HV) 87 TEED-2 TEED (2&3) 87 TEED-1 (3&2)
(6CT METHOD)
87 TEED-2 TEED (1&2) BCU (L) BCU (HV) 87 TEED-2 TEED (2&3) 87 TEED-1 TEED (2&3)
MAIN1:21L1 / 87L1
87 TEED-2 (1&2)
BU
BUS-1
87 TEED-1 (1&2)
BU
87BB1M1
MAIN2: 21L2/87L2
EM (L)
ICT
MAIN2:87T2
MAIN1:87T1
BCU
ABB Network Partner AG REL 316*4
4 5 6 7 8
C E
MAIN2: 21L2
REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
LINE
C E
EM
BCU(HV)
EM(HV)
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
B/U: 67HV
REL 316*4
ICT
MAIN1: 87T1
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
B/U: 67LV
MAIN2: 87T2
MAIN2: 87T2
.
79
87 TD2 LZ
CVT
25
BF
FEEDER2 / LINE2
.
87 TD2 LZ VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 BF 87 TD1 HZ BUSBARBUSBAR -2 87BB2
CVT VL2 MAIN-1 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .
BUS-2 3-89
P1
1A-CT
P2
3A-CT
P2
1-52CB
P2
3-52CB
P2
1B-CT
P1
3B-CT
P1
1-89A
P1
2-89A 1-89L
P2
2-52CB
2-89B 3-89T
P2
1L-CT
P1
3T-CT
P1
T/F-1 LINE 1
1L1L-CT
TEED PROTPROT-1 (BAY 1&2)
2B 2B-CT
TEED PROTPROT-1 (BAY 1&2)
2A 2A-CT
TEED PROTPROT-1 (BAY 2&3)
3T 3T-CT
TEED PROTPROT-1 (BAY 2&3)
3A 3A-CT
TEED PROTPROT-1 (BAY 2&3)
3B 3B-CT
MAIN1 BUSBARBUSBAR -2 PROTECTION LBB IN BUILT (87BB2M1) MAIN2 BUSBARBUSBAR -2 PROTECTION LBB INBUILT (87BB2M2)
CORE-1 CORE(PS) CORE-2 CORE(PS) CORE-3 CORE(0.2) CORE-4 CORE(PS) CORE-5 CORE(PS)
MAIN1 BUSBARBUSBAR -1 PROTECTION LBB IN BUILT (87BB1M1) MAIN2 BUSBARBUSBAR -1 PROTECTION LBB INBUILT (87BB1M2)
TEED PROTPROT-2 TEED PROTPROT-2 TEED PROTPROT-2 TEED PROTPROT-2 (BAY 1&2) (BAY 1&2) (BAY 1&2) (BAY 2&3)
BCU (L)
SPARE
BCU (L)
BCU (HV)
SPARE
BCU (HV)
TEED-1 FOR BAY-1 & 2 IS: 1L-CT, 1A-CT & 2A-CT TEED-2 FOR BAY-1 & 2 IS: 1L-CT, 1B-CT & 2B-CT
PROTECTION
TEED-1 FOR BAY-2 & 3 IS: 3T-CT, 3A-CT & 2B-CT TEED-2 FOR BAY-2 & 3 IS: 3T-CT, 3B-CT & 2A-CT
(21L1/87L1)
(67 HV)
BUS-2
87 TEED-2 TEED (2&3) MAIN1:87T1 B/U: 67HV 87 TEED-1 TEED (2&3) 87 TEED-2 (3&2) 87 TEED-1 (3&2) EM (HV) MAIN2:87T2 B/U: 67LV MAIN1:21L1 / 87L1 MAIN2: 21L2/87L2 87 TEED-2 (1&2) 87 TEED-1 (1&2) BU 87BB1M2 BCU (L) 87 TEED-2 TEED (1&2) 87 TEED-1 TEED (1&2) EM (L)
BU BU 87BB2M1
87BB2M2
(8CT METHOD)
87 TEED-2 TEED (1&2) BCU (L) BCU (HV) 87 TEED-2 TEED (2&3) 87 TEED-1 TEED (2&3)
BU
87BB1M1
BUS-1
ICT
BCU(HV)
MAIN1:87T1
BCU
ABB Network Partner AG REL 316*4
4 5 6 7 8
C E
MAIN2: 21L2
REL 316*4
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
LINE
C E
EM
BCU(HV)
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
EM(HV)
C E
B/U: 67HV
REL 316*4
ICT
MAIN1: 87T1
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
B/U: 67LV
MAIN2: 87T2
MAIN2: 87T2
. .
VL1
87 TD2 LZ
21M2
VL1
CVT
BF
FEEDER2 / LINE2
.
BF VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 87 TD1 HZ BUSBARBUSBAR -2 87BB2 87 TD2 LZ
CVT VL2 MAIN-1 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .
6B6B-CT
6A6A-CT
5A5A-CT
5B5B-CT
4L4L-CT
6T6T-CT
OR
(7 SS 52) SIEMENS
FO OR OR
(487B) SEL
BU/PU
OR
(MICOM P740) AREVA (MICOM P746) AREVA
BU/PU FO
ADOPTED CT METHODS IN ANDHRA PRADESH CT METHODS 3 CT METHOD 4 CT METHOD 6 CT METHOD 5 CT METHOD 6 CT METHOD 8 CT METHOD BUS SECTION SUBSTATION WARANGAL MALKARAM UTILITY POWERGRID APTRANSCO
3 CT METHOD 1 CT 3 CT
1 - CT & 2 - CT
4 CT METHOD 1 CT 3 CT
1 CT & 2 B - CT
6 CT METHOD 1B CT & 3B CT
1 A CT & 2 B CT
5 CT METHOD 1 CT 3 CT 1 L - CT
6 CT METHOD 1 CT 3 CT 1 L - CT
8 CT METHOD 1B CT 3B CT 1 L - CT
ABOVE CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDERFEEDER-1 BELOW CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDERFEEDER-2 3 - CT & 2 CT 3 - CT & 2 A - CT 3 A - CT & 2 A - CT
STUB-1 & STUB STUBSTUB-2 PROTECTION IS INBUILT PROTECTION FOR MAINMAIN-1 & MAINMAIN-2 RELAYS. STUB PROTECTION WORKS WHEN LINE ISOLATOR OPEN CONDITION ONLY.
TEED1 IS HIGH IMPEDENCE DIFFERENTIAL RELAY & TEED TEEDTEED -2 IS LOW IMPEDENCE DIFFERENTIAL RELAY.
BLIND ZONE
A FAULT BETWEEN CIRCUIT BREAKERS AND CT (END FAULT) MAY THEN STILL BE FED FROM ONE SIDE EVEN WHEN THE BREAKER HAS BEEN OPENED. CONSEQUENTLY, FINAL FAULT CLEARING BY CASCADED TRIPPING HAS TO BE ACCEPTED IN THIS CASE. THIS SITUATION LBB/BFR OPERATES AND TIME TAKEN TO CLEAR FAULT IS ABOUT 300 mSECs mSECs.. THIS IS BLIND ZONE AREA.
MINIMUM CT METHOD
ADVANTAGES
WHEN THE FAULT IS TAKEN PLACE BETWEEN THE MAIN CB, TIE CB & LINE ISOLATOR, DURING SERVICE ONLY, DISTANCE SCHEME SHOULD TAKE CARE.
WHEN THE FAULT IS TAKEN PLACE BETWEEN THE MAIN CB, TIE CB & LINE ISOLATOR, TEED PROTECTION SHOULD TAKE CARE.
ADVANTAGES: ADVANTAGES:
THREE CIRCUIT BREAKERS IN A FULL DIA ARE ALWAYS IN CLOSED POSITION. IF MAIN CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD THE FEEDER IS FEEDING FROM TIE CB & OTHER BUS . NEED NOT REQUIRE TRANSFER THE FEEDER. IF TIE CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD THE FEEDER IS FEEDING FROM MAIN CB & CONNECTED BUS. EVEN IF BOTH MAIN BREAKERS UNDER TROUBLE, DURING THAT PERIOD ONE FEEDER WORKS AS INCOMING AND OTHER FEEDER WORKS AS OUTGOING VIA TIE CB. (WITHOUT INTERUPTION TO FEEDERS) IF BUSBAR-1 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN BREAKERS CONNECTED TO BUSBAR-1 WILL TRIP. DURING THAT PERIOD THE FEEDERS CONNECTED TO BUS-1 ARE FEEDING VIA TIE CB FROM BUS-2. IF BUSBAR-2 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN BREAKERS CONNECTED TO BUSBAR-2 WILL TRIP. DURING THAT PERIOD THE FEEDERS CONNECTED TO BUS-2 ARE FEEDING VIA TIE CB FROM BUS-1. IN THIS BUSBAR PROTECTION IS SIMPLE AND NEED NOT REQUIRE SELECTION OF ISOLATOR. IT IS MORE RELIABLE SYSTEM FOR OPERATION & MAINTANENCE POINT OF VIEW.
5.
6.
7. 8.
B.
1. 2. 3. 4.
DISADVANTAGES
CT CONNECTIONS & PROTECTION TRIP LOGICS ARE SOME WHAT COMPLICATED. COMPLEX CONTROL & PROTECTION PHILOSOPHY COST TOWARDS CTs, CIRCUIT BREAKERS & PANELS ARE TO BE INCREASED DUE TO EXTRA BAY. THE COST COMPARISION TABLE SHOWN IN NEXT PRESENTATION. THE OPERATIONS FOR OPERATOR POINT OF VIEW IS LITTLE BIT COMPLICATED WHEN COMPARED TO CONVENTIONAL SYSTEM. SPACE OCUPATION FOR BAY IS MORE i.e COST OF LAND IS INCREASE.
COST COMPARISION BETWEEN CONVENTIONAL SYSTEM & ONE AND HALF BREAKER SYSTEM FOR FEEDER
S.No
1.
EQUIPMENT
CIRCUIT BREAKERS CURRENT TRANSFORMERS 3 CT METHOD 4 CT METHOD 5 CT METHOD 6 CT METHOD 8 CT METHOD
CONVENTIONAL SYSTEM
1 No
% INCREASE IN COST
50%
INCLUDES THE COST OF CT MARSHELLING BOXES. 3 Sets 1 Set 4 Sets 5 Sets 6 Sets 8 Sets I SET 3 SETS 50% 100% 125% 200% 300% 30% 2 Sets 2 Sets 3 Sets 3 Sets 4 Sets 2 SETS 100% 100% 200% 200% 300% 30%
2.
3.
NORMALLY EXTRA PANEL IS TIE BAY PANEL. PANEL. IT IS ARROUND 30% 30% COST OF MAIN PANEL. PANEL . BECAUSE IT IS NOT HAVING PROTECTION RELAYS ( M-1 & M-2 AND OTHER RELAYS) . ONLY TIE CB TRIPPING RELAYS & ASSOCIATED RELAYS(A/R +LBB). +LBB).
4. 5.
1 No 8 KM
3 Nos 30 KM
50% 100%
2 Nos 20 KM
30% 150%
MAIN-1, MAINMAINMAIN-2 PROTECTION & METERING FOR LINE ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
Sr.No
1. 2. 3. 4. 5. 6. 7.
DIRECTIONAL O/L & E/F RELAYS WITH HIGH SET ( 67 + 67N ) SWITCHED DISTANCE SCHEME OR
220 KV LINES NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21P+ 21N)
DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE 400 KV LINES NUMERICAL + in BUILT DEF RELAY(67N) DIFFERENTIAL SCHEME (87L) WITH B/U 21 DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE 765 KV LINES NUMERICAL + in BUILT DEF RELAY(67N) DIFFERENTIAL SCHEME (87L) WITH B/U 21
IF MAIN MAIN-1 & MAIN MAIN-2 ARE NUMERICAL RELAYS, BOTH SHOULD BE SEPARATE MEASURING PRINCIPLES (CHARECTERESTICS), MODELS AND ALGORITHAMS (SHOULD NOT BE DUPLICATED) AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS SHOULD BE 100% 100% REDENDENCY IN ALL ASPECTS ( COMPLEMENTARY TO EACH OTHER ) . DISSIMILAR CARRIER SCHEMES ARE TO BE SELECTED ( POTT & PUTT or BLOCK & UNBLOCK). UNBLOCK). OTHER WISE MAIN MAIN-2 MAY BE DIFFERENT MAKE OR PHASE COMPARISION PROTECTION/LINE DIFFERENTIAL PROTECTION WITH BACKUP DISTANCE PROTECTION IS TO BE ADOPTED. ADOPTED. BOTH M1 & M2 SHOULD CONTAIN DIRECTIONAL EARTH FAULT PROTECTION (67 67N) N) WITH DIRECTIONAL COMPARISION PICKUP SCHEME AS INBUILT FUNCTION FUNCTION..
ZONE-1: 80% OF MAIN LINE ZONEZONEZONE -2: 100% OF MAIN LINE + 50% OF SHORTEST LINE AT OTHER END ZONEZONE -3: 100% OF MAIN LINE + 100% OF SHORTEST LINE AT OTHER END ZONEZONE -4: 100% OF MAIN LINE + (100% OF SHORTEST LINE + 20% OF LONGEST LINE) AT
OTHER END.
