Académique Documents
Professionnel Documents
Culture Documents
Macusani
Hombres
Mujeres
Urbana
Hombres
Mujeres
Rural
Hombres
Mujeres
Poblacin
11707
5845
5862
8645
4320
4325
3062
1525
1537
73.84
26.16
100.00
DESCRIPCIN
Cantidad de manzanas
Cantidad de viviendas
Promedio de personas por
Poblacin base al 2008
Tasa de crecimiento
CANTIDAD
59
636
7
4452
0.0169
Grupos de edades
Menores a 16 aos
Entre 16 y 25 aos
Entre 26 y 60 aos
Total
Hombres
552
625
1168
2345
Mujeres
543
603
961
2107
Total
1095
1228
2129
4452
%
24.60
27.58
47.82
100.00
DESCRIPCIN
1
2
3
4
5
6
7
8
9
10
DESCRIPCIN
INFECCIONES AGUDAS DE LAS VAS RESPIRATO
ENFERMEDADES DEL ESTOMAGO, PARASITARIAS E INFECCIOSAS INTESTINALES
OTRAS INFECCIONES AGUDAS DE LAS VIAS RESPIRATORIAS
DERMATITIS Y ECZEMA (L20 - L30)
ENFERMEDADES CRNICAS DE LAS VAS RESPIRATORIAS
INFECCIONES DE LA PIEL Y DEL TEJIDO SUBCUTANEO
OTRAS ENFERMEDADES DEL SISTEMA URINARIO
TRASTORNOS DE LA CONJUNTIVA (H10 - H13)
SINTOMAS Y SIGNOS GENERALES (R50 - R69)
OTROS
TOTAL
Sin ni
Educa
Super
Super
Super
Super
TOTA
N
4762
813
741
421
402
311
274
192
110
813
8839
DISTRITO MACUSANI
Primaria
Secundaria
Sin nivel
Educacin inicial
Superior no univ. completo
Superior univ. completo
Superior no univ. incompleto
Superior univ. incompleto
TOTAL
POBLACIN %
4676
2629
2072
340
320
316
277
173
10803
43.28
24.34
19.18
3.15
2.96
2.93
2.56
1.60
100.00
Jr. Corani
Mz. C16
Total
Calle/Pasaje
Av. Mi Per
Paralela calle 8 de Diciembre
Paralela plaza Tupa Amar
Mz 028
Mz. 023
Mz. 021
Jr. Corani
Mz. C16
Total
Longitud (m.)
8.00
167.23
121.56
94.12
57.85
87.33
11.64
74.72
622.45
Ancho (m.)
Solo Ancho
Desigual
Desigual
Promed. 3.0
Desigual
Ancho
20
Caractersticas
Capa de rodadura de tierra y arena
suelta, sin veredas, tiene condiciones
inadecuadas para el acceso peatonal
y ciclistas. Defensa riberea
inconclusa.
Secciones transversales,
ondulados y longitudinales
irregulares.
Sumergidos (m
Defensa riber
Longitud de la
Ancho de defe
Altura de la de
Baranda de tu
Ciclo va y ma
Longitud de la
Ciclo va
rea verde de
Calzada de pie
Prgola virtual
Puente colgan
Caractersticas Tcnicas
Calzada
Longitud
Topografa
Ancho de va (m.)
Ancho de bermas (m.)
Velocidad directriz (Km. / hora) en bicicleta
Tipo de superficie de rodadura
Estado de la va
Espesor de pavimento (m.)
Sardineles
Sumergidos (m.)
Defensa riberea
Longitud de la defensa
Ancho de defensa (m.)
Altura de la defensa (m.)
Baranda de tubo de fierro (m.)
Ciclo va y malecn
Longitud de la ciclo va (m.)
Ciclo va
rea verde dentro (m2)
Calzada de piedra laja (m2)
Prgola virtual (m2)
Puente colgante de madera (Ml.)
Con Proyecto
622.45
Ondulada
8.2/3.5
1.80-3.30
15-20
Pavimentado
Bueno
0.05
105 Aprox.
265.50
5.77
4.86 Aprox.
265.50
1714
1.20
1492
1350
45
4.00 Aprox.
Calzada y graderas
IMT (Peatn y ciclista/da)
Longitud
Cobertura con pavimento (%)
Ancho de superficie de rodadura
Velocidad directriz (Km. / hora) en
Tipo de superficie de rodadura
Pendiente mxima (%)
Ancho de bermas (m.)
