Cluster Name: 8
Prepared By:
Reviewed By:
Page 1 of 13
Table of Contents
1 INTRODUCTION....................................................................................................2
1.1 DT Route/Area..............................................................................................3
1.2 On-Air Status of Cluster..............................................................................4
2 PROCEDURE........................................................................................................5
3 CALL SUMMARY..................................................................................................5
1 Introduction
Page 2 of 13
1.1 DT Route/Area
Page 3 of 13
1.2 On-Air Status of Cluster
Page 4 of 13
2 Procedure
The procedure for the drive tests is described below:
Cluster drive tests shall perform 3 call scenarios: short call, long call, and PS call. GPRS functionality
drive tests were performed by downloading a huge file from an FTP server throughout the cluster drive
test route. Configuration of MS is as follows in the DT Kit:
3 Call Summary
Page 5 of 13
4 RF Indicators Distribution Plots
4.1 Serving Cell ID
Page 6 of 13
4.2 RxLev(Sub)
Page 7 of 13
4.3 RxQuality(Sub)
Page 8 of 13
4.3 C/I
Page 9 of 13
4.4 Handover Failure
No call drop
Page 10 of 13
Page 11 of 13
Page 12 of 13
5 Recommendation & Technical Overview
• Two handover failures were occurred on the main lobe of Lakkidi site’s first sector
after 2.5 Km, Due to poor signal strength(above -90) at the edge .
• This cluster is having terrain issue(thick vegetation ,Amsl variation),so our signal
strength is poor in some areas.
6 Punch List
Yes No
Page 13 of 13