(3/4/6 CT METHOD)
IR5 / A511 IY5 / A531 VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 1-CVT CORE 1 IB5 / A551
1-CT
CTR: 2000-1000-500/1A
CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT
2-BCT CORE-5
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
5S4 5S4 5S2 5S2
CORE-5
5S4 5S2
IN5 / A571
100VA CLASS: 3P
CT MB
3 3 3
5S2 5S2 5S4 5S4
5S2 5S4
P2 P2 P2
CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT
2-BCT CORE-5
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
5S4 5S4 5S2 5S2
CORE-5
5S4 5S2
IN5 / A571
ESC
ENT
CT MB
ENABLED TRIP
TARGET RESET
IN5 / A571
5S2
5S2
5S2 5S4
3 3 3
5S4 5S4
P2 P2 P2
SEL
SEL- 421
PROTECTION AUTOMATION CONTROL
1-LCT
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
5S4 5S4 5S2 5S2
CORE-5
5S4 5S2
21 L2
VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271 1-CVT CORE 2 100VA CLASS: 3P
CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT
2-BCT CORE-4
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
4S4 4S4 4S2 4S2
CORE-4
4S4 4S2
IN4 / C471
CT MB
3 3 3
4S2 4S2 4S4 4S4
4S2 4S4
P2 P2 P2
50ZT LBB/BFR
CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT
2-BCT CORE-4
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
4S4 4S4 4S2 4S2
CORE-4
4S4 4S2
IN4 / C471
CT MB
IN4 / C471
3 3 3
4S2 4S2 4S4 4S4
4S2 4S4
P2 P2 P2
MULTI FUNCTION NUMERICAL RELAY FOR MULTI BREAKER, MULTI CT & CVT/PT APPLICATION
(NEW APPLICATION) (ONE & HALF BREAKER SYSTEM or RING BUS SYSTEM)
1-52 CB
2-52 CB
3-52 CB
59
BUS-1 PT
BUS-2 PT
1-LCT
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
4S4 4S4 4S2 4S2
CORE-4
4S4 4S2
1-CT
CTR: 2000-1000-500/1A
CLASS: 0.2
3 CT METHOD : 1 1-CT & 2-CT 4 CT METHOD : 1 1-CT & 2-BCT 6 CT METHOD : 1 1-ACT & 2-BCT
2-BCT CORE-3
CTR: 2000-1000-500/1A
CLASS: 0.2
3 3 3
3S4 3S4 3S2 3S2
CORE-3
3S4 3S2
IN3 / D371
CT MB
VR31 / E311 VY31 / E331 VB31 / E351 VN31 / E371 1-CVT CORE 3 50VA
3 3 3
3S2 3S2 3S4 3S4
3S2 3S4
P2 P2 P2
CLASS: 0.2
1-LCT
CTR: 2000-1000-500/1A
3 3 3
3S4 3S4 3S2 3S2
CORE-3
3S4 3S2
VR31 / E311 VY31 / E331 VB31 / E351 VN31 / E371 1-CVT CORE 3 50VA CLASS: 0.2
MAIN-1 & MAINMAINMAIN-2 PROTECTION FOR AUTO TRANSFORMER ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
2.
3.
5. BACK UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE. A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE) B. UNDER IMPEDENCE / DISTANCE ( Z<)(21T). C. NEUTRAL DISPLACEMENT PROTECTION (Un>).
NORMALLY ADOPTED POWER TRANSFORMERS CAPACITIES IN 400KV / 220KV CAPACITY OF TRANSFORMER HV VOLTAGE HV CURRENT LV VOLTAGE LV CURRENT
VOLTAGE RATIO IN KV
T Y P E
MAINMAIN -1
MAIN MAIN-2
BACK UP PROTECTION HV LV
PROTECTION
1 2 3 4 5 6 7 8 9 10
7.5 & 16 7.5 , 16 & 25 7.5 , 16 , 25 & 31.5 16 , 31.5 50 & 80 31.5, 50 31.5, 50 & 100 100, 200 & 250 100 & 160 315, 500 & 630 1000 & 1500
66 / 11 66 / 33 132 / 11 132 / 33 220 / 33 220 / 66 400 / 132 220 / 132 400 / 220 765 / 400
87 T1 DIFFERENTIAL RELAY
3 OL + 1 EL (51)
( LOW IMPEDANCE PERCENTAGE BIASED PHASE SEGREGATED DIFFERENTIAL RELAY PRINCIPLE: MERZ PRICE)
HV & LV REF 64
NIL
HV REF (64)
BUCHHOLZ OVER FLUX OLTC OSR PRV/PRD OIL TEMP WDNG TEMP
87 T2 / 64 REF
ITEM /MVA
HV
1
600/1 800/1 1000/1 1600/1
IV
3 1
600/1 800/1 1000/1 1600/1
NEUTRAL
2 3 1
600/1 800/1 1000/1 1600/1
LV
3
1 2
CORE
100
2
300/1 500/1 600/1 1000/1
2
600/1 800/1 1000/1 1600/1
RATIO
--
--
--
5 6 7
NEUTRAL BUSHING CT : CORE-1 & 2 : BEFORE STAR FORMATION IN RYB PHASES, 100 600 V 600 V 600 V 600 V 600 V 600 V VKNEE FOR 160 800 V 800 V 800 V 800 V 800 V 800 V PS & 315 1000 V 1000 V 1000 V 1000 V 1000 V 1000 V VA FOR MET 500 1600V 1600V 1600 V 1600 V 1600 V 1600 V 100 1.5 1.5 1.5 1.5 1.5 1.5 160 2.0 2.0 2.0 2.0 2.0 2.0 RCT IN OHMS 315 2.5 2.5 2.5 2.5 2.5 2.5 500 4.0 4.0 4.0 4.0 4.0 4.0 100 100 100 100 100 100 100 I MAG IN 160 80 80 80 80 80 80 mA at 315 60 60 60 60 60 60 VKNEE 500 25 25 25 25 25 25 CLASS OF PS PS PS PS PS PS ACURACY
PURPOSE
87T2(L)
87T2(H)
WTI
87T2(L)
87T2(H)
WTI
87T2(L)
87T2(H)
WTI
87 T1
CT MB
3-CT
CTR: 2000-1000-500/1A
CLASS: PS
3 CT METHOD : 3-CT & 2-CT 4 CT METHOD : 3-CT & 2-ACT 6 CT METHOD : 3-ACT & 2-ACT
2-ACT CORE-5
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
5S4 5S4 5S3 5S3
CORE-5
3 3 3
5S3 5S3
5S1
5S1
P2 P2 P2 LV-CT CORE-5
CTR: 1200-800/1A
CT MB
CLASS: PS IN CASE OF 1&1/2 CB SYSTEM, THE DIFFERENTIAL PROTECTION CTs ASSOCIATED WITH MAIN & TIE CBs SHOULD BE CONNECTED TO SEPARATE BIAS WINDINGS AND THESE SHOULD NOT BE PARALLED IN ORDER TO AVOID FALSE OPERATION DUE TO DISSIMILAR CT TRANSIENT RESPONSE.
3 3 3
5S3 5S3 5S4 5S4
5S3 5S4
P2 P2 P2
P2 P2 P2
CT MB
5S1 5S3
3 3 3
5S3 5S3
5S1
5S1
3-TCT
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
5S4 5S4 5S3 5S3
CORE-5
5S4 5S3
P2 P2 P2 LV-CT CORE-5
CTR: 1200-800/1A
CLASS: PS
NORMALLY LOW IMPEDENCE BIASED DIFFERENTIAL RELAY IS USED FOR TRANSFORMER DIFFERENTIAL PROTECTION
NUMERICAL RELAYS DOES NOT REQUIRE AUX CTs
87 T2
400KV HV
CORE-1
CTR: 1000/1A
CLASS: PS P1 P1 P1 P1 P1 P1 NEUTRAL
CORE-1
CTR: 1000/ 1A
CLASS: PS
3 3 3
BUSHING CT
3 3 3
S1 S1 S1 S2 S1 S2
BUSHING CT
S2
S2
S2 S1
S1 S2
3 3 3
S2 S2
S1
S1
S1
S2
P2 P2 P2
400KV HV
CORE-1
CTR: 1000/1A
CLASS: PS P1 P1 P1 P1 NEUTRAL
CORE-1
CTR: 1000/ 1A
CLASS: PS
CLASS: PS
3 3 3
S1
S1
S1
S2
S2
S2
P2 P2 P2
BUSHING CT
3 3 3
S1 S1
BUSHING CT
S2
S2
S2 S1
S1 S2
P2
400KV HV
CORE-2
CTR: 1000/1A
P1 P1 P1 P1 P1 P1 NEUTRAL
CORE-2
CTR: 1000/ 1A
CLASS: PS
3 3 3
BUSHING CT
S1 S2
S1 S2
S1 S2
3 3 3
S1
S1
S1
S2
S2
S2
P2 P2 P2
CLASS: PS
3 3 3
S1 S1
BUSHING CT
S2
S2
S2 S1
87 T2
CORE-1
CTR: 1000/1A
CLASS: PS P1 P1 P1 P1 P1 P1 NEUTRAL
CORE-1
CTR: 1000/ 1A
CLASS: PS
3 3 3
BUSHING CT
3 3 3
S1 S1 S1 S2 S1 S2
BUSHING CT
S2
S2
S2 S1
S1 S2
3 3 3
S2 S2
S1
S1
S1 S2
P2 P2 P2
CORE-1
CTR: 1000/1A
CLASS: PS P1 P1 P1 P1 NEUTRAL
CORE-1
CTR: 1000/ 1A
CLASS: PS
CLASS: PS
3 3 3
S1 S2
S1 S2
S1 S2
P2 P2 P2
BUSHING CT
3 3 3
S1 S1
BUSHING CT
S2
S2
S2 S1
S1 S2
P2
3-CT
CTR: 2000-1000-500/1A
CLASS: PS
3 CT METHOD : 3-CT & 2-CT 4 CT METHOD : 3-CT & 2-ACT 6 CT METHOD : 3-ACT & 2-ACT
2-ACT CORE-4
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
4S4 4S4 4S3 4S3
CORE-4
4S4 4S3
IN4 / C471
3 3 3
E172 E174
CT MB
3 3
3 3 3
4S3 4S3 4S4 4S4
4S3 4S4
CLASS: 3P
P2 P2 P2
3-TCT
CTR: 2000-1000-500/1A
VN11 / E171
3 3 3
E172 E174
CLASS: PS
3 3 3
4S4 4S4 4S3 4S3
CORE-4
4S4 4S3
3 3
IN4 / C471
CLASS: 3P
LV-CT
CTR: 1200 800 /1A
CLASS: PS
3 3 3
4S2 4S2 4S1 4S1
CORE-4
4S2 4S1
IN4 / C471
P2 P2 P2
3 3 3
E172 E174
3 3
VOLTAGE
CLASS: 3P
LBB & BUSBAR PROTECTION SCHEMES ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)
LBB/BFR PROTECTION
LINE1 BUS-1 1-52CB 2-52CB 3-52CB AT/F-1 BUS-2
50Z
50ZT
50Z
LBB/BFR IS LOCAL BREAKER BACKUP PROTECTION/ BREAKER FAILURE RELAY. 1No LBB RELAY IS PROVIDED FOR EACH BREAKER. LBB IS CURRENT OPERATED RELAY. LBB RELAY IS ENERGISED WHEN MASTER TRIP RELAY(86-A OR/AND 86-B OR/AND 96) OPERATES OR SINGLE PHASE TRIP RELAYS OPERATES AND GIVEN SIGNAL TO BREAKER FOR TRIP. LBB RELAY TIME DELAY IS PROVIDED. LBB RELAY OPERATES WHEN THE BREAKER IS UNDER TROUBLE/ FAILS TO OPERATE. AFTER ENERGISED THE LBB RELAY AND TIME DELAY COMPLETES, EVEN CURRENT IS THERE THIS THINKS BREAKER FAIL TO OPERATE AND GIVEN SIGNAL AS PER SCHEME DESCRIBED NEXT PRESENTATION.
NEW CONCEPT: Normally the CT connections for LBB/BFR relay is in series with Main-2 Protection. In case of Numerical Distributed LBB/BFR and Centralized Bus-Bar System, the CT connections for Bus-Bar are terminated at LBB/BFR and Centralized Bus-Bar is interconnected by Fiber-Optic cable.
DIRECT TRIP 1&2 VIA CARRIER TO OTHER END BUSBAR-1 PROTECTION (96-BB ) OPTD AND BUSBAR-1 ISOLATED
50Z
3-52CB BUS-2
Breaker Failure Relay of the Main Circuit Breaker Trips the 1. Connected Bus Bar Protection, 2. Tie Circuit Breaker 96/50Z Relay & 3. Remote End Circuit Breaker through Carrier Tripping.
86 86-A
50ZT
86 86-B
2-52CB TC-2
3-52CB BUS-2
Breaker Failure Relay of the Tie Circuit Breaker Trips the 1. Both Sides Main Circuit Breakers and 2. Remote End Circuit Breakers through carrier Tripping ( In case of Transformer, LV Circuit Breaker)
Breaker Failure Relay of the Main Circuit Breaker Trips the 1. Connected Bus Bar Protection 2. Tie Circuit Breaker 96/50Z Relay & 3. Remote End Circuit Breaker ( In case of ICT, LV CB)
BASIC THEORY
KIRCHOFFs CURRENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING AT THAT NODE.
ADVANTAGES
FREE OF ANY NEED FOR MATCHED CT CHARACTERESTICS OR RATIOs, LOW LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT. STABLE FOR INFINITE FAULT LEVELS. INSENSITIVE TO CT SATURATION. DETECTS FAULTS WITHIN 1 2ms & INITIATES TRIPPING WITHIN 5 7ms.
CTs BURDEN CT SATURATION UTILISATION OPERATING TIME STABILITY PERFORMANCE ADDITIONAL PROTECTION
IT REQUIRES ALL IDENTICAL CT RATIOs & TURNS RATIO RATIO.. LOW IT CAN WORK WITH CTs OF UNEQUAL RATIOS ALSO ALSO.. FREE OF RESISTANCE OF SECONDARY WINDING. WINDING. Class X for all CT Cores. Cores. ANY NEED OF MATCHED CT CHARACTERESTIC OR RATIOs LOW MINIMUM KNEE POINT VOLTAGE OF 300300-500V 500V. LEAKAGE REACTANCE OR RESISTANCE. RESISTANCE. OTHER PROTECTIVE LOW MAGNETISING CURRENT(FEW MILLIAMPS) MILLIAMPS).. RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT. CIRCUIT. IMPOSES COMPARATIVELY HIGH BURDEN ON CTs. CTs. AUXILIARY CTs IMPOSES LESS BURDEN ON CTs. CTs. AUXILIARY CTs HAVE NO REDUCE THE PERFORMANCE OF THE SCHEME EFFECT ON PERFORMANCE OF SCHEME. SCHEME. OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED DURING OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED INTERNAL FAULTS. FAULTS. DURING INTERNAL FAULTS. FAULTS. INSENSITIVE TO CT SATURATION SATURATION.. IT IS GOOD SOLUTION FOR SINGLE BUSBAR ARRANGEMENTS, ONE & MOST SUITABLE FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS HALF BREAKER SYSTEMS OR RING BUSBAR SYSTEMS. SYSTEMS. ( WITH OR WITHOUT TRANSFER BUS). BUS). BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 20 mS mS.. INABILITY TO COPE WITH INCREASING FAULT CURRENT CURRENT.. DETECTS FAULTS WITH IN 1 2 mS AND INITIATES TRIPPING WITH IN 5-7 mS mS.. STABLE FOR INFINITE FAULT LEVEL LEVEL..
HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY STABLE HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY FOR EXTERNAL FAULTS FAULTS.. STABLE FOR EXTERNAL FAULTS FAULTS.. THIS RELAY REQUIRES CHECK ZONE FEATURE FEATURE.. THE TRIP COMMAND IS THIS RELAY HAS IN BUILT CHECK ZONE FEATURE (NO SEPARATE ONLY GIVEN WHEN BOTH A DISCRIMINATING & CHECK ZONE SYSTEM CHECKZONE FEATURE) i.e OVER CURRENT STARTING RELAY OPERATES.. OPERATES PROVIDED.. PROVIDED
IN1 / B171
CLASS: PS
CLASS: PS
3 3 3
1S3 1S3 1S1 1S1
CORE-1
1S3 1S1
IB1 / B151
3 3 3
1S1 1S1 1S3 1S3
1S1 1S3
IN1 / B171
P2 P2 P2
11-52
14-52
BUS-2
12-52
15-52
18-52
3-52
6-52
9-52
17-52
2-52
5-52
8-52
BUS-2
2-52 1-52 52 6-52 6-CT CT 4-CT
BUS-1
87 BB2
5-52 9-52 9-CT CT 8-52 7-CT 12-52 12-CT CT 11-52 10-CT 15-52 15-CT CT 14-52 13-CT
87 BB1
4-52 52
7-52 52
10-52
MAIN CB LBB
OR
(487B) SEL
OR
TIE CB LBB
OR
(MICOM P740) AREVA
OR
(MICOM P746) AREVA
MAIN CB LBB FO
OR
(7 SS 52) SIEMENS
MAIN CB LBB FO
OR
(7 SS 52) SIEMENS
TIE CB LBB FO
OR
(MICOM P740) AREVA
OR
(MICOM P740) AREVA
OR
OR
(487B) SEL
(487B) SEL
OR
(MICOM P746) AREVA
OR
(MICOM P746) AREVA
OR
BUSBUS -1
OR
10-52 10
11-52
BUSBUS -2
OR
OR
12-52
15-52
3-52
6-52
9-52
14-52
2-52
5-52
8-52
13-52 13
1-52 1
4-52 4
7-52 7
ABB
ABB Network Partner AG
SIEMENS
c
AREVA
BAY UNIT
ABB Network Partner AG
7 8
C E
REL531
LINE PROTECTION
21 L1
ABB Network Partner AG REL531
C E
21 L2
21 L1
21 L2
21 L1
21 L2
TRANSFORMER PROTECTION
1. 2. 3.
C E
DESCRIPTION
4.
87 T2 87 T1 87 T2 87 T1 87 T1 87 T2 IN THIS NO SEPARATE CORE IS REQUIRED FOR EITHER BUSBAR PROTECTION OR LBB / BFR. CENTRALISED BUSBAR IS CONNECTED FROM BAY UNIT OR LBB OR BFR THROUGH FIBRE OPTIC. BAY UNIT / BFR / LBB IS CONNECTED FROM MAIN-1 & MAIN-2 OF LINE PROTECTION OR MAIN & BACKUP PROTECTION OF TRANSFORMER THROUGH FIBRE OPTIC FOR REDUNDANCY TO BAY UNIT. THE CURRENT DATA IS TRANSFERED TO BAY UNIT TO BUSBAR CENTRAL UNIT FROM LINE / TRANSFORMER PROTECTIONS FOR NUMIRICAL ALGORITHAM OF LBB & BUSBAR CENTRAL UNIT AND IT WILL OPERATE FOR INTERNAL FAULTS AND DOES NOT OPERATE FOR THROUGH / EXTERNAL FAULTS.
MISCELENEOUS RELAYS & PROTECTIONS ADOPTED FOR LINE IN ONE AND HALF CIRCUIT BREAKER SCHEME
(STUB, TEED AND AUTO RECLOSURE FUNCTIONS) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)
LINE-1
AT/F-1
WHEN A LINE IS SUPPLIED VIA TWO CIRCUIT BREAKERS IN A ONE & HALF CIRCUIT BREAKER ARRANGEMENT, THE LINE PROTECTION INCLUDES THE AREA BETWEEN THE TWO CTs. HOWEVER, WHEN THE LINE ISOLATOR IS OPEN THE LINE CVTs FOR THE DISTANCE PROTECTION ARE CONNECTED TO THE LINE AND CANNOT PROVIDE THE CORRECT VOLTAGE FOR THE STUB END.(i.e END.(i.e THE AREA BETWEEN THE LINE ISOLATOR AND CTs) (STUB = DEAD END) TO PROVIDE PROTECTION FOR A FAULT IN THIS AREA, REL 521/ REL 316 IS PROVIDED WITH A STUB PROTECTION WHICH GIVES AN BUS OVER CURRENT TRIP IF THE LINE ISOLATOR IS OPEN AND THE CURRENT EXCEEDS THE SET VALUE IN ANY PHASE.
IT OPERATES THE 33-PH TRIP GR GR-A MAIN CB (1 (1-52CB OR 3 3-52CB) AND 33-PH TRIP GR GR-A TIE CB (2 (2-52CB) IT OPERATES THE 33-PH TRIP GR GR-B MAIN CB (1 (1-52CB OR 3 3-52CB) AND 33-PH TRIP GR GR-B TIE CB (2 (2-52CB)
LINE-1 AT/F-1 TEED PROTECTION IS BASED ON KIRCHOFFS CURRENT LAW. THREE SETS OF CTS ARE CONNECTED IN STAR FASHION. SOME OF THE CURRENTS MUST BE ZERO. IF ANY UNBALANCE CURRENTS ARE NOTICED THEN IMMEDIATELY TEED PROTECTION OPERATES. IF TEED PROTECTION BAY 1&2 OPERATED THEN IT TRIPS 11-52CB & 2 2-52CB. SIMILARLY IF TEED PROTECTION BAY 2&3 OPERATED THEN IT TRIPS 22-52CB & 3 3-52CB.
SUMMATION OF INDIVIDUAL PHASES OF TT-SHAPED 3 CTs BEFORE REACHING TO RELAY. THIS IS CIRCULATING CURRENT PRINCIPLE. THE CURRENT FLOWING THROUGH IS ZERO DURING BALANCED CONDITION. HIGH IMPENDENCE THREE PHASE DIFFERENTIAL RELAY IS USED AS TEEDTEED-1 PROTECTION. T- SHAPED 3 CTs ARE CONNECTED TO RELAY. THE RELAY HAVING OPERATING COIL & RESTAIRING COIL. BASED ON THE DIFFERENTIAL CURRENT FLOWING THROUGH THE OPERATING COIL THE RELAY OPERATES. LOW IMPEDENCE PERCENTAGE BIASED THREE TERMINAL THREE PHASE DIFFERENTIAL RELAY IS USED AS TEEDTEED-2 PROTECTION.
TEED-1 TEEDPROTECTION
TEED-2 TEEDPROTECTION
TEEDTEED -1 PROTECTION
P2 P2 P2
1-CT
CTR: 2000-1000-500/1A
CLASS: PS
2-CT
CTR: 2000-1000-500/1A
CLASS: PS
1-LCT CORE-1
CTR: 2000-1000/1A
CLASS: PS
3 3 3
CORE-5
3 3 3
5S4 5S4 5S2 5S2 5S4 5S4 5S2 5S2
CORE-5
5S4 5S2
87 TEED-1
IN5
P1 P1 P1 P2 P2 P2
5S4 5S2
P1 P1 P1 P2 P2 P2
IT WORKS ON CIRCULATING CURRENT PRINCIPLE AND IT IS HIGH IMPEDENCE DIFFERENTIAL RELAY. TEED-1 PROTECTION FOR BAY 2&3 IS ALSO SAME AS ABOVE AND THE FOLLOWING CTs & CORES ARE USED 3-CT(CORE-5), 2-CT(CORE-1) & 3-TCT(CORE-1) ARE STARRED AND CONNECTED TO TEED-1 PROTECTION
IN1
3 3 3
1S2 1S2
1S3
1S3
1S3 1S2
5 CT METHOD : 1-CT, 2-CT & 1L-CT 6 CT METHOD : 1-CT, 2-BCT & 1L-CT 8 CT METHOD : 1-ACT, 2-BCT & 1L-CT
TEEDTEED -2 PROTECTION
{BAY1&2} (5/6/8 CT METHOD)
P2 P2 P2 CT MB CT MB
87 TEED-2
1-CT
CTR: 2000-1000-500/1A
P2 P2 P2
CLASS: PS
1-LCT CORE-2
CTR: 2000-1000/1A
CLASS: PS
3 3 3
4S4 4S4 4S2 4S2
CORE-4
3 3 3
4S2 4S2
4S4
4S4
2-CT CORE-4
CTR: 2000-1000-500/1A
P2 P2 P2 CT MB
CLASS: PS
2S3
2S3
2S3 2S2
2S2
2S2
TEED-2 PROTECTION FOR BAY 2&3 IS ALSO SAME AS ABOVE AND THE FOLLOWING CTs & CORES ARE USED. 3-CT(CORE-4), 2-CT(CORE-2) & 3-TCT (CORE-2) ARE CONNECTED TO TEED-2 PROTECTION. IT WORKS ON KIRCHOFFS CURRENT PRINCIPLE & IT IS PERCENTAGE BIASED LOW IMPEDENCE DIFFERENTIAL RELAY
3 3 3
STUB OR TEED-1
STUB OR TEED-1
TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86 86ABB -B REL521 MTR/ MAINMAIN HSTR -1
TEED-2 OR STUB
TEED-2 OR STUB
86 86-A : GROUPGROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY 86 86-B : GROUPGROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY LINE/TRANSFORMER ISOLATOR OPENS THIS INTERLOCK WILL INITIATE 21 L1 / 87 T1 & 21 L2 / 87 T2 CONVERTED STUB STUB-1 & 2 PROTECTION
TYPES OF AUTO-RECLOSING SCHEMES: 1. BASED ON PHASE A. THREE PHASE AUTO-RECLOSING: This type of Auto-Reclosing causes an immediate drift part of the two systems and hence no interchange of synchronizing power can take place during the dead time. B. SINGLE PHASE AUTO-RECLOSING: In this, only the faulty phase(only SLG Faults) is reclosed without causing interruption in interchange synchronizing power between two systems through other two healthy phases. 2. BASED ON ATTEMPTS OF RECLOSURE A. SINGLE SHOT AUTO-RECLOSING: In this scheme, Breaker is reclosed only once on a given fault before lockout of Circuit Breaker Occurs. High-Speed Auto-Reclosing for EHT System is invariably Single Shot. B. MULTI-SHOT AUTO-RECLOSING: In this scheme, more than one reclosing attempts made for a given fault before lockout of Circuit Breaker occurs. B.I. DISADVANTAGES: Repeated closure attempts has with high fault level would seriously affect the Circuit Breaker, Equipment and System Stability. B.ii. CIRCUIT BREAKER LIMITATIONS: Ability of Circuit Breaker to Perform several Trip Close operations in quick succession. B. iii. SYSTEM CONDITIONS: In the percentage of the semi-Permanent faults (which could be burnt out) is moderate, For example on the lines through the forest, multi shot Auto-Reclosing is followed. 3. DEPENDING ON SPEED: A. HIGH-SPEED AUTO-RECLOSING: This aids in fast restoration of supply but should be done by taking into account the following factors. I. System disturbance time can be tolerated without loss of system stability. ii. Characteristics of Protection Schemes and Circuit Breaker. B. LOW SPEED OR DELAYED AUTO RECLOSING: This is suitable for highly interconnected systems where the loss of a single line is unlikely to cause two sections of the system to drift apart and loose synchronism.
METHOD OF ADOPTION IN ONE AND HALF BREAKER SYSTEM: The Auto-Reclosure Functions used for the Bus Breakers 1-52CB & 3-52CB are set as Masters and one for the Center Breaker 2-52CB(TIE) as Follower. Co-ordination is required between the Auto-Reclosure Functions. A Synchrocheck function is also loaded in each Relay to permit 3 pole Auto-Reclosing. Each Line Protection relays starts both MAIN & TIE Circuit Breakers to trip for the Concerned line. After a Successful reclosure of the Main Breaker, The Tie Breaker will be reclosed after a supplementary time delay. Should the Main CB AutoReclosure relay not be successful in its reclosing attempts, the Tie CB AutoReclosure is blocked. If the Main CB is Open or its Auto-Reclosure Relay is not ready or Out of service, The TIE CB Auto-Reclosure will reclose The TIE Breaker after its own dead time without any supplementary time delay. CHOICES OF EHV SYSTEM: 1. CHOICE OF DEAD TIME: A. Lower limit is decided by deionising of Circuit Breaker. B. Upper Limit is decided by Transient Stability and Synchronism. C. Longer Transmission Lines Require Longer dead Time. D. The dead time for High Speed Auto-Reclosing scheme with EHV System is 0.3 to 1.2 sec. 2. CHOICE OF RECLAIM TIME: This should not be set to such a low value that the operating cycle of Breaker is exceeded when two faults incident occurs close together. The reclaim time will be in the range of 10 to 30 sec., depending the breaker opening and closing mechanisms. 3. CHOICE OF ZONE: This should normally kept in Zone-1. It is a Zone-1 fault and SLG fault only autoreclosure is comes in to picture. In other zones the auto reclosure is blocked.
