Vous êtes sur la page 1sur 1

0 26

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41 26

POWER GENERATION HV SWITCHROOM 40-LER81120


25

C ONTI NUE DF ROM DRAW I NG PGHUC VE DSL D40 0 0 0 1

25

24

BUS A BUS B

40-SWG82320 40-SWG82321

24

23

23

250A

250A 630A 630A 630A 630A NC NO 630A NO 630A NO NC

250A

250A

160A 630A 630A NO 22

22

NO

NO

NC

NO

NO NC

NC

21

21

20

20

NOTE 5 19

NOTE 5 19

SPARE

SPARE

SPARE

SPARE

18

18

41-SWG82320

6.6kV, 630A, 3+E, 31.5kA RMS SYM FOR 3 Secs

41-SWG82321

6.6kV, 630A, 3+E, 31.5kA RMS SYM FOR 3 Secs

17

NOTE 2

NOTE 2 40-XF82371 6.6kV/420V 1.6MVA ONAN Dyn11 100A 315A 315A 100A 315A 315A

17

FUTURE
16

40-XF82370 6.6kV/420V 1.6MVA ONAN Dyn11

16

40-EJB82310
NOTE 4 15 NOTE 4 HGCP HV INTERFACE JUNCTION BOX

40-EJB82311
HGCP HV INTERFACE JUNCTION BOX 15

BOOSTER COMPRESSOR MAIN LV 40-BD82270 SWITCHROOM 40-LER81170

40-BD82271

M
3~

RTD

FUTURE ANGORE WELLPAD FEEDER


14

14

NOTE 1 ATS NC 40-SWG82270 NC 80kA FOR 1 Sec NO

FIRE WATER PUMP OPERATIONS ROTATOR COMMUNITY SWITCHROOM 41-LER81120 PACKAGE


40-PFW41102 (550kW)

13

13

12

NC

NC

NC

NC 41-XF82310 6.6kV/420V 750kVA ONAN Dyn11 Z=5% 41-XF82311 41-XF82320 41-XF82321 41-XF82322 6.6kV/420V 6.6kV/420V 2MVA ONAN 2MVA ONAN Dyn11 Dyn11 Z=6.25% Z=6.25% 41-XF82323 6.6kV/420V 2MVA ONAN Dyn11 Z=6.25%

12

11

6.6kV/420V 6.6kV/420V 750kVA ONAN 2MVA ONAN Dyn11 Dyn11 Z=5% Z=6.25%

11

NOTE 4

NOTE 4

NOTE 4 41-BD82220

NOTE 4 41-BD82221

NOTE 4 41-BD82222

NOTE 4 41-BD82223 10

BOOSTER COMPRESSOR No.1


10

NC 40-MCC82272 NO

NC 40-MCC82273 NOTE 1 ATS

LV SWITCHROOM 40-LER65710

NOTE 1 ATS NC NC NC NC

NOTE 1 ATS NC 9

NC

41-SWG82210 8

NO

41-SWG82211

41-SWG82220

NO

41-SWG82221

41-SWG82222

NO

41-SWG82223 8

BOOSTER COMPRESSOR No.2 LV SWITCHROOM 40-LER65720

NC 40-MCC82274 NO

NC 40-MCC82275

400V, 1600A, 3+N+E, 80kA FOR 1 Sec

400V, 3500A, 3+N+E, 80kA FOR 1 Sec

400V, 3500A, 3+N+E, 80kA FOR 1 Sec

INDUSTRIAL PARK LV SWITCHROOM 41-LER81110


45SWG82320 45SWG82330 45SWG82340

ESSENTIAL & HVAC SERVICES


45SWG82350

NON-ESSENTIAL SERVICES
45SWG82360 45SWG82370 7

6 25A 25A 25A 25A 25A 25A

5 45-XF82320 6.6kV/420V 100kVA ONAN Dyn11 Z=4% 45-XF82330 6.6kV/420V 100kVA ONAN Dyn11 Z=4% 45-XF82340 6.6kV/420V 100kVA ONAN Dyn11 Z=4% 45-XF82350 6.6kV/420V 100kVA ONAN Dyn11 Z=4% 45-XF82360 6.6kV/420V 100kVA ONAN Dyn11 Z=4% 45-XF82370 6.6kV/420V 100kVA ONAN Dyn11 Z=4%

NOTES:
3 1. 2. AUTO TRANSFER SYSTEM SHALL BE INHIBITED UNDER FAULT CONDITIONS. CABLES SHALL BE RUN TO TRANSFORMER LOCATION, COILED, LABELLED AND SECURED FOR FUTURE CONNECTION.

