Net Hold Amount = Rs. 633376.40 Net Payable Amount = Rs. 158344.10 Net Payable Amount -- Rs. One Lac Fifty Eight Thousand Three Hundred Forty Four & Ten Paisa Only Note:- Amount Rs. 633376.40 Hold (i.e. 80% of Claimed Value) due to ------a) Description of sizes of structures are not mentioned in R.A. Bill-01 dated 13.02.12, b) Site Measurements for DFT's , as recorded is found unsatisfactory, c) It is advisable to M/s. VINOD KUMAR LODHI to reproduce this Bill (R.A. BILL-01) with detail of sizes of structure. d) DFT Measurement Report is attached herewith.
TRUSST ENGINEERS
MEASUREMENT OF DRY FILM THICKNESS (DFT) OF PAINT WORK FOR M/s. VINOD KUMAR LODHI
SL.NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 DESCRIPTION OF AREA MEASUREMENT (m ) 36 37 34 33 88 63 65 116 90 74 88 52 54 83 49 54 58 63 68 REMARKS
QUALITY WORK STATUS --UNSATISFACTORY 126 HAND RAIL WORK 150 QUALITY WORK STATUS --SATISFACTORY OVERALL WORK STATUS --UNSATISFACTORY
Average = 138
REMARKS:-
1) Tested points are randomly selected, 2) As per Work Order Minimum DFT required = 85 m, 3) Surface preparation also not found satisfactory.
TRUSST ENGINEERS
DATE : 20.04.2012
REMARKS
USST ENGINEERS
HI
USST ENGINEERS
M/S. K J S CEMENT LIMITED FOR- 6000 TPD CEMENT PLANT DATE : 14.05.2012
CONTRACTORDESCRIPTIONM/S. VINOD KUMAR LODHI R.A. BILL-01 ( PAINTING WORK -- CEMENT MILL HOPPER)
RATE (Rs.) / M2 CLAIMED QTY. M2 THIS BILL QTY. M2 DIFF. M2 AMOUNT CLAIMED (Rs.) THIS BILL AMOUNT (Rs.) DIFF./HOLD (Rs.)
SL. NO.
DESCRIPTION
REMARKS
One Coat Red Oxide & Two Coat Paint for -Cement Mill Hopper
190.00
4166.95
3843.78
323.17
791720.00
730318.20
61401.80
ABOVE SUM
4166.95
3843.78
323.17
791720.00
730318.20
61401.80
Note:- a) 10% of Payable Amount Hold i.e. Rs. 73031.82/-Only Due to un-checked DFT.
b) Physical appearance of Paint Work found satisfactory at site.
Net Excess Amount = Rs. 61401.80 Net Hold Amount = Rs. 73031.82 Net Payable Amount = Rs. 657286.38 Net Payable Amount -- Rs. Six Lac Fifty Seven Thousand Two Hundred Eighty Six & Thirty Eight Paisa Only
TRUSST ENGINEERS
page 1 2 3 4 5 6 7
quantity- m2 811.61 96.42 1307.79 859.38 142.51 423.55 202.52 total - m2 3843.78
M/S. K J S CEMENT LIMITED FOR- 6000 TPD CEMENT PLANT DATE : 08.08.2012
CONTRACTORDESCRIPTIONM/S. VINOD KUMAR LODHI R.A. BILL-02 ( PAINTING WORK -- CEMENT MILL HOPPER, CONVEYOR GALLERY & FLY ASH SILO)
SL. NO.
DESCRIPTION One Coat Red Oxide & Two Coat Paint for -Cement Mill Hopper, Conyeyor Gallery & Fly Ash Silo Top Structures Release of 10% Hold Amount in R.A. Bill-01
RATE (Rs.) / M2
CLAIMED QTY. M2
DIFF. M2
DIFF./HOLD (Rs.)
REMARKS
190.00
3093.50
3017.32
76.18
587737.00
573290.80
14446.20
73031.82
73031.82
0.00
ABOVE SUM
3093.50
3017.32
76.18
660768.82
646322.62
14446.20
Net Excess Amount = Rs. 14446.20 Net Payable Amount = Rs. 646322.62
Net Payable Amount -- Rs. Six Lac Forty Six Thousand Three Hundred Twenty Two & Sixty Two Only
TRUSST ENGINEERS
page 1 2 3 4 5 6 7
quantity- m2 811.61 96.42 1307.79 859.38 142.51 423.55 202.52 total - m2 3843.78
DATE : 15.09.2012
SL. NO.
DESCRIPTION One Coat Red Oxide & Two Coat Paint ---Coal Truck Tripler Area One Coat Red Oxide & Two Coat Paint ---Gypsum Shed Area & Conveyor Belt
RATE (Rs.) / M2
CLAIMED QTY. M2
DIFF. M2
DIFF./HOLD (Rs.)
REMARKS
190.00
664.88
660.38
4.50
126326.44
125472.20
854.24
Excess Qty.
190.00
1231.74
1153.72
78.02
234030.60
219206.80
14823.80
Excess Qty.
ABOVE SUM
1896.62
1814.10
82.52
360357.04
344679.00
15678.04
Net Excess Amount = Rs. 15678.04 Net Payable Amount = Rs. 344679.00 Net Payable Amount -- Rs. Three Lac Forty Four Thousand Six Hundred Seventy Nine Only
TRUSST ENGINEERS
DATE : 03.11.2012
CONTRACTORDESCRIPTIONM/S. VINOD KUMAR LODHI R.A. BILL-05 ( PAINTING WORK -- WORK SHOP AREA )
SL. NO.
DESCRIPTION
RATE (Rs.) / M2
CLAIMED QTY. M2
DIFF. M2
DIFF./HOLD (Rs.)
One Coat Red Oxide & Two Coat Paint for -Structures at Work Shop Area
190.00
4266.34
4227.78
38.56
810604.60
803278.20
7326.40
ABOVE SUM
4266.34
4227.78
38.56
810604.60
803278.20
7326.40
Net Excess Amount = Rs. 7326.40 Net Payable Amount = Rs. 803278.20
Net Payable Amount -- Rs. Eight Lac Three Thousand Two Hundred Seventy Eight & Twenty Paisa Only
TRUSST ENGINEERS
ATE : 03.11.2012
REMARKS
Only
T ENGINEERS