1-52CB
2-52CB
3-52CB
REL531
REC 316*4
REC 316*4
LINE-1
C E
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
LINE-2
C E C E C E
TRANSIENT FAULT
OPERATING TIME
TRIP COIL CONTACTS ARC CONTACTS ENERGISED SEPARATE EXTINGUISHED FULLY OPEN
CIRCUIT BREAKER
OPENING TIME ARCING TIME RESETS CLOSING TIME DEAD TIME OPERATES RESETS
PROTECTION
PERMANENT FAULT
OPERATING TIME
RECLOSE ON TO FAULT
TRIP COIL CONTACTS ARC CONTACTS ENERGISED SEPARATE EXTINGUISHED FULLY OPEN
CIRCUIT BREAKER
OPENING TIME
TIME
CARRIER INTERTRIPPING SCHEMES ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)
BLOCKING SCHEME
Blocking commands are initiated by a protection element that detects faults external to the protected zone. Detection of an external fault at the local end of a protected circuit results in a blocking signal being transmitted to the remote end. At the remote end, receipt of the blocking signal prevents the remote end protection operating if it had detected the external fault. Loss of the communications channel is less serious for this scheme than in others as loss of the channel does not result in a failure to trip when required. However, the risk of a spurious trip is higher.
II. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 1. III. WEEK IN FEED CONDITIONS. 4. DIRECTIONAL COMPARISON UNBLOCKING SCHEME
- - -
ZONE-2
SECURE & FAST DISTANCE & DIRECTION ZONE-2 DISTANCE & DIRECTION SECURE &
DEPENDABLE
ZONE-1 ZONE-1
- - - - -
- - -
REVERSE LOCKING
PUTT
POTT
BLOCKING
UNBLOCKING
Dependable and secure communication channel 1. Power line carrier with frequency shift modulation. HF signal coupled to 2 phases of the protected line, or even better, to a parallel circuit to avoid transmission of the HF signal through the fault location. 2. Microwave radio, especially digital(PCM) 3. Fibre -optic cables
Characteristic Best suited for longer lines - where Of line the Under-reach zone provides sufficient resistance coverage.
1. Excellent coverage On short lines in the Presence of fault resistance. 2. Suitable for the Protection of multiterminal lines with intermediate infeed.
Reliable communication channel (only required during external faults) 1. Power line carrier With amplitude Modulation (ON/OFF). The same frequency may be used on all terminals) All line types Preferred practice in the USA.
Dedicated channel With continuous signal Transfer 1. Power line carrier With frequency shift keying. Continuous Signal transmission must be permitted.
Same as POTT
Criterion
Speed of operation Suitable for auto Re Close Current reversal Loss of communications Weak In feed/Open CB
Blocking scheme
Not as Fast As fast Yes Special features required good Special features required
Speed with in-service testing Slower Security against mal-operation due to:
Modern digital or numerical distance relays are provided with a choice of several schemes in the same relay. Thus scheme selection is now largely independent of relay selection, and the user is assured that a relay is available with all the required features to cope with changing system conditions.
PUTT
1. Simple technique 2. No coordination Of zones and times With the opposite End required. 3.The combination Of different relay Types therefore presents no Problems.
1. Overlapping of the zone 1 reaches must be ensured. On parallel lines, teed feeders and tapped lines, the influence of zero sequence coupling and intermediate In feeds must be carefully considered to make sure a minimum overlapping of the zone 1 reach is always present. 2. Not suitable for weak In feed terminals
POTT
1. Can be applied without Under reaching zone1 stage (e.g. overcompensated Series compensated lines). 2. Can be applied on Extremely short lines (impedance less than minimum relay setting) 3. Better for parallel lines as mutual coupling is not critical for the overreach zone 4. Weak in feed terminals are no problem. (Echo and Weak In feed logic is included)
UNBLOCKING
Same as POTT but: 1. If no signal is Received (no block and no unblock) then tripping by the overreach zone is released after 20 ms
ADVANTAGES
DRAWBACKS
1. Zone reach and signal timing coordination with the Remote end is necessary (current reversal).
Same as POTT Same as 1. Slow tripping all POTT Tele-protection trips must be delayed to wait for the eventual blocking signal. 2. Continuous channel Monitoring is not Possible.
PUTT
Not Suitable as the Zone1 Operation is essential and Zone1 setting in X and R direction must be small on Short Lines.
POTT
Suitable as the Z1B setting may be substantially larger than the Line impedance so that signal Transmission is secure for all faults on the Line. Suitable as the Strong end detects all the Line Faults with the OverReaching Z1B. The Weak In-feed end then echos the received Signal.
BLOCKING
Suitable as Reverse Reach Setting is independent of Line Length.
UNBLOCKING
Suitable Same as POTT.
Short Line
Weak InInfeed
Amplitude Modulated Power Line Carrier Frequency or Phase Modulated Power Line Carrier
Communication
Not Suitable as the Zone1 Operation is essential at Both Ends for 100% Coverage.
Not Suitable as the Signal must be Transmitted through the Fault Location which Attenuates the Signal.
Partially Suitable Suitable Same as as the Reverse Fault POTT. is also Detected at the Weak In-feed end but no trip at Weak In-feed end.
Suitable as the Signal is only sent when the Line is not Faulted. Suitable as the Signal can be Transmitted under all Conditions. Suitable.
Suitable as the Signal can be Transmitted through the Fault Location. Suitable.
Suitable.
Suitable.
ALARM-1 ALARM250V DC
C S
2+ 5C R
TX TRIP A(C)
1C S
2+ 5C R
TX TRIP C(A)
6+
RX TRIP A(C)
6+
RX TRIP C(A)
DISPLAY C
7
ALARM-2 ALARM250V DC
C S
TX TRIP B(D)
9C S
10+ 13 13C R
TX TRIP D(B)
E
G4AA TB: V9LB
C R
RX TRIP B(D)
14+
RX TRIP D(B)
GA4D TB:V9LC
LINE
CR
21L1
-VE
CS
CARRIER SEND
ABB
+VE
-VE
NSD 50
G4AC V9LC 10 G4AC V9LC 13 G4AC V9LC 14 G4AC V9LC 9 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL
ABB
PANEL-2
LINE
CR
21L2
-VE
CS
CARRIER SEND
ABB
+VE
-VE
NSD 50
G4AC V9LC 10 G4AC V9LC 13 G4AC V9LC 14 G4AC V9LC 9 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL
ABB
PANEL-1
PANEL-1
ABB NSD 50
DC +VE FROM PANEL
MAIN CB(1-52CB)
T NC
TIE CB(2-52CB)
50 LBB/BFR FOR MAIN CB / RAICA 59L1 / OVER VOLTAGE STAGE-1 59L2 / OVER VOLTAGE STAGE-2 87 HZ / TEED-1 PROTECTION 87 LZ / TEED-2 PROTECTION 50 LBB/BFR FOR TIE CB / RAICA
DC VE FROM PANEL CONDITIONS FOR DIRECT TRIP 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 HZ TEED-1 PROTECTION OPERATED 10. 87 LZ TEED-2 PROTECTION OPERATED.
PANEL-2
ABB NSD 50
DC +VE FROM PANEL
MAIN CB(1-52CB)
T NC
TIE CB(2-52CB)
50 LBB/BFR FOR MAIN CB / RAICA 59L1 / OVER VOLTAGE STAGE-1 59L2 / OVER VOLTAGE STAGE-2 87 HZ / TEED-1 PROTECTION 87 LZ / TEED-2 PROTECTION 50 LBB/BFR FOR TIE CB / RAICA
DC VE FROM PANEL CONDITIONS FOR DIRECT TRIP 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 HZ TEED-1 PROTECTION OPERATED 10. 87 LZ TEED-2 PROTECTION OPERATED.
ABB NSD 50
DC +VE G4AD V9LC 6 G4AD V9LC 5 PANEL-2
DIRECT TRIP-1 CARRIER RECEIVE RELAY
TO 8686-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB(152CB) TO 8686-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB(252CB)
+VE
-VE TO 8686-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB(152CB) TO 8686-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB(252CB)
ABB NSD 50
DC +VE G4AD V9LC 6 G4AD V9LC 5
DIRECT TRIP-2 CARRIER RECEIVE RELAY
ELECTRICAL CONNECTION NSD 50 PANEL PLCC PANEL NSD 50 PANEL ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 9 10 11 12 13 14 15 16
2 3 4 5 6 7 8
NSD 70 PANEL
NSD 70 PANEL
ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 9 10 11 12 13 14 15 16
2 3 4 5 6 7 8
FIBRE OPTIC CARRIER PROTECTION SYSTEM (TELEPROTECTION) DIGITAL RELAY CONNECTION VIA FIBRE OPTIC
ABB Network Partner AG REL531 ABB Network Partner AG REL531
OTERM
TUNOS
REC 316*4
TUNOS
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
9 10 11 12 13 14 15 16
2 3 4 5 6 7 8
OTERM
REC 316*4 C E
FOX-U FOX-515
FOX-U FOX-515
FIBRE OPTIC CARRIER PROTECTION SYSTEM (TELEPROTECTION) DIGITAL RELAY CONNECTION VIA FIBRE OPTIC
Tx Rx Rx
Tx
PROTN COUPLER
OPTIMUX
NMS
NMS
PROTN COUPLER
OPTIMUX
Tx Rx
Rx Tx
MISCELLENEOUS RELAYS & PROTECTIONS ADOPTED FOR AUTO TRANSFORMER IN ONE AND HALF CIRCUIT BREAKER SCHEME
(OVER FLUX & REF FUNCTIONS)
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)
99 T HV
CLASS: 3P
HV OVER FLUX RELAY IS IN BUILT FUNCTION OF MAIN1: 87T1: DIFF PROTN LV OVER FLUX RELAY IS IN BUILT FUNCTION OF MAIN2: 87T2: DIFF PROTN CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1
VA : 100
99 T LV
CLASS: 3P
1-52CB
2-52CB
3-52CB
BUS-2
LINE1
AT/F-1
FEEDER HAVING LINE CVTs &BUSES ARE HAVING BUS CVTs BUT AT/Fs ARE NOT HAVING CVTs. FOR TRANSFORMER PANEL, PT SUPPLY IS SELECTED AS PER SELECTION DESCRIBED BELOW FOR METERING AND PROTECTION, WHICH IS FIRST SELECTED .
If AT/F is feeding from BusBus-1 and 1 1-52CB & 2 2-52CB is closed. Then BusBus -1 CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer. If AT/F is feeding from BusBus-2 and 3 3-52 CB is closed & 2 2-52CB is open. Then BusBus-2 CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer. If AT/F is feeding from Direct Line and 22-52CB is closed & 11-52 CB & 33-52 CB is open and 389T ISO is Closed . Then line CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer.
1-PH UNITS OF 500 MVA TRANSFORMER ( EACH 167 MVA ) WITH CHANGE OVER FACILITY
R Y B R Y B
SPARE
4
SPARE
MAIN-1 & MAINMAINMAIN-2 PROTECTION FOR SHUNT REACTOR ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
3.
4.
B. BUS REACTOR THE REACTOR IS CONNECTED PARALLEL TO THE BUS i.e LIKE A FEEDER/LINE. DURING LIGHTLY LOADED CONDITIONS THERE MAY BE POSSIBULITY OF RAISING BUS VOLTAGES. FOR SAFEGUARD THE OPERATING EQUIPMENT BUS REACTORS ARE UTILISING. NORMALLY IT IS NOT IN SERVICE. WHENEVER THE VOLTAGE RAISES TO 4%TO 5% MORE THAN THE RATED VOLTAGE THIS MAY BE KEPT IN SERVICE AND 2% TO 3% LESS THAN THE RATED VOLTAGE THIS MAY BE KEPT OUT OF SERVICE. SELECTION OF REACTOR A. LINE REACTOR NORMALLY LINE REACTORS ARE PROVIDED IF THE LINE IS MORE OR EQUAL TO 250KM. IN APTRANSCO NETWORK MAXIMUM LENTH OF LINE IS 350KM. AS PER SYSTEM STUDIES RECOMANDATIONS IF LINE LENGTH IS 250KM TO 300KM 50MVAR REACTOR IS TO BE USED. IF MORE THAN 300KM 63MVAR REACTOR IS TO BE USED. B. BUS REACTOR NORMALLY BUS REACTORS ARE PROVIDED IF THE SUBSTATION BUS VOLTAGE IS RAISING 5% MORE THAN THE RATED VOLTAGE DURING LIGHTLY LOADED CONDITION. BASED ON THE SYSTEM STUDIES RECOMANDATIONS BUS REACTORS ARE TO BE PROVIDED. CALCULATIONS ARE REQUIRED FOR PROVIDING BUS REACTOR. IN THIS THERE IS NO STANDARDISATION. LOCATION OF REACTORS WITH CAPACITY IN APTRANSCO A. LINE REACTOR 1. 400KV KALAPAKA-KHAMMAM 1 AT BOTH ENDS 63MVAR 2. 400KV KALAPAKA-KHAMMAM 2 AT BOTH ENDS 63MVAR B. BUS REACTOR 1. 400KV KALAPAKA SS 2 X 50 MVAR 2. 400KV NUNNA SS(PGCIL BAYS) 1 x 63 MVAR
5.
6.
7.
8.
9.