NOTE 4

NOTE 4

NOTE 4

NOTE 4

NOTE 4

NOTE 4 3

c : \ p d f ma k e r \ P DF MAKE R I N\ 5 6 7 7 7 2 6 3 _8 . DW G 2 0 1 1 0 9 1 2 0 3 : 46

3.

SURGE PROTECTION TO BE INSTALLED WHERE REQUIRED FOR LIGHTNING OVERVOLTAGES/SWITCHING TRANSIENTS. 45-DP82820

NC 45-DP82830

NC 45-DP82840

NC 45-DP82850

NC 45-DP82860

NC 45-DP82870

NC

4. 5. 1 6.

LV SYSTEM EARTHED VIA MEN LINKS LOCATED IN LV SWITCHBOARDS. SPARE WELLPAD FEEDER USED DURING BUSBAR MAINTENANCE. IN ESSENTIAL MODE HV FEEDER U/V PROTECTION IS DISABLED & FEEDERS/LOADS ARE RE-ENERGIZED SEQUENTIALLY. 400V, 160A, 3+N+E, 10kA FOR 1 Sec 400V, 160A, 3+N+E, 10kA FOR 1 Sec 400V, 160A, 3+N+E, 10kA FOR 1 Sec 400V, 160A, 3+N+E, 10kA FOR 1 Sec 400V, 160A, 3+N+E, 10kA FOR 1 Sec 400V, 160A, 3+N+E, 10kA FOR 1 Sec 1

HIDES WELLPAD B 45-LER71220

HIDES WELLPAD C 45-LER71230

HIDES WELLPAD D 45-LER71240

HIDES WELLPAD E 45-LER71250

HIDES WELLPAD F 45-LER71260

HIDES WELLPAD G 45-LER71270


0

PNG LNG PROJECT


0 PGHU-CV-EDECI-450001 PGHU-CV-EDECI-414001~02/415001 PGHU-CV-EDECI-400005 TO 400006 PGHU-CV-EDECI-400003 TO 400004 PGHU-CV-EDSYM-000001 PGHU-CV-EDSLD-400001 REFERENCE DRAWING NUMBER WELLPADS PROTECTION & METERING DIAGRAM AREA 41 PROTECTION AND METERING DIAGRAMS LV PROTECTION AND METERING DIAGRAMS HV PROTECTION AND METERING DIAGRAMS ELECTRICAL CIRCUIT SYMBOLS & EQUIPMENT DESIGNATIONS LEGEND SHEET SINGLE LINE DIAGRAM HGCP AREA POWER RETICULATION SHEET 1 REFERENCE DRAWING TITLE G F REV 07MAY10 10MAR10 DATE J I H 28OCT10 05OCT10 07JUN10 ISSUED FOR CONSTRUCTION ISSUED FOR DESIGN ISSUED FOR CLIENT REVIEW RE-ISSUED FOR INFORMATION (FIRE WATER PUMP STARTER MOVED TO VENDOR PACKAGE) ISSUED FOR INFORMATION ISSUED FOR IDR REVISION DESCRIPTION AA MC BY KFT KFT CHD LRP LRP ENG JA JA APPD MAV MRC MRC AA DF LRP LRP KFT JA/KC JA KC LRP CW ME JA JA

SINGLE LINE DIAGRAM HIDES GAS CONDITIONING PLANT Esso Highlands Limited CBI Clough JV
DRAWING NO:

AREA POWER RETICULATION (SHEET 2 OF 2)


DRAWN BY DATE SCALE CKD KFT JA REVISION

MC

10MAR10

NONE

APPD

EPC4: HGCP and WELLPADS PROJECT


19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

PGHU-CV-EDSLD-400002
36 37 38 39 40

0
A1

10

11

12

13

14

15

16

17

18

41

Vous aimerez peut-être aussi