Bombeo (%)
Espesor de afirmado
Gradera con vista al ro (m2)
Defensa riberea
Longitud de la defensa
Ancho de defensa (m.)
Altura de la defensa (m.)
Baranda de tubo de fierro (m.)
Ciclo va y malecn
Longitud de la ciclo va (m.)
Ciclo va
rea verde dentro (m2)
Prgola virtual (m2)
Puente colgante de madera (Ml.)
Caractersticas Tcnicas
Calzada y graderas
IMT (Peatn y ciclista/da)
Longitud
Cobertura con pavimento (%)
Ancho de superficie de rodadura
Velocidad directriz (Km. / hora) en bicicleta
Tipo de superficie de rodadura
Pendiente mxima (%)
Ancho de bermas (m.)
Bombeo (%)
Espesor de afirmado
Gradera con vista al ro (m2)
Defensa riberea
Longitud de la defensa
Ancho de defensa (m.)
Altura de la defensa (m.)
Baranda de tubo de fierro (m.)
Sin Proyecto
Con Proyecto
<250
622.45
0
Variable
>250
622.45
30
6.00-12.00
15-20
Pavimentado
Variable
Variable
1
2"
350
Tierra
Variable
0
256.50
265.50
5.77
4.86 Aprox.
265.50
Ciclo va y malecn
Longitud de la ciclo va (m.)
Ciclo va
rea verde dentro (m2)
Prgola virtual (m2)
Puente colgante de madera (Ml.)
0
0
0
0
1714
1.20
1492
45
4.00 Aprox.
Ao
0
1
2
3
4
5
6
7
8
9
10
Poblacin Benefiaciaria
Defensa Riberea
1,000
1,017
1,034
1,052
1,069
1,087
1,106
1,124
1,143
1,163
1,182
Poblacin Benefiaciaria
Malecn Recreacional
3,452
3,510
3,570
3,630
3,691
3,754
3,817
3,882
3,947
4,014
4,082
Poblacin
Beneficiaria
4,452
4,527
4,604
4,682
4,761
4,841
4,923
5,006
5,091
5,177
5,264
COSTO (S/)
439,284.54
17,314.74
18,039.02
75,506.76
2,102.36
5,837.99
4,929.07
9,728.29
37,702.23
639.84
1,581.16
24,166.29
91,539.69
12,555.15
5,089.47
12,000.00
32,267.95
22,887.21
11,397.32
35,360.67
8,639.33
10,000.00
251,630.62
4,747.14
51,645.14
195,238.34
17,913.89
1,301.87
128.55
193.54
1,617.59
1,428.90
355.94
437.40
3,453.30
8,056.80
540.00
400.00
708,829.05
106,324.36
35,441.45
850,594.86
COSTO (S/)
368,999.01
14,544.38
15,152.78
63,425.68
1,765.98
4,903.91
4,140.42
8,171.76
31,669.87
537.47
1,328.17
20,299.68
76,893.34
10,546.33
4,275.15
10,080.00
27,105.08
19,225.26
9,573.75
29,702.96
7,257.04
8,400.00
211,369.72
3,987.60
43,381.92
164,000.21
15,047.67
1,093.57
107.98
162.57
1,358.78
1,200.28
298.99
367.42
2,900.77
6,767.71
453.60
336.00
595,416.40
75,022.47
25,007.49
695,446.36
COSTO (S/)
439,284.54
17,314.74
18,039.02
75,506.76
2,102.36
5,837.99
4,929.07
9,728.29
37,702.23
639.84
1,581.16
24,166.29
91,539.69
12,555.15
5,089.47
12,000.00
32,267.95
22,887.21
11,397.32
35,360.67
8,639.33
10,000.00
261,638.07
4,747.14
51,645.14
205,245.79
17,913.89
1,301.87
128.55
193.54
1,617.59
1,428.90
355.94
437.40
3,453.30
8,056.80
540.00
400.00
718,836.50
107,825.48
35,941.83
862,603.80
COSTO (S/)
368,999.01
14,544.38
15,152.78
63,425.68
1,765.98
4,903.91
4,140.42
8,171.76
31,669.87
537.47
1,328.17
20,299.68
76,893.34
10,546.33
4,275.15
10,080.00
27,105.08
19,225.26
9,573.75
29,702.96
7,257.04
8,400.00
219,775.98
3,987.60
43,381.92
172,406.46
15,047.67
1,093.57
107.98
162.57
1,358.78
1,200.28
298.99
367.42
2,900.77
6,767.71
453.60
336.00
603,822.66
76,081.66
25,360.55
705,264.87
DESCRIPCIN
COSTOS DE OPERACIN
UNIFORME DE LIMPIEZA
ESCOBAS PARA 2 PERSONAS
RECOGEDORES ACERADOS DE 2mm. C/ MANGO DE
TUBO ACERADO DE 2mm.