PURPOSE OF SHUNT REACTOR PROTECTION THE PURPOSE OF THE PROTECTION RELAYING IS TO DISCONNECT THE REACTOR AND LIMIT DAMAGE IN CASE OF INTERNAL SHORT CIRCUITS, EARTH FAULTS, INTERTURN FAULTS AND OVER VOLTAGE OR OVER LOAD.THE REACTOR FORMS CERTAIN IMPEDENCE FOR RATED FREQUENCY, AND AS IT IS SHUNT CONNECTED, AS OVER LOAD MAY BE CAUSED BY OVER VOLTAGE OR HARMONICS IN VOLTAGE AND CURRENT. PROTECTION DEVICES INBUILT OR MOUNTED ON REACTOR A. OIL IMMERSED REACTOR USUALLY HAVE A GAS DETECTOR AND OIL SURGE. DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR DETECTING INTERNAL FAULTS. B. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD PROTECTION. C. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE REACTOR FROM HIGH PRESURES. REACTOR DIFFERENTIAL PROTECTION IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR REACTOR. IT CAN BE OF HIGH IMPEDENCE TYPE OR OF A SENSITIVE CURRENT STABILISED TYPE. HIGH IMPEDENCE DIFFERENTIAL PROTECTION RELAYS REQUIRE AN EQUAL CT TURNS RATIO ON THE PHASE AND NEUTRAL SIDE. SENSITIVITY IS 5% OF NOMINAL REACTOR CT CURRENT. BACKBACK-UP PROTECTION A VARIETY OF RELAYS ARE AVAILABLE. A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE) B. UNDER IMPEDENCE / DISTANCE ( Z<)(21R). C. NEUTRAL DISPLACEMENT PROTECTION (Un>). RESTRICTED EARTH FAULT PROTECTION IF, FOR SOME REASON, A SENSITIVE DIFFERENTIAL PROTECTION NOT CHOOSEN A RESTRICTED EARTH FAULT PROTECTION CAN BE UTILISED.
BUS-2 3-89
1-89
1-52CB
P2 P2
3-52CB 1-CT
P1
3-CT
P1
3-89A
.
2-89A
P1
P2
2-52CB
2-89B 3-89R
UUU
UUU
LINE 1
UUUU
1-89L
NGR
LINE SIDE EARTH SIDE
CORE-1
CORE-2
2000- 2000200/1 200/1 200/1 1000- 1000- 200/1 WTI 200/1 200/1 500/1 500/1 NEUTRAN BUSHING CT : BEFORE STAR FORMATION IN RYB PHASES 200V 200V 1000500250V 1000500250V
Parameters of WTI CT for each winding shall be provided by the contractor
200/1
200/1
200V
200V
200V
200V
1 OHM PS 87 R2 DIFF2
1 OHM PS 87 R1 DIFF1
1 OHM PS 87 R2 DIFF2
1 OHM PS 64 R REF2
1 OHM PS 64 R REF1/2
OHM PS MET
PURPOSE
CORE-4 CORE-5
87 TEED-2
(M_CT, T_CT, R_CT)
21L2
(M_CT+T_CT R_CT)
87 BBC/BB-2 87 BBM/BB-1
21L1
(M_CT + T_CT R_CT)
87 TEED-1
(M_CT, T_CT, R_CT)
21L1
(M_CT + T_CT R_CT)
CORE -1
CORE -2
CORE -3
CORE -4
CORE -5
.
CORE -1
UUU
CORE -2
CORE -1
CORE -2
CORE -3
CORE -4
CORE -5
ONE & HALF BREAKER LINE & BUS SHUNT REACTOR PROTECTION SCHEME
87BB1 BUSBARBUSBAR -1 79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 BF 87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1 79 VL1 / VBB1 VL2 / VBB2 25 87R 21M1 VL1
VL1/VBB1/VBB2
BF
64R 21R
87R
64R
PROTECTION OF BUS REACTOR 21R BUSBARBUSBAR -2 FOR REACTOR PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .
87BB2
UUU UUU
OR
UUU
P2 P2 P2 R-CT
CT MB
RET 670
3S1 3S2
3 3 3
3S2 3S2
3S1
3S1
CORE-1
CTR: 200/1A
CLASS: PS
3 3 3
1S2 1S2 1S1 1S1
HV BUSHING
1S2 1S1
ACTIVE
START
TRIP
P2 P2 P2 R-CT
DISPLAY C
CLASS: PS
NORMALLY LOW IMPEDENCE (87R1) DIFFERENTIAL RELAY IS USED FOR BUS / LINE REACTOR DIFFERENTIAL PROTECTION
R-CT HV
RET 670
1S2 1S2 1S2 ACTIVE START TRIP 1S1 1S1 1S1
CORE-2
CTR: 200/1A
CLASS: PS P1 P1 P1
CLASS: PS
3 3 3 3 3 3
BUSHING CT
DISPLAY C E
NORMALLY HIGH IMPEDENCE (87R2) DIFFERENTIAL RELAY IS USED FOR BUS / LINE REACTOR DIFFERENTIAL PROTECTION
IN CASE OF REACTOR BUSHING CT P2 IS AWAY FROM REACTOR & P1 IS TOWARDS REACTOR
P1 P1 P1
P2 P2 P2
R-CT HV
RET 670
2S2 2S2 2S2 ACTIVE START TRIP 2S1 2S1 2S1
CORE-2
CTR: 200/1A
CLASS: PS P1 P1 P1
CLASS: PS IN CASE OF REACTOR BUSHING CT P2 IS AWAY FROM REACTOR & P1 IS TOWARDS REACTOR
3 3 3 3 3 3
BUSHING CT
DISPLAY C E
P1 P1 P1
NORMALLY HIGH IMPEDENCE VOLTAGE/CURRENT OPERATED SINGLE POLE RELAY IS USED FOR BUS / LINE REACTOR RESTRICTED EARTH FAULT PROTECTION. PRESENTLY NUMERICAL DIFFERENTIAL RELAYS HAVING IN BUILT FUNCTION OF 2 REF OR 2 SEF PROTECTIONS.
P2 P2 P2
R-CT HV
RET 670
2S2 2S2 2S2 ACTIVE START TRIP 2S1 2S1 2S1
CORE-2
CTR: 200/1A
CLASS: PS P1 P1 P1
CLASS: PS
3 3 3
BUSHING CT
DISPLAY C E
NORMALLY HIGH IMPEDENCE VOLTAGE/CURRENT OPERATED SINGLE POLE RELAY IS USED FOR BUS / LINE REACTOR RESTRICTED EARTH FAULT PROTECTION. PRESENTLY NUMERICAL DIFFERENTIAL RELAYS HAVING IN BUILT FUNCTION OF 2 REF OR 2 SEF PROTECTIONS.
P1
S1 S2
R-CT HV
RET 670
2S2 2S2 2S2 ACTIVE START TRIP 1S2 2S1 2S1 2S1
P2
CORE-2
CTR: 200/1A
CLASS: PS P1 P1 P1
CLASS: PS
3 3 3 3 3 3
BUSHING CT
1S1
3
P1
DISPLAY C
E
NORMALLY HIGH IMPEDENCE VOLTAGE/CURRENT OPERATED SINGLE POLE RELAY IS USED FOR BUS / LINE REACTOR RESTRICTED EARTH FAULT PROTECTION. PRESENTLY NUMERICAL DIFFERENTIAL RELAYS HAVING IN BUILT FUNCTION OF 2 REF OR 2 SEF PROTECTIONS.
CTR: 200/1A
CLASS: PS
P1 P1 P1
P1
2S1
2S2
3
P2
P2 P2 P2
P2 P2 P2 R-CT HV
CT MB IR3 / A311 IY3 / A331 IB3 / A351 VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171
CORE-3
CTR: 200/1A
CLASS: PS
3 3 3
3S2 3S2 3S1 3S1
BUSHING CT
REL 670
ACTIVE START TRIP
3S2 3S1
IN3 / A371
DISPLAY C E
CLASS: 3P
(MAIN(MAIN -1 PROTECTION)
IR5 / A511 IY5 / A531 VR11 / E111 VY11 / E131 IB5 / A551
1-CT
CTR: 2000-1000-500/1A
REL 521
ACTIVE START TRIP
CLASS: PS
2-CT CORE-5
CTR: 2000-1000-500/1A
CLASS: PS
CLASS: PS P1 P1 P1
3 3 3
5S4 5S4 5S2 5S2
CORE-5
5S4 5S2
IN5 / A571
DISPLAY C
3 3 3
5S2 5S2 5S4 5S4
5S2 5S4
P2 P2 P2
3 3 3
5S4 5S4 5S2 5S2
5S4 5S2
IB4 / A451
REL 316
ACTIVE START TRIP
CLASS: PS
2-CT CORE-4
CTR: 2000-1000-500/1A
CLASS: PS
CLASS: PS P1 P1 P1
3 3 3
4S4 4S4 4S2 4S2
CORE-4
4S4 4S2
IN4 / A471
DISPLAY C
3 3 3
4S2 4S2 4S4 4S4
4S2 4S4
P2 P2 P2
3 3 3
4S4 4S4 4S2 4S2
4S4 4S2
3-CT
CTR: 2000-1000-500/1A
CLASS: PS
2-CT
CTR: 2000-1000-500/1A
CLASS: PS
BR-RCT CORE-5
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
CORE-1
3 3 3
5S4 5S4 5S2 5S2 1S4 1S4 1S2 1S2
CORE-5
5S4 5S2
IN5
RET 670
P1 P1 P1 P2 P2 P2
ACTIVE START
TRIP
1S4 1S2
DISPLAY C E
P1 P1 P1 P2 P2 P2
IN5
3 3 3
5S2 5S2
5S4
5S4
5S4 5S2
IT WORKS ON CIRCULATING CURRENT PRINCIPLE AND IT IS HIGH IMPEDENCE DIFFERENTIAL RELAY. TEED-1 PROTECTION FOR BAY 2&3 AND THE FOLLOWING CTs & CORES ARE USED 3CT(CORE-5), 2-CT(CORE-1) & BR-CT (CORE-5) ARE STARRED AND CONNECTED TO TEED-1 PROTECTION
P2 P2 P2
CLASS: PS
BR-CT CORE-4
CTR: 2000-1000-500/1A
CLASS: PS
3 3 3
4S4 4S4 4S2 4S2
CORE-4
4S4 4S2
RET 670
ACTIVE START TRIP
2S4 2S2
3 3 3
2S2 2S2
2S4
2S4
2-CT
DISPLAY
P2 P2 P2 CT MB
CORE-2
CTR: 2000-1000-500/1A
CLASS: PS
4S4
4S4
4S4 4S2
4S2
4S2
IT WORKS ON KIRCHOFFS CURRENT PRINCIPLE & IT IS PERCENTAGE BIASED LOW IMPEDENCE DIFFERENTIAL RELAY. TEED-2 PROTECTION FOR BAY 2&3 IS THE FOLLOWING CTs & CORES ARE USED. 3-CT(CORE-4), 2-CT(CORE-2) & BR-CT (CORE-4) ARE CONNECTED TO TEED-2 PROTECTION.
