Vous êtes sur la page 1sur 13

Cluster Acceptance Report

Cluster Name: 8

Cluster Stage 100%

Prepared By:

Reviewed By:

Page 1 of 13
Table of Contents

1 INTRODUCTION....................................................................................................2

1.1 DT Route/Area..............................................................................................3
1.2 On-Air Status of Cluster..............................................................................4

2 PROCEDURE........................................................................................................5

3 CALL SUMMARY..................................................................................................5

4 RF INDICATORS DISTRIBUTION PLOTS...........................................................6

4.1 Serving Cell ID..............................................................................................6


4.2 RxLev(Sub)...................................................................................................7
4.3 RxQuality(Sub).............................................................................................8
4.3 C/I...............................................................................................................9
4.4 Handover Failure........................................................................................10
4.5 Call Drop.....................................................................................................10
4.6 Data Throughput(Downlink) ....................................................................10

5 RECOMMENDATION & TECHNICAL OVERVIEW............................................13

6 PUNCH LIST .......................................................................................................13

1 Introduction

Page 2 of 13
1.1 DT Route/Area

Page 3 of 13
1.2 On-Air Status of Cluster

Cluster Completion : 100%

Page 4 of 13
2 Procedure
The procedure for the drive tests is described below:

Cluster drive tests shall perform 3 call scenarios: short call, long call, and PS call. GPRS functionality
drive tests were performed by downloading a huge file from an FTP server throughout the cluster drive
test route. Configuration of MS is as follows in the DT Kit:

 MS1= Long call (MS to MSC Test Number ,continous call )


 MS2 = Short call (MS to MSC Test Number, 30sec., 3 sec. delay)
 MS3 = EGPRS downloading

3 Call Summary

Content Couter & KPI Value Remark

Call Drop(Long Call) Number of Call Drops 0


Total Call duration Contionous call
Call Drop Rate(<=1.2%) 0%
Call Setup(Short Call) Number of call setup failed 0
Number of Call Attempt 141
Call Setup Succ. Rate(>=97%) 100%
Handover(Long Call) Handover Success 27
Handover Attempt 29
HO Succ. Rate( >=97%) 93.10%
Downlink Throughput Average Downlink Throughput 30.48

Page 5 of 13
4 RF Indicators Distribution Plots
4.1 Serving Cell ID

Page 6 of 13
4.2 RxLev(Sub)

Legend Bin count Percentage


-65 to -10 2758 24.40
-75 to -65 2894 25.06
-85 to -75 3101 27.43
-95 to -85 2096 18.54
-120 to -95 455 4.02
Total 11304 100

Page 7 of 13
4.3 RxQuality(Sub)

Legend Bin count Percentage


0-4 10610 93.86
5 296 1.79
6 196 1.73
7 296 2.62
Total 11304 100

Page 8 of 13
4.3 C/I

Legend Bin count Percentage


20 to 35 9545 89.10
12 to 20 1102 10.29
9 to 12 64 0.60
5 to 9 2 0.02
0 to 5 0 0
-10 to 0 0 0
TOTAL 10713 100

Page 9 of 13
4.4 Handover Failure

4.5 Call Drop

No call drop

4.6 Data Throughput(Downlink)

Page 10 of 13
Page 11 of 13
Page 12 of 13
5 Recommendation & Technical Overview

• Two handover failures were occurred on the main lobe of Lakkidi site’s first sector
after 2.5 Km, Due to poor signal strength(above -90) at the edge .
• This cluster is having terrain issue(thick vegetation ,Amsl variation),so our signal
strength is poor in some areas.

6 Punch List

Name / Signature of closing


Sr. No. Item Date Closed
authority

ALL TEST COMPLETED WITHOUT ANY ITEMS ON PUNCH LIST

Yes No

Page 13 of 13

Vous aimerez peut-être aussi