CILINDRO
ACCESORIOS VARIOS
FRANELA
GUANTES DE JEBE
PERSONAL DE LIMPIEZA POR 2 HRS. DIARIAS
COSTO DE MANTENIMIENTO
ARQUITECTURA
ESTRUCTURAS
INSTALACIONES ELCTRICAS
INSTALACIONES SANITARIAS
COSTO TOTAL
U.M.
CANTIDAD
PRECIO (S/)
COSTO / AO (S/)
1,814.00
80.00
160.00
5.00
120.00
UND
UND
UND
2.00
24.00
6.00
5.00
30.00
UNID
GLB
M
UND
UND
2.00
6.00
20.00
12.00
2.00
30.00
90.00
1.60
6.00
400.00
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1436.00
1881.00
291.00
209.00
60.00
540.00
32.00
72.00
800.00
3,817.00
1,436.00
1,881.00
291.00
209.00
5,631.00
DESCRIPCIN
COSTOS DE OPERACIN
UNIFORME DE LIMPIEZA
ESCOBAS PARA 2 PERSONAS
RECOGEDORES ACERADOS DE 2mm. C/ MANGO DE
TUBO ACERADO DE 2mm.
CILINDRO
ACCESORIOS VARIOS
FRANELA
GUANTES DE JEBE
PERSONAL DE LIMPIEZA POR 2 HRS. DIARIAS
COSTO DE MANTENIMIENTO
ARQUITECTURA
ESTRUCTURAS
INSTALACIONES ELCTRICAS
INSTALACIONES SANITARIAS
COSTO TOTAL
U.M.
CANTIDAD
PRECIO (S/)
COSTO / AO (S/)
1,331.76
67.20
134.40
4.20
100.80
UND
UND
UND
2.00
24.00
6.00
4.20
25.20
UNID
GLB
M
UND
UND
2.00
6.00
20.00
12.00
2.00
25.20
75.60
1.34
5.04
240.00
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1206.24
1580.04
244.44
175.56
50.40
453.60
26.88
60.48
480.00
3,206.28
1,206.24
1,580.04
244.44
175.56
4,538.04
DESCRIPCIN
COSTOS DE OPERACIN
UNIFORME DE LIMPIEZA
ESCOBAS PARA 2 PERSONAS
RECOGEDORES ACERADOS DE 2mm. C/ MANGO DE
TUBO ACERADO DE 2mm.
CILINDRO
ACCESORIOS VARIOS
FRANELA
GUANTES DE JEBE
PERSONAL DE LIMPIEZA POR 2 HRS. DIARIAS
COSTO DE MANTENIMIENTO
ARQUITECTURA
ESTRUCTURAS
INSTALACIONES ELCTRICAS
INSTALACIONES SANITARIAS
COSTO TOTAL
U.M.
CANTIDAD
PRECIO (S/)
COSTO / AO (S/)
1,814.00
80.00
160.00
5.00
120.00
UND
UND
UND
2.00
24.00
6.00
5.00
30.00
UNID
GLB
M
UND
UND
2.00
6.00
20.00
12.00
2.00
30.00
90.00
1.60
6.00
400.00
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1436.00
2077.34
291.00
209.00
60.00
540.00
32.00
72.00
800.00
4,013.34
1,436.00
2,077.34
291.00
209.00
5,827.34
DESCRIPCIN
COSTOS DE OPERACIN
UNIFORME DE LIMPIEZA
ESCOBAS PARA 2 PERSONAS
RECOGEDORES ACERADOS DE 2mm. C/ MANGO DE
TUBO ACERADO DE 2mm.