3 3 3
CORE-2
CTR: 200/1A
CLASS: 0.2
3 3 3
2S2 2S2 2S1 2S1
BUSHING CT
2S2 2S1
IN2 / D271
VR31 / E311 VY31 / E331 VB31 / E351 VN31 / E371 BASED ON SELECTION LINE CVT / BUS-1 CVT / BUS-2 CVT CORE 3 100VA CLASS: 0.2
ABB NSD 50
DC +VE FROM PANEL
87R1 REACTOR DIFFERENTIAL RELAY RET 670 21R REACTOR IMPEDENCE RELAY REL 670
87R2/64R RESTRICTED EARTH FAULT RELAY
ABB NSD 50
DC +VE FROM PANEL
ADDITIONAL AND SPECIAL FUNCTIONS ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
(EVENT LOGGER & DISTURBANCE RECORDER) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)
400KV SRISAILAMSRISAILAM-2 MAIN MAIN-2 RAZFE PROT TRIP 400KV SRISAILAMSRISAILAM-2 MAIN MAIN-1 REL100 PROT STARTY 400KV SRISAILAMSRISAILAM-2 MAIN MAIN-1 REL100 PROT STARTR 400KV SRISAILAMSRISAILAM-2 MAIN MAIN-1 REL100 PROT TRIP 400KV SRISAILAMSRISAILAM-2 MAIN CB 752 Y Y-PH OPEN 400KV SRISAILAMSRISAILAM-2 MAINMAIN-2 RAZFE CARRIER SEND 400KV SRISAILAMSRISAILAM-2 AT/FAT/F-2 TIE CB 852 B B-PH OPEN 400KV SRISAILAMSRISAILAM-2 MAIN CB 752 RR-PH OPEN 400KV SRISAILAMSRISAILAM-2 MAIN CB 752 B B-PH OPEN 400KV SRISAILAMSRISAILAM-2 AT/FAT/F-2 TIE CB 852 YY-PH OPEN 400KV SRISAILAMSRISAILAM-2 AT/FAT/F-2 TIE CB 852 R R-PH OPEN 400KV SRISAILAMSRISAILAM-2 MAINMAIN-1 REL100 CARRIER SEND 400KV SRISAILAMSRISAILAM-2 CARRIER PROT CHCH-2 RECEIVED 400KV SRISAILAMSRISAILAM-2 CARRIER PROT CHCH-1 RECEIVED 400KV SRISAILAMSRISAILAM-2 MAINMAIN-2 RAZFE PROT TRIP RESET 400KV SRISAILAMSRISAILAM-2 MAINMAIN-2 RAZFE CARRIER SEND RESET 400KV SRISAILAMSRISAILAM-2 MAINMAIN-1 REL100 START R RESET 400KV SRISAILAMSRISAILAM-2 MAINMAIN-1 REL100 PROT TRIP RESET 400KV SRISAILAMSRISAILAM-2 MAINMAIN-1 REL100 START Y RESET 400KV SRISAILAMSRISAILAM-2 MAINMAIN-1 REL100 CARRIER SEND RESET 400KV SRISAILAMSRISAILAM-2 CARRIER PROT CHCH-2 RECEIVED RESET 400KV SRISAILAMSRISAILAM-2 CARRIER PROT CHCH-1 RECEIVED RESET 400KV SRISAILAMSRISAILAM-2 MAIN CB 752 B B-PH CLOSE 400KV SRISAILAMSRISAILAM-2 MAIN CB 752 R R-PH CLOSE 400KV SRISAILAMSRISAILAM-2 MAIN CB 752 Y Y-PH CLOSE 400KV SRISAILAMSRISAILAM-2 AT/FAT/F-2 TIE CB 852 Y Y-PH CLOSE 400KV SRISAILAMSRISAILAM-2 AT/FAT/F-2 TIE CB 852 R R-PH CLOSE 400KV SRISAILAMSRISAILAM-2 AT/FAT/F-2 TIE CB 852 B B-PH CLOSE
DISTURBANCE RECORDER
R PH VOLTAGE Y PH VOLTAGE B PH VOLTAGE OPEN DELTA VOLTAGE R PH CURRENT Y PH CURRENT B PH CURRENT STAR/NEUTRAL CURRENT
MAIN CB R PH OPEN MAIN CB Y PH OPEN MAIN CB B PH OPEN TIE CB R PH OPEN TIE CB Y PH OPEN TIE CB B PH OPEN MAIN/TIE CB LBB OPTD DIRECT TRIP CH-1/2 OPTD BUSBAR PROT OPTD MAIN-1 PROT OPTD MAIN-2 PROT OPTD OVER VOLTAGE STAGE-1/2 OPTD STUB PROT-1/2 OPTD MAIN-1 PROT CARRIER RECEIVE MAIN-2 PROT CARRIER RECEIVE DF/DT OPTD EVENT NO NAME OF FEEDER DATE & TIME
400 KV TRANSFORMER
ANALOG CHANNELS
1. HV 2. HV 3. HV 4. HV 5. LV 6. LV 7. LV 8. LV 9. HV 10. HV 11. HV 12. HV 13. LV 14. LV 15. LV 16. LV R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT
DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN 2. HV MAIN CB Y-PH OPEN 3. HV MAIN CB B-PH OPEN 4. HV TIE CB R-PH OPEN 5. HV TIE CB Y-PH OPEN 6. HV TIE CB B-PH OPEN 7. LV 220 CB R-PH OPEN 8. LV 220 CB Y-PH OPEN 9. LV 220 CB B-PH OPEN 10. 87 T1 DIFF RLY OPERATED 11. 87 T2 DIFF RLY OPERATED 12. HV 67 ABCN OPERATED 13. LV 67 ABCN OPERATED 14. 51 O/L RLY OPERATED 15. NDR RLY OPERATED 16. HV 99T OVER FLUX OPTD 17. LV 99T OVER FLUX OPTD 18. HV 400 BUSBAR OPERATED 19. LV 220 BUSBAR OPERATED 20. HV MAIN CB LBB OPERATED 21. HV TIE CB LBB OPERATED 22. LV MAIN CB LBB OPERATED 23. HV 86 GR-A/B RELAY OPTD 24. LV 86 GR-A/B RELAY OPTD 25. AT/F 21T UZ RELAY OPERATED 26. OIL TEMP HIGH TRIP 27. WNDG TEMP HV/IV/LV TRIP 28. BUCHHOLZ MAIN/OLTC TRIP 29. PRD 1/ 2 TRIP 30. AT/F NEUTRAL CURRENT TRIP
DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN 2. HV MAIN CB Y-PH OPEN 3. HV MAIN CB B-PH OPEN 4. HV TIE CB R-PH OPEN 5. HV TIE CB Y-PH OPEN 6. HV TIE CB B-PH OPEN 7. 21 MAIN1 REL 521 OPERATED 8. 21 MAIN2 REL 316 OPERATED 9. 87 BUSBAR RELAY OPERATED 10. MAIN CB A/R OPERATED 11. TIE CB A/R OPERATED 12. PSB OPERATED 13. SOTF OPERATED 14. 27 O/V STG-1/2 OPERATED 15. 51 STUB-1/2 OPERATED 16. 87HZ / LZ TEED-1/2 OPERATED 17. MAIN CB LBB OPERATED 18. TIE CB LBB OPERATED 19. DIRECT TRIP CH-1/2 TRIP 20. 21M1 / 21M2 CARRIER RECEIVE 21. 86 GR-A/B RELAY OPERATED 22. 67N DEF/TEF RLY OPERATED 23. DF/DT RELAY OPERATED
CONFIGUARATION OF CONTROL & RELAY PANELS IN ONE AND HALF CIRCUIT BREAKER SCHEME
CB RELAY PANEL 1. BAY CONTROL UNIT 2. BREAKER FAILURE RELAY 3. AUTO RECLOSURE RELAY 4. CHECK SYNCHRONISING RELAY 5. CB ALARM RELAYS 6. CB TRIP CKT SUPERVISION RELAYS 7. 3-PH TRIP UNITS 86-GA, 86-GB & 96/50Z 8. 1-PH TRIP RELAYS M1, M2 - 1 2 Nos 9. DIRECT TRIP RECEIVE RELAYS 10. DC SUPERVISION RELAYS 11. U/V RELAY E/S I/L 12. CB EMERGENCY TNC SWITCH 13. CLOSING AUX RELAYS 14. ENERGY METER WITH TTB 15. PANEL INDICATING LABEL
LINE PROTECTION PANEL 1. MAIN-1 NUM. DIST. PROT 2. MAIN-2 NUM. DIST. PROT. 3. O/V STAGE-1 (EXT/IN BUILT) 4. O/V STAGE-2 (EXT/IN BUILT) 5. DISTURBANCE RECORDER(EXT/INBUILT) 6. DISTANCE TO FAULT (EXT/ INBUILT) 7. DC SUPERVISION RELAYS 8. TEED-1 PROTECTION 9. TEED-2 PROTECTION 10. STUB-1/2 PROTECTION (EXT/ INBUILT) 11. MAIN-1 CARRIER SEL.SWITCH 12. MAIN-2 CARRIER SEL.SWITCH 13. CARRIER RECEIVE RELAYS 14.PANEL INDICATING LABEL
IN ADDITION TO THE ABOVE THE FOLLOWING PANELS WILL BE AVAILABLE 1. CONTROL & RELAY PANEL B/C, B/S, TBC (AS & WHEN REQ) 2. COMMON CONTROL PANEL IS PART OF BUSBAR PANEL I. NOMINCLATURE FOR PANELS ARE NORMALLY MAIN CB C&RPANEL RLA, TIE CB C&R PANEL RTB, HV CB C&RPANEL RTRA, LV CB C&R PANEL RTRC, LINE PROTECTION PANEL RLB, ICT PROTECTION PANEL RTRB, LINE REACTOR PROTECTION PANEL RLRC, BUS REACTOR PROTECTION PANEL RBRA, BUS BAR PANEL RBB,
BCU
MFM1
MFM2
MFM1
MFM2
BCU
APTRANSCO IS FOLLOWING SINGLE BUS BAR PROTECTION. POWERGRID IS FOLLOWING DUPLICATE BUS BAR PROTECTION. ABB, AREVA, SIEMENS, TOSHIBA ARE HAVING DISTRIBUTED ARCHITECTURE. ABB, AREVA, GE, ERL PHASE, SEL ARE HAVING CENTRALISED ARCHITECTURE. LBB IS THE PART OF BUSBAR IS LATEST CONCEPT. INCASE OF DISTRIBUTED ARCHITECTURE BAY/PERIPHERAL UNIT IS DATA AQUSITION UNIT AND COMMUNICATE TO CENTRAL UNIT THROUGH FIBER OPTIC CABLE. DISTRIBUTED ARCHITECTURE - LBB IS INBUILT LOGIC. CENTRALISED ARCHITECTURE - LBB IS STAND ALONE. FINALLY THE CONCEPT AS FOLLOWS IN FUTURE FOR FEEDER : REDUNDANT DISTANCE PROTECTION. FOR ICT : REDUNDANT DIFFERENTIAL PROTECTION. FOR BUSBAR : REDUNDANT BUSBAR PROTECTION.
89BB2 AE CMR
75A,B,L
BAY1 BCU
21L1
87R
BAY2 BCU
A/R+SC 79+25
A/R+SC 79+25
21L2
64R
DC-1
DC-2
59-1&2
D/T-1 D/T-2 Receive Receive Relays Relays
21R
CB PB
50 ZT
CB PB
99R
DC-2
DC-1
A/R+SC 79+25
LBB/ BU 50Z
CB 1&2 TROUBLES HEALTHY LEDS & ALARMS
LBB/ BU 50Z
TRIP COIL
87T2
TRIP COIL
DC-1
DC-1
DC-2
DC-2
67HV
67IV
CB PB
CB PB
99HV
99IV
CB PB
MFM
MFM
DC-2
86 GR-A
DC-1
A/R+SC 79+25
21L2
186 86 R1,Y1,B1 GR-A R2,Y2,B2 286 86 R1,Y1,B1 GR-B R2,Y2,B2 96 / 50Z TTS
DC-2
DC-1
CB PB
MFM
BC BCU
TBC BCU
BS BCU
LBB/ BU 50Z
A/R+SC 79+25
LBB/ BU 50Z
DC-1
DC-1
DC-2
DC-2
CB PB
CB PB
CB PB
DC-2
DC-1
For AC 415V System-2 BCU2 For DC 220V System-2 BCU4 For DC 48V System-2 BCU6 For Fire Fighting System BCU8 For fire & Smoke Detector BCU10
COM581
Main Server
ABB Network Partner AG COM581
Redunt Server
ABB Network Partner AG COM581
C E
C E
Communication Gateway
Network Partner SSLTA 88 SERVICE RS232 SRS485M SRS485M SREDU/M RS485 RS485 1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028
Router to ALDC/SLDC
Network Partner SSLTA 88 SERVICE RS232 SRS485M SRS485M SREDU/M RS485 RS485 1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028
Ethernet Switch
C E
Ethernet Switch
Surveillance system
SUBSTATION AUTOMATION
Alarm/Event Line Printer DM Printer For 15 Min Metering & Trends Hardcopy Printer + MFD
2 Ports for RCC & 2 Ports for ALDC/SLDC COMMUNICATION GATEWAY TO RCC & ALDC
RCC LDC
Base System
Alarm Unit
Base System
Alarm Unit
GPS Meinberg
POWER V1 OVP ACQR LOCK GPS 166 SATELLITE CONTROLLED CLOCK NORMAL OPERATION WED 11.12.1996 MEZ 11.42.25 SV 24 > SY N MENUCLR NEXT INC ACK MEINBERG
Printer Server
Ethernet (TCP/IP)
Network Partner SSLTA 88 SRS485M SRS485M SREDU/M SERVICE RS232 RS485 RS485
Rugged Com/Equivalent Ethernet Switches forming Redundant Managed switched Ethernet LAN on fiber optic medium Interbay bus on IEC61850 Communication Gate way with hot standby for RCC and SLDC For Control and Protection Relays.
Network Partner
LOCAL REMOTE
SET OPERATION
9 10 11 12 13 14 15 16
9 10 11 12 13 14 15 16
9 10 11 12 13 14 15 16
9 10 11 12 13 14 15 16
LOCAL REMOTE
SET OPERATION
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
9 10 11 12 13 14 15 16
9 10 11 12 13 14 15 16
LOCAL REMOTE
SET OPERATION
C E
9 10 11 12 13 14 15 16
C E
9 10 11 12 13 14 15 16
9 10 11 12 13 14 15 16
EM
LOCAL REMOTE SET OPERATION
HYD RAN
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
EM EM
EM EM EM
C E
C E C E
EM
LOCAL REMOTE SET OPERATION
AVR
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
C E
C E
EM
LOCAL REMOTE SET OPERATION
OTH
EM
OTH
OTH
C E
Service Modem
GROUPGROUP -B
MAIN2: 87R2 : REACTOR DIFF PROT BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP FIRE PROTECTION TRIP
GROUPGROUP -B
MAIN-2 : 87L2 : LINE PROTECTION M2 BUILT IN FUNCTIONS TEED-2 PROTECTION (87 TEED2) OVER VOLTAGE STAGE-2 PROT (59L2) DIRECT TRIP CHANNEL-2 RECEIVED GROUP-BB GROUPLBB/BFR RELAY BUSBAR PROTECTION
GROUPGROUP -B
MAIN2 : 87T2: ICT DIFF PROTN B/U : 67LV: ICT LV BACKUP RELAY B/U : 51O/C: ICT NCT B/U RELAY T/F LV OVERFLUX RELAY OVER LOAD PROT (ALARM ONLY) BUCHHOLZ TRIP OLTC BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP
MAIN-1 PROTECTION MAIN-2 PROTECTION SOTF, PSB OVER VOLTAGE STAGE-1 & STAGE-2 (BUILT IN 21 M1) OVER VOLTAGE STAGE-1 & STAGE-2 (BUILT IN 21 M2) STUB, TOC, BOC, TEF, DEF, (BUILT- IN 21M1) STUB, TOC, BOC, TEF, DEF, (BUILT- IN 21M2) TEED PROT-1 TEED PROT-2 DIRECT TRIP CH-1 RECD DIRECT TRIP CH-2 RECD M_CB BFR / LBB PROT T_CB BFR / LBB PROT
21 L1 21 L2
A B
1-PH 1-PH
X X
X X
X X
X X
X X
59 L1 & L2
3-PH
3-PH
B 87T HZ 87T LZ A B A B B B
X X X X X
X X
X X X
X X X
X X X X X
INITIATE ALARM
X X X X X X X X X
PROTECTION RELAY
SYMBOL
OUTPUT
GROUP
AUTO RECLOSURE RELAY (BUILT IN 21M1 & 21M2) SYNC CHECK RELAY (BUILT IN 21M1 & 21M2) 1-PH TRIP UNIT GR-A 3-PH TRIP UNIT GR-A 1-PH TRIP UNIT GR-B 3-PH TRIP UNIT GR-B TRIP SIGNAL FROM 400KV BUSBAR PROTECTION LINE UNDER VOLTAGE RELAY
79 A/R
A&B
CLOSE MAIN CB
PROTECTION RELAY
25 SYNC
A&B
3-PH
186 86 GR A 286 86 GR B
A A B B
X X X X
X X X X
X X X X X X
96 BB
3-PH
27 UV
SYMBOL
OUTPUT
GROUP
PROTECTION RELAY
3-PH TRIP UNIT GR-B 3-PH TRIP UNIT GR-A 1-PH TRIP UNIT GR-A
186
79 A/R
286
50 ZT
50 Z
86B
86A
152 INITIATE M_CB 1PH TRIP UNIT GR GR-A 152 INITIATE M_CB 3PH TRIP UNIT GR GR-A
152 INITIATE M_CB 1PH TRIP UNIT GR GR-B 152 INITIATE M_CB 3PH TRIP UNIT GR GR-B
X
252 INITIATE T_CB 3PH TRIP UNIT GR GR-A 252 INITIATE T_CB 1PH TRIP UNIT GR GR-B 252 INITIATE T_CB 3PH TRIP UNIT GR GR-B 352 INITIATE M_CB 1PH TRIP UNIT GR GR-A 352 INITIATE M_CB 3PH TRIP UNIT GR GR-A 352 INITIATE M_CB 1PH TRIP UNIT GR GR-B 352 INITIATE M_CB 3PH TRIP UNIT GR GR-B 252 INITIATE T_CB TRIPCOIL TRIPCOIL-1 & COIL-2 252 START LBB/BFR OF T_CB 252 CLOSE T_CB DIRECT TRIP CARRIER SEND INITIATE ALARM INITIATE SCADA (DR & SOE)
SYMBOL
3-PH
3-PH
3-PH
OUTPUT
GROUP
DIFFERENTIAL RELAY HV BACKUP PROTECTION HV OVER FLUX PROT OVER LOAD RELAY HV PROT TRIP UNIT GR-A & B REF PROTECTION TEED PROT-1 / 2 STUB PROT AT/F TROUBLE TRIP HV & LV AT/F TROUBLE ALRM M_CB BFR / LBB PROT T_CB BFR / LBB PROT LV_CB BFR / LBB PROT 400KV B/B PROT 220KV B/B PROT LV BACKUP PROTECTION LV OVER FLUX PROT TERI NEUTRAL DISP PROT LV PROT TRIP UNIT GR-A & B
87T(LZ) 67 ABCN 99T HV 51 O/L 86 GR-A/B 64T(HZ) 87T HZ/LZ 50 STUB 86 GR-A/B
X X X X X X X X X X X X
X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X
X X X X X X X X X X
INITIATE ALARM
X X X X X X X X X
PROTECTION RELAY
X X X
B B B 96 96 B B A A/B
X X
X X X X X X X X X X X
X X X X X X
X X X X
X X
GROUP
21 MAIN 1
87 T LZ
21 MAIN 2
9
87 T HZ
9 10 11 12 13 14 15 16
10 11 12 13 14 15 16
2 3 4 5 6 7 8
8686-A : GROUP GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY 8686-B : GROUP GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY
REL 521
ACTIVE START TRIP
INITIATE TIE CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) START MAIN CB AUTO RECLOSURE START TIE CB AUTO RECLOSURE
DISPLAY
CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION
REL 316
ACTIVE START TRIP
INITIATE MAIN CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) INITIATE TIE CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) START MAIN CB AUTO RECLOSURE START TIE CB AUTO RECLOSURE
DISPLAY
INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION
AUTO RECLOSURE
CONDITIONS REQUIRED FOR A/R OPERATION
1. 2. 3. 4. 5. 6. 7. 7. 8. 9. 1. 2. 3. 4. CB CLOSE CONDITION. TIME LAPSED MORE THAN RECLAIM TIME. OPERATING PRESSURE OF CB SUITABLE FOR AUTORECLOSURE OPERATION. DC SUPPLY TO AUTORECLOSURE SHOULD BE AVAILABLE. PREPARE 33-PH TRIP RELAY SHOULD BE RELEASED CONDITION. NO BLOCKING SIGNAL TO AUTORECLOSURE RELAY. POLE DISTURBANCE RELAY TIME SHOULD BE MORE THAN TWICE OF DEAD TIME OF AUTO RECLOSURE. CARRIER FAIL SIGNAL SHOULD NOT COME AT BOTH ENDS. CARRIER SWITCH SHOULD BE IN SERVICE CONDITION. SINGLE PHASE & ZONE ZONE-1 FAULT ONLY.
5. 6.
REL 521
ACTIVE START TRIP
INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION
REL 316
ACTIVE START TRIP
INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION
REL 521
ACTIVE START TRIP
INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION CAME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
REL 316
ACTIVE START TRIP
INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
CARRIER SEND ( IF PUTT OR2 SCHEME SELECTED ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION
REL 521
ACTIVE START TRIP
INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION CAME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
REL 316
ACTIVE START TRIP
INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
TIE CB
REL 521
ACTIVE START TRIP
DISPLAY
C
186 B
E
CO 286 R
REL 316
ACTIVE START TRIP
DISPLAY
TRANSFORMER PROTECTION
(DIFFERENCIAL & REF / 33-PH HZ DIFF PROTECTION)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RET 521
ACTIVE START TRIP
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
87 T1
(LZ)
DISPLAY
RET 316
INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
87 T2
(LZ/HZ)
ACTIVE
START
TRIP
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
TRANSFORMER PROTECTION
( BACKUP DIRECTIONAL O/L & E/F PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
REF 610
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
67 HV ABCN
ACTIVE
START
TRIP
DISPLAY
REX 521
ACTIVE START TRIP
INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
67 LV ABCN
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION
MAIN LBB
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)
REQ 650
ACTIVE START TRIP
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END
DISPLAY
86-GR-A MASTER TRIP RELAY 86-GR-B MASTER TRIP RELAY 96 BB BUSBAR RELAY
CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION OF LINE-1(BAY1) & LINE-2 (BAY3) 1-PH TRIP RELAYS OF MAIN-2 PROTECTION OF LINE-1 (BAY1) & LINE-2 (BAY 3) 86-GR-A MASTER TRIP RELAY
TIE LBB
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )
REQ 650
ACTIVE START TRIP
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES ) BLOCK MAIN CB OF BAY1 & BAY3 AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3 CLOSE INTERLOCK OF TIE CB
DISPLAY
DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES
C
86-GR-B MASTER TRIP RELAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (BAY1 & BAY3)
INITIATION
86-GR-A MASTER TRIP RELAY 86-GR-B MASTER TRIP RELAY 96 BB BUSBAR RELAY
MAIN LBB
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)
RAICA
ACTIVE START TRIP
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INTER TRIP TO 220KV LV MAIN CB INTER TRIP TO 220KV LV TBC CB CLOSE INTERLOCK OF MAIN CB & TIE CB
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)
INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION OF LINE-1(BAY1)
TIE LBB
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )
RAICA
ACTIVE START TRIP
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES ) BLOCK MAIN CB OF BAY1 AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3 CLOSE INTERLOCK OF TIE CB
DISPLAY
86-GR-A MASTER TRIP RELAY
DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES
C
86-GR-B MASTER TRIP RELAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (BAY1)
M_CB OPEN M_CB CLOSE BUS ISO OPEN BUS ISO CLOSE T_CB OPEN T_CB CLOSE TO DIRECT TRIP SEND CH1 (LBB OPTD) TO DIRECT TRIP SEND CH2 (LBB OPTD) TO DIRECT TRIP SEND CH1 (BB OPTD) TO DIRECT TRIP SEND CH2 (BB OPTD) TO TIE LBB TRIP RELAY (50ZTX/96TIE) TO TC-1 TO TC-2 96 HIGH SPEED MASTER TRIP RELAY TO TC-1 TO TC-2 TO 21 L1 (DR) TO 21 L2 (DR) TO CLOSE I/L TO BAY UNIT TO BCU (SOE & A/R BLK)
86-A
86-B
96-A
C E
ABB Network Partner AG REL 316*4
T_CB OPEN
1 9
TO DIRECT TRIP SEND CH1 (LINE RE SIDE) TO DIRECT TRIP SEND CH2 (LINE RE SIDE) TO INTER TRIP SEND CH1 (ICT LV SIDE) TO INTER TRIP SEND CH2(ICT LV SIDE) TO M_L LBB TRIP RELAY (96 M_L CB) TO M_T LBB TRIP RELAY (96 M_T CB) TO TC-1 TO TC-2 96 HIGH SPEED MASTER TRIP RELAY TO TC-1 TO TC-2 TO 21 L1 (DR M_L) TO 21 L2 (DR M_T) TO CLOSE I/L TO BAY UNIT TO BCU (SOE & A/R BLK) TO 87 T1 (DR M_L) TO 87 T2 (DR M_T)
10
11
12
13
14
15
16
T_ISO2 CLOSE
E
86-A
86-B
M_CB OPEN M_CB CLOSE BUS ISO OPEN BUS ISO CLOSE T_CB OPEN T_CB CLOSE TO INTERTRIP TRIP SEND CH1 (LBB OPTD) TO INTERTRIP SEND CH2 (LBB OPTD) TO INTERTRIP SEND CH1 (BB OPTD) TO INTERTRIP SEND CH2 (BB OPTD) TO TIE LBB TRIP RELAY (50ZTX/96TIE) TO TC-1 TO TC-2 96 HIGH SPEED MASTER TRIP RELAY TO TC-1 TO TC-2 TO 87 T1 (DR) TO 87 T2 (DR) TO CLOSE I/L TO BAY UNIT TO BCU (SOE)
TIE LBB OPTD LV M_LBB OPTD LV T_LBB OPTD 96-B CB CLOSE PULSE 86-A 86-B 96-A
M_CB OPEN M_CB CLOSE BUS1 ISO OPEN BUS1 ISO CLOSE BUS2 ISO OPEN BUS2 ISO CLOSE BUS3 ISO OPEN BUS3 ISO CLOSE TBC LBB OPTD TO DIRECT TRIP SEND CH1 (LBB OPTD) TO DIRECT TRIP SEND CH2 (LBB OPTD) TO DIRECT TRIP SEND CH1 (BB OPTD) TO DIRECT TRIP SEND CH2 (BB OPTD) TO TBC LBB TRIP RELAY (96TBC) TO TC-1 TO TC-2 96 HIGH SPEED MASTER TRIP RELAY TO TC-1 TO TC-2 TO 21 L1 (DR) TO 21 L2 (DR) TO CLOSE I/L TO BAY UNIT TO BCU (SOE & A/R BLK)
86-A
86-B
96-A
REB 500
ACTIVE START TRIP
TO TRIP COIL-2 CONCERNED BAY CB TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB DIRECT TRIP SEND CHANNEL-1 TO OTHER END DIRECT TRIP SEND CHANNEL-2 TO OTHER END
DISPLAY
INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE. TO TRIP COIL-1 CONCERNED BAY CB
REB 670
ACTIVE START TRIP
TO TRIP COIL-2 CONCERNED BAY CB TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB DIRECT TRIP SEND CHANNEL-1 TO OTHER END DIRECT TRIP SEND CHANNEL-2 TO OTHER END
DISPLAY
HIGH SPEED TRIP RELAY FOR 1-52 CB HIGH SPEED TRIP RELAY FOR 4-52 CB HIGH SPEED TRIP RELAY FOR 7-52 CB HIGH SPEED TRIP RELAY FOR 1010-52 CB HIGH SPEED TRIP RELAY FOR 1313-52 CB HIGH SPEED TRIP RELAY FOR 1616-52 CB
1-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
4-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
4-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
7-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
7-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
10 10-52CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
1010-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
13 13-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
1313-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
1616-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
16 16-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
+VE
BUSBAR PANEL
HIGH SPEED TRIP RELAY FOR 3-52 CB HIGH SPEED TRIP RELAY FOR 6-52 CB HIGH SPEED TRIP RELAY FOR 9-52 CB HIGH SPEED TRIP RELAY FOR 1212-52 CB HIGH SPEED TRIP RELAY FOR 1515-52 CB HIGH SPEED TRIP RELAY FOR 1818-52 CB
3-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
6-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
6-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
9-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
9-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
12 12-52CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
1212-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
15 15-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
1515-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
1818-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB
18 18-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER
+VE
BUSBAR PANEL
STUB PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
REL 521
ACTIVE START TRIP
INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
REL 316
ACTIVE START TRIP
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
TEED PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RET 521
INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
87 T1
(HZ)
ACTIVE
START
TRIP
DISPLAY
CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
RET 670
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
87 T2
(LZ)
ACTIVE
START
TRIP
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
REL 521
ACTIVE START TRIP
INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
DISPLAY
DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
REL 316
ACTIVE START TRIP
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
DISPLAY
DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
REU 521
ACTIVE START TRIP
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
DISPLAY
DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )
1O% OF V
DISPLAY
PERMISSIVE TRIPPING
MAIN-1 PROTECTION : MAINIT SENDS SIGNAL PARALLEL VIA PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL & PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE CHANNEL..
DIRECT TRIPPING
CHANNEL-2 CHANNELSEND
HERE CHANNEL-1 & CHANNEL-2 SIGNALS ARE MAIN & ALTERNATE CHANNEL 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 87 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 87 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). MAINMAIN -2 PROTECTION : 5. MAIN CB 50 LBB/BFR OPERATED. IT SENDS SIGNAL PARALLEL VIA 6. TIE CB 50 LBB/BFR OPERATED. PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL & 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. CHANNEL. 9. 87 TEED-1 PROTECTION OPERATED 10. 87 TEED-2 PROTECTION OPERATED MAIN-1 PROTECTION : MAIN1. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB. IT RECEIVES SIGNAL PARALLEL VIA 2. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB. PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL & PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE CHANNEL. MAIN-2 PROTECTION : MAIN1. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB. IT RECEIVES SIGNAL PARALLEL VIA PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL & 2. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB. PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE CHANNEL.