CILINDRO
ACCESORIOS VARIOS
FRANELA
GUANTES DE JEBE
PERSONAL DE LIMPIEZA POR 2 HRS. DIARIAS
COSTO DE MANTENIMIENTO
ARQUITECTURA
ESTRUCTURAS
INSTALACIONES ELCTRICAS
INSTALACIONES SANITARIAS
COSTO TOTAL
U.M.
CANTIDAD
PRECIO (S/)
COSTO / AO (S/)
1,331.76
67.20
134.40
4.20
100.80
UND
UND
UND
2.00
24.00
6.00
4.20
25.20
UNID
GLB
M
UND
UND
2.00
6.00
20.00
12.00
2.00
25.20
75.60
1.34
5.04
240.00
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1206.24
1744.97
244.44
175.56
50.40
453.60
26.88
60.48
480.00
3,371.21
1,206.24
1,744.97
244.44
175.56
4,702.97
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
850,594.86
0.00
0.00
0.00
850,594.86
1.00
850,594.86
1
0.00
5,631.00
0.00
5,631.00
5,631.00
0.90
5,072.97
2
0.00
5,631.00
0.00
5,631.00
5,631.00
0.81
4,570.25
7
0.00
5,631.00
0.00
5,631.00
5,631.00
0.48
2,712.22
8
0.00
5,631.00
0.00
5,631.00
5,631.00
0.43
2,443.44
9
0.00
5,631.00
0.00
5,631.00
5,631.00
0.39
2,201.30
10
0.00
5,631.00
0.00
5,631.00
5,631.00
0.35
1,983.15
871,846.76
4,858
0.11
179.47
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
695,446.36
0.00
0.00
0.00
695,446.36
1.00
695,446.36
1
0.00
4,538.04
0.00
4,538.04
4,538.04
0.90
4,088.32
2
0.00
4,538.04
0.00
4,538.04
4,538.04
0.81
3,683.18
712,573.33
4,858
0.11
146.68
7
0.00
4,538.04
0.00
4,538.04
4,538.04
0.48
2,185.79
8
0.00
4,538.04
0.00
4,538.04
4,538.04
0.43
1,969.18
9
0.00
4,538.04
0.00
4,538.04
4,538.04
0.39
1,774.03
10
0.00
4,538.04
0.00
4,538.04
4,538.04
0.35
1,598.23
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
862,603.80
0.00
0.00
0.00
862,603.80
1.00
862,603.80
1
0.00
5,827.34
0.00
5,827.34
5,827.34
0.90
5,249.86
2
0.00
5,827.34
0.00
5,827.34
5,827.34
0.81
4,729.60
7
0.00
5,827.34
0.00
5,827.34
5,827.34
0.48
2,806.79
8
0.00
5,827.34
0.00
5,827.34
5,827.34
0.43
2,528.64
9
0.00
5,827.34
0.00
5,827.34
5,827.34
0.39
2,278.05
10
0.00
5,827.34
0.00
5,827.34
5,827.34
0.35
2,052.30
884,596.70
4,858
0.11
182.09
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
705,264.87
0.00
0.00
0.00
705,264.87
1.00
705,264.87
1
0.00
4,702.97
0.00
4,702.97
4,702.97
0.90
4,236.91
2
0.00
4,702.97
0.00
4,702.97
4,702.97
0.81
3,817.04
723,014.29
4,858
0.11
148.83
7
0.00
4,702.97
0.00
4,702.97
4,702.97
0.48
2,265.23
8
0.00
4,702.97
0.00
4,702.97
4,702.97
0.43
2,040.74
9
0.00
4,702.97
0.00
4,702.97
4,702.97
0.39
1,838.51
10
0.00
4,702.97
0.00
4,702.97
4,702.97
0.35
1,656.31
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
935,654.35
0.00
0.00
0.00
935,654.35
1.00
935,654.35
1
0.00
5,631.00
0.00
5,631.00
5,631.00
0.90
5,072.97
2
0.00
5,631.00
0.00
5,631.00
5,631.00
0.81
4,570.25
7
0.00
5,631.00
0.00
5,631.00
5,631.00
0.48
2,712.22
8
0.00
5,631.00
0.00
5,631.00
5,631.00
0.43
2,443.44
9
0.00
5,631.00
0.00
5,631.00
5,631.00
0.39
2,201.30
10
0.00
5,631.00
0.00
5,631.00
5,631.00
0.35
1,983.15
956,906.24
4,858
0.11
196.98
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
750,394.79
0.00
0.00
0.00
750,394.79
1.00
750,394.79
1
0.00
4,538.04
0.00
4,538.04
4,538.04
0.90
4,088.32
2
0.00
4,538.04
0.00
4,538.04
4,538.04
0.81
3,683.18
767,521.75
4,858
0.11
157.99
7
0.00
4,538.04
0.00
4,538.04
4,538.04
0.48
2,185.79
8
0.00
4,538.04
0.00
4,538.04
4,538.04
0.43
1,969.18
9
0.00
4,538.04
0.00
4,538.04
4,538.04
0.39
1,774.03
10
0.00
4,538.04
0.00
4,538.04
4,538.04
0.35
1,598.23
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
948,864.18
0.00
0.00
0.00
948,864.18
1.00
948,864.18
1
0.00
5,827.34
0.00
5,827.34
5,827.34
0.90
5,249.86
2
0.00
5,827.34
0.00
5,827.34
5,827.34
0.81
4,729.60
7
0.00
5,827.34
0.00
5,827.34
5,827.34
0.48
2,806.79
8
0.00
5,827.34
0.00
5,827.34
5,827.34
0.43
2,528.64
9
0.00
5,827.34
0.00
5,827.34
5,827.34
0.39
2,278.05
10
0.00
5,827.34
0.00
5,827.34
5,827.34
0.35
2,052.30
970,857.08
4,858
0.11
199.85
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
760,989.07
0.00
0.00
0.00
760,989.07
1.00
760,989.07
1
0.00
4,702.97
0.00
4,702.97
4,702.97
0.90
4,236.91
2
0.00
4,702.97
0.00
4,702.97
4,702.97
0.81
3,817.04
778,738.50
4,858
0.11
160.30
7
0.00
4,702.97
0.00
4,702.97
4,702.97
0.48
2,265.23
8
0.00
4,702.97
0.00
4,702.97
4,702.97
0.43
2,040.74
9
0.00
4,702.97
0.00
4,702.97
4,702.97
0.39
1,838.51
10
0.00
4,702.97
0.00
4,702.97
4,702.97
0.35
1,656.31
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
1020713.83
0.00
0.00
0.00
1020713.83
1.000
1020713.83
1
0
5631.00
0.00
5631.00
5631.00
0.901
5072.97
2
0
5631.00
0.00
5631.00
5631.00
0.812
4570.25
7
0
5631.00
0.00
5631.00
5631.00
0.482
2712.22
8
0
5631.00
0.00
5631.00
5631.00
0.434
2443.44
9
0
5631.00
0.00
5631.00
5631.00
0.391
2201.30
10
0
5631.00
0.00
5631.00
5631.00
0.352
1983.15
1041965.73
4,858
0.11
214.48
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
818612.49
0.00
0.00
0.00
818612.49
1.000
818612.49
1
0.00
4,538.04
0.00
4,538.04
4,538.04
0.901
4088.32
2
0.00
4,538.04
0.00
4,538.04
4,538.04
0.812
3683.18
835739.46
4,858
0.11
172.03
7
0.00
4,538.04
0.00
4,538.04
4,538.04
0.482
2185.79
8
0.00
4,538.04
0.00
4,538.04
4,538.04
0.434
1969.18
9
0.00
4,538.04
0.00
4,538.04
4,538.04
0.391
1774.03
10
0.00
4,538.04
0.00
4,538.04
4,538.04
0.352
1598.23
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
1,035,124.56
0.00
0.00
0.00
1,035,124.56
1.00
1,035,124.56
1
0.00
5,827.34
0.00
5,827.34
5,827.34
0.90
5,249.86
2
0.00
5,827.34
0.00
5,827.34