CHANNEL-1 CHANNELRECEIVE
CHANNEL-2 CHANNELRECEIVE
21 M1 REL 521
ABB Network Partner AG REL531
ONE END
CARRIER PROTECTION PANEL-2
PT SEND PT RECEIVE PT SEND PT RECEIVE DT SEND DT RECEIVE
OTHER END
CARRIER PROTECTION PANEL-2
PT SEND PT RECEIVE PT SEND PT RECEIVE DT SEND DT RECEIVE
21 M2 REL 316
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
21 M2 REL 316
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
85 LO X1
ACTIVE START TRIP
INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
85 LO X2
ACTIVE START TRIP
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )
TRANSFORMER PROTECTION
( OVER FLUX PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RALK
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
99T HV
ACTIVE
START
TRIP
DISPLAY
RATUB
ACTIVE START TRIP
INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
99T LV
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
TRANSFORMER PROTECTION
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RXIG 21
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
51 O/L
ACTIVE
START
TRIP
DISPLAY
RAEDK1
ACTIVE START TRIP
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
NDR
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )
TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86 86ABB -B REL521 MTR/ MAINMAIN HSTR -1
(BAY 1&2)
OVER VOLTAGE STAGE-1 & STAGE-2 ARE IN BUILT FUNCTIONS OF MAIN-1 & MAIN-2 LINE DISTANCE RELAYS. HV OVER FLUX IS INBUILT FUNCTION OF MAIN-1 ICT DIFFERENTIAL RELAY LV OVER FLUX IS INBUILT FUNCTION OF MAIN-2 ICT DIFFERENTIAL RELAY
TRIP COIL-2
LV - CB
(BAY LV)
TRIP COIL-1
86 86-GA & 86 GB MASTER TRIP / HIGH SPEED TRIP LOCKOUT RELAY OPERATION
TRIP COILCOIL-1 TRIP COIL -1
86 86-GA MASTER TRIP / HIGH SPEED TRIP RELAY
OVER VOLTAGE STAGE-1 (INBUILT MAIN-1) DIRECT TRIP CHANNEL-1 RECEIVED SOTF PROTECTION (INBUILT MAIN-1) DEF,TOC, BOC, STUB (INBUILT MAIN-1) TEED-1 PROTECTION
TIE CB
MAIN CB
TRIP COILCOIL-2
DIRECT TRIP CHANNEL-2 RECEIVED SOTF PROTECTION ( IN BUILT MAIN-2 ) OVER VOLTAGE STAGE-2 DEF, TOC, BOC, STUB ( IN BUILT MAIN-2 ) MAIN LBB OPERATED TIE LBB OPERATED TEED-2 PROTECTION
TRIP COIL -2
86 86-GA & 86 GB MASTER TRIP / HIGH SPEED TRIP LOCKOUT RELAY OPERATION
TRIP COILCOIL-1 TRIP COIL -1
86 86-GA MASTER TRIP / HIGH SPEED TRIP RELAY
T/F DIFFERENTIAL RELAY 87 T B/U O/C & E/F PROTN RLY 67 ABCN INTER TRIP FROM LV SIDE ICT TROUBLES GR-A PROTECTION TRIP ICT HV OVER FLUX RELAY
TIE CB
MAIN CB
TRIP COILCOIL-2
INTER TRIP FROM LV SIDE ICT TROUBLES GR-B PROTECTION TRIP STUB RELAY 50ST MAIN LBB OPERATED TIE LBB OPERATED ICT LV OVER FLUX RELAY INTER TRIP FROM TBC LBB & MANUAL TRIP OF 220KV
TRIP COIL -2
TO INITIATE LBB/BFR OF CONCERNED BAY BLOCK AUTO RECLOSURE OF CONCERNED BAY TO TRIP COIL-1 CONCERNED BAY CB TO TRIP COIL-2 CONCERNED BAY CB INITIATE FLAG RELAY (FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )
TO INITIATE LBB/BFR OF CONCERNED BAY BLOCK AUTO RECLOSURE OF CONCERNED BAY TO TRIP COIL-1 CONCERNED BAY CB TO TRIP COIL-2 CONCERNED BAY CB INITIATE FLAG RELAY (FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )
FOR HV M-CB MASTER TRIP RELAY 86 GR-A 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED. FOR HV M-CB MASTER TRIP RELAY 86 GR-B 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED. FOR HV T-CB MASTER TRIP RELAY 86 GR-A 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED. FOR HV T-CB MASTER TRIP RELAY 86 GR-B 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED.
86 BY
186R2
186Y2
186B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY
286R1
286Y1
286B1
286R2
286Y2
286B2
86GR-A
. .
. .
. .
86GR-B
96BB
186R2
186Y2
186B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY
286R1
286Y1
286B1
286R2
286Y2
286B2
86GR-A
. .
. .
. .
86GR-B
96BB
ISOLATOR INTERLOCKS
S.NO BAY - 1 1 2 3 4 5 6
ISOLATOR OPEN/CLOSE
EQUIPMENTEQUIPMENT -1
EQUIPMENT EQUIPMENT-2
EQUIPMENT EQUIPMENT-3
EQUIPMENT EQUIPMENT-4
1 - 89 1 89 E 1 89 A 1 89 AE 1 89 L 1 89 LE
O O O O O O
O O O O O A
O O O -
152 CB ------
O -
NOTE: All Earth Switches in the Bay are towards Circuit Breaker side only. The Line and Transformer Earth Switches are towards Line & Transformer. O: OPEN C: CLOSE A: ACTED
BAY - 2 7 8 9 10 BAY - 3 11 12 13 14 15 16 3 89 3 89 E 3 89 A 3 89 AE 3 89 T 3 89 TE ISO ES ISO ES ISO ES BB289 E 389 A 389 AE 389 A LV89 E2 389 T O O O O O O 389 AE 389 389 E 389 389 TE LV89 T O O O O O O 389 E -352 CB -252 CB -O O O 352 CB ---352 CB -O O 2 89 A 2 89 AE 2 89 B 2 89 BE ISO ES ISO ES 289 BE 289 B 289 BE 289 B O O O O 289 AE 289 A 289 AE 289 A O O O O 252 CB -252 CB -O O -----
BB189E : BUSBARBUSBAR-1 EARTH SWITCH . BB289E : BUSBARBUSBAR-2EARTH SWITCH . UV RELAY: UNDER VOLTAGE RELAY.
OPEN OPEN
BB289E 3-89AE 3-89E 3-52CB 3-52CB 3-89AE 3-89E 3-52CB 3-89TE 2-52CB LV89E2 3-89 3-89A 3-89 3-89A 3-89T LV89T
1-89
CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE RESET RESET RESET RESET RESET RESET RESET RESET
& 1-52CB & 2-52CB & 3-52CB & 1-52CB & 2-52CB & 3-52CB
REMOTE CLOSE REMOTE CLOSE REMOTE CLOSE LOCAL CLOSE LOCAL CLOSE
LOCAL CLOSE
3-89
OPERATION
&
&
OPERATION
1-89A
2-89BE 3-89E
3-89A
OPERATION
&
1-52CB 1-89LE 2-52CB 1-89 1-89A 1-89 1-89A 1-89L U/V RLY
3-89AE
&
OPERATION
1-89L
3-89T
OPERATION
OPEN
&
OPERATION
1-89E
86GR-A 86GR-B
3-89E
OPERATION
OPEN OPEN
OPERATION
1-89AE
3-89AE
OPERATION
OPERATION
1-89LE
3-89TE
OPERATION
OPERATION
&
OPERATION
2-89A
2-89A 2-89B
OPERATION
&
OPERATION
2-89B
-ve
CB REMOTE CLOSE
21M1 AR
CB AUTO RECLOSE
21M2 AR
86 GRGR-A
-ve
CB REMOTE CLOSE
TIE
AR
CB AUTO RECLOSE
ABB RELAYS
ABB Network Partner AG
REL 521
REL 316*4
10
11
12
13
14
15
16
E E
C E
ABB Relays
ABB Network Partner AG
REL 512
c
E
AREVA RELAYS
P443
P445
P437
E-PAC
P442
GE MULTILIN RELAYS
SIEMENS RELAYS
SEL RELAYS
ENABLED
TRIP
TARGET RESET
SEL- 421
PROTECTION AUTOMATION CONTROL
PH - A PH - B PH - C GND
50 51 79 RESET 79 LOCKOUT
RELAY TEST
CB OPEN
SEL
2ENABLED 3
TRIP
TARGET RESET
SEL- 321- 5 - 2
PROTECTION AUTOMATION CONTROL
ZONE G Q 51 50 O/C
FAULT TYPE
SEL
RELAY HARDWARE
16 / 32 BIT
PC MODEM
IRIG-B RE/CC
NORMALLY 400KV RELAYS SUPPLIED WITH CONFIGUARATION/HARDWARE 1. MIN 4Nos MAX 8Nos COMMAND/TRIP OUTPUTS 2. MIN 24Nos SIGNAL OUTPUTS 3. MIN 14 LED INDICATIONS 4. MIN 24 BINARY INPUTS
FOLLOWING
T/F PROTECTION DIFFERENTIAL RET 670 MICOM P633 MICOM P643 7UT 613/ 2 7UT 513/ 2 DUOBIAS M T-35 / T T-60 SEL 487T T-PRO DIR O/L,E/F REF 6XX MICOM P141
7SJ 62/3/4/5 7SJ 52/3/4/5 ARGUS
MAINMAIN -2 (87) RED 670 MICOM P545 SIPROTEC 7SD532 OHMEGA 311/308 L-60/L 60/L-90 SEL 487L L-PRO
CURVES
QUAD
QUAD/ MHO
QUAD/ MHO MHO
LENS/ TOMAT0
ABB AREVA
6MD66/3
7SJ 62/3/4
7SA 522/6..
SEL TOSHIBA
CAPACITY
3 X 315 MVA (2 + 1**) X 315 MVA 2 X 315 MVA 2 X 315 MVA 3 X 315 MVA 2 X 315 MVA (2 + 1**) X 315 MVA 2 X 315 MVA 2 X 315 MVA (2 + 1**)X 315 MVA 3 X 315 MVA 2 X 315 MVA 2 X 315 MVA
1. SRISAILAM 1 2. GHANAPUR (PGCIL) 1. SRISAILAM 2. GHANAPUR (PGCIL)
FEEDERS
3. KHAMMAM 1&2(PGCIL) 4. YEDDUMAILARAM** 3. GOOTY (PGCIL) 4. KURNOOL**(PGCIL765) 3. KHAMMAM 1&2 (PGCIL) 4. VEMAGIRI 1&2 5. GVK EXTN 1&2 (IPP) 6. GOWTHAMI 1&2 (IPP) 7. KONASEEMA 1&2 (IPP) 8. GMR VASAVI 1&2 (IPP) 2. RAICHUR 2. KADAPA
1. SIMHADRI 1,2,3&4 (NTPC) 2. GAJUWAKA 1&2 (PGCIL) 1. KALAPAKA 1&2 2. GAJUWAKA 1&2 (PGCIL) 3. NUNNA 1&2 (PGCIL) 4. NUNNA 3&4 (NRPT** 1&2) 1. TALLAPALLY 1. CHENNAI RED HILLS 3. KRISHNAPATNAM**1&2 1. KRISHNAPATNAM**1&2
1. RAMAGUNDAM 1. RAMAGUNDAM 3. BTPS 1&2** 1. RAMAGUNDAM 3. VTPS**1&2 1. GAJWEL 1&2* 1. SRISAILAM 1&2 2. VTPS 1&2 1. VTPS 1&2 2. GHANAPUR 4. YEDDUMAILARAM 1&2** 2. GHANAPUR
CAPACITY
2 X 200 MVA 2 X 250 MVA 1 X 315 MVA 3 X 315 MVA 2 X315 MVA 2 X315 MVA 3 X 315 MVA 2 X 315 MVA 2 X 315 MVA 2 X 315 MVA
1. GHANAPUR 1&2 2. GAJWEL 3. MALKARAM
FEEDERS
4. TALLAPALLY 1&2 5. DICHPALLY 6. WARANGAL 7. CHANDRAPUR 1&2 4. NAGARJUNA SAGAR 5. KURNOOL 6. MALKARAM 3. SIMHADRI (VMGR*) 1&2 4. JAIPUR(HVDC) 4. VEMAGIRI 3&4 (#) 5. KHAMMAM 6. NELLORE 1&2 7. LANCO1&2 4. GOOTY(KNL765*) 5. CHINAKAMPALLY 1&2 4. MAMIDIPALLY 1&2 5. KALAPAKA 1&2 4. NEELAMANGALA 5. RAICHUR 1&2 3. KOLAR 4. CHITTOR 2. ALAMATHI 1&2 3. BTPS(KTPS)* 1&2
1. RAMAGUNDAM 1&2 2. MAMIDIPALLY 3. GAJWEL 1. NUNNA(*GMR) 2. KALAPAKA1&2 5. BERAHUMPURBERAHUMPUR-1&2 1. GAJUWAKA(GMR*) 2. VTPS 1&2 3. VEMAGIRI 1&2 1. RAMAGUNDAM 1&2 2. GHANAPUR 3. MAHABOOBNAGAR 1. WARANGAL 2. NUNNA 5. KTPS**1&2 1. TLPLY(KNL765*) 2. SOMANAHALLY 3. KURNOOL 1. TALLAPALLY 1&2 2. SOMANAHALLY 1. NUNNA 1&2 3. MEENAKSHI 1&2
2 X 315 MVA
1. RAMAGUNDAM 2. KHAMMAM
1. GAJUWAKA VEMAGIRI 1&2 IS PROPOSED TO TAKE LILO AT SIMHADRI SS. 2. GAJUWAKA NUNNA CKT IS PROPOSED TO TAKE LILO AT GMR SS. 3. 765KV KURNOOL IS ABOUT TO START, 765KV DC TO RAICHUR & 400KV KUMPP-DC, KNL 400-DC, LILO TLPLY-GOOTY. 4. 765KV NELLORE, EAST GODAVARI(VEMAGIRI), SRIKAKULAM IS UNDER FORMULATION STAGE. 5. VEMAGIRI TO NUNNA (APTRANSCO) 1&2 LINES WILL BE DISCONNECTED AT NUNNA & EXTENDED UP TO NRPT
400KV NETWORK IN AP
GAJUWAKA
HVDC
RAMAGUNDAM
JAIPUR
SIMHADRI
GAJWEL
LANCO
IPP1
ASUPAKA
KTPS
KHAMMAM GUNTUR(NRPT)
SRISAILAM MAMIDIPALLY
KOLAR
765KV SS ANGUL
765KV SS SHOLAPUR
765KV SS KHAMMAM
765KV SS VEMAGIRI
765KV VODAREVU
765KV SS NELLORE
GUNTUR I
GUNTUR II
KOPCL II VPGCL I VPGCL II KOPCL I GMR VASAVI GMR VASAVI KONASEEMA KONASEEMA
GVK EXT I
GVK EXT II
A large Pooling station at Vemagiri being planned with 28 nos 400 kV bays, 8 nos 765 kV line bays, 6 nos transformer bays
DISPLAY