5,827.34
0.81
4,729.60
7
0.00
5,827.34
0.00
5,827.34
5,827.34
0.48
2,806.79
8
0.00
5,827.34
0.00
5,827.34
5,827.34
0.43
2,528.64
9
0.00
5,827.34
0.00
5,827.34
5,827.34
0.39
2,278.05
10
0.00
5,827.34
0.00
5,827.34
5,827.34
0.35
2,052.30
1,057,117.46
4,858
0.11
217.60
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
830,169.90
0.00
0.00
0.00
830,169.90
1.00
830,169.90
1
0.00
4,702.97
0.00
4,702.97
4,702.97
0.90
4,236.91
2
0.00
4,702.97
0.00
4,702.97
4,702.97
0.81
3,817.04
847,919.33
4,858
0.11
174.54
7
0.00
4,702.97
0.00
4,702.97
4,702.97
0.48
2,265.23
8
0.00
4,702.97
0.00
4,702.97
4,702.97
0.43
2,040.74
9
0.00
4,702.97
0.00
4,702.97
4,702.97
0.39
1,838.51
10
0.00
4,702.97
0.00
4,702.97
4,702.97
0.35
1,656.31
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
1105773.32
0.00
0.00
0.00
1105773.32
1.000
1105773.32
1
0
5,631.00
0.00
5,631.00
5,631.00
0.901
5072.97
2
0
5,631.00
0.00
5,631.00
5,631.00
0.812
4570.25
7
0
5,631.00
0.00
5,631.00
5,631.00
0.482
2712.22
8
0
5,631.00
0.00
5,631.00
5,631.00
0.434
2443.44
9
0
5,631.00
0.00
5,631.00
5,631.00
0.391
2201.30
10
0
5,631.00
0.00
5,631.00
5,631.00
0.352
1983.15
1127025.21
4,858
0.11
231.99
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
886,830.20
0.00
0.00
0.00
886,830.20
1.00
886,830.20
1
0.00
4,538.04
0.00
4,538.04
4,538.04
0.90
4,088.32
2
0.00
4,538.04
0.00
4,538.04
4,538.04
0.81
3,683.18
903,957.17
4,858
0.11
186.08
7
0.00
4,538.04
0.00
4,538.04
4,538.04
0.48
2,185.79
8
0.00
4,538.04
0.00
4,538.04
4,538.04
0.43
1,969.18
9
0.00
4,538.04
0.00
4,538.04
4,538.04
0.39
1,774.03
10
0.00
4,538.04
0.00
4,538.04
4,538.04
0.35
1,598.23
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
1,121,384.94
0.00
0.00
0.00
1,121,384.94
1.00
1,121,384.94
1
0.00
5,827.34
0.00
5,827.34
5,827.34
0.90
5,249.86
2
0.00
5,827.34
0.00
5,827.34
5,827.34
0.81
4,729.60
7
0.00
5,827.34
0.00
5,827.34
5,827.34
0.48
2,806.79
8
0.00
5,827.34
0.00
5,827.34
5,827.34
0.43
2,528.64
9
0.00
5,827.34
0.00
5,827.34
5,827.34
0.39
2,278.05
10
0.00
5,827.34
0.00
5,827.34
5,827.34
0.35
2,052.30
1,143,377.84
4,858
0.11
235.36
INVERSIN
COSTO DE O. M.
COSTOS DE O. M. SIN PROYECTO
COSTOS CON PROYECTO
TOTAL COSTOS INCREMENTALES
FACTOR DE ACTUALIZACION
VALOR ACTUAL DE LOS COSTOS
0
899,350.72
0.00
0.00
0.00
899,350.72
1.00
899,350.72
1
0.00
4,702.97
0.00
4,702.97
4,702.97
0.90
4,236.91
2
0.00
4,702.97
0.00
4,702.97
4,702.97
0.81
3,817.04
917,100.15
4,858
0.11
188.78
7
0.00
4,702.97
0.00
4,702.97
4,702.97
0.48
2,265.23
8
0.00
4,702.97
0.00
4,702.97
4,702.97
0.43
2,040.74
9
0.00
4,702.97
0.00
4,702.97
4,702.97
0.39
1,838.51
10
0.00
4,702.97
0.00
4,702.97
4,702.97
0.35
